31
TCM PowerLink Diagnostics & Simulation presented by: John Barton Senior V.P. Of Engineering Teledyne Continental Motors January 2007

TCM PowerLink Diagnostics & Simulation - · PDF fileFADEC - Customer Value • Starting Ease • Reduced Pilot Workload • Reduced Fuel Burn • Reduced Maintenance Cost • General

Embed Size (px)

Citation preview

Page 1: TCM PowerLink Diagnostics & Simulation - · PDF fileFADEC - Customer Value • Starting Ease • Reduced Pilot Workload • Reduced Fuel Burn • Reduced Maintenance Cost • General

TCM PowerLinkDiagnostics & Simulation

presented by: John Barton Senior V.P. Of EngineeringTeledyne Continental Motors

January 2007

Page 2: TCM PowerLink Diagnostics & Simulation - · PDF fileFADEC - Customer Value • Starting Ease • Reduced Pilot Workload • Reduced Fuel Burn • Reduced Maintenance Cost • General

Overview

• System Description

• Maintenance System

• Data Analysis

• Simulation

Page 3: TCM PowerLink Diagnostics & Simulation - · PDF fileFADEC - Customer Value • Starting Ease • Reduced Pilot Workload • Reduced Fuel Burn • Reduced Maintenance Cost • General
Page 4: TCM PowerLink Diagnostics & Simulation - · PDF fileFADEC - Customer Value • Starting Ease • Reduced Pilot Workload • Reduced Fuel Burn • Reduced Maintenance Cost • General

FADEC FADEC -- Customer ValueCustomer Value

•• Starting EaseStarting Ease

•• Reduced Pilot WorkloadReduced Pilot Workload

•• Reduced Fuel BurnReduced Fuel Burn

•• Reduced Maintenance CostReduced Maintenance Cost

•• General Engine Health General Engine Health IncreasedIncreased

•• Monitors and Controls Monitors and Controls Critical Engine ParametersCritical Engine Parameters

•• Data Port for Maintenance Data Port for Maintenance and Display Interfacesand Display Interfaces

Page 5: TCM PowerLink Diagnostics & Simulation - · PDF fileFADEC - Customer Value • Starting Ease • Reduced Pilot Workload • Reduced Fuel Burn • Reduced Maintenance Cost • General

FADEC Operating MethodFADEC Operating Method

Typical EGT Mixture Ratio Curve

1250

1300

1350

1400

1450

1500

1550

50 55 60 65 70 75 80 85 90

Fuel Flow (pph)

EGT

(°F)

Best Power, Rich of Peak

Stoichiometric, Peak EGT

Best Economy, Lean of Peak

• Closed Loop on EGT in Cruise - Absolute Mixture Detection

and Control• Individual Cylinder

Control• Best Power for Takeoff,

Climb, and Max Cruise

• Best Economy for Normal Cruise

• Mixture Modified as Required for Cylinder Temps, Detonation or T.I.T. Limiting

Page 6: TCM PowerLink Diagnostics & Simulation - · PDF fileFADEC - Customer Value • Starting Ease • Reduced Pilot Workload • Reduced Fuel Burn • Reduced Maintenance Cost • General

Component Array for 4-Cylinder Engine

Page 7: TCM PowerLink Diagnostics & Simulation - · PDF fileFADEC - Customer Value • Starting Ease • Reduced Pilot Workload • Reduced Fuel Burn • Reduced Maintenance Cost • General

Manifold Pressure Sensors

Manifold Air Temp Sensors

Fuel Pressure Sensors

CHT & EGT Sensors

Page 8: TCM PowerLink Diagnostics & Simulation - · PDF fileFADEC - Customer Value • Starting Ease • Reduced Pilot Workload • Reduced Fuel Burn • Reduced Maintenance Cost • General

Four Cylinder FADEC System

Page 9: TCM PowerLink Diagnostics & Simulation - · PDF fileFADEC - Customer Value • Starting Ease • Reduced Pilot Workload • Reduced Fuel Burn • Reduced Maintenance Cost • General

Six Cylinder FADEC System

Page 10: TCM PowerLink Diagnostics & Simulation - · PDF fileFADEC - Customer Value • Starting Ease • Reduced Pilot Workload • Reduced Fuel Burn • Reduced Maintenance Cost • General

