    ContentsContents

    Background of the Trial

    Trial Project for MTN

    Features to Prove In the Trial

  • 8/6/2019 Storage Trial Project for MTN Swaziland

    3/18

    HUAWEI TECHNOLOGIES CO., LTD. Page 3

    Background of the TrialBackground of the Trial

    Trial ProjectTrial Project

    RequirementsRequirements Trial SolutionTrial Solution

    MTN Huawei

    Disaster Recovery

    Easy Management

    Virtual Intelligent

    Storage

    Easy Management

    Disaster Recovery

    Trial project showcase

    The schedule and the responsibilities.

    ValueValue

    CooperatioCooperatio

    nn

    Topic todayTopic today

  • 8/6/2019 Storage Trial Project for MTN Swaziland

    4/18

    HUAWEI TECHNOLOGIES CO., LTD. Page 4

    ContentsContents

    Background of the Trial

    Trial Project for MTN

    Features to Prove In the Trial

  • 8/6/2019 Storage Trial Project for MTN Swaziland

    5/18HUAWEI TECHNOLOGIES CO., LTD. Page 5

    Huawei Trial DiagramHuawei Trial Diagram

  • 8/6/2019 Storage Trial Project for MTN Swaziland

    6/18HUAWEI TECHNOLOGIES CO., LTD. Page 6

    Responsibility Division MatrixResponsibility Division MatrixNo. Item Description MTN Huawei

    1 Test rooms Provide proper space for the trial project (2 racks) Provide

    2 Air conditioners Cooling equipment to keep the working ambient temperaturefrom 5C to 35C;

    Provide

    3 AC power supply Power supply at 16A 240 V 50/60 HZ for each cabinet2KW AC (1KVA* 2 racks)

    Provide

    4 Cabinets 2 racks ( 600 X 1000 X 2200 (mm) each) Provide

    5 Heterogeneous Disk Array(Optional)

    one set of Disk Array used in the existing network(To test Heterogeneous with existing network) (Optional)

    Provide

    6 Assisting technical engineer Provide

    7 Installation, commissioning, testdevices

    Provide

    8 Test software/tools Provide

    9 Test Schedule Approve Provide

    10 Test Cases Approve Provide

    11 Test Report Approve Provide

    12 Clearance & Transport Provide

  • 8/6/2019 Storage Trial Project for MTN Swaziland

    7/18HUAWEI TECHNOLOGIES CO., LTD. Page 7

    Responsibility Of Assisting Technical EngineerResponsibility Of Assisting Technical Engineer

    No. Duty Description Owner

    1 HP Storageconfiguration

    Create host Raidgroup virtual disks on theHP storage and present the virtual disks to VIS

    Mduduzi

    2 Server configuration Scan the disks presented from VIS on theserver and use these disks for billing system

    Mduduzi

    3 Billing systemconfiguration

    Configure the billing system and make sure thesystem work properly

    Mduduzi

    4 Network plan Ip address plan and cables plan to make sure thenetwork between the product center and DR center

    works The two VIS can access each other.

    Mduduzi

  • 8/6/2019 Storage Trial Project for MTN Swaziland

    8/18

    HUAWEI TECHNOLOGIES CO., LTD. Page 8

    Test ItemTest ItemTest Item Sub-Item Optional

    Heterogeneous storagevirtualization function

    Managing storage resources across different storage arrays

    Not damaging existing data in the original arrays Remote replication Synchronous replication

    Asynchronous replication

    Periodic replication

    Bandwidth restriction

    Breakpoint transmission resumption (network fault)

    Disaster recovery

    Snapshot function (backup) HyperClone snapshot

    Complete snapshot

    Optimal snapshot

    Thin-provisioning function Taking Thin-provision Volume

    High Availability One Controller Failed Test

  • 8/6/2019 Storage Trial Project for MTN Swaziland

    9/18

    HUAWEI TECHNOLOGIES CO., LTD. Page 9

    POC SchedulePOC ScheduleID Key Point Task Name Start Date Finish Date Duration (Day) Engineer

