SPECIFICATION Building Demolition and Remediation of Impacted Soil Riding Mountain National Park, Manitoba Solicitation No. ET022-151830/A Project #: R.073988.001

SPECIFICATION Building Demolition and Remediation of

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SPECIFICATION Building Demolition and Remediation of

SPECIFICATION Building Demolition and Remediation of Impacted Soil Riding Mountain National Park, Manitoba Solicitation No. ET022-151830/A Project #: R.073988.001

Page 2: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 00 01 10 Riding Mountain National Park, MB TABLE OF CONTENTS R.073988.001 Page 1

Section Number Section Title No. of Pages Division 01 – General Requirements 01 11 00 Summary of Work 7 01 14 00 Work Restrictions 2 01 31 19 Project Meetings 2 01 32 16.07 Construction Progress Schedules – Bar (GANTT) Chart 3 01 33 00 Submittal Procedures 2 01 35 00.06 Special Procedures for Traffic Control 2 01 35 29.06 Health and Safety Requirements 6 01 35 43 Environmental Procedures 5 01 52 00 Construction Facilities 3 01 56 00 Temporary Barriers and Enclosures 2 01 57 13 Erosion and Sediment Control 2 01 74 11 Cleaning 2 01 74 21 Construction/Demolition Waste Management and Disposal 7 01 77 00 Closeout Procedures 2 01 78 00 Closeout Submittals 1 Division 02 – Existing Conditions 02 41 16 Structure Demolition 6 02 42 13 Deconstruction of Structures 7 02 61 00.01 Soil Remediation 4 02 81 01 Hazardous Materials 5 02 82 00.01 Asbestos Abatement - Minimum Precautions 6 Division 31 – Earthwork 31 23 33.01 Excavating, Trenching and Backfilling 7 Supporting Documentation Figure 01 Location Plan Figure 02 Site Plan Figure 03 Area of Impacted Soil Remediation and Selective Demolition Appendix A Supplemental Phase II ESA, Former Mount Agassiz Ski Lodge, Riding Mountain

National Park, DST Consulting Engineers Inc., October 14, 2014. Appendix B Hazardous Materials Survey, Former Mount Agassiz Ski Resort, Riding Mountain

National Park, DST Consulting Engineers Inc., September 29, 2014. Appendix C Leachable Lead Results - Painted Surfaces

END OF SECTION

Page 3: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 01 11 00 Riding Mountain National Park, MB SUMMARY OF WORK R.073988.001 Page 1 December 2014

Part 1 General

1.1 WORK COVERED BY CONTRACT DOCUMENTS

.1 Title and description of Work: Soil remediation including building demolition of Former Mount Agassiz Ski Resort Lodge, Riding Mountain National Park, near McCreary, Manitoba.

.2 The work comprises all activities associated with the remediation of petroleum hydrocarbon (PHC) and polycyclic aromatic hydrocarbon (PAH) impacted soil located within the building footprint of the Former Mount Agassiz Ski Lodge, and includes building demolition and designated substance removal/disposal, including asbestos abatement.

.3 The site will be restored to pre-deconstruction conditions or better.

.4 Mobilization and demobilization consists of preparatory work and operations including but not limited to, those necessary for the movement of personnel, equipment, supplies and incidentals to and from the project.

.5 Work included:

.1 Permit Applications, including:

.1 Obtaining all municipal, provincial and federal permits, as required to complete the Work.

.2 Management of Site Safety, including:

.1 Responsibility for Site Safety.

.2 Development of Site Specific Safety Plan.

.3 Coordinating and Leading Pre-Job Safety Meeting and Daily On-Site Safety Meetings.

.3 Site Preparation Activities, including:

.1 Site property limits should be identified prior to beginning work and all work should remain within the property boundaries.

.2 Erection of temporary perimeter security fencing.

.3 Erosion and sediment control measures.

.6 “Departmental Representative” means the person designated in the Contract or by written notice to the Contractor, to act as the Departmental Representative for the purposes of the Contract, and includes a person, designated and authorized in writing by the Departmental Representative to the Contractor.

.7 Structure Demolition, including:

.1 Completing a Waste Audit (WA), quantifying amounts of materials and wastes that will be generated during deconstruction/demolition activities.

.2 Submitting a Waste Reduction Workplan (WRW) identifying actions to be taken to reduce, reuse and recycle materials during deconstruction, including the wood rafters (16) from the east wing of the Mount Agassiz Ski Lodge for designated reuse by the Owner.

Page 4: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 01 11 00 Riding Mountain National Park, MB SUMMARY OF WORK R.073988.001 Page 2

.3 Removal and disposal of the Mount Agassiz Ski Lodge, including all building contents, structure and concrete foundations (southwest and northeast basements and central crawl space).

.4 Removal and disposal of all hazardous materials and designated substances, including asbestos abatement.

.5 Backfilling with imported Type 2 fill any open areas excavated to facilitate demolition requirements (1,600 tonnes or approximately 900 m3).

.6 Disconnecting and capping of services as indicated or as directed by the Department Representative.

.7 Restoration and grading of all areas affected by the demolition work.

.8 Provision of a photographic record of all waste materials removed from the site for disposal.

.8 Soil Remediation, including:

.1 Co-ordination, supervision and preparation for excavation and disposal of 630 tonnes (350 m3) of PHC/PAH contaminated soil from beneath the Mount Agassiz Ski Lodge.

.2 Excavation, stockpiling, replacement and compaction of 50 m3 of clean (Type 3) soil from the remedial excavation area.

.3 Provision and installation of materials and equipment necessary to remediate site.

.4 Implementation of safety work zones, site Health and Safety Plans and Emergency Response Plans.

.5 Air monitoring around remedial area during work.

.6 Insurance that remediation has no negative impact on environment.

.7 Construction of water control and recovery structures, including the supply and installation of 110 m of straw wattles.

.8 Management of contaminated waters generated during soil remediation work, including separation, recovery and elimination of free-phase hydrocarbons.

.9 Dismantling facilities following acceptance of final report by Departmental Representative.

.10 Backfilling the balance of the remedial excavation with 300 m3 of Type 3 on-site borrow material, including excavation of the borrow, transport to the work area, placement and compaction.

.11 Obtaining required permits and approvals for waste disposal.

.9 Hazardous Materials, including:

.1 On-site storage/handling and management of all hazardous materials required during demolition of the Mount Agassiz Ski Lodge and removal and disposal of all designated substances, including asbestos abatement.

.10 Asbestos Abatement, including:

.1 Removing non-friable asbestos-containing materials, other than ceiling tiles, if the material is installed or removed without being broken, cut, drilled, abraded, ground, sanded or vibrated at locations indicated on drawings.

Page 5: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 01 11 00 Riding Mountain National Park, MB SUMMARY OF WORK R.073988.001 Page 3

.2 Break, cut, grind, sand, drill, scrape, vibrate or abrade non-friable asbestos containing materials using non-powered hand-held tools, and the material is wetted to control the spread of dust or fibres.

.11 Work by Others: Soil sampling by Departmental Representative.

1.2 CONTRACT METHOD

.1 Construct Work under combined lump sum and unit price contract.

.2 Relations and responsibilities between Contractor and subcontractors assigned by Owner are as defined in Conditions of Contract. Assigned Subcontractors must, in addition:

.1 Furnish to Contractor, bonds covering faithful performance of subcontracted work and payment of obligations thereunder when Contractor is required to furnish such bonds.

.2 Purchase and maintain liability insurance to protect Contractor from claims for not less than limits of liability which Contractor is required to provide to Owner.

1.3 WORK BY OTHERS

.1 Co-operate with other Contractors in carrying out their respective works and carry out instructions from Departmental Representative.

.2 Co-ordinate work with that of other Contractors. If any part of work under this Contract depends for its proper execution or result upon work of another Contractor, report promptly to Departmental Representative, in writing, any defects which may interfere with proper execution of Work.

1.4 COORDINATION

.1 Perform coordination of progress schedules, submittals, use of site, temporary facilities, and construction Work, with progress of Work of other contractors, where applicable, under instructions of the Departmental Representative.

1.5 CONSTRUCTION ORGANIZATION AND START UP

.1 Within 7 days after award of Contract, request a meeting of parties in contract to discuss and resolve administrative procedures and responsibilities.

.2 Departmental Representative, Owner, Contractor, major Subcontractors, field inspectors and supervisors to be in attendance.

.3 Agenda to include:

.1 Appointment of official representative of participants in the Work.

.2 Schedule of Work: in accordance with Section 01 32 16.07 - Construction Progress Schedules - Bar (GANTT) Chart.

.3 Requirements for temporary facilities, site sign, offices, storage sheds, utilities, fences in accordance with Section 01 52 00 - Construction Facilities.

.4 Site security in accordance with Section 01 56 00 - Temporary Barriers and Enclosures.

.5 Proposed changes, change orders, procedures, approvals required, mark-up percentages permitted, time extensions, overtime, administrative requirements.

Page 6: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 01 11 00 Riding Mountain National Park, MB SUMMARY OF WORK R.073988.001 Page 4

.6 Health and safety requirements in accordance with Section 01 35 29.06 - Health and Safety Requirements.

.7 Environmental protection requirements in accordance with Section 01 35 43 - Environmental Proceedures.

.8 Close out procedures and submittals in accordance with Sections 01 77 00 - Closeout Procedures and 01 78 00 - Closeout Submittals.

.9 Other Business.

.4 During construction, coordinate use of site and facilities through Departmental Representative.

.5 Coordinate field engineering and layout work with Departmental Representative.

1.6 SUBMITTALS

.1 Submittals in accordance with Section 01 33 00 - Submittal Procedures.

.2 Submit, within 14 days of Contract Award, Environmental Protection Plan detailing management of waste (waste streams and disposal locations), Emergency Response Plan and Health and Safety Plan, in accordance with Section 01 35 29.06 - Health and Safety Requirements and Section 01 35 43 - Environmental Procedures.

.3 Site Layout: within 14 days of Contract Award and prior to mobilization to site, submit site layout drawings showing existing conditions and facilities, construction facilities and temporary controls provided by Contractor including the following:

.1 Equipment and personnel decontamination areas.

.2 Means of ingress, egress and temporary traffic control facilities (as required).

.3 Equipment and material staging areas.

.4 Exclusion Zones, Contamination Reduction Zones and other zones specified in Contractor’s site-specific Health and Safety Plan

.4 Submit documentation verifying that employees have been trained, tested and certified to safely and effectively carry out their assigned duties in accordance with Section 01 35 29.06 - Health and Safety Requirements.

.5 Submit Waste Audit (WA) and Waste Reduction Workplan (WRW) in accordance with Section 01 74 21 - Construction/Demolition Waste Management and Disposal.

1.7 WORK SEQUENCE

.1 Construct Work in stages to accommodate overall project schedule, including substantial completion within 6 weeks of Contract Award.

.2 Maintain fire access/control.

1.8 CONTRACTOR USE OF PREMISES

.1 Limit use of premises for Work, for storage, and for access, to allow:

.1 Work by other contractors.

.2 Co-ordinate use of premises under direction of PCA and Department Representative.

Page 7: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 01 11 00 Riding Mountain National Park, MB SUMMARY OF WORK R.073988.001 Page 5 1.9 CONSTRUCTION PARKING

.1 Parking will be permitted on site provided it does not disrupt performance of Work.

.2 Provide and maintain adequate access to project site.

1.10 ALTERATIONS, ADDITIONS OR REPAIRS TO EXISTING BUILDING

.1 Execute work with least possible interference or disturbance to site. Arrange with Departmental Representative to facilitate execution of work.

1.11 EXISTING SITE CONDITIONS

.1 Contractor to satisfy themselves as to the nature and location of the work, local conditions, soil structure and topography at the sites of the work, the equipment and facilities needed preliminary to and during the execution of the work, the means of access to the sites, all necessary information as to risks, contingencies, and circumstances and all other maters which can in any way affect the work under the Contract.

.2 A limited subsurface investigation was carried out at the site. The report, titled “Supplemental Phase II ESA, Former Mount Agassiz Ski Lodge, Riding Mountain National Park, Manitoba”, dated October 14, 2014 is appended to the Specifications for reference (see Appendix A).

.3 A limited hazardous material survey was carried out at the site. The report, titled “Hazardous Materials Survey, Former Mount Agassiz Ski Resort, Riding Mountain National Park, Manitoba, Canada”, dated September 29, 2014 is appended to the Specifications for reference (see Appendix B).

.4 Leachable lead analysis was carried out on representative paint samples collected from the interior and exterior painted surfaces of the Mount Agassiz Ski Lodge. Copies of the analytical results are appended to the Specifications for reference (see Appendix C).

1.12 EXISTING SERVICES

.1 Notify Department Representative and utility companies of intended interruption of services and obtain required permission.

.2 Where Work involves breaking into or connecting to existing services, give Departmental Representative 48 hours notice. Carry out work at times as directed by governing authorities with minimum disturbance to vehicular traffic and tenant operations.

.3 Establish location and extent of service lines in area of work before starting Work. Notify Departmental Representative of findings.

.4 Submit schedule to and obtain approval from Departmental Representative for any shut-down or closure of active service or facility including power and communications services. Adhere to approved schedule and provide notice to affected parties.

.5 Provide adequate bridging over trenches which cross sidewalks or roads to permit normal traffic.

.6 Where unknown services are encountered, immediately advise Departmental Representative and confirm findings in writing.

.7 Protect, relocate or maintain existing active services. When inactive services are encountered, cap off in manner approved by authorities having jurisdiction.

Page 8: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 01 11 00 Riding Mountain National Park, MB SUMMARY OF WORK R.073988.001 Page 6

.8 Record locations of maintained, re-routed and abandoned service lines.

.9 Construct barriers in accordance with Section 01 56 00 - Temporary Barriers and Enclosures.

.10 Maintain existing services to other buildings at the site and provide for personnel and vehicle access.

1.13 TEMPORARY UTILITY SERVICES

.1 If needed, provide temporary utility services during construction until excavation has been successfully remediated and backfilled.

.2 Remove temporary utility services and restore and stabilize areas disturbed during removal.

1.14 WASTE DISPOSAL QUANTITIES

.1 Contractor to provide summary of all wastes disposed including quantities, disposal locations, and original scale tickets, as applicable.

1.15 DOCUMENTS REQUIRED

.1 Maintain at job site, one copy each document as follows:

.1 Contract Drawings.

.2 Specifications.

.3 Addenda.

.4 Change Orders.

.5 Other Modifications to Contract.

.6 Traffic Management Plan.

.7 Workplace Hazardous Materials Information System documents.

.8 Environmental Protection Plan.

.9 Field Test Reports.

.10 Copy of Approved Work Schedule and most recent updated schedule.

.11 Health and Safety Plan and Other Safety Related Documents.

.12 Notice of Project.

.13 Labour and Material Board.

.14 Other documents as specified.

Part 2 Products

2.1 NOT USED

.1 Not used.

Page 9: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 01 11 00 Riding Mountain National Park, MB SUMMARY OF WORK R.073988.001 Page 7 Part 3 Execution

3.1 NOT USED

.1 Not used.

END OF SECTION

Page 10: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 01 14 00 Riding Mountain National Park, MB WORK RESTRICTIONS R.073988.001 Page 1 December 2014

Part 1 General

1.1 ACCESS AND EGRESS

.1 Design, construct and maintain temporary "access to" and "egress from" work areas, including stairs, runways, ramps or ladders and scaffolding, independent of finished surfaces if necessary and in accordance with relevant municipal, provincial and other regulations.

1.2 USE OF SITE AND FACILITIES

.1 Execute work with least possible interference or disturbance to normal use of premises. Make arrangements with Departmental Representative to facilitate work as stated.

.2 Maintain existing services to surrounding facilities and provide for personnel and vehicle access.

.3 Where security is reduced by work provide temporary means to maintain security.

.4 Contractor to provide sanitary facilities and will be responsible for upkeep of these facilities.

1.3 EXISTING SERVICES

.1 Notify, Departmental Representative and utility companies of intended interruption of services and obtain required permission.

.2 Where Work involves breaking into or connecting to existing services, give Departmental Representative 48 hours of notice for necessary interruption of mechanical or electrical service throughout course of work. Keep duration of interruptions minimum. Carry out interruptions after normal working hours of occupants, preferably on weekends.

.3 Provide for pedestrian and vehicular traffic. Limit access to Work as indicated in Section 01 56 00 - Temporary Barriers and Enclosures.

.4 Construct barriers in accordance with Section 01 56 00 - Temporary Barriers and Enclosures.

1.4 SPECIAL REQUIREMENTS

.1 Submit schedule in accordance with Section 01 32 16.07 - Construction Progress Schedule - Bar (GANTT) Chart.

.2 Ensure Contractor's personnel employed on site are familiar with and obey regulations including safety, fire, traffic and security regulations.

.3 Keep within limits of work and avenues of ingress and egress.

.4 Main gate to be locked and/or manned at all times.

.5 Contractor to provide portable power and heat generation needed to complete work. Use of temporary power and/or heat within Lodge building to be restricted to manned or working hours, only.

Page 11: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 01 14 00 Riding Mountain National Park, MB WORK RESTRICTIONS R.073988.001 Page 2 1.5 SMOKING ENVIRONMENT

.1 Comply with smoking restrictions. Smoking is not permitted.

Part 2 Products

2.1 NOT USED

.1 Not Used.

Part 3 Execution

3.1 NOT USED

.1 Not Used.

END OF SECTION

Page 12: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 01 31 19 Riding Mountain National Park, MB PROJECT MEETINGS R.073988.001 Page 1 December 2014

Part 1 General

1.1 ADMINISTRATIVE

.1 Departmental Representative to schedule and administer preconstruction meeting upon Award.

.2 Departmental Representative to schedule and administer project meetings throughout the progress of the Work as needed.

.3 Representative of Contractor, Subcontractor and suppliers attending meetings will be qualified and authorized to act on behalf of party each represents.

.4 Departmental Representative and Contractor to meet daily once work on site commences to discuss:

.1 Field observations, problems and conflicts.

.2 Problems which impede construction schedule.

.3 Corrective measures and procedures to regain projected schedule.

.4 Revision to construction schedule.

.5 Progress schedule during succeeding work period.

.6 Review proposed changes for affect on construction schedule and on completion date.

.7 Other business including possible changes in scope.

1.2 PRECONSTRUCTION MEETING

.1 Within 7 days after award of Contract, request a meeting of parties in contract to discuss and resolve administrative procedures and responsibilities.

.2 Departmental Representative, Owner, Contractor, major Subcontractors, field inspectors and supervisors will be in attendance.

.3 Establish time and location of meeting and notify parties concerned minimum 5 days before meeting.

.4 Incorporate mutually agreed variations to Contract Documents into Agreement, prior to signing.

.5 Agenda to include:

.1 Appointment of official representative of participants in the Work.

.2 Schedule of Work: in accordance with Section 01 32 16.07 - Construction Progress Schedules - Bar (GANTT) Chart.

.3 Requirements for temporary facilities, site sign, offices, storage sheds, utilities, fences in accordance with Section 01 52 00 - Construction Facilities.

.4 Site security in accordance with Section 01 56 00 - Temporary Barriers and Enclosures.

.5 Proposed changes, change orders, procedures, approvals required, mark-up percentages permitted, time extensions, overtime, administrative requirements.

Page 13: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 01 31 19 Riding Mountain National Park, MB PROJECT MEETINGS R.073988.001 Page 2

.6 Health and safety requirements in accordance with Section 01 35 29.06 - Health and Safety Requirements.

.7 Environmental protection requirements in accordance with Section 01 35 43 - Environmental Procedures.

.8 Close out procedures and submittals in accordance with Sections 01 77 00 - Closeout Procedures and 01 78 00 - Closeout Submittals.

.9 Other business.

1.3 PROGRESS MEETINGS

.1 During course of Work, schedule regular progress meetings.

.2 Contractor, major Subcontractors involved in Work and Departmental Representative are to be in attendance.

.3 Agenda to include the following:

.1 Review of Work progress since previous meeting.

.2 Field observations, problems, conflicts.

.3 Problems which impede construction schedule.

.4 Corrective measures and procedures to regain projected schedule.

.5 Revision to construction schedule.

.6 Progress schedule, during succeeding work period.

.7 Review submittal schedules: expedite as required.

.8 Review proposed changes for affect on construction schedule and on completion date.

.9 Other business.

Part 2 Products

2.1 NOT USED

.1 Not Used.

Part 3 Execution

3.1 NOT USED

.1 Not Used.

END OF SECTION

Page 14: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge 01 32 16.07 Riding Mountain National Park, MB CONSTRUCTION PROGRESS SCHEDULE - R.073988.001 BAR (GANTT) CHART Page 1 December 2014

Part 1 General

1.1 DEFINITIONS

.1 Activity: element of work performed during course of Project. Activity normally has expected duration, and expected cost and expected resource requirements. Activities can be subdivided into tasks.

.2 Bar Chart (GANTT Chart): graphic display of schedule-related information. In typical bar chart, activities or other Project elements are listed down left side of chart, dates are shown across top, and activity durations are shown as date-placed horizontal bars. Generally Bar Chart should be derived from commercially available computerized project management system.

.3 Baseline: original approved plan (for project, work package or activity), plus or minus approved scope changes.

.4 Construction Work Week: Sunday to Saturday, inclusive, will provide seven day work week and define schedule calendar working days as part of Bar (GANTT) Chart submission.

.5 Duration: number of work periods (not including holidays or other nonworking periods) required to complete activity or other project element. Usually expressed as work days or work weeks.

.6 Milestone: significant event in project, usually completion of major deliverable.

.7 Project Schedule: planned dates for performing activities and the planned dates for meeting milestones. Dynamic, detailed record of tasks or activities that must be accomplished to satisfy Project objectives. Monitoring and control process involves using Project Schedule in executing and controlling activities and is used as basis for decision making throughout project life cycle.

.8 Project Planning, Monitoring and Control System: overall system operated by Departmental Representative to enable monitoring of project Work in relation to established milestones.

1.2 REQUIREMENTS

.1 Ensure Project Schedule is practical and remains within specified duration.

.2 Plan to complete Work in accordance with prescribed milestones and time frame.

.3 Schedule activity durations to a maximum of approximately 10 working days to allow for progress reporting.

.4 Ensure that it is understood that time of beginning, rate of progress, Interim Certificate and Final Certificate as defined times of completion are of the essence of this contract.

1.3 ACTION AND INFORMATIONAL SUBMITTALS

.1 Submit in accordance with Section 01 33 00 - Submittal Procedures.

Page 15: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge 01 32 16.07 Riding Mountain National Park, MB CONSTRUCTION PROGRESS SCHEDULE - R.073988.001 BAR (GANTT) CHART Page 2

.2 Submit to Departmental Representative within 5 working days of Award of Contract Schedule as Bar (GANTT) Chart for planning, monitoring and reporting of project progress.

1.4 PROJECT MILESTONES

.1 Project milestones form interim targets for Project Schedule.

.1 Participate in Preconstruction Meeting within seven working days of award date.

.2 Complete preparatory Work including landfill acceptance, permitting, and health and safety within two weeks of award date.

.3 Interim Certificate (Substantial Completion) within 6 weeks of Award of Contract Date.

1.5 PROJECT SCHEDULE

.1 Structure schedule to allow orderly planning, organizing and execution of Work as Bar Chart (GANTT).

.2 Ensure detailed Project Schedule includes as minimum milestone and activity types as follows:

.1 Award.

.2 Permits including record of licensed waste management facility acceptance of demolition waste and impacted soil from Site.

.3 All submittals as specified in Section 01 33 00 - Submittal Procedures including but not limited to health and safety plan, environmental protection plan, emergency response plan, and site layout drawings.

.4 Completion of utility locates.

.5 Completion of Waste Audit and Waste Reduction Work Plan in accordance with Section 01 74 21 - Construction/Demolition Waste Management and Disposal.

.6 Mobilization.

.7 Demolition.

.8 Excavation.

.9 Off-site disposal of impacted soil at licensed waste management facility.

.10 Backfill and compaction.

.11 Final Grading.

.12 Final inspection.

.13 Deficiency corrections.

.14 Demobilization.

.3 Departmental Representative will review Project Schedule and return revised schedule within five working days.

.4 Revise schedule and resubmit within five working days.

.5 Accepted revised schedule will be used as baseline for updates.

Page 16: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge 01 32 16.07 Riding Mountain National Park, MB CONSTRUCTION PROGRESS SCHEDULE - R.073988.001 BAR (GANTT) CHART Page 3 1.6 PROJECT SCHEDULE REPORTING

.1 Update Project Schedule on regular basis reflecting activity changes and completions, as well as activities in progress and submit to Departmental Representative for review.

1.7 PROJECT MEETINGS

.1 Discuss Project Schedule at site meetings with Departmental Representative, identify activities that are behind schedule and provide measures to regain slippage. Activities considered behind schedule are those with projected start or completion dates later than current approved dates shown on baseline schedule.

Part 2 Products

2.1 NOT USED

.1 Not used.

Part 3 Execution

3.1 NOT USED

.1 Not used.

END OF SECTION

Page 17: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 01 33 00 Riding Mountain National Park, MB SUBMITTAL PROCEDURES R.073988.001 Page 1 December 2014

Part 1 General

1.1 ADMINISTRATIVE

.1 Submit to Departmental Representative submittals listed for review. Submit promptly and in orderly sequence to not cause delay in Work. Failure to submit as required by this specification in ample time is not considered sufficient reason for extension of Contract Time and no claim for extension by reason of such default will be allowed.

.2 Do not proceed with Work affected by submittal until review is complete.

.3 Present product data, samples and mock-ups in SI Metric units.

.4 Where items or information is not produced in SI Metric units converted values are acceptable.

.5 Review submittals prior to submission to Departmental Representative. This review represents that necessary requirements have been determined and verified, or will be, and that each submittal has been checked and co-ordinated with requirements of Work and Contract Documents. Submittals not stamped, signed, dated and identified as to specific project will be returned without being examined and considered rejected.

.6 Notify Departmental Representative, in writing at time of submission, identifying deviations from requirements of the Contract Documents stating reasons for deviations.

.7 Verify field measurements and affected adjacent Work are co-ordinated.

.8 Contractor's responsibility for errors and omissions in submission is not relieved by Departmental Representative's review of submittals.

.9 Contractor's responsibility for deviations in submission from requirements of Contract Documents is not relieved by Departmental Representative review.

.10 Keep one reviewed copy of each submission on site.

1.2 SAMPLES

.1 Submit for review samples as requested in respective specification Sections. Label samples with origin and intended use.

.2 Deliver samples prepaid to Departmental Representative's business address.

.3 Notify Departmental Representative in writing, at time of submission of deviations in samples from requirements of Contract Documents.

.4 Where colour, pattern or texture is criterion, submit full range of samples.

.5 Adjustments made on samples by Departmental Representative are not intended to change Contract Price. If adjustments affect value of Work, state such in writing to Departmental Representative prior to proceeding with Work.

.6 Make changes in samples which Departmental Representative may require, consistent with Contract Documents.

.7 Reviewed and accepted samples will become standard of workmanship and material against which installed Work will be verified.

Page 18: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 01 33 00 Riding Mountain National Park, MB SUBMITTAL PROCEDURES R.073988.001 Page 2 1.3 PHOTOGRAPHIC DOCUMENTATION

.1 Submit electronic copy of colour digital photography in jpg format, standard resolution monthly with progress statement as directed by Departmental Representative.

.2 Project identification: name and number of project and date of exposure indicated.

.3 Frequency of photographic documentation: daily or as directed by Departmental Representative.

1.4 CERTIFICATES AND TRANSCRIPTS

.1 Immediately after award of Contract, submit Workers' Compensation Board status.

.2 Submit transcription of insurance immediately after award of Contract.

Part 2 Products

2.1 NOT USED

.1 Not Used.

Part 3 Execution

3.1 NOT USED

.1 Not Used.

END OF SECTION

Page 19: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 01 35 00.06 Riding Mountain National Park, MB SPECIAL PROCEDURES FOR TRAFFIC CONTROL R.073988.001 Page 1 December 2014

Part 1 General

1.1 PROTECTION OF PUBLIC TRAFFIC

.1 Comply with requirements of Acts, Regulations and By-Laws in force for regulation of traffic or use of roadways upon or over which it is necessary to carry out Work or haul materials or equipment.

.2 When working on travelled way:

.1 Place equipment in position to minimize interference and hazard to travelling public.

.2 Keep equipment units as close together as working conditions permit and preferably on same side of travelled way.

.3 Do not leave equipment on travelled way overnight.

.3 Close lanes of road only after receipt of written approval from Departmental Representative.

.4 Keep travelled way graded, free from pot holes and of sufficient width for required number of lanes of traffic.

.5 Provide and maintain road access and egress to property fronting along Work under Contract and in other areas as indicated, except where other means of road access exist that meet approval of Departmental Representative.

1.2 INFORMATIONAL AND WARNING DEVICES

.1 Provide and maintain signs, and other devices required to indicate construction activities or other temporary and unusual conditions resulting from Project Work which requires road user response.

.2 Meet with Departmental Representative prior to commencement of Work to prepare list of signs and other devices required for project. If situation on site changes, revise list to approval of Departmental Representative.

.3 Continually maintain traffic control devices in use:

.1 Check signs daily for legibility, damage, suitability and location. Clean, repair or replace to ensure clarity and reflectance.

.2 Remove or cover signs which do not apply to conditions existing from day to day.

1.3 CONTROL OF PUBLIC TRAFFIC

.1 Provide competent flag personnel, trained in accordance with, and properly equipped for situations as follows:

.1 When public traffic is required to pass working vehicles or equipment that block all or part of travelled roadway.

Page 20: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 01 35 00.06 Riding Mountain National Park, MB SPECIAL PROCEDURES FOR TRAFFIC CONTROL R.073988.001 Page 2

.2 When it is necessary to institute one-way traffic system through construction area or other blockage where traffic volumes are heavy, approach speeds are high and traffic signal system is not in use.

.3 When workmen or equipment are employed on travelled way over brow of hills, around sharp curves or at other locations where oncoming traffic would not otherwise have adequate warning.

.4 Where temporary protection is required while other traffic control devices are being erected or taken down.

.5 For emergency protection when other traffic control devices are not readily available.

.6 In situations where complete protection for workers, working equipment and public traffic is not provided by other traffic control devices.

1.4 OPERATIONAL REQUIREMENTS

.1 Maintain existing conditions for traffic throughout period of contract except that, when required for construction under contract and when measures have been taken as specified and approved by Departmental Representative to protect and control public traffic.

.2 Maintain existing conditions for traffic crossing right-of-way.

Part 2 Products

2.1 NOT USED

.1 Not Used.

Part 3 Execution

3.1 NOT USED

.1 Not Used.

END OF SECTION

Page 21: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 01 35 29.06 Riding Mountain National Park, MB HEALTH AND SAFETY REQUIREMENTS R.073988.001 Page 1 December 2014

Part 1 General

1.1 REFERENCES

.1 Canada Labour Code, Part 2, Canada Occupational Safety and Health Regulations

.2 Province of Manitoba

.1 The Workers Compensation Act RSM 1987 - Updated [2013].

.3 Health Canada/Workplace Hazardous Materials Information System (WHMIS).

.1 Material Safety Data Sheets (MSDS).

.4 Transportation of Dangerous Goods Act (1992).

1.2 ACTION AND INFORMATIONAL SUBMITTALS

.1 Submit in accordance with Section 01 33 00 - Submittal Procedures.

.2 Submit site-specific Health and Safety Plan: Within 14 days after date of Award and prior to commencement of Work. Health and Safety Plan must include:

.1 Results of site specific safety hazard assessment.

.2 Results of safety and health risk or hazard analysis for site tasks and operation found in work plan.

.3 On-site contingency and Emergency Response Plan.

.4 Personnel training requirements including:

.1 Names of personnel and alternates responsible for site safety and health, hazards present on site, and use of personal protective equipment.

.2 Work practices by which personnel can minimize risks from hazards, safe use of engineering controls and equipment on site, medical surveillance requirements, including recognition of symptoms and signs which might indicate over exposure to hazards, and elements of site-specific Health and Safety Plan.

.5 Personal protective equipment (PPE) program addressing:

.1 Donning and doffing procedures.

.2 PPE selection based upon site hazards.

.3 PPE use and limitations of equipment.

.4 Work mission duration, PPE maintenance and storage.

.5 PPE decontamination and disposal.

.6 PPE inspection procedures prior to, during, and after use.

.7 Training on proper use of PPE.

.8 Evaluation of effectiveness of PPE program, and limitations during temperature extremes, and other appropriate medical considerations.

.6 Site control measures employed at site including site map, site Work zones, site communications, alerting means for emergencies, standard operating procedures or safe work practices, and identification of nearest medical assistance.

Page 22: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 01 35 29.06 Riding Mountain National Park, MB HEALTH AND SAFETY REQUIREMENTS R.073988.001 Page 2

.7 Decontamination procedures for both personnel and equipment.

.8 Emergency response requirements addressing: pre-emergency planning, personnel roles, lines of authority and communication, emergency recognition and prevention, safe distances and places of refuge, site security and control, evacuation routes and procedures, decontamination procedures not covered under decontamination section, emergency medical treatment and first aid, emergency alerting and response procedures, critique of response and follow-up, PPE and emergency equipment, site topography, layout, prevailing weather conditions, and procedures for reporting incidents to local, provincial, or federal agencies.

.9 Written respiratory protection program for project activities.

.10 Procedures dealing with heat and/or cold stress.

.11 Spill containment program if waste material is generated, excavated, stored, or managed on site.

.3 Submit 1 electronic copy of Contractor's authorized representative's work site health and safety inspection reports to Departmental Representative weekly.

.4 Submit copies of reports or directions issued by Federal and Provincial health and safety inspectors. Submit verbal report immediately followed by a written report within 24 hours to the Departmental Representative.

.5 Submit copies of incident and accident reports. Submit verbal report immediately followed by a written report within 24 hours to the Departmental Representative.

.6 Submit WHMIS MSDS - Material Safety Data Sheets in accordance with Section 02 81 01 - Hazardous Materials.

.7 Departmental Representative will review Contractor's site-specific Health and Safety Plan including on-site contingency and Emergency Response Plan and provide comments to Contractor within 5 days after receipt of plan. Revise plan as appropriate and resubmit plan to Departmental Representative 3 days after receipt of comments from Departmental Representative.

.8 Departmental Representative's review of Contractor's final Health and Safety plan should not be construed as approval and does not reduce the Contractor's overall responsibility for construction Health and Safety.

.9 On-site Contingency and Emergency Response Plan: address standard operating procedures to be implemented during emergency situations.

.1 Plan must provide immediate response to serious site occurrence such as explosion, fire, or migration of significant quantities of toxic or hazardous material from site.

1.3 FILING OF NOTICE

.1 File Notice of Project with Provincial authorities prior to beginning of Work.

1.4 SAFETY ASSESSMENT

.1 Perform site specific safety hazard assessment related to project.

Page 23: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 01 35 29.06 Riding Mountain National Park, MB HEALTH AND SAFETY REQUIREMENTS R.073988.001 Page 3 1.5 MEETINGS

.1 Schedule and administer Health and Safety meeting with Departmental Representative prior to commencement of Work.

1.6 PROJECT/SITE CONDITIONS

.1 Work at site will involve contact with:

.1 Petroleum hydrocarbon (PHC) and polycyclic aromatic hydrocarbon (PAH) impacted soils. Impacted soils defined as soils with PHC and/or PAH concentrations exceeding Canadian Council of Ministers of the Environment (CCME) Canadian Environmental Quality Guidelines (CEQG) for residential/parkland land use.

.2 PHC and PAH concentrations in soils have the potential to be ingested or inhaled if dust is mobilized by wind, and can be carried long distances. Dust may come from excavation activities or during transport of materials for disposal off site.

.3 Possible cold weather and wet conditions.

.4 Hazardous building materials, including asbestos containing materials (ACMs), lead, mould and/or mercury/PCB containing equipment.

.5 Bird droppings noted throughout the building have the potential to be disturbed during demolition. Proper worker protection should be used when completing work in these areas.

1.7 GENERAL REQUIREMENTS

.1 Develop written site-specific Health and Safety Plan based on hazard assessment prior to beginning site Work and continue to implement, maintain, and enforce plan until final demobilization from site. Health and Safety Plan must address project specifications.

.2 Departmental Representative may respond in writing, where deficiencies or concerns are noted and may request re-submission with correction of deficiencies or concerns.

.3 Ensure Health and Safety guidelines provide for safe and minimal risk for site personnel and minimize impact of activities involving contact with hazardous materials or hazardous wastes on general public and surrounding environment.

1.8 RESPONSIBILITY

.1 Be responsible for health and safety of persons on site, safety of property on site and for protection of persons adjacent to site and environment to extent that they may be affected by conduct of Work.

.2 Comply with and enforce compliance by employees with safety requirements of Contract Documents, applicable federal, provincial, and local statutes, regulations, and ordinances, and with site-specific Health and Safety Plan.

1.9 COMPLIANCE REQUIREMENTS

.1 Comply with The Workers Compensation Act, Workplace Safety and Health Regulation, Manitoba Reg. M.R. 217/2006.

.2 Comply with Canada Labour Code, Canada Occupational Safety and Health Regulations.

Page 24: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 01 35 29.06 Riding Mountain National Park, MB HEALTH AND SAFETY REQUIREMENTS R.073988.001 Page 4 1.10 UNFORSEEN HAZARDS

.1 When unforeseen or peculiar safety-related factor, hazard, or condition occur during performance of Work, follow procedures in place for Employee's Right to Refuse Work in accordance with Acts and Regulations of Province having jurisdiction and immediately advise Departmental Representative verbally and in writing.

1.11 HEALTH AND SAFETY CO-ORDINATOR

.1 Employ and assign to Work, competent and authorized representative as Health and Safety Co-ordinator. Health and Safety Co-ordinator must:

.1 Have site-related working experience specific to activities associated with Petroleum hydrocarbon (PHC) and polycyclic aromatic hydrocarbon (PAH) impacted soil and designated substances, including asbestos containing materials (ACMs), lead, mould, and/or mercury/PCB containing equipment.

.2 Have working knowledge of occupational safety and health regulations.

.3 Be responsible for completing Contractor's Health and Safety Training Sessions and ensuring that personnel not successfully completing required training are not permitted to enter site to perform Work.

.4 Be responsible for implementing, enforcing daily and monitoring site-specific Contractor's Health and Safety Plan.

.5 Be on site during execution of Work and report directly to and be under direction of site supervisor.

1.12 POSTING OF DOCUMENTS

.1 Ensure applicable items, articles, notices and orders are posted in conspicuous location on site in accordance with Acts and Regulations of Province having jurisdiction, and in consultation with Departmental Representative.

1.13 CORRECTION OF NON-COMPLIANCE

.1 Immediately address health and safety non-compliance issues identified by authority having jurisdiction or by Departmental Representative.

.2 Provide Departmental Representative with written report of action taken to correct non-compliance of health and safety issues identified.

.3 Departmental Representative may stop Work if non-compliance of health and safety regulations is not corrected.

1.14 BLASTING

.1 Blasting or other use of explosives is not permitted.

1.15 WORK STOPPAGE

.1 Give precedence to safety and health of public and site personnel and protection of environment over cost and schedule considerations for Work.

Page 25: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 01 35 29.06 Riding Mountain National Park, MB HEALTH AND SAFETY REQUIREMENTS R.073988.001 Page 5 1.16 PERSONNEL HEALTH, SAFETY, AND HYGIENE

.1 Training: ensure personnel entering site are trained in accordance with specified personnel training requirements.

.2 Levels of Protection: establish levels of protection for each Work area based on planned activity and location of activity.

.3 Personal Protective Equipment:

.1 Furnish site personnel with appropriate PPE. Ensure that safety equipment and protective clothing is kept clean and maintained.

.4 Develop protective equipment usage procedures and ensure that procedures are strictly followed by site personnel; include following procedures as minimum:

.1 Ensure prescription eyeglasses worn are safety glasses and do not permit contact lenses on site within Work zones.

.2 Ensure footwear is Canadian Safety Association approved safety boots.

.3 Dispose of or decontaminate PPE worn on site at end of each workday.

.4 Decontaminate reusable PPE before reissuing.

.5 Respiratory Protection:

.1 Provide site personnel with training in usage and limitations of, and qualitative fit testing for, air purifying respirators in accordance with specified regulations.

.2 Develop, implement, and maintain respirator program.

.3 Monitor, evaluate, and provide respiratory protection for site personnel.

.4 Ensure levels of protection have been chosen consistent with site-specific potential airborne hazards associated with major contaminants identified on site.

.5 Immediately notify Departmental Representative when level of respiratory protection required increases.

.6 Assess ability for site personnel to wear respiratory protection.

.7 Ensure site personnel have passed respirator fit test prior to entering potentially contaminated Work areas. Ensure facial hair does not interfere with proper respirator fit.

.6 Heat Stress/Cold Stress: implement heat stress, cold stress monitoring program as applicable and include in site-specific Health and Safety Plan.

.7 Personnel Hygiene and Personnel Decontamination Procedures. Provide minimum as follows:

.1 Suitable containers for storage and disposal of used disposable PPE.

.2 Potable water and suitable sanitation facility.

.8 Emergency and First-Aid Equipment:

.1 Locate and maintain emergency and first-aid equipment in appropriate location on site including first-aid kit to accommodate number of site personnel; portable emergency eye wash; two 9 kg ABC type dry chemical fire extinguishers.

.2 As minimum, provide on site at all times when Work activities are in progress 1 first-aid technician holding at a minimum a Standard First Aid and CPR Level C

Page 26: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 01 35 29.06 Riding Mountain National Park, MB HEALTH AND SAFETY REQUIREMENTS R.073988.001 Page 6

certification recognized in Canada, as per Canada Labour Code and Manitoba Occupational Health and Safety regulations.

.9 Site Communications:

.1 Post emergency in a conspicuous location on site.

.2 Develop hand signal system appropriate for site activities.

.3 Provide system to notify employees of site emergency situations or to stop Work activities if necessary.

.4 Furnish selected personnel with 2-way radios.

.10 Safety Meetings: conduct mandatory daily safety meetings for personnel, Departmental Representative, and additionally as required by special or Work-related conditions; include refresher training for existing equipment and protocols, review ongoing safety issues and protocols, and examine new site conditions as encountered. Hold additional safety meetings on as-needed basis.

1.17 SITE CONTROL

.1 Meet specified requirements as indicated in Section 01 14 00 - Work Restrictions, Section 01 35 00.06 - Special Procedures for Traffic Control, Section 01 35 43 - Environmental Procedures, Section 01 52 00 - Construction Facilities, Section 01 56 00 - Temporary Barriers and Enclosures, Section 01 57 13 - Erosion and Sediment Control, Section 01 74 11 - Cleaning and Section 01 74 21 - Construction/Demolition Waste Management and Disposal.

.2 Restrict access to site to those involved in the remediation Work.

Part 2 Products

2.1 NOT USED

.1 Not used.

Part 3 Execution

3.1 NOT USED

.1 Not used.

END OF SECTION

Page 27: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 01 35 43 Riding Mountain National Park, MB ENVIRONMENTAL PROCEDURES R.073988.001 Page 1 December 2014

Part 1 General

1.1 REFERENCES

.1 Definitions:

.1 Environmental Pollution and Damage: presence of chemical, physical, biological elements or agents which adversely affect human health and welfare; unfavourably affect the ecological integrity of the Parks ecosystems; unfavourably alter ecological balances of importance to human life; affect other species of importance to humans; or degrade environment aesthetically, culturally and/or historically.

.2 Environmental Protection: prevention/control of pollution and habitat or environment disruption during construction.

.2 Reference Standards:

.1 Health Canada/Workplace Hazardous Materials Information System (WHMIS).

.1 Material Safety Data Sheets (MSDS).

.2 Transportation and Dangerous Goods Act (1992).

.3 Canadian Council of Ministers of the Environment (CCME) Canadian Environmental Quality Guidelines (CEQG) (2008).

.1 PHC and PAH for residential/parkland land use.

.4 Canadian Environmental Assessment Act (2012).

.5 Canadian Environmental Protection Act (1999).

.6 Canada Labour Code (1985, c. L-2) – Canadian Occupational Health and Safety Regulations (SOR/86-304).

.7 Canada National Parks Act (2000).

.8 U.S. Environmental Protection Agency (EPA)/Office of Water

.1 EPA 832/R-92-005-[92], Storm Water Management for Construction Activities, Chapter 3.

.2 EPA General Construction Permit (GCP) 2012.

1.2 REGLATORY REQUIREMENTS

.1 Perform work in accordance to Canadian Environmental Protection Act.

.2 Provide erosion and sediment control in accordance to regulations of authorities having jurisdiction.

.3 Comply with federal, provincial, and local anti-pollution laws, ordinances, codes, and regulations when disposing of waste materials, debris, and rubbish.

.4 Work to meet or exceed minimum requirements established by federal, provincial, and local laws and regulations which are applicable.

.1 Contractor: responsibility for complying with amendments as they become effective.

Page 28: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 01 35 43 Riding Mountain National Park, MB ENVIRONMENTAL PROCEDURES R.073988.001 Page 2

.5 In event that compliance exceeds scope of work of conflicts with specific requirements of contract notify Departmental Representative immediately.

1.3 ACTION AND INFORMATIONAL SUBMITTALS

.1 Submit in accordance with Section 01 33 00 - Submittal Procedures.

.2 Before commencing construction activities or delivery of materials to site, submit Environmental Protection Plan for review by Departmental Representative.

