Status of Construction and Commissioning of the GSI HITRAP Decelerator

  • Upload
    fausta

  • View
    35

  • Download
    0

Embed Size (px)

DESCRIPTION

Status of Construction and Commissioning of the GSI HITRAP Decelerator. Outline: Introduction and motivation Beam dynamics issues of the decelerator Status of the linac, trap and of the commissioning efforts. HITRAP. Charge state breeding. Production of multi-charged ions. - PowerPoint PPT Presentation