PowerLinkTM V2 Engine Data Processing and Service Support System ConfigurationFADEC SYSTEM BLOCK DIAGRAM

FIREWALL

LOW VOLTAGE HARNESS

HIGH VOLTAGE HARNESS

Secondary Power

Primary Power

Starter

CABIN HARNESS

J6

J7

J8

ECP

EngineSensor

Package AnalogInputs

Conventional EngineDisplays[Optional]

LEVEL 2 DIAGNOSTICCAPABILITY LEVEL 3 DIAGNOSTIC

CAPABILITY

ECU 1

ECU 2

ECU 3

P6

P7

P8

IOF or TSIOFENGINE

MFD

Starter Relay

Pow

er, E

nabl

es, F

aults

SERIAL BUSCONTROLLER

ENGINEDATA

INTERFACE(EDI)

LEVEL 1 DIAGNOSTICCAPABILITY

RS-232

CompactFlashCard

Fault FileDownload

Real-TimeDiagnostics

Raw Data & FaultsRS-232

RS-485

A/D

D/A

RS-232

D/A & PulseOutputs

RS-232

Fuel Flow,MOP,MOT,OAT,OAP,TIT,UDP,UDT,CDP,DPCASE,

DPCYL,Vibrations

Correct & TotalFuel Flow

&Calculate %Power

--------------Average Multiple

Channel Parameters

PFD

FBO Fault History AnalysisImplemented by removingCompactFlash Card and

installing in PocketPC PDA

RS-232

Level 3 AnalysisImplemented by removingCompactFlash Card and

installing in standard readerfor TCMLink upload

RS-232

Real-TimeBlended Data & Faults

RS-232

Identical RS232 DataTransmissions

Real-TimeBlended Data & Faults

RS-232

BOOST PUMPCOMMAND

REMOTESHUTDOWN

Page 11: TCM PowerLink Diagnostics & Simulation - · PDF fileFADEC - Customer Value • Starting Ease • Reduced Pilot Workload • Reduced Fuel Burn • Reduced Maintenance Cost • General

Engine Control Panel& Data Display

Page 12: TCM PowerLink Diagnostics & Simulation - · PDF fileFADEC - Customer Value • Starting Ease • Reduced Pilot Workload • Reduced Fuel Burn • Reduced Maintenance Cost • General

Engine Control Panel –ECP-

• FADEC Faults• Low Fuel Pressure• Boost Pump On• Electrical Power• Over Temp Cylinders• Oil Pressure• Oil Temperature

Page 13: TCM PowerLink Diagnostics & Simulation - · PDF fileFADEC - Customer Value • Starting Ease • Reduced Pilot Workload • Reduced Fuel Burn • Reduced Maintenance Cost • General

Signal ConditioningSerial Bus Controller (SBC)

• SBC Inputs Digital & Analog Data

– FADEC

– Analog Sensors

– Multi-function Displays

– Arinc 429 data

Page 14: TCM PowerLink Diagnostics & Simulation - · PDF fileFADEC - Customer Value • Starting Ease • Reduced Pilot Workload • Reduced Fuel Burn • Reduced Maintenance Cost • General

Signal ConditioningSerial Bus Controller (SBC)

• SBC Outputs Digital & Analog Data– Multi-Function Displays

– Gauges

– Cautions & Warning Lights

– Cowl Flap Controller

– Engine Data Interface

– Removable Data Module

Page 15: TCM PowerLink Diagnostics & Simulation - · PDF fileFADEC - Customer Value • Starting Ease • Reduced Pilot Workload • Reduced Fuel Burn • Reduced Maintenance Cost • General

Operational Simplicity

• Automatic Mixture Control

• Automatic Boost Pump Control

• Automatic Cowl Flap Control

• Automatic Electrical Power System

Page 16: TCM PowerLink Diagnostics & Simulation - · PDF fileFADEC - Customer Value • Starting Ease • Reduced Pilot Workload • Reduced Fuel Burn • Reduced Maintenance Cost • General

Engine Data Interface

• Captures Engine Data– Time and Date– Event History– Individual Cylinders– Outside Air Pressure– Fuel Flow– Faults