.3 Environmental Protection Plan must include comprehensive overview of known or potential environmental issues to be addressed during construction.

.4 Address topics at level of detail commensurate with environmental issue and required construction tasks.

.5 Include in Environmental Protection Plan:

.1 Names of persons responsible for ensuring adherence to Environmental Protection Plan.

.2 Names and qualifications of persons responsible for manifesting hazardous waste to be removed from site.

.3 Erosion and sediment control plan identifying type and location of erosion and sediment controls to be provided including monitoring and reporting requirements to assure that control measures are in compliance with erosion and sediment control plan, Federal, Provincial, and Municipal laws and regulations and EPA 832/R-92-005, Chapter 3.

.4 Work area plan showing proposed activity in each portion of area and identifying areas of limited use or non-use.

.5 Spill Control Plan to include procedures, instructions, and reports to be used in event of unforeseen spill of regulated substance.

.6 Non-Hazardous solid waste disposal plan identifying methods and locations for solid waste disposal including clearing debris.

.7 Air pollution control plan detailing provisions to assure that dust, debris, materials, and trash, are contained on project site.

.8 Contaminant Prevention Plan identifying potentially hazardous substances to be used on job site; intended actions to prevent introduction of such materials into air, water, or ground; and detailing provisions for compliance with Federal, Provincial, and Municipal laws and regulations for storage and handling of these materials.

.9 Waste Water Management Plan identifying methods and procedures for management and /or discharge of waste waters which are directly derived from construction activities, such as, clean-up water and dewatering of ground water.

.10 Historical, archaeological, cultural resources biological resources and wetlands plan that defines procedures for identifying and protecting historical, archaeological, cultural resources, biological resources and wetlands.

1.4 FIRES

.1 Fires and burning of rubbish on site is not permitted.

Page 29: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 01 35 43 Riding Mountain National Park, MB ENVIRONMENTAL PROCEDURES R.073988.001 Page 3 1.5 DRAINAGE

.1 Control disposal or runoff of water containing suspended materials or other harmful substances in accordance with local authority requirements.

1.6 SITE CLEARING AND PLANT PROTECTION

.1 Protect trees and plants on site and adjacent properties from harm.

.2 Minimize stripping of topsoil and vegetation.

.3 Restrict tree removal and clearing activities to areas indicated by Departmental Representative.

.4 Imported fill materials must be free of seeds of any invasive plant species.

1.7 WORK ADJACENT TO WATERWAYS

.1 Waterways to be kept free of excavated fill, waste material and debris.

1.8 POLLUTION CONTROL

.1 Maintain erosion and sedimentation control features installed under this Contract and in accordance with Section 01 57 13 - Erosion and Sediment Control.

.2 Control emissions from equipment and plant in accordance with local authorities' emission requirements.

.3 Cover or wet down dry materials and rubbish to prevent blowing dust and debris. Provide dust control for temporary roads.

.4 Provide methods, means, and facilities to prevent contamination of soil, water, and atmosphere from discharge of noxious toxic substances and pollutants produced by construction operations.

.5 Be prepared to intercept, clean up, and dispose of spills or releases that may occur whether on land or water. Maintain materials and equipment required for cleanup of spills or releases readily accessible on site.

.6 Promptly report spills and releases potentially causing damage to environment to:

.1 Authority having jurisdiction or interest in spill or release including conservation authority, water supply authorities, drainage authority, road authority, and fire department.

.2 Owner of pollutant, if known.

.3 Person having control over pollutant, if known.

.4 Departmental Representative.

.7 Contact manufacturer of pollutant if known and ascertain hazards involved, precautions and measures used in cleanup or mitigating action.

.8 Take immediate action using available resources to contain and mitigate effects on environment and persons from spill or release.

.9 Provide spill response materials including, containers, adsorbent, shovels, and personal protective equipment. Make spill response materials available at all times in which

Page 30: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 01 35 43 Riding Mountain National Park, MB ENVIRONMENTAL PROCEDURES R.073988.001 Page 4

hazardous materials or wastes are being handled or transported. Spill response materials: compatible with type of material being handled.

1.9 EQUIPMENT DECONTAMINATION

.1 Perform equipment decontamination at Work site.

.2 At minimum, perform following steps during equipment decontamination: mechanically remove packed dirt, grit, and debris by scraping and brushing without using steam or high-pressure water. Perform assessment as directed by Departmental Representative to determine effectiveness of decontamination.

.3 Each piece of equipment may be inspected by Departmental Representative after decontamination and prior to removal from site and/or travel on clean areas. Departmental Representative will have right to require additional decontamination to be completed if deemed necessary.

.4 Collect decontamination sediments which accumulate on equipment decontamination area.

.5 Furnish and equip personnel engaged in equipment decontamination with appropriate personal protective equipment.

1.10 NOTIFICATION

.1 Departmental Representative will notify Contractor in writing of observed noncompliance with Federal, Provincial or Municipal environmental laws or regulations, permits, and other elements of Contractor's Environmental Protection plan.

.2 Contractor: after receipt of such notice, inform Departmental Representative of proposed corrective action and take such action for approval by Departmental Representative.

.1 Take action only after receipt of written approval by Departmental Representative.

.3 Departmental Representative will issue stop order of work until satisfactory corrective action has been taken.

.4 No time extensions granted or equitable adjustments allowed to Contractor for such suspensions.

1.11 WILDLIFE

.1 Do not feed or harass the wildlife.

1.12 MONITORING WELLS

.1 Take necessary measures to protect and not damage or destroy existing monitoring wells located in proximity to the Mount Agassiz Ski Lodge.

.2 Advise Departmental Representative in advance of work in these areas to arrange for mitigation measures, if required.

Page 31: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 01 35 43 Riding Mountain National Park, MB ENVIRONMENTAL PROCEDURES R.073988.001 Page 5 Part 2 Products

2.1 NOT USED

.1 Not Used.

Part 3 Execution

3.1 CLEANING

.1 Progress Cleaning: clean in accordance with Section 01 74 11 - Cleaning.

.1 Leave Work area clean at end of each day.

.2 Ensure public waterways, storm and sanitary sewers remain free of waste and volatile materials disposal.

.3 Final Cleaning: upon completion remove surplus materials, rubbish, tools and equipment in accordance with Section 01 74 11 - Cleaning.

.4 Waste Management: separate waste materials for reuse and recycling in accordance with Section 01 74 21 - Construction/Demolition Waste Management and Disposal.

.1 Contractor will provide all refuse and recycling bins required to complete Work.

.2 Remove recycling and refuse containers and bins from site and dispose of materials at appropriate facility.

END OF SECTION

Page 32: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 01 52 00 Riding Mountain National Park, MB CONSTRUCTION FACILITIES R.073988.001 Page 1 December 2014

Part 1 General

1.1 REFERENCES

.1 Canadian Construction Documents Committee (CCDC)

.2 Canadian Standards Association (CSA International)

.1 CAN/CSA-S269.2-[M1987(R2003)], Access Scaffolding for Construction Purposes.

.2 CAN/CSA-Z321-[96(R2001)], Signs and Symbols for the Occupational Environment.

.3 Public Works Government Services Canada (PWGSC) Standard Acquisition Clauses and Conditions (SACC)-ID: R0202D, Title: General Conditions 'C', In Effect as of: May 14, 2004.

.4 U.S. Environmental Protection Agency (EPA) / Office of Water

.1 EPA 832R92005, Storm Water Management for Construction Activities: Developing Pollution Prevention Plans and Best Management Practices.

1.2 INSTALLATION AND REMOVAL

.1 Prepare site plan indicating proposed location and dimensions of area to be fenced and used by Contractor, number of trailers to be used, avenues of ingress/egress to fenced area and details of fence installation.

.2 Indicate use of supplemental or other staging area.

.3 Provide construction facilities in order to execute work expeditiously.

.4 Remove from site all such work after use.

1.3 SCAFFOLDING

.1 Scaffolding in accordance with CAN/CSA-S269.2.

.2 Provide and maintain scaffolding, ramps, ladders, swing staging, platforms, temporary stairs.

1.4 HOISTING

.1 Provide, operate and maintain hoists or cranes required for moving of workers, materials and equipment. Make financial arrangements with Subcontractors for their use of hoists.

.2 Hoists or cranes to be operated by qualified operator.

1.5 SITE STORAGE/LOADING

.1 Confine work and operations of employees by Contract Documents. Do not unreasonably encumber premises with products.

.2 Do not load or permit to load any part of Work with weight or force that will endanger Work.

Page 33: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 01 52 00 Riding Mountain National Park, MB CONSTRUCTION FACILITIES R.073988.001 Page 2 1.6 CONSTRUCTION PARKING

.1 Parking will be permitted on site provided it does not disrupt performance of Work.

.2 Provide and maintain adequate access to project site.

1.7 OFFICES

.1 Provide office heated to 22 degrees C, lighted 750 lx and ventilated, of sufficient size to accommodate site meetings and furnished with drawing laydown table.

.2 Provide marked and fully stocked first-aid case in a readily available location.

1.8 EQUIPMENT, TOOL AND MATERIALS STORAGE

.1 Provide and maintain, in clean and orderly condition, lockable weatherproof sheds for storage of tools, equipment and materials as necessary.

.2 Locate materials not required to be stored in weatherproof sheds on site in manner to cause least interference with work activities.

1.9 SANITARY FACILITIES

.1 Provide sanitary facilities for work force in accordance with governing regulations and ordinances.

.2 Post notices and take precautions as required by local health authorities. Keep area and premises in sanitary condition.

1.10 CONSTRUCTION SIGNAGE

.1 No other signs or advertisements, other than warning signs, are permitted on site.

.2 Signs and notices for safety and instruction in both official languages Graphic symbols to CAN/CSA-Z321.

.3 Maintain approved signs and notices in good condition for duration of project, and dispose of off site on completion of project or earlier if directed by Departmental Representative.

1.11 PROTECTION AND MAINTENANCE OF TRAFFIC

.1 Provide access and temporary relocated roads as necessary to maintain traffic.

.2 Maintain and protect traffic on affected roads during construction period except as otherwise specifically directed by Departmental Representative.

.3 Provide measures for protection and diversion of traffic, including provision of watch-persons and flag-persons, erection of barricades, placing of lights around and in front of equipment and work, and erection and maintenance of adequate warning, danger, and direction signs.

.4 Protect travelling public from damage to person and property.

.5 Contractor's traffic on roads selected for hauling material to and from site to interfere as little as possible with public traffic.

.6 Verify adequacy of existing roads and allowable load limit on these roads. Contractor: responsible for repair of damage to roads caused by construction operations.

Page 34: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 01 52 00 Riding Mountain National Park, MB CONSTRUCTION FACILITIES R.073988.001 Page 3

.7 Construct access and haul roads necessary.

.8 Haul roads: constructed with suitable grades and widths; sharp curves, blind corners, and dangerous cross traffic shall be avoided.

.9 Provide necessary lighting, signs, barricades, and distinctive markings for safe movement of traffic.

.10 Dust control: adequate to ensure safe operation at all times.

.11 Provide snow removal during period of Work.

.12 Remove, upon completion of work, haul roads designated by Departmental Representative.

1.12 CLEAN-UP

.1 Remove construction debris, waste materials, packaging material from work site daily.

.2 Clean dirt or mud tracked onto paved or surfaced roadways.

.3 Clean-up in accordance with Section 01 74 11 - Cleaning.

Part 2 Products

2.1 NOT USED

.1 Not Used.

Part 3 Execution

3.1 EROSION AND SEDIMENTATION CONTROL

.1 Provide erosion and sedimentation control measures to prevent soil erosion and discharge of soil-bearing water runoff that complies with EPA 832/R-92-005 or requirements of authorities having jurisdiction, whichever is more stringent and in accordance with Section 01 57 13 - Erosion and Sediment Control.

.2 Inspect, repair, and maintain erosion and sedimentation control measures during construction.

.3 Remove any temporary erosion and sedimentation controls and restore and stabilize areas disturbed during removal.

.4 Install final erosion and sediment controls following demolition in accordance with site drawings and Section 01 57 13 - Erosion and Sediment Control.

3.2 TEMPORARY UTILITY SERVICES

.1 Utilities requiring disconnection will be completed by the Contractor.

END OF SECTION

Page 35: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 01 56 00 Riding Mountain National Park, MB TEMPORARY BARRIERS AND ENCLOSURES R.073988.001 Page 1 December 2014

Part 1 General

1.1 INSTALLATION AND REMOVAL

.1 Provide temporary controls in order to execute Work expeditiously.

.2 Remove from site all such work after use.

1.2 HOARDING

.1 Erect temporary site enclosure using new 1.2 m high snow fence wired to rolled steel "T" bar fence posts spaced at 2.4 m on centre. Provide one lockable truck gate. Maintain fence in good repair.

.2 Provide barriers around trees and plants designated to remain. Protect from damage by equipment and construction procedures.

1.3 GUARD RAILS AND BARRICADES

.1 Provide secure, rigid guard rails and barricades around all excavations, open shafts, open stair wells, open edges of floors and roofs.

1.4 ACCESS TO SITE

.1 Provide and maintain access roads, sidewalk crossings, ramps and construction runways as may be required for access to Work.

1.5 FIRE ROUTES

.1 Maintain access to property including overhead clearances for use by emergency response vehicles.

1.6 PROTECTION FOR OFF-SITE AND PUBLIC PROPERTY

.1 Protect surrounding private and public property from damage during performance of Work.

.2 Be responsible for damage incurred.

1.7 WASTE MANAGEMENT AND DISPOSAL

.1 Separate waste materials for reuse and recycling in accordance with Section 01 74 21 - Construction/Demolition Waste Management And Disposal.

Part 2 Products

2.1 NOT USED

.1 Not Used.

Page 36: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 01 56 00 Riding Mountain National Park, MB TEMPORARY BARRIERS AND ENCLOSURES R.073988.001 Page 2 Part 3 Execution

3.1 NOT USED

.1 Not Used.

END OF SECTION

Page 37: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 01 57 13 Riding Mountain National Park, MB EROSION AND SEDIMENT CONTROL R.073988.001 Page 1 December 2014

Part 1 General

1.1 REFERENCES

.1 EPA 832/R-92-005 - Storm Water Management for Construction Activities: Developing Pollution Prevention Plans and Best Management Practices, September 1992.

.2 Local erosion and sediment control guidelines.

1.2 DEFINITIONS

.1 Erosion: Deterioration, displacement, or transportation of land surface by wind or water, intensified by land-clearing practices related to construction activates.

.2 Rain or Rain Storm: An event defined causing the pooling of water on road or other impervious surfaces.

.3 Sediment: Particulate matter transported and deposited as a layer of solid particles within a body of water.

.4 Snow Melt: An event in snow conditions when the temperature is above 0 degrees C or when environmental conditions causing snow on the ground to melt.

1.3 SUBMITTALS

.1 Provide requested information specified in Section 01 33 00 - Submittal Procedures.

Part 2 Products

2.1 STRAW WATTLES

.1 Wattles: 288 mm (9”) diameter, minimum lengths of 7.6 m (25’), and consisting of 100% agricultural straw.

Part 3 Execution

.1 Prevent cleared topsoil and excavated earth stockpiles on-site, and regraded areas, from being eroded by rain storm, snow melt or wind.

.2 Install straw wattles at locations shown on site drawing and as directed by Departmental Representative. Remove snow and ice as needed.

.3 Place wattles in shallow trench. Soil from excavation to be placed on uphill side.

.4 Adjoining lengths of wattles to be firmly abutted to ensure no leakage at the abutments.

.5 Pin wattles securely to the ground in accordance with manufacture’s installation instructions.

.6 Limit operation of vehicles on site to paved surfaces or temporary gravel surfaces in order to avoid the disturbing soil.

Page 38: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 01 57 13 Riding Mountain National Park, MB EROSION AND SEDIMENT CONTROL R.073988.001 Page 2 3.2 MUNICIPAL STORM WATER

.1 Protect catch basins, drains, culverts and other points of entry into municipal storm water collection systems.

.2 Each Week: Inspect erosion and sediment control measures, to ensure proper functions are not damaged.

END OF SECTION

Page 39: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 01 74 11 Riding Mountain National Park, MB CLEANING R.073988.001 Page 1 December 2014

Part 1 General

1.1 PROJECT CLEANLINESS

.1 Maintain Work in tidy condition, free from accumulation of waste products and debris.

.2 Remove waste materials from site at daily regularly scheduled times or dispose of as directed by Departmental Representative. Do not burn waste materials on site.

.3 Clear snow and ice from access to building, Bank/pile snow in designated areas only.

.4 Make arrangements with and obtain permits from authorities having jurisdiction for disposal of waste and debris.

.5 Provide on-site refuse and recycling containers for collection of waste materials and debris.

.6 Provide and use marked separate bins for recycling. Refer to Section 01 74 21 - Construction/Demolition Waste Management and Disposal.

.7 Dispose of waste materials and debris off site.

.8 Store volatile waste in covered metal containers, and remove from premises at end of each working day.

.9 Provide adequate ventilation during use of volatile or noxious substances.

.10 Use only cleaning materials recommended by manufacturer of surface to be cleaned, and as recommended by cleaning material manufacturer.

1.2 FINAL CLEANING

.1 When Work is Substantially Performed remove surplus products, tools, construction machinery and equipment not required for performance of remaining Work.

.2 Remove waste products and debris other than that caused by others, and leave Work clean.

.3 Prior to final inspection by Departmental Representative and as per Section 01 77 00 -Closeout Procedures, remove surplus products, tools, construction machinery and equipment.

.4 Remove waste products and debris other than that caused by Owner or other Contractors.

.5 Remove waste materials from site at regularly scheduled times or dispose of as directed by Departmental Representative. Do not burn waste materials on site.

.6 Make arrangements with and obtain permits from authorities having jurisdiction for disposal of waste and debris.

1.3 WASTE MANAGEMENT AND DISPOSAL

.1 Separate waste materials for reuse and recycling in accordance with Section 01 74 21 - Construction/Demolition Waste Management and Disposal.

Page 40: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 01 74 11 Riding Mountain National Park, MB CLEANING R.073988.001 Page 2 Part 2 Products

2.1 NOT USED

.1 Not Used.

Part 3 Execution

3.1 NOT USED

.1 Not Used.

END OF SECTION

Page 41: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 01 74 21 Riding Mountain National Park, MB CONSTRUCTION/DEMOLITION WASTE R.073988.001 MANAGEMENT AND DISPOSAL Page 1 December 2014

Part 1 General

1.1 WASTE MANAGEMENT GOALS

.1 Prior to start of Work conduct meeting with Departmental Representative to review and discuss Contractor's proposed Waste Reduction Workplan for Demolition waste to be project generated from the Mount Agassiz Ski Lodge, including the wood rafters (16) from the east wing of the lodge designated for reuse by the Owner.

.2 Prior to project completion provide Departmental Representative documentation certifying that waste management, recycling, reuse of recyclable and reusable materials have been extensively practiced.

.3 Minimize amount of non-hazardous solid waste generated by project and accomplish maximum source reduction, reuse and recycling of solid waste produced by CRD activities.

.4 Protect environment and prevent environmental pollution damage.

1.2 REFERENCES

.1 Definitions:

.1 Approved/Authorized recycling facility: waste recycler approved by applicable provincial authority or other users of material for recycling approved by the Departmental Representative.

.2 Class III: non-hazardous waste - construction renovation and demolition waste.

.3 Construction, Renovation and/or Demolition (CRD) Waste: Class III solid, non-hazardous waste materials generated during construction, demolition, and/or renovation activities

.4 Inert Fill: inert waste - exclusively asphalt and concrete.

.5 Recyclable: ability of product or material to be recovered at end of its life cycle and re-manufactured into new product for reuse.

.6 Recycle: process by which waste and recyclable materials are transformed or collected for purpose of being transferred into new products.

.7 Recycling: process of sorting, cleansing, treating and reconstituting solid waste and other discarded materials for purpose of using in altered form. Recycling does not include burning, incinerating, or thermally destroying waste.

.8 Reuse: repeated use of product in same form but not necessarily for same purpose. Reuse includes:

.1 Salvaging reusable materials from re-modelling projects, before demolition stage, for resale, reuse on current project or for storage for use on future projects.

.2 Returning reusable items including pallets or unused products to vendors.

.9 Salvage: removal of structural and non-structural materials from deconstruction/disassembly projects for purpose of reuse or recycling.

.10 Separate Condition: refers to waste sorted into individual types.

Page 42: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 01 74 21 Riding Mountain National Park, MB CONSTRUCTION/DEMOLITION WASTE R.073988.001 MANAGEMENT AND DISPOSAL Page 2

.11 Source Separation: act of keeping different types of waste materials separate beginning from the point they became waste.

.12 Waste Audit (WA): inventory of estimated quantities of waste materials that will be generated during demolition. Involves quantifying by volume/weight amounts of materials and wastes that will be reused, recycled or landfilled. Refer to Schedule A.

.13 Waste Diversion Report: report of final results, quantifying cumulative weights and percentages of waste materials reused, recycled and landfilled over course of project.

.14 Waste Management Co-ordinator (WMC): contractor representative responsible for supervising waste management activities as well as co-ordinating required submittal and reporting requirements.

.15 Waste Reduction Workplan (WRW): report which addresses opportunities for reduction, reuse, or recycling of materials generated by project. Specifies diversion goals, implementation and reporting procedures, anticipated results and responsibilities. Waste Reduction Workplan (Schedule B) information acquired from Waste Audit.

.2 Reference Standards:

.1 Canadian Construction Association (CCA)

.1 CCA 81-2001: A Best Practices Guide to Solid Waste Reduction.

.2 Public Works and Government Services Canada (PWGSC)

.1 2002 National Construction, Renovation and Demolition Non-Hazardous Solid Waste Management Protocol.

.2 CRD Waste Management Market Research Report (available from PWGSC's Environmental Services).

1.3 DOCUMENTS

.1 Post and maintain in visible and accessible area at job site, one copy of following documents:

.1 Waste Audit (Schedule A).

.2 Waste Reduction Workplan (Schedule B).

1.4 ACTION AND INFORMATIONAL SUBMITTALS

.1 Submit in accordance with Section 01 33 00 - Submittal Procedures.

.2 Prepare and submit following prior to project start-up:

.1 1 copy and 1 electronic copy of completed Waste Audit (WA): Schedule A.

.2 1 copy and 1 electronic copy of completed Waste Reduction Workplan (WRW): Schedule B.

.3 Prepare and submit on weekly basis, throughout project or at intervals agreed to by Departmental Representative the following:

.1 Receipts, scale tickets, waybills, and/or waste disposal receipts that show quantities and types of materials reused, recycled, or disposed of.

Page 43: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 01 74 21 Riding Mountain National Park, MB CONSTRUCTION/DEMOLITION WASTE R.073988.001 MANAGEMENT AND DISPOSAL Page 3

.2 Written bi-weekly summary report detailing cumulative amounts of waste materials reused, recycled and landfilled, and brief status of ongoing waste management activities.

.4 Submit prior to final payment the following:

.1 Waste Diversion Report, indicating final quantities by material types salvaged for reuse, recycling or disposal in landfill and recycling centres, re-use depots and other waste processors that received waste materials.

.2 Provide receipts, scale tickets, waybills, waste disposal receipts that confirm quantities and types of materials reused, recycled or disposed of and destination.

1.5 WASTE AUDIT (WA)

.1 Contractor to prepare WA prior to project mobilization and submission of Waste Reduction Workplan (see Schedule A).

.2 WA to provide detailed inventory, estimated quantities and types of waste materials that will be generated as well as their potential to be reused and/or recycled.

.3 Post on-site WA where contractor and sub-contractors are able to review content.

1.6 WASTE REDUCTION WORKPLAN (WRW)

.1 Prepare and submit WRW (Schedule B) at least 5 days prior to project start-up.

.2 WRW identifies strategies to optimize diversion through reduction, reuse, and recycling of materials and comply with applicable regulations, based on information collected in the WA.

.3 WRW should include but not limited to:

.1 Applicable regulations.

.2 Specific goals for waste reduction.

.3 Destination of materials identified.

.4 Deconstruction/disassembly techniques and schedules.

.5 Methods to collect, separate, and reduce generated wastes.

.6 Location of waste bins on-site.

.7 Security of on-site stock piles and waste bins.

.8 Protection of personnel, sub-contractors.

.9 Details on materials handling and removal procedures.

.10 Quantities of materials to be salvaged for reuse or recycled and materials sent to landfill.

1.7 USE OF SITE AND FACILITIES

.1 Execute Work with minimal interference and disturbance to normal use of premises.

.2 Provide temporary security measures approved by Departmental Representative, where required.

Page 44: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 01 74 21 Riding Mountain National Park, MB CONSTRUCTION/DEMOLITION WASTE R.073988.001 MANAGEMENT AND DISPOSAL Page 4 1.8 WASTE PROCESSING SITES

.1 Contractor is responsible to research and locate waste diversion resources and service providers. Salvaged materials are to be transported off site to approved and/or authorized recycling facilities or to users of material for recycling, with the exception of the wood rafters (16) from the east wing of the Mount Agassiz Ski Lodge, which the Owner will transport off-site following removal of the rafters by the Contractor.

1.9 QUALITY ASSURANCE

.1 After award of Contract, a mandatory site examination will be held for this Project for Contractor and/or sub-contractors responsible for demolition/deconstruction waste management.

.1 Date, time and location will be arranged by Departmental Representative.

.2 Waste Management Meeting: Waste Management Co-ordinator is to provide an update on status of waste diversion and management activities at each meeting.

1.10 STORAGE, HANDLING AND PROTECTION

.1 Store, materials to be reused, recycled and salvaged in locations as directed by Departmental Representative.

.2 Unless specified otherwise, materials for removal become Contractor's property.

.3 Separate non-salvageable materials from salvaged items. Transport and deliver non-salvageable items to licensed disposal facility.

.4 Protect structural components not removed and salvaged materials from movement or damage.

.5 Support affected structures. If safety of building is endangered, cease operations and immediately notify Departmental Representative.

.6 Protect surface drainage from damage and blockage.

.7 Provide on-site facilities and containers for collection and storage of reusable and recyclable materials, where required.

.8 Separate and store materials produced during project in designated areas.

.9 Handle materials in accordance with requirements for acceptance by designated processing facilities.

.1 On-site source separation is recommended.

.2 Remove co-mingled materials to off site processing facility for separation.

.3 Obtain waybills, receipts and/or scale tickets for separated materials removed from site.

1.11 DISPOSAL OF WASTES

.1 Do not bury rubbish or waste materials.

.2 Do not dispose of waste into waterways, storm, or sanitary sewers.

.3 Keep records of construction waste including:

.1 Number and size of bins.

Page 45: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 01 74 21 Riding Mountain National Park, MB CONSTRUCTION/DEMOLITION WASTE R.073988.001 MANAGEMENT AND DISPOSAL Page 5

.2 Waste type of each bin.

.3 Total tonnage generated.

.4 Tonnage reused or recycled.

.5 Reused or recycled waste destination.

.4 Remove materials on-site as Work progresses.

.5 Prepare project summary to verify destination and quantities on a material-by-material basis as identified in the waste audit.

1.12 SCHEDULING

.1 Co-ordinate Work with other activities at site to ensure timely and orderly progress of Work.

Part 2 Products

2.1 NOT USED

.1 Not Used.

Part 3 Execution

3.1 APPLICATION

.1 Do Work in compliance with WRW.

.2 Handle waste materials not reused, salvaged, or recycled in accordance with appropriate regulations and codes.

3.2 CLEANING

.1 Progress Cleaning: clean in accordance with Section 01 74 11 - Cleaning.

.1 Leave Work area clean at end of each day.

.2 Final Cleaning: upon completion remove surplus materials, rubbish, tools and equipment in accordance with Section 01 74 11 - Cleaning.

.3 Waste Management: separate waste materials for reuse or recycling.

.1 Remove recycling containers and bins from site and dispose of materials at appropriate facility.

.2 Source separate materials to be reused/recycled into specified sort areas.

3.3 DIVERSION OF MATERIALS

.1 Separate materials from general waste stream and stockpile in separate piles or containers, as reviewed by Departmental Representative, and consistent with applicable fire regulations, including the wood rafters (16) from the east wing of the Mount Agassiz Ski Lodge, designated for reuse by the Owner.

.2 On-site sale of salvaged, recovered, reusable or recyclable materials is not permitted.

Page 46: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 01 74 21 Riding Mountain National Park, MB CONSTRUCTION/DEMOLITION WASTE R.073988.001 MANAGEMENT AND DISPOSAL Page 6 3.4 WASTE DIVERSION REPORT

.1 At completion of Project, prepare written Waste Diversion Report indicating quantities of materials reused, recycled or disposed of as well as the following:

.1 Identify final diversion results.

.2 Compare final quantities/percentages diverted with initial projections in Waste Audit and Waste Reduction Workplan. Include:

.1 Supporting documentation.

.2 Waybills and tracking forms.

3.5 WASTE AUDIT (WA)

.1 Schedule A - Waste Audit (WA)

(1) Material Category

(2) Material Quantity Unit

(3) Estimated Waste %

(4) Total Quantity of Waste (unit)

(5) Generation Point

(6) % Recycled

(7) % Reused

Wood and Plastics Material Description

Other Doors and Windows Material Description

Glass Wood Metal Concrete

3.6 WASTE REDUCTION WORKPLAN (WRW)

.1 Schedule B

(1) Material Category

(2) Person(s) Respon- sible

(3) Total Quantity of Waste (unit)

(4) Reused Amount (units) Projected

Actual (5) Recycled Amount (unit) Projected

Actual (6) Material(s) Destina- tion

Wood and Plastics Material Description

Other Doors and Windows Material Description

Page 47: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 01 74 21 Riding Mountain National Park, MB CONSTRUCTION/DEMOLITION WASTE R.073988.001 MANAGEMENT AND DISPOSAL Page 7 Glass Wood Metal Concrete

3.7 CANADIAN GOVERNMENTAL DEPARTMENTS CHIEF RESPONSIBILITY FOR THE ENVIRONMENT

.1 Schedule G - Government Chief Responsibility for the Environment:

Province Address General Inquires Fax Manitoba Manitoba Environment

Building 2 139 Tuxedo Avenue, Winnipeg, MB R3N 0H6

204-945-7100

The Clean Environment Commission 284 Reimer Avenue Box 21420 Steinbach MB R0A 2T3

204-326-2395 204-326-2472

END OF SECTION

Page 48: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 01 77 00 Riding Mountain National Park, MB CLOSEOUT PROCEDURES R.073988.001 Page 1 December 2014

Part 1 General

1.1 ADMINISTRATIVE REQUIREMENTS

.1 Acceptance of Work Procedures:

.1 Contractor's Inspection: conduct inspection of Work, identify deficiencies and defects, and repair as required to conform to Contract Documents.

.1 Notify Departmental Representative in writing of satisfactory completion of Contractor's inspection and submit verification that corrections have been made.

.2 Request Departmental Representative inspection within one week of project completion.

.2 Departmental Representative Inspection:

.1 Departmental Representative and Contractor to inspect Work and identify defects and deficiencies.

.2 Contractor to correct Work as directed.

.3 Completion Tasks: submit written certificates that tasks have been performed as follows:

.1 Work: completed and inspected for compliance with Contract Documents.

.2 Defects: corrected and deficiencies completed.

.3 Certificates required by authorities having jurisdiction: submitted.

.4 Work: complete and ready for final inspection.

.4 Final Inspection:

.1 When completion tasks are done, request final inspection of Work by Departmental Representative, and Contractor.

.2 When Work incomplete according to Owner and Departmental Representative, complete outstanding items and request re-inspection.

.5 Declaration of Substantial Performance: when Departmental Representative considers deficiencies and defects corrected and requirements of Contract substantially performed, make application for Certificate of Substantial Performance.

.6 Commencement of Lien and Warranty Periods: date of Owner's acceptance of submitted declaration of Substantial Performance to be date for commencement for warranty period and commencement of lien period unless required otherwise by lien statute of Place of Work.

.7 Final Payment:

.1 When Departmental Representative considers final deficiencies and defects corrected and requirements of Contract met, make application for final payment.

.2 When Work deemed incomplete by Departmental Representative, complete outstanding items and request re-inspection.

Page 49: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 01 77 00 Riding Mountain National Park, MB CLOSEOUT PROCEDURES R.073988.001 Page 2

.8 Payment of Holdback: after issuance of Certificate of Substantial Performance of Work, submit application for payment of holdback amount in accordance with contractual agreement.

1.2 FINAL CLEANING

.1 Clean in accordance with Section 01 74 11 - Cleaning.

.1 Remove surplus materials, excess materials, rubbish, tools and equipment.

.2 Waste Management: separate waste materials for reuse and recycling in accordance with Section 01 74 21 - Construction/Demolition Waste Management and Disposal.

Part 2 Products

2.1 NOT USED

.1 Not Used.

Part 3 Execution

3.1 NOT USED

.1 Not Used.

END OF SECTION

Page 50: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 01 78 00 Riding Mountain National Park, MB CLOSEOUT SUBMITTALS R.073988.001 Page 1 December 2014

Part 1 General

1.1 ACTION AND INFORMATIONAL SUBMITTALS

.1 Provide submittals in accordance with Section 01 33 00 - Submittal Procedures.

.2 Provide evidence, if requested, for type, source and quality of products supplied.

1.2 FORMAT

.1 Organize data as a neat record of Work, available for inspection by Departmental Representative.

1.3 CONTENTS - PROJECT RECORD DOCUMENTS

.1 Provide copies of federal, provincial and/or municipal permits, applications and/or approvals.

.2 Provide waste diversion report, including summary of wastes hauled, disposal location and hauler. Include all original weigh scale tickets.

1.4 RECORDING INFORMATION ON PROJECT RECORD DOCUMENTS

.1 Provide digital photos, if requested, for site records within one week of project completion to Departmental Representative.

Part 2 Products

2.1 NOT USED

.1 Not Used.

Part 3 Execution

3.1 NOT USED

.1 Not Used.

END OF SECTION

Page 51: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 02 41 16 Riding Mountain National Park, MB STRUCTURE DEMOLITION R.073988.001 Page 1 December 2014

Part 1 General

1.1 SUMMARY

.1 Work includes demolition, removal and disposal of all structures as indicated on Demolition Plans (and related ancillary facilities) including the following:

.1 Removal and disposal of the Mount Agassiz Ski Lodge identified for demolition.

.2 Removal and disposal of hazardous materials in accordance with Section 02 81 01 - Hazardous Materials.

.3 Removal and disposal of asbestos containing material in accordance with Section 02 82 00.01 - Asbestos Abatement.

.4 Backfilling of any areas excavated to facilitate demolition requirements.

.5 Disconnecting and capping of services as indicated or as directed by the Department Representative.

.6 Restoration and grading of all areas affected by demolition work in accordance with Section 31 23 33.01 - Excavating, Trenching and Backfilling.

.7 Provision of a photographic record of all waste materials removed from the site for disposal.

1.2 PRICE AND PAYMENT PROCEDURES

.1 Measurement and Payment

.1 Structure demolition to be a lump sum payment. Include backfilling costs in items of Section 31 23 33 .01 – Excavation, Trenching and Backfilling.

1.3 REFERENCES

.1 Definitions:

.1 Hazardous Materials: dangerous substances, dangerous goods, hazardous commodities and hazardous products, include but not limited to: poisons, corrosive agents, flammable substances, ammunition, explosives, radioactive substances, or materials that endanger human health or environment if handled improperly.

.2 Waste Management Co-ordinator (WMC): contractor representative responsible for supervising waste management activities as well as co-ordinating related, required submittal and reporting requirements.

.3 Waste Audit (WA): inventory of materials in building. Involves quantifying by volume/weight amounts of materials and wastes generated during demolition. Indicates quantities of reuse, recycling and landfill.

.4 Waste Reduction Workplan (WRW): report which addresses opportunities for reduction, reuse, or recycling of materials. WRW is based on information acquired from WA.

.2 Reference Standards:

.1 Canadian Environmental Protection Act (CEPA)

Page 52: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 02 41 16 Riding Mountain National Park, MB STRUCTURE DEMOLITION R.073988.001 Page 2

.2 CSA International

.1 CSA S350-[M1980(R2003)], Code of Practice for Safety in Demolition of Structures.

.3 Department of Justice Canada (Jus)

.1 Canadian Environmental Assessment Act (CEAA), 1995, c. 37.

.2 Canadian Environmental Protection Act (CEPA), 1999, c. 33.

.4 U.S. Environmental Protection Agency (EPA)

.1 EPA 832/R-92-005, Storm Water Management for Construction Activities: Developing Pollution Prevention Plans and Best Management Practices.

1.4 ADMINISTRATIVE REQUIREMENTS

.1 Pre-Construction Meeting:

.1 Attend pre-construction meeting prior to beginning work of this Section in accordance with Section 01 31 19 - Project Meetings to:

.1 Verify project requirements.

.2 Verify existing site conditions adjacent to demolition work.

.3 Co-ordination with other construction subtrades.

.2 Ensure site supervisor and subcontractor representatives attend.

.3 Departmental Representative will provide written notification of change to meeting schedule established upon contract award 24 hours prior to scheduled meeting.

.2 Scheduling:

.1 Employ necessary means to meet project time lines without compromising material diversion.

.1 In event of unforeseen delay notify Departmental Representative in writing.

1.5 ACTION AND INFORMATIONAL SUBMITTALS

.1 Submit in accordance with Section 01 33 00 - Submittal Procedures and Section 01 74 21 - Construction/Demolition Waste Management and Disposal.

.2 WMC is responsible for fulfilment of reporting requirements.

.3 Prior to beginning of Work on site submit Waste Reduction Workplan in accordance with Section 01 74 21 - Construction/Demolition Waste Management and Disposal and indicate:

.1 Descriptions of and anticipated quantities of materials to be salvaged, reused, recycled and landfilled, including the wood rafters (16) from the east wing of the Mount Agassiz Ski Lodge designated for reuse by the Owner.

.2 Schedule of selective demolition.

.3 Number and location of dumpsters.

.4 Name and address of haulers and waste facilities.

Page 53: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 02 41 16 Riding Mountain National Park, MB STRUCTURE DEMOLITION R.073988.001 Page 3

.4 Submit copies of weigh bills, bills of lading or receipts from authorized disposal sites and reuse and recycling facilities for material removed from site on a weekly basis or upon request of Departmental Representative.

.1 Written authorization from Departmental Representative is required to deviate from facilities listed in Waste Reduction Workplan.

1.6 QUALITY ASSURANCE

.1 Regulatory Requirements: Ensure Work is performed in compliance with CEPA, CEAA, TDGA, and applicable Provincial and Municipal regulations.

1.7 SITE CONDITIONS

.1 Environmental protection:

.1 Ensure Work is done in accordance with Section 01 35 43 - Environmental Procedures.

.2 Ensure Work does not adversely affect adjacent watercourses, groundwater and wildlife or contribute to excess air and noise pollution.

.3 Fires and burning of waste or materials is not permitted on site.

.4 Do not bury rubbish waste materials.

.5 Do not dispose of waste or volatile materials including but not limited to: mineral spirits, oil, petroleum based lubricants, or toxic cleaning solutions into watercourses, storm or sanitary sewers.

.1 Ensure proper disposal procedures are maintained throughout project.

.6 Do not pump water containing suspended materials into watercourses, storm or sanitary sewers or onto adjacent properties.

.7 Control disposal or runoff of water containing suspended materials or other harmful substances in accordance with authorities having jurisdiction.

.8 Protect trees, plants and foliage on site and adjacent properties where indicated.

.9 Prevent extraneous materials from contaminating air beyond application area, by providing temporary enclosures during demolition work.

.10 Cover or wet down dry materials and waste to prevent blowing dust and debris. Control dust on all temporary roads.

1.8 EXISTING CONDITIONS

.1 Structures to be demolished are based on their condition at time of examination prior to tendering.

.2 Leachable lead analyses were completed on samples of the various painted surfaces (see Appendix C) and the results indicate that the painted materials would not be classified as hazardous waste.

Page 54: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 02 41 16 Riding Mountain National Park, MB STRUCTURE DEMOLITION R.073988.001 Page 4 Part 2 Products

2.1 EQUIPMENT

.1 Leave machinery running only while in use, except where extreme temperatures prohibit shutting machinery down.

Part 3 Execution

3.1 PREPARATION

.1 Erosion and Sedimentation Control:

.1 Provide erosion and sedimentation control measures to prevent soil erosion and discharge of soil-bearing water runoff that complies with EPA 832/R-92-005 or requirements of authorities having jurisdiction, whichever is more stringent and in accordance with Section 01 57 13 - Erosion and Sediment Control.

.2 Inspect, repair, and maintain erosion and sedimentation control measures during construction.

.3 Remove any temporary erosion and sedimentation controls and restore and stabilize areas disturbed during removal.

.4 Install final erosion and sediment controls following demolition in accordance with site drawings and Section 01 57 13 - Erosion and Sediment Control.

.2 Protection of in-place conditions:

.1 Work in accordance with Section 01 35 43 - Environmental Procedures.

.2 Prevent movement, settlement or damage of adjacent services, trees, landscaping and adjacent grades.

.1 Provide bracing, shoring and underpinning as required.

.2 Repair damage caused by demolition as directed by Departmental Representative.

.3 Prevent debris from blocking surface drainage system, which must remain in operation.

.3 Surface Preparation:

.1 Disconnect electrical and telephone service lines entering building to be demolished.

.2 Disconnect and cap designated mechanical services.

.1 Sewer and water lines: remove and cut and cap at the margin of excavation or as directed by Departmental Representative.

.2 Other underground services: remove and dispose of as directed by Departmental Representative.

.3 Remove rodent and vermin as required by Departmental Representative.

3.2 DEMOLITION

.1 Do demolition work in accordance with Section 01 56 00 - Temporary Barriers and Enclosures.

Page 55: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 02 41 16 Riding Mountain National Park, MB STRUCTURE DEMOLITION R.073988.001 Page 5

.2 Blasting operations not permitted during demolition.

.3 Remove contaminated or dangerous materials as defined by authorities having jurisdiction, relating to environmental protection, from site and dispose of in safe manner to minimize danger at site or during disposal.

.4 Prior to start of Work remove hazardous materials, listed as hazardous, as defined by authorities having jurisdiction or as directed by Departmental Representative from site and dispose of at designated disposal facilities in safe manner and in accordance with TDGA and other applicable requirements and Section 02 81 01 - Hazardous Materials.

.5 Demolish structure.

.6 Demolish foundation walls, floors and footings. Remove all concrete demolition waste to an approved off-site facility.

.7 At end of each day's work, leave Work Site in safe and stable condition, and to not be a hazard to wildlife.

.8 Demolish to minimize dusting. Keep materials wetted as directed by Departmental Representative.

.9 Remove structural framing.

.10 Contain fibrous materials to minimize release of airborne fibres while being transported within facility.

.11 Remove and dispose of demolished materials except where noted otherwise and in accordance with authorities having jurisdiction.

.12 Use natural lighting to do Work where possible.

.1 Shut off temporary lighting except those required for security purposes at end of each day.

3.3 CLEANING

.1 Develop Waste Reduction Workplan related to Work of this Section and in accordance with Section 01 74 21 - Construction/Demolition Waste Management and Disposal.

.2 Waste Management: separate waste materials for reuse and recycling in accordance with Section 01 74 21 - Construction/Demolition Waste Management and Disposal.

.1 Remove recycling containers and bins from site and dispose of materials at appropriate facility.

.3 Divert excess materials from landfill to site approved by Departmental Representative.

.4 Designate appropriate security resources / measures to prevent vandalism, damage and theft.

.5 Stockpile materials designated for alternate disposal in location which does not impede disassembly, processing, or hauling procedures.

.1 Label stockpiles, indicating material type and quantity.

.6 Where required by disposal facility, separate from general waste stream and stockpile materials in neat and orderly fashion in location and as directed by Departmental Representative for alternate disposal. Stockpile materials in accordance with applicable fire and safety regulations.

Page 56: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 02 41 16 Riding Mountain National Park, MB STRUCTURE DEMOLITION R.073988.001 Page 6

.7 Supply separate, clearly marked disposal bins for categories of waste material. Do not remove bins from site until inspected and approved by Departmental Representative. Notify Departmental Representative prior to removal of bins from site.

.8 Remove stockpiled material as directed by Departmental Representative, when it interferes with operations of project construction.

.9 Remove stockpiles of like materials by alternate disposal option once collection of materials is complete.

.10 Transport material designated for alternate disposal using approved haulers listed in Waste Reduction Workplan and in accordance with applicable regulations.

.1 Written authorization from Departmental Representative is required to deviate from haulers listed in Waste Reduction Workplan.

.11 Dispose of materials not designated for alternate disposal in accordance with applicable regulations.

.1 Disposal facilities must be those approved of and listed in Waste Reduction Workplan.

.2 Written authorization from Departmental Representative is required to deviate from disposal facilities listed in Waste Reduction Workplan.

END OF SECTION

Page 57: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 02 42 13 Riding Mountain National Park, MB DECONSTRUCTION OF STRUCTURES R.073988.001 Page 1 December 2014

Part 1 General

1.1 SUMMARY

.1 Work includes deconstruction, removal and disposal of all building contents and structures as indicated on Demolition Plans (and related ancillary facilities) including the following:

.1 Completing a Waste Audit, quantifying amounts of materials and wastes that will be generated during deconstruction/demolition activities, including the wood rafters (16) from the east wing of the Mount Agassiz Ski Lodge designated for reuse by the Owner.

