STOP! STOP! 16685 Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll free number: 1-800-577-9663 or email: [email protected] Our staff is ready to provide assistance April through October M-F 8:00 AM to 4:30 PM EST Saturday 8:30 AM to 4:30 PM EST November through March M - F 8:00 AM to 5:00 PM EST

STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

STOP!STOP!

16685

Call Us First!DO NOT RETURN TO STORE.

For immediate help with assembly or product informationcall our toll free number:

1-800-577-9663

or email:

[email protected]

Our staff is ready to provide assistance

April through October M-F 8:00 AM to 4:30 PM EST

Saturday 8:30 AM to 4:30 PM EST

November through March M - F 8:00 AM to 5:00 PM EST

Page 2: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

(This page intentionally left blank.)

Page 3: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

2/8/13

KEEP THIS MANUAL FOR FUTURE REFERENCE

ASSEMBLY MANUAL

BEFORE YOU BEGIN

IMPORTANT!READ INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING ASSEMBLY.

- CUSTOMER SERVICE -

Call: 1-800-577-96631-800-577-9663 email: [email protected]

ACTUAL FLOOR SIZE IS: 96 x 92-1/2" (243,8 x 235 cm)BELMONT 8' x 8' (244 x 244 cm) VALUE SERIES

16685

A Backyard Products Company

• BUILDING RESTRICTIONS AND APPROVALS

Be sure to check with local building department and homeowners association for specifi c restrictions and/ or requirements before building.

• ENGINEERED DRAWINGS

Contact our Customer Service Team if engineered drawings are needed to pull local permits.

• SURFACE PREPARATION

To ensure proper assembly you must build your shed on a level surface. Recommended methods and materials to level your shed are

listed on page 7.

• CHECK ALL PARTS

Inventory all parts listed on pages 5 - 6. Contact our Customer Service Team if any parts are missing or damaged.

ADDITIONAL MATERIALSYou will ne additional materials to complete your shed. See page 4 for required and optional materials and quantities

Page 4: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

2

TOOLS

Safety! Always use approved safety glasses during assembly.

OptionalRequired

HELPFUL REMINDER SYMBOLSLook for these symbols for helpful reminders throughout this manual.

ORIENT LUMBER AND TRIM FOR BEST APPEARANCE

= Assistance Required; two or more people.

= Ensure squareness.

= Important required step or operation.

= Helpful assembly hint.

= Mark part with pencil.

= Beginning of steps for assembly or installation.

= You have fi nished the assembly or installation.

= Level

Gloves

Framing lumber is graded for structural strength and not appearance. Exterior trim is graded for one good side.

Always install the material leaving the best edge and best surface visible. Please remember that these blemishes in no waynegatively affect the strength or integrity of our product. (See Fig. A, B, C.)

A

Safety Glasses

Tape Measure

Paint Tools

Ladder

Wood Glue

Caulk Gun

Hammer

Level

FINISH

BEGIN

Pencil

Phillips Screwdriver

Drill / Driver

5/16" Drill Bit 1/8" Drill Bit #2 Philips Drive Bit

Tool Belt/ Nail Pouch

Chalk Line

Nail Gun

• gun nails

Tin Snips (for drip edge)

Square or

Utility Knife

Shingle Blades

B C

Page 5: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

3

CONCRETE FOUNDATIONIf you choose to install your kit on a concrete slab refer to the diagram below.

A

B C

4" (10,2 cm)

3-1/2"(8,9 cm)

DOOR

A B CActual Floor SizeBuilding Size

• A treated 2 x 4" (5,1 x 10,2 cm) sill plate is required when installing your shed on concrete. Hint: Use treated lumber in your kit or purchase full length treated lumber. • Use a high quality exterior grade caulk beneath all sill plates. • Fasten 2 x 4" (5,1 x 10,2 cm) sill plates to slab using approved concrete anchors (fasteners not included). • Check local code for concrete foundation requirements.

96" (243,8 cm) 85-1/2" (217,2 cm)8'x 7'-8-1/2" (243,8 x 235 cm)8'x 8' (243,8 x 243,8 cm) 92-1/2" (235 cm)

Treated Sill Plate

Caulk between sill plate and concrete.

2 x 4 x 8' (5,1 x 10,2 x 243,8 cm)

Requires:

x4 MUST be treated lumber.

Caulkx1

Allow new concrete slabs to cure for at least seven (7) days.

NOTES

Page 6: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

4

COMPLETING YOUR SHEDYou will need these additional materials:

OPTIONAL MATERIALS

ADDITIONAL MATERIALS

DRIP EDGE ..................... 40 Feet #15 ROOFING FELT To cover 75 Sq. Ft. of roof area.

1" GALVANIZED ROOFING NAILS.........1/4 LbFor roofi ng felt.

REFER TO THE BACK OF THIS MANUAL AND THE MANUFACTURER’S INSTRUCTIONS FOR INSTALLATION OF SHINGLES, DRIP EDGE AND FELT.

3-TAB SHINGLES ............................ 4 Bundles

PAINT FOR SIDING .......................... 2 GallonsUse 100% acrylic latex exterior paint. (2) coats recommended.

CAULK ................................................. 2 TubesUse acrylic latex exterior caulk that is paintable.

1" GALVANIZED ROOFING NAILS.... 2 LbsFor shingles.PAINT FOR TRIM .............................1 QuartUse 100% acrylic latex exterior paint.

WOOD GLUE ....................... Exterior Rated

REINFORCED WOOD FLOOR FRAME (OPTIONAL)IMPORTANT! The included fl oor has been designed for general use. Depending on your specifi c use you may want to construct a heavy duty fl oor frame by adding additional fl oor joists (shown below as shaded). Below is a list of additional materials (not included):

x4

x16

2 x 4 x 8' (5,1 x 10,2 x 243,8 cm) Treated LumberCut to 2 x 4 x 93" (5,1 x 10,2 x 236,2 cm)

ea. 3" (7,6 cm) Hot Dipped Galvanized NailsOptional12" (30,5 cm) spacing

Standard24" (61 cm)spacing

FOUNDATION OR FLOOR MATERIALS

• This shed does not include any leveling materials.• See the FLOOR LEVELING section on page 7 for recommended methods and suggested materials to properly level your fl oor, as this will vary depending on your specifi c site.

• This shed kit includes a complete wood fl oor frame system. It does not include floor panels.

FLOOR PANELS (NOT INCLUDED)

x1x1 3/4 x 48" x 96"(1,9 x 121,9 x 243,8 cm)

3/4 x 44-1/2" x 96"(1,9 x 113 x 243,8 cm)

Floor panels are3/4" (1,9 cm) thick.

Page 7: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

DQ

LW

2 x 3 x 11-7/8" (2,5 x 7,6 x 30,2 cm)

2 x 3 x 17-1/2" (2,5 x 7,6 x 44,5 cm)

2 x 3 x 23-7/8" (2,5 x 7,6 x 60,6 cm)

x11

5

PARTS IDENTIFICATION AND SIZESTR

US

STR

IMW

ALL

6 x 24" (15,2 x 61 cm)x6

PARTS LISTINVENTORY YOUR PARTS before you begin. We suggest sorting parts by the category they are listed in.

WOOD SIZE CONVERSION CHARTNominal Board Size Actual Size

1" x 4".................3/4" x 3-1/2" (1,9 x 8,9 cm)

2" x 4"..............1-1/2" x 3-1/2" (3,8 x 8,9 cm)

2" x 3"..............1-1/2" x 2-1/2" (3,8 x 6,3 cm)

1" x 3".................3/4" x 2-1/2" (3,8 x 6,3 cm)

x2

x2

x2

x2

1 x 2 x 14" (2,5 x 5,1 x 35,6 cm)

1 x 2 x 11" (2,5 x 5,1 x 2 7,9 cm)

BV

WQ

WO

x1

2 x 3 x 66-1/2" (5,1 x 7,6 x 168,9 cm)FZ

x4 2 x 3 x 92-1/2" (5,1 x 7,6 x 235 cm) PNA

x2 2 x 3 x 96" (5,1 x 7,6 x 243,8 cm) PT

x4

x4

2 x 4 x 54-1/16" (5,1 x 10,2 x 129,8 cm)x6 WI

2 x 3 x 34" (5,1 x 7,6 x 86,4 cm) x2 CI

stamped on some parts.