EDI

Compact Flash Data Storage

Page 17: TCM PowerLink Diagnostics & Simulation - · PDF fileFADEC - Customer Value • Starting Ease • Reduced Pilot Workload • Reduced Fuel Burn • Reduced Maintenance Cost • General

ALPHA MAINTENANCE SYSTEM

• Data Recording System• Engine Trend

Monitoring• On Condition

Maintenance• Glass Panel Displays

Page 18: TCM PowerLink Diagnostics & Simulation - · PDF fileFADEC - Customer Value • Starting Ease • Reduced Pilot Workload • Reduced Fuel Burn • Reduced Maintenance Cost • General

LEVEL I DIAGNOSTICS

MULTIFUNCTION DISPLAY

LEVEL I DIAGNOSTICS• REAL-TIME, IN-FLIGHT HIGH LEVEL

FAULT ANNUNCIATION

• REAL-TIME FAULT AND ENGINE PARAMETER DATA DISPLAY

• GROUND-BASED DIAGNOSTIC SOFTWARE WITH LIVE DATA FEED TO TCM

Low Power Cruise

FADEC CAUTIONFUEL PRESSURE SENSOR FAULT

PowerLinkTM Engine Control Panel

Level I DIAGNOSTIC SOFTWARE

PROPRIETARY INFORMATIONThe information contained in or disclosed by this document is considered proprietary by Teledyne Continental Motors. This document and the items and information contained or disclosed herein shall not be used, copied or reproduced in whole or in part, nor shall the contents be revealed in any manner unless written permission is obtained from Teledyne Continental M t

Page 19: TCM PowerLink Diagnostics & Simulation - · PDF fileFADEC - Customer Value • Starting Ease • Reduced Pilot Workload • Reduced Fuel Burn • Reduced Maintenance Cost • General

A LOT OF DATA• Each Cylinder’s Control Computer transmits 30 Parameters and 96 Status Bits

• 4 Cylinder Engines: 120 parameters and 384 Status Bits every 0.88 seconds

• 6 Cylinder Engines: 180 parameters and 576 Status Bits every 1.32 seconds

STABILITY CALIBRATE(Leaning)

PartiallyComplete

COMPLETE(Optimized)

MIXTURE OPTIMIZATION PROCESS DISPLAY

PROPRIETARY INFORMATIONThe information contained in or disclosed by this document is considered proprietary by Teledyne Continental Motors. This document and the items and information contained or disclosed herein shall not be used, copied or reproduced in whole or in part, nor shall the contents be revealed in any manner unless written permission is obtained from Teledyne Continental M t

Page 20: TCM PowerLink Diagnostics & Simulation - · PDF fileFADEC - Customer Value • Starting Ease • Reduced Pilot Workload • Reduced Fuel Burn • Reduced Maintenance Cost • General

LEVEL II DIAGNOSTICS

STATISTICS FAULT DIAGNOSIS & TROUBLESHOOTING EXCEEDANCES

ENGINE DATA INTERFACE(EDI)

CompactFlash Data Storage

LEVEL II DIAGNOSTICS• ENGINE RUNTIME LOG

• OFF-LINE DETAILED FAULT LISTING

• OFF-LINE FAULT TROUBLESHOOTING AID

• EXCEEDANCE LISTING

Page 21: TCM PowerLink Diagnostics & Simulation - · PDF fileFADEC - Customer Value • Starting Ease • Reduced Pilot Workload • Reduced Fuel Burn • Reduced Maintenance Cost • General

REPORTSRECOMMENDATIONS

CHECKLISTTRANSIENT ANALYSIS

FAULT HISTORY ANALYSIS

www.tcmlink.comTCM Control Center

STEADY STATESTATISTICAL ANALYSIS TREND ANALYSIS

AUTOMATED FLIGHT DATA ANALYSIS ROUTINES

INTERNET

PowerLinkTM V2 LEVEL 3 DIAGNOSTICSPowerLinkTM LEVEL III ANALYSIS

PROPRIETARY INFORMATIONThe information contained in or disclosed by this document is considered proprietary by Teledyne Continental Motors. This document and the items and information contained or disclosed herein shall not be used, copied or reproduced in whole or in part, nor shall the contents be revealed in any manner unless written permission is obtained from Teledyne Continental M t