.2 Submitting a Waste Reduction Workplan (WRW) identifying actions to be taken to reduce, reuse and recycle materials during deconstruction of the Mount Agassiz Ski Lodge. Deconstruction, removal, segregation and disposal of all contents of the building identified for demolition, including the wood rafters (16) from the east wing of the lodge designated for reuse by the Owner.

.3 Removal and disposal of hazardous materials in accordance with Section 02 81 01 - Hazardous Materials.

.4 Removal and disposal of asbestos containing material in accordance with Section 02 82 00.01 - Asbestos Abatement.

.5 Disassembly and salvage of 16 wood rafters in the east wing of the Mount Agassiz Ski Lodge.

.6 Provision of a photographic record of all waste materials removed from the site for disposal.

1.2 PRICE AND PAYMENT PROCEDURES

.1 Measurement and Payment

.1 Structure demolition to be a lump sum payment.

1.3 REFERENCES

.1 Definitions:

.1 Alternate Disposal: reuse and recycling of materials by designated facility, user or receiving organization which has valid Certificate of Approval to operate. Alternative to landfill disposal.

.2 Deconstruction: systematic dismantling of structure in a manner that achieves safe removal/disposal of hazardous materials and maximum salvage/recycling of materials.

.1 Ultimate objective is to recover potentially valuable resources while diverting from landfill what has traditionally been significant portion of waste system.

.3 Demolition: rapid destruction of structure with or without prior removal of hazardous materials.

Page 58: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 02 42 13 Riding Mountain National Park, MB DECONSTRUCTION OF STRUCTURES R.073988.001 Page 2

.4 Disassembly: physical detachment of materials from structure: prying, pulling, cutting, unscrewing.

.5 Hauler: company (possessing appropriate and valid Certificate of Approval) contracted to transport waste, reusable or recyclable materials off site to designated facility, user or receiving organization.

.6 Hazardous Materials: dangerous substances, dangerous goods, hazardous commodities and hazardous products, including but not limited to: corrosive agents, flammable substances, ammunition, explosives, radioactive substances, or other material that can endanger human health, well being or environment if handled improperly.

.7 Processing: tasks which are subsequent to disassembly and may include: moving materials, denailing, cleaning, separating and stacking.

.8 Recyclable: ability of product or material to be recovered at end of its life cycle and re-manufactured into new product for reuse by others.

.9 Recycle: process by which waste and recyclable materials are transformed or collected for purpose of being transferred into new products.

.10 Recycling: process of sorting, cleansing, treating and reconstituting solid waste and other discarded materials for purpose of using in altered form.

.1 Recycling does not include burning, incinerating, or thermally destroying waste.

.11 Reuse: repeated use of product in same form but not necessarily for same purpose. Reuse includes:

.1 Salvaging reusable materials from remodelling projects, before demolition stage, for resale, reuse on current project or for storage for use on future projects.

.2 Returning reusable items including pallets or unused products to vendors.

.12 Salvage: removal of structural and non-structural materials from deconstruction/disassembly projects for purpose of reuse or recycling.

.13 Source Separation: acts of keeping different types of waste materials separate, beginning from first time they became waste.

.14 Used Building Material Receipt: receipt issued at end destination for materials designated for alternate disposal.

.15 Waste Audit (WA): inventory of materials in building. Involves quantifying (by volume or weight) amounts of materials and wastes generated during deconstruction. Indicates quantities of reuse, recycling and landfill.

.16 Waste Management Coordinator (WMC): contractor representative responsible for supervising waste management activities as well as coordinating related, required submittal and reporting requirements.

.17 Waste Reduction Workplan (WRW): report which outlines actions to be taken to reduce, reuse and recycle materials during course of deconstruction. Actions based on finding of the Waste Audit (WA).

.18 Weigh Bill: receipt received from recycling facility indicating weight and content of each load/bin of material.

.2 Reference Standards:

.1 CSA International

Page 59: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 02 42 13 Riding Mountain National Park, MB DECONSTRUCTION OF STRUCTURES R.073988.001 Page 3

.1 CSA S350-[M1980(R2003)], Code of Practice for Safety in Demolition of Structures.

.2 Federal Legislation

.1 Canadian Environmental Assessment Act (CEAA), 1995, c. 37.

.2 Canadian Environmental Protection Act (CEPA), 1999, c. 33.

.3 Transportation of Dangerous Goods Act (TDGA), 1992, c. 34.

.4 Motor Vehicle Safety Act 1993, c. 16 (MVSA).

.5 Provincial Legislation Manitoba Regulation 217/2006 Workplan Safety and Health Regulation.

1.4 ADMINISTRATIVE REQUIREMENTS

.1 Scheduling:

.1 Employ necessary means to meet project time lines without compromising material diversion. In event of unforeseen delay notify Departmental Representative in writing.

1.5 ACTION AND INFORMATIONAL SUBMITTALS

.1 Submit in accordance with Section 01 33 00 - Submittal Procedures.

.2 WMC is responsible for fulfillment of reporting requirements.

.3 Submit WRW indicating schedule of selective demolition, material descriptions and quantities to be salvaged, number and location of bins, anticipated frequency of tippage, and names and addresses of haulers and facilities in accordance with Section 01 74 21 - Construction/Demolition Waste Management and Disposal, including the wood rafters (16) from the east wing of the Mount Agassiz Ski Lodge designated for reuse by the Owner.

.4 Submit copies of certificates: weigh bills, bills of lading, used building material receipts, from authorized disposal sites and reuse and recycling facilities for material removed from site to Departmental Representative weekly.

.1 Written authorization from Departmental Representative is required to deviate from haulers or facilities listed in WRW.

.5 Hazardous Materials:

.1 Submit description of Hazardous Materials and Notification of Filing with proper authorities prior to beginning of Work as required.

.6 Workers, haulers and subcontractors must possess current, applicable permits to remove, handle and dispose of wastes categorized Provincially, as hazardous.

.1 Provide proof of compliance within 24 hours upon written request of Departmental Representative.

1.6 QUALITY ASSURANCE

.1 Qualifications: provide adequate workforce training through meetings and demonstrations. Have someone on site with deconstruction experience throughout project for consultation and supervision purposes.

Page 60: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 02 42 13 Riding Mountain National Park, MB DECONSTRUCTION OF STRUCTURES R.073988.001 Page 4

.2 Regulatory Requirements:

.1 Ensure Work is performed in compliance with applicable Provincial regulations.

.3 Site Meetings: conduct regular project meetings.

.1 Meet with Departmental Representative to examine existing site conditions adjacent to demolition work, prior to start of demolition activities.

.2 Ensure site supervisor and any subcontractor representatives attend.

1.7 ENVIRONMENTAL REQUIREMENTS

.1 Do Work in accordance with Section 01 35 43 - Environmental Procedures.

.2 Ensure deconstruction work does not adversely affect adjacent watercourses, groundwater and wildlife, or contribute to excess air noise pollution.

.3 Fires and burning of waste or materials is not permitted on site.

.4 Do not bury waste or materials on site unless approved in writing by Departmental Representative.

.5 Do not dispose of waste or volatile materials into watercourses, storm or sanitary sewers.

.1 Ensure proper disposal procedures in accordance with CEPA, TDGA and applicable Provincial regulations.

.6 Do not pump water containing suspended materials into watercourses, storm or sanitary sewers or onto adjacent properties in accordance with authorities having jurisdiction.

.7 Control disposal or runoff of water containing suspended materials or other harmful substances in accordance with authorities having jurisdiction.

.8 Protect trees, plants and foliage on site and adjacent properties where indicated.

.9 Cover or wet down dry materials and waste to prevent blowing dust and debris.

.10 Use natural lighting to do Work where possible.

.1 Shut off temporary lighting except those required for security purposes at end of each day.

.11 Organize site and workers in manner which promotes efficient flow of materials through disassembly, processing, stockpiling and removal.

.12 At end of each day’s work, leave Work Site in safe and stable condition, and to not be a hazard to wildlife.

1.8 SITE CONDITIONS

.1 Existing Conditions:

.1 Should materials resembling spray or trowel applied asbestos or other designated substance be encountered in course of deconstruction, stop work, take preventative measures, and notify Departmental Representative immediately. Do not proceed until written instructions have been received.

.2 Leachable lead analyses were completed on samples of the various painted surfaces (see Appendix C) and the results indicate that the painted materials would not be classified as hazardous waste.

Page 61: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 02 42 13 Riding Mountain National Park, MB DECONSTRUCTION OF STRUCTURES R.073988.001 Page 5

.2 Structures to be demolished to be based on their condition at time of examination prior to tendering.

.3 Storage and Protection:

.1 Store materials salvaged for reuse and recycling or designated for alternate disposal in locations as outlined in Waste Reduction Workplan or as directed by Departmental Representative, including the rafters (16) from the east wing of the ski lodge designated for reuse by the Owner.

.2 Prevent movement, settlement or damage of adjacent structures, groundwater monitoring wells, trees, landscaping and adjacent grades. Provide protection as required. Repair damage caused by deconstruction as directed by Departmental Representative.

.3 Prevent debris from blocking surface drainage system.

Part 2 Products

2.1 EQUIPMENT

.1 Leave equipment and machinery running only while in use, except where extreme temperatures prohibit shutting down.

Part 3 Execution

3.1 SITE VERIFICATION OF CONDITIONS

.1 Employ necessary means to assess site conditions and structure to determine quantity and locations of hazardous materials.

.2 Investigate site and structure to determine dismantling, processing and storage logistics required prior to beginning of Work.

.3 Develop strategy for deconstruction to facilitate salvage of select or potentially reusable and recyclable materials, including the wood rafters (16) from the east wing of the Mount Agassiz Ski Lodge designated for reuse by the Owner.

3.2 PREPARATION

.1 Obtain necessary permits and approvals.

.1 Provide copies to Departmental Representative prior to start of Work on site.

.2 Contact Manitoba Hydro to confirm electrical service lines have been located and disconnected prior to deconstruction activities.

.3 Locate and protect utility lines. Do not disrupt active or energized utilities.

.4 Disconnect and cap mechanical services.

.1 Sewer and water lines: cut and cap underground utilities at the margin of the excavation in accordance to industry accepted methods and as directed by Departmental Representative.

.2 Other underground services: remove and dispose of as indicated and as directed by Departmental Representative.

Page 62: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 02 42 13 Riding Mountain National Park, MB DECONSTRUCTION OF STRUCTURES R.073988.001 Page 6 3.3 REMOVAL OF HAZARDOUS WASTES

.1 Prior to start of deconstruction work remove contaminated or hazardous materials listed or as directed by Departmental Representative from site and dispose of at designated disposal facilities in safe manner in accordance with TDGA and other applicable regulatory requirements and in accordance with Section 02 81 01 - Hazardous Materials.

.2 Leachable lead analyses were completed on samples of the various painted surfaces (see Appendix C) and the results indicate that the painted materials would not be classified as hazardous waste.

3.4 DISASSEMBLY

.1 Materials removed from the site are the property of Contractor, with the exception of the wood rafters (16) from the east wing of the Mount Agassiz Ski Lodge designated for reuse by the Owner, and which will remain the property of the Owner.

.2 Ensure workers and subcontractors are trained to carry out work in accordance with appropriate deconstruction techniques.

.3 Project supervisor with previous deconstruction experience must be present on site throughout project.

.4 Deconstruct in accordance with CSA S350.

.5 Workers must utilize adequate fall protection in accordance with Manitoba Regulation 217/2006.

.6 Where required remove finishes, furnishings, and mechanical and electrical equipment.

.7 Carefully remove windows and doors from structure.

.8 Disassemble non-loadbearing interior partitions and remove materials from structure.

.9 Disassemble in sequence: roof, interior loadbearing partitions, exterior walls, floors and foundation.

.10 Wherever possible, transfer material assemblies from heights to ground level for easier disassembly. Take appropriate measures to ensure safety.

.11 Separate from waste stream, material designated for alternate disposal.

.12 Remove and store materials to be salvaged, in manner to prevent damage.

.1 Store and protect in accordance with requirements for maximum preservation of material.

.2 Handle salvaged materials as new materials.

.13 Where appropriate, source separate for recycling, materials that cannot be salvaged for reuse including wood, metal, concrete and asphalt.

.14 Remove materials that cannot be salvaged for reuse or recycling and dispose of in accordance with applicable codes at licensed facilities.

3.5 PROCESSING

.1 Designate location for processing of materials which eliminates double handling and provides adequate space to maintain efficient material flow.

Page 63: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 02 42 13 Riding Mountain National Park, MB DECONSTRUCTION OF STRUCTURES R.073988.001 Page 7

.2 Keep processing area clean and free of excess debris.

.3 At end of each day’s work, leave Work Site in safe and stable condition, and to not be a hazard to wildlife.

.4 Supply separate, marked disposal bins for categories of waste material. Do not remove bins from site until inspected and approved by Departmental Representative. Notify Departmental Representative prior to removal of bins from site.

.5 Separate processed materials into organized piles for stockpiling. Provide collection area for materials designated for alternate disposal, including the wood rafters (16) from the east wing of the Mount Agassiz Ski Lodge designated for reuse by the Owner.

3.6 STOCKPILING

.1 Label stockpiles, indicating material type and quantity.

.2 Designate appropriate security resources/measures to prevent vandalism, damage and theft.

.3 Stockpile materials designated for alternate disposal in location which facilitates removal from site, and which does not impede disassembly, processing or hauling procedures.

.4 Stockpile materials designated for salvage by Owner (16 wood rafters from east wing of ski lodge) in location designated by Departmental Representative.

3.7 REMOVAL FROM SITE

.1 Transport material designated for alternate disposal by approved haulers and in accordance with applicable regulations. Do not deviate from haulers listed in Waste Reduction Workplan without prior written authorization from Departmental Representative.

.2 Dispose of materials not designated for alternate disposal in accordance with applicable regulations. Disposal facilities must be approved of and listed in Waste Reduction Workplan. Do not deviate from disposal facilities listed in Waste Reduction Workplan without prior written authorization from Departmental Representative.

3.8 CLEANING AND RESTORATION

.1 Keep site clean and organized throughout deconstruction.

.2 Upon completion of project, remove debris, trim surfaces and leave work site clean.

.3 Upon completion of project, reinstate areas affected by Work to match grade and slope of adjacent, undisturbed areas.

END OF SECTION

Page 64: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge 02 61 00.01 Riding Mountain National Park, MB SOIL REMEDIATION R.073988.001 Page 1 December 2014

Part 1 General

1.1 SUMMARY

.1 Work Includes:

.1 Co-ordination, supervision and preparation for excavation and disposal of contaminated soil from beneath the Mount Agassiz Ski Lodge.

.2 Provision and installation of materials and equipment necessary to remediate site in accordance with Section 31 23 33.01 - Excavating, Trenching and Backfilling.

.3 Implementation of safety work zones, site Health and Safety Plans and Emergency Response Plans in accordance with Section 01 35 29.06 - Health and Safety Requirements.

.4 Air monitoring around remedial area during work.

.5 Insurance that remediation has no negative impact on environment.

.6 Construction of water control and recovery structures in accordance with Section 01 57 13 - Erosion and Sediment Control.

.7 Management of contaminated waters generated during soil remediation work, including separation, recovery and elimination of free-phase hydrocarbons.

.8 Dismantling facilities following acceptance of final report by Departmental Representative.

.9 Backfilling of excavation in accordance with Section 31 23 33.01- Excavating, Trenching and Backfilling.

.10 Obtaining required permits and approvals for waste disposal.

1.2 PRICE AND PAYMENT PROCEDURES

.1 Measurement and Payment:

.1 No measurement of payment will be made for this section.

.1 Include soil remediation costs in items of Section 31 23 33.01 -Excavation, Trenching and Backfilling.

1.3 REFERENCES

.1 Applicable environmental and health and safety laws and regulations for Canada, Province of Manitoba and Municipal by-laws.

.2 CCME (Canadian Council of Ministers of the Environment) Contaminated Sites, Contaminated Soil and Groundwater, and Remediation of Contaminated Sites most current publications.

.3 Federal Contaminated Sites Action Plan (FCSAP).

.4 National Fire Code (2005).

.5 Canada National Parks Act (2000).

Page 65: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge 02 61 00.01 Riding Mountain National Park, MB SOIL REMEDIATION R.073988.001 Page 2 1.4 ACTION AND INFORMATIONAL SUBMITTALS

.1 Provide submittals in accordance with Section 01 33 00 - Submittal Procedures.

.2 Closeout Submittals:

.1 Provide Closeout Submittals in accordance with Section 01 77 00 - Closeout Procedures and Section 01 78 00 - Closeout Submittals as follows:

.1 Provide written proof (weigh scale tickets) that contaminated soil has been sent to waste disposal facility authorized by the Province of Manitoba.

.2 Provide written proof that waste and debris have been sent to waste disposal facility authorized by the Province of Manitoba.

1.5 QUALITY ASSURANCE

.1 Qualifications:

.1 Identify members of project team including project manager. Define experience, and qualifications.

.2 Regulatory Requirements:

.1 Perform work in accordance with:

.1 Acts, Regulations, Laws, guidelines, codes of practice, directives and policies of government authorities pertaining to: environment; noise; water supply; waste water; air quality; health and safety; transportation; and waste management.

.2 WHMIS.

.3 Canadian Environmental Assessment Act.

.4 Canadian Environmental Protection Act (New Substance Notification Regulations).

.5 Transportation of Dangerous Goods Act.

.6 National Building Code of Canada.

.7 National Fire Code of Canada.

.8 The Fisheries Act.

.9 Migratory Birds Convention Act.

.10 Migratory Birds Regulations.

.11 Canada National Parks Act (2000).

.3 Field Samples:

.1 Field samples of waste soil and water will be collected for laboratory analyses by Departmental Representative. Contractor to notify Departmental Representative of the analytical requirements of the waste-receiving facilities in accordance with Section 01 33 00 - Submittal Procedures.

1.6 DELIVERY, STORAGE, AND HANDLING

.1 Contaminated Soil:

Page 66: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge 02 61 00.01 Riding Mountain National Park, MB SOIL REMEDIATION R.073988.001 Page 3

.1 Transport and dispose of contaminated soil according to federal requirements and current Manitoba regulations.

.2 Segregate the non-contaminated soil for reuse in the final excavation. Ensure no contact between non-contaminated excavated soil and drainage or contaminated water or contaminated soil.

1.7 SITE CONDITIONS

.1 Existing Conditions:

.1 Review Supplemental Phase II ESA Report, as provided in Appendix A, summarizing extent of soil and groundwater contamination.

1.8 SEQUENCING

.1 When floating free phase substance is present, remove free phase from saturated soil without further contaminating soil or groundwater prior to commencing other decontamination Work.

.2 Decontaminate equipment used in decontamination procedures before removing equipment from job site.

1.9 MAINTENANCE

.1 Access Roads:

.1 Maintain Access Roads in accordance with Section 01 35 00.06 - Special Procedures for Traffic Control and as follows:

.1 Obtain permission to use existing roads to access site.

.2 Maintain and clean roads for duration of Work.

.3 Repair damage incurred from use of roads.

.4 Provide photographic documentation of roads used by construction vehicles before, during and after Work.

Part 2 Products

2.1 MATERIALS

.1 Fill:

.1 Characterized and compactible to meet decontamination objectives.

.2 Hazardous Waste:

.1 Disposed in accordance with Manitoba regulations.

2.2 EQUIPMENT

.1 Leave equipment and machinery running only while in use, except where extreme temperatures prohibit shutting down.

.2 Trucks:

.1 Cleaned meticulously between loads of contaminated soil and clean fill.

Page 67: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge 02 61 00.01 Riding Mountain National Park, MB SOIL REMEDIATION R.073988.001 Page 4

.2 Cleaned meticulously at end of work day.

.3 Cover truck bodies with tarpaulins during transportation.

.4 Use watertight truck bodies for transporting contaminated soil.

Part 3 Execution

3.1 PREPARATION

.1 Protection:

.1 Keep excavation sites water free throughout work and manage recovered water according to contamination level and provincial/municipal regulations.

.2 Protect excavation from precipitation as practical.

.3 Provide temporary structures to divert flow of surface waters from excavation.

.4 Provide safety measures to ensure worker and public safety.

.5 At end of each day's work, leave Work Site in safe and stable condition, and to not be a hazard to wildlife.

3.2 APPLICATION

.1 Soil Management:

.1 Do not dilute contaminated soil with less contaminated soil.

.2 Groundwater Management:

.1 Install equipment necessary for recovery of free product (less or more dense than water) and pumping of groundwater.

.2 Vacuum truck is an acceptable means of excavation dewatering.

.3 Store, transport and eliminate off-site or treat residues generated by water treatment process in accordance with standards, requirements and regulations of the Province of Manitoba.

3.3 RESTORATION

.1 Ensure confirmatory sampling results indicate that contaminant concentrations are in compliance with applicable federal standards prior to backfilling.

.2 Backfill excavation in accordance with Section 31 23 33.01 - Excavating, Trenching and Backfilling.

3.4 EQUIPMENT DECONTAMINATION

.1 Decontaminate equipment used in excavation process and remove from site at end of remedial activities.

END OF SECTION

Page 68: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 02 81 01 Riding Mountain National Park, MB HAZARDOUS MATERIALS R.073988.001 Page 1 December 2014

Part 1 General

1.1 SUMMARY

.1 Work Includes:

.1 On-site storage/handling and management of all hazardous materials required during demolition of the Mount Agassiz Ski Lodge.

.2 Removal and off-site disposal of all designated substances from within the Mount Agassiz Ski Lodge, including asbestos containing materials, lead, mould and/or mercury/PCB containing equipment, as identified, but not limited to, those materials identified in the Hazardous Materials Survey (Appendix B).

.3 Asbestos abatement in accordance with Section 02 82 00.01- Asbestos Abatement.

1.2 PRICE AND PAYMENT PROCEDURES

.1 Measurement and Payment

.1 On-site storage/handling and management of all hazardous materials and removal and off-site disposal of designated substances, including asbestos abatement, to be lump sum payment.

1.3 REFERENCES

.1 Definitions:

.1 Dangerous Goods: product, substance, or organism specifically listed or meets hazard criteria established in Transportation of Dangerous Goods Regulations.

.2 Hazardous Material: product, substance, or organism used for its original purpose; and is either dangerous goods or material that will cause adverse impact to environment or adversely affect health of persons, animals, or plant life when released into the environment.

.3 Hazardous Waste: hazardous material no longer used for its original purpose and that is intended for recycling, treatment or disposal.

.2 Reference Standards:

.1 Canadian Environmental Protection Act,1999 (CEPA 1999)

.1 Export and Import of Hazardous Waste and Hazardous Recyclable Material Regulations (SOR/2005-149).

.2 Department of Justice Canada (Jus)

.1 Transportation of Dangerous Goods Act, 1992 (TDG Act), (c. 34).

.2 Transportation of Dangerous Goods Regulations (T-19.01-SOR/2001-286).

.3 Health Canada / Workplace Hazardous Materials Information System (WHMIS)

.1 Material Safety Data Sheets (MSDS).

Page 69: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 02 81 01 Riding Mountain National Park, MB HAZARDOUS MATERIALS R.073988.001 Page 2

.4 National Research Council Canada Institute for Research in Construction (NRC-IRC)

.1 National Fire Code of Canada-2005.

1.4 ACTION AND INFORMATIONAL SUBMITTALS

.1 Submit in accordance with Section 01 33 00 - Submittal Procedures.

.2 Product Data:

.1 Submit manufacturer's instructions, printed product literature and data sheets for hazardous materials and include product characteristics, performance criteria, physical size, finish and limitations.

.2 Submit copies of WHMIS MSDS in accordance with Section 01 35 29.06 - Health and Safety Requirements and Section 01 35 43 - Environmental Procedures to Departmental Representative for each hazardous material required prior to bringing hazardous material on site.

.3 Submit hazardous materials management plan to Departmental Representative that identifies hazardous materials, usage, location, personal protective equipment requirements and disposal arrangements.

1.5 DELIVERY, STORAGE AND HANDLING

.1 Deliver, store and handle materials in accordance with with manufacturer's written instructions.

.2 Transport hazardous materials and wastes in accordance with Transportation of Dangerous Goods Act, Transportation of Dangerous Goods Regulations and applicable provincial regulations.

.3 Storage and Handling Requirements:

.1 Co-ordinate storage of hazardous materials with Departmental Representative and abide by internal requirements for labelling and storage of materials and wastes.

.2 Store and handle hazardous materials and wastes in accordance with applicable federal and provincial laws, regulations, codes and guidelines.

.3 Store and handle flammable and combustible materials in accordance with National Fire Code of Canada requirements.

.4 Keep no more than 250 litres of flammable and combustible liquids such as gasoline, kerosene and naphtha for ready use.

.1 Store flammable and combustible liquids in approved safety cans bearing the Underwriters' Laboratory of Canada or Factory Mutual seal of approval.

.2 Storage of quantities of flammable and combustible liquids exceeding 250 litres for work purposes requires the written approval of the Departmental Representative.

.5 Transfer of flammable and combustible liquids is prohibited within buildings.

.6 Transfer flammable and combustible liquids away from open flames or heat-producing devices.

Page 70: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 02 81 01 Riding Mountain National Park, MB HAZARDOUS MATERIALS R.073988.001 Page 3

.7 Solvents or cleaning agents must be non-flammable or have flash point above 38 degrees C.

.8 Store flammable and combustible waste liquids for disposal in approved containers located in safe, ventilated area. Keep quantities to minimum.

.9 Observe smoking regulations, smoking is prohibited in areas where hazardous materials are stored, used or handled.

.10 Storage requirements for quantities of hazardous materials and wastes in excess of 5 kg for solids and 5 litres for liquids:

.1 Store hazardous materials and wastes in closed and sealed containers.

.2 Label containers of hazardous materials and wastes in accordance with WHMIS.

.3 Store hazardous materials and wastes in containers compatible with that material or waste.

.4 Segregate incompatible materials and wastes.

.5 Ensure that different hazardous materials or hazardous wastes are stored in separate containers.

.6 Store hazardous materials and wastes in secure storage area with controlled access.

.7 Maintain clear egress from storage area.

.8 Store hazardous materials and wastes in location that will prevent them from spilling into environment.

.9 Have appropriate emergency spill response equipment available near storage area, including personal protective equipment.

.10 Maintain inventory of hazardous materials and wastes, including product name, quantity, and date when storage began.

.11 When hazardous waste is generated on site:

.1 Co-ordinate transportation and disposal with Departmental Representative.

.2 Comply with applicable federal, provincial and municipal laws and regulations for generators of hazardous waste.

.3 Use licensed carrier authorized by provincial authorities to accept subject material.

.4 Before shipping material obtain written notice from intended hazardous waste treatment or disposal facility it will accept material and it is licensed to accept this material.

.5 Label container[s] with legible, visible safety marks as prescribed by federal and provincial regulations.

.6 Only trained personnel handle, offer for transport, or transport dangerous goods.

.7 Provide photocopy of shipping documents and waste manifests to Departmental Representative.

.8 Track receipt of completed manifest from consignee after shipping dangerous goods. Provide photocopy of completed manifest to Departmental Representative.

Page 71: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 02 81 01 Riding Mountain National Park, MB HAZARDOUS MATERIALS R.073988.001 Page 4

.9 Report discharge, emission, or escape of hazardous materials immediately to Departmental Representative and appropriate provincial authority. Take reasonable measures to control release.

.12 Ensure personnel have been trained in accordance with Workplace Hazardous Materials Information System (WHMIS) requirements.

.13 Report spills or accidents immediately to Departmental Representative. Submit a written spill report to Departmental Representative within [24] hours of incident.

.4 Develop Waste Reduction Workplan related to Work of this Section and in accordance with Section 01 74 21 - Construction/Demolition Waste Management and Disposal.

Part 2 Products

2.1 MATERIALS

.1 Description:

.1 Bring on site only quantities hazardous material required to perform Work.

.2 Maintain MSDS in proximity to where materials are being used. Communicate this location to personnel who may have contact with hazardous materials.

Part 3 Execution

3.1 CLEANING

.1 Progress Cleaning: clean in accordance with Section 01 74 11 - Cleaning.

.1 Leave Work area clean at end of each day.

.2 Final Cleaning: upon completion remove surplus materials, rubbish, tools and equipment in accordance with Section 01 74 11 - Cleaning.

.3 Asbestos abatement in accordance with Section 02 82 00.01- Asbestos Abatement.

.4 Waste Management: separate waste materials for reuse and recycling in accordance with Section 01 74 21 - Construction/Demolition Waste Management and Disposal.

.1 Dispose of hazardous waste materials in accordance with applicable federal and provincial acts, regulations and guidelines.

.2 Leachable lead analyses were completed on samples of the various painted surfaces (see Appendix C) and the results indicate that the painted materials would not be classified as hazardous waste.

.3 Recycle hazardous wastes for which there is approved, cost effective recycling process available.

.4 Send hazardous wastes to authorized hazardous waste disposal or treatment facilities.

.5 Burning, diluting or mixing hazardous wastes for purpose of disposal is prohibited.

Page 72: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 02 81 01 Riding Mountain National Park, MB HAZARDOUS MATERIALS R.073988.001 Page 5

.6 Disposal of hazardous materials in waterways, storm or sanitary sewers or in municipal solid waste landfills is prohibited.

.7 Dispose of hazardous wastes in timely fashion in accordance with applicable provincial regulations.

.8 Minimize generation of hazardous waste to maximum extent practicable. Take necessary precautions to avoid mixing clean and contaminated wastes.

.9 Identify and evaluate recycling and reclamation options as alternatives to land disposal, such as:

.1 Hazardous wastes recycled in manner constituting disposal.

.2 Lead-acid battery recycling.

.3 Hazardous wastes with economically recoverable precious metals.

END OF SECTION

Page 73: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 02 82 00.01 Riding Mountain National Park, MB ASBESTOS ABATEMENT - MINIMUM PRECAUTIONS R.073988.001 Page 1 December 2014

Part 1 General

1.1 SUMMARY

.1 Comply with requirements of this Section when performing following work:

.1 Removing non-friable asbestos-containing materials from within the Mount Agassiz Ski Lodge, other than ceiling tiles, if the material is installed or removed without being broken, cut, drilled, abraded, ground, sanded or vibrated at locations indicated on drawings.

.2 Break, cut, grind, sand, drill, scrape, vibrate or abrade non-friable asbestos containing materials using non-powered hand-held tools, and the material is wetted to control the spread of dust or fibres.

1.2 PRICE AND PAYMENT PROCEDURES

.1 Measurement and Payment

.1 Removal and off-site disposal of asbestos containing materials to be lump sum payment, including, but not limited to, those materials identified in the Hazardous Materials Survey (Appendix B).

1.3 REFERENCES

.1 Department of Justice Canada (Jus)

.1 Canadian Environmental Protection Act, 1999 (CEPA).

.2 Transport Canada (TC)

.1 Transportation of Dangerous Goods Act, 1992 (TDGA).

1.4 DEFINITIONS

.1 HEPA vacuum: High Efficiency Particulate Air filtered vacuum equipment with filter system capable of collecting and retaining fibres greater than 0.3 microns in any direction at 99.97% efficiency.

.2 Amended Water: water with nonionic surfactant wetting agent added to reduce water tension to allow thorough wetting of fibres.

.3 Asbestos-Containing Materials (ACMs): materials that contain 0.5 per cent or more asbestos by dry weight and are identified under Existing Conditions including fallen materials and settled dust.

.4 Asbestos Work Area: area where work takes place which will or may, disturb ACMs.

.5 Authorized Visitors: Departmental Representative or representative[s] of regulatory agencies.

.6 Competent worker: in relation to specific work, means a worker who:

.1 Is qualified because of knowledge, training and experience to perform the work.

Page 74: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 02 82 00.01 Riding Mountain National Park, MB ASBESTOS ABATEMENT - MINIMUM PRECAUTIONS R.073988.001 Page 2

.2 Is familiar with the provincial and federal laws and with the provisions of the regulations that apply to the work.

.3 Has knowledge of all potential or actual danger to health or safety in the work.

.7 Friable material: means material that:

.1 When dry, can be crumbled, pulverized or powdered by hand pressure, or

.2 is crumbled, pulverized or powdered.

.8 Non-Friable Material: material that when dry cannot be crumbled, pulverized or powdered by hand pressure.

.9 Occupied Area: any area of the building or work site that is outside Asbestos Work Area.

.10 Polyethylene: polyethylene sheeting or rip-proof polyethylene sheeting with tape along edges, around penetrating objects, over cuts and tears, and elsewhere as required to provide protection and isolation.

.11 Sprayer: garden reservoir type sprayer or airless spray equipment capable of producing mist or fine spray. Must have appropriate capacity for work.

1.5 ACTION AND INFORMATIONAL SUBMITTALS

.1 Submittals in accordance with Section 01 33 00 - Submittal Procedures.

.2 Submit proof satisfactory to Departmental Representative that suitable arrangements have been made to dispose of asbestos-containing waste in accordance with requirements of authority having jurisdiction.

.3 Submit Provincial and/or local requirements for Notice of Project Form.

.4 Submit proof of Contractor's Asbestos Liability Insurance.

.5 Submit to Departmental Representative necessary permits for transportation and disposal of asbestos-containing waste and proof that asbestos-containing waste has been received and properly disposed.

.6 Submit proof that all asbestos workers and/or supervisor have received appropriate training and education by a competent person in the hazards of asbestos exposure, good personal hygiene and work practices while working in Asbestos Work Areas, and the use, cleaning and disposal of respirators and protective clothing.

.7 Submit proof satisfactory to Departmental Representative that employees have respirator fitting and testing. Workers must be fit tested (irritant smoke test) with respirator that is personally issued.

1.6 QUALITY ASSURANCE

.1 Regulatory Requirements: comply with Federal, Provincial, and local requirements pertaining to asbestos, provided that in case of conflict among these requirements or with these specifications, more stringent requirement applies. Comply with regulations in effect at time Work is performed.

.2 Health and Safety:

.1 Perform construction occupational health and safety in accordance with Section 01 35 29.06 - Health and Safety Requirements.

Page 75: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 02 82 00.01 Riding Mountain National Park, MB ASBESTOS ABATEMENT - MINIMUM PRECAUTIONS R.073988.001 Page 3

.2 Safety Requirements: worker protection.

.1 Protective equipment and clothing to be worn by workers while in Asbestos Work Area include:

.1 Air purifying half-maskrespirator with N-100, R-100 or P-100 particulate filter, personally issued to worker and marked as to efficiency and purpose, suitable for protection against asbestos and acceptable to Provincial Authority having jurisdiction. The respirator to be fitted so that there is an effective seal between the respirator and the worker's face, unless the respirator is equipped with a hood or helmet. The respirator to be cleaned, disinfected and inspected after use on each shift or more often if necessary, when issued for the exclusive use of one worker or after each use when used by more than one worker. The respirator to have damaged or deteriorated parts replaced prior to being used by a worker; and, when not in use, to be stored in a convenient, clean and sanitary location. The employer to establish written procedures regarding the selection, use and care of respirators, and a copy of the procedures to be provided to and reviewed with each worker who is required to wear a respirator. A worker not to be assigned to an operation requiring the use of a respirator unless he or she is physically able to perform the operation while using the respirator.

.2 Disposable-type protective clothing that does not readily retain or permit penetration of asbestos fibres. Protective clothing to be provided by the employer and worn by every worker who enters the work area, and the protective clothing shall consist of a head covering and full body covering that fits snugly at the ankles, wrists and neck, in order to prevent asbestos fibres from reaching the garments and skin under the protective clothing. To include suitable footwear, and to be repaired or replaced if torn.

.2 Eating, drinking, chewing and smoking are not permitted in Asbestos Work Area.

.3 Before leaving Asbestos Work Area, the worker can decontaminate his or her protective clothing by using a vacuum equipped with a HEPA filter or by damp wiping, before removing the protective clothing or if the protective clothing will not be reused, place it in a container for dust and waste. The container to be dust tight, suitable for asbestos waste, impervious to asbestos, identified as asbestos waste, cleaned with a damp cloth or a vacuum equipped with a HEPA filter immediately before removal from the work area, and removed from the work area frequently and at regular intervals.

.4 Facilities for washing hands and face shall be provided within or close to the Asbestos Work Area.

.5 Ensure workers wash hands and face when leaving Asbestos Work Area.

.6 Ensure that no person required to enter an Asbestos Work Area has facial hair that affects seal between respirator and face.

Page 76: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 02 82 00.01 Riding Mountain National Park, MB ASBESTOS ABATEMENT - MINIMUM PRECAUTIONS R.073988.001 Page 4 1.7 WASTE MANAGEMENT AND DISPOSAL

.1 Separate waste materials for reuse and recycling in accordance with Section 01 74 21 - Construction/Demolition Waste Management and Disposal.

.2 Separate for reuse and recycling and place in designated containers steel, metal and plastic waste in accordance with Waste Management Plan.

.3 Place materials defined as hazardous or toxic in designated containers.

.4 Handle and dispose of hazardous materials in accordance with the CEPA, TDGA, Regional and Municipal regulations.

.5 Fold up metal banding, flatten and place in designated area for recycling.

.6 Disposal of asbestos waste generated by removal activities must comply with Federal, Provincial and Municipal regulations. Dispose of asbestos waste in sealed double thickness 6 mil bags or leak proof drums. Label containers with appropriate warning labels.

.7 Provide manifests describing and listing waste created. Transport containers by approved means to licensed landfill for burial.

1.8 EXISTING CONDITIONS

.1 Reports and information pertaining to ACMs to be handled, removed or otherwise disturbed and disposed of during this project are provided in Appendix B.

.2 Notify Departmental Representative of friable material discovered during Work and not apparent from drawings, specifications or report pertaining to Work. Do not disturb such material pending instructions from Departmental Representative.

1.9 PERSONNEL TRAINING

.1 Before beginning Work, provide Departmental Representative satisfactory proof that every worker has had instruction and training in hazards of asbestos exposure, in personal hygiene and work practices, and in use, cleaning, and disposal of respirators and protective clothing.

.2 Instruction and training related to respirators includes, following minimum requirements:

.1 Fitting of equipment.

.2 Inspection and maintenance of equipment.

.3 Disinfecting of equipment.

.4 Limitations of equipment.

.3 Instruction and training must be provided by a competent, qualified person.

Part 2 Products

2.1 MATERIALS

.1 Drop Sheets:

.1 Polyethylene: 0.15 mm thick.

Page 77: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 02 82 00.01 Riding Mountain National Park, MB ASBESTOS ABATEMENT - MINIMUM PRECAUTIONS R.073988.001 Page 5

.2 FR polyethylene: 0.15 mm thick woven fibre reinforced fabric bonded both sides with polyethylene.

.2 Wetting Agent: 50% polyoxyethylene ester and 50% polyoxyethylene ether mixed with water in a concentration to provide thorough wetting of asbestos-containing material.

.3 Waste Containers: contain waste in two separate containers.

.1 Inner container: 0.15 mm thick sealable polyethylene waste bag.

.2 Outer container: sealable metal or fibre type where there are sharp objects included in waste material; otherwise outer container may be sealable metal or fibre type or second 0.15 mm thick sealable polyethylene bag.

.3 Labelling requirements: affix pre-printed cautionary asbestos warning in both official languages that is visible when ready for removal to disposal site.

.4 Slow - drying sealer: non-staining, clear, water - dispersible type that remains tacky on surface for at least 8 hours and designed for purpose of trapping residual asbestos fibres.

.5 Tape: fibreglass - reinforced duct tape suitable for sealing polyethylene under both dry conditions and wet conditions using amended water.

Part 3 Execution

3.1 PROCEDURES

.1 Do construction occupational health and safety in accordance with Section 01 35 29.06 - Health and Safety Requirements.

.2 Before beginning Work, isolate Asbestos Work Area using, minimum, preprinted cautionary asbestos warning signs in both official languages that are visible at access routes to Asbestos Work Area.

.1 Remove visible dust from surfaces in the work area where dust is likely to be disturbed during course of work.

.2 Use HEPA vacuum or damp cloths where damp cleaning does not create a hazard and is otherwise appropriate.

.3 Do not use compressed air to clean up or remove dust from any surface.

.3 Prevent spread of dust from Asbestos Work Area using measures appropriate to work to be done.

.4 Wet materials containing asbestos to be cut, ground, abraded, scraped, drilled or otherwise disturbed unless wetting creates hazard or causes damage.

.1 Use garden reservoir type low - velocity fine - mist sprayer.

.2 Perform Work to reduce dust creation to lowest levels practicable.

.3 Work will be subject to visual inspection and air monitoring.

.4 Contamination of surrounding areas indicated by visual inspection or air monitoring will require complete enclosure and clean-up of affected areas.

.5 Frequently and at regular intervals during Work and immediately on completion of work:

Page 78: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 02 82 00.01 Riding Mountain National Park, MB ASBESTOS ABATEMENT - MINIMUM PRECAUTIONS R.073988.001 Page 6

.1 Dust and waste to be cleaned up and removed using a vacuum equipped with a HEPA filter or by damp mopping or wet sweeping, and placed in a waste container.

.2 Drop sheets to be wetted and placed in a waste container as soon as practicable.

.6 Cleanup:

.1 Place dust and asbestos containing waste in sealed dust-tight waste bags. Treat drop sheets and disposable protective clothing as asbestos waste; wet and fold these items to contain dust, and then place in plastic bags.

.2 Clean exterior of each waste-filled bag using damp cloths or HEPA vacuum and place in second clean waste bag immediately prior to removal from Asbestos Work Area.

.3 Seal waste bags and remove from site. Dispose of in accordance with requirements of Provincial and Federal Authority having jurisdiction. Supervise dumping and ensure that dump operator is fully aware of hazardous nature of material to be dumped and that the appropriate guidelines and regulations for asbestos disposal are followed.

.4 Perform final thorough clean-up of Work areas and adjacent areas affected by Work using HEPA vacuum.

END OF SECTION

Page 79: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 31 23 33.01 Riding Mountain National Park, MB EXCAVATING, TRENCHING AND BACKFILLING R.073988.001 Page 1 December 2014

Part 1 General

1.1 SUMMARY

.1 Comply with requirements of this section when performing the following Work:

.1 Excavation and off-site disposal of the PHC/PAH impacted soil from beneath the Mount Agassiz Ski Lodge in accordance with Section 02 61 00.01 - Soil Remediation.

.2 Implementation of erosion and sediment control measures in accordance with Section 01 57 13 - Erosion and Sediment Control.

.3 Management of waste water in accordance with Section 02 61 00.01 - Soil Remediation.

.4 Backfilling of remedial excavation in accordance with Section 02 61 00.01 - Soil Remediation or open areas following demolition of the Mount Agassiz Ski Lodge in accordance with Section 02 41 16 - Structure Demolition and Section 02 42 12 - Deconstruction of Structures.

1.2 PRICE AND PAYMENT PROCEDURES

.1 Measurement and Payment:

.1 Measure excavation of soil with soil quality meeting applicable Canadian Council of Ministers of the Environment (CCME) Tier 2 Residential/Parkland Environmental Quality Guidelines in cubic metres. Measurement to include excavation from within the building footprint, placement in temporary stockpiles, followed by replacement into excavation. Measurement to be based on in-place compacted volume. Estimated volume of non-impacted soil to be excavated, stockpiled, replaced and compacted is 50 m3.

.2 Measure excavation of soil with soil quality not meeting applicable CCME Tier 2 Residential/Parkland Environmental Quality Guidelines in tonnes. Measurement to include excavation within the former building footprint, placement in temporary stockpiles, loading into trucks upon determination of soil quality, and transport to approved waste receiving facility. Measurement to be based on weigh scale tickets. Estimated weight of impacted soil to be excavated and transported off-site for disposal is 630 tonnes (350 m3).

.3 Unit of Measure for the services of a vacuum truck, if necessary, for excavation dewatering will be hourly. Estimated time for dewatering, including travel, is 8 hours.

.4 Measure waste water (groundwater, water in excavation, wash water) to be disposed of in litres. Measurement to include removal and any storage on-site followed by loading, transport and disposal to approved waste receiving facility. Estimated volume of wastewater requiring off-site disposal is 2,500 litres.

.5 Backfilling using Type 3 on-site borrow material will be measured in cubic metres. Measurement based on in-place compacted volume and to include excavation of borrow, transport to work site, placement and compaction of

Page 80: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 31 23 33.01 Riding Mountain National Park, MB EXCAVATING, TRENCHING AND BACKFILLING R.073988.001 Page 2

borrow material. Estimated volume of on-site borrow to be excavated, transported, placed and compacted is 300 m3.

.6 Backfilling using Type 2 imported fill will be measured in tonnes. Measurement to be based on weigh scale tickets. Estimated weight of imported fill to be supplied, placed and compacted is 1,600 tonnes (900 m3).

.7 Measure placement of erosion control straw wattles in linear meters. Measurement based on in-place length of installed wattles. Estimated length of straw wattles to be supplied and installed is 110 m.

.8 Balance of Project Costs to be measured as lump sum.

1.3 REFERENCES

.1 American Society for Testing and Materials International (ASTM)

.1 ASTM C117-[04], Standard Test Method for Material Finer than 0.075 mm (No.200) Sieve in Mineral Aggregates by Washing.

.2 ASTM C136-[05], Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates.

.3 ASTM D422-63[2002], Standard Test Method for Particle-Size Analysis of Soils.

.2 Canadian General Standards Board (CGSB)

.1 CAN/CGSB-8.1-[88], Sieves, Testing, Woven Wire, Inch Series.

.2 CAN/CGSB-8.2-[M88], Sieves, Testing, Woven Wire, Metric.

