Reducing Energy Consumption on Indian Railways : Key Initiatives and Opportunities
Energy conservation activities on IR have led to a saving of about Rs. 2600 crores in last 5 years in Electric Traction
• It has reduced consumption by > 3.3 % on yr to yr in Electric Traction
• By about 2% in non traction despite a growth in load by 5%
• With PAT scheme in force the industry has achieved savings of about 1.3 % per yr from 2012-15.
• No other organization has matched the performance of Railways
• Bagged 64 National Energy Conservation Awards in the last 5 years, with 22 “Awards” in 2013, highest by any single org.
• Appreciate these works in the light of financial crunch and challenges of Governmental systems
• Development of web based software ‘Rail Saver’ for energy conservation.
Actions initiated earlier • Introduction of 3 Phase technology in Electric
Locos and Electric Multiple Units • On date out of about 5000 locos, 800 are
three phase based.• Further improve the 3 phase technology -
Going for IGBT based system from GTO• Improving Driving techniques in use of
regenerative braking• Use of power factor improving techniques. • Use of high efficiency transformers• Segregating of lighting circuits at platforms • Use of energy efficient CFL & T-5 luminaries.
What is next for an Org which pays 12000cr as electric bill (Consumes 17 Billion units) and has real Electricity consumption growth of about 7%
YEAR Expenditure on Power
(Electricity)
Expenditure on Fuel (Diesel)
Total
2009-10 5655 8922 14577
2010-11 6206 10556 16762
2011-12 7236 11601 18837
2012-13 8634 13749 22383
2013-14 9650 18875 28525
2014-15 10600 19226 29826
Growth of Traction Bill for Indian Railways
8
Vision of Hon’ble Minister of Railways
Power bill can be Reduced substantially using market forces
Railways to lead in Reducing Carbon footprints
Actions initiated to achieve this Vision
1. Further Improve Power utilization
2.Migrate from DISCOMs to GENCO
3. Go for Renewable Energy
Improve Power utilization - Strategy
• Introduction of latest technology in Traction and non Traction
• Use of Retrofit systems• Arrest leakages • Develop manpower skills • Closely work with the Industry to
develop innovative solutions• Develop IT based analysis tools• Develop investment management and
financing systems• Work on Energy policy development
Improve Power utilization - What is being done
• Switching to 100% production of three phase locomotives from next year and
• Progressively do the same for EMUs• Provide Training to loco pilots on Simulator• Analysis and monitoring of energy
consumption through Rail saver - a web portal• Retro-fitment of LED lights in Railway coaches • Optimal light control system at various
locations
Improve Power utilization - What is being done
• Implementation of SCADA system for major power supply systems
• Automation of pumping installations• Use of LED lighting• Procure star rating equipment- 3 star and
above• Energy auditing of major load centers. • Use of timers for high mast lighting and
sensors in offices• Going for Solar water heating system
LED Lights in EMUs
LED lights have been provided at stations
LED lights at Palanpur station
LED lights at Makarpura station
Improve Power utilization - Future Plans
• Switch to 100% three phase EMUs• Procure Train Sets • Go for High Horse power locos- 9000/
12000HP• Use of LED lighting only • Switch to 5 star equipment • Use Building management system extensively• Go for ECBC Compliant Buildings• Have new energy efficient designs for Railway
stations using renewal energy
Improve Power utilization - Future Plans
• Automate Train Operation- Optimize train operations - Pass trains can save up to 10% whereas the Freight trains up to 30 %
• Install Smart sense & smart Grid system• Switch to 100% Automatic light & fan control • Opt for SCADA system for major installations• Use of super efficient ceiling fans• Go for 2*25 KV system
INITIATIVES TO REDUCE ELECTRIC TRACTION BILL
Power trading: • Pilot project to procure electricity through
Exchange initiated in Haryana• Ground work for trading done in many other
Railways CR,WR, NR, SER, WCR etc.