• Check these locations for part stamp.

RS RS

x1 2 x 3 x 91 " (5,1 x 7,6 x 231,1 cm) PS

DO

OR

FLO

OR

x2

2 x 4 x 93" (5,1 x 10,2 x 236,2 cm)x5

2 x 4 x 92-1/2" (5,1 x 10,2 x 235 cm)

TREATED

TREATED

2 x 3 x 55-3/4" (5,1 x 7,6 x 141,6 cm)

3/8 x 1-3/4 x 71-1/4" (1 x 4,4 x 181 cm)

3/8 x 1-3/4 x 71-3/4" (1 x 4,4 x 182,2 cm)

x4 WX

1 x 3 x 5" (2,5 x 7,6 x 12,7 cm) GAUGE BLOCK FOR 3/4" (1,9 cm) MEASUREMENTx1 GAA

3/4"(1,9 cm)

5

Treated lumber is stamped:

Treated lumber is stamped:

OO

WR

x2

x1 19/32 x 3 x 63" (1,5 x 7,6 x 160 cm)

2 x 3 x 69" (5,1 x 7,6 x 175,3 cm) Finger Jointed

Page 8: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

6

WALL PANELS, AND DOORS

FASTENER/HARDWARE BAG

NAIL BOXES

NOTES

3" (7,6 cm) 2" (5,1 cm)x1 BOXES x3 BOXES

x23/8 x 48 x 72"(1 x 121,9 x 182,9 cm)

x43/8 x 46-1/8 x 72"(1 x 117,2 x 182,9 cm)

x23/8 x 20 x 72"(1 x 50,8 x 182,9 cm)

x2 x27-7/8" x 96"(20 x 243,8 cm)

48" x 96"(121,9 x 243,8 cm)

ROOF PANELS

x1LEFT DOOR

x1RIGHT DOOR

Roof panels are7/16" (1,1 cm) thick.

x1

x1

x1

x1

For Window

x20

x41

x64

x42

x70

x8

3" (7,6 cm)

2" (5,1 cm)

2" (5,1 cm)

3/4" (1,9 cm)

3/4" (1,9 cm)

1-1/4" (3,2 cm)

x701-1/2" (3,8 cm)

VENT, DOOR HARDWARE, AND WINDOW

x1x1

x4

x12

x2

8 x 16" (20,3 x 35,6 cm)

1" (2,5 cm)

1/2" (1,3 cm)

3/4" (1,9 cm)1/2" (1,3 cm)

56" (142,2 cm) Metal Threshold

Bagged seperately / special coating

x1

x1

x7x8

x8

1" (2,5 cm)

Bagged seperately / 1-5/8" (4,1 cm)

x8

NOTE POINT

x1x1

x41" (2,5 cm) 3/4" (1,9 cm)

1/2" (1,3 cm)

56" (142,2 cm) Metal Threshold

x1

x1

x7x8

Page 9: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

7

FLOOR LEVELING OPTIONS

Leveling materials are not included in this kit.

There are multiple ways to level your wooden floor frame. Our recommended leveling method is shown below

PREFERRED METHOD - 4x4 TREATED RUNNERS

12" (30,5 cm)

12" (30,5 cm)

Measurements to centers of 4x4's.

• 3" Screw angled into 4x4.• (2) at each point frame

and 4x4 touch.

4x4 Runners (not included).

• Level under 4x4 runners only.• Locate leveling material 12" from ends of runners and no more than 48" apart.• Asphalt shingles should be used between 4x4 runners and blocks or treated lumber. Never use shingles in direct contact with ground.• For best results and aiding in water drainage use gravel under each concrete block.

LEVELING METHODS

• If you are building your shed on a concrete foundation see the following page.

CONCRETE

MATERIAL REQUIRED

x2 4" x 4" x 8' (10,2 x 10,2 x 243,8 cm) Treated Lumber

Fasteners for Frame to 4"x 4". (3" Screws shown as one option.) Minimum (20) 3" screws / exterior grade.

Use only wood treated for ground contact and fasteners approved for use with treated wood.

Always support frame seams.

Leveling higher than 16" not recommended.

LEVELING MATERIALSGravel

2x4 Treated Lumber

Solid Masonry Blocks in 1", 2", 4" or 8" thickness

Asphalt Shingles

4" Block

8" Block

GravelGravel

Do not exceed 16".

4x4 Runner

Shingle

ShingleMaximum between leveling material locations.

48"12"

2x4 Treated Lumber

2" Block

Level

12"

DOOR

96"(243,8 cm)

Page 10: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

PARTS REQUIRED: NOTE:Look for Stamp.

STANDARD FLOOR FRAME

3" (7,6 cm)

x5 2 x 4 x 93" (5,1 x 10,2 x 236,2 cm)

x2 2 x 4 x 92-1/2" (5,1 x 10,2 x 235 cm)

TREATED

TREATED

96"(243,8 cm)

92-1/2"(235 cm)

93"(236,2 cm)

48"(121,9 cm)

24"(60,9 cm)

20-1/2"(52,1 cm)

72"(182,8 cm)

92-1/2"(235 cm)

Flushat ends.

x20

HINT:For easier nailingstand on frame.

• FOR 10' x 12', SKIP TO PAGE 16

Centeron marks.

Centeron marks.

You have fi nished your fl oor frame. Proceed to level and square frame.

BEGIN

1 Orient parts as shown on fl at surface. Measure and mark each dimension from end of boards

2 Use two 3" nails at each mark

FINISH

3

DO

OR

8

Page 11: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

First, secure at endswith one fastener.

Second, secure at ends with one fastener.

133-5/16"(338,6 cm)

133-5/16"(338,6 cm)

Fig. A

LEVEL AND SQUARE FLOOR FRAMEBefore attaching fl oor decking, it is important to level and square the fl oor frame.

A level and square fl oor frame is required to correctly construct your shed.

FINISH

5

BEGIN

2

3

4

1

Use level and check the frame is level before applying fl oor panels.

Check for frame squareness by measuring diagonally across corners. If the measurements are the same, the frame is square. The diagonal measurement will be approximately 133-5/16" (338,6 cm).

When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner. At the opposite end of the frame, secure the frame to 4x4 runners with one fastener at ends of each runner making sure the frame remains square (Fig. A).

Once the fl oor frame is level and square fasten the frame at each point the frame contacts the 4x4 runners.

See page 7 for the preferred fl oor leveling method.

9

Page 12: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

3/4 x 48 x 96"(1,9 x 121,9 x 243,8 cm)

PARTS REQUIRED:

Ensure your fl oor frame is square by installing one panel and squaring frame.

FLOOR PANELS (NOT INCLUDED)

x1 2" (5,1 cm)

Fig. C

(2) NailsFlush

Fig. A

Flush at top corner edge.

Fig. B

(2) Nails

x53

Attach the 3/4 x 48 x 96" panel with the rough side up (painted-grid lines side) with the 48" edge and corner fl ush to the fl oor frame (Fig A). Secure panel with two 2" nails in the corners.Move to the opposite end. Using the long edge of the panel as a lever move thepanel side-to-side until the top corner is fl ush to the fl oor frame (Fig. B).Secure panel with two 2" nails in the corners.

2

BEGIN1

3

4 Continue attaching the panel using 2" nails 6" apart on edges and 12" apart inside panel.Use a chalk line or use pre-painted grid lines to nail into joists under panel.