.3 U.S. Environmental Protection Agency (EPA)/Office of Water

.1 EPA 832R92005, Storm Water Management for Construction Activities: Developing Pollution Prevention Plans and Best Management Practices.

1.4 DEFINITIONS

.1 Waste material: excavated material unsuitable for use in Work or surplus to requirements.

.2 Borrow material: material obtained from locations outside area to be graded, and required for construction of fill areas or for other portions of Work.

.3 Unsuitable materials:

.1 Weak, chemically unstable, and compressible materials.

.2 Frost susceptible materials:

.1 Fine grained soils with plasticity index less than 10 when tested to ASTM D4318, and gradation within limits specified when tested to ASTM D422 and C136: Sieve sizes to CAN/CGSB-8.1.

.2 Table: Sieve Designation % Passing 2.00 mm [100] 0.10 mm [45 - 100] 0.02 mm [10 - 80] 0.005 mm [0 - 45]

.3 Coarse grained soils containing more than 20 % by mass passing 0.075 mm sieve.

Page 81: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 31 23 33.01 Riding Mountain National Park, MB EXCAVATING, TRENCHING AND BACKFILLING R.073988.001 Page 3

.4 Unshrinkable fill: very weak mixture of cement, concrete aggregates and water that resists settlement when placed in utility trenches, and capable of being readily excavated.

1.5 ACTION AND INFORMATIONAL SUBMITTALS

.1 Make submittals in accordance with Section 01 33 00 - Submittal Procedures.

.2 Pre-construction Submittals:

.1 Submit records of underground utility locates, indicating: location plan of existing utilities as found in field and abandoned services, as required.

.3 Samples:

.1 Submit samples in accordance with Section 01 33 00 - Submittal Procedures.

.2 Inform Departmental Representative at least 2 weeks prior to backfilling activities of proposed source of fill materials.

.3 Provide third party test results demonstrating the proposed fill material meets the specifications.

.4 Submit 2 kg sample of proposed fill material.

.5 Ship sample to Departmental Representative, in tightly closed container to prevent contamination and exposure to elements.

1.6 QUALITY ASSURANCE

.1 Qualification Statement: submit proof of insurance coverage for professional liability.

.2 Engage services of qualified professional Engineer who is registered or licensed in Province of Manitoba, Canada in which Work is to be carried out to design and inspect shoring, bracing and underpinning required for Work.

.3 Do not use soil material until written report of soil test results are reviewed and approved by Departmental Representative.

.4 Health and Safety Requirements:

.1 Do construction occupational health and safety in accordance with Section 01 35 29.06 - Health and Safety Requirements.

1.7 WASTE MANAGEMENT AND DISPOSAL

.1 Separate waste materials for recycling in accordance with Section 01 74 21 - Construction/Demolition Waste Management and Disposal.

1.8 EXISTING CONDITIONS

.1 Examine Supplemental Phase II ESA report provided in Appendix A.

.2 Buried services:

.1 Before commencing work establish location of buried services on and adjacent to site.

.2 Arrange with appropriate authority for relocation of buried services that interfere with execution of work: pay costs of relocating services.

.3 Remove obsolete buried services within 2 m of foundations: cap cut-offs.

Page 82: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 31 23 33.01 Riding Mountain National Park, MB EXCAVATING, TRENCHING AND BACKFILLING R.073988.001 Page 4

.4 Prior to beginning excavation Work, notify applicable Departmental Representative and establish location and state of use of buried utilities and structures.

.5 Confirm locations of buried utilities in the work area.

.6 Maintain and protect from damage, water, sewer, gas, electric, telephone and other utilities and structures encountered.

.7 Where utility lines or structures exist in area of excavation, obtain direction of Departmental Representative before removing.

.8 Record location of maintained and abandoned underground lines.

.3 Existing buildings and surface features:

.1 Conduct, with Departmental Representative, condition survey of existing buildings, trees and other plants, lawns, fencing, service poles, wires, rail tracks, pavement, survey bench marks and monuments which may be affected by Work.

.2 Protect existing buildings and surface features from damage while Work is in progress. In event of damage, immediately make repair as directed by Departmental Representative.

.3 Where required for excavation, cut roots or branches as directed by Departmental Representative.

Part 2 Products

2.1 MATERIALS

.1 Type 2 fill: approved by the Departmental Representative and meeting the following requirements:

.1 Crushed, pit run or screened stone, gravel or sand.

.2 Gradations to be within limits specified when tested to ASTM C136 and ASTM C117. Sieve sizes to CAN/CGSB-8.1.

.3 Table: Sieve Designation % Passing Type 2 75 mm [100] 50 mm - 37.5 mm - 25 mm - 19 mm - 12.5 mm - 9.5 mm - 4.75 mm [22-85] 2.00 mm - 0.425 mm [5-30] 0.180 mm - 0.075 mm [0-10]

Page 83: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 31 23 33.01 Riding Mountain National Park, MB EXCAVATING, TRENCHING AND BACKFILLING R.073988.001 Page 5

.2 Type 3 fill: selected material from excavation or other on-site sources, approved by Departmental Representative for use intended, free from rocks larger than 75 mm, cinders, ashes, sods, refuse or other deleterious materials.

.3 Straw Wattles: 288 mm (9”) diameter, minimum length of 7.6 m (25’), and consisting of 100% agricultural straw.

Part 3 Execution

3.1 EROSION AND SEDIMENTATION CONTROL

.1 Provide erosion and sedimentation control measures to prevent soil erosion and discharge of soil-bearing water runoff that complies with EPA 832/R-92-005 or requirements of authorities having jurisdiction, whichever is more stringent, and in accordance with Section 01 57 13 - Erosion and Sediment Control.

.2 Inspect, repair, and maintain erosion and sedimentation control measures during construction.

.3 Remove any temporary erosion and sedimentation controls and restore and stabilize areas disturbed during removal.

.4 Install final erosion and sediment controls following demolition in accordance with site drawings and Section 01 57 13 - Erosion and Sediment Control.

3.2 SITE PREPARATION

.1 Remove obstructions, ice and snow, from surfaces to be excavated within limits indicated.

3.3 PREPARATION/PROTECTION

.1 Protect existing features in accordance with Section 01 56 00 - Temporary Barriers and Enclosures and applicable local regulations.

.2 Keep excavations clean, free of standing water and loose soil.

.3 Protect natural and man-made features required to remain undisturbed. Unless otherwise indicated, protect existing trees from damage.

.4 Protect buried services that are required to remain undisturbed.

.5 At end of each day's work, leave Work Site in safe and stable condition, and to not be a hazard to wildlife.

3.4 STOCKPILING

.1 Stockpile fill materials in areas designated by Departmental Representative.

.1 Stockpile granular materials in manner to prevent segregation.

.2 Protect fill materials from contamination.

.3 Implement sufficient erosion and sediment control measures to prevent sediment release off construction boundaries and into water bodies.

Page 84: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 31 23 33.01 Riding Mountain National Park, MB EXCAVATING, TRENCHING AND BACKFILLING R.073988.001 Page 6 3.5 DEWATERING AND HEAVE PREVENTION

.1 Keep excavations free of water while Work is in progress.

.2 Protect open excavations against flooding and damage due to surface run-off.

.3 Dispose of water in accordance with Section 01 35 43 - Environmental Procedures and in a manner not detrimental to public and private property or portion of Work completed or under construction.

3.6 EXCAVATION

.1 Advise Departmental Representative at least 7 days in advance of excavation operations.

.2 Excavate to lines, grades, elevations and dimensions as directed by Departmental Representative.

.3 Keep excavated and stockpiled materials safe distance away from edge of trench as directed by Departmental Representative.

.4 Restrict vehicle operations directly adjacent to open trenches.

.5 Reuse of surplus non-contaminated excavated material is acceptable.

.6 Do not obstruct flow of surface drainage or natural watercourses.

.7 Earth bottoms of excavations to be undisturbed soil, level, free from loose, soft or organic matter.

.8 Notify Departmental Representative when bottom of excavation is reached.

.9 Obtain Departmental Representative approval of completed excavation.

.10 Remove unsuitable material from trench bottom including those that extend below required elevations to extent and depth as directed by Departmental Representative.

.11 Correct unauthorized over-excavation at Contractor’s expense.

.12 The Contractor is to recognize within the contract that soil sampling will be undertaken by the Departmental Representative throughout the duration of the project, sometimes with the assistance of the Contractor. The Contractor is required to assist the Departmental Representative in obtaining samples by use of their equipment where the Departmental Representative deems it unsafe to enter the excavation. The Contractor is to further recognize that excavation and backfill work will be slowed down due to environmental sampling requirements.

.13 The Contractor is to recognize the inherent delays involved in projects of this nature and to facilitate the receipt of laboratory analytical results. A minimum turnaround time of 72 hours is to be provided to the Departmental Representative for receipt of laboratory analytical results.

3.7 FILL TYPES AND COMPACTION

.1 Excavation, building footprint and general site grading: use Type 3 on-site sources as designated by Departmental Representative or Type 2 imported fill.

3.8 BACKFILLING

.1 Do not proceed with backfilling operations until completion of following:

Page 85: SPECIFICATION Building Demolition and Remediation of

Remediation - Former Mount Agassiz Ski Lodge Section 31 23 33.01 Riding Mountain National Park, MB EXCAVATING, TRENCHING AND BACKFILLING R.073988.001 Page 7

.1 Departmental Representative has completed environmental sampling, and has received laboratory analytical results.

.2 Inspection, testing, approval, and recording location of underground utilities.

.3 Backfilling of voids with satisfactory soil material.

.2 Areas to be backfilled to be free from debris, snow, ice and water.

.3 Do not use backfill material which is frozen or contains ice, snow or debris.

.4 Place backfill material in uniform layers not exceeding 300 mm compacted thickness up to grades indicated. Compact each layer before placing succeeding layer.

3.9 GRADING

.1 Grade so that areas of work match surrounding slope and grade and provide positive drainage away from area. Finished grade, including finished surface to be approximately 250 mm above adjacent grade to allow for limited settlement of area of work.

3.10 RESTORATION

.1 Upon completion of Work, remove waste materials and debris in accordance to Section 01 74 21 - Construction/Demolition Waste Management and Disposal, trim slopes, and correct defects as directed by Departmental Representative.

.2 Clean and reinstate areas affected by Work as directed by Departmental Representative.

.3 Protect newly graded areas from traffic and erosion and maintain free of trash or debris.

END OF SECTION

Page 86: SPECIFICATION Building Demolition and Remediation of

McCREARY

SITE

PT

H 5

HWY 50

McC

RE

AR

Y M

UN

IC

IP

ALIT

Y

ACCESS ROAD

S

C

O

T

T

C

R

E

E

K

M

c

K

IN

N

O

N

C

R

E

E

K

RIDING MOUNTAIN

NATIONAL PARK

P

R

3

6

1

ACCESS GATE - TO BE LOCKEDOR MANNED AT ALL TIMES

Page 87: SPECIFICATION Building Demolition and Remediation of

ACCESS ROAD

M

c

K

I

N

N

O

N

C

R

E

E

K

TO P

TH 5

@ M

cCREARY

BUFFALO BAR LOUNGE

SKI LODGE

T-BAR BUILDING

CHAIR LIFT

GARAGE

POTENTIAL SOURCE OF ON-SITE BORROW(ESTIMATED VOLUME OF 300 TO 500 m³)

Page 88: SPECIFICATION Building Demolition and Remediation of

BH/MW14-1

BH/MW14-2

BH/MW04

BH/MW06

BH14-3

SOUTHWEST

BASEMENT

M

c

K

I

N

N

O

N

C

R

E

E

K

TO P

TH 5

@ M

cCREARY

BUFFALO BAR LOUNGE(TO REMAIN)

DRAIN

T-BAR BUILDING(TO REMAIN)

CRAWLSPACE

NORTHEAST

BASEMENT

FORMER USTEXCAVATION

FORMER USTEXCAVATION

SKI LODGE(TO BE DEMOLISHED)

LEGEND:

GRAB SAMPLE

TEST HOLE

MONITORING WELL

AREA OF PHC CONTAMINATION (60m²)

AREA OF PAH CONTAMINATED SOIL (115m²)

ACCESS ROAD(TO REMAIN)

EXISTING MONITORING WELL(TO REMAIN, TYPICAL)

AREA FOR INSTALLATION OFFINAL EROSION AND SEDIMENTCONTROL (WATTLES)

AREA OF POTENTIAL PHC/PAHIMPACTED SOIL TO BE EXCAVATED

FOR OFF-SITE DISPOSAL

NOTES:

1. REMEDIAL EXCAVATION AND BASEMENT AREAS TOBE BACKFILLED USING ON-SITE (SEE FIGURE 02)AND IMPORTED BACKFILL. THE VOLUME OFON-SITE BORROW IS ESTIMATED AT 300 TO 500m³.

2. BACKFILLED AREAS TO BE RESTORED TO MATCHSURROUNDING GRADE, AS DIRECTED BYDEPARTMENT REPRESENTATIVE.

3. SKI LODGE DEMOLITION TO INCLUDE ENTIRESTRUCTURE, INCLUDING CONCRETE BASEMENT,ALL EXISTING CONTENTS AND ALL DESIGNATEDSUBSTANCES.

4. SEE HAZARDOUS MATERIALS SURVEY REPORT(APPENDIX C) FOR SPECIFIC DETAILS ON EXISTINGDESIGNATED SUBSTANCES.

5. ALL EXISTING UTILITIES TO SKI LODGE TO BEREMOVED AND/OR CAPPED AT THE MARGINS OFTHE EXCAVATION. THIS INCLUDES REMOVAL OFEXISTING CULVERT (VERTICAL) CONTAINING GATEVALVE ON EXISTING SEWER LINE.

6. CONTRACTOR TO REMOVE AND STOCKPILEON-SITE, RAFTERS (16) FROM THE EAST WING OFTHE SKI LODGE FOR REUSE BY THE OWNER.

VERTICAL CULVERT WITH SEWER LINEGATE VALVE (TO BE REMOVED)

Page 89: SPECIFICATION Building Demolition and Remediation of

October 14, 2014

DST File No.: OE-WG-017795

Prepared for:

Public Works and Government Services Canada

Environmental Services, Western Region

Prepared by:

DST Consulting Engineers Inc.

885 Regent Street, Suite 3-1B, Sudbury, Ontario, P3E 5P5

Tel: (705) 523-6680 Fax: (705) 523-6690 Email: [email protected]

Distribution:

PWGSC – One Electronic Copy and Two Hard Copies

DST Consulting Engineers Inc. – One Electronic Copy, One Hard Copy

FINAL REPORT

Supplemental Phase II ESA

Former Mount Agassiz Ski Lodge

Riding Mountain National Park

Manitoba

Page 90: SPECIFICATION Building Demolition and Remediation of

Supplemental Phase II ESA Page i

Former Agassiz Ski Lodge

Riding Mountain National Park, Manitoba

DST File No. OE-WG-017795

DST CONSULTING ENGINEERS INC.

EXECUTIVE SUMMARY DST Consulting Engineers Inc. (DST) was engaged by the Department of Public Works and Government Services Canada (PWGSC) to carry out a Phase II Environmental Site Assessment (ESA) at the former Agassiz Ski Lodge located in Riding Mountain National Park, approximately 15 km west of McCreary, Manitoba (the Site) in order to further delineate contaminated soil and assess groundwater conditions at the Site. In 2009 a Phase II/III ESA completed (AMEC, 2010) at the Site indicated that soil samples

collected from the south side walls and floors of two underground storage tank (UST) nest

excavations located north of the Ski Lodge, used to store heating oil, exhibited petroleum

hydrocarbon concentrations that exceeded the appropriate guidelines. Laboratory results from

soil samples collected during a subsequent tank removal completed by Clearsky Environmental

in 2009 (IBED) identified PHC impacted soil in the location of two former UST locations. During

the Phase III remediation work completed in December 2010, a total of approximately 150 m3 of

impacted soil was removed from two excavation sites (AMEC 2011). However, analytical results

from the confirmatory samples collected from an excavation wall adjacent to the ski lodge building

exhibited concentrations of PHC F2 and PHC F3 which exceeded the applicable guidelines

(IBED). This area was not accessible for removal due to the presence of the building. Therefore,

contaminated soil was left in place on the Site.

DST advanced boreholes southeast of and inside the building footprint of the lodge building in

order to delineate the contaminated soil, and instrumented two exterior boreholes as monitoring

wells to further investigate groundwater conditions. Soil samples collected from the boreholes

exhibited concentrations within applicable guidelines, with the exception of one sample (BH14-3

@ 0-0.25 m) which exceeded CCME guidelines for phenanthrene. The area of contaminated soil,

included PHC and PAH impacted soil is estimated at 115 m2, and its volume is estimated at 345

m3.

Samples of groundwater taken from the cross-gradient well MW14-02 and water sampled from

beneath the basement floor of the lodge building through a drain exhibited polycyclic aromatic

hydrocarbon concentrations in excess of Canadian Drinking Water Quality Guidelines and in

excess of Federal Interim Groundwater Quality Guidelines

An updated NCSCS score of 63.0 was calculated for the Site, resulting in a ranking of category 2

– Medium Priority for Action.

DST recommends removal and off-site disposal of the fuel-contaminated soil, and that the ski lodge building be demolished to accommodate the remediation. DST also recommends resampling MW14-02 to verify the PAH contamination, followed by quarterly sampling of MW14-01, MW14-02, MW04 and MW06 until three consecutive sampling events show that groundwater meets CCME guidelines. Should re-sampling of MW14-02 confirm the existence of PAH contamination in MW14-02, Monitoring well MW01 and a new monitoring well located west of MW14-02 should be added to the monitoring program.

Page 91: SPECIFICATION Building Demolition and Remediation of

Supplemental Phase II ESA Page ii

Former Mount Agassiz Ski Lodge

Riding Mountain National Park, Manitoba

DST File No. OE-WG-017795

DST CONSULTING ENGINEERS INC.

Table of Contents

Executive Summary .............................................................................................i

1.0 Introduction ...............................................................................................1

1.1 Objectives .................................................................................................... 1

2.0 Background Information ..........................................................................2

2.1 Site Description ........................................................................................... 2

2.2 Past Investigations ...................................................................................... 2

3.0 Scope of Work ..........................................................................................4

4.0 Assessment Criteria .................................................................................5

4.1 Soil ............................................................................................................... 6

4.1 Groundwater ................................................................................................ 6

5.0 METHODOLOGY .......................................................................................7

5.1 Ground Disturbance and Utility Locates ................................................... 7

5.2 Borehole Drilling and Monitoring Well Installation and

Development............................................................................................................ 7

5.3 Field Screening and Soil Sampling Methodology ..................................... 8

6.0 Results ......................................................................................................9

6.1 Soil Stratigraphy .......................................................................................... 9

6.2 Soil Results .................................................................................................. 9

6.3 Groundwater Results .................................................................................. 9

7.0 Quality Assurance/ Quality Control (QA/QC) ....................................... 10

8.0 Discussion of Results ............................................................................ 11

8.1 Soil ............................................................................................................. 11

8.2 Groundwater .............................................................................................. 13

8.3 National Classification System for Contaminated Sites (NCSCS) ......... 14

9.0 Remedial Options Analysis ................................................................... 15

Page 92: SPECIFICATION Building Demolition and Remediation of

Supplemental Phase II ESA Page iii

Former Mount Agassiz Ski Lodge

Riding Mountain National Park, Manitoba

DST File No. OE-WG-017795

DST CONSULTING ENGINEERS INC.

9.1 Excavation and Disposal .......................................................................... 15

9.2 In Situ Chemical Oxidation ....................................................................... 16

9.3 In Situ Bioremediation .............................................................................. 18

9.4 Risk Assessment ....................................................................................... 19

9.5 Monitored Natural Attenuation ................................................................. 20

9.6 Preferred Option ........................................................................................ 20

10.0 Conclusions and Recommendations .................................................... 23

11.0 References .............................................................................................. 24

12.0 Closure .................................................................................................... 25

List of Attachments

Figures Figure 1: Site Location Map

Figure 2: Site Plan

Figure 3: Soil Exceedances

Figure 4: Groundwater Exceedances

Figure 5: Groundwater Contours (18 June 2014)

Tables Table 1 Soil Analytical Results

Table 2: Groundwater Analytical Results

Table 3: Groundwater Field Measured Parameters

Appendix A Borehole and Monitoring Well Logs

Appendix B Laboratory Certificates of Analysis

Appendix C NCSCS Classification

Appendix D Photographs

Page 93: SPECIFICATION Building Demolition and Remediation of

Supplemental Phase II ESA Page 1

Former Agassiz Ski Lodge

Riding Mountain National Park, Manitoba

DST File No. OE-WG-017795

DST CONSULTING ENGINEERS INC.

1.0 Introduction

DST Consulting Engineers Inc. (DST) was retained by the Department of Public Works and

Government Services Canada (PWGSC) to carry out additional environmental soil and

groundwater assessment at the former Agassiz Ski Lodge located in Riding Mountain National

Park, approximately 15 km west of McCreary, Manitoba (the Site). The Site location is shown in

Figure 1.

1.1 Objectives

The objectives of the investigation were to reduce data gaps through further delineation of soil

contamination identified on the Site (AMEC 2011), conduct groundwater sampling to further

establish groundwater conditions, update the National Classification System for Contaminated

Sites (NCSCS) scoring for the Site, provide information on site conditions to assist in management

of the ski lodge property and to provide a remedial options assessment.

Page 94: SPECIFICATION Building Demolition and Remediation of

Supplemental Phase II ESA Page 2

Former Mount Agassiz Ski Lodge

Riding Mountain National Park, Manitoba

DST File No. OE-WG-017795

DST CONSULTING ENGINEERS INC.

2.0 Background Information

2.1 Site Description

The Site is an abandoned ski lodge located approximately 15.5 km west of McCreary. The site

was operated as a ski area until 2000, when it was abandoned. Topography at the Site slopes

gently down to the southeast, towards McKinnon Creek, which is approximately 60 m southeast

of the Ski Lodge Building. Soil at the Site includes both coarse soil and fine soil, with clay, sand,

gravel, and boulders observed on the Site. There is a lounge building located approximately 30

m east of the lodge building. Besides the lounge and lodge, there are two garage buildings on

the Site. Photographs of the site are provided in Appendix D.

2.2 Past Investigations

The Former Mount Agassiz Ski Resort, located in the Riding Mountain National Park, Manitoba

has undergone several environmental site assessments (ESA) in the past. A summary of those

investigation is included below:

A Phase I ESA, and a Phase II/III ESA were completed in 2009 and 2010, respectively, by

AMEC. Following the Phase I and II/III ESAs a Remedial Activities Report was completed

by AMEC in 2011. The 2011 AMEC report provided a summary of the 2010 AMEC report

and past assessments. According to AMEC (2011), the following potential areas of concern

were identified in the Phase I ESA:

Two 1360 L fuel oil ASTs located to the northeast of the Ski Lodge building;

The location of the two former 1360 L ASTs (the tanks were originally located closer

to McKinnon Creek);

The area near the AST at the base of the T-Bar lift. Additionally, staining and product

were observed in a pit beneath the motor of the lift and staining was observed beneath

and around the mechanical equipment used for the T-Bar and chair lift;

The former location of the fuel source for the gasoline-powered original tow ropes that

existed prior to being converted to electric tow ropes;

The area near the AST located in the brush south of the Maintenance building. This

AST was on a skid and was previously used to transport fuel to various tanks on-site;

The area near the USTs located along the north side of the Main Ski Lodge building.

There are two USTs associated with this building, in two separate locations;

The 1135 L tank which was partially buried and located in the crawlspace of the Main

Ski Lodge; and,

The UST located along the north side of the Lounge building.

Phase II/III Environmental Site Assessment (ESA) AMEC 2010:

Prior to conducting the Phase II/III ESA, the various ASTs and USTs were removed from the

Site. The Phase II/III ESA report indicated that soil samples collected from the south side

Page 95: SPECIFICATION Building Demolition and Remediation of

Supplemental Phase II ESA Page 3

Former Mount Agassiz Ski Lodge

Riding Mountain National Park, Manitoba

DST File No. OE-WG-017795

DST CONSULTING ENGINEERS INC.

walls and floors of two UST nest excavations located north of the Ski Lodge exhibited

petroleum hydrocarbon (PHC) concentrations that exceed the appropriate guidelines.

Nineteen boreholes, with seven completed as monitoring wells were completed to evaluate

the lateral extent of contamination. At the time of drilling, elevated soil vapour was measured

in a borehole located north of the Ski Lodge building. During a follow up visit, in-well vapour

concentrations were not detected in any of the monitoring wells installed at the Site. No soil

or groundwater impacts were found at the Site. However, based on laboratory results from

soil samples collected during a tank removal completed by Clearsky Environmental, PHC

impacted soil was found in the locations of two former USTs.

Remedial Activities Report, Former Mount Agassiz Ski Resort Riding Mountain National

Park, Manitoba AMEC 2011:

In December 2010, AMEC completed remediation work at the former Mount Agassiz Ski

Resort (AMEC 2011), the scope of work for the remediation work included:

Excavation of impacted soil;

Collection of soil samples within the excavation area;

Supervision of the installation of a hydrocarbon resistant liner along the walls of the

excavation where impacted soils were not removed;

Supervision of backfilling and site restoration activities;

Provision of a remedial report, and;

Completion of post remedial documentation (NCSCS) and Treasury Board of Canada

Secretariat (TBS) liability requirements.

Based on the work plan described above, a total of approximately 150 m3 of impacted soil

was removed from two excavation sites. A total of 12 soil samples were collected and sent

to the laboratory for analysis of PHCs. One soil sample collected from an area not accessible

(below the Lodge building) for removal exhibited concentrations of PHC F2 and PHC F3 which

exceeded the applicable guidelines. A liner was installed in this area and along the east and

south sidewalls to prevent contaminant migration into the excavation backfill. The excavation

was backfilled with a combination of imported clean fill and clean overburden.

A NCSCS score was calculated for the Site, a score of 43.3 which corresponds to a Class 3

–Low Priority for Action was attributed to the Site.

Page 96: SPECIFICATION Building Demolition and Remediation of

Supplemental Phase II ESA Page 4

Former Mount Agassiz Ski Lodge

Riding Mountain National Park, Manitoba

DST File No. OE-WG-017795

DST CONSULTING ENGINEERS INC.

3.0 Scope of Work DST made two site visits to complete the following scope of work. The first site visit was

completed March 6, 2014 through March 7, 2014 to advance boreholes, collect soil samples and

install monitoring wells. The second sit visit took place between June 17 and 18, 2014 to collect

groundwater samples, and collect additional soil samples after the ground had thawed. The

following scope of work was completed:

Underground utility locates;

Development and implementation of a Health and Safety Plan that met provincial and

federal regulations;

Using hand augering techniques, the advancement of two interior boreholes: one in the

north basement floor to a depth of 1.0 m and one in the crawlspace, as close as practicable

to northwest wall of the lodge where previous contamination was noted, to a depth of 1.5

m (both terminated at auger refusal);

Drilling two holes (WS1 and WS2) through foundation and collecting two soil samples

outside the northwest basement walls (one from the northeast basement and one from the

southwest basement - collected in lieu of interior borehole samples due to limited access

within the crawlspace);

Using a track mounted DR 150 drill rig, advancing two exterior boreholes (BH14-1, and

BH14-2) to depths of 5 m and 3 m respectively, converted into monitoring wells southeast

of the lodge;

Collecting and submitting 11 soil samples (fewer than the 14 originally planned, due to

limited access within the crawlspace) for laboratory analysis of PHC F1-F4 and benzene,

toluene, ethylbenzene and xylenes (BTEX), and submitting six worst case soil samples

for analysis of polycyclic aromatic hydrocarbons (PAHs) to determine the extents of the

soil impacts under the former Ski Lodge building;

Collecting and submitting four groundwater samples for the analysis of PHC F1-F4 and

BTEX and PAHs from the newly installed monitoring wells and the two previously installed

groundwater wells near the lodge (MW04 and MW06), and submitting a water sample

from beneath the northeast basement (accessed through a drain) for analysis of PHC F1-

F4, BTEX and PAHs;

Collecting and submitting two soil sample duplicates (one per sampling event) and one

groundwater sample duplicate for QA/QC purposes;

Collecting and submitting a groundwater field blank and trip blank for QA/QC purposes;

Providing remediation options with costs associated with remediation;

Calculating an updated National Classification System for Contaminated Sites score for

the Site;

Summarizing the field activities and findings in a report; and,

Collecting and analysing shingle samples from the roof of the ski lodge building and the

nearby lounge building for analysis of asbestos to inform the Designated Substances

Survey (results reported under separate cover).

Page 97: SPECIFICATION Building Demolition and Remediation of

Supplemental Phase II ESA Page 5

Former Mount Agassiz Ski Lodge

Riding Mountain National Park, Manitoba

DST File No. OE-WG-017795

DST CONSULTING ENGINEERS INC.

4.0 Assessment Criteria

Federal guidelines apply to the Site, given its location within Riding Mountain National Park.

Accordingly, Canadian Council of Ministers of the Environment (CCME) and Federal

Contaminated Sites Action Plan Guidelines were applied.

Manitoba uses the CCME Canadian Environmental Quality Guidelines (with an incremental risk

level of 106 where CCME lists both 106 and 105 risk levels). For consistency with previous reports

and Provincial Guidelines, a 106 incremental risk level was used where applicable.

As the contamination is within 30 cm of a building, CCME Canada-Wide Standard for Petroleum

Hydrocarbons in Soil technical Supplement (2008) requires a Tier 2 approach, wherein the more

general and therefore conservative default Tier 1 guidelines may be altered by using site specific

parameters and considering only exposure pathways appropriate to the Site.

In determining the assessment criteria, the Tier 1 criteria were modified by eliminating the potable

groundwater pathway due to the presence of a confined aquifer. The shallow groundwater at or

near the Site is not utilized as a potable resource; according to provincial well records, the facility

draws its domestic water supply from shale bedrock aquifers that are overlain by a clay

overburden that is greater than 5 m thick (AMEC 2010).

All other pathways were considered active, including the protection of aquatic life. The aquatic

life pathway was considered active due to the presence of McKinnon Creek, within 65 m of the

contaminated soil at the lodge building.

For all parameters, the more stringent of the coarse or fine grained criteria were chosen due to

the presence of both coarse grained soil and fine grained soil on the Site. Grain size analyses of

soil samples collected from a borehole near the ski lodge building ([email protected] and

[email protected]), indicated coarse grained soil. These samples are representative of the

contaminated soil and of the soil in the vicinity of the building for which coarse grained soil criteria

for indoor air vapour inhalation would be critical for some parameters. Fine grained soil was also

found on the Site according to grain size analysis of soil sample TH11 (AMEC 2011) and provincial

well records. Fine grained soil is representative of much of the Site, for which fine grained soil

criteria for soil contact and protection of aquatic life pathways would be critical for some

parameters.

Due to the Site being within a National Park and due to potential future use of the Site being

uncertain, Residential/Parkland land use was employed, consistent with previous reports.

Page 98: SPECIFICATION Building Demolition and Remediation of

Supplemental Phase II ESA Page 6

Former Mount Agassiz Ski Lodge

Riding Mountain National Park, Manitoba

DST File No. OE-WG-017795

DST CONSULTING ENGINEERS INC.

4.1 Soil

The CCME Canadian Environmental Quality Guidelines, Soil Quality Guidelines for the Protection

of Human and Environmental Health for Residential/Parkland land use and using the more

stringent of fine or coarse grained soil were applied to the Site.

A risk level of 10-6 was chosen for consistency with previous reports and accordance with

Manitoba criteria.

The CCME guidelines for volatile organic compounds (VOCs) and Inorganic compounds and pH

were obtained from the CCME web page Canadian Environmental Quality Guidelines Summary

Table, Soil Quality Guidelines for the Protection of Environmental and Human Health (CCME

2014).

The PAH parameter guidelines for comparison to the soil analytical data from this investigation were derived from Soil Quality Guidelines for the Protection of Environmental and Human Health, Polycyclic Aromatic Hydrocarbons (CCME 2010). The lowest criteria of all pathways were used. The index of additive cancer risk for the protection of potable resources was also calculated for informational purposes. Consistent with previous reports, and with Manitoba provincial guidelines, the 10-6 risk level was applied. The PHC F1 – F4 guidelines were obtained from the 2008 Canadian Council of Ministers of the

Environment document “Canada Wide Standards for Petroleum Hydrocarbons in Soil, Technical

Supplement” (CCME 2008). The most stringent criteria from all pathways considered were used.

The more stringent of coarse grained or fine grained soil criteria were used.

4.1 Groundwater

The Federal guidelines applied to the Site for Groundwater were derived from Environment

Canada (2012) Guidance Document on Federal Interim Groundwater Quality Guidelines for

Federal Contaminated Sites (FIGQG), Table 2, Tier 2, using the lowest of values for all pathways

listed except for Marine Life; the aquatic life pathway was included because there is a creek

approximately 60 m from the Site.

Health Canada Drinking Water Quality Guidelines (Health Canada 2012) were provided for informational purposes.

Page 99: SPECIFICATION Building Demolition and Remediation of

Supplemental Phase II ESA Page 7

Former Mount Agassiz Ski Lodge

Riding Mountain National Park, Manitoba

DST File No. OE-WG-017795

DST CONSULTING ENGINEERS INC.

5.0 METHODOLOGY All work was conducted in accordance with standard operating procedures. It is understood that

the Site is within federal jurisdiction and that the CCME Environmental Quality Criteria apply. It

is noted that Manitoba provincial standards rely on federal standards and guidelines; according

to Manitoba Conservation, they have adopted the following criteria and standards:

CCME Canada Wide Standard (CWS) for Petroleum Hydrocarbons in Soil;

CCME Environmental Quality Guidelines (CCME EQGs).

Therefore, the CCME EQGs and CWSs and consistent methods were used to assess the soil and

groundwater quality during this work.

5.1 Ground Disturbance and Utility Locates

Prior to completing the drilling activities, all relevant service providers were contacted and utility

locates were requested to identify all public and private underground utilities. All locates were

arranged by a utility clearance sub-contractor (Structure Scan Inc.). The Site was also inspected

and site conditions reviewed with the subcontractors including the locations of potential

underground private utility lines.

5.2 Borehole Drilling and Monitoring Well Installation and Development

Interior boreholes CS and BH14-3 were advanced using a hand auger. Boreholes BH14-1, BH14-

2 and BH14-2A were advanced using a DR 150 drill rig, equipped with hollow stem auger.

Boreholes BH14-1 and BH1402 were instrumented as monitoring wells. Soils samples were

collected from boreholes CS, BH14-1, BH14-2 and BHBH14-3 and screened as described in

section 5.3.

Each groundwater monitoring well was constructed of 5.1 cm polyvinyl chloride (PVC) well

materials consisting of a 0.254 mm (0.01 inch) machine slotted section installed to intersect the

water table and a solid riser extending to grade. An appropriate sand pack backfilled the screened

portion of the well and a bentonite seal was employed in the well annulus around the riser portion

to prevent surface contamination. A steel above-grade cover was installed at each well location.

Monitoring wells were installed on March 7, 2014, and developed by purging up to five well casing

volumes of groundwater from them (or until dry several times); within 24 hours of their installation.

Groundwater samples were obtained on June 18, 2014. Static water levels were recorded and a

level survey of the monitoring well elevations at the Site was completed. After the static water

level was completed, a graduated interface probe was used to measure for the presence and

thickness of free product at each monitoring well prior to sampling. Prior to sample collection, the

wells were purged of approximately three casing volumes of groundwater using a low flow,

peristaltic pump.

Page 100: SPECIFICATION Building Demolition and Remediation of

Supplemental Phase II ESA Page 8

Former Mount Agassiz Ski Lodge

Riding Mountain National Park, Manitoba

DST File No. OE-WG-017795

DST CONSULTING ENGINEERS INC.

A groundwater sample was collected from the newly installed monitoring wells (MW14-1 and

MW14-2), from the existing monitoring wells (MW04 and MW06) and a water sample was

collected from beneath the northeast basement (accessed through a drain) on June 18, 2014.

A level survey of the monitoring well elevations at the Site was completed on June 20, 2014.

Purged water was set aside in sealed containers until subsequently disposed of by Tervita on July

11, 2014, in accordance with the results of groundwater chemical analysis.

5.3 Field Screening and Soil Sampling Methodology

All soil samples collected were field screened and logged with respect to colour, texture, moisture,

and visible/olfactory evidence of petroleum contamination. A portion of each soil sample was

placed in a plastic bag and allowed to equilibrate for approximately 15 minutes in a warm

environment (i.e. the interior of the field vehicle) prior to being tested for combustible headspace

vapour concentrations (CHVCs). CHVC was measured using an RKI Eagle portable vapour

meter, with methane response switched off.

A portion of selected soil samples was placed directly into laboratory-supplied sample jars and

vials. The sample jars were filled completely with the soil sample to reduce the amount of

headspace vapour within the jars. Cross-contamination between samples was prevented by

washing sampling tools with phosphate-free detergent and water and then rinsing with distilled

water, using disposable sampling equipment, and by wearing new disposable nitrile gloves during

sampling activities. Once collected, selected soil samples were placed in a cooler packed with

ice, under chain of custody documentation, until delivery to the contract laboratory within the

applicable sample hold times. Soil cuttings were stored on the Site pending analytical results,

and contaminated cuttings were subsequently disposed of by a waste subcontractor (Tervita) in

accordance with the analytical results.

Soil samples collected were collected from the locations shown in Figure 2 using different

collection methods:

Soil samples were collected from MW14-1 and MW14-2 using a split spoon;

Soil samples were collected from BH14-3 and CS using a hand auger; and,

Soil samples WS1 and WS 2 were grab samples obtained from soil on the outside of the

foundation wall accessed by creating (and repairing) a hole through the basement wall of

the building.

Page 101: SPECIFICATION Building Demolition and Remediation of

Supplemental Phase II ESA Page 9

Former Mount Agassiz Ski Lodge

Riding Mountain National Park, Manitoba

DST File No. OE-WG-017795

DST CONSULTING ENGINEERS INC.

6.0 Results

6.1 Soil Stratigraphy

Borehole logs presented in Appendix A illustrate the soil stratigraphy observed at the Site. In the

vicinity of the Ski lodge building a layer of sand and gravel fill approximately 1.2 m thick was found

underlain by a mixture of fine sand, silt and clay with a trace of gravel. East of the lodge, borehole

MW14-2A revealed a similar mixture of sand, silt and clay with a trace of gravel, except without

the sand and gravel fill layer.

Provincial well records in the area indicate that the soil in the general area consists of

approximately 12 m of clay underlain by shale.

6.2 Soil Results

Soil analytical results are presented in Table 1. The laboratory reported a Phenanthrene

concentration of 0.050 µg/g for sample BH1, collected from borehole BH14-3 from interval 0 –

0.25 m (beneath the basement floor, approximately 2 m below ground surface), which is

marginally above the CCME guideline of 0.046 µg/g.

All other soil samples from the current sampling program exhibited concentrations within the

selected guidelines for all parameters analysed. Historical results (AMEC 2011) indicate

contaminated soil was left in place under the building. Results are further discussed in Section

8.1 below.

6.3 Groundwater Results

Analytical Results

Groundwater Analytical results are provided in Table 2, and groundwater field parameters are

presented in Table 3. All groundwater samples exhibited concentrations within the applicable

guidelines with the exception of two groundwater samples that exhibited PAH concentrations in

excess of the applicable FIGQG and in excess of CDWQG (provided for informational purposes).

These exceedances are discussed in Section 8.2 below.

Groundwater Elevations

Results of field measurements and an elevation survey conducted on June 18, 2014 indicate that

groundwater was found at an elevation that varied from 98.3 to 98.9 m (relative to a local

benchmark). These elevations put the groundwater table 1.5 to 1.9 m below ground surface.

The water level found in drain D1 was approximately 0.5 m below the groundwater table levels

found above, indicating that the water in D1 is most likely not groundwater.

Page 102: SPECIFICATION Building Demolition and Remediation of

Supplemental Phase II ESA Page 10

Former Mount Agassiz Ski Lodge

Riding Mountain National Park, Manitoba

DST File No. OE-WG-017795

DST CONSULTING ENGINEERS INC.

7.0 Quality Assurance/ Quality Control (QA/QC)

Duplicate soil and groundwater samples were collected from the Site:

Soil sample MW14-6 @ 2.4 – 3.0 m was a field duplicate of MW14-1 @ 2.4 – 3.0 m; and,

Groundwater Sample MW14-104 was a field duplicate of MW-04.

Reportable percentage differences were not calculable for these samples because all analytical

results were below the laboratory reported detection limits for all of the samples and duplicate

samples.

Laboratory spikes and blanks were within alert limits. The analytical results are considered

reproducible. The laboratory certificates of analysis are included in Appendix B.

Page 103: SPECIFICATION Building Demolition and Remediation of

Supplemental Phase II ESA Page 11

Former Mount Agassiz Ski Lodge

Riding Mountain National Park, Manitoba

DST File No. OE-WG-017795

DST CONSULTING ENGINEERS INC.

8.0 Discussion of Results

A discussion of the current analytical results with regards to the site condition, taking into account

previous results and potential future use of the property is provided in the following sections.

8.1 Soil

Historical analytical results identified contaminated soil at the western edge of the lodge building

footprint, under the building at the edge of a remedial excavation referred to as Excavation 1

(AMEC 2011). This contamination was left in place due to concerns over excavating soil from

under the building. AMEC 2011 estimated the volume of PHC contaminated soil at 6 m3, however

according to AMEC 2011 there were no delineation samples taken within the building footprint to

arrive at this volume. Furthermore, the estimated volume was based on the soil meeting

guidelines based on fine grained soil. This grain size was based on one soil sample collected

during the 2009 field program (AMEC 2010), TH11. That soil sample was obtained approximately

75 m northeast of the excavation and hence may not be representative of the (contaminated) soil

at the ski lodge.

Two soil grain size analyses from MW14-02 located proximate to the ski lodge building indicate

the soil at the ski lodge is coarse grained, with 53 and 56 % being retained on the 75 micron

(#200) sieve. Using coarse grained criteria would result in a larger volume of contaminated soil

(e.g. the vapour inhalation exposure pathway value for F2 is 150 µg/g with coarse grained soil

and 3100 µg/g with fine grained soil for a building that is slab on grade).

Analytical results obtained in 2014 included samples taken further southwest and northeast along

the western wall of the lodge building, and interior soil samples taken underneath the basement

floor in the north-eastern basement and samples taken from the crawlspace under the main

portion of the building.

The 2014 soil samples exhibited PHC concentrations within the applicable guidelines, thus

providing “clean” locations for the delineation of the PHC contaminated soil. Due to the

crawlspace providing only limited access, it was not practicable to take the samples as close to

the previously identified contaminated soil as was desired, which prevented the delineation from

being more precise.

The current and historical (sampled in December 2010) exceedances of the selected current

criteria (using the more stringent guidelines for coarse or fine gained soil) are shown in the table

below. Note that although the exceedances shown below occurred for coarse grained soil criteria,

other parameters (not shown because they passed the criteria) had more stringent fine grained

criteria (e.g. benzene):

Page 104: SPECIFICATION Building Demolition and Remediation of

Supplemental Phase II ESA Page 12

Former Mount Agassiz Ski Lodge

Riding Mountain National Park, Manitoba

DST File No. OE-WG-017795

DST CONSULTING ENGINEERS INC.

2014 and 2010 Soil Exceedances

Sample ID Parameter Concentration

(µg/g) CCME (µg/g)

AMEC SAMPLE SW @ 2 m (1)

PHC F1 167 30

PHC F2 7190 150

PHC F3 3590 300

BH14-3 @ 0-0.25 m Phenanthrene 0.050 0.046 Notes:

1)Data for SW @ 2 m from AMEC 2011

The AMEC sample SW @ 2. m exceeded the CCME guideline for PHC F2 by a factor of 48.

Sampling locations, including the location of the historical exceedance, are included in Figure 3

which illustrates the estimated area of PHC contaminated soil. The area was estimated by using

the “½-way method” as a first step, wherein soil is considered contaminated up to a point located

half way between a sample that exhibits concentrations exceeding the guideline and a sample

that exhibits concentrations within the guideline. As such, the predicted area is dependent on the

spacing of the sampling points. The estimated area was then reduced by considering the

groundwater flow direction, because it is reasonable to assume that the fuel contamination did

not extend south of the “clean” sample WS2 (collected from the same elevation as the known

contamination), given the observed groundwater flow direction. The area of PHC contaminated

soil was thus estimated at 60 m2.

Only one soil sample exhibited concentrations in excess of the applicable critera for the 2014

sampling event. Sample BH14-3 taken from a depth 0 to 0.25 m below the concrete floor

exceeded the CCME guideline for phenanthrene (for the protection of freshwater life pathway) by

9%, and was the only sample to exceed the CCME guidelines for PAHs. Previous studies (AMEC

2011, AMEC 2010) did not analyse any samples for PAHs.

Although the area of the PAH contamination is not delineated to the north or east, there are “clean”

samples to the northwest, west and south west. However, given the low concentration, the

distance down gradient from the PHC impacted soil and the mobility of phenanthrene in soil, the

area of phenanthrene contamination is not expected to extend more than a couple of meters down

gradient. Considering the groundwater flow direction and assuming the phenanthrene

contamination originates from the same source as the PHC contaminated soil, and that the limits

of the phenanthrene contaminated soil coincide with the half-way point between boreholes BH14-

3 and CS results in the area of approximately 115 m2 shown in Figure 3. Using a 3 m depth

results in a volume of 345 m3 (690 metric tonnes).

