7/23/2019 Standard Installation of Grounding and Power AC Cables in Huawei Outdoor Cabinet_ Indosat MBS Project_South Sulawesi Region http://slidepdf.com/reader/full/standard-installation-of-grounding-and-power-ac-cables-in-huawei-outdoor-cabinet 1/8 HUAWEI TECHNOLOGIES CO., LTD. Security Level: www.huawei.com Made in : Huawei Warehouse Assembly Area. Drafted by : Marwan Purba. Region : Makasar - South Sulawesi. Standard Installation of Grounding and AC Power cable in Huawei Outdoor Cabinet in flat concrete foundation.

Standard Installation of Grounding and Power AC Cables in Huawei Outdoor Cabinet_ Indosat MBS Project_South Sulawesi Region

Embed Size (px)

Citation preview

Page 1: Standard Installation of Grounding and Power AC Cables in Huawei Outdoor Cabinet_ Indosat MBS Project_South Sulawesi Region

7/23/2019 Standard Installation of Grounding and Power AC Cables in Huawei Outdoor Cabinet_ Indosat MBS Project_South Sulawesi Region

http://slidepdf.com/reader/full/standard-installation-of-grounding-and-power-ac-cables-in-huawei-outdoor-cabinet 1/8

HUAWEI TECHNOLOGIES CO., LTD.

Security Level:

www.huawei.com

Made in : Huawei Warehouse Assembly Area.

Drafted by : Marwan Purba.

Region : Makasar - South Sulawesi.

Standard Installation of Grounding and AC Power cable in Huawei

Outdoor Cabinet in flat concrete foundation.

Page 2: Standard Installation of Grounding and Power AC Cables in Huawei Outdoor Cabinet_ Indosat MBS Project_South Sulawesi Region

7/23/2019 Standard Installation of Grounding and Power AC Cables in Huawei Outdoor Cabinet_ Indosat MBS Project_South Sulawesi Region

http://slidepdf.com/reader/full/standard-installation-of-grounding-and-power-ac-cables-in-huawei-outdoor-cabinet 2/8

No  Name  Company  Sign 

Rae Lawrance as SME. PT. Indosat

Marwan Purba as Quality Controller. PT. Huawei.

3 Muhammad Fauzan as Project Engineer. PT. Huawei.

This document is Installation Standard for Grounding and AC Power Termination in Huawei

Outdoor Cabinet in the flat concrete.

Built by Huawei and Indosat Team in Huawei Warehouse Pre assembly Area Makasar.

Below are PIC of each company. 

Page 3: Standard Installation of Grounding and Power AC Cables in Huawei Outdoor Cabinet_ Indosat MBS Project_South Sulawesi Region

7/23/2019 Standard Installation of Grounding and Power AC Cables in Huawei Outdoor Cabinet_ Indosat MBS Project_South Sulawesi Region

http://slidepdf.com/reader/full/standard-installation-of-grounding-and-power-ac-cables-in-huawei-outdoor-cabinet 3/8

 

Full view Door Open Outdoor Cabinet Full view Door closed.

Outdoor Cabinet

Page 4: Standard Installation of Grounding and Power AC Cables in Huawei Outdoor Cabinet_ Indosat MBS Project_South Sulawesi Region

7/23/2019 Standard Installation of Grounding and Power AC Cables in Huawei Outdoor Cabinet_ Indosat MBS Project_South Sulawesi Region

http://slidepdf.com/reader/full/standard-installation-of-grounding-and-power-ac-cables-in-huawei-outdoor-cabinet 4/8

 

Termination of cables through at the bottom inlet gland.

Page 5: Standard Installation of Grounding and Power AC Cables in Huawei Outdoor Cabinet_ Indosat MBS Project_South Sulawesi Region

7/23/2019 Standard Installation of Grounding and Power AC Cables in Huawei Outdoor Cabinet_ Indosat MBS Project_South Sulawesi Region

http://slidepdf.com/reader/full/standard-installation-of-grounding-and-power-ac-cables-in-huawei-outdoor-cabinet 5/8

 

2 cables of GI-wire from Outdoor grounding bar

coming through the back gland of cabinet andconnected to 2 bolts of Plinth in front.

1 cable of GI-wire from Outdoor grounding bar

coming through the back gland of cabinet usingand connected to left side bolts of cabinet.

3 grounding cables of GI-wire termination

Page 6: Standard Installation of Grounding and Power AC Cables in Huawei Outdoor Cabinet_ Indosat MBS Project_South Sulawesi Region

7/23/2019 Standard Installation of Grounding and Power AC Cables in Huawei Outdoor Cabinet_ Indosat MBS Project_South Sulawesi Region

http://slidepdf.com/reader/full/standard-installation-of-grounding-and-power-ac-cables-in-huawei-outdoor-cabinet 6/8

 

Grounding cable yellow green from Indoor

grounding bar, going down through the inletgland (R14).

And connected to the plinth.

Indoor grounding termination

Page 7: Standard Installation of Grounding and Power AC Cables in Huawei Outdoor Cabinet_ Indosat MBS Project_South Sulawesi Region

7/23/2019 Standard Installation of Grounding and Power AC Cables in Huawei Outdoor Cabinet_ Indosat MBS Project_South Sulawesi Region

http://slidepdf.com/reader/full/standard-installation-of-grounding-and-power-ac-cables-in-huawei-outdoor-cabinet 7/8

 

AC Power cable from ACPDB get inside

outdoor cabinet through inlet (R15).

AC Power terminated in MCB of Outdoor

cabinet. Phase-R: Brown, Phase-S: Black,Phase-T: Grey and Neutral: Blue.

 AC Power Termination

Page 8: Standard Installation of Grounding and Power AC Cables in Huawei Outdoor Cabinet_ Indosat MBS Project_South Sulawesi Region

7/23/2019 Standard Installation of Grounding and Power AC Cables in Huawei Outdoor Cabinet_ Indosat MBS Project_South Sulawesi Region

http://slidepdf.com/reader/full/standard-installation-of-grounding-and-power-ac-cables-in-huawei-outdoor-cabinet 8/8

Thank youwww.huawei.com 

Copyright©2011 Huawei Technologies Co., Ltd. All Rights Reserved. 

The information in this document may contain predictive statements including, without limitation, statementsregarding the future financial and operating results, future product portfolio, new technology, etc. There are anumber of factors that could cause actual results and developments to differ materially from those expressed orimplied in the predictive statements. Therefore, such information is provided for reference purpose only andconstitutes neither an offer nor an acceptance. Huawei may change the information at any time without notice.