Check the fl oor frame is square by measuring diagonally across the frame corners. If the measurements are the same, your fl oor frame is square. The measurement will be approximately 133-5/16" (Fig. C).

96"(243,8 cm)

133-5/16"(338,6 cm)

133-5/16"(338,6 cm)

92-1/2"(235 cm)

48"(121,9 cm)

Flush

12" (30,5 cm) inside panel.Grid lines UP

3/4"(1,9 cm)

Approximately

6" (15,2 cm) edges of panel.

Flush

DO

OR

Floor Panels not includedSee page 4 for panel sizes

and quantities.

10

Page 13: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

FLOOR PANELS (NOT INCLUDED)

2" (5,1 cm)

Use a chalk line or grid lines on panels for 2" nails 6" apart on edges and 12" apart inside panel. .

3/4 x 44-1/2 x 96"(1,9 x 113 x 243,8 cm)

Continue by installing 3/4 x 44-1/2 x 96" panel with rough side up (painted grid lines).5

PARTS REQUIRED:x1

6

96"(243,8 cm)

96"(243,8 cm)

44-1/2"(113 cm)

Flush

12"(30,5 cm)

6"(15,2 cm)

Flush

Flush

Grid lines UP.

x53

You have fi nished Installing your fl oor panels.FINISH7

DO

OR

11

Page 14: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

12

I M P O R TA N T !

Check the floor frame is level after installing floor panels. Re-level if needed.

• The floor should be used as a stable work surface for wall construction.

• Organize your assembly procedure during the build process to avoid over-handling of the walls.

HINT:

IMPORTANT!

DOOR

SIDEWALL

SIDEWALL FRONTWALL

BACKWALL

DOOR

Page 15: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

PARTS REQUIRED:

HINT:

Center on marks.

PNA

PNA

FZ x5

46-1/4"(117,5 cm)

22-1/4"(56,7 cm)

70-1/4"(178,5 cm)

92-1/2"(235 cm)

66-1/2"(168,9 cm)

x10

x42 x 3 x 66-1/2 " (5,1 x 7,6 x 168,9 cm)

2 x 3 x 92-1/2" (5,1 x 7,6 x 235 cm) PNA

FZ

1BEGIN

2

Orient parts on edge on fl oor. Measure and mark from end of boards.

IMPORTANT! You will build two walls the same.

Use two 3" nails at each mark.

You have fi nished building one side wall frame. Proceed to attach wall panels.

SIDE WALL FRAMES

3" (7,6 cm)

FINISH

3

3" (7,6 cm) Nails

x40

13

Page 16: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

2" (5,1 cm)PARTS REQUIRED:

3/4" GAUGE BLOCK

2x3" GAUGE BLOCK

SIDE WALL PANELS

3/8 x 46-1/8 x 72" (1 x 117,2 x 182,8 cm)

x2

x90

Fig. A

Fig. B

3/4" (1,9 cm)

3/4" (1,9 cm)

2 Nails1-1/2"

(3,8 cm)Overlap

1-1/2"(3,8 cm)Overlap

2 Nails

Place a 46-1/8 x 72" panel onto wall frame with primed side up as shown.

Locate the panel 1-1/2" above the top plate. Use a DQ as a gauge block for the 1-1/2" top overhang measurement. Use the GAA gauge block to mark the 3/4" side measurement on the wall stud. Secure panel with two 2" nails in the corners (Fig. A).

3

2

Nail the panel using 2" nails 6" apart on edges and 12" apart inside panel.

Ensure your wall frame is square by installing one panel and squaring frame.

Move to the opposite end. Using the long edge of the panel as a lever, move the panel side-to-side until you have a 3/4" measurement on the wall stud. Secure corner with two 2" nails (Fig. B).

For squareness maintain 3/4" and 1-1/2" measurement along panel edge.

BEGIN HERE

6"(15,2 cm)

Panelwill be back from frame about 1/8"

1-1/2"(3,8 cm)

3/4"(1,9 cm)

46-1/8 "(117,2 cm)

12"(30,5 cm)

Primed side UP

3/4" Gauge Block

2 x 3"

1BEGIN

GAA DQ

14

Page 17: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

2x3"GAUGE BLOCK

DQ

15

2" (5,1 cm)PARTS REQUIRED:

SIDE WALL PANELS

3/8 x 46-1/8 x 72" (1 x 117,2 x 182,8 cm)

x2

x90

Place 46-1/8" panel on frame as shown with primed side facing up fl ush with fi rst panel. Nail using 2" nails 6" apart on edges and 12" apart inside panel.

4

5

To draw panels tight at seams angle nail.

You have fi nished building both of your side walls.FINISH

6

Carefully fl ip your sidewall over.Repeat STEPS 1-4 to assemble your second side wall.

12"(30,5 cm)

6"(15,2 cm)

1-1/2"(3,8 cm)Flush

2 x 3"

Page 18: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

2 x 3 x 34" (5,1 x 7,6 x 86,4 cm)

x1 CI

x12 x 3 x 91 " (5,1 x 7,6 x 231,1 cm)

PS

Flush

16

BACK WALL FRAME

1-1/2"(3,8 cm)

2-1/2"(6,4 cm)

34"(86,4 cm)

45-1/2"(115,6 cm)

45-1/2"(115,6 cm)

91"(231,1 cm)

1-1/2" (3,8 cm)

Nail using two 3" nails at each connection.3

2

1BEGIN

3" (7,6 cm)

CI

PS

PARTS REQUIRED:

(2) 3" (7,6 cm) Nails

x2

Center PS flush on CI on edge on floor as shown (Fig. A).

Orient CI on flat using a gusset as a temporary spacer.

Fig. A

Page 19: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

2 x 3 x 34" (5,1 x 7,6 x 86,4 cm)

x1 CI

x12 x 3 x 96" (5,1 x 7,6 x 243,8 cm)

PT

Flush

Flush

17

(2) 3" (7,6 cm) Nails

48"(121,9 cm)

48"(121,9 cm)

96"(243,8 cm)

1-1/2"(3,8 cm)

1-1/2"(3,8 cm)

34"(86,4 cm)

2-1/2"(6,4 cm)

Fig. B

Fig. A

Center PT on CI on edge on fl oor as shown.

Center CI fl ush on PS on fl at using a gusset as a temporary spacer.

Nail PT to CI using two 3" Nails (Fig. A).

3" (7,6 cm)

BACK WALL FRAME

Use two 3" screws at middle connection (Fig. B).

4

5

6

7

FINISH

8 You have fi nished building your back wall frame.

PARTS REQUIRED:3" (7,6 cm)

x2

PS

PT

CI

(2) 3" (7,6 cm)Screws

(2) 3" (7,6 cm)Nails

x2

Page 20: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

3/8 x 48 x 72"(1 x 121,9 x 182,9 cm)

18

34"(86,4 cm)

6"(15,2 cm)

34"(86,4 cm)

2-1/2"(6,4 cm)

34"(86,4 cm)

34"(86,4 cm)

12"(30,5 cm)

3/4"(1,9 cm)

3/4"(1,9 cm)

2" Nails

x1

Place LEFT panel on back frame as shown with primed side facing up.BEGIN

2

1

BACK WALL PANELS

PARTS REQUIRED:

Primed side UP

For squareness maintain flush and 3/4" measurement along panel edges.Ensure 34" spacing before

nailing panel.

2" (5,1 cm)x22

Secure Using 2" nails 6" apart on edges and 12" apart inside panel.

Page 21: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

3/8 x 48 x 72"(1 x 121,9 x 182,9 cm)

19

34"(86,4 cm)

6"(15,2 cm)

34"(86,4 cm)

2-1/2"(6,4 cm)

12"(30,5 cm)

3/4”(1,9 cm)

34"(86,4 cm)

34"(86,4 cm)

x1

Place RIGHT panel on back frame as shown with primed side facing up and fl ush to panel.