Page 105: SPECIFICATION Building Demolition and Remediation of

Supplemental Phase II ESA Page 13

Former Mount Agassiz Ski Lodge

Riding Mountain National Park, Manitoba

DST File No. OE-WG-017795

DST CONSULTING ENGINEERS INC.

8.2 Groundwater

Exceedances of the FIGQG are shown in the following table:

Groundwater Exceedances

Sample ID ParameterConcentration

(µg/L)

FIGQG

(µg/L)

Anthracene 0.018 0.012

Benzo(a)anthracene 0.041 0.018

Benzo(a)pyrene 0.037 0.017

Fluoranthene 0.085 0.04

Pyrene 0.075 0.025

Anthracene 0.048 0.012

Benzo(a)anthracene 0.049 0.018

Benzo(a)pyrene 0.043 0.017

Fluoranthene 0.16 0.04

Pyrene 0.13 0.025

MW14-2

D1 (1)

Note:

1) Sample D1 was taken from a floor drain that apparently terminated in the

engineered fill immediately beneath the concrete floor.

A water sample taken from the north-eastern basement’s floor drain (for wastewater disposal

classification purposes during potential future remediation/demolition) also exhibited

concentrations exceeding the applicable guidelines and CDWQG (provided for informational

purposes only) for PAH parameters anthracene, benzo(a)anthracene, benzo(a)pyrene,

fluoranthene and pyrene. This floor drain appeared to terminate in the engineered fill immediately

below the concrete basement floor. Comparison of groundwater elevations and the water

elevation within the drain revealed that the water in the drain was approximately ½ a meter lower

than the groundwater table, suggesting the water in the drain may not be groundwater. However,

groundwater infiltration remains a possible source of the contamination.

Groundwater samples taken from monitoring well MW14-02 also exhibited concentrations of

anthracene, benzo(a)anthracene, benzo(a)pyrene, fluoranthene and pyrene that exceeded the

applicable FIGQG and exceeded CDWQG for benzo(a)pyrene and pyrene. These groundwater

exceedances are shown in Figure 4.

Note that samples MW14-2 and D1 contained sediment greater than 1 cm, and that the lab did

not decant the samples before processing, which likely biased the results high. Additional

sampling of well MW14-2 would provide verification of the groundwater exceedances. Additional

sampling of groundwater during potential excavation activities would inform a decision on

groundwater disposal during any such activities.

Page 106: SPECIFICATION Building Demolition and Remediation of

Supplemental Phase II ESA Page 14

Former Mount Agassiz Ski Lodge

Riding Mountain National Park, Manitoba

DST File No. OE-WG-017795

DST CONSULTING ENGINEERS INC.

Monitoring wells MW14-01, MW04 and MW06, sampled during the current study provided

groundwater PAH delineation in the westerly and northerly directions, and but the extent of the

groundwater PAH contamination to the south and west remains undetermined. There is an

existing well approximately 35 to 40 m south of the lodge (MW01) that could be sampled, but

there is no existing well west of the lodge. The westerly extent of any groundwater contamination

is not expected to be up gradient of the lodge building foundation. Previous studies (AMEC 2011

and 2010) did not analyse any samples for PAHs.

Given the location of MW14-2, the observed groundwater flow direction and the fact that PAHs

were not found in the other wells that are closer to and down gradient of the observed soil

contamination, it is also possible that these PAH groundwater exceedances (if confirmed)

originate from a different source than the fuel contaminated soil observed at AMEC sample SW2.

Groundwater Flow Direction

The average hydraulic gradient was calculated as 0.019 with a flow direction toward the east (79

degrees clockwise from north) using the water levels measured on June 18, 2014 in all four

monitoring wells (MW04, MW05, MW14-1 and MW14-2). Groundwater flow direction may vary

seasonally, and based on topography and the position of McKinnon Creek, groundwater flow

direction could at times be toward the southeast, placing MW14-2 downgradient from the UST

area.

8.3 National Classification System for Contaminated Sites (NCSCS)

An updated NCSCS score of 63.0 was calculated for the site, resulting in a ranking of category 2

– Medium Priority for Action.

Page 107: SPECIFICATION Building Demolition and Remediation of

Supplemental Phase II ESA Page 15

Former Mount Agassiz Ski Lodge

Riding Mountain National Park, Manitoba

DST File No. OE-WG-017795

DST CONSULTING ENGINEERS INC.

9.0 Remedial Options Analysis

This assessment has identified PHC and PAH contaminated soil under the Lodge building with a

total area estimated to be approximately 115 m2. The depth of the contamination has been

estimated to be 3 m and therefore the estimated volume for remediation is 345 m3. Based on the

estimated volume the weight of the impacted soils is estimated to be 690 tonnes. Given the

above, consideration was given to the following remedial options:

1. Ex Situ Treatment Technologies

Excavation and Disposal

2. In Situ Treatment Technologies

In Situ Chemical Oxidation

In Situ Bioremediation

3. Risk Management Alternatives (with development of site specific remediation criteria, if applicable)

Risk Assessment

No Action / Monitoring (i.e. natural attenuation)

Groundwater monitoring to establish groundwater conditions at the Site with regards to applicable

guideline would remain a requirement regardless of the remediation option chosen.

The various remedial alternatives were considered for the Site with regards to the following

factors:

Effectiveness in meeting the selected clean-up criteria;

Applicability to site conditions;

Complexity;

Public acceptance;

Risk to human health and the environment;

Timeframe;

Comparative cost; and,

On-site versus. off-site contamination.

9.1 Excavation and Disposal

The excavation and disposal alternative would include source removal by excavation and disposal

of contaminated soil at an approved waste disposal facility. This alternative would be an viable

since it would eliminate the source of contamination at the Site. Appropriate health and safety

plans would be required to avoid ingestion/inhalation of impacted soil/dust by site personnel, and

to prevent contaminant impact to the vicinity.

Page 108: SPECIFICATION Building Demolition and Remediation of

Supplemental Phase II ESA Page 16

Former Mount Agassiz Ski Lodge

Riding Mountain National Park, Manitoba

DST File No. OE-WG-017795

DST CONSULTING ENGINEERS INC.

DST understands the buildings are to be demolished. During demolition, after removal of the

building, would be the best time to address this contamination. During building demolition,

appropriate abatement techniques would need to be employed to deal with any hazardous

materials referred to in the hazardous materials survey (DST 2014).

Excavation and disposal of contaminated soil off site would present a permanent solution for

remediation of the hydrocarbon soil contamination.

A breakdown of the estimated cost to remove and dispose of the petroleum hydrocarbon

contaminated soil from the Site is provided in the following table:

Estimated Cost for Excavation and Disposal Alternative

Activity Estimated Cost 1

Project Management $4,000

Remediation Site Supervision $2,500

Excavation and Disposl of contaminated soil

($95/tonne)$65,550

Verification Sampling (waste characterization and

excavation limit soil samples for PHC, BTEX and

Selenium) (rush analysis)

$6,000

Restoration with Clean Granular Fill (690 tonnes @

$30/tonne)$20,700

Disbursement (site security, consultant equipment

and vehicle expenses)$2,000

Disbursement (site security, consultant equipment

and vehicle expenses)$5,000

Building Demolition $120,000

Contingency 20% $45,150

Total $270,900

Notes:

1) For 690 tonnes of impacted soil.

9.2 In Situ Chemical Oxidation

This option would involve the addition of an oxidant such as hydrogen peroxide and persulphate

to promote the degradation of hydrocarbons by direct oxidation. This method is often highly

effective in treating PHCs when good distribution is achieved. Effectiveness diminishes during

winter and when distribution is not effective. The addition of a strong oxidant would also

accelerate decay of underground infrastructure. Removal of the building prior to remediation

would facilitate amendment application.

Page 109: SPECIFICATION Building Demolition and Remediation of

Supplemental Phase II ESA Page 17

Former Mount Agassiz Ski Lodge

Riding Mountain National Park, Manitoba

DST File No. OE-WG-017795

DST CONSULTING ENGINEERS INC.

An estimate of the cost for this option is provided below:

Estimated Cost for In-Situ Chemical Oxidation

Activity Estimated Cost

Project Management $4,000

Remediation Site Supervision $1,500

Building demolition $120,000

Ammendment Application Design and

Application$150,000

Disbursement (site security, consultant

equipment and vehicle expenses)$2,000

Remediation Reporting $5,000

Contingency 20% $56,500

Total $339,000

Page 110: SPECIFICATION Building Demolition and Remediation of

Supplemental Phase II ESA Page 18

Former Mount Agassiz Ski Lodge

Riding Mountain National Park, Manitoba

DST File No. OE-WG-017795

DST CONSULTING ENGINEERS INC.

9.3 In Situ Bioremediation

This option would involve addition of amendments such as oxygen (for aerobic biodegredation)

and nutrients (for aerobic and anaerobic biodegradation) to the saturated zone to enhance natural

bioremediation. Removal of the building would facilitate amendment application. This option

could potentially take years to achieve results. An estimated cost is provided below:

Estimated Cost for In-Situ Bioremediation

Activity Estimated Cost

Project Management $4,000

Remediation Site Supervision $1,500

Building demolition $120,000

Amendment Application Design and

Long Term Application/Verification

sampling

$100,000

Disbursement (site security, consultant

equipment and vehicle expenses)$2,000

Remediation Reporting $8,000

Contingency 20% $47,100

Total $282,600

Page 111: SPECIFICATION Building Demolition and Remediation of

Supplemental Phase II ESA Page 19

Former Mount Agassiz Ski Lodge

Riding Mountain National Park, Manitoba

DST File No. OE-WG-017795

DST CONSULTING ENGINEERS INC.

9.4 Risk Assessment

A preliminary quantitative risk assessment level (PQRA) consisting of a site specific risk

assessment for human health (SSRA-HH) and a screening level ecological risk assessment

(SLERA) would be completed for the Site. Due to the presence of McKinnon Creek, it is possible

that additional bioassays may be required as part of the risk assessment; an extra $15,000 has

been included in the contingency cost for this purpose.

Given the complexity of the Site, the risk assessment process can likely be completed in a period

of two to six months. However additional sampling may be required to delineate the PAH

impacted groundwater, which would potentially add two months.

The Risk assessment would likely recommend a Risk Management Plan (RMP). The cost of the

risk assessment is expected to be approximately $40,000. The additional groundwater

delineation is estimated at $10,000. Although it is not possible to accurately predict without

performing the Risk Assessment and developing the RMP, the expected cost of vapour extraction

system likely to recommended as a result of a potential RMP is estimated at an additional

$75,000.

Estimated Cost for Risk Assessment

Activity Estimated Cost

Project Management $4,000

Additional Delineation and Reporting $10,000

Disbursement (site security, consultant

equipment and vehicle expenses)$2,000

Risk Assessment $40,000

RMP $75,000

Contingency 20% + $15,000 for BioAssays $41,200

Total $172,200

Page 112: SPECIFICATION Building Demolition and Remediation of

Supplemental Phase II ESA Page 20

Former Mount Agassiz Ski Lodge

Riding Mountain National Park, Manitoba

DST File No. OE-WG-017795

DST CONSULTING ENGINEERS INC.

9.5 Monitored Natural Attenuation

This option would include continued monitoring of groundwater, soil vapour and indoor air quality.

It is estimated that a monitoring program including groundwater, soil vapour, and indoor air

monitoring would cost approximately $20,000 for the first year and $15,000 per year thereafter.

Natural attenuation of some contaminants (e.g. PAHs) could take decades, and given the levels

of contamination at the site, this option could not be recommended unless it was in conjunction

with a risk assessment or other remediation option.

9.6 Preferred Option

Site specific conditions were taken into account to select the preferred remedial option, most

notably the following conditions:

Hydrocarbon concentrations in Soil exceeded the applicable guidelines by over an order

of magnitude in sample SW@ 2m with an F2 concentration of 7190 µg/L (AMEC 2011);

There are underground utilities at the site that would potentially impacted by the

application of chemical oxidizing agents;

The Site is accessible by road;

The Site includes public spaces and is in a national park. and,

It is preferable to have the site remediated in a reasonable time frame.

The following table presents a summary of the assessment of the remedial alternatives potentially

appropriate for the site, considering the factors.

Page 113: SPECIFICATION Building Demolition and Remediation of

Supplemental Phase II ESA Page 21

Former Agassiz Ski Lodge

Riding Mountain National Park, Manitoba

DST File No. OE-WG-017795

DST CONSULTING ENGINEERS INC.

Assessment of Remedial Options for PAH and PHC Contamination at the Site

Excavation and

DisposalRisk Assessment

In Situ

Chemical

Oxidation

In Situ

Bioremediation

Natural Attenuation

with Monitoring

Effectiveness in

meeting the clean up

criteria for

hydrocarbons

High

Not Applicable

(Risk assessment

approach

establishes site

specific criteria)

High High Medium

Effectiveness in

meeting the clean up

criteria for PAHs

High

Not Applicable

(Risk assessment

approach

establishes site

specific criteria)

Medium-High Medium Low

Applicability to Site

ConditionsHigh High Medium High High

Complexity Low Medium Medium Low Low

Public Acceptance High Medium Medium Medium Medium

Risk to Human Health

and the EnvironmentLow Medium Low Medium Medium

Estimated Time Frame Two to four months Six to eight months 10 to 20 Months Potentially > 5 years Potentially >10 Years

Comparative Cost Medium-High Medium Medium Low to Medium Low

Assessment Criteria

Assessment Rating

Page 114: SPECIFICATION Building Demolition and Remediation of

Supplemental Phase II ESA Page 22

Former Agassiz Ski Lodge

Riding Mountain National Park, Manitoba

DST File No. OE-WG-017795

DST CONSULTING ENGINEERS INC.

Considering the above factors, the preferred option selected for remediation of the Site was

Excavation and Offsite Disposal. Removing the fuel-impacted soil would remove the source of

the PAHs in the groundwater.

Quarterly Groundwater sampling is recommended until three consecutive sampling rounds reveal

that groundwater concentrations are not of concern.

Page 115: SPECIFICATION Building Demolition and Remediation of

Supplemental Phase II ESA Page 23

Former Mount Agassiz Ski Lodge

Riding Mountain National Park, Manitoba

DST File No. OE-WG-017795

DST CONSULTING ENGINEERS INC.

10.0 Conclusions and Recommendations

Contaminated soil with concentrations of PHC F1, F2 and F3 in excess of current CCME

guidelines was identified during excavation limit sampling near the building foundation at a depth

greater than the building foundation (AMEC 2011). The PHC impacted soil is estimated to be

approximately 60 m2 in area, with a depth of approximately 3 m and a volume of 180 m3.

One soil sample (BH14-3) exhibited a phenanthrene concentration of 0.050 µg/g, which is above

the CCME guideline of 0.046 µg/g. The criteria exceeded was for the protection of freshwater life

pathway, which does not vary with land use.

The area of impacted soil including the PHC and PAH contaminated soil is estimated at

approximately 115 m2 with a depth of 3 m and a volume of 345 m3. Verification sampling of the

excavation should include analyses for PAHs.

A remedial options analysis indicated the preferred remedial option for the Site was excavation

and off-site disposal of the contaminated soil. Scheduling demolition of the ski lodge building

prior to the soil remediation would facilitate excavating the soil, which is located within the building

footprint. DST estimates for the cost of this remediation at approximately $271,000.

Groundwater sample from monitoring well MW14-02 exhibited concentrations of anthracene,

benzo(a)anthracene, benzo(a)pyrene, fluoranthene, and pyrene in excess of FIGQG for the

freshwater life exposure pathway, which is not dependent on land use and only slightly dependent

on soil grain size.

Due to sediment in groundwater sample MW14-02, and the low concentrations reported in the

sample, re-sampling of MW14-02 is recommended to verify the groundwater contamination.

Should disposal of groundwater be required during potential future remediation work (e.g.

disposal of infiltrating water during excavation) , a sample of the groundwater should be analysed

for PAHs.

Monitoring wells MW04, MW06, MW14-01 and MW14-02 should be included in a monitoring

program. Should confirmation sampling confirm the existence of PAH contamination in MW14-

02, monitoring well MW01 and a new monitoring well located west of MW14-02 should be added

to the monitoring program. All wells should be sampled for PHCs, BTEX and PAHs.

Page 116: SPECIFICATION Building Demolition and Remediation of

Supplemental Phase II ESA Page 24

Former Mount Agassiz Ski Lodge

Riding Mountain National Park, Manitoba

DST File No. OE-WG-017795

DST CONSULTING ENGINEERS INC.

11.0 References

AMEC Earth and Environmental 2010. Final Phase II/III Environmental Site Assessment, Former Mount Agassiz Ski Resort, Riding Mountain National Park, Manitoba. AMEC Earth and Environmental 2011. Final Remedial Activities Report, Former Mount Agassiz Ski Resort, Riding Mountain National Park, Manitoba. Canadian Council of Ministers of the Environment, 2008. Canada Wide Standard for petroleum Hydrocarbons (PHC) in Soil, User Guidance. PN 1398. Prepared by O’Connor Associates Environmental Inc. (2001) and Meridian Environmental Inc. (2001, 2007). Canadian Council of Ministers of the Environment, 2010. Canadian Soil Quality Guidelines, Carcinogenic and other Polycyclic Aromatic Hydrocarbons (PAHs), Environmental and Human Health Effects. Scientific Criteria Document (revised). PN 1445. DST Consulting Engineers 2014. Hazardous Materials Survey, Former Mount Agassiz Ski Resort, Riding Mountain National Park, Manitoba, Canada. Environment Canada 2012. Guidance Document on Federal Interim Groundwater Quality Guidelines for Federal Contaminated Sites. Health Canada (2012) Guidelines for Canadian Drinking Water Quality Summary Table. Available from Health Canada web site: http://www.hc-sc.gc.ca/ewh-semt/alt_formats/pdf/pubs/water-eau/2012-sum_guide-res_recom/2012-sum_guide-res_recom-eng.pdf (Accessed June 23, 2014).

Page 117: SPECIFICATION Building Demolition and Remediation of

Supplemental Phase II ESA Page 25

Former Mount Agassiz Ski Lodge

Riding Mountain National Park, Manitoba

DST File No. OE-WG-017795

DST CONSULTING ENGINEERS INC.

12.0 Closure

If you have any questions about this report, or require clarification regarding the described work,

please do not hesitate to contact the undersigned.

For DST Consulting Engineers Inc.

François Pugh, P.Eng, Ph.D. Milan Makusa, Ing., P.Geo.

Environmental Engineer Sr. Technical Advisor

Page 118: SPECIFICATION Building Demolition and Remediation of

Supplemental Phase II ESA

Former Agassiz Ski Lodge

Riding Mountain National Park, Manitoba

DST File No. OE-WG-017795

Figures

Page 119: SPECIFICATION Building Demolition and Remediation of

500 1000

APPROXIMATE SCALE

2000m0

SITE LOCATION

M.M.

R.P.

F.P. OE-WG-017795

REV ISSUE APPROVAL

DRAWN BY

DESIGN BY PROJECT NO.:

DATE

DATE

NOTE:

1. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH THE

ASSOCIATED TECHNICAL REPORT.

A DRAFT

August 2014

21/08/14

885 REGENT STREET, UNIT 3-1B

SUDBURY, ONTARIO, P3E 5M4

TEL (705) 523-6680 FAX (705) 523-6690

www.dstgroup.com

consulting engineers

DRAWING TITLE

PROJECT TITLE

FIGURE No.:

SOURCE:

1. GOOGLE EARTH, © 2014 GOOGLE

FIGURE 1

SUPPLEMENTAL PHASE II ESA

FORMER MOUNT AGASSIZ SKI LODGE

RIDING MOUNTAIN NATIONAL PARK

MANITOBA

SITE LOCATION MAP

Page 120: SPECIFICATION Building Demolition and Remediation of

BH/MW14-1

BH/MW14-2

WS2

WS1

BH14-3

D-1

SW @ 2m (AMEC)

EW @ 3m (AMEC)

CS

BH/MW06

BH/MW04

BH14-2A

885 REGENT STREET, UNIT 3-1B

A

Draft

R.P.

M.M. OE-WG-017795

REV ISSUE APPROVAL

PROJECT TITLE

DRAWING TITLE

DESIGNED BY:

DRAWN BY:

APPROVED BY:

SCALE:

PROJECT NO.:

DATE:

DATE

SUDBURY, ONTARIO, P3E 5M4

TEL (705) 523-6680 FAX (705) 523-6690

www.dstgroup.com

LEGEND:

F.P.

20/08/14

August 2014

consulting engineers

M.M.

FIGURE 2

SITE PLAN

As Shown

BOREHOLE/MONITORING WELL

(DST)

BH/MW14-2

WS2

GRAB SOIL SAMPLE (DST)

D-1

DRAIN

SW @ 2m

CS

BOREHOLE LOCATION (DST)

BH/MW06

BOREHOLE/MONITORING WELL

(AMEC)

CRAWLSPACE SAMPLE (DST)

BH14-3

EXCAVATION LIMIT SAMPLE

(AMEC)

SOURCE: BING IMAGERY, © 2014 MICROSOFT CORPORATION, © 2014 NOKIA

SUPPLEMENTAL PHASE II ESA

FORMER MOUNT AGASSIZ SKI LODGE

RIDING MOUNTAIN NATIONAL PARK

MANITOBA

Page 121: SPECIFICATION Building Demolition and Remediation of

EXCAVATION 2

(AMEC)

EXCAVATION 1

(AMEC)

S

O

U

T

H

E

A

S

T

B

A

S

E

M

E

N

T

N

O

R

T

H

E

A

S

T

B

A

S

E

M

E

N

T

C

R

A

W

L

S

P

A

C

E

885 REGENT STREET, UNIT 3-1B

A

Draft

R.P.

M.M. OE-WG-017795

REV ISSUE APPROVAL

PROJECT TITLE

DRAWING TITLE

DESIGNED BY:

DRAWN BY:

APPROVED BY:

SCALE:

PROJECT NO.:

DATE:

DATE

SUDBURY, ONTARIO, P3E 5M4

TEL (705) 523-6680 FAX (705) 523-6690

www.dstgroup.com

LEGEND:

F.P.

21/08/14

August 2014

consulting engineers

M.M.

FIGURE 3

SOIL EXCEEDANCES

As Shown

BOREHOLE/MONITORING WELL (DST)

SOIL ANALYTICAL RESULTS MEET

CCME GUIDELINES FOR PHCs, BTEX

AND PAHs

BH/MW14-2

WS1

GRAB SOIL SAMPLE (DST)

ANALYTICAL RESULTS MEET CCME

GUIDELINES FOR PHCs AND BTEX

D-1

DRAIN

BH/MW14-1

BH/MW14-2

BH14-3

D-1

EW @ 3m

(AMEC)

BH/MW06

BH/MW04

WS2

SW @ 2m

(AMEC)

BH14-2A

CS

WS1

BOREHOLE (DST)

AREA OF PHC CONTAMINATION

(60 m²)

BH/MW06

BOREHOLE/MONITORING WELL

(AMEC) SOIL ANALYTICAL RESULTS

BH/MW06 MEETS CCME GUIDELINES

FOR PHCS AND BTEX

consulting engineers

SW @ 2m

GRAB SOIL SAMPLE (AMEC)

ANALYTICAL RESULTS EXCEED CCME

GUIDELINES FOR PHCS AND BTEX

BH14-2A

AREA OF PAH CONTAMINATED

SOIL (115 m²)

BOREHOLE (DST) EXCEEDS CCME

GUIDLINES FOR PAHs

BH14-3

BOREHOLE/MONITORING WELL

(AMEC)

BH/MW04

CS

CRAWLSPACE BOREHOLE SAMPLE

(DST) SOIL ANALYTICAL RESULTS

MEET CCME GUIDELINES FOR PHCS,

BTEX AND PAHS

GRAB SOIL SAMPLE (AMEC) -

ANALYTICAL RESULTS MEET CCME

GUIDELINES FOR PHCs AND BTEX

SUPPLEMENTAL PHASE II ESA

FORMER MOUNT AGASSIZ SKI LODGE

RIDING MOUNTAIN NATIONAL PARK

MANITOBA

Page 122: SPECIFICATION Building Demolition and Remediation of

EXCAVATION 2

(AMEC)

EXCAVATION 1

(AMEC)

BH/MW14-2

BH14-3

D-1

EW @ 3m

(AMEC)

BH/MW06

BH/MW04

WS2

BH14-2A

CS

WS1

SW @ 2m

(AMEC)

885 REGENT STREET, UNIT 3-1B

A

Draft

R.P.

M.M. OE-WG-017795

REV ISSUE APPROVAL

PROJECT TITLE

DRAWING TITLE

DESIGNED BY:

DRAWN BY:

APPROVED BY:

SCALE:

PROJECT NO.:

DATE:

DATE

SUDBURY, ONTARIO, P3E 5M4

TEL (705) 523-6680 FAX (705) 523-6690

www.dstgroup.com

LEGEND:

F.P.

21/08/14

August 2014

consulting engineers

M.M.

FIGURE 4

GROUNDWATER EXCEEDANCES

As Shown

BOREHOLE/MONITORING WELL

(DST) MEETS CCME GUIDELINES

FOR PAHs, BTEX AND PHCs

BH/MW14-1

WS2

GRAB SOIL SAMPLE (DST)

D-1

DRAIN

BOREHOLE (DST)

BH/MW06

BOREHOLE/MONITORING WELL

(AMEC) MEETS CCME GUIDELINES

FOR PAHs, BTEX AND PHCs

S

O

U

T

H

E

A

S

T

B

A

S

E

M

E

N

T

N

O

R

T

H

E

A

S

T

B

A

S

E

M

E

N

T

BH14-3

BOREHOLE/MONITORING WELL

(DST) EXCEEDS CCME

GUIDELINES FOR PAHs

BH/MW14-2

CRAWL SPACE BOREHOLE SAMPLE

(DST)

GRAB SOIL SAMPLE (AMEC)

CS

C

R

A

W

L

S

P

A

C

E

SUPPLEMENTAL PHASE II ESA

FORMER MOUNT AGASSIZ SKI LODGE

RIDING MOUNTAIN NATIONAL PARK

MANITOBA

BH/MW14-1

Page 123: SPECIFICATION Building Demolition and Remediation of

EXCAVATION 2

(AMEC)

EXCAVATION 1

(AMEC)

98.46 m

98.27 m

98.8

98.6

98.91 m

98.81 m

BH/MW14-1

BH/MW14-2

BH14-3

D-1

EW @ 3m

(AMEC)

BH/MW06

BH/MW04

WS2

SW @ 2m

(AMEC)

BH14-2A

CS

WS1

S

O

U

T

H

E

A

S

T

B

A

S

E

M

E

N

T

N

O

R

T

H

E

A

S

T

B

A

S

E

M

E

N

T

C

R

A

W

L

S

P

A

C

E

885 REGENT STREET, UNIT 3-1B

A

Draft

R.P.

M.M. OE-WG-017795

REV ISSUE APPROVAL

PROJECT TITLE

DRAWING TITLE

DESIGNED BY:

DRAWN BY:

APPROVED BY:

SCALE:

PROJECT NO.:

DATE:

DATE

SUDBURY, ONTARIO, P3E 5M4

TEL (705) 523-6680 FAX (705) 523-6690

www.dstgroup.com

LEGEND:

F.P.

21/08/14

August 2014

consulting engineers

M.M.

FIGURE 5

GROUNDWATER CONTOURS

(18 JUNE 2014)

As Shown

BOREHOLE/MONITORING WELL

(DST)

BH/MW14-2

WS2

CRAWLSPACE BOREHOLE (DST)

D-1

DRAIN

SW @ 2m

SOIL SAMPLE (AMEC)

BOREHOLE (DST)

BH/MW06

BOREHOLE/MONITORING WELL

(AMEC)

98.8

98.9 mGROUNDWATER ELEVATION

GROUNDWATER CONTOUR LINE

GROUNDWATER FLOW

DIRECTION

BH14-3

SUPPLEMENTAL PHASE II ESA

FORMER MOUNT AGASSIZ SKI LODGE

RIDING MOUNTAIN NATIONAL PARK

MANITOBA

CRAWLSPACE (DST)

CS

Page 124: SPECIFICATION Building Demolition and Remediation of

Supplemental Phase II ESA

Former Agassiz Ski Lodge

Riding Mountain National Park, Manitoba

DST File No. OE-WG-017795

Tables

Page 125: SPECIFICATION Building Demolition and Remediation of

Supplemental Phase II ESA

Former Agissiz Ski Lodge

Riding Mountain National Park, Manitoba Table 1

Soil Analytical Results

Page 1 of 1

AMEC

SAMPLE

SW @ 2 m (1)

MW14-1

@1.8-2.4 m

MW14-1

@2.4-3.0 m

MW14-6

@2.4-3.0 m

MW14-2

@1.2-1.8 m

MW14-2

@1.8-2.4 mWS1 WS2 CS-03 CS-04 CS-104

BH14-3

@ 0-0.25 m

BH14-3

@ 0.25-0.75 m

SW MW14-1 MW14-1 MW14-6 MW14-2 MW14-2 WS1 WS2 Crawlspace Crawlspace CrawlspaceUtility Room

Borehole

Utility Room

Borehole

1300 5 5 5 5 <5 - (3) - <5 10 10 <5 10

2 1.8-2.4 2.4-3.0 2.4-3.0 1.2-1.8 1.8-2.4 2 2 0.75-1.25 1.25-1.5 1.25-1.5 0-0.25 0.25-0.75

5-Mar-2014 5-Mar-2014 5-Mar-2014 7-Mar-2014 7-Mar-2014 5-Mar-2014 7-Mar-2014 18-Jun-2014 18-Jun-2014 18-Jun-2014 18-Jun-2014 18-Jun-2014

452448 452448 452448 452425 452425 - - - - - - -

5623525 5623525 5623523 5623506 5623506 - - - - - - -

Parameter

Units CCME (4,5)

Residential/

Parkland

Field

duplicate of

MW14-

[email protected]

3.0M

Field

duplicate of

CS-04

Inorganics

pH none 6-8 7.73 7.50 - - - - - - - - - -

Miscellaneous Parameters - - - - -

Grain Size NV (6) Coarse Coarse - - - - - - - - - -

Sieve - #200 (<0.075mm) % NV 47 44 - - - - - - - - - -

Sieve - #200 (>0.075mm) % NV 53 56 - - - - - - - - - -

BTEX - - - - -

Benzene µg/g 0.0068 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005

Ethylbenzene µg/g 0.018 <0.015 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01

Toluene µg/g 0.080 <0.05 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02

m-Xylene & p-Xylene µg/g NV 0.981 <0.04 <0.04 <0.04 <0.04 <0.04 <0.04 <0.04 <0.04 <0.04 <0.04 <0.04 <0.04

o-Xylene µg/g NV 0.483 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02

Total Xylenes µg/g 2.4 1.46 <0.04 <0.04 <0.04 <0.04 <0.04 <0.04 <0.04 <0.04 <0.04 <0.04 <0.04 <0.04

PAHs

Acenaphthene µg/g 0.28 - <0.0050 - - <0.0050 - - - <0.0050 <0.0050 - <0.0050 <0.0050

Acenaphthylene µg/g 320 - <0.0050 - - <0.0050 - - - <0.0050 <0.0050 - <0.0050 <0.0050

Anthracene µg/g 2.5 - <0.0050 - - <0.0050 - - - <0.0050 <0.0050 - 0.016 0.0071

Benzo(a)anthracene µg/g 1 - <0.0050 - - <0.0050 - - - <0.0050 <0.0050 - 0.039 0.019

Benzo(a)pyrene µg/g 0.6 - <0.0050 - - <0.0050 - - - <0.0050 <0.0050 - 0.035 0.016

Benzo(b/j)fluoranthene µg/g 1 - <0.0050 - - <0.0050 - - - 0.007 <0.0050 - 0.052 0.024

Benzo(ghi)perylene µg/g NV - <0.0050 - - <0.0050 - - - <0.0050 <0.0050 - 0.02 0.0099

Benzo(k)fluoranthene µg/g 1.00 - <0.0050 - - <0.0050 - - - <0.0050 <0.0050 - 0.018 0.0093

Chrysene µg/g 6.20 - <0.0050 - - <0.0050 - - - 0.0059 <0.0050 - 0.035 0.018

Dibenzo(a,h)anthracene µg/g 1 - <0.0050 - - <0.0050 - - - <0.0050 <0.0050 - 0.0053 <0.0050

Fluoranthene µg/g 15.4 - <0.0050 - - <0.0050 - - - 0.011 <0.0050 - 0.083 0.04

Fluorene µg/g 0.25 - <0.0050 - - <0.0050 - - - <0.0050 <0.0050 - <0.0050 <0.0050

Indeno(1,2,3-cd)pyrene µg/g 1 - <0.0050 - - <0.0050 - - - <0.0050 <0.0050 - 0.021 0.0099

1-Methylnaphthalene µg/g NV - <0.0050 - - <0.0050 - - - <0.0050 <0.0050 - <0.0050 <0.0050

2-Methylnaphthalene µg/g NV - <0.0050 - - <0.0050 - - - <0.0050 <0.0050 - <0.0050 <0.0050

Naphthalene µg/g 0.6 - <0.0050 - - <0.0050 - - - <0.0050 <0.0050 - <0.0050 <0.0050

Phenanthrene µg/g 0.046 - <0.0050 - - <0.0050 - - - 0.0075 <0.0050 - 0.050 0.023

Pyrene µg/g 7.7 - <0.0050 - - <0.0050 - - - 0.0091 0.016 - 0.062 0.031

B[a]P Total Potency Equivalent µg/g 0.6 - <0.012 - - <0.012 - - - <0.012 <0.012 - 0.054 0.027

Index of Additive Cancer Risk 1 - <0.064 - - <0.064 - - - <0.131 <0.064 - 0.7 <0.343

PHCs

F1 (C6-C10) µg/g 30 167 <10 <10 <10 <10 <10 <10 <10 <10 <10 <10 <10 <10

F1 (C6-C10) - BTEX µg/g NV 166 <10 <10 <10 <10 <10 <10 <10 <10 <10 <10 <10 <10

F2 (C10-C16) µg/g 150 7190 <10 <10 <10 <10 <10 <10 <10 <10 <10 - 11 110

F3 (C16-C34) µg/g 300 3590 <50 <50 <50 <50 <50 110 <50 <50 <50 - <50 170

F4 (C34-C50) µg/g 2800 <50 <50 <50 <50 <50 <50 1400 <50 <50 <50 - <50 <50

Notes:

1) Data for SW @ 2 m is from AMEC 2011.

2) "ppm" stands for parts per million.

3) "-" indicates no data available for this parameter and sample.

6) "NV" means no value for that parameter was presented in the CCME guidance document.

UTM Zone 14 CordinatesEasting

Northing

5) Exceedances of the CCME guidelines (if any) are illustrated by white font and red highlighting

4) CCME guidelines were derived from the following:

- For VOCs and Inorganics, CCME (2014) Canandian Environmental Guidelines Summary Table, Soil Guidelines for the Protection of Environment and Human Health, Available from CCME Website:

http://st-ts.ccme.ca/ (accessed June 2014), Residential/Parkland Use, more stringent of fine-grained and coarse-grained soil;

- For PHCs - CCME (2008), Canada Wide Standard for Petroleum Hydrocarbons in Soil; Residential/Parkland Land Use, most stringent of all pathways considered, the more stringent of fine-grained and coarse-grained soil;

- For PAHs - CCME (2010) Canadian Environmental Guidelines for the protection of Environmental and Human Health, Polycyclic Aromatic Hydrocarbons. Available from CCME website: http://st-ts.ccme.ca/ (accessed June 2014).

Sample ID

Combustible Vapour concentration (ppm)(2)

Sample Depth (m)

Sample Date (dd-mmm-yyyy)

Sample Location

DST Project No. OE-WG-017795 DST Consulting Engineers Inc.

Page 126: SPECIFICATION Building Demolition and Remediation of

Supplemental Phase II ESA

Former Agissiz Ski Lodge

Riding Mountain National Park, Manitoba

Table 2

Groundwater Analytical Results

Page 1 of 1

Sample ID MW14-01 MW14-2 MW04 MW104 MW06 D-1 Field Blank Trip Blank

MW14-01 MW14-2 MW04 MW04 MW06 D-1 NA (7) NA

18-Jun-2014 18-Jun-2014 18-Jun-2014 18-Jun-2014 18-Jun-2014 18-Jun-2014 18-Jun-2014 18-Jun-2014

WL3638 WL3637 WL3639 WL3641 WL3640 WL3642 WL3647 WL3648

Parameter

Unit

FIGQG (1,2)

Residential/

Parkland

CDWQG (3,4)

Field

Duplicate of

MW04

VOCs

Benzene µg/L 140 5 <0.20 <0.20 <0.20 <0.20 <0.20 <0.20 <0.20 <0.20

Toluene µg/L 83 2.4 <0.20 <0.20 <0.20 <0.20 <0.20 <0.20 <0.20 <0.20

Ethylbenzene µg/L 16000 24 <0.20 <0.20 <0.20 <0.20 <0.20 <0.20 <0.20 <0.20

m-Xylene & p-Xylene µg/L NV (5)

NV <0.40 <0.40 <0.40 <0.40 <0.40 <0.40 <0.40 <0.40

o-Xylene µg/L NV NV <0.20 <0.20 <0.20 <0.20 <0.20 <0.20 <0.20 <0.20

Total Xylenes µg/L 3900 300 <0.40 <0.40 <0.40 <0.40 <0.40 <0.40 <0.40 <0.40

PAHs

Acenaphthene µg/L 5.8 NV <0.010 0.13 <0.010 -(6)

<0.010 0.033 - -

Acenaphthylene µg/L 46 NV <0.010 <0.010 <0.010 - <0.010 <0.010 - -

Anthracene µg/L 0.012 NV <0.010 0.018 <0.010 - <0.010 0.048 - -

Benzo(a)anthracene µg/L 0.018 NV <0.010 0.041 <0.010 - <0.010 0.049 - -

Benzo(a)pyrene µg/L 0.017 0.01 <0.010 0.037 <0.010 - <0.010 0.043 - -

Benzo(b/j)fluoranthene µg/L 0.48 NV <0.010 0.046 <0.010 - <0.010 0.054 - -

Benzo(ghi)perylene µg/L 0.17 NV <0.010 0.029 <0.010 - <0.010 0.028 - -

Benzo(k)fluoranthene µg/L 0.48 NV <0.010 0.018 <0.010 - <0.010 0.027 - -

Chrysene µg/L 1.4 NV <0.010 0.031 <0.010 - <0.010 0.045 - -

Dibenzo(a,h)anthracene µg/L 0.26 NV <0.010 <0.010 <0.010 - <0.010 <0.010 - -

Fluoranthene µg/L 0.04 NV <0.010 0.085 <0.010 - <0.010 0.16 - -

Fluorene µg/L 3 NV <0.010 0.15 <0.010 - <0.010 <0.050 - -

Indeno(1,2,3-cd)pyrene µg/L 0.21 NV <0.010 0.025 <0.010 - <0.010 0.03 - -

1-Methylnaphthalene µg/L 180 NV <0.010 0.022 <0.010 - <0.010 0.045 - -

2-Methylnaphthalene µg/L 180 NV <0.010 0.05 <0.010 - <0.010 0.059 - -

Naphthalene µg/L 1.1 NV <0.010 0.056 <0.010 - <0.010 0.056 - -

Phenanthrene µg/L 0.4 NV <0.010 0.066 <0.010 - <0.010 0.19 - -

Pyrene µg/L 0.025 NV <0.010 0.075 <0.010 - <0.010 0.13 - -

PHC

F1 (C6-C10) µg/L 810 NV <25 <25 <25 <25 <25 <25 - -

F1 (C6-C10) - BTEX µg/L NV NV <25 <25 <25 <25 <25 <25 - -

F2 (C10-C16) µg/L 1300 NV <100 <100 <100 - <100 110 - -

F3 (C16-C34) µg/L NV NV <200 <200 <200 - <200 <200 - -

F4 (C34-C50) µg/L NV NV <200 <200 <200 - <200 <200 - -

Reached Baseline at C50 µg/L NA NA YES YES YES - YES YES - -

Notes:

2) Exceedances of FIGQG are illustrated by red highlighting and bold white font.

4) Exceedances of CDWG are indicated by underlining

5) "NV" means no value for that parameter was presented in the associated standard/guidance document.

6) "-" indicates the parameter was not analyzed.

7) "NA" indicates not applicable.

Sample Location

Sample Date (dd-mmm-yyyy)

Lab Reference Number

1) Guidelines were derived from Environment Canada (2012) Guidance Document on Federal Interim Groundwater Quality Guidelines for Federal Contaminated Sites; Table 2

(Residential/Parkland), Tier 2 values for all exposure pathways except for marine life. Values from the more stringent of coarse or fine grained soil.

3) Provided for informational purposes. Values obtained from "Guidelines for Canadian Drinking Water Quality Summary Table", Federal-Provincial-Territorial Committee on Drinking

Water of the Federal-Provincial-Territorial Committee on Health and the Environment, August 2012.

DST Project No. OE-WG-017795 DST Consulting Engineers Inc.

Page 127: SPECIFICATION Building Demolition and Remediation of

Supplemental Phase II ESA

Former Agissiz Ski Lodge

Riding Mountain National Park, Manitoba

Table 3

Groundwater Field Measured Parameters

Page 1 of 1

Top of Well

Casing

Elevation

DateElectrical

ConductivitypH DO

Oxidation

Reduction

Potential

Temperature

(m) (1, 2) (dd-mmm-yyyy) (m btpvc)

(3)(mbgs)

(4)(m)

2(mS/cm) (mg/L)

(5)(mV) (

oC)

MW14-01 down gradient 101.09 18-Jun-2014 2.82 1.93 98.27 1066 7.7 8.8 9.0 7.7

MW14-02 cross gradient 101.48 18-Jun-2014 2.57 1.51 98.91 713 7.5 8.6 19 12.0

MM04 cross gradient 101.40 18-Jun-2014 2.59 1.93 98.81 1124 9.2 5.0 70 7.9

MW06 cross gradient 101.25 18-Jun-2014 2.85 1.82 98.40 609 7.4 8.6 30 5.7

D-1 (6) down gradient 98.78

(7) 18-Jun-2014 1.00 (7)

1.00 (7) 97.8 686 7.4 18.1 34 12.1 3 cm of water

Notes:

1) Top of PVC well casings surveyed by DST 18 June 2014, relative to local benchmark (top of I-beam found implanted into the ground in front of the lounge building).

2) Elevations are in relation to a local datum assigned an arbitrary elevation of 100.00 m.

3) "m btpvc" means metres below the top of PVC well casing.

4) "m bgs" means metres below ground surface.

5) Oxygen probe malfunction is suspected due to unrealistic high readings.

6) D-1 was not a monitoring well, but a floor drain terminating in fill immediately under the basement floor.

7) Floor elevation used instead of top of casing and ground surface.

Water LevelMonitoring

Well ID

Position/

ClassificationComments

DST Project No: OE-WG-017795 DST Consulting Engineers Inc.

Page 128: SPECIFICATION Building Demolition and Remediation of

Supplemental Phase II ESA

Former Agassiz Ski Lodge

Riding Mountain National Park, Manitoba

DST File No. OE-WG-017795

Appendix A

Borehole/Monitoring Well Logs

Page 129: SPECIFICATION Building Demolition and Remediation of

ND

Insufficient sampleto GASTECH.

FNE SAND & CLAY - Trace gravel, cobbles,brown.

SILTY CLAYEY SAND - Trace gravel, cobbles,brown.

Auger Refusal / End of Borehole at 1.2 m.

DST CONSULTING ENGINEERS INC.

ELEV

SUBSURFACE PROFILE

Bentonite & Riser

REMARKS

SURFACE

% LEL

mDPTH

CVCConc.

PPM

1

2

3

4

5

6

7

8

mTyp

e

Wel

lIn

stal

latio

nD

etai

ls

CLIENT: Public Works and Government Services Canada

No.

SAMPLES

80604020

800

PROJECT: Supplemental Phase II ESA

REF. No.: OE-WG-017795

1

L O G O F BOREHOLE BH14-2A

LOCATION: Mount Agassiz, Manitoba

CHVC *

MATERIAL DESCRIPTION

SY

MB

L

Val

ue

SPT

N-

METHOD: Hollow Stem Auger/Split Spoon Auger

DIAMETER: 20 cm ID

600

DATE: 5 March 2014

400200

Split SpoonAuger Sample

Sand Pack & Screen

PPM

* - Combustible Headspace Vapour ConcentrationND - Not Detectable

GA

ST

EC

BH

OE

-WG

-017

795.

GP

J D

ST

_MIN

.GD

T 1

9/8

/14

SURFACE ELEVATION: Not Available

UTM: Zone 14U 5623511 N, 452436 E

Page 130: SPECIFICATION Building Demolition and Remediation of

ND

10

ND

Sample [email protected] m submittedfor PHC, BTEX andPAH analysis.Sample MW14-3 @0.25-0.75 msubmitted for PHCBTEX and PAHanalysis.

SAND GRAVEL FILL - Grey / brown, wet.

End of Borehole at 1.0 m.

DST CONSULTING ENGINEERS INC.

ELEV

SUBSURFACE PROFILE

Bentonite & Riser

REMARKS

SURFACE

% LEL

mDPTH

CVCConc.

