Technical Evaluation for Fuel Oil System-sent 12th Jan-2016

Embed Size (px)

Citation preview

  • 8/18/2019 Technical Evaluation for Fuel Oil System-sent 12th Jan-2016

    1/15

  • 8/18/2019 Technical Evaluation for Fuel Oil System-sent 12th Jan-2016

    2/15

  • 8/18/2019 Technical Evaluation for Fuel Oil System-sent 12th Jan-2016

    3/15

  • 8/18/2019 Technical Evaluation for Fuel Oil System-sent 12th Jan-2016

    4/15

  • 8/18/2019 Technical Evaluation for Fuel Oil System-sent 12th Jan-2016

    5/15

  • 8/18/2019 Technical Evaluation for Fuel Oil System-sent 12th Jan-2016

    6/15

  • 8/18/2019 Technical Evaluation for Fuel Oil System-sent 12th Jan-2016

    7/15

  • 8/18/2019 Technical Evaluation for Fuel Oil System-sent 12th Jan-2016

    8/15

  • 8/18/2019 Technical Evaluation for Fuel Oil System-sent 12th Jan-2016

    9/15

  • 8/18/2019 Technical Evaluation for Fuel Oil System-sent 12th Jan-2016

    10/15

  • 8/18/2019 Technical Evaluation for Fuel Oil System-sent 12th Jan-2016

    11/15

  • 8/18/2019 Technical Evaluation for Fuel Oil System-sent 12th Jan-2016

    12/15

  • 8/18/2019 Technical Evaluation for Fuel Oil System-sent 12th Jan-2016

    13/15

    Sr. NO. DESCRIPTION UNIT NPPL/KVK/MEIL/TPSC SPEC.XICON

    offer no: 16/456/NB/RGK andfurther Email correspondences

    THERMOSYSTEMSoffer no: T2004 and further Email

    correspondences

    SRI & SRI Engineersoffer no: SRI/MEIL/1907Aand further Email

    correspondencesRemarks

    PROJECT : 2 x 150 MW TPP,Nagapatinnam , Tamilnadu

    Specification no.M-TNI1-527-11-0001,Rev-3

    Ammendment dated 30th september-2015 and further replies on clarifications

    TECHNICAL BID EVALUATION REPORT - Fuel Oil Syst em

    1 INo .. x 250 KL LDO storagetank

    Xicon thermosystems

    2 INo. x 5 KL drain Oil tank. Xicon thermosystems

    33 Nos. unloading points forunloading LDOfrom roadtankers (as per P& ID)

    Xicon thermosystems

    4LDO unloading system whichincluded pumps,strainers, valves, pipes, fittingsetc.

    Xicon thermosystems

    5

    LDO forwarding system uptoBoiler which includedpumps, strainers, valves, pipes,fittings etc.

    Xicon thermosystems

    6 Drain oil system Xicon thermosystems

    7 MCC for supplied equipments Client Client

    8 Incoming cable to MCC Client Client9 Power cables Client thermosystems

    10 Control cables from LPBS toMCC Client Client

    11 Flameproof local push buttonstation

    Client Client

    12Instrumentation cable up to localcontrol panel

    Client

    Noted and considered relay based LCPin our revised offer.Further distribution from LCP to DCS,MCC is in purchaser's scope.

    13Cable tray for control andinstrumentation cables

    Client considered upto junction box

    14Relay logic based LCP at pumphouse

    Client

    Noted and considered relay based LCPin our revised offer.Further distribution from LCP to DCS,MCC is in purchaser's scope.