4

3

BACK WALL PANELS

PARTS REQUIRED:

Primed side UP

FINISH

5 You have fi nished installing your back wall panels.

Ensure 34" (86,4 cm) between PT and PS.

Secure Using 2" nails 6" apart on edges and 12" apart inside panel.

x111-1/2" (3,8 cm)

2" (5,1 cm)x11

2" Nails

Flush

Ensure 34" spacing before nailing panel.

Page 22: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

MAINTAIN DIMENSIONBETWEEN PANELS

96"(243,8 cm)

56"(142,2 cm)

56"(142,2 cm)

20"(50,8 cm)

20"(50,8 cm)

4"(10,2 cm)

1-1/2"(3,8 cm)

PT

FRONT WALL FRAME

PARTS REQUIRED:

HINT:

2 x 3 x 96" (5,1 x 7,6 x 243,8 cm) x1 PT

3/8 x 20 x 72" (1 x 50,8 x 182,9 cm)

x2

Orient PT on edge and place LEFT panel on PT as shown with primed side facing up.

BEGIN

2

3

1

Nail using 2" nails 4" apart.

Use BV as a temporary support as shown.

Repeat steps 1-2 for RIGHT panel.

2" (5,1 cm)x8

Flush Flush

2x3 temporary support

x22 x 3 x 17-1/2" (5,1 x 7,6 x 44,5 cm) TEMPORARY SUPPORT

BV

20

2" (5,1 cm) Nails

Primed side up

Page 23: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

FRONT WALL PANELS

2" (5,1 cm)PARTS REQUIRED: x6

MAINTAIN DIMENSIONBETWEEN PANELS

2-1/2"(6,4 cm)

2-1/2"(6,4 cm)

2-1/2"(6,4 cm)

2-1/2"(6,4 cm)

1"(2,5 cm)

1"(2,5 cm)

1"(2,5 cm)

1"(2,5 cm)

1-1/2"(3,8 cm)

1-1/2"(3,8 cm)

56"(142,2 cm)

17-1/2"(44,5 cm)

17-1/2"(44,5 cm)

Fig A. Fig B.

BV BV

Position BV on edge, 2-1/2" from outside edge and 1" from bottom edge of LEFT wall panel. (Fig A.)

Nail BV to wall panel using (3) 2" Nails.

3

2

1

Repeat step 1-2 for RIGHT wall panel. (Fig B.)

You have fi nished building your front wall.

BEGIN

FINISH

4

x22 x 3 x 17-1/2" (5,1 x 7,6 x 44,5 cm)

BV

21

2" (5,1 cm) Nails

Page 24: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

Center FZ on PT on flat, flush to front wall panel (Fig. A).BEGIN

2

3

1

Secure using five 3" screws on angle spaced evenly.

Mark center of door opening for later alignment.

FRONT WALL TOP PLATE

PARTS REQUIRED:

FZ

FZ

PT

2 x 3 x 66-1/2" (5,1 x 7,6 x 168,9 cm)x1 FZ

Flush

Fig. A

NOTE:Drive screws at an angle to

avoid screw points protruding into the door opening

22

Flush

Front wall panel

CENTER CENTER

Use to maintain 3/8" overhang.

5-1/4"5-1/4"

x1 GUSSET TEMPORARY SPACER

3" (7,6 cm)x5

Page 25: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

SIDE WALL INSTALLATION

DOOR

DOOR

23

2" (5,1 cm)

PARTS REQUIRED (TEMPORARY):

x173" (7,6 cm)

x8

Use OO as a temporary brace. Secure with two 3" screws.

Center side wall assembly on the 92-1/2" (235 cm) fl oor dimension.

Ensure 1-1/2" measurement is on top

2

BEGIN

1

First, nail lower edge of panel to fl oor frame using 2" nails 6" apart.Angle nail to hit fl oor frame (Fig. A).

3

Nail side wall bottom plate to fl oor using eight 3" nails.(Nail two 3" nails between each stud through bottom plate)

4

5 You have fi nished standing your side wall.Repeat steps 1-4 to stand second wall.

FINISH

92-1/2" (235 cm)3" (7,6 cm)

Screws

Nail 2" nails fi rst.

Angle to nail into fl oor frame.

2" (5,1 cm) Nail

Fig. A

1-1/2" overhang

3" Nails into bottom plate.

6"15,2 cm

Flush

Flush

OOx12 x 3 x 69" (5,1 x 7,6 x 175,3 cm)

TEMPORARY SUPPORT

OO

3" (7,6 cm)x2

Page 26: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

2424

2" (5,1 cm)

PARTS REQUIRED:

x19

SIDE WALL INSTALLATION

Set back wall on side wall top plates and secure using two 3" screws on each side (Fig.A).

1

Nail lower edge of panel to � oor frame using 2" nails 6" apart.Angle nail to hit � oor frame (Fig. B).

2

Secure back wall upright to � oor using two 3" screws (Fig. C).3

6 You have � nished standing your back wall.FINISH

6"(15,2 cm)

6"15,2 cmNail 2" nails � rst.

Angle to nail into � oor frame.

2" (5,1 cm) Nails

Fig. B

Fig. C

Fig. D

1-1/2" (3,8 cm) Nails

Fig. A

4

x261-1/2" (3,8 cm)

Nail back wall panel to side wall stud using thirteen 1-1/2" nails at 6" apart.

Secure back wall center horizontal 2 x 3" using two 3" screws into back wall frame at an angle as shown (Fig. D).

5

It is important to secure the side wall in the following order:BEGIN

(2) 3" (7,6 cm)Screws

(2) 3" (7,6 cm)Screws

Flush

x103" (7,6 cm)

(2) 3" (7,6 cm)Screws

DOOR

24

2" (5,1 cm)

PARTS REQUIRED:

x19

SIDE WALL INSTALLATION

Set back wall on side wall top plates and secure using two 3" screws on each side (Fig.A).

1

Nail lower edge of panel to � oor frame using 2" nails 6" apart.Angle nail to hit � oor frame (Fig. B).

2

Secure back wall upright to � oor using two 3" screws (Fig. C).3

6 You have � nished standing your back wall.FINISH

6"(15,2 cm)

6"15,2 cmNail 2" nails � rst.

Angle to nail into � oor frame.

2" (5,1 cm) Nails

Fig. B

Fig. C

Fig. D

1-1/2" (3,8 cm) Nails

Fig. A

4

x261-1/2" (3,8 cm)

Nail back wall panel to side wall stud using thirteen 1-1/2" nails at 6" apart.

Secure back wall center horizontal 2 x 3" using two 3" screws into back wall frame at an angle as shown (Fig. D).

5

It is important to secure the side wall in the following order:BEGIN

(2) 3" (7,6 cm)Screws

(2) 3" (7,6 cm)Screws

Flush

x103" (7,6 cm)

(2) 3" (7,6 cm)Screws

DOOR24

2" (5,1 cm)

PARTS REQUIRED:

x19

SIDE WALL INSTALLATION

Set back wall on side wall top plates and secure using two 3" screws on each side (Fig.A).

1

Nail lower edge of panel to � oor frame using 2" nails 6" apart.Angle nail to hit � oor frame (Fig. B).

2

Secure back wall upright to � oor using two 3" screws (Fig. C).3

6 You have � nished standing your back wall.FINISH

6"(15,2 cm)

6"15,2 cmNail 2" nails � rst.

Angle to nail into � oor frame.

2" (5,1 cm) Nails

Fig. B

Fig. C

Fig. D

1-1/2" (3,8 cm) Nails

Fig. A

4

x261-1/2" (3,8 cm)

Nail back wall panel to side wall stud using thirteen 1-1/2" nails at 6" apart.