PPM

1

2

3

4

5

6

7

8

mTyp

e

SURFACE ELEVATION: 98.78 metres

Wel

lIn

stal

latio

nD

etai

ls

CLIENT: Public Works and Government Services Canada

No.

SAMPLES

80604020

800

PROJECT: Supplemental Phase II ESA

REF. No.: OE-WG-017795

98

97

96

95

94

93

92

91

90

2

L O G O F BOREHOLE BH14-3

LOCATION: Mount Agassiz, Manitoba

CHVC *

MATERIAL DESCRIPTION

SY

MB

L

Val

ue

SPT

N-

METHOD: Hand Auger

DIAMETER: 8 cm ID

600

DATE: 18 June 2014

400200

Split SpoonAuger Sample

Sand Pack & Screen

PPM

* - Combustible Headspace Vapour ConcentrationND - Not Detectable

GA

ST

EC

BH

OE

-WG

-017

795.

GP

J D

ST

_MIN

.GD

T 1

9/8

/14

UTM: Zone 14U 5623531 N, 452433 E

Page 131: SPECIFICATION Building Demolition and Remediation of

ND

ND

ND

10

Sample [email protected] m submittedfor PHC BTEX andPAH analysis.Sample [email protected] msubmitted for PHCBTEX and PAHanalysis.

SAND GRAVEL FILL - Cobbles, brown, damp.- Appears like backfill.

End of Borehole at 1.5 m.

DST CONSULTING ENGINEERS INC.

ELEV

SUBSURFACE PROFILE

Bentonite & Riser

REMARKS

SURFACE

% LEL

mDPTH

CVCConc.

PPM

1

2

3

4

5

6

7

8

mTyp

e

Wel

lIn

stal

latio

nD

etai

ls

CLIENT: Public Works and Government Services Canada

No.

SAMPLES

80604020

800

PROJECT: Supplemental Phase II ESA

REF. No.: OE-WG-017795

98

97

96

95

94

93

92

91

90

89

3

L O G O F BOREHOLE CS

LOCATION: Mount Agassiz, Manitoba

CHVC *

MATERIAL DESCRIPTION

SY

MB

L

Val

ue

SPT

N-

METHOD: Hand Auger

DIAMETER: 8 cm ID

600

DATE: 14 June 2014

400200

Split SpoonAuger Sample

Sand Pack & Screen

PPM

* - Combustible Headspace Vapour ConcentrationND - Not Detectable

GA

ST

EC

BH

OE

-WG

-017

795.

GP

J D

ST

_MIN

.GD

T 1

9/8

/14

UTM: Zone 14U 5623531 N, 452432 E

SURFACE ELEVATION: Approximately 98 metres

Page 132: SPECIFICATION Building Demolition and Remediation of

20

30

30

25

35

30

35

30

150 mm Aboveground casingconcrete in place.

-Bentonite seal.

GroundwaterElevation = 98.27 mon June 18/14.Duplicate MW14-1@ 1.8-2.4 msubmitted for PHC,BTEX, PH andgrain size analysis.

Duplicate MW14-6@ 2.4-3.0 msubmitted for PHC,BTEX, PH andgrain size analysis.

-Sandpack.

-51 mm PVCscreen slot.

- Slough.

SAND & GRAVEL, FILL.

FINE SAND SILTY CLAY - Some gravel, brown.

- Moist, soft, brown.

- Trace gravel, hard moist, grey.

End of Borehole at 5.4 m.

DST CONSULTING ENGINEERS INC.

ELEV

SUBSURFACE PROFILE

Bentonite & Riser

REMARKS

SURFACE

% LEL

mDPTH

CVCConc.

PPM

1

2

3

4

5

6

7

8

mTyp

e

SURFACE ELEVATION: 100.19 metres

Wel

lIn

stal

latio

nD

etai

ls

CLIENT: Public Works and Government Services Canada

No.

SAMPLES

80604020

800

PROJECT: Supplemental Phase II ESA

REF. No.: OE-WG-017795

100

99

98

97

96

95

94

93

92

4

L O G O F BOREHOLE MW14-1

LOCATION: Mount Agassiz, Manitoba

CHVC *

MATERIAL DESCRIPTION

SY

MB

L

Val

ue

SPT

N-

METHOD: Hollow Stem Auger/Split Spoon Auger

DIAMETER: 20 cm ID

600

DATE: 5 March 2013

400200

Split SpoonAuger Sample

Sand Pack & Screen

PPM

* - Combustible Headspace Vapour ConcentrationND - Not Detectable

GA

ST

EC

BH

OE

-WG

-017

795.

GP

J D

ST

_MIN

.GD

T 1

9/8

/14

UTM: Zone 14U 5623525 N, 452448 E

Page 133: SPECIFICATION Building Demolition and Remediation of

ND

ND

5

ND

ND

150 mm Aboveground casingconcrete in place.-Bentonite seal.

-Sandpack.-51 mm PVCscreen slot.

GroundwaterElevation = 98.91 mon June 18/14.Duplicate MW14-2@ 1.2-1.8 msubmitted for PHCand BTEX analysis.

Duplicate MW14-2@ 1.8-2.4 msubmitted for PHCand BTEX analysis.

GRAVEL & GRAVEL - FILL - Brown, frozen.

SANDY SILT - Trace gravel.

SILTY SAND & GRAVEL - Trace gravel, wet, grey.

SILTY SAND - Trace gravel, wet, grey.

End of Borehole at 3.04 m.

DST CONSULTING ENGINEERS INC.

ELEV

SUBSURFACE PROFILE

Bentonite & Riser

REMARKS

SURFACE

% LEL

mDPTH

CVCConc.

PPM

1

2

3

4

5

6

7

8

mTyp

e

SURFACE ELEVATION: 100.42 metres

Wel

lIn

stal

latio

nD

etai

ls

CLIENT: Public Works and Government Services Canada

No.

SAMPLES

80604020

800

PROJECT: Supplemental Phase II ESA

REF. No.: OE-WG-017795

100

99

98

97

96

95

94

93

92

5

L O G O F BOREHOLE MW14-2

LOCATION: Mount Agassiz, Manitoba

CHVC *

MATERIAL DESCRIPTION

SY

MB

L

Val

ue

SPT

N-

METHOD: Hollow Stem Auger/Split Spoon Auger

DIAMETER: 20 cm ID

600

DATE: 7 March 2014

400200

Split SpoonAuger Sample

Sand Pack & Screen

PPM

* - Combustible Headspace Vapour ConcentrationND - Not Detectable

GA

ST

EC

BH

OE

-WG

-017

795.

GP

J D

ST

_MIN

.GD

T 1

9/8

/14

UTM: Zone 14U 5623505 N, 452419 E

Page 134: SPECIFICATION Building Demolition and Remediation of

Supplemental Phase II ESA

Former Agassiz Ski Lodge

Riding Mountain National Park, Manitoba

DST File No. OE-WG-017795

Appendix B

Laboratory Certificates of Analysis

Page 135: SPECIFICATION Building Demolition and Remediation of

Your Project #: OE-WG-017795 Your C.O.C. #: na

Attention: François PughDST Consulting Engineers IncSudbury - Standing Offer1351-E Kelly Lake RdUnit 4Sudbury, ONP3E 5P5

Report Date: 2014/04/11Report #: R2993653

Version: 4R

CERTIFICATE OF ANALYSIS – REVISED REPORT

MAXXAM JOB #: B438649Received: 2014/03/11, 10:30

Sample Matrix: Soil# Samples Received: 7

Date Date MethodAnalyses Quantity Extracted Analyzed Laboratory Method ReferencePetroleum Hydro. CCME F1 & BTEX in Soil 7 2014/03/12 2014/03/17 CAM SOP-00315 CCME CWS Petroleum Hydrocarbons F2-F4 in Soil 7 2014/03/15 2014/03/17 CAM SOP-00316 CCME CWS F4G (CCME Hydrocarbons Gravimetric) 1 2014/03/18 2014/03/18 CAM SOP-00316 CCME CWS Moisture 7 N/A 2014/03/13 CAM SOP-00445 R . C a r t e r , 1 9 9 3 PAH Compounds in Soil by GC/MS (SIM) 2 2014/03/13 2014/03/14 CAM SOP - 00318 EPA 8270 pH CaCl2 EXTRACT 1 2014/03/21 2014/03/21 CAM SOP-00413 SM 4500H+ B pH CaCl2 EXTRACT 1 2014/03/27 2014/03/27 CAM SOP-00413 SM 4500H+ B Sieve, 75um 2 N/A 2014/03/25 CAM SOP-00467 M.R Carter SSMA

* RPDs calculated using raw data. The rounding of final results may result in the apparent difference.

Encryption Key

Please direct all questions regarding this Certificate of Analysis to your Project Manager.

Andrew Turner, Project ManagerEmail: [email protected]# (800) 268-7396 Ext:233

====================================================================Maxxam has procedures in place to guard against improper use of the electronic signature and have the required "signatories", as per section5.10.2 of ISO/IEC 17025:2005(E), signing the reports. For Service Group specific validation please refer to the Validation Signature Page.

Total cover pages: 1

Maxxam Analytics International Corporation o/a Maxxam Analytics Mississauga Env: 6740 Campobello Road L5N 2L8 Telephone(905) 817-5700 FAX(905) 817-5777

Page 1 of 11

Page 136: SPECIFICATION Building Demolition and Remediation of

DST Consulting Engineers IncMaxxam Job #: B438649 Client Project #: OE-WG-017795Report Date: 2014/04/11

Sampler Initials: GF

CCME PETROLEUM HYDROCARBONS (SOIL)

Maxxam ID V D 9 8 1 7 V D 9 8 1 8 V D 9 8 1 9Sampling Date 2014/03/05 2014/03/05 2014/03/07

11:30 11:30COC Number na na na U n i t s Criteria [email protected] QC Batch [email protected] QC Batch [email protected] RDL QC Batch

Inorganics

Moisture % - 21 3539600 22 3539468 18 1.0 3539600

BTEX & F1 Hydrocarbons

Benzene ug/g 0.5 <0.005 3542548 <0.005 3542548 <0.005 0.005 3542548

Toluene ug/g 0.8 <0.02 3542548 <0.02 3542548 <0.02 0.02 3542548

Ethylbenzene ug/g 1.2 <0.01 3542548 <0.01 3542548 <0.01 0.01 3542548

o-Xylene ug/g - <0.02 3542548 <0.02 3542548 <0.02 0.02 3542548

p+m-Xylene ug/g - <0.04 3542548 <0.04 3542548 <0.04 0.04 3542548

Total Xylenes ug/g - <0.04 3542548 <0.04 3542548 <0.04 0.04 3542548

F1 (C6-C10) ug/g - <10 3542548 <10 3542548 <10 10 3542548

F1 (C6-C10) - BTEX ug/g - <10 3542548 <10 3542548 <10 10 3542548

F2-F4 Hydrocarbons

F2 (C10-C16 Hydrocarbons) ug/g - <10 3542114 <10 3542114 <10 10 3542114

F3 (C16-C34 Hydrocarbons) ug/g - <50 3542114 <50 3542114 <50 50 3542114

F4 (C34-C50 Hydrocarbons) ug/g - <50 3542114 <50 3542114 <50 50 3542114

Reached Baseline at C50 ug/g - Yes 3542114 Yes 3542114 Yes 3542114

Surrogate Recovery (%)

1,4-Difluorobenzene % - 101 3542548 101 3542548 96 3542548

4-Bromofluorobenzene % - 101 3542548 101 3542548 103 3542548

D10-Ethylbenzene % - 98 3542548 108 3542548 100 3542548

D4-1,2-Dichloroethane % - 99 3542548 99 3542548 95 3542548

o-Terphenyl % - 92 3542114 93 3542114 94 3542114

RDL = Reportable Detection LimitQC Batch = Quality Control BatchCriteria: Soils - CCME Residential/Parkland Guidelines Metal Scan

Canadian Council of Ministers of the Environment, "Canadian Soil Quality Guidelines for the Protection of Environmental and Human Health, 1999.

Added Uranium as per summary table Update 7.0 September 2007

Page 2 of 11

Page 137: SPECIFICATION Building Demolition and Remediation of

DST Consulting Engineers IncMaxxam Job #: B438649 Client Project #: OE-WG-017795Report Date: 2014/04/11

Sampler Initials: GF

CCME PETROLEUM HYDROCARBONS (SOIL)

Maxxam ID V D 9 8 2 0 V D 9 8 2 7 V D 9 8 2 9 V D 9 8 3 0Sampling Date 2014/03/07 2014/03/05 2014/03/05 2014/03/07COC Number na na na na U n i t s Criteria [email protected] [email protected] WS 1 WS 2 RDL QC Batch

Inorganics

Moisture % - 21 21 11 12 1.0 3539468

BTEX & F1 Hydrocarbons

Benzene ug/g 0.5 <0.005 <0.005 <0.005 <0.005 0.005 3542548

Toluene ug/g 0.8 <0.02 <0.02 <0.02 <0.02 0.02 3542548

Ethylbenzene ug/g 1.2 <0.01 <0.01 <0.01 <0.01 0.01 3542548

o-Xylene ug/g - <0.02 <0.02 <0.02 <0.02 0.02 3542548

p+m-Xylene ug/g - <0.04 <0.04 <0.04 <0.04 0.04 3542548

Total Xylenes ug/g - <0.04 <0.04 <0.04 <0.04 0.04 3542548

F1 (C6-C10) ug/g - <10 <10 <10 <10 10 3542548

F1 (C6-C10) - BTEX ug/g - <10 <10 <10 <10 10 3542548

F2-F4 Hydrocarbons

F2 (C10-C16 Hydrocarbons) ug/g - <10 <10 <10 <10 10 3542114

F3 (C16-C34 Hydrocarbons) ug/g - <50 <50 110 <50 50 3542114

F4 (C34-C50 Hydrocarbons) ug/g - <50 <50 360 <50 50 3542114

Reached Baseline at C50 ug/g - Yes Yes No Yes 3542114

Surrogate Recovery (%)

1,4-Difluorobenzene % - 102 101 101 102 3542548

4-Bromofluorobenzene % - 101 101 104 102 3542548

D10-Ethylbenzene % - 98 95 101 98 3542548

D4-1,2-Dichloroethane % - 98 100 100 99 3542548

o-Terphenyl % - 96 97 94 95 3542114

RDL = Reportable Detection LimitQC Batch = Quality Control BatchCriteria: Soils - CCME Residential/Parkland Guidelines Metal Scan

Canadian Council of Ministers of the Environment, "Canadian Soil Quality Guidelines for the Protection of Environmental and HumanHealth, 1999.

Added Uranium as per summary table Update 7.0 September 2007

Page 3 of 11

Page 138: SPECIFICATION Building Demolition and Remediation of

DST Consulting Engineers IncMaxxam Job #: B438649 Client Project #: OE-WG-017795Report Date: 2014/04/11

Sampler Initials: GF

RESULTS OF ANALYSES OF SOIL

Maxxam ID V D 9 8 1 7 V D 9 8 1 8Sampling Date 2014/03/05 2014/03/05

11:30 11:30COC Number na na U n i t s [email protected] QC Batch [email protected] QC Batch

Inorganics

Available (CaCl2) pH pH 7.73 3553742 7.50 3548018

Miscellaneous Parameters

Grain Size % COARSE 3550852 COARSE 3550852

Sieve - #200 (<0.075mm) % 47 3550852 44 3550852

Sieve - #200 (>0.075mm) % 53 3550852 56 3550852

QC Batch = Quality Control Batch

Page 4 of 11

Page 139: SPECIFICATION Building Demolition and Remediation of

DST Consulting Engineers IncMaxxam Job #: B438649 Client Project #: OE-WG-017795Report Date: 2014/04/11

Sampler Initials: GF

SEMI-VOLATILE ORGANICS BY GC-MS (SOIL)

Maxxam ID V D 9 8 1 7 V D 9 8 1 9Sampling Date 2014/03/05 2014/03/07

11:30COC Number na na U n i t s Criteria [email protected] [email protected] RDL QC Batch

Polyaromatic Hydrocarbons

Acenaphthene ug/g 0 <0.0050 <0.0050 0.0050 3540067

Acenaphthylene ug/g 0 <0.0050 <0.0050 0.0050 3540067

Anthracene ug/g 2.5 <0.0050 <0.0050 0.0050 3540067

Benzo(a)anthracene ug/g 1 <0.0050 <0.0050 0.0050 3540067

Benzo(a)pyrene ug/g 20 <0.0050 <0.0050 0.0050 3540067

Benzo(b/j)fluoranthene ug/g 1 <0.0050 <0.0050 0.0050 3540067

Benzo(g,h,i)perylene ug/g - <0.0050 <0.0050 0.0050 3540067

Benzo(k)fluoranthene ug/g 1 <0.0050 <0.0050 0.0050 3540067

Chrysene ug/g - <0.0050 <0.0050 0.0050 3540067

Dibenz(a,h)anthracene ug/g 1 <0.0050 <0.0050 0.0050 3540067

Fluoranthene ug/g 50 <0.0050 <0.0050 0.0050 3540067

Fluorene ug/g - <0.0050 <0.0050 0.0050 3540067

Indeno(1,2,3-cd)pyrene ug/g 1 <0.0050 <0.0050 0.0050 3540067

1-Methylnaphthalene ug/g - <0.0050 <0.0050 0.0050 3540067

2-Methylnaphthalene ug/g - <0.0050 <0.0050 0.0050 3540067

Naphthalene ug/g 0.013 <0.0050 <0.0050 0.0050 3540067

Phenanthrene ug/g 0.046 <0.0050 <0.0050 0.0050 3540067

Pyrene ug/g 10 <0.0050 <0.0050 0.0050 3540067

Surrogate Recovery (%)

D10-Anthracene % - 94 96 3540067

D14-Terphenyl (FS) % - 84 88 3540067

D8-Acenaphthylene % - 95 98 3540067

RDL = Reportable Detection LimitQC Batch = Quality Control BatchCriteria: Soils - CCME Residential/Parkland Guidelines Metal Scan

Canadian Council of Ministers of the Environment, "Canadian Soil Quality Guidelines for the Protection ofEnvironmental and Human Health, 1999.

Added Uranium as per summary table Update 7.0 September 2007

Page 5 of 11

Page 140: SPECIFICATION Building Demolition and Remediation of

DST Consulting Engineers IncMaxxam Job #: B438649 Client Project #: OE-WG-017795Report Date: 2014/04/11

Sampler Initials: GF

PETROLEUM HYDROCARBONS (CCME)

Maxxam ID V D 9 8 2 9Sampling Date 2014/03/05COC Number na U n i t s WS 1 RDL QC Batch

F2-F4 Hydrocarbons

F4G-sg (Grav. Heavy Hydrocarbons) ug/g 1400 200 3543813

RDL = Reportable Detection LimitQC Batch = Quality Control Batch

Page 6 of 11

Page 141: SPECIFICATION Building Demolition and Remediation of

DST Consulting Engineers IncMaxxam Job #: B438649 Client Project #: OE-WG-017795Report Date: 2014/04/11

Sampler Initials: GF

GENERAL COMMENTS

Revised Report (2014/03/19): Requested regulatory criteria have been included on this report.

Revised Report (2014/04/11): Results have been split onto separate reports as per client request.

Results relate only to the items tested.

Page 7 of 11

Page 142: SPECIFICATION Building Demolition and Remediation of

DST Consulting Engineers IncAttention: François Pugh Client Project #: OE-WG-017795P.O. #: Site Location:

Quality Assurance ReportMaxxam Job Number: MB438649

QA/QC DateBatch AnalyzedNum Init QC Type Parameter yyyy/mm/dd Value Recovery Units QC Limits

3539600 SDE RPD Moisture 2014/03/13 0 % 203540067 DTI Matrix Spike D10-Anthracene 2014/03/14 91 % 50 - 130

D14-Terphenyl (FS) 2014/03/14 83 % 50 - 130D8-Acenaphthylene 2014/03/14 93 % 50 - 130Acenaphthene 2014/03/14 95 % 50 - 130Acenaphthylene 2014/03/14 110 % 50 - 130Anthracene 2014/03/14 93 % 50 - 130Benzo(a)anthracene 2014/03/14 99 % 50 - 130Benzo(a)pyrene 2014/03/14 95 % 50 - 130Benzo(b/j)fluoranthene 2014/03/14 103 % 50 - 130Benzo(g,h,i)perylene 2014/03/14 79 % 50 - 130Benzo(k)fluoranthene 2014/03/14 104 % 50 - 130Chrysene 2014/03/14 102 % 50 - 130Dibenz(a,h)anthracene 2014/03/14 83 % 50 - 130Fluoranthene 2014/03/14 98 % 50 - 130Fluorene 2014/03/14 104 % 50 - 130Indeno(1,2,3-cd)pyrene 2014/03/14 80 % 50 - 1301-Methylnaphthalene 2014/03/14 89 % 50 - 1302-Methylnaphthalene 2014/03/14 90 % 50 - 130Naphthalene 2014/03/14 83 % 50 - 130Phenanthrene 2014/03/14 96 % 50 - 130Pyrene 2014/03/14 97 % 50 - 130

Spiked Blank D10-Anthracene 2014/03/14 83 % 50 - 130D14-Terphenyl (FS) 2014/03/14 77 % 50 - 130D8-Acenaphthylene 2014/03/14 85 % 50 - 130Acenaphthene 2014/03/14 97 % 50 - 130Acenaphthylene 2014/03/14 103 % 50 - 130Anthracene 2014/03/14 88 % 50 - 130Benzo(a)anthracene 2014/03/14 95 % 50 - 130Benzo(a)pyrene 2014/03/14 95 % 50 - 130Benzo(b/j)fluoranthene 2014/03/14 105 % 50 - 130Benzo(g,h,i)perylene 2014/03/14 83 % 50 - 130Benzo(k)fluoranthene 2014/03/14 108 % 50 - 130Chrysene 2014/03/14 100 % 50 - 130Dibenz(a,h)anthracene 2014/03/14 84 % 50 - 130Fluoranthene 2014/03/14 93 % 50 - 130Fluorene 2014/03/14 102 % 50 - 130Indeno(1,2,3-cd)pyrene 2014/03/14 83 % 50 - 1301-Methylnaphthalene 2014/03/14 88 % 50 - 1302-Methylnaphthalene 2014/03/14 88 % 50 - 130Naphthalene 2014/03/14 83 % 50 - 130Phenanthrene 2014/03/14 92 % 50 - 130Pyrene 2014/03/14 92 % 50 - 130

Method Blank D10-Anthracene 2014/03/14 89 % 50 - 130D14-Terphenyl (FS) 2014/03/14 81 % 50 - 130D8-Acenaphthylene 2014/03/14 89 % 50 - 130Acenaphthene 2014/03/14 <0.0050 ug/gAcenaphthylene 2014/03/14 <0.0050 ug/gAnthracene 2014/03/14 <0.0050 ug/gBenzo(a)anthracene 2014/03/14 <0.0050 ug/gBenzo(a)pyrene 2014/03/14 <0.0050 ug/gBenzo(b/j)fluoranthene 2014/03/14 <0.0050 ug/gBenzo(g,h,i)perylene 2014/03/14 <0.0050 ug/gBenzo(k)fluoranthene 2014/03/14 <0.0050 ug/gChrysene 2014/03/14 <0.0050 ug/g

Maxxam Analytics International Corporation o/a Maxxam Analytics Mississauga Env: 6740 Campobello Road L5N 2L8 Telephone(905) 817-5700 FAX(905) 817-5777

Page 8 of 11

Page 143: SPECIFICATION Building Demolition and Remediation of

DST Consulting Engineers IncAttention: François Pugh Client Project #: OE-WG-017795P.O. #: Site Location:

Quality Assurance Report (Continued)Maxxam Job Number: MB438649

QA/QC DateBatch AnalyzedNum Init QC Type Parameter yyyy/mm/dd Value Recovery Units QC Limits

3540067 DTI Method Blank Dibenz(a,h)anthracene 2014/03/14 <0.0050 ug/gFluoranthene 2014/03/14 <0.0050 ug/gFluorene 2014/03/14 <0.0050 ug/gIndeno(1,2,3-cd)pyrene 2014/03/14 <0.0050 ug/g1-Methylnaphthalene 2014/03/14 <0.0050 ug/g2-Methylnaphthalene 2014/03/14 <0.0050 ug/gNaphthalene 2014/03/14 <0.0050 ug/gPhenanthrene 2014/03/14 <0.0050 ug/gPyrene 2014/03/14 <0.0050 ug/g

RPD Acenaphthene 2014/03/14 NC % 40Acenaphthylene 2014/03/14 NC % 40Anthracene 2014/03/14 NC % 40Benzo(a)anthracene 2014/03/14 NC % 40Benzo(a)pyrene 2014/03/14 NC % 40Benzo(b/j)fluoranthene 2014/03/14 NC % 40Benzo(g,h,i)perylene 2014/03/14 NC % 40Benzo(k)fluoranthene 2014/03/14 NC % 40Chrysene 2014/03/14 NC % 40Dibenz(a,h)anthracene 2014/03/14 NC % 40Fluoranthene 2014/03/14 NC % 40Fluorene 2014/03/14 NC % 40Indeno(1,2,3-cd)pyrene 2014/03/14 NC % 401-Methylnaphthalene 2014/03/14 NC % 402-Methylnaphthalene 2014/03/14 NC % 40Naphthalene 2014/03/14 NC % 40Phenanthrene 2014/03/14 NC % 40Pyrene 2014/03/14 NC % 40

3542114 BLZ Matrix Spike[VD9825-01] o-Terphenyl 2014/03/17 92 % 50 - 130

F2 (C10-C16 Hydrocarbons) 2014/03/17 99 % 50 - 130F3 (C16-C34 Hydrocarbons) 2014/03/17 101 % 50 - 130F4 (C34-C50 Hydrocarbons) 2014/03/17 86 % 50 - 130

Spiked Blank o-Terphenyl 2014/03/17 93 % 50 - 130F2 (C10-C16 Hydrocarbons) 2014/03/17 97 % 80 - 120F3 (C16-C34 Hydrocarbons) 2014/03/17 101 % 80 - 120F4 (C34-C50 Hydrocarbons) 2014/03/17 86 % 80 - 120

Method Blank o-Terphenyl 2014/03/17 92 % 50 - 130F2 (C10-C16 Hydrocarbons) 2014/03/17 <10 ug/gF3 (C16-C34 Hydrocarbons) 2014/03/17 <50 ug/gF4 (C34-C50 Hydrocarbons) 2014/03/17 <50 ug/g

3542548 LRA Matrix Spike[VD9817-02] 1,4-Difluorobenzene 2014/03/17 102 % 60 - 140

4-Bromofluorobenzene 2014/03/17 105 % 60 - 140D10-Ethylbenzene 2014/03/17 88 % 60 - 140D4-1,2-Dichloroethane 2014/03/17 99 % 60 - 140Benzene 2014/03/17 79 % 60 - 140Toluene 2014/03/17 78 % 60 - 140Ethylbenzene 2014/03/17 82 % 60 - 140o-Xylene 2014/03/17 83 % 60 - 140p+m-Xylene 2014/03/17 82 % 60 - 140F1 (C6-C10) 2014/03/17 86 % 60 - 140

Spiked Blank 1,4-Difluorobenzene 2014/03/17 101 % 60 - 1404-Bromofluorobenzene 2014/03/17 106 % 60 - 140D10-Ethylbenzene 2014/03/17 95 % 60 - 140D4-1,2-Dichloroethane 2014/03/17 95 % 60 - 140

Maxxam Analytics International Corporation o/a Maxxam Analytics Mississauga Env: 6740 Campobello Road L5N 2L8 Telephone(905) 817-5700 FAX(905) 817-5777

Page 9 of 11

Page 144: SPECIFICATION Building Demolition and Remediation of

DST Consulting Engineers IncAttention: François Pugh Client Project #: OE-WG-017795P.O. #: Site Location:

Quality Assurance Report (Continued)Maxxam Job Number: MB438649

QA/QC DateBatch AnalyzedNum Init QC Type Parameter yyyy/mm/dd Value Recovery Units QC Limits

3542548 LRA Spiked Blank Benzene 2014/03/17 90 % 60 - 140Toluene 2014/03/17 89 % 60 - 140Ethylbenzene 2014/03/17 94 % 60 - 140o-Xylene 2014/03/17 95 % 60 - 140p+m-Xylene 2014/03/17 94 % 60 - 140F1 (C6-C10) 2014/03/17 110 % 80 - 120

Method Blank 1,4-Difluorobenzene 2014/03/17 97 % 60 - 1404-Bromofluorobenzene 2014/03/17 103 % 60 - 140D10-Ethylbenzene 2014/03/17 97 % 60 - 140D4-1,2-Dichloroethane 2014/03/17 95 % 60 - 140Benzene 2014/03/17 <0.005 ug/gToluene 2014/03/17 <0.02 ug/gEthylbenzene 2014/03/17 <0.01 ug/go-Xylene 2014/03/17 <0.02 ug/gp+m-Xylene 2014/03/17 <0.04 ug/gTotal Xylenes 2014/03/17 <0.04 ug/gF1 (C6-C10) 2014/03/17 <10 ug/gF1 (C6-C10) - BTEX 2014/03/17 <10 ug/g

RPD [ V D 9 8 1 7 - 0 2 ] Benzene 2014/03/17 NC % 50Toluene 2014/03/17 NC % 50Ethylbenzene 2014/03/17 NC % 50o-Xylene 2014/03/17 NC % 50p+m-Xylene 2014/03/17 NC % 50Total Xylenes 2014/03/17 NC % 50F1 (C6-C10) 2014/03/17 NC % 50F1 (C6-C10) - BTEX 2014/03/17 NC % 50

3543813 RUS Matrix Spike[VD9829-01] F4G-sg (Grav. Heavy Hydrocarbons) 2014/03/18 99 % 65 - 135Spiked Blank F4G-sg (Grav. Heavy Hydrocarbons) 2014/03/18 102 % 65 - 135Method Blank F4G-sg (Grav. Heavy Hydrocarbons) 2014/03/18 <100 ug/gRPD [ V D 9 8 2 9 - 0 1 ] F4G-sg (Grav. Heavy Hydrocarbons) 2014/03/18 13.3 % 50

3550852 BOP QC Standard Sieve - #200 (<0.075mm) 2014/03/25 89 % 86 - 91Sieve - #200 (>0.075mm) 2014/03/25 11 % 9 - 14

RPD Sieve - #200 (<0.075mm) 2014/03/25 0.02 % 20Sieve - #200 (>0.075mm) 2014/03/25 0.1 % 20

Duplicate: Paired analysis of a separate portion of the same sample. Used to evaluate the variance in the measurement.Matrix Spike: A sample to which a known amount of the analyte of interest has been added. Used to evaluate sample matrix interference.QC Standard: A sample of known concentration prepared by an external agency under stringent conditions. Used as an independent check of methodaccuracy.Spiked Blank: A blank matrix sample to which a known amount of the analyte, usually from a second source, has been added. Used to evaluate methodaccuracy.Method Blank: A blank matrix containing all reagents used in the analytical procedure. Used to identify laboratory contamination.Surrogate: A pure or isotopically labeled compound whose behavior mirrors the analytes of interest. Used to evaluate extraction efficiency.NC (RPD): The RPD was not calculated. The level of analyte detected in the parent sample and its duplicate was not sufficiently significant to permit areliable calculation.

Maxxam Analytics International Corporation o/a Maxxam Analytics Mississauga Env: 6740 Campobello Road L5N 2L8 Telephone(905) 817-5700 FAX(905) 817-5777

Page 10 of 11

Page 145: SPECIFICATION Building Demolition and Remediation of

Validation Signature Page

Maxxam Job #: B438649

The analytical data and all QC contained in this report were reviewed and validated by the following individual(s).

Cristina Carriere, Scientific Services

Medhat Riskallah, Manager, Hydrocarbon Department

====================================================================Maxxam has procedures in place to guard against improper use of the electronic signature and have the required "signatories", as per section 5.10.2 ofISO/IEC 17025:2005(E), signing the reports. For Service Group specific validation please refer to the Validation Signature Page.

Page 11 of 11

Page 146: SPECIFICATION Building Demolition and Remediation of

MAXXAM JOB #: B4A9993Received: 2014/06/24, 15:15

CERTIFICATE OF ANALYSIS – REVISED REPORT

Your Project #: OE-WG-017995 Riding MountainYour C.O.C. #: 47320605, 473206-05-01

Report Date: 2014/07/28Report #:   R3103868

Version: 2R

Attention:Geoffrey Lake

DST Consulting Engineers IncSudbury - Standing Offer885 Regent StreetSuite 3-1BSudbury, ONP3E 5M4

Sample Matrix: Soil# Samples Received: 5

ReferenceLaboratory MethodDateAnalyzed

DateExtractedQuantityAnalyses

EPA 8270 mCAM SOP-003012014/06/30N/A4Methylnaphthalene Sum

CCME PHC-CWS mCAM SOP-003152014/06/302014/06/275Petroleum Hydro. CCME F1 & BTEX in Soil

CCME CWSCAM SOP-003162014/06/302014/06/284Petroleum Hydrocarbons F2-F4 in Soil

R.Carter,1993CAM SOP-004452014/06/27N/A4Moisture

R.Carter,1993CAM SOP-004452014/06/30N/A1Moisture

EPA 8270 mCAM SOP - 003182014/06/282014/06/284PAH Compounds in Soil by GC/MS (SIM)

Sample Matrix: Water# Samples Received: 8

ReferenceLaboratory MethodDateAnalyzed

DateExtractedQuantityAnalyses

CCME PHC-CWS mCAM SOP-003152014/07/02N/A8Petroleum Hydro. CCME F1 & BTEX in Water

CCME PHC-CWS mCAM SOP-003162014/07/032014/07/025Petroleum Hydrocarbons F2-F4 in Water

EPA 8270 mCAM SOP-003182014/07/012014/06/305PAH Compounds in Water by GC/MS (SIM)

Maxxam Analytics has performed all analytical testing herein in accordance with ISO 17025 and the Protocol for Analytical Methods Used in theAssessment of Properties under Part XV.1 of the Environmental Protection Act. All methodologies comply with this document and are validated for use inthe laboratory. The methods and techniques employed in this analysis conform to the performance criteria (detection limits, accuracy and precision) asoutlined in the Protocol for Analytical Methods Used in the Assessment of Properties under Part XV.1 of the Environmental Protection Act. Reportingresults to two significant figures at the RDL is to permit statistical evaluation and is not intended to be an indication of analytical precision.

The CWS PHC methods employed by Maxxam conform to all prescribed elements of the reference method and performance based elements have beenvalidated. All modifications have been validated and proven equivalent following the 'Alberta Environment Draft Addenda to the CWS-PHC, Appendix 6,Validation of Alternate Methods'. Documentation is available upon request. Maxxam has made the following improvements to the CWS-PHC referencebenchmark method: (i) Headspace for F1; and, (ii) Mechanical extraction for F2-F4. Note: F4G cannot be added to the C6 to C50 hydrocarbons. Theextraction date for samples field preserved with methanol for F1 and Volatile Organic Compounds is considered to be the date sampled.

Maxxam Analytics is accredited for all specific parameters as required by Ontario Regulation 153/04. Maxxam Analytics is limited in liability to the actualcost of analysis unless otherwise agreed in writing. There is no other warranty expressed or implied. Samples will be retained at Maxxam Analytics for threeweeks from receipt of data or as per contract.

Remarks:

Page 1 of 26

Maxxam Analytics International Corporation o/a Maxxam Analytics 6740 Campobello Road, Mississauga, Ontario, L5N 2L8 Tel: (905) 817-5700 Toll-Free: 800-563-6266 Fax: (905) 817-5777 www.maxxam.ca

Page 147: SPECIFICATION Building Demolition and Remediation of

MAXXAM JOB #: B4A9993Received: 2014/06/24, 15:15

CERTIFICATE OF ANALYSIS – REVISED REPORT

Your Project #: OE-WG-017995 Riding MountainYour C.O.C. #: 47320605, 473206-05-01

Report Date: 2014/07/28Report #:   R3103868

Version: 2R

Attention:Geoffrey Lake

DST Consulting Engineers IncSudbury - Standing Offer885 Regent StreetSuite 3-1BSudbury, ONP3E 5M4

Encryption Key

Please direct all questions regarding this Certificate of Analysis to your Project Manager.Andrew Turner, Project ManagerEmail: [email protected]# (800)268-7396 Ext:233==================================================================== Maxxam has procedures in place to guard against improper use of the electronic signature and have the required "signatories", as per section 5.10.2 of ISO/IEC 17025:2005(E), signing the reports.  For Service Group specific validation please refer to the Validation Signature Page. 

Total Cover Pages : 2Page 2 of 26

Maxxam Analytics International Corporation o/a Maxxam Analytics 6740 Campobello Road, Mississauga, Ontario, L5N 2L8 Tel: (905) 817-5700 Toll-Free: 800-563-6266 Fax: (905) 817-5777 www.maxxam.ca

Page 148: SPECIFICATION Building Demolition and Remediation of

Maxxam Job #: B4A9993Report Date: 2014/07/28

DST Consulting Engineers IncClient Project #: OE-WG-017995 Riding Mountain

CCME PETROLEUM HYDROCARBONS (SOIL)

Lab-Dup = Laboratory Initiated Duplicate

QC Batch = Quality Control Batch

RDL = Reportable Detection Limit

365887794938588%o-Terphenyl

36588037677767676%D4-1,2-Dichloroethane

3658803136103109111110%D10-Ethylbenzene

3658803108109108109109%4-Bromofluorobenzene

36588038889898989%1,4-Difluorobenzene

Surrogate Recovery (%)

3658877YesYesYesYesug/gReached Baseline at C50

365887750<50<50<50<50ug/gF4 (C34-C50 Hydrocarbons)

365887750170<50<50<50ug/gF3 (C16-C34 Hydrocarbons)

36588771011011<10<10ug/gF2 (C10-C16 Hydrocarbons)

F2-F4 Hydrocarbons

365880310<10<10<10<10<10ug/gF1 (C6-C10) - BTEX

365880310<10<10<10<10<10ug/gF1 (C6-C10)

36588030.04<0.04<0.04<0.04<0.04<0.04ug/gTotal Xylenes

36588030.04<0.04<0.04<0.04<0.04<0.04ug/gp+m-Xylene

36588030.02<0.02<0.02<0.02<0.02<0.02ug/go-Xylene

36588030.01<0.01<0.01<0.01<0.01<0.01ug/gEthylbenzene

36588030.02<0.02<0.02<0.02<0.02<0.02ug/gToluene

36588030.005<0.005<0.005<0.005<0.005<0.005ug/gBenzene

BTEX & F1 Hydrocarbons

36577461.018172018%Moisture

Inorganics

QC BatchRDLBH14-3 @ 0.25-0.75

mBH14-3 @ 0-0.25

mCS-04

CS-03Lab-Dup

CS-03Units

473206-05-01473206-05-01473206-05-01473206-05-01473206-05-01COC Number

2014/06/182014/06/182014/06/182014/06/182014/06/18Sampling Date

WL3646WL3645WL3644WL3643WL3643Maxxam ID

Page 3 of 26

Maxxam Analytics International Corporation o/a Maxxam Analytics 6740 Campobello Road, Mississauga, Ontario, L5N 2L8 Tel: (905) 817-5700 Toll-Free: 800-563-6266 Fax: (905) 817-5777 www.maxxam.ca

Page 149: SPECIFICATION Building Demolition and Remediation of

Maxxam Job #: B4A9993Report Date: 2014/07/28

DST Consulting Engineers IncClient Project #: OE-WG-017995 Riding Mountain

CCME PETROLEUM HYDROCARBONS (SOIL)

QC Batch = Quality Control Batch

RDL = Reportable Detection Limit

365880376%D4-1,2-Dichloroethane

3658803108%D10-Ethylbenzene

3658803108%4-Bromofluorobenzene

365880389%1,4-Difluorobenzene

Surrogate Recovery (%)

365880310<10ug/gF1 (C6-C10) - BTEX

365880310<10ug/gF1 (C6-C10)

36588030.04<0.04ug/gTotal Xylenes

36588030.04<0.04ug/gp+m-Xylene

36588030.02<0.02ug/go-Xylene

36588030.01<0.01ug/gEthylbenzene

36588030.02<0.02ug/gToluene

36588030.005<0.005ug/gBenzene

BTEX & F1 Hydrocarbons

QC BatchRDLCS-104Units

473206-05-01COC Number

2014/06/18Sampling Date

WL3649Maxxam ID

Page 4 of 26

Maxxam Analytics International Corporation o/a Maxxam Analytics 6740 Campobello Road, Mississauga, Ontario, L5N 2L8 Tel: (905) 817-5700 Toll-Free: 800-563-6266 Fax: (905) 817-5777 www.maxxam.ca

Page 150: SPECIFICATION Building Demolition and Remediation of

Maxxam Job #: B4A9993Report Date: 2014/07/28

DST Consulting Engineers IncClient Project #: OE-WG-017995 Riding Mountain

CCME PETROLEUM HYDROCARBONS (WATER)

Lab-Dup = Laboratory Initiated Duplicate

QC Batch = Quality Control Batch

RDL = Reportable Detection Limit

366134895959589%o-Terphenyl

3659880939492939393%D4-1,2-Dichloroethane

3659880991019710110099%D10-Ethylbenzene

3659880103104102103103103%4-Bromofluorobenzene

3659880102103101103103100%1,4-Difluorobenzene

Surrogate Recovery (%)

3661348YesYesYesYesug/LReached Baseline at C50

3661348200<200<200<200<200ug/LF4 (C34-C50 Hydrocarbons)

3661348200<200<200<200<200ug/LF3 (C16-C34 Hydrocarbons)

3661348100<100<100<100<100ug/LF2 (C10-C16 Hydrocarbons)

F2-F4 Hydrocarbons

365988025<25<25<25<25<25<25ug/LF1 (C6-C10) - BTEX

365988025<25<25<25<25<25<25ug/LF1 (C6-C10)

36598800.40<0.40<0.40<0.40<0.40<0.40<0.40ug/LTotal Xylenes

36598800.40<0.40<0.40<0.40<0.40<0.40<0.40ug/Lp+m-Xylene

36598800.20<0.20<0.20<0.20<0.20<0.20<0.20ug/Lo-Xylene

36598800.20<0.20<0.20<0.20<0.20<0.20<0.20ug/LEthylbenzene

36598800.20<0.20<0.20<0.20<0.20<0.20<0.20ug/LToluene

36598800.20<0.20<0.20<0.20<0.20<0.20<0.20ug/LBenzene

BTEX & F1 Hydrocarbons

QC BatchRDLMW104MW06MW04MW14-1MW14-2Lab-Dup

MW14-2Units

473206-05-01473206-05-01473206-05-01473206-05-01473206-05-01473206-05-01COC Number

2014/06/182014/06/182014/06/182014/06/182014/06/182014/06/18Sampling Date

WL3641WL3640WL3639WL3638WL3637WL3637Maxxam ID

Page 5 of 26

Maxxam Analytics International Corporation o/a Maxxam Analytics 6740 Campobello Road, Mississauga, Ontario, L5N 2L8 Tel: (905) 817-5700 Toll-Free: 800-563-6266 Fax: (905) 817-5777 www.maxxam.ca

Page 151: SPECIFICATION Building Demolition and Remediation of

Maxxam Job #: B4A9993Report Date: 2014/07/28

DST Consulting Engineers IncClient Project #: OE-WG-017995 Riding Mountain

CCME PETROLEUM HYDROCARBONS (WATER)

QC Batch = Quality Control Batch

RDL = Reportable Detection Limit

366134899%o-Terphenyl

3659880939392%D4-1,2-Dichloroethane

3659880989897%D10-Ethylbenzene

3659880104103103%4-Bromofluorobenzene

3659880103103102%1,4-Difluorobenzene

Surrogate Recovery (%)

3661348Yesug/LReached Baseline at C50

3661348200<200ug/LF4 (C34-C50 Hydrocarbons)

3661348200<200ug/LF3 (C16-C34 Hydrocarbons)

3661348100110ug/LF2 (C10-C16 Hydrocarbons)

F2-F4 Hydrocarbons

365988025<25<25<25ug/LF1 (C6-C10) - BTEX

365988025<25<25<25ug/LF1 (C6-C10)

36598800.40<0.40<0.40<0.40ug/LTotal Xylenes

36598800.40<0.40<0.40<0.40ug/Lp+m-Xylene

36598800.20<0.20<0.20<0.20ug/Lo-Xylene

36598800.20<0.20<0.20<0.20ug/LEthylbenzene

36598800.20<0.20<0.20<0.20ug/LToluene

36598800.20<0.20<0.20<0.20ug/LBenzene

BTEX & F1 Hydrocarbons

QC BatchRDLFIELD BLANK-2FIELD BLANK-1D-1Units

473206-05-01473206-05-01473206-05-01COC Number

2014/06/182014/06/182014/06/18Sampling Date

WL3648WL3647WL3642Maxxam ID

Page 6 of 26

Maxxam Analytics International Corporation o/a Maxxam Analytics 6740 Campobello Road, Mississauga, Ontario, L5N 2L8 Tel: (905) 817-5700 Toll-Free: 800-563-6266 Fax: (905) 817-5777 www.maxxam.ca

Page 152: SPECIFICATION Building Demolition and Remediation of

Maxxam Job #: B4A9993Report Date: 2014/07/28

DST Consulting Engineers IncClient Project #: OE-WG-017995 Riding Mountain

O.REG 153 PAHS (SOIL)

QC Batch = Quality Control Batch

RDL = Reportable Detection Limit

3658846117989898%D8-Acenaphthylene

365884693939393%D14-Terphenyl (FS)

365884692908990%D10-Anthracene

Surrogate Recovery (%)

36588460.00500.0310.0620.0160.0091ug/gPyrene

36588460.00500.0230.050<0.00500.0075ug/gPhenanthrene

36588460.0050<0.0050<0.0050<0.0050<0.0050ug/gNaphthalene

36588460.0050<0.0050<0.0050<0.0050<0.0050ug/g2-Methylnaphthalene

36588460.0050<0.0050<0.0050<0.0050<0.0050ug/g1-Methylnaphthalene

36588460.00500.00990.021<0.0050<0.0050ug/gIndeno(1,2,3-cd)pyrene

36588460.0050<0.0050<0.0050<0.0050<0.0050ug/gFluorene

36588460.00500.0400.083<0.00500.011ug/gFluoranthene

36588460.0050<0.00500.0053<0.0050<0.0050ug/gDibenz(a,h)anthracene

36588460.00500.0180.035<0.00500.0059ug/gChrysene

36588460.00500.00930.018<0.0050<0.0050ug/gBenzo(k)fluoranthene

36588460.00500.00990.020<0.0050<0.0050ug/gBenzo(g,h,i)perylene

36588460.00500.0240.052<0.00500.0070ug/gBenzo(b/j)fluoranthene

36588460.00500.0160.035<0.0050<0.0050ug/gBenzo(a)pyrene

36588460.00500.0190.039<0.0050<0.0050ug/gBenzo(a)anthracene

36588460.00500.00710.016<0.0050<0.0050ug/gAnthracene

36588460.0050<0.0050<0.0050<0.0050<0.0050ug/gAcenaphthylene

36588460.0050<0.0050<0.0050<0.0050<0.0050ug/gAcenaphthene

Polyaromatic Hydrocarbons

36557290.0071<0.0071<0.0071<0.0071<0.0071ug/gMethylnaphthalene, 2-(1-)

Calculated Parameters

QC BatchRDLBH14-3 @ 0.25-0.75

mBH14-3 @ 0-0.25

mCS-04CS-03Units

473206-05-01473206-05-01473206-05-01473206-05-01COC Number

2014/06/182014/06/182014/06/182014/06/18Sampling Date

WL3646WL3645WL3644WL3643Maxxam ID

Page 7 of 26

Maxxam Analytics International Corporation o/a Maxxam Analytics 6740 Campobello Road, Mississauga, Ontario, L5N 2L8 Tel: (905) 817-5700 Toll-Free: 800-563-6266 Fax: (905) 817-5777 www.maxxam.ca

Page 153: SPECIFICATION Building Demolition and Remediation of

Maxxam Job #: B4A9993Report Date: 2014/07/28

DST Consulting Engineers IncClient Project #: OE-WG-017995 Riding Mountain

RESULTS OF ANALYSES OF SOIL

QC Batch = Quality Control Batch

RDL = Reportable Detection Limit

36601121.020%Moisture

Inorganics

QC BatchRDLCS-104Units

473206-05-01COC Number

2014/06/18Sampling Date

WL3649Maxxam ID

Page 8 of 26

Maxxam Analytics International Corporation o/a Maxxam Analytics 6740 Campobello Road, Mississauga, Ontario, L5N 2L8 Tel: (905) 817-5700 Toll-Free: 800-563-6266 Fax: (905) 817-5777 www.maxxam.ca

Page 154: SPECIFICATION Building Demolition and Remediation of

Maxxam Job #: B4A9993Report Date: 2014/07/28

DST Consulting Engineers IncClient Project #: OE-WG-017995 Riding Mountain

SEMI-VOLATILE ORGANICS BY GC-MS (WATER)

(2) Surrogate recovery may have been impacted by the amount of sediment that was present in sample.