Power through short term PPAs:
50 MW power of NTPC in NCR replaced through bilateral PPA - saving about Rs. 140 Cr. in a yr.
MEASURE TO REDUCE ELECTRIC TRACTION BILL
MEDIUM TERM
• Procurement of power through bi-lateral arrangement- PPA for 100 MW power signed with GUVNL
• 500 MW allocated from RGPPL• Procurement through Tenders: commercial
bids for 50 MW power from market opened • Technical bids for about 1000 MW called
MEASURE TO REDUCE ELECTRIC TRACTION BILL
LONG TERM - Dedicated Transmission lines with captive power plants:
• Work on Transmission corridors – Kanpur - Allahabad –Mughalsarai in progress
• Work for Transmission line from Sahibabad to Diwana is under progress
• Blue print for a 5000 Km transmission network in progress
Renewable Energy-Use Solar/Wind Power Potentials
AIMs: •To reduced the cost of Power for Railways
•Climate proofing of energy infrastructure
•Use Railway rooftop and land spaces
• Explore new potential areas- Railway land parallel to Tracks
Harnessing of renewable energy
• 10.5 MW wind plant installed in 2009 for ICF• Tender in progress for 10.5 MW wind plant SR• 25 Mw Wind plant will be ready in Oct 2015.• Tenders for 137 MW more will be issued soon• 10.085 MWp solar plants installed : With 1
MWp on roof of Katra railway station• Work on 6.5 MW solar units in progress• Will float tenders for 50 MW Solar units on
Roof Top soon
One MW Solar Plant at Katra Largest rooftop
plant in the IR
• About 3500 PV panels
• Power fed through local grid to all railway installation
Harnessing of renewable energy – Solar – Future Plans
Target to put up 1000 MW Solar plants up to 2019.
• 200 MW through VGF from MNRE under PSU scheme
• 250 MW by REMC through open bidding• 450 MW more on roof top and vacant
Railway land
Harnessing renewable energy - New Areas-
Solar Panels on the roof top of a coachUsing railway land parallel to tracks
Future Power need Scenario- 2032By 2032 – • With over 80% electrification, • 7000 RKm DFC network, • some new high speed (350 Kmph) corridors, • Numberof tracks at 160 to 200 Kmph &• Loading of > 4 billion MT (as per National
Transport Development Policy Committee)• Power requirement to go from 4000 MW to
15000 MW.
Future Scenario- 2032For sustainable growth • Power to be available at a competitive cost• Ensuring reliability - Railways to have its
transmission network of 10000 km &• Captive power plant for about 5000 MW- • Renewable generation of 3000- 5000 MW • With a judicious mix of renewable and
thermal power.
Renewals- Opportunities / Challenges ahead
• Assess potential sites • Developing technically feasible model as per Types of roofs, Land Patches- variable in Sizes• Address connectivity issues at 25 KV • Develop single phase inverters issue• Develop Railway specific designs- vibrations, security • Handle financing issues
Renewals- Opportunities / Challenges ahead
• Speedily implementation• Innovative solutions for Railway environment• Tackle issues of Obsolescence• Club initiative / innovation in the Governmental
environment• Remain competitive• Make available easy financing• Bring a cultural shift
Key opportunities
• Provide innovative solutions for energy saving• Develop energy consciousness in Staff - Training
for all• Leverage information technology to bring
cultural shift• Leverage technology to empower the customer• Introduce life cycle based costing
We will have to think Differently
Thank You
THANK YOU
32
“Railsaver” Website Screenshot – www.railsaver.gov.in
10.5 MW Wind Mill Project for ICF in the state of Tamil
Nadu commissioned in March 2009
This Wind Mill has so far generated 115.85 million units of electricity from the date of its commissioning.
30 KWp solar plant at Rail Bhawan inaugurated by Hon’ble MR and MoSR
Energy Reduction Programmes
• Energy management Energy purchasing Metering and billing Performance measurement Energy policy development Energy surveying and auditing Awareness-raising, training and education Capital investment management
Specific Energy Consumption for Electricity (in kWH/000
GTKMs) for Five Years from 2009-2010 to 2013-2014 S.No. Year Specific Energy
ConsumptionPassenger Reduction
in %Goods Reduction
in %
1 2009-10 19.6 7.29
2 2010-11 19.4 1.02 6.79 6.85
3 2011-12 19.0 2.06 6.43 5.30
4 2012-13 18.9 0.52 6.13 4.66
5 2013-14 18.9 0 6.00 2.12Average imp/det. For five years.
3.57 17.6
DSM Example: In Non-AC Coach Before DSM Post DSM
Load type Qty. Rating (W)
Load in
Watt
Load in Watt
Rating (W)
Qty. Load Type
Tube light 26 22.5 585 234 9 26 LED light
Gang way light 2 25 50 14 7 2 LED Gang way light
Total 635 248
There is around 61 % electrical load reduction in lighting