Secure back wall center horizontal 2 x 3" using two 3" screws into back wall frame at an angle as shown (Fig. D).

5

It is important to secure the side wall in the following order:BEGIN

(2) 3" (7,6 cm)Screws

(2) 3" (7,6 cm)Screws

Flush

x103" (7,6 cm)

(2) 3" (7,6 cm)Screws

DOOR

1-1/2" (3,8 cm) Nails

Page 27: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

25

1

2" (5,1 cm)

PARTS REQUIRED:x8

FRONT WALL INSTALLATION

x6

Center front wall assembly on fl oor, resting top plate on side walls.

Secure front wall top plate to side walls using two 3" screws (Fig. A, B).

Secure lower edge of panel to fl oor frame using eight 2" nails 6" apart.Angle nail to hit fl oor frame (Fig. C).

2

Secure bottom plates with three 3" nails on each side (Fig. C).

3

6 You have fi nished standing your walls.FINISH

Nail front wall to side walls using 1-1/2" nails 6" apart (Fig. D).

4

5

3" (7,6 cm)x261-1/2" (3,8 cm)

It is important to secure the front wall in the following order:BEGIN

FlushFlush

Center wall assembly on

Maintain 56” dimension

oor.

(2) 3" (7,6 cm) Screws

Fig. A Fig. B

Nail 2" nails rst. Angle to nail into

oor frame.

Fig. C 2" (5,1 cm) Nails

3" (7,6 cm) Nails

3" (7,6 cm) Nails

1-1/2" (3,8 cm) Nails

Fig. D

3" (7,6 cm)x4

Page 28: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

26

RAFTERS

2" (5,1 cm)PARTS REQUIRED:

6 x 24" (15,2 x 61 cm)x6

x72

OOx12 x 3 x 69" (5,1 x 7,6 x 175,3 cm)TEMPORARY SUPPORT

Fit base of rafters in corners of back wall.

96”(243,8 cm)

GUSSET x2

1/4" gap (6 mm)

Center

Glue

Glue

You will build THREE assemblies;Place two rafter-halves WI in the corner of back and side walls.Rafters contact at peak.

BEGIN

1

Temporary support (OO)

HINT:Use fl oor and walls to help

assemble rafters!

2" (5 cm)

Apply glue to rafters where the gusset will fi t.

Contact at peak

Contact at peak

2

Nail gusset to rafters using twelve 2" nails in pattern shown. 3

Flip over rafter assembly and repeat STEPS 2-3 to attach second gusset to other side.4

Repeat STEPS 1-4 to build TWO additional rafter assemblies.5

FlushFINISH

6 You have fi nished assemblingyour rafters.

2 x 4 x 54-1/16" (5,1 x 10,2 x 129,8 cm)x6 WI

Page 29: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

27

RAFTERS

3" (7,6 cm)PARTS REQUIRED:

PRE-ASSEMBLEDx3

x12

22-5/8"(57,5 cm)

22-5/8"(57,5 cm)

24" (61 cm)

24" (61 cm)

Align over studs.

Maintain the measurements between rafters.

NOTE: Measurements from outside of panels

Screw into top plate.

(2) 3" (7,6)Screws

Fig.A

Fig. B

Locate rafters directly over the wall studs.

Secure with two 3" screws angled at each end (Fig. B).

Screw through panel into end of rafter with 2" screw (Fig. A).

Ensure you have the measurements shown.1

FINISH

4 You have fi nished installing your rafters.

BEGIN

2

3

2" (5,1 cm) Screw

2" (5,1 cm)x6

Page 30: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

x1 2 x 3 x 23-7/8" (5,1 x 7,6 x 60,6 cm) LW

28

Place RIGHT gable panel primed side up, centered on LW with a 3/4" overhang on bottom. Nail using fi ve 1-1/2" nails, 6" apart.

Place LEFT gable panel primed side up, fl ush to right panel on LW with a 3/4" overhang on bottom. Nail using fi ve 1-1/2" Nails, 6" apart.

Place LW on fl at on fl oor.

2

3

You have fi nished building your back wall gable panels.FINISH

4

BEGIN

1

BACK WALL GABLE PANELS

PARTS REQUIRED:

x1 x1

1-1/4"(3,2 cm)

1-1/4"3,2 cm

3/4"(1,9 cm)

2-1/2"(6,3 cm)

6"(15,2 cm)

6"(15,2 cm)

LW

x101-1/2" (3,8 cm)

Primed side UP

Page 31: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

29

Nail assembly to back wall panels using 2" nails 6" apart.

Screw LW to top plate using two 3" screws (Fig. B).

Place gable assembly centered on back wall top plate overlapping the back wall panels 3/4" (Fig. A).

2

3

You have fi nished installing your back wall gable panels.FINISH

4

BEGIN

1

BACK WALL GABLE PANELS

PARTS REQUIRED:

BACK WALL

6"(15,2 cm)

3/4"(1,9 cm)

2" (5,1) Nails

Nail fi rst

FlushLEVEL

LEVEL

2" (5,1 cm)x18

(2) 3" (7,6 cm)Screws

(2) 3" (7,6 cm) Screws

Fig. B

Fig. A

PRE-ASSEMBLED

x23" (7,6 cm)

3/4"(1,9 cm)

3/4"(1,9 cm)

Page 32: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

x2 2 x 3 x 11-7/8" (5,1 x 7,6 x 30,2 cm) DQ

30

Place RIGHT gable panel primed side up, centered on top DQ as shown.Secure using two 1-1/2" nails.

Orient LEFT gable panel primed side up, fl ush to right panel on DQ's with a 1-1/2" overhang on bottom. Nail using four 1-1/2" Nails.

Place DQ on fl at on fl oor as shown.

2

3

You have fi nished building your Front wall gable panels.FINISH

4

BEGIN

1

FRONT WALL GABLE PANELS

PARTS REQUIRED:

x1

1-1/2"(3,8 cm)

1-1/2"(3,8 cm)

1/4"(0,6 cm)

5-15/16"(15,1 cm)

5-15/16"(15,1 cm)

11-7/8"(30,2 cm)

2-1/2"(6,3 cm)

2-1/2"(6,3 cm)

Flush

DQ

x1

x81-1/2" (3,8 cm)

Primed side UP

Page 33: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

31

Center window in window opening as shown. Make sure both measurements are equal from bottom.

2

BEGIN

1

WINDOW INSTALL

PARTS REQUIRED:

EQUAL

x1

1/8" (0,3 cm)Drill Bit

Secure window to DQ using one screw in top and bottom (Fig. B).

(2) 1" (2,5 cm) Screws

Center window in window opening as shown.Make sure frame is at an equal distance from bottom of panel (Fig. A).

Fig. A

Fig. B

1" (2,5 cm)x2

Page 34: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

32

x2

x21 x 2 x 14" (2,5 x 5,1 x 35,6 cm)

1 x 2 x 11" (2,5 x 5,1 x 27,9 cm) WQ

WO

WO

WQ

32

Place one WO under window as shown. Secure using two 1/2" screws.

Using WQ as a spacer, repeat process to secure second WO to opposite end.

Align WQ � ush to WO and secure with two 1/2" screws in center holes.Repeat process to secure second WQ.

Place window framing on � at as shown. Place window face down on framing.

2

3

You have � nished building your window frame.FINISH

4

BEGIN

1

WINDOW INSTALL

PARTS REQUIRED:

5/16"(0,8 cm)

5/16"(0,8 cm)

5/16"(0,8 cm)

5/16"(0,8 cm)

14"(35,6 cm)

11"(27,9 cm)

11"

(27,9 cm)

1/4"(0,6 cm)

1/4"(0,6 cm)

Flush

Flush

Flush

Flush

Use WQ as temporary spacer

1/2" (1,3 cm) Screws

1/2" (1,3 cm) Screws

1/2" (1,3 cm)

x8

Secure window trim using self-drilling 1-5/8" screws through window fl ange (Fig. A)

Center window trim on window. NOTE: There will be a slight reveal inside window.