(1) Detection Limit was raised due to matrix interferences.

Lab-Dup = Laboratory Initiated Duplicate

QC Batch = Quality Control Batch

RDL = Reportable Detection Limit

3660337749270829351%D8-Acenaphthylene

3660337    33 (2)1036874101    19 (2)%D14-Terphenyl (FS)

36603376899748593    37 (2)%D10-Anthracene

Surrogate Recovery (%)

36603370.0100.130.010<0.010<0.010<0.010<0.0100.075ug/LPyrene

36603370.0100.190.010<0.010<0.010<0.010<0.0100.066ug/LPhenanthrene

36603370.0100.0560.010<0.010<0.010<0.010<0.0100.056ug/LNaphthalene

36603370.0100.0590.010<0.010<0.010<0.010<0.0100.050ug/L2-Methylnaphthalene

36603370.0100.0450.010<0.010<0.010<0.010<0.0100.022ug/L1-Methylnaphthalene

36603370.0100.0300.010<0.010<0.010<0.010<0.0100.025ug/LIndeno(1,2,3-cd)pyrene

36603370.050    <0.050 (1)0.010<0.010<0.010<0.010<0.0100.15ug/LFluorene

36603370.0100.160.010<0.010<0.010<0.010<0.0100.085ug/LFluoranthene

36603370.010<0.0100.010<0.010<0.010<0.010<0.010<0.010ug/LDibenz(a,h)anthracene

36603370.0100.0450.010<0.010<0.010<0.010<0.0100.031ug/LChrysene

36603370.0100.0270.010<0.010<0.010<0.010<0.0100.018ug/LBenzo(k)fluoranthene

36603370.0100.0280.010<0.010<0.010<0.010<0.0100.029ug/LBenzo(g,h,i)perylene

36603370.0100.0540.010<0.010<0.010<0.010<0.0100.046ug/LBenzo(b/j)fluoranthene

36603370.0100.0430.010<0.010<0.010<0.010<0.0100.037ug/LBenzo(a)pyrene

36603370.0100.0490.010<0.010<0.010<0.010<0.0100.041ug/LBenzo(a)anthracene

36603370.0100.0480.010<0.010<0.010<0.010<0.0100.018ug/LAnthracene

36603370.010<0.0100.010<0.010<0.010<0.010<0.010<0.010ug/LAcenaphthylene

36603370.0100.0330.010<0.010<0.010<0.010<0.0100.13ug/LAcenaphthene

Polyaromatic Hydrocarbons

QC BatchRDLD-1RDLMW06MW04

Lab-DupMW04MW14-1MW14-2Units

473206-05-01473206-05-01473206-05-01473206-05-01473206-05-01473206-05-01COC Number

2014/06/182014/06/182014/06/182014/06/182014/06/182014/06/18Sampling Date

WL3642WL3640WL3639WL3639WL3638WL3637Maxxam ID

Page 9 of 26

Maxxam Analytics International Corporation o/a Maxxam Analytics 6740 Campobello Road, Mississauga, Ontario, L5N 2L8 Tel: (905) 817-5700 Toll-Free: 800-563-6266 Fax: (905) 817-5777 www.maxxam.ca

Page 155: SPECIFICATION Building Demolition and Remediation of

Maxxam Job #: B4A9993Report Date: 2014/07/28

DST Consulting Engineers IncClient Project #: OE-WG-017995 Riding Mountain

TEST SUMMARY

AnalystDate AnalyzedExtractedBatchInstrumentationTest Description

Maxxam ID: WL3637 Collected: 2014/06/18Sample ID: MW14-2

Matrix: WaterShipped:

Received: 2014/06/24

Simon Xi2014/07/02N/A3659880HSGC/MSFDPetroleum Hydro. CCME F1 & BTEX in Water

Zhiyue (Frank) Zhu2014/07/032014/07/023661348GC/FIDPetroleum Hydrocarbons F2-F4 in Water

Darryl Tiller2014/07/012014/06/303660337GC/MSPAH Compounds in Water by GC/MS (SIM)

AnalystDate AnalyzedExtractedBatchInstrumentationTest Description

Maxxam ID: WL3637 Dup Collected: 2014/06/18Sample ID: MW14-2

Matrix: WaterShipped:

Received: 2014/06/24

Simon Xi2014/07/02N/A3659880HSGC/MSFDPetroleum Hydro. CCME F1 & BTEX in Water

AnalystDate AnalyzedExtractedBatchInstrumentationTest Description

Maxxam ID: WL3638 Collected: 2014/06/18Sample ID: MW14-1

Matrix: WaterShipped:

Received: 2014/06/24

Simon Xi2014/07/02N/A3659880HSGC/MSFDPetroleum Hydro. CCME F1 & BTEX in Water

Zhiyue (Frank) Zhu2014/07/032014/07/023661348GC/FIDPetroleum Hydrocarbons F2-F4 in Water

Darryl Tiller2014/07/012014/06/303660337GC/MSPAH Compounds in Water by GC/MS (SIM)

AnalystDate AnalyzedExtractedBatchInstrumentationTest Description

Maxxam ID: WL3639 Collected: 2014/06/18Sample ID: MW04

Matrix: WaterShipped:

Received: 2014/06/24

Simon Xi2014/07/02N/A3659880HSGC/MSFDPetroleum Hydro. CCME F1 & BTEX in Water

Zhiyue (Frank) Zhu2014/07/032014/07/023661348GC/FIDPetroleum Hydrocarbons F2-F4 in Water

Darryl Tiller2014/07/012014/06/303660337GC/MSPAH Compounds in Water by GC/MS (SIM)

AnalystDate AnalyzedExtractedBatchInstrumentationTest Description

Maxxam ID: WL3639 Dup Collected: 2014/06/18Sample ID: MW04

Matrix: WaterShipped:

Received: 2014/06/24

Darryl Tiller2014/07/012014/06/303660337GC/MSPAH Compounds in Water by GC/MS (SIM)

AnalystDate AnalyzedExtractedBatchInstrumentationTest Description

Maxxam ID: WL3640 Collected: 2014/06/18Sample ID: MW06

Matrix: WaterShipped:

Received: 2014/06/24

Simon Xi2014/07/02N/A3659880HSGC/MSFDPetroleum Hydro. CCME F1 & BTEX in Water

Zhiyue (Frank) Zhu2014/07/032014/07/023661348GC/FIDPetroleum Hydrocarbons F2-F4 in Water

Darryl Tiller2014/07/012014/06/303660337GC/MSPAH Compounds in Water by GC/MS (SIM)

Page 10 of 26

Maxxam Analytics International Corporation o/a Maxxam Analytics 6740 Campobello Road, Mississauga, Ontario, L5N 2L8 Tel: (905) 817-5700 Toll-Free: 800-563-6266 Fax: (905) 817-5777 www.maxxam.ca

Page 156: SPECIFICATION Building Demolition and Remediation of

Maxxam Job #: B4A9993Report Date: 2014/07/28

DST Consulting Engineers IncClient Project #: OE-WG-017995 Riding Mountain

TEST SUMMARY

AnalystDate AnalyzedExtractedBatchInstrumentationTest Description

Maxxam ID: WL3641 Collected: 2014/06/18Sample ID: MW104

Matrix: WaterShipped:

Received: 2014/06/24

Simon Xi2014/07/02N/A3659880HSGC/MSFDPetroleum Hydro. CCME F1 & BTEX in Water

AnalystDate AnalyzedExtractedBatchInstrumentationTest Description

Maxxam ID: WL3642 Collected: 2014/06/18Sample ID: D-1

Matrix: WaterShipped:

Received: 2014/06/24

Simon Xi2014/07/02N/A3659880HSGC/MSFDPetroleum Hydro. CCME F1 & BTEX in Water

Zhiyue (Frank) Zhu2014/07/032014/07/023661348GC/FIDPetroleum Hydrocarbons F2-F4 in Water

Darryl Tiller2014/07/012014/06/303660337GC/MSPAH Compounds in Water by GC/MS (SIM)

AnalystDate AnalyzedExtractedBatchInstrumentationTest Description

Maxxam ID: WL3643 Collected: 2014/06/18Sample ID: CS-03

Matrix: SoilShipped:

Received: 2014/06/24

Automated Statchk2014/06/30N/A3655729CALCMethylnaphthalene Sum

Lincoln Ramdahin2014/06/302014/06/273658803HSGC/MSFDPetroleum Hydro. CCME F1 & BTEX in Soil

Dorina Popa2014/06/302014/06/283658877GC/FIDPetroleum Hydrocarbons F2-F4 in Soil

Chun Yan2014/06/27N/A3657746BALMoisture

Lingyun Feng2014/06/282014/06/283658846GC/MSPAH Compounds in Soil by GC/MS (SIM)

AnalystDate AnalyzedExtractedBatchInstrumentationTest Description

Maxxam ID: WL3643 Dup Collected: 2014/06/18Sample ID: CS-03

Matrix: SoilShipped:

Received: 2014/06/24

Lincoln Ramdahin2014/06/302014/06/273658803HSGC/MSFDPetroleum Hydro. CCME F1 & BTEX in Soil

AnalystDate AnalyzedExtractedBatchInstrumentationTest Description

Maxxam ID: WL3644 Collected: 2014/06/18Sample ID: CS-04

Matrix: SoilShipped:

Received: 2014/06/24

Automated Statchk2014/06/30N/A3655729CALCMethylnaphthalene Sum

Lincoln Ramdahin2014/06/302014/06/273658803HSGC/MSFDPetroleum Hydro. CCME F1 & BTEX in Soil

Dorina Popa2014/06/302014/06/283658877GC/FIDPetroleum Hydrocarbons F2-F4 in Soil

Chun Yan2014/06/27N/A3657746BALMoisture

Lingyun Feng2014/06/282014/06/283658846GC/MSPAH Compounds in Soil by GC/MS (SIM)

AnalystDate AnalyzedExtractedBatchInstrumentationTest Description

Maxxam ID: WL3645 Collected: 2014/06/18Sample ID: BH14-3 @ 0-0.25 m

Matrix: SoilShipped:

Received: 2014/06/24

Automated Statchk2014/06/30N/A3655729CALCMethylnaphthalene Sum

Lincoln Ramdahin2014/06/302014/06/273658803HSGC/MSFDPetroleum Hydro. CCME F1 & BTEX in Soil

Page 11 of 26

Maxxam Analytics International Corporation o/a Maxxam Analytics 6740 Campobello Road, Mississauga, Ontario, L5N 2L8 Tel: (905) 817-5700 Toll-Free: 800-563-6266 Fax: (905) 817-5777 www.maxxam.ca

Page 157: SPECIFICATION Building Demolition and Remediation of

Maxxam Job #: B4A9993Report Date: 2014/07/28

DST Consulting Engineers IncClient Project #: OE-WG-017995 Riding Mountain

TEST SUMMARY

AnalystDate AnalyzedExtractedBatchInstrumentationTest Description

Maxxam ID: WL3645 Collected: 2014/06/18Sample ID: BH14-3 @ 0-0.25 m

Matrix: SoilShipped:

Received: 2014/06/24

Dorina Popa2014/06/302014/06/283658877GC/FIDPetroleum Hydrocarbons F2-F4 in Soil

Chun Yan2014/06/27N/A3657746BALMoisture

Lingyun Feng2014/06/282014/06/283658846GC/MSPAH Compounds in Soil by GC/MS (SIM)

AnalystDate AnalyzedExtractedBatchInstrumentationTest Description

Maxxam ID: WL3646 Collected: 2014/06/18Sample ID: BH14-3 @ 0.25-0.75 m

Matrix: SoilShipped:

Received: 2014/06/24

Automated Statchk2014/06/30N/A3655729CALCMethylnaphthalene Sum

Lincoln Ramdahin2014/06/302014/06/273658803HSGC/MSFDPetroleum Hydro. CCME F1 & BTEX in Soil

Dorina Popa2014/06/302014/06/283658877GC/FIDPetroleum Hydrocarbons F2-F4 in Soil

Chun Yan2014/06/27N/A3657746BALMoisture

Lingyun Feng2014/06/282014/06/283658846GC/MSPAH Compounds in Soil by GC/MS (SIM)

AnalystDate AnalyzedExtractedBatchInstrumentationTest Description

Maxxam ID: WL3647 Collected: 2014/06/18Sample ID: FIELD BLANK-1

Matrix: WaterShipped:

Received: 2014/06/24

Simon Xi2014/07/02N/A3659880HSGC/MSFDPetroleum Hydro. CCME F1 & BTEX in Water

AnalystDate AnalyzedExtractedBatchInstrumentationTest Description

Maxxam ID: WL3648 Collected: 2014/06/18Sample ID: FIELD BLANK-2

Matrix: WaterShipped:

Received: 2014/06/24

Simon Xi2014/07/02N/A3659880HSGC/MSFDPetroleum Hydro. CCME F1 & BTEX in Water

AnalystDate AnalyzedExtractedBatchInstrumentationTest Description

Maxxam ID: WL3649 Collected: 2014/06/18Sample ID: CS-104

Matrix: SoilShipped:

Received: 2014/06/24

Lincoln Ramdahin2014/06/302014/06/273658803HSGC/MSFDPetroleum Hydro. CCME F1 & BTEX in Soil

Min Yang2014/06/30N/A3660112BALMoisture

Page 12 of 26

Maxxam Analytics International Corporation o/a Maxxam Analytics 6740 Campobello Road, Mississauga, Ontario, L5N 2L8 Tel: (905) 817-5700 Toll-Free: 800-563-6266 Fax: (905) 817-5777 www.maxxam.ca

Page 158: SPECIFICATION Building Demolition and Remediation of

Maxxam Job #: B4A9993Report Date: 2014/07/28

DST Consulting Engineers IncClient Project #: OE-WG-017995 Riding Mountain

GENERAL COMMENTS

Sample  WL3645-01 : Revised Report (2014/07/28): Client sample ID changed as per client request.

Sample  WL3646-01 : Revised Report (2014/07/28): Client sample ID changed as per client request.

Results relate only to the items tested.

Page 13 of 26

Maxxam Analytics International Corporation o/a Maxxam Analytics 6740 Campobello Road, Mississauga, Ontario, L5N 2L8 Tel: (905) 817-5700 Toll-Free: 800-563-6266 Fax: (905) 817-5777 www.maxxam.ca

Page 159: SPECIFICATION Building Demolition and Remediation of

DST Consulting Engineers IncClient Project #: OE-WG-017995 Riding MountainMaxxam Job #: B4A9993

Report Date: 2014/07/28QUALITY ASSURANCE REPORT

QC LimitsValue (%)UnitsValueQC Limits% RecoveryQC Limits% RecoveryDateParameterQC Batch

RPDMethod BlankSpiked BlankMatrix Spike

%8960 - 1408860 - 140882014/06/301,4-Difluorobenzene3658803

%10860 - 14011360 - 1401132014/06/304-Bromofluorobenzene3658803

%9660 - 1409260 - 1401072014/06/30D10-Ethylbenzene3658803

%7760 - 1407660 - 140762014/06/30D4-1,2-Dichloroethane3658803

%8950 - 1308950 - 130892014/06/28D10-Anthracene3658846

%9350 - 1309450 - 130942014/06/28D14-Terphenyl (FS)3658846

%9550 - 1309550 - 130972014/06/28D8-Acenaphthylene3658846

%8950 - 1309850 - 130902014/06/30o-Terphenyl3658877

%9970 - 1309870 - 130992014/07/021,4-Difluorobenzene3659880

%10470 - 13010370 - 1301032014/07/024-Bromofluorobenzene3659880

%9170 - 1309570 - 1301052014/07/02D10-Ethylbenzene3659880

%9870 - 1309870 - 130922014/07/02D4-1,2-Dichloroethane3659880

%10050 - 1309450 - 130892014/07/01D10-Anthracene3660337

%10350 - 13010150 - 130982014/07/01D14-Terphenyl (FS)3660337

%9450 - 1309050 - 130862014/07/01D8-Acenaphthylene3660337

%9260 - 1309560 - 130962014/07/03o-Terphenyl3661348

50NCug/g<0.00560 - 1408260 - 140852014/06/30Benzene3658803

50NCug/g<0.0160 - 14011060 - 1401142014/06/30Ethylbenzene3658803

50NCug/g<102014/06/30F1 (C6-C10) - BTEX3658803

50NCug/g<1080 - 1208460 - 140842014/06/30F1 (C6-C10)3658803

50NCug/g<0.0260 - 14010760 - 1401112014/06/30o-Xylene3658803

50NCug/g<0.0460 - 1409460 - 140982014/06/30p+m-Xylene3658803

50NCug/g<0.0260 - 1409660 - 1401002014/06/30Toluene3658803

50NCug/g<0.042014/06/30Total Xylenes3658803

ug/g<0.005050 - 1308850 - 1301002014/06/281-Methylnaphthalene3658846

ug/g<0.005050 - 13010750 - 130NC2014/06/282-Methylnaphthalene3658846

ug/g<0.005050 - 1309350 - 130892014/06/28Acenaphthene3658846

ug/g<0.005050 - 13010150 - 1301062014/06/28Acenaphthylene3658846

ug/g<0.005050 - 1309250 - 130852014/06/28Anthracene3658846

ug/g<0.005050 - 1309250 - 130922014/06/28Benzo(a)anthracene3658846

ug/g<0.005050 - 1309250 - 130872014/06/28Benzo(a)pyrene3658846

ug/g<0.005050 - 13010150 - 130962014/06/28Benzo(b/j)fluoranthene3658846

Page 14 of 26

Maxxam Analytics International Corporation o/a Maxxam Analytics 6740 Campobello Road, Mississauga, Ontario, L5N 2L8 Tel: (905) 817-5700 Toll-Free: 800-563-6266 Fax: (905) 817-5777 www.maxxam.ca

Page 160: SPECIFICATION Building Demolition and Remediation of

DST Consulting Engineers IncClient Project #: OE-WG-017995 Riding MountainMaxxam Job #: B4A9993

Report Date: 2014/07/28QUALITY ASSURANCE REPORT(CONT'D)

QC LimitsValue (%)UnitsValueQC Limits% RecoveryQC Limits% RecoveryDateParameterQC Batch

RPDMethod BlankSpiked BlankMatrix Spike

ug/g<0.005050 - 1308550 - 130832014/06/28Benzo(g,h,i)perylene3658846

ug/g<0.005050 - 13010550 - 130992014/06/28Benzo(k)fluoranthene3658846

ug/g<0.005050 - 1309450 - 130912014/06/28Chrysene3658846

ug/g<0.005050 - 1308550 - 130862014/06/28Dibenz(a,h)anthracene3658846

ug/g<0.005050 - 1309550 - 130932014/06/28Fluoranthene3658846

ug/g<0.005050 - 13010350 - 1301002014/06/28Fluorene3658846

ug/g<0.005050 - 1308450 - 130822014/06/28Indeno(1,2,3-cd)pyrene3658846

ug/g<0.005050 - 1308950 - 130NC2014/06/28Naphthalene3658846

ug/g<0.005050 - 1308950 - 130902014/06/28Phenanthrene3658846

ug/g<0.005050 - 1309650 - 130942014/06/28Pyrene3658846

ug/g<1080 - 12011150 - 1301012014/06/30F2 (C10-C16 Hydrocarbons)3658877

ug/g<5080 - 12010850 - 130992014/06/30F3 (C16-C34 Hydrocarbons)3658877

ug/g<5080 - 12010450 - 130962014/06/30F4 (C34-C50 Hydrocarbons)3658877

30NCug/L<0.2070 - 1309670 - 1301082014/07/02Benzene3659880

30NCug/L<0.2070 - 13010370 - 1301232014/07/02Ethylbenzene3659880

30NCug/L<252014/07/02F1 (C6-C10) - BTEX3659880

30NCug/L<2570 - 1309370 - 130832014/07/02F1 (C6-C10)3659880

30NCug/L<0.2070 - 13010070 - 1301152014/07/02o-Xylene3659880

30NCug/L<0.4070 - 1309370 - 1301122014/07/02p+m-Xylene3659880

30NCug/L<0.2070 - 1309470 - 1301082014/07/02Toluene3659880

30NCug/L<0.402014/07/02Total Xylenes3659880

30NCug/L<0.01050 - 1308750 - 130782014/07/011-Methylnaphthalene3660337

30NCug/L<0.01050 - 1308650 - 130772014/07/012-Methylnaphthalene3660337

30NCug/L<0.01050 - 1309350 - 130822014/07/01Acenaphthene3660337

30NCug/L<0.01050 - 1309250 - 130822014/07/01Acenaphthylene3660337

30NCug/L<0.01050 - 1309550 - 130882014/07/01Anthracene3660337

30NCug/L<0.01050 - 1309550 - 130952014/07/01Benzo(a)anthracene3660337

30NCug/L<0.01050 - 1309450 - 130922014/07/01Benzo(a)pyrene3660337

30NCug/L<0.01050 - 1309350 - 130912014/07/01Benzo(b/j)fluoranthene3660337

30NCug/L<0.01050 - 1309350 - 130922014/07/01Benzo(g,h,i)perylene3660337

30NCug/L<0.01050 - 1309450 - 130912014/07/01Benzo(k)fluoranthene3660337

30NCug/L<0.01050 - 1309450 - 130942014/07/01Chrysene3660337

Page 15 of 26

Maxxam Analytics International Corporation o/a Maxxam Analytics 6740 Campobello Road, Mississauga, Ontario, L5N 2L8 Tel: (905) 817-5700 Toll-Free: 800-563-6266 Fax: (905) 817-5777 www.maxxam.ca

Page 161: SPECIFICATION Building Demolition and Remediation of

DST Consulting Engineers IncClient Project #: OE-WG-017995 Riding MountainMaxxam Job #: B4A9993

Report Date: 2014/07/28QUALITY ASSURANCE REPORT(CONT'D)

QC LimitsValue (%)UnitsValueQC Limits% RecoveryQC Limits% RecoveryDateParameterQC Batch

RPDMethod BlankSpiked BlankMatrix Spike

30NCug/L<0.01050 - 1308450 - 130872014/07/01Dibenz(a,h)anthracene3660337

30NCug/L<0.01050 - 1309950 - 130982014/07/01Fluoranthene3660337

30NCug/L<0.01050 - 1309350 - 130852014/07/01Fluorene3660337

30NCug/L<0.01050 - 1309550 - 130922014/07/01Indeno(1,2,3-cd)pyrene3660337

30NCug/L<0.01050 - 1308750 - 130772014/07/01Naphthalene3660337

30NCug/L<0.01050 - 1309150 - 130882014/07/01Phenanthrene3660337

30NCug/L<0.01050 - 1309850 - 130952014/07/01Pyrene3660337

ug/L<10060 - 1309750 - 130982014/07/03F2 (C10-C16 Hydrocarbons)3661348

ug/L<20060 - 13010350 - 1301042014/07/03F3 (C16-C34 Hydrocarbons)3661348

ug/L<20060 - 13010250 - 1301042014/07/03F4 (C34-C50 Hydrocarbons)3661348

NC (Duplicate RPD): The duplicate RPD was not calculated. The concentration in the sample and/or duplicate was too low to permit a reliable RPD calculation (one or both samples < 5x RDL).

NC (Matrix Spike): The recovery in the matrix spike was not calculated. The relative difference between the concentration in the parent sample and the spiked amount was too small to permit a reliablerecovery calculation (matrix spike concentration was less than 2x that of the native sample concentration).

Surrogate:  A pure or isotopically labeled compound whose behavior mirrors the analytes of interest. Used to evaluate extraction efficiency.

Method Blank:  A blank matrix containing all reagents used in the analytical procedure. Used to identify laboratory contamination.

Spiked Blank: A blank matrix sample to which a known amount of the analyte, usually from a second source, has been added. Used to evaluate method accuracy.

Matrix Spike:  A sample to which a known amount of the analyte of interest has been added. Used to evaluate sample matrix interference.

Duplicate:  Paired analysis of a separate portion of the same sample. Used to evaluate the variance in the measurement.

Page 16 of 26

Maxxam Analytics International Corporation o/a Maxxam Analytics 6740 Campobello Road, Mississauga, Ontario, L5N 2L8 Tel: (905) 817-5700 Toll-Free: 800-563-6266 Fax: (905) 817-5777 www.maxxam.ca

Page 162: SPECIFICATION Building Demolition and Remediation of

Maxxam Job #: B4A9993Report Date: 2014/07/28

DST Consulting Engineers IncClient Project #: OE-WG-017995 Riding Mountain

VALIDATION SIGNATURE PAGE

The analytical data and all QC contained in this report were reviewed and validated by the following individual(s).

Cristina Carriere, Scientific Services

Suzana Popovic, Supervisor, Hydrocarbons

Maxxam has procedures in place to guard against improper use of the electronic signature and have the required "signatories", as per section 5.10.2 of ISO/IEC17025:2005(E), signing the reports.  For Service Group specific validation please refer to the Validation Signature Page.

Page 17 of 26

Maxxam Analytics International Corporation o/a Maxxam Analytics 6740 Campobello Road, Mississauga, Ontario, L5N 2L8 Tel: (905) 817-5700 Toll-Free: 800-563-6266 Fax: (905) 817-5777 www.maxxam.ca

Page 163: SPECIFICATION Building Demolition and Remediation of

Maxxam Job #: B4A9993Report Date: 2014/07/28Maxxam Sample: WL3637

Petroleum Hydrocarbons F2-F4 in Water Chromatogram

DST Consulting Engineers IncClient Project #: OE-WG-017995 Riding MountainClient ID: MW14-2

Note: This information is provided for reference purposes only. Should detailed chemist interpretation

or fingerprinting be required, please contact the laboratory.

Page 18 of 26

Page 164: SPECIFICATION Building Demolition and Remediation of

Maxxam Job #: B4A9993Report Date: 2014/07/28Maxxam Sample: WL3638

Petroleum Hydrocarbons F2-F4 in Water Chromatogram

DST Consulting Engineers IncClient Project #: OE-WG-017995 Riding MountainClient ID: MW14-1

Note: This information is provided for reference purposes only. Should detailed chemist interpretation

or fingerprinting be required, please contact the laboratory.

Page 19 of 26

Page 165: SPECIFICATION Building Demolition and Remediation of

Maxxam Job #: B4A9993Report Date: 2014/07/28Maxxam Sample: WL3639

Petroleum Hydrocarbons F2-F4 in Water Chromatogram

DST Consulting Engineers IncClient Project #: OE-WG-017995 Riding MountainClient ID: MW04

Note: This information is provided for reference purposes only. Should detailed chemist interpretation

or fingerprinting be required, please contact the laboratory.

Page 20 of 26

Page 166: SPECIFICATION Building Demolition and Remediation of

Maxxam Job #: B4A9993Report Date: 2014/07/28Maxxam Sample: WL3640

Petroleum Hydrocarbons F2-F4 in Water Chromatogram

DST Consulting Engineers IncClient Project #: OE-WG-017995 Riding MountainClient ID: MW06

Note: This information is provided for reference purposes only. Should detailed chemist interpretation

or fingerprinting be required, please contact the laboratory.

Page 21 of 26

Page 167: SPECIFICATION Building Demolition and Remediation of

Maxxam Job #: B4A9993Report Date: 2014/07/28Maxxam Sample: WL3642

Petroleum Hydrocarbons F2-F4 in Water Chromatogram

DST Consulting Engineers IncClient Project #: OE-WG-017995 Riding MountainClient ID: D-1

Note: This information is provided for reference purposes only. Should detailed chemist interpretation

or fingerprinting be required, please contact the laboratory.

Page 22 of 26

Page 168: SPECIFICATION Building Demolition and Remediation of

Maxxam Job #: B4A9993Report Date: 2014/07/28Maxxam Sample: WL3643

Petroleum Hydrocarbons F2-F4 in Soil Chromatogram

DST Consulting Engineers IncClient Project #: OE-WG-017995 Riding MountainClient ID: CS-03

Note: This information is provided for reference purposes only. Should detailed chemist interpretation

or fingerprinting be required, please contact the laboratory.

Page 23 of 26

Page 169: SPECIFICATION Building Demolition and Remediation of

Maxxam Job #: B4A9993Report Date: 2014/07/28Maxxam Sample: WL3644

Petroleum Hydrocarbons F2-F4 in Soil Chromatogram

DST Consulting Engineers IncClient Project #: OE-WG-017995 Riding MountainClient ID: CS-04

Note: This information is provided for reference purposes only. Should detailed chemist interpretation

or fingerprinting be required, please contact the laboratory.

Page 24 of 26

Page 170: SPECIFICATION Building Demolition and Remediation of

Maxxam Job #: B4A9993Report Date: 2014/07/28Maxxam Sample: WL3645

Petroleum Hydrocarbons F2-F4 in Soil Chromatogram

DST Consulting Engineers IncClient Project #: OE-WG-017995 Riding MountainClient ID: BH14-3 @ 0-0.25 m

Note: This information is provided for reference purposes only. Should detailed chemist interpretation

or fingerprinting be required, please contact the laboratory.

Page 25 of 26

Page 171: SPECIFICATION Building Demolition and Remediation of

Maxxam Job #: B4A9993Report Date: 2014/07/28Maxxam Sample: WL3646

Petroleum Hydrocarbons F2-F4 in Soil Chromatogram

DST Consulting Engineers IncClient Project #: OE-WG-017995 Riding MountainClient ID: BH14-3 @ 0.25-0.75 m

Note: This information is provided for reference purposes only. Should detailed chemist interpretation

or fingerprinting be required, please contact the laboratory.

Page 26 of 26

Page 172: SPECIFICATION Building Demolition and Remediation of

Supplemental Phase II ESA

Former Agassiz Ski Lodge

Riding Mountain National Park, Manitoba

DST File No. OE-WG-017795

Appendix C

NCSCS Classification

Page 173: SPECIFICATION Building Demolition and Remediation of

CCME National Classification System for Contaminated Sites (2008, 2010 v 1.2)

Pre-Screening Checklist

Response

(yes / no)

1. No

2. No

3. No

4. No

5. No

6. No

7. No

Question Comment

Are Radioactive material, Bacterial contamination or

Biological hazards likely to be present at the site?

If yes, do not proceed through the NCSCS. Contact

applicable regulatory agency immediately.

Are there no contamination exceedances (known or

suspected)?

Determination of exceedances may be based on: 1)

CCME environmental quality guidelines; 2) equivalent

provincial guidelines/standards if no CCME guideline

exists for a specific chemical in a relevant medium; or

3) toxicity benchmarks derived from the literature for

chemicals not covered by CCME or provincial

guidelines/standards.

If yes (i.e., there are no exceedances), do not proceed

through the NCSCS.

Are there indicators of significant adverse effects in

the exposure zone (i.e., the zone in which receptors

may come into contact with contaminants)? Some

examples are as follows:

-Hydrocarbon sheen or NAPL in the exposure zone

-Severely stressed biota or devoid of biota;

-Presence of material at ground surface or sediment

with suspected high concentration of contaminants

such as ore tailings, sandblasting grit, slag, and coal

tar.

If yes, automatically rate the site as Class 1, a priority

for remediation or risk management, regardless of the

total score obtained should one be calculated (e.g., for

comparison with other Class 1 sites).

Do measured concentrations of volatiles or unexploded

ordnances represent an explosion hazard?

If yes, automatically rate the site as Class 1, a priority

for remediation or risk management, and do not

continue until the safety risks have been addressed.

Consult your jurisdiction's occupational health and

safety guidance or legislation on exposive hazards and

measurement of lower explosive limits.

Have partial/incompleted or no environmental site

investigations been conducted for the Site?

If yes, do not proceed through the NCSCS.

Is there direct and signficant evidence of impacts to

humans at the site, or off-site due to migration of

contaminants from the site?

If yes, automatically rate the site as Class 1, a priority

for remediation or risk management, regardless of the

total score obtained should one be calculated (e.g., for

comparison with other Class 1 sites).

Is there direct and significant evidence of impacts to

ecological receptors at the site, or off-site due to

migration of contaminants from the site?

Some low levels of impact to ecological receptors are

considered acceptable, particularly on commercial and

industrial land uses. However, if ecological effects are

considered to be severe, the site may be categorized

as Class 1, regardless of the numerical total NCSCS

score. For the purpose of application of the NCSCS,

effects that would be considered severe include

observed effects on survival, growth or reproduction

which could threaten the viability of a population of

ecological receptors at the site. Other evidence that

qualifies as severe adverse effects may be determined

based on professional judgement and in consultation

with the relevant jurisdiction.

CCME National Classification System for Contaminated Sites

(2008, 2010 v 1.2) Page 1 of 2

Page 174: SPECIFICATION Building Demolition and Remediation of

If none of the above applies, proceed with the NCSCS scoring.

CCME National Classification System for Contaminated Sites

(2008, 2010 v 1.2) Page 2 of 2

Page 175: SPECIFICATION Building Demolition and Remediation of

CCME National Classification System for Contaminated Sites (2008, 2010 v 1.2)

Summary of Site Conditions

Subject Site:

Civic Address: (or other description of location)

Site Common Name :(if applicable)

Site Owner or Custodian: (Organization and Contact

Person)

Legal description or

metes and bounds:

Approximate Site area:

PID(s) :

(or Parcel Identification Numbers

[PIN] if untitled Crown land)

Latitude:

Longitude:

______ degrees ______ min ______ secs

______ degrees ______ min ______ secs

UTM

Coordinate:

14 U Northing 5623540 N

Easting 45243 E

Current: unoccupied ski resort

Proposed: Unknown

Site Plan

Provide a brief description

of the Site:

To delineate the bounds of the Site a site plan MUST be attached. The plan must be drawn to scale

indicating the boundaries in relation to well-defined reference points and/or legal descriptions.

Delineation of the contamination should also be indicated on the site plan.

The former ski resort facility covers 350 acres and consists of previously groomed ski slopes, several

buildings including a ski lodge, lounge, first aid building, maintenance and mechanical buildings and

storage sheds. Three underground storage tanks were known to exist and supplied heating oil for the

three furnaces in the lodge (2 furnaces) and lounge building. A third aboveground tank was located in the

crawlspace of the Lodge. Several small aboveground petroleum storage tanks were observed at the ski lift

equipment. Two 1360 L (300 gallon) ASTs with a secondary containment were observed near the main

structures. With exception of the 1360 L ASTs, all known ASTs and USTs have been removed from the

Site. The Site is located within a protected national park and all surrounding property is undeveloped

forest. The closest developed property is in the Rural Municipality of McCreary 10 kilometers east of the

Site.

Parks Canada

Centre of site:(provide latitude/longitude or

UTM coordinates)

Site Land Use:

Mount Agassiz Ski Hill Facility

Mount Agassiz Ski Resort, Riding Mountain National Park, Manitoba Canada

Former Mount Agassiz Ski Hill Facility

142 hectares (350 acres)

CCME National Classification System for Contaminated Sites

(2008, 2010 v 1.2) 1 of 2

Page 176: SPECIFICATION Building Demolition and Remediation of

CCME National Classification System for Contaminated Sites (2008, 2010 v 1.2)

Summary of Site Conditions

Affected media and

Contaminants of Potential

Concern (COPC):

Please fill in the "letter" that best describes the level of information available for the site being assessed:

Site Letter Grade C

If letter grade is F, do not continue, you must have a minimum of a Phase I Environmental Site Assessment or equivalent.

Scoring Completed By:

Date Scoring Completed:

François Pugh, DST Consulting Engineers

9-Jul-14

Contaminants of concern include petroleum hydrocarbon fractions F1-F3 (PHC F1-F3) in soil and

polyaromatic hydrocarbons (PAHs) anthracene, benzo(a)anthracene, benzo(a)pyrene, fluoranthene and

pyrene.

CCME National Classification System for Contaminated Sites

(2008, 2010 v 1.2) 2 of 2

Page 177: SPECIFICATION Building Demolition and Remediation of

CCME National Classification System for Contaminated Sites (2008, 2010 v 1.2)

User's Guide - Instructions

I. Contaminant Characteristics II. Migration Potential III. Exposure

1. Residency Media 1. Groundwater Movement 1. Human Receptors

2. Chemical Hazard 2. Surface water Movement A. Known Impact

3. Contaminant Exceedance Factor 3. Soil B Potential

4. Contaminant Quantity 4. Vapour a. Land Use

5. Modifying Factors 5. Sediment Movement b. Accessibility

6. Modifying Factors c. Exposure Route

2. Human Modifying Factors

3. Ecological Receptors

A. Known Impact

B. Potential

a. Terrestrial

b. Aquatic

4. Ecological Modifying Factors

a. Species at Risk

b. Aesthetics

5. Other Receptors

a. Permafrost

Exposure Instructions & Worksheet - Prompts the user for information related to exposure pathways and receptors

which may be located on the site.

Summary Score Sheet - Generates a total site score by adding up the scores generated on each of the three

worksheets and provides the corresponding Site Classification. It also provides an estimate of certainty in the score

provided (Certainty Percentage).

Reference Material - Additional information which may be useful to refer to when conducting the evaluation.

Contaminant Hazard Ranking

Examples of Persistent Substances

Examples of Substances in the Various Chemical Classes

Chemical-specific Properties

Range of Values of Hydraulic Conductivity and Permeability

1) Please review the following overview of contents. The revised CCME National Classification System for Contaminated

Sites (NCSCS) consists of a pre-screening checklist, summary of site conditions, summary score sheet, and three

instruction/worksheet pages for the user to fill out: Contaminant Characteristics, Migration Potential and Exposure. For

ease of printing, the method of evaluation for scoring each section of the worksheet is provided in a separate Instructions

tab. Reference material is also provided to assist with the evaluation. A brief description of each sheet is as follows:

Contaminant Characteristics Instructions & Worksheet - Prompts the user for information related to the contaminants

of potential concern (COPC) found at the site.

Migration Potential Instructions & Worksheet - Prompts the user for information related to physical transport

processes which may move contamination to neighboring sites or re-distribute contamination within a site. Migration

potential includes many of the exposure pathways, but is not limited to exposure pathways. Migration potential does

not require clearly defined receptors.

Site Description Sheet - Summarizes Site information. It also indicates the level of information available (Site Letter

Grade) for the site to conduct the NCSCS scoring evaluation. The known/potential contaminants of concern and

affected media will also be summarized here.

Pre-Screening Checklist - Used to determine if the Site can either be considered a Class 1 site (to be remediated

immediately) or more information must be collected before the Site can be ranked, or other hazards exist at the Site

that must be addressed first before the Site can be ranked using the revised NCSCS.

The worksheet titles and sub headings are as follows.

CCME National Classification System for Contaminated Sites

(2008, 2010 v 1.2) Page 1 of 3

Page 178: SPECIFICATION Building Demolition and Remediation of

CCME National Classification System for Contaminated Sites (2008, 2010 v 1.2)

User's Guide - Instructions

Site Letter

Grade:

Detailed Descriptions:

F

E

D

C

B

A

5) A few terms are used throughout which require definition, they are as follows:

Confirmation Sampling – Remedial work, monitoring, and/or compliance testing have been

conducted and confirmatory sampling demonstrates whether contamination has been removed or

stabilized effectively and whether cleanup or risk management objectives have been attained.

Known - refers to scores that are assigned based on documented scientific and/or technical observations

Potential - refers to scores that are assigned when something is not known, though it may be suspected

Allowed Potential - If, in a given category, known and potential scores are provided by the user, the checklist will typically

default to the "known" score. If a "known" score is provided, the "allowed potential" score will equal zero. Exceptions can be

found within the Modifying Factors categories in each worksheet where there are often several independent questions.

Therefore, "known" and "potential" scores are allowed to contribute to the total modifying factor score.

Raw - refers to score totals which have not been adjusted down to the total maximum score for the given category. In most

cases the possible total raw score is greater than the maximum allowed

2) This is an electronic form which will prompt the user for information. Based on the answers provided, a score is

calculated for the contaminated site in question. In most cases, the user will be asked to select amongst two or more

choices in a drop down checklist. To access the drop down checklist, move the mouse towards the right side of the

"action box". If a drop down is available, an arrow will appear, which must be selected to access the drop down choices.

An "action box" requires input from the user. All action boxes have an amber background.

3) When assigning scores for each factor, it is highly recommended to give a rationale (a column has been provided for this purpose

in Worksheets I, II and III). Information that would be useful in justifying the scores assigned may include: a statement of any

assumptions, a description of site-specific information, and references for any data sources (e.g., site visit, personal interview, site

assessment reports, or other documents consulted).

Pre Phase I ESA – No environmental investigations have been conducted or there are only partial or

incomplete Phase I ESA for the Site. It is not recommended to continue through the NCSCS when

insufficient data are available. In these cases, it will generally be necessary to conduct a Phase I

ESA or other site investigation tasks in order to complete the NCSCS scoring.

4) The Site Letter Grade is related to the level of information available for the Site (as defined by the User) and provides

an indication of completeness of information based on the level of investigation and remediation work that has been

carried out at the site. More detailed descriptions of the various categories are provided below.

Phase I ESA – A preliminary desk-top type study has been conducted, involving non-intrusive data

collection to determine whether there is a potential for the Site to be contaminated and to provide

information to direct any intrusive investigations. Data collected may include a review of available

information on current site conditions and history of the property, a site inspection and interviews with

personnel familiar with the Site. [Note: This stage is similar to "Phase I: Site Information Assessment"

as described in Guidance Document on the Management of Contaminated Sites in Canada (CCME

1997).]

Limited Phase II ESA – An initial intrusive investigation and assessment of the property has been

conducted, generally focusing on potential sources of contamination, to determine whether there is

contamination present above the relevant screening guidelines or criteria, and to broadly define soil

and groundwater conditions; samples have been collected and analyzed to identify, characterize and

quantify contamination that may be present in air, soil, groundwater, surface water or building

materials. [Note: This stage is similar to "Phase II: Reconnaissance Testing Program" as described in

Guidance Document on the Management of Contaminated Sites in Canada (CCME 1997).]

