1
Superconducting Solenoid: KEK designed and constructed a supercond ucting solenoid which provides a 2 Tesl a field for ATLAS Inner Detector region. The coil is specially designed to minimi ze its thickness while keeping enough sa fety. After completed at Toshiba, it was shipped to CERN in 2001. After integrate d with LAr calorimeter and test, the coi l was installed in ATLAS detector. The t est at final position was successful on 1 Aug. 2006. L H C International Collaboration on the LHC Project International Collaboration on the LHC Project A T L A S LHC Superconducting Magnet s: KEK developed and completed 19 superconduc ting quad magnets MQXA. These 6.5m-long m agnets with the field gradient of 215 Tesl a/m will be used to focus the LHC beams at the high-luminosity interaction points. T he construction started in Jun. 2001 and e nded in Jan. 2004. The measurements at KEK showed their excellent field qualities. Al l magnets were shipped to Fermilab for ass embly and then transported to CERN for fin al installation in the LHC tunnel. Muon Detectors: KEK and Japanese universities (Tokyo, Ko be, TMU, Nagoya…) are in charge of constr uction of the muon system. For end-cap mu on triggering, 1,100 TGC s (t hin g ap wire c hamber) were manufactured at KEK, being tested at Kobe using cosmic-rays. TGC rea dout and Level-1 trigger electronics wer e designed and constructed by KEK, Kobe e tc. All chambers and electronics are bein g assembled into big-wheel at CERN. TDC A SIC chips AMT3 was designed by KEK for MDT readout. Silicon SCT Tracker: KEK designed and fabricated Cu/Polyimide hybrid circuits with efficient thermal removal capability. A high precision assembly technique was developed for positioning sensors within a few microns. KEK completed production and inspection of 980 barrel SCT modules (40% of all). Conductor winding at Toshiba Installation in progress in LHC tunnel Coil insertion to LAr cryo stat at CERN (2004.2.27) Coil completed at Toshiba (1999.12.7) Celebrating successful test at final position in ATLAS pit (2006.8.1) TGC construction at KEK TGC sector assembly at CERN 24ch TDC ASIC chips AMT3 was designed by KEK for MDT readout. AMT3 TGC big-wheels are being assembled in the ATLAS pit. Sensor bonding and inspection at KEK 980 modules assembled and inspected by KEK Module assembly at Oxford using KEK robot. http://atlas.kek.jp/sub/poster

Superconducting Solenoid:

  • Upload
    river

  • View
    47

  • Download
    2

Embed Size (px)

DESCRIPTION

International Collaboration on the LHC Project. http://atlas.kek.jp/sub/poster. L H C. LHC Superconducting Magnets: - PowerPoint PPT Presentation

Citation preview

Page 1: Superconducting Solenoid:

Superconducting Solenoid: KEK designed and constructed a superconducting solenoid which provides a 2 Tesla field for ATLAS Inner Detector region. The coil is specially designed to minimize its thickness while keeping enough safety. After completed at Toshiba, it was shipped to CERN in 2001. After integrated with LAr calorimeter and test, the coil was installed in ATLAS detector. The test at final position was successful on 1 Aug. 2006.

L  H   C

International Collaboration on the LHC International Collaboration on the LHC ProjectProject

A T L A S 

LHC Superconducting Magnets: KEK developed and completed 19 superconducting quad magnets MQXA. These 6.5m-long magnets with the field gradient of 215 Tesla/m will be used to focus the LHC beams at the high-luminosity interaction points. The construction started in Jun. 2001 and ended in Jan. 2004. The measurements at KEK showed their excellent field qualities. All magnets were shipped to Fermilab for assembly and then transported to CERN for final installation in the LHC tunnel.

Muon Detectors: KEK and Japanese universities (Tokyo, Kobe, TMU, Nagoya…) are in charge of construction of the muon system. For end-cap muon triggering, 1,100 TGCs (thin gap wire chamber) were manufactured at KEK, being tested at Kobe using cosmic-rays. TGC readout and Level-1 trigger electronics were designed and constructed by KEK, Kobe etc. All chambers and electronics are being assembled into big-wheel at CERN. TDC ASIC chips AMT3 was designed by KEK for MDT readout.

Silicon SCT Tracker: KEK designed and fabricated Cu/Polyimide hybrid circuits with efficient thermal removal capability. A high precision assembly technique was developed for positioning sensors within a few microns. KEK completed production and inspection of 980 barrel SCT modules (40% of all).

Conductor winding

at Toshiba

Installation in progress in LHC tunnel

Coil insertion to LAr cryostat at CERN (2004.2.27)

Coil completed

at Toshiba

(1999.12.7)

Celebratingsuccessful

test at final position in ATLAS pit(2006.8.1)

TGC construction at KEK

TGC sector assembly at CERN

24ch TDC ASIC chips AMT3 was designed by KEK for MDT readout.

AMT3TGC big-wheels are beingassembled in the ATLAS

pit.

Sensor bonding andinspection at KEK

980 modules assembled and inspected by KEK

Module assembly at Oxford using KEK

robot.

http://atlas.kek.jp/sub/poster