(8) 1-5/8" (4,1 cm) Screws

1-5/8" (4,1 cm) Screw

WO

WO

WQWQFlush Flush

2

You have fi nished installing your window trim.FINISH

3

BEGIN

1

x2

x21 x 2 x 14" (2,5 x 5,1 x 35,6 cm)

1 x 2 x 11" (2,5 x 5,1 x 27,9 cm) WQ

WO

WO

WQ

32

Place one WO under window as shown. Secure using two 1/2" screws.

Using WQ as a spacer, repeat process to secure second WO to opposite end.

Align WQ � ush to WO and secure with two 1/2" screws in center holes.Repeat process to secure second WQ.

Place window framing on � at as shown. Place window face down on framing.

2

3

You have � nished building your window frame.FINISH

4

BEGIN

1

WINDOW INSTALL

PARTS REQUIRED:

5/16"(0,8 cm)

5/16"(0,8 cm)

5/16"(0,8 cm)

5/16"(0,8 cm)

14"(35,6 cm)

11"(27,9 cm)

11"

(27,9 cm)

1/4"(0,6 cm)

1/4"(0,6 cm)

Flush

Flush

Flush

Flush

Use WQ as temporary spacer

1/2" (1,3 cm) Screws

1/2" (1,3 cm) Screws

1/2" (1,3 cm)

x8

WO

Flange

CENTER TRIMON WINDOW

Fig. A

1-5/8" (4,1 cm)

NOTE POINT

x8

Page 35: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

33

3" (7,6 cm)

Nail gable panels to front wall panels and LW using 2" nails, 6" apart.

Screw DQ to top plate using two 3" screws (Fig. A).

Place gable assembly centered on front wall top plate overlapping front wall panels.

2

3

You have fi nished installing your front wall gable panels.FINISH

4

BEGIN

1

FRONT WALL GABLE PANELS

PARTS REQUIRED:

2" (5,1 cm) Nails

2" (5,1 cm) Nails

2" (5,1 cm) NailsFlush

Center gable panel assembly on mark.

LEVEL

LEVEL

2" (5,1 cm)x18

(2) 3" (7,6 cm)Screws

(2) 3" (7,6 cm) Screws

Fig. A

x2

LW

6"(15,2 cm)

PRE-ASSEMBLEDCenter window in window opening as shown. Make sure both measurements are equal from bottom.

2

BEGIN

1

WINDOW INSTALL

PARTS REQUIRED:

EQUAL

x1

1/8" (0,3 cm)Drill Bit

DQ

Page 36: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

1-1/4" (3,2 cm)

GABLE TRIM

PARTS REQUIRED:

Flush

x40

Center on gable panels.

WX

WX

WX

1-1/4" (3,1 cm)Screws

Flush to top of panel

1-1/4" (3,1 cm)Screws Stagger Screws

FINISH

4

Install front gable trim WX fl ush to top edge of panel and fl ush at peak (Fig. A) as shown.

Attach trim to wall using 1-1/4" screws 7-1/4" apart. Screw through panels into WX.

Repeat above steps 1-2 to secure back wall gable trim.

You have fi nished installing your gable trim.

2

3

BEGIN

Fig. A

Flush

2 x 3 x 55-3/4" (5,1 x 7,6 x 141,6 cm)

x4 WX

34

IF YOU DO NOT HAVE THE DELUXE PACKAGE CONTINUE TO PAGE 43.

Flush

Page 37: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

ROOF PANELS

Move to the opposite end. Using the long edge of the panel as a lever move the panel side-to-side until the top corner is flush to the peak (Fig. C) and there is a 1/2" measurement to the gable trim (Fig. D). You may need to move your backwall to get the 1/2" measurement. Secure panel with two 2" nails in the corners.

2

You must square the roof by attaching one panel first. You will use the panels’ long edge as a lever to bring your roof into square. Commonly known as “racking”.

Roof panels may cause serious injury until securely fastened.

Attach the 48 x 96" panel with the rough side up (painted-grid lines side) with a 1/2" measurement on the gable trim (Fig A) and the panel flush at the peak (Fig. B). Secure panel with two 2" nails in the corners.

1BEGIN

Two Nails

48"(121,9 cm)

1/2" (1,3 cm)

1/2" (1,3 cm)

Flush at peak.

Fig. B

Gable Trim

Gable Trim

Fig. D

Flush at peak.

Fig. C

2" (5,1 cm)PARTS REQUIRED: x8

7/16 x 48 x 96"(1,1 x 121,9 x 243,8 cm)

x2

Fig. A

35

Page 38: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

ROOF PANELS

Keep spacing between the center of the rafters at the lower edge of the panel and secure with one 2" nail into each rafter (Fig. E). Move to the top of the panel and keep spacing between the center of the rafters. Secure with one 2" nail into each rafter (Fig. E). Nail the roof panel using 2" nails 6" apart on edges and 12" apart inside panel (Fig. F).

3

Attach the lower roof panel flush to the upper panels and with a 1/2" measurement at the gable trim (Fig.G).

Nail the roof panel using 2" nails 6" apart on edges and 12" apart inside panel.

Repeat process to attach roof panels on the opposite side.

4

12"(30,5 cm) 6" (15,2 cm)

Fig. F

7-7/8"(20 cm)

96"(243,8 cm)

1/2"(1,3 cm)

Gable Trim

Flush

Fig. G

PARTS REQUIRED:2" (5,1 cm)

x86

24-1/2"(62,2 cm)

24-1/2"(62,2 cm)

24" (61 cm)

24" (61 cm)

Fig. E

NOTE: Measurements from outside of gable trim.

2" Nail

x2 7/16 x 7-7/8" x 96"(1,1 x 20 x 243,8 cm)

36

Page 39: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

3738

TRIM

PARTS REQUIRED: x562" (5,1 cm)

BEGIN

FINISH

5

Attach 71-1/4" trim � ush to bottom of gable panel (Fig. B ) and � ush to edge of 71-3/4" trim using one 2" (5,1 cm) nail as shown.

Attach 71-3/4" trim � ush to back of gable trim and bottom of roof panel and trim (Fig. A) using 2" (5,1 cm) � nish nail as shown.

Repeat steps 1-3 to attach trim to all four corners.

Finish attaching trim � ush to corners using seven 2" (5,1 cm) � nish nails as shown.

You have attached your corner trim.

4

3

2

71-3/4" (182,2 cm)

71-1/4" (181 cm)

x4

x43/8 x 1-3/4 x 71-1/4" (1 x 4,4 x 181 cm)

3/8 x 1-3/4 x 71-3/4" (1 x 4,4 x 182,2 cm)

Fig. A

Fig. B

Flush

Flush

2" (5,1 cm)Finish Nails

You have finished attaching your corner trim.

Page 40: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

1 x 3 x 5" (2,5 x 7,6 x 12,7 cm)x1 GAA

Orient parts as shown on flat surface. 3/8" offset is to top. Look for red (right) and green (left) on hinge board.

PARTS REQUIRED:

x1x1Left Door Right Door

BEGIN1

DOORS

1-1/4" (3,2 cm)

2

3

Attach temporary support OO with 3" screws in middle and at ends as shown. Tighten securely.

Attach temporary support GAA with two 1-1/4" screws as shown. Tighten securely.

HINT:Look for 3/8" SPACER

attached to doors.

OO

GAA

Make sure spacer is attached.

Tighten screws securely.

OFFSET

(4) 3" (7,6 cm) Screws

Screws 1-1/4" (3 cm)

Bottom edges flush.

NOTE:Screw hole will be used later.

