Tech spec E4691027R.K.MEENA 12.07.19 REV DATE ALT REV- DATE ALT- REV 00 NAME SIGN DATE confirming to...
3
Tech spec E4691027R.K.MEENA 12.07.19 REV DATE ALT REV- DATE ALT- REV 00 NAME SIGN DATE confirming to I 61850 through Fibre Optic (PO) port. O utput ot tne system snall De brought to