    15Interconnection betweenDDCIMS and bidder'sinstruments and panel

    Client Client

    16 Below ground earthing ofequipments

    Client Client

    17 Above ground earthing ofequipments

    Client Client

    18 Illumjnation Client Client19 Lightning protection Client Client20 Foundation bolts for tanks Xicon thermosystems

    21 All civil works including insertplates,grouting etc

    Client Client

    This scope matrix is not given by bidder

    22 Structural work likepiperack,trestles,bridges etc

    Client Client

    13 of 15

  • 8/18/2019 Technical Evaluation for Fuel Oil System-sent 12th Jan-2016

    14/15

    Sr. NO. DESCRIPTION UNIT NPPL/KVK/MEIL/TPSC SPEC.XICON

    offer no: 16/456/NB/RGK andfurther Email correspondences

    THERMOSYSTEMSoffer no: T2004 and further Email

    correspondences

    SRI & SRI Engineersoffer no: SRI/MEIL/1907Aand further Email

    correspondencesRemarks

    PROJECT : 2 x 150 MW TPP,Nagapatinnam , Tamilnadu

    Specification no.M-TNI1-527-11-0001,Rev-3

    Ammendment dated 30th september-2015 and further replies on clarifications

    TECHNICAL BID EVALUATION REPORT - Fuel Oil Syst em

    23 Oil water collection sump Client Client

    25 Waste water pump Client Client

    26 Design and supply of OWS &mechanical components

    Client Client

    27 Effluent treatment Client Client28 Service water piping Client Client

    29

    Instrument air piping inside and

    outside dyke area and pumphouse Client Client

    30 Monorail hoist 2T capacity Xicon thermosystems31 Service air piping Client Client32 Construction water Client Client33 Construction power Client Client34 CCOE approval Xicon thermosystems

    35 Local NOC for CCOE approval Client client

    36 All other statutory approval client thermosystems

    38 Recommended spares for 2years operation

    Xicon Not applicable. As most of spares arecovered in Mandatory spares.

    39 Commissioning spares Xicon,pls obtain the list of spares Fasteners and gaskets required forcommissioning is considered

    40 Cathodic protection Client Client

    41 Fire fighting system Client Client

    H Ter mi nal Po in t

    1 LDO inlet 1) At the outlet of Road Tanker 1) At the outlet of Road Tanker

    2 LDO outlet2) At Terminal Point Near Boiler asper specification

    LDO will be terminated near to boiler #1.Piping to Boiler #2 will be in the

    purchasers scope.

    3 Drain 3.All drains to drain oil tank3.Drain from fuel oil are to drain oil tankincluding piping,accessories are inbidders scope.

    IPERFORMANCEGUARANTEES

    1 LDO unloading pump cum/hr 25 25 25Guaranteed head of LDOunloading pump

    m 30 25 10

    Guaranteed auxiliary power

    consumption of LDO unloadingpump

    kw 7.5 7.5 15

    2 LDO forwarding pump cum/hr 23 23 23Guaranteed head of LDO m 240 180 25 kg/cm 2

    Terminal point details not furnished

    14 of 15

  • 8/18/2019 Technical Evaluation for Fuel Oil System-sent 12th Jan-2016

    15/15

    Sr. NO. DESCRIPTION UNIT NPPL/KVK/MEIL/TPSC SPEC.XICON

    offer no: 16/456/NB/RGK andfurther Email correspondences

    THERMOSYSTEMSoffer no: T2004 and further Email

    correspondences

    SRI & SRI Engineersoffer no: SRI/MEIL/1907Aand further Email

    correspondencesRemarks

    PROJECT : 2 x 150 MW TPP,Nagapatinnam , Tamilnadu

    Specification no.M-TNI1-527-11-0001,Rev-3

    Ammendment dated 30th september-2015 and further replies on clarifications

    TECHNICAL BID EVALUATION REPORT - Fuel Oil Syst em

    Guaranteed auxiliary power

    pump3 Drain oil pump cum/hr 5 5

    Guaranteed head of drain oilpump

    m 30 10 Drain sump pump not considered in scope bySSEC

    Guaranteed auxiliary powerconsumption of drain oil pump

    kw 2.2 2.2Drain sump pump not considered in scope bySSEC

    J Tec hn ic al Ran ki ng 1 st -XICON 2nd -THERMOSYSTEMS 3 rd - SRI & SRI ENGINEERS

    Thermosystem also supported but someof the technical datas are irrelevant and

    K Tec hn ic al Co nc lu si on

    XICON has given sufficienttechnical datas from the initial

    stage and supporting us byproviding relevant information forour clarifications.

    ,are open and bidder mentioned thatthey will furnish during detailengineering.

    LDO forwarding pump head shall besame as XICON.

    Drain oil pump head shall be same asXICON

    We suggest, not to consider SSEC offerconsidering the limited technical datas and limited

    support by them.If they are commerciallysuitable,we need to get many technical itemsconfirmed from them.