3/8"(1 cm)3/8"

(1 cm)

3/8"(1 cm)

3/8"(1 cm)

OFFSETGREEN RED

3" (7,6 cm)

OOx12 x 3 x 69" (5,1 x 7,6 x 175,3 cm)

3/4" (1,9 cm)

23-1/2"(59,7 cm)

23-1/2"(59,7 cm)

3/4"(1,9 cm)

x2

x4

38

Page 41: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

4

PARTS REQUIRED:

x13" (7,6 cm)

DOORS

OO2 x 3 x 69" (5,1 x 7,6 x 175,3 cm)

Center doors on panel seam as shown (Fig. B).5Check ledger board is still fl ush under panels.

Remove temporary supports and check doors open properly.7

FINISH

8 You have fi nished installing your doors.

Screw hinge boards into wall supports and fl oor using four 3" screws as shown. Make sure screws go into framing and fl oor (Fig. C, D).

6

3" (7,6 cm)Screws into the wall support and fl oor frame.

Fig. B

SEAM

Fig. C

3/8"(1 cm)

Fig. D

Angle 3" (7,6 cm)Screw

Attach temporary support OO as a ledger board fl ush under wall panels for doors to rest on, using three 3" screws (Fig. A).

x7

OO

72" from gable panels

OO Fig. A

72" (182,9 cm)from bottom of gable panel to top of ledger

board

39

Page 42: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

DOOR

DOOR

BEGIN

CENTER CENTER

CENTER

CENTER

Secure hinge boards from inside using 3/4" screws as shown (Fig. A).

Center trim WR over doors and secure using eight 2" � nish nails into framing as shown.

Reinforce the door trim using 3/4" screws through door panel into trim (Fig. A).Locate screws as shown in Fig. B. Use two screws at seams.

3/4" (1,9 cm)

3/4" (1,9 cm)

You have � nished securing your door and trim.

PARTS REQUIRED: x8 x58

x10

2" (5,1 cm)

FINISH

5

3

2

1

Center

Install 3/4" screws from inside. x6

2" Nails x8

Fig. B

14" (35,5 cm)Approximately

Nail into framing.

Two Screws

DoorTrim

Fig. A

DoorPanel

Hinge BoardWR

WRx119/32 x 2-1/2 x 63" (1,5 x 6,4 x 160 cm)

Center metal threshold between doors and secure using ten 3/4" special coating screws into � oor as shown (Fig, C).

4

(10) Specialcoating screws

Fig. C

Bagged seperately / special coating

41

Nail 1/2" from bottom

40

Page 43: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

DOOR

You have fi nished installing your door weatherstrips.

BEGIN

With left door closed, center a weatherstrip OO vertically on the left door in the door opening (Fig. A). OO will offset the left door 1" OUT past the door trim 1" (Fig. B).

1

PARTS REQUIRED:

2 x 3 x 69" (5 x 7,6 x 175 cm)x2

x142" (5 cm)

DOOR WEATHERSTRIP

OO

FINISH

5

On right door center OO vertically in door opening (Fig. A). OO will offset the right door 1" IN from the door trim (Fig. C).

3

Secure OO using seven 2" screws through outside trim into OO (Fig. C).4

OO

Screws2" (5,1 cm)

x14

2" (5,1 cm) Screw

1"(2,5 cm)

OFFSET

1"(2,5 cm)

OFFSET

Secure OO using seven 2" screws through outside trim into OO (Fig. B)2

Fig. A Fig. B

Center OO in door opening.

11" (28 cm)Approximately

41

Page 44: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

BEGIN

Install bolt with screws supplied and drill 5/16" hole for bolt to extend into door frame.2

Place bolt onto OO in open position with bolt end 1/4" down from frame. Bolt is open when loop is contacting base (Fig A).Mark and pre-drill holes for screws.

1

LEFTDOOR

PARTS REQUIRED:

DOOR

1" (2,5 cm)

x1

x4

5/16" (0,8 cm) Drill Bit

Fig. A

x4

Loop contacts base.

PRE-DRILL(4) HOLES

2 x 3 x 69"1/4" with bolt in open position.

OPEN POSITION, Spring is loose.

5/16" drill for bolt:1" deep.

OVER DOOR FRAME

OO

LOCATE AND PRE-DRILL HOLES TO AVOID SPLITTING WOOD

35-1/2" (90 cm)

FINISH

4

Install hasp on right door and latch on left door. Bottom edge of hasp is35-1/2" (90 cm) up from bottom edge of door trim. Measure and mark locations and install with 3/4" screws as shown (Fig B)

.

3

x7

x1

3/4" (1,9 cm)

Fig. B

3/4" (1,9 cm) Screw x7

42

Page 45: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

4445

• Use acrylic latex caulk that is paintable. Caulk at all horizontal and vertical seams, between the trim and walls, and all around the door trim.

• Use a high quality exterior acrylic latex paint. When painting your building, there are a few key areas that can be easily overlooked that must be painted: • Bottom edge of all siding and trim • Inside of doors and all 4 edges

Note: Prime all un-primed exterior wood before painting. (Follow directions provided by manufacturer.)

Snip bottom side of drip edge andbend over to other side of roof.

(Follow directions provided by manufacturer.)

PAINT & CAULK- NOT INCLUDED -

ROOF FELT- NOT INCLUDED -

DRIP EDGE- NOT INCLUDED -

• Install over roof felt on gable side and under roof felt on eave side (Fig. A).• Do not use nails on side of drip edge that hangs over side of building.• Only nail top of drip edge as shown.

• Install felt � ush to all roof edges overlapping 3". Use minimal amount of roo� ng nails to hold in place.

OK to overlap at ridge.3" OVERLAP

Flush

Flush

Edge � ush to trim.

Roof Felt

Drip Edge

Drip Edge

Fig. A

Page 46: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

45

• Follow directions provided by manufacturer and these instructions.

SHINGLES - NOT INCLUDED -

Install first starter row upside down and color up with a 1" overhang at back and bottom of roof panel. Use (4) nails per shingle. Starter row must be straight and level all the way across with lower edge of roof deck. NOTE: If you have installed drip edge install shingles flush to drip edge.

BEGIN

1

TABS UP

Shingle overlaps roof decking.

1" (2,5 cm) overhang past roof deck.

1" (2,5 cm) overhang or flush with drip edge.

(4) Nails

BACK OF SHED

FRONT OF SHED

NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS.

Familiarize yourself with a 3-Tab Shingle.

SHINGLE NAIL PATTERN

1"(2,5 cm)

NAILS

Sealing Strip 1"(2,5 cm)

1/2"(1,3 cm)

Full Rain Slot

Half A Rain Slot

NotchNotch

Page 47: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

46

Beginning at front of shed, install first row of shingles with notch at 1" past roof edge or flush with drip edge.22

FRONT OF SHED

BACK OF SHED

Notch- or -

Drip Edge

Notch

Roof Deck

1"(2,5 cm)

Flush with starter row.

Flush with starter row.

Continue installing rows of shingles by staggering at front.

4

SHINGLES continued...

Install second row of shingles flush at top of first row's rain slots. Ensure 1" overhang or flush to drip edge at front, stagger each row.

3

1"(2,5 cm)

1"(2,5 cm)

BACK OF SHED

FRONT OF SHED

FRONT OF SHED

Flush with rain slots. Flush with rain slots.

Notch

Notch

Page 48: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

47

You have fi nished shingling your roof. Proceed to capping the ridge.FINISH

Continue installing rows of shingles to the peak. At the peak make sure there is a maximum of 5" or less to the rain slot, as shown below. If shingles overlap at ridge cut to peak with a utility knife.

Repeat steps 1 - 5 to shingle the opposite side of your roof. Trim shingles at ridge.

Once both sides are shingled you need to trim ends. Strike a chalk line 1" from edge.

Using your shingle hooked blade carefully cut shingles along chalk line.