Page 22: TCM PowerLink Diagnostics & Simulation - · PDF fileFADEC - Customer Value • Starting Ease • Reduced Pilot Workload • Reduced Fuel Burn • Reduced Maintenance Cost • General

PowerLinkTM LEVEL III DIAGNOSTICS

• Integrated Analysis System including– Complete Level 3 Analysis– Oil Analysis– Cylinder Compression Analysis– Call Center Data

• Fully Integrated TCM Engine Performance Diagnostic and Analysis System TCMLink-based Factory Full Service Performance Analysis System

• Requires TCMLink interface and integration of customer service databases

PROPRIETARY INFORMATIONThe information contained in or disclosed by this document is considered proprietary by Teledyne Continental Motors. This document and the items and information contained or disclosed herein shall not be used, copied or reproduced in whole or in part, nor shall the contents be revealed in any manner unless written permission is obtained from Teledyne Continental M t

Page 23: TCM PowerLink Diagnostics & Simulation - · PDF fileFADEC - Customer Value • Starting Ease • Reduced Pilot Workload • Reduced Fuel Burn • Reduced Maintenance Cost • General
Page 24: TCM PowerLink Diagnostics & Simulation - · PDF fileFADEC - Customer Value • Starting Ease • Reduced Pilot Workload • Reduced Fuel Burn • Reduced Maintenance Cost • General

Maintenance Summary

• Real-Time Cautions/Warnings• Ground Trouble-Shooting with PDA/Laptop• Data transfer to TCM

– Technical Expertise– Trend Monitoring

• On-Condition Replacements• Extended TBO’S• Normal Condition Validation

Page 25: TCM PowerLink Diagnostics & Simulation - · PDF fileFADEC - Customer Value • Starting Ease • Reduced Pilot Workload • Reduced Fuel Burn • Reduced Maintenance Cost • General

Removable Data Module –RDM-

• Captures Engine Data• Incorporates Aircraft Data – 80 Parameters

– GPS Location– Airspeed– Altitude– Fuel Level– Other as required

Page 26: TCM PowerLink Diagnostics & Simulation - · PDF fileFADEC - Customer Value • Starting Ease • Reduced Pilot Workload • Reduced Fuel Burn • Reduced Maintenance Cost • General

PowerLink™ RDM Retrievable Engine Parameters

Engine Data Display - Caution

Page 27: TCM PowerLink Diagnostics & Simulation - · PDF fileFADEC - Customer Value • Starting Ease • Reduced Pilot Workload • Reduced Fuel Burn • Reduced Maintenance Cost • General

PowerLink™ RDM Plotted Parameters

Page 28: TCM PowerLink Diagnostics & Simulation - · PDF fileFADEC - Customer Value • Starting Ease • Reduced Pilot Workload • Reduced Fuel Burn • Reduced Maintenance Cost • General

Development Programs

Simulations- Aircraft Flight Paths

- Ground Display

- Weather Displays

Page 29: TCM PowerLink Diagnostics & Simulation - · PDF fileFADEC - Customer Value • Starting Ease • Reduced Pilot Workload • Reduced Fuel Burn • Reduced Maintenance Cost • General

Development Programs

In-flight Aircraft Downlinks- Data from RDM and EDI is securely transmitted via wireless and

continuously updating an aircraft information database located at

Teledyne Continental Motors and or Airframe manufactures.

- Database immediately accessible to recognizing faults.

- Flight data comparison between recent flights and base line

engine data.

- Maintenance activity can become on demand using data analysis

- Extended TBO based on recorded data and compared to base lines.

- Gather Data, Analyze Data, Trend Data, Provide Recommendation

on Data.

Page 30: TCM PowerLink Diagnostics & Simulation - · PDF fileFADEC - Customer Value • Starting Ease • Reduced Pilot Workload • Reduced Fuel Burn • Reduced Maintenance Cost • General

ALPHA SERVICE SYSTEMFlight Reconstruction

Page 31: TCM PowerLink Diagnostics & Simulation - · PDF fileFADEC - Customer Value • Starting Ease • Reduced Pilot Workload • Reduced Fuel Burn • Reduced Maintenance Cost • General

QUESTIONS?