    HW MTN

    1 Environment Building up 2009-8-4 2009-8-14

    1.1 Hardware installation 2009-8-4 2009-8-7 4

    1.2 Software Configuration 2009-8-10 2009-8-14 5

    2 Solution Test 2009-8-17 2009-9-25

    2.1 Heterogeneous storage virtualizationfunction test

    2009-8-17 2009-8-21 5

    2.2 Asynchronous replication test 2009-8-24 2009-8-28 5

    2.3 Synchronous replication test 2009-8-31 2009-9-4 5

    2.4 Bandwidth restriction test 2009-9-7 2009-9-11 5

    2.5 Breakpoint transmission resumption(network fault) test

    2009-9-14 2009-9-18 5

    2.6 Disaster recovery test 2009-9-5 2009-9-11 5

    2.7 Periodic replication test 2009-9-12 2009-9-18 5

    2.8 Snapshot function (backup) test 2009-9-21 2009-9-25 5

    2.9 Storage consolidation(ThinProvisioning) test

    2009-9-28 2009-10-2 5

    3 Documentation & Report 2009-10-5 2009-10-15

    3.1 Test report prepare 2009-10-5 2009-10-9 5

    3.2 Report signature 2009-10-12 2009-10-15 3

  • 8/6/2019 Storage Trial Project for MTN Swaziland

    10/18

    HUAWEI TECHNOLOGIES CO., LTD. Page 10

    ContentsContents

    Background of the Trial

    Trial Project for MTN

    Features to Prove In the Trial

  • 8/6/2019 Storage Trial Project for MTN Swaziland

    11/18

    HUAWEI TECHNOLOGIES CO., LTD. Page 11

    Storage Integration to be TestedStorage Integration to be Tested

    Windows AIX HP-UX Solaris Linux Netware

    VIS6000

    Host Layer

    SAN DAS

    Network Layer

    Storage Layer

    Centralized storage resource poolStorage

    integration

    http://www-900.ibm.com/storage/cn/disk/ds8000/
  • 8/6/2019 Storage Trial Project for MTN Swaziland

    12/18

    HUAWEI TECHNOLOGIES CO., LTD. Page 12

    Synchronous Replication to be TestedSynchronous Replication to be Tested

    Production center Disaster backup center

    VIS6000 VIS6000

    Storage

    Resource

    Layer

    HostLayer

    Logvolume

    Storage

    Resource

    Layer

    Write newdata.

    Write data intothe log volume.

    Write data

    into theproduction

    volume.

    Send a write request.

    "Ok"

    "Complete"

    Write data into

    the replicationvolume.

    Writing data iscompete.

    Productionvolume

    Logvolume

    Replicationvolume

    The replication technology of the VIS6000 is based on dynamic

    I/O, thus implementing true real-time replication.

    Synchronous

    Replication

  • 8/6/2019 Storage Trial Project for MTN Swaziland

    13/18

    HUAWEI TECHNOLOGIES CO., LTD. Page 13

    Asynchronous Replication to be TestedAsynchronous Replication to be Tested

    The log volume is used to store data when a link failure occur during data

    replication. Once the link is recovered, the data stored in the log volume is copied to

    the disaster backup center. This ensures the reliability of data replication.

    Asynchronous

    Replication

    Logvolume

    ReplicationvolumeLog

    volumeProductvolume

    VIS6000 VIS6000

    Storage

    Resource

    Layer

    Host

    Layer

    Storage

    ResourceLayer

    Write newdata.

    Write datainto the log

    volume.

    Write data

    into the

    production

    volume.

    Send a write request.

    "Ok"

    "Complete"

    Write data intothe replication

    volume.

    Writing data iscomplete.

    Production center Disaster backup center

  • 8/6/2019 Storage Trial Project for MTN Swaziland

    14/18

    HUAWEI TECHNOLOGIES CO., LTD. Page 14

    Cyclical Replication to be TestedCyclical Replication to be Tested

    The production center is busy in the day and relatively idle at night. As a replication

    trigger time can be set based on needs in cyclical replication, you may set the

    replication to be triggered at midnight.

    Cyclical

    Replication

    VIS6000 VIS6000

    Storage

    Resource

    Layer

    Host

    Layer

    Production center Disaster backup center

    Logvolume Production

    volume

    Logvolume

    Replicationvolume

    Write newdata.

    Write newdata into thelog volume.

    Write datacontinuouslyinto the logvolume.

    Send a write request.

    "Ok"

    "Complete"

    Write data into

    the replicationvolume.

    Writing data is complete.

    http://image.baidu.com/i?ct=503316480&z=0&tn=baiduimagedetail&word=%CC%AB%D1%F4&in=26945&cl=2&cm=1&sc=0&lm=-1&pn=76&rn=1&di=1555248728&ln=2000
  • 8/6/2019 Storage Trial Project for MTN Swaziland

    15/18

    HUAWEI TECHNOLOGIES CO., LTD. Page 15

    High Availability to be TestedHigh Availability to be Tested

    VIS6000

    Controller A

    VIS6000

    Controller B

    Service 1 Service 2

    LUN 1

    Data flow of service 1

    Data flow of service 2

    Troubleshooting

    LUN 2

    After the first controller recovers from the fault, the services are

    switched back to it. The cluster design improves availability.

    High

    Availability

  • 8/6/2019 Storage Trial Project for MTN Swaziland

    16/18

    HUAWEI TECHNOLOGIES CO., LTD. Page 16

    Upgrade Smoothly to be TestedUpgrade Smoothly to be Tested

    Expansion according to requirements

    without any effect on server

    configuration

    Thin

    Provision

    1T

    1TB 1TB

    1T 2T 1T

    Storage Space isnot enough

    1TB 1TB1TB

  • 8/6/2019 Storage Trial Project for MTN Swaziland

    17/18

    HUAWEI TECHNOLOGIES CO., LTD. Page 17

    Disaster Recovery Solution to be TestedDisaster Recovery Solution to be Tested

    OracleBillingserver

    Billingserver

    Billingserver

    Primary Storage

    Primary Site

    IP SAN/FC SAN

    Storage

    VIS

    WAN

    VIS

    DR site

    Virtual

    Intelligent

    DR

    Two pair of VIS system can achieve zero data loss disaster recoverywithout effect on original network. No need to install any agent onhosts.