5

7

6

9

8

SHINGLEScontinued...

• If more than 5" to rain slot you must install another row of shingles.

5"(12,7 cm) MAX.

Top of rain slot.

Cut Off.CUT

Page 49: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

48

SHINGLES - RIDGE CAP

• You will finish off the top of the roof with a ridge cap made from shingles.

Note: • You will need about 20 - 22 cut pieces.

Cut shingles into THREE pieces. Hint: Use cut-off pieces first.

Score shingle, then snap-off angled cut.

Install first ridge cap flush to shingles at front, as shown.

Install second ridge cap 5" back, as shown.

2

3

BEGIN

1

2" (5,1 cm)

2" (5,1 cm)

2" (5,1 cm)

2" (5,1 cm)

2" (5,1 cm)

2" (5,1 cm)

Top of slot.Weather Seal

Flush

(1) Nail per side through weather seal.

(1) Nail per side through weather seal.

5" 12,7 cm

FRONT OF SHED

FRONT OF SHED

Flush

20 to 22Pieces

Page 50: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

49

SHINGLES - RIDGE CAPcontinued...

Continue installing ridge cap to back of roof.

Make sure there is 4" between the shingle-color and edge of shingles.

When you have 4" minimum of shingle color cut one piece to cap your roof.

Install fl ush to shingles.

4

5

6

7

(2) Nails per side.

You have fi nished your ridge cap.FINISH

8

Flush to shingles

Trim cap off fl ush to shingles

Cap

Page 51: STSTOP!OP!heartlandind.com/wp-content/uploads/2015/08/... · • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. •

50

WARRANTY B a cky a rd S tor a ge S ol u tion s , LLC w a rr a nt s the following: 1. Every prod u ct i s w a rr a nted from defect s in workm a n s hip a nd m a n u f a ct u ring for one ye a r. 2. All h a rdw a re a nd met a l component s a re w a rr a nted for two ye a r s . 3 . Trim i s w a rr a nted for 15 yea r s . 4. W a fer b o a rd s iding a nd s he a thing i s w a rr a nted for two ye a r s . 5. S m a rt S ide™ s iding i s w a rr a nted for 15 yea r s. 6. Tim b er s erie s bu ilding s’ s iding a nd trim a re w a rr a nted for 10 ye a r s . 7. S ol a r S hed window s a re w a rr a nted for 1 ye a r. 8 . Ced a r l u m b er i s w a rr a nted for 15 ye a r s . 9. Ced a r door s a nd Ced a r G a rden Center a re w a rr a nted for 10 ye a r s . 10. Met a l roof i s w a rr a nted for 25 ye a r s .

B a cky a rd S tor a ge S ol u tion s , LLC will rep a ir, repl a ce or p a y for the a ffected p a rt. In no event s h a ll B a cky a rd S tor a ge S ol u tion s , LLC p ay the co s t of l ab or or in s t a ll a tion or a ny other co s t s rel a ted thereto. All w a rr a ntie s a re from d a te of p u rch as e. If a c as h ref u nd i s p a id on a n a ffected p a rt, it will b e pror a ted from the d a te of p u rch as e.

CONDITION S The w a rr a nty i s effective only when: 1. The u nit h as b een erected in a ccord a nce with the ass em b ly in s tr u ction s . 2. The u nit h as b een properly s hingled a nd p a inted or s t a ined a nd re as on ab ly a nd reg u l a rly m a int a ined there a fter. 3 . The f a il u re occ u r s when the u nit i s owned b y the origin a l p u rch as er. 4. B a cky a rd S tor a ge S ol u tion s , LLC h as received the w a rr a nty regi s tr a tion c a rd within thirty ( 3 0) d a y s of p u rch as e a nd notific ation

of the f a il u re in writing within the w a rr a nty period s pecified ab ove. 5. B a cky a rd S tor a ge S ol u tion s , LLC h as h a d re as on ab le opport u nity d u ring the s ixty (60) d a y s following receipt of notific ation

to in s pect a nd verify the f a il u re prior to commencement of a ny rep a ir work.

REQUIREMENT S S tora g e Buildin gs & Playhou s e s To v a lid a te yo u r w a rr a nty, it i s nece ssa ry to properly m a int a in yo u r B a cky a rd S tor a ge S ol u tion s , LLC u nit; s hingle the roof a nd p a int or s olid-colored s t a in the s iding us ing 100% a crylic l a tex exterior prod u ct with a minim u m of two (2) co a t s within thirty ( 3 0) d a y s of ass em b ly;

ab ove a ll door s a nd a ll horizont a l a nd vertic a l trim b o a rd s ; p a int a nd s e a l a ll expo s ed edge s , s ide s a nd f a ce s of S m a rt S ide™ and w a fer b o a rd s iding to incl u de a ll exterior w a ll s a nd a ll s ide s a nd a ll edge s of door s .

Gazebo s , Per g ola s & Timber Buildin gs To v a lid a te yo u r w a rr a nty, it i s nece ssa ry to properly m a int a in yo u r B a cky a rd S tor a ge S ol u tion s , LLC u nit. Thi s incl u de s tre a ting all of the expo s ed ced a r a nd pine su rf a ce s on yo u r g a ze b o or tim b er bu ilding with a n exterior gr a de wood pre s erv a tive, a n exterior oil- bas ed s emi-tr a n s p a rent s t a in, a n a crylic l a tex exterior p a int or a n a crylic l a tex s olid color exterior s t a in within 3 0 d a y s of ass em b ly a nd as needed there a fter to m a int a in yo u r w a rr a nty.

Keep veget a tion trimmed a w a y from bu ilding a nd m a ke su re s iding p a nel s a nd trim do not come in cont a ct with m asonry or cement. The minim u m gro u nd cle a r a nce for s iding m us t b e one h a lf inch (½ inch) from concrete s l ab or two a nd one h a lf inche s (2 ½ ” ) from the ground

when bu ilding i s erected or con s tr u cted on a tre a ted wood floor kit. W a ter from s prinkler s m us t b e kept off u nit. In no event will B a cky a rd

events, acts or omi ss ion s b eyond o u r control incl u ding, bu t not limited to, mi sus e or improper ass em b ly, improper m a inten a nce (which le a d s to rot or dec a y) a nd a ct s of God. B a cky a rd S tor a ge S ol u tion s , LLC will not b e held re s pon s i b le for a ny l ab or co s t s inc urred

to con s tr u ct your unit. Thi s w a rr a nty give s yo u cert a in s pecific right s th a t v a ry from s t a te to s ta te.

CLAIM PROCEDURE To m a ke a cl a im u nder thi s w a rr a nty, yo u c a n either c a ll 1- 888 - 8 27-9056 or prep a re a letter. Ple as e h a ve re a dy the inform a tion b elow when you c a ll or incl u de the inform a tion when writing: 1. The model a nd s ize of the prod u ct. 2. A li s t of the p a rt( s ) for which the cl a im i s m a de. 3 . Proof of p u rch as e of the B a cky a rd S tor a ge S ol u tion s , LLC item, as s hown on the origin a l invoice. 4. R u n code, as li s ted on the yellow w a rr a nty c a rd enclo s ed in the prod u ct p a ck a ge.

M a il the ab ove inform a tion to: B a cky a rd S tor a ge S ol u tion s , LLC Attn: C us tomer S ervice 1000 Terne s Monroe, MI 4 8162

Limited Conditional Warranty *

*WARRANTY TERM S MAY VARY OUT S IDE THE U. S .A. IMPORTANT: Thi s i s your warranty certificate. Plea s e complete and mail your warranty card to properly validate your warranty.

S tor a ge S ol u tion s , LLC b e re s pon s i b le for a ny indirect, incident a l, con s e qu enti a l or s peci a l d a m a ge s nor for f a il u re( s ) th a t a re c aus ed by eventually

caulk