Detailed Phase II ESA – Further intrusive investigations have been conducted to characterize and

delineate the contamination, to obtain detailed information on the soil and groundwater conditions, to

identify the contaminant pathways, and to provide other information required to develop a remediation

plan. [Note: This stage is similar to "Phase III: Detailed Testing Program" as described in Guidance

Document on the Management of Contaminated Sites in Canada (CCME 1997).]

Risk Assessment with or without Remedial Plan or Risk Management Strategy – A risk

assessment has been completed, and if the risk was found to be unacceptable, a site-specific

remedial action plan has been designed to mitigate environmental and health concerns associated

with the Site, or a risk management strategy has been developed.

action box

CCME National Classification System for Contaminated Sites

(2008, 2010 v 1.2) Page 2 of 3

Page 179: SPECIFICATION Building Demolition and Remediation of

CCME National Classification System for Contaminated Sites (2008, 2010 v 1.2)

User's Guide - Instructions

Class 1 - High Priority for Action (Total NCSCS Score greater than 70)

Class 2 - Medium Priority for Action (Total NCSCS Score between 50 and 69.9)

Class 3 - Low Priority for Action (Total NCSCS Score between 37 and 49.9)

Class N - Not a Priority for Action (Total NCSCS Score less than 37)

Class INS - Insufficient Information (>15% of Responses are "Do Not Know")

There is insufficient information to classify the site. In this event, additional information is required to address data gaps.

8) Additional Complementary Tools to the NCSCS

The CCME Soil Quality Index (SoQI) is a complementary tool that focuses more on evaluating the relative hazard, by

comparing contaminant concentrations with their respective soil quality guidelines. The SoQI uses three factors for its

calculations, namely: 1) scope (% of contaminants that do not meet their respective guidelines), 2) frequency (% of individual

tests of contaminants that do not meet their respective guidelines), and 3) amplitude (the amount by which the contaminants do

not meet their respective guidelines). The soil quality index can be used to compare different contaminated sites with similar

types of contamination as well as to see if the jurisdictional requirements have been met after remediation of a particular site.

6) Certainty Percentage: The ratio of “Known” to “Potential” responses reflects the relative certainty, or confidence, of

the resulting final score and the classification. The NCSCS system defines this ratio as the “Certainty Percentage”. The

Certainty Percentage is generated from the number of sections assigned scores based on “known” information divided

by the total number of sections. A high percentage indicates that more is known about the Site, and therefore there is

more confidence in the ranking, whereas a low percentage suggests that the ranking should be treated with caution.

Note: For some questions in the worksheets, the option selected will determine whether a "known" or "potential" score is assigned.

In these cases, if "Do Not Know" is selected, a score will automatically be listed as "potential", whereas all of the other options in the

list will provide a "known" score.

The NCSCS was not developed for and is not readily applicable for the assessment of sites with a significant marine or aquatic

component. Environmental conditions at marine and aquatic sites are best measured in the bed sediments as they act as long-

term reservoirs of chemicals to the aquatic environment and to organisms living in or having direct contact with sediments.

The CCME Sediment Quality Index (SeQI) provides a convenient means of summarizing sediment quality data and can

complement the NCSCS. The SeQI provides a mathematical framework for assessing sediment quality conditions by

comparing contaminant concentrations with their respective sediment quality guidelines.

7) Site Classification Categories: Sites should not be ranked relative to one another. Sites must be classifed on their individual

characteristics in order to determine the appropriate classification (Class 1, 2, 3, or N) according to their priority for action, or Class

INS (Insufficient Information) for sites that require further information before they can be classifed. The classification groupings are

as follows:

The available information indicates that action (e.g., futher site characterization, risk management, remediation, etc.) is

required to address existing concerns. Typically, Class 1 sites indicate high concern for several factors, and measured or

observed impacts have been documented.

The available information indicates that there is high potential for adverse impacts, although the threat to human health and the

environment is generally not imminent. There will tend not to be indication of off-site contamination, however, the potential for

this was rated high and therefore some action is likely required.

The available information indicates that this site is currently not a high concern. However, additional investigation may be

carried out to confirm the site classification, and some degree of action may be required.

The available information indicates there is probably no significant environmental impact or human health threats. There is

likely no need for action unless new information becomes available indicating greater concerns, in which case the site should

be re-examined.

CCME National Classification System for Contaminated Sites

(2008, 2010 v 1.2) Page 3 of 3

Page 180: SPECIFICATION Building Demolition and Remediation of

CCME National Classification System (2008, 2010 v 1.2)

(I) Contaminant CharacteristicsMount Agassiz Ski Hill Facility

Definition Score

Rationale for Score

(document any assumptions, reports, or site-specific

information; provide references)

Method of Evaluation

1. Residency Media (replaces physical state)

Which of the following residency media are known (or

strongly suspected) to have one or more exceedances of

the applicable CCME guidelines?

yes = has an exceedance or strongly suspected to have

an exceedance

no = does not have an exceedance or strongly suspected

not to have an exceedance

A. Soil Yes

Yes 2

No

Do Not Know ---

B. Groundwater Do Not Know

Yes ---

No

Do Not Know 1

C. Surface water No

Yes 0

No

Do Not Know ---

D. Sediment No

Yes 0

No

Do Not Know ---

"Known" -score 2

"Potential" - score 1

2. Chemical Hazard

What is the relative degree of chemical hazard of the

contaminant in the list of hazard rankings proposed by the

Federal Contaminated Sites Action Plan (FCSAP)?

High

High

Medium

LowDo Not Know

"Known" -score 8

"Potential" - score---

3. Contaminant Exceedence Factor

What is the ratio between the measured contaminant

concentration and the applicable CCME guidelines (or

other "standards")?

Medium (10x to 100x)

Mobile NAPL

High (>100x)

Medium (10x to 100x)

Low (1x to 10x)

Do Not Know

"Known" -score 4

"Potential" - score ---

Notes

Ranking of contaminant "exceedance" is determined by comparing contaminant

concentrations with the most conservative media-specific and land-use appropriate

CCME environmental quality guidelines. Ranking should be based on contaminant

with greatest exceedance of CCME guidelines.

Ranking of contaminant hazard as high, medium and low is as follows:

High = One or more measured contaminant concentration is greater than 100 X

appropriate CCME guidelines

Medium = One or more measured contaminant concentration is 10 - 99.99 X appropriate

CCME guidelines

Low = One or more measured contaminant concentration is 1 - 9.99 X appropriate CCME

guidelines

Mobile NAPL = Contaminant is a non-aqueous phase liquid (i.e., due to its low solubility, it

does not dissolve in water, but remains as a separate liquid) and is present at a

sufficiently high saturation (i.e., greater than residual NAPL saturation) such that there is

significant potential for mobility either downwards or laterally.

Other standards may include local background concentration or published toxicity

benchmarks.

Results of toxicity testing with site samples can be used as an alternative.

This approach is only relevant for contaminants that do not biomagnify in the food web,

since toxicity tests would not indicate potential effects at higher trophic levels.

High = lethality observed.

Medium = no lethality, but sub lethal effects observed.

Low = neither lethal nor sub lethal effects observed.

In the event that elevated levels of a material with no

associated CCME guidelines are present, check provincial

and USEPA environmental criteria.

Hazard Quotients (sometimes referred to as a screening

quotient in risk assessments) refer to the ratio of

measured concentration to the concentration believed to

be the threshold for toxicity. A similar calculation is used

here to determine the contaminant exceedance factor

(CEF). Concentrations greater than one times the

applicable CCME guideline (i.e., CEF=>1) indicate that

risks are possible. Mobile NAPL has the highest

associated score (8) because of its highly concentrated

nature and potential for increase in the size of the

impacted zone.

An increasing number of residency media containing

chemical exceedances often equates to a greater

potential risk due to an increase in the number of potential

exposure pathways.

The relative degree of chemical hazard should be selected based on the most hazardous

contaminant known or suspected to be present at the site.

The degree of hazard has been defined by the Federal Contaminated Sites Action Plan

(FCSAP) and a list of substances with their associated hazard (Low, Medium and High)

has been provided as a separate sheet in this file.

See Attached Reference Material for Contaminant Hazard Rankings.

Hazard as defined in the revised NCS pertains to the

physical properties of a chemical which can cause harm.

Properties can include toxic potency, propensity to

biomagnify, persistence in the environment, etc. Although

there is some overlap between hazard and contaminant

exceedance factor below, it will not be possible to derive

contaminant exceedance factors for many substances

which have a designated chemical hazard designation,

but don't have a CCME guideline. The purpose of this

category is to avoid missing a measure of toxic potential.

The overall score is calculated by adding the individual scores from each residency media

(having one or more exceedance of the most conservative media specific and land-use

appropriate CCME guideline).

Summary tables of the Canadian Environmental Quality Guidelines for soil, water (aquatic

life, non-potable groundwater environments, and agricultural water uses) and sediment

are available on the CCME website at

http://www.ccme.ca/publications/ceqg_rcqe.html?category_id=124.

For potable groundwater environments, guidelines for Canadian Drinking Water Quality

(for comparison with groundwater monitoring data) are available on the Health Canada

website at http://www.hc-sc.gc.ca/ewh-semt/pubs/water-eau/doc_sup-appui/sum_guide-

res_recom/index_e.html.

Soil samples exhibited PHC F1-F3 concentrations in excess of

CCME Guidelines for residential parkland use (AMEC 2012)

Groundwater samples taken from onsite monitoring wells

exhibited concentrations of PAHs (anthracene,

benzo(a)anthracene, benzo(a)pyrene, and pyrene) in excess of

Federal Interim Groundwater Quality Guidelines and in excess

Canadian Drinking Water Quality Guidelines. (DST 2014)

However, groundwater samples contained sediment in excess

of 1 cm, and may have been biased high.

The PAHs and PHC F1 have high hazard rankings

PHC F2 soil concentrations are approximately 49 times the

CCME guideline, PHC F1 12 times the guideline,

CCME National Classification System for Contaminated Sites

(2008 2010 v 1.2) Page 1 of 2

Page 181: SPECIFICATION Building Demolition and Remediation of

CCME National Classification System (2008, 2010 v 1.2)

(I) Contaminant CharacteristicsMount Agassiz Ski Hill Facility

Definition Score

Rationale for Score

(document any assumptions, reports, or site-specific

information; provide references)

Method of Evaluation Notes

4. Contaminant Quantity (known or strongly suspected)

What is the known or strongly suspected quantity of all

contaminants?

<2 ha or

1000 m3

>10 hectare (ha) or 5000 m3

2 to 10 ha or 1000 to 5000 m3

<2 ha or 1000 m3

Do Not Know

"Known" -score 2

"Potential" - score ---

5. Modifying Factors

Yes

Yes 2

No

Do Not Know

---

Are there contaminants present that could cause damage

to utilities and infrastructure, either now or in the future,

given their location?

No

Yes 0

No

Do Not Know ---

How many different contaminant classes have

representative CCME guideline exceedances?two to four

one 2

two to four

five or more

Do Not Know ---

"Known" - Score 4

"Potential" - Score ---

Contaminant Characteristic Total

Raw Total Scores- "Known" 20

Raw Total Scores- "Potential" 1

Raw Combined Total Scores 21

Total Score (Raw Combined / 40 * 33) 17.3

Does the chemical fall in the class of persistent chemicals

based on its behavior in the environment?

Persistent chemicals, e.g., PCBs, chlorinated pesticides etc. either do not degrade or take

longer to degrade, and therefore may be available to cause effects for a longer period of

time. Canadian Environmental Protection Act (CEPA) classifies a chemical as persistent

when it has at least one of the following characteristics:

(a) in air,

(i) its half-life is equal to or greater than 2 days, or

(ii) it is subject to atmospheric transport from its source to a

remote area;

(b) in water, its half-life is equal to or greater than 182 days;

(c) in sediments, its half-life is equal to or greater than

365 days; or

(d) in soil, its half-life is equal to or greater than 182 days.

This list does not include metals or metalloids, which in their elemental form do not

degrade. However metals and metalloids form chemical species in the environment, many

of which are not readily bioavailable.

Some contaminants may react or absorb into underground

utilities and infrastructure. For example, organic solvents

may degrade some plastics, and salts could cause

corrosion of metal.

Measure or estimate the area or quantity of total contamination (i.e, all contaminants

known or strongly suspected to be present on the site). The "Area of Contamination" is

defined as the area or volume of contaminated media (soil, sediment, groundwater,

surface water) exceeding appropriate environmental criteria.

Examples of Persistent Substances are provided in

attached Reference Materials

For the purposes of the revised NCS ranking system, the following chemicals represent

distinct chemical "classes": inorganic substances (including metals), volatile petroleum

hydrocarbons, light extractable petroleum hydrocarbons, heavy extractable petroleum

hydrocarbons, PAHs, phenolic substances, chlorinated hydrocarbons, halogenated

methanes, phthalate esters, pesticides.

Refer to the Reference Material sheet for a list of example

substances that fall under the various chemical classes.

The contaminants are not expected to cause damage to

utilities.

Volatile petroleum hydrocarbons, light extractible

hydrocarbons, heavy extractible hydrocarbons, PAHs.

Benzo(a)pyrene is in the list of persistent chemicals.

The PHCs are considered persistent based on half-life.

Area of contamination is estimated to be less than 1000 cubic

metres.

A larger quantity of a potentially toxic substance can result

in a larger frequency of exposure as well as a greater

probability of migration, therefore, larger quantities of

these substances earn a higher score.

CCME National Classification System for Contaminated Sites

(2008 2010 v 1.2) Page 2 of 2

Page 182: SPECIFICATION Building Demolition and Remediation of

CCME National Classification System (2008, 2010 v 1.2)

(II) Migration Potential (Evaluation of contaminant migration pathways)

Mount Agassiz Ski Hill Facility

Definition ScoreRationale for Score

(document any assumptions, reports, or site-specific information; provide references)

Method Of Evaluation Notes

1. Groundwater Movement

A. Known COPC exceedances and an operable groundwater

pathway within and/or beyond the property boundary.

i) For potable groundwater environments, 1) groundwater

concentrations exceed background concentrations and 1X the

Guideline for Canadian Drinking Water Quality (GCDWQ) or 2)

there is known contact of contaminants with groundwater,

based on physical evidence of groundwater contamination.

For non-potable environments (typically urban environments

with municipal services), 1) groundwater concentrations exceed

1X the applicable non potable guidelines or modified generic

guidelines (which exclude ingestion of drinking water pathway)

or 2) there is known contact of contaminants with groundwater,

based on physical evidence of groundwater impacts.

12

ii) Same as (i) except the information is not known but strongly

suspected based on indirect observations.9

iii) Meets GCDWQ for potable environments; meets non-

potable criteria or modified generic criteria (excludes ingestion

of drinking water pathway) for non-potable environments

or

Absence of groundwater exposure pathway (i.e., there is no

aquifer (see definition at right) at the site or there is an

adequate isolating layer between the aquifer and the

contamination, and within 5 km of the site there are no aquatic

receiving environments and the groundwater does not

daylight).

0

Go to Potential

12

Score 12

B. Potential for groundwater pathway.

a. Relative MobilityOrganics Metals with higher mobility Metals with higher mobility

Koc (L/kg) at acidic conditions at alkaline conditions

High 4 Koc < 500 (i.e., log Koc < 2.7) pH < 5 pH > 8.5

Moderate 2 Koc = 500 to 5000 (i.e., log Koc = 2.7 to 3.7) pH = 5 to 6 pH = 7.5 to 8.5

Low 1 Koc = 5,000 to 100,000 (i.e., log Koc = 3.7 to 5) pH > 6 pH < 7.5

Insignificant 0 Koc > 100,000 (i.e., log Koc > 5)

Do Not Know 2

Low

Score 1

b. Presence of engineered sub-surface containment?

No containment 3

Partial containment 1.5

Full containment 0

Do Not Know 1.5

No containment

Score 3

c. Thickness of confining layer over aquifer of concern or

groundwater exposure pathway

3 m or less including no confining layer or discontinuous

confining layer1

3 to 10 m 0.5

> 10 m 0

Do Not Know 0.5

3 m or less

Score 1

d. Hydraulic conductivity of confining layer

>10-4

cm/s or no confining layer 1

10-4

to 10-6

cm/s 0.5

<10-6

cm/s 0

Someone experienced must provide a thorough description of the sources researched to

determine the containment of the source at the contaminated site. This information must

be documented in the NCS Site Classification Worksheet including contact names,

phone numbers, e-mail correspondence and/or reference maps, geotechnical reports or

natural attenuation studies and other resources such as internet links.

Selected Resources:

United States Environmental Protection Agency (USEPA) 1998. Technical Protocol for

Evaluating Natural Attenuation of Chlorinated Solvents in Groundwater. EPA/600/R-

98/128.

Environment Canada – Ontario Region – Natural Attenuation Technical Assistance

Bulletins (TABS) Number 19 –21.

Determine the nature of geologic materials and estimate hydraulic conductivity from published

material (or use "Range of Values of Hydraulic Conductivity and Permeability" figure in the

Reference Material sheet). Unfractured clays should be scored low. Silts should be scored

medium. Sand, gravel should be scored high. The evaluation of this category is based on:

1) The presence and hydraulic conductivity (“K”) of saturated subsurface materials that impede

the vertical migration of contaminants to lower aquifer units which can or are used as a drinking

water source, groundwater exposure pathway or

2) The presence and permeability (“k”) of unsaturated subsurface materials that impede the

vertical migration of contaminants from the source location to the saturated water table aquifer,

first hydrostratigraphic unit or other groundwater pathway.

The 1992 NCS rationale evaluated the off-site migration as a regulatory issue. The

exposure assessment and classification of hazards should be evaluated regardless of the

property boundaries.

Someone experienced must provide a thorough description of the sources researched to

determine the presence/absence of a groundwater supply source in the vicinity of the

contaminated site. This information must be documented in the NCS Site Classification

Worksheet including contact names, phone numbers, e-mail correspondence and/or

reference maps/reports and other resources such as internet links.

Note that for potable groundwater that also daylights into a nearby surface water body,

the more stringent guidelines for both drinking water and protection of aquatic life should

be considered.

Selected References

Potable Environments

Guidelines for Canadian Drinking Water Quality: www.hc-sc.gc.ca/ewh-semt/pubs/water-

eau/doc_sup-appui/sum_guide-res_recom/index_e.html

Non-Potable Environments

Canadian Water Quality Guidelines for Protection of Aquatic Life. CCME. 1999

www.ccme.ca

Compilation and Review of Canadian Remediation Guidelines, Standards and

Regulations. Science Applications International Corporation (SAIC Canada),

report to Environment Canada, January 4, 2002.

POTENTIAL SCORE NOT USED

Reference: US EPA Soil Screening Guidance (Part 5 - Table 39)

If a score of zero is assigned for relative mobility, it is still recommended that the following

sections on potential for groundwater pathway be evaluated and scored. Although the

Koc of an individual contaminant may suggest that it will be relatively immobile, it is

possible that, with complex mixtures, there could be enhanced mobility due to co-solvent

effects. Therefore, the Koc cannot be relied on solely as a measure of mobility. An

evaluation of other factors such as containment, thickness of confining layer, hydraulic

conductivities and precipitation infiltration rate are still useful in predicting potential for

groundwater migration, even if a contaminant is expected to have insignificant mobility

based on its chemistry alone.

Potable groundwater Environment. Contaminants in excess of GCDWQ. Contamints in

contact with groundwater.

Review chemical data and evaluate groundwater quality.

The evaluation method concentrates on 1) a potable or non-potable groundwater environment; 2)

the groundwater flow system and its potential to be an exposure pathway to known or potential

receptors

An aquifer is defined as a geologic unit that yields groundwater in usable quantities and drinking

water quality. The aquifer can currently be used as a potable water supply or could have the

potential for use in the future. Non-potable groundwater environments are defined as areas that

are serviced with a reliable alternative water supply (most commonly provided in urban areas). The

evaluation of a non-potable environment will be based on a site specific basis.

Physical evidence includes significant sheens, liquid phase contamination, or contaminant

saturated soils.

Seeps and springs are considered part of the groundwater pathway.

In Arctic environments, the potability and evaluation of the seasonal active layer (above the

permafrost) as a groundwater exposure pathway will be considered on a site-specific basis.

NOTE: If a score is assigned here for Known COPC Exceedances, then you can

skip Part B (Potential for groundwater pathway) and go to Section 2 (Surface Water Pathway)

Although F1 was found at high concentrations in soil, the Koc for the contaminants found in

groundwater range 5,000 to 10^6. The volume of PHC contamination is estimated to be

small and therefore the F1 is diluted to acceptable levels within a small area. No PHC

exceedances were detected in groundwater samples from nearby wells.

POTENTIAL SCORE NOT USED

POTENTIAL SCORE NOT USED

POTENTIAL SCORE NOT USED

Review the existing engineered systems or natural attenuation processes for the site and

determine if full or partial containment is achieved.

Full containment is defined as an engineered system or natural attenuation processes, monitored

as being effective, which provide for full capture and/or treatment of contaminants. All chemicals

of concern must be contained for “Full Containment” scoring. Natural attenuation must have

sufficient data, and reports cited with monitoring data to support steady state conditions and the

attenuation processes. If there is no containment or insufficient natural attenuation process, this

category is evaluated as high. If there is less than full containment or if uncertain, then evaluate as

medium. In Arctic environments, permafrost will be evaluated, as appropriate, based on detailed

evaluations, effectiveness and reliability to contain/control contaminant migration.

The term "confining layer" refers to geologic material with little or no permeability or hydraulic

conductivity (such as unfractured clay); water does not pass through this layer or the rate of

movement is extremely slow.

Measure the thickness and extent of materials that will impede the migration of contaminants to

the groundwater exposure pathway.

The evaluation of this category is based on:

1) The presence and thickness of saturated subsurface materials that impede the vertical

migration of contaminants to lower aquifer units which can or are used as drinking water sources

or

2) The presence and thickness of unsaturated subsurface materials that impede the vertical

migration of contaminants from the source location to the saturated zone (e.g., water table

aquifer, first hydrostratigraphic unit or other groundwater pathway).

CCME National Classification System for Contaminated Sites

(2008, 2010 v 1.2) Page 1 of 5

Page 183: SPECIFICATION Building Demolition and Remediation of

CCME National Classification System (2008, 2010 v 1.2)

(II) Migration Potential (Evaluation of contaminant migration pathways)

Mount Agassiz Ski Hill Facility

Definition ScoreRationale for Score

(document any assumptions, reports, or site-specific information; provide references)

Method Of Evaluation Notes

Do Not Know 0.5

>10-4 cm/s

Score 1

B. Potential for groundwater pathway.

e. Precipitation infiltration rate

(Annual precipitation factor x surface soil relative

permeability factor)

High 1

Moderate 0.6

Low 0.4

Very Low 0.2

None 0

Do Not Know 0.4

Low

Score 0.4

f. Hydraulic conductivity of aquifer

>10-2

cm/s 2

10-2

to 10-4

cm/s 1

<10-4

cm/s 0

Do Not Know 1

10-2 to 10-4 cm/s

Score 1

Potential groundwater pathway total 7.4

Allowed Potential score --- Note: If a "known" score is provided, the "potential" score is disallowed.

Groundwater pathway total 12

2. Surface Water Movement

A. Demonstrated migration of COPC in surface water above

background conditions

Known concentrations of surface water:

i) Concentrations exceed background concentrations and exceed

CCME CWQG for protection of aquatic life, irrigation, livestock

water, and/or recreation (whichever uses are applicable at the site)

by >1 X;

or

There is known contact of contaminants with surface water based

on site observations.

or

In the absence of CWQG, chemicals have been proven to be toxic

based on site specific testing (e.g. toxicity testing; or other indicator

testing of exposure).

12

Collect all available information on quality of surface water near to site. Evaluate available data

against Canadian Water Quality Guidelines (select appropriate guidelines based on local water

use, e.g., recreation, irrigation, aquatic life, livestock watering, etc.). The evaluation method

concentrates on the surface water flow system and its potential to be an exposure pathway.

Contamination is present on the surface (above ground) and has the potential to impact surface

water bodies.

Surface water is defined as a water body that supports one of the following uses: recreation,

irrigation, livestock watering, aquatic life.

ii) Same as (i) except the information is not known but strongly

suspected based on indirect observations.8

iii) Meets CWQG or absence of surface water exposure pathway

(i.e., Distance to nearest surface water is > 5 km.) 0

Go to Potential

Go to Potential

Score ---

B. Potential for migration of COPCs in surface water

a. Presence of containment

No containment 5

Partial containment 3

Full containment 0.5

Do Not Know 3

No containment

Score 5

b. Distance to Surface Water

0 to <100 m 3

100 - 300 m 2

>300 m 0.5

Do Not Know 2

0 to <100 m

Score 3

Determine the nature of geologic materials and estimate hydraulic conductivity from published

material (or use "Range of Values of Hydraulic Conductivity and Permeability" figure in the

Reference Material sheet). Unfractured clays should be scored low. Silts should be scored

medium. Sand, gravel should be scored high. The evaluation of this category is based on:

1) The presence and hydraulic conductivity (“K”) of saturated subsurface materials that impede

the vertical migration of contaminants to lower aquifer units which can or are used as a drinking

water source, groundwater exposure pathway or

2) The presence and permeability (“k”) of unsaturated subsurface materials that impede the

vertical migration of contaminants from the source location to the saturated water table aquifer,

first hydrostratigraphic unit or other groundwater pathway.

Review available mapping and survey data to determine distance to nearest surface water

bodies.

General Notes:

Someone experienced must provide a thorough description of the sources researched to

classify the surface water body in the vicinity of the contaminated site. This information

must be documented in the NCS Site Classification Worksheet including contact names,

phone numbers, e-mail correspondence and/or reference maps/reports and other

resource such as internet links.

Selected References:

CCME. 1999. Canadian Water Quality Guidelines for the Protection of Aquatic Life

www.ccme.ca

CCME. 1999. Canadian Water Quality Guidelines for the Protection of Agricultural Water

Uses (Irrigation and Livestock Water)

www.ccme.ca

Health and Welfare Canada. 1992. Guidelines for Canadian Recreational Water Quality.

Review the existing engineered systems and relate these structures to site conditions and

proximity to surface water and determine if full containment is achieved: score low if there is full

containment such as capping, berms, dikes; score medium if there is partial containment such as

natural barriers, trees, ditches, sedimentation ponds; score high if there are no intervening barriers

between the site and nearby surface water. Full containment must include containment of all

chemicals.

Determine the nature of geologic materials and estimate hydraulic conductivity of all aquifers of

concern from published material (refer to "Range of Values of Hydraulic Conductivity and

Permeability" in the Reference Material sheet).

Precipitation

Refer to Environment Canada precipitation records for relevant areas. Divide annual precipitation

by 1000 and round to nearest tenth (e.g., 667 mm = 0.7 score).

Permeability

For surface soil relative permeability (i.e., infiltration) assume: gravel (1), sand (0.6), loam (0.3) and

pavement or clay (0).

Multiply the surface soil relative permeability factor with precipitation factor to obtain the score for

precipitation infiltration rate.

POTENTIAL SCORE NOT USED

Distance is between 0 and 100 m

Rainfall factor of 0.5 (488 mm annual rainfall)

x Permiability factor of.6

= 0.3 Infiltration rate

POTENTIAL SCORE NOT USED

Estimated based on reference material

POTENTIAL SCORE NOT USED

NOTE: If a score is assigned here for Demonstrated Migration in Surface Water, then you can

skip Part B (Potential for migration of COPCs in surface water) and go to Section 3 (Surface Soils)

No containment

CCME National Classification System for Contaminated Sites

(2008, 2010 v 1.2) Page 2 of 5

Page 184: SPECIFICATION Building Demolition and Remediation of

CCME National Classification System (2008, 2010 v 1.2)

(II) Migration Potential (Evaluation of contaminant migration pathways)

Mount Agassiz Ski Hill Facility

Definition ScoreRationale for Score

(document any assumptions, reports, or site-specific information; provide references)

Method Of Evaluation Notes

c. Topography

Contaminants above ground level and slope is steep 2

Contaminants at or below ground level and slope is steep 1.5

Contaminants above ground level and slope is intermediate

Contaminants at or below ground level and slope is

Contaminants above ground level and slope is flat 1

Contaminants at or below ground level and slope is flat 0

Do Not Know 1

At/below and intermediate

Score 1

d. Run-off potential

High (rainfall run-off score > 0.6) 1

Moderate (0.4 < rainfall run-off score <0.6) 0.6

Low (0.2 < rainfall run-off score <0.4) 0.4

Very Low (0 < rainfall run-off score < 0.2) 0.2

None (rainfall run-off score = 0) 0

Do Not Know 0.4

Moderate

Score 0.6

e. Flood potential

1 in 2 years 1

1 in 10 years 0.5

1 in 50 years 0.2

Not in floodplain 0.5

Do Not Know Do Not Know

Score 0.5

Potential surface water pathway total 10.1

Allowed Potential score 10.1 Note: If a "known" score is provided, the "potential" score is disallowed.

Surface water pathway total 10.1

3. Surface Soils (potential for dust, dermal and ingestion exposure)

A. Demonstrated concentrations of COPC in surface soils (top 1.5 m)

COPCs measured in surface soils exceed the CCME soil quality

guideline.12

Strongly suspected that soils exceed guidelines9

COPCs in surface soils does not exceed the CCME soil quality guideline

or is not present (i.e., bedrock). 0Go to Potential

12

Score 12

B. Potential for a surface soils (top 1.5 m) migration pathway

a. Are the soils in question covered?

Exposed 6

Vegetated 4

Landscaped 2

Paved 0

Do Not Know 4

Do Not Know

Score 4

b. For what proportion of the year does the site remain covered

by snow?

0 to 10% of the year 6

10 to 30% of the year 4

More than 30% of the year 2

Do Not Know 4

Do Not Know

Score 3

Potential surface soil pathway total 7

Allowed Potential score --- Note: If a "known" score is provided, the "potential" score is disallowed.

Soil pathway total 12

Collect all available information on quality of surface soils (i.e., top 1.5 metres) at the site. Evaluate

available data against Canadian Soil Quality Guidelines. Select appropriate guidelines based on

current (or proposed future) land use (i.e, agricultural, residential/parkland, commercial, or

industrial), and soil texture if applicable (i.e., coarse or fine).

Selected References:

CCME. 1999. Canadian Soil Quality Guidelines for the Protection of Environmental and

Human Health

www.ccme.ca

The possibility of contaminants in blowing snow have not been included in the revised

NCS as it is difficult to assess what constitutes an unacceptable concentration and

secondly, spills to snow or ice are most efficiently mitigated while freezing conditions

remain.

Selected Sources:

Environment Canada web page link: www.msc.ec.gc.ca

Snow to rainfall conversion apply ratio of 15 (snow):1(water)

Review published data such as flood plain mapping or flood potential (e.g., spring or mountain run-

off) and Conservation Authority records to evaluate flood potential of nearby water courses both

up and down gradient. Rate zero if site not in flood plain.

Rainfall

Refer to Environment Canada precipitation records for relevant areas. Divide rainfall by 1000 and

round to nearest tenth (e.g., 667 mm = 0.7 score).

The former definition of “annual rainfall” did not include the precipitation as snow. This minor

adjustment has been made. The second modification was the inclusion of permeability of

surface materials as an evaluation factor.

Permeability

For infiltration assume: gravel (0), sand (0.3), loam (0.6) and pavement or clay (1).

Multiply the infiltration factor with precipitation factor to obtain rainfall run off score.

Review engineering documents on the topography of the site and the slope of surrounding

terrain.

Steep slope = >50%

Intermediate slope = between 5 and 50%

Flat slope = < 5%

Note: Type of fill placement (e.g., trench, above ground, etc.).

NOTE: If a score is assigned here for Demonstrated Concentrations in Surface Soils, then you can

skip Part B (Potential for a surface soils migration pathway) and go to Section 4 (Vapour)

Consult climatic information for the site. The increments represent the full span from soils which

are always wet or covered with snow (and therefore less likely to generate dust) to those soils

which are predominantly dry and not covered by snow (and therefore are more likely to generate

dust).

Rainfall factor of 0.5 (488 mm annual rainfall)

x Permiability factor of 1

= 0.5 Run-off Score

Contaminants are below ground level and slope is between 5 and 50% based on field

observations.

Consult engineering or risk assessment reports for the site. Alternatively, review photographs or

perform a site visit.

Landscaped surface soils must include a minimum of 0.5 m of topsoil.

Unknown

POTENTIAL SCORE NOT USED

Snow coverage is more than 30% of the year.

POTENTIAL SCORE NOT USED

CCME National Classification System for Contaminated Sites

(2008, 2010 v 1.2) Page 3 of 5

Page 185: SPECIFICATION Building Demolition and Remediation of

CCME National Classification System (2008, 2010 v 1.2)

(II) Migration Potential (Evaluation of contaminant migration pathways)

Mount Agassiz Ski Hill Facility

Definition ScoreRationale for Score

(document any assumptions, reports, or site-specific information; provide references)

Method Of Evaluation Notes

4. Vapour

A. Demonstrated COPCs in vapour.

Vapour has been measured (indoor or outdoor) in concentrations

exceeding risk based concentrations.12

Consult previous investigations, including human health risk assessments, for reports of vapours

detected.

Strongly suspected (based on observations and/or modelling) 9

Vapour has not been measured and volatile hydrocarbons have not

been found in site soils or groundwater.0

Go to Potential

Go to Potential

Score ---

B. Potential for COPCs in vapour

a. Relative Volatility based on Henry's Law Constant, H'

(dimensionless)

High (H' > 1.0E-1) Reference: US EPA Soil Screening Guidance (Part 5 - Table 36)Moderate (H' = 1.0E-1 to 1.0E-3)

Low (H' < 1.0E-3) Provided in Attached Reference MaterialsNot Volatile

Do Not Know

High

Score 4

b. What is the soil grain size?

Fine

Coarse

Do Not Know

Coarse

Score 4

c. Is the depth to the source less than 10m?Review groundwater depths below grade for the site.

Yes

No

Do Not Know

Yes

Score 2

d. Are there any preferential pathways? Visit the site during dry summer conditions and/or review available photographs.

Yes Where bedrock is present, fractures would likely act as preferential pathyways.

No

Do Not Know

Yes

Score 2

Potential vapour pathway total 12

Allowed Potential score 12 Note: If a "known" score is provided, the "potential" score is disallowed.

Vapour pathway total 12

5. Sediment Movement

A. Demonstrated migration of sediments containing COPCs

There is evidence to suggest that sediments originally deposited to the

site (exceeding the CCME sediment quality guidelines) have migrated.

12

Review sediment assessment reports. Evidence of migration of contaminants in sediments must

be reported by someone experienced in this area.

Strongly suspected (based on observations and/or modelling) 9

Sediments have been contained and there is no indication that

sediments will migrate in future.

or

Absence of sediment exposure pathway (i.e., within 5 km of the site

there are no aquatic receiving environments, and therefore no

sediments).

0

Go to Potential

Go to Potential

Score ---

Usually not considered a significant concern in lakes/marine environments, but could be

very important in rivers where transport downstream could be significant.

Preferential pathways refer to areas where vapour migration is more likely to occur

because there is lower resistance to flow than in the surrounding materials. For example,

underground conduits such as sewer and utility lines, drains, or septic systems may serve

as preferential pathways. Features of the building itself that may also be preferential

pathways include earthen floors, expansion joints, wall cracks, or foundation perforations

for subsurface features such as utility pipes, sumps, and drains.

NOTE: If a score is assigned here for Demonstrated COPCs in Vapour, then you can

skip Part B (Potential for COPCs in vapour) and go to Section 5 (Sediment)

NOTE: If a score is assigned here for Demonstrated Migration of Sediments, then you can

skip Part B (Potential for Sediment Migration) and go to Section 6 (Modifying Factors)

Depth to source is less than 10 m

Includes PHC F1 If the Henry's Law Constant for a substance indicates that it is not volatile, and a score of

zero is assigned here for relative volatility, then the other three questions in this section on

Potential for COPCs will be automatically assigned scores of zero and you can skip to

section 5.

Review soil permeability data in engineering reports. The greater the permeability of soils, the

greater the possible movement of vapours.

Fine-grained soils are defined as those which contain greater than 50% by mass particles less

than 75 µm mean diameter (D50 < 75 µm). Coarse-grained soils are defined as those which

contain greater than 50% by mass particles greater than 75 µm mean diameter (D50 > 75 µm).

There are preferential pathways (Underground Utilities)

Site contains fine and coarse grained soil.

CCME National Classification System for Contaminated Sites

(2008, 2010 v 1.2) Page 4 of 5

Page 186: SPECIFICATION Building Demolition and Remediation of

CCME National Classification System (2008, 2010 v 1.2)

(II) Migration Potential (Evaluation of contaminant migration pathways)

Mount Agassiz Ski Hill Facility

Definition ScoreRationale for Score

(document any assumptions, reports, or site-specific information; provide references)

Method Of Evaluation Notes

B. Potential for sediment migration

a. Are the sediments having COPC exceedances capped with

sediments having no exceedances ("clean sediments")? Do Not Know

Yes

No

Do Not Know 2

b. For lakes and marine habitats, are the contaminated

sediments in shallow water and therefore likely to be affected by

tidal action, wave action or propeller wash?No

Review existing sediment assessments. If the sediments present at the site are in a river, select

"no" for this question.

Yes

No

Do Not Know 0

c. For rivers, are the contaminated sediments in an area prone

to sediment scouring? Do Not Know

Review existing sediment assessments. It is important that the assessment is made under worst

case flows (high yearly flows). Under high yearly flows, areas which are commonly depositional

may become scoured. If the sediments present at the site are in a lake or marine habitat, select Yes

No

Do Not Know 2

Potential sediment pathway total 4

Allowed Potential score 4 Note: If a "known" score is provided, the "potential" score is disallowed.

Sediment pathway total 4

6. Modifying Factors

Are there subsurface utility conduits in the area affected by

contamination? Yes

Consult existing engineering reports. Subsurface utilities can act as conduits for contaminant

migration.

Yes

No Do Not Know

Known 4

Potential 0

Migration Potential Total

Raw "known" total 28

Raw "potential" total 26.1

Raw combined total 54.1

Total (max 33) 27.9

Note: If "Known" and "Potential" scores are provided, the checklist defaults to known. Therefore,

the total "Potential" Score may not reflect the sum of the individual "Potential" scores.

Review existing sediment assessments. If sediment coring has been completed, it may indicate

that historically contaminated sediments have been covered over by newer "clean" sediments.

This assessment will require that cores collected demonstrate a low concentration near the top

and higher concentration with sediment depth.

Subsurface conduits are present in the affected area

No sediments were sampled

CCME National Classification System for Contaminated Sites

(2008, 2010 v 1.2) Page 5 of 5

Page 187: SPECIFICATION Building Demolition and Remediation of

CCME National Classification System (2008, 2010 v 1.2)

(III) Exposure (Demonstrates the presence of an exposure pathway and receptors)

Mount Agassiz Ski Hill Facility

Definition Score Method Of Evaluation Notes

1. Human

A. Known exposure

Documented adverse impact or high quantified exposure which has or

will result in an adverse effect, injury or harm or impairment of the

safety to humans as a result of the contaminated site. (Class 1 Site*)

22

Same as above, but "Strongly Suspected" based on observations or

indirect evidence.10

No quantified or suspected exposures/impacts in humans. 0

Go to PotentialGo to Potential

Score

---

B. Potential for human exposure

a) Land use (provides an indication of potential human exposure

scenarios)

This is the main "receptor" factor used in site scoring. A higher score implies a greater exposure and/or exposure of more

sensitive human receptors (e.g., children).

Agricultural 3

Residential / Parkland 2

Commercial 1

Industrial 0.5

Do Not Know 1.5

Res / Parkland

Score 2

b. Indicate the level of accessibility to the contaminated portion of the

site (e.g., the potential for coming in contact with contamination)

Limited barriers to prevent site access; contamination not covered 2

Moderate access or no intervening barriers, contaminants are

covered. Remote locations in which contaminants not covered.1

Controlled access or remote location and contaminants are

covered0

Do Not Know 1

Controlled or remote

Score 0

B. Potential for human exposure

c) Potential for intake of contaminated soil, water, sediment or foods

for operable or potentially operable pathways, as identified in

Worksheet II (Migration Potential).

i) direct contact

Is dermal contact with contaminated surface water,

groundwater, sediments or soils anticipated?

Yes

No

Do Not Know No

Score 0

ii) inhalation (i.e., inhalation of dust, vapour)

Vapour - Are there inhabitable buildings on the site within 30

m of soils or groundwater with volatile contamination as

determined in Worksheet II (Migration Potential)?

If inhabitable buildings are on the site within 30 m of soils or groundwater exceeding their respective

guidelines for volatile chemicals, there is a potential of risk to human health (Health Canada, 2004).

Review site investigations for location of soil samples (having exceedances of volatile substances)

relative to buildings. Refer to (II) Migration Potential worksheet, 4B.a), Potential for COPCs in Vapour

for a definition of volatility.

Yes

No

Do Not Know Yes

Score 3

Dust - If there is contaminated surface soil (e.g. top 1.5 m) ,

indicate whether the soil is fine or coarse textured. If it is

known that surface soil is not contaminated, enter a score of

zero.

Consult grain size data for the site. If soils (containing exceedances of the CCME soil quality

guidelines) predominantly consist of fine material (having a median grain size of 75 microns; as defined

by CCME (2006)) then these soils are more likely to generate dusts.

Fine 3

Coarse 2

Surface soil is not contaminated or absent 1

Do Not Know Texture 0

Score Coarse

1

inhalation total 4

Exposure via the lungs (inhalation) can be a very important exposure pathway. Inhalation can be via both particulates

(dust) and gas (vapours). Vapours can be a problem where buildings have been built on former industrial sites or where

volatile contaminants have migrated below buildings resulting in the potential for vapour intrusion.

Assesses the potential for humans to be exposed to vapours originating from site soils. The closer the receptor is to a

source of volatile chemicals in soil, the greater the potential of exposure. Also, coarser-grained soil will convey vapour

much more efficiently in the soil than finer grained material such as clays and silts.

General Notes;

Someone experienced must provide a thorough description of the sources researched to determine the presence/absence

of a vapour migration and/or dust generation in the vicinity of

the contaminated site. This information must be documented in the NCS Site Classification Worksheet including contact

names, phone numbers, e-mail correspondence and/or reference

maps/reports and other resource such as internet links.

Selected References;

Canadian Council of Ministers of the Environment (CCME). 2006. Protocol for the Derivation of Environmental

and Human Health Soil Quality Guidelines. PN 1332. www.ccme.ca

Golder, 2004. Soil Vapour Intrusion Guidance for Health Canada Screening Level Risk Assessment (SLRA)

Submitted to Health Canada, Burnaby, BC

Known adverse impact includes domestic and traditional food sources. Adverse effects based on food chain transfer to

humans and/or animals can be scored in this category. However, the weight of evidence must show a direct link of a

contaminated food source/supply and subsequent ingestion/transfer to humans. Any associated adverse effects to the

environment are scored separately later in this worksheet.

Someone experienced must provide a thorough description of the sources researched to evaluate and determine the

quantified exposure/impact (adverse effect) in the vicinity of the contaminated site.

Selected References:

Health Canada – Federal Contaminated Site Risk Assessment in Canada Parts 1 and 2 Guidance on Human Heath

Screening Level Risk Assessments (www.hc-sc.gc.ca/ewh-semt/pubs/contamsite/index_e.html)

United States Environmental Protection Agency, Integrated Risk Information System (IRIS) – http://toxnet.nml.nih.gov

*Where adverse effects on humans are documented, the site should be automatically designated as a

Class 1 site (i.e., action required). There is no need to proceed through the NCS in this case.

However, a scoring guideline (22) is provided in case a numerical score for the site is still desired (e.g.,

for comparison with other Class 1 sites).

This category can be based on the outcomes of risk assessments and applies to studies which have

reported Hazard Quotients >1 for noncarcinogenic chemicals and incremental cancer risks that exceed

acceptable levels defined by the jurisdiction for carcinogenic chemicals (for most jurisdictions this is

typically either >10-5

or >10-6

). Known impacts can also be evaluated based on blood testing (e.g.

blood lead >10 ug/dL) or other health based testing.

This category can be based on the outcomes of risk assessments and applies to studies which have

reported Hazard Quotients of less than 0.2 for non-carcinogenic chemicals and incremental lifetime

cancer risks for carcinogenic chemicals that are within acceptable levels as defined by the jurisdiction

(for most jurisdictions this is less than either 10-6

or 10-5

).

Review location and structures and contaminants at the site and determine if there are intervening

barriers between the site and humans. A low rating should be assigned to a (covered) site surrounded

by a fence or in a remote location, whereas a high score should be assigned to a site that has no

cover, fence, natural barriers or buffer.

If soils or potable groundwater are present exceeding their respective CCME guidelines, dermal

contact is assumed. Exposure to surface water, non-potable groundwater or sediments exceeding their

respective CCME guidelines will depend on the site. Select "Yes" if dermal exposure to surface water,

non-potable groundwater or sediments is expected. For instance, dermal contact with sediments would

not be expected in an active port. Only soils in the top 1.5 m are defined by CCME (2003) as surface

soils. If contaminated soils are only located deeper than 1.5 m, direct contact with soils is not

anticipated to be an operable contaminant exposure pathway.

Exposure via the skin is generally believed to be a minor exposure route. However for some organic contaminants, skin

exposure can play a very important component of overall exposure. Dermal exposure can occur while swimming in

contaminated waters, bathing with contaminated surface water/groundwater and digging in contaminated dirt, etc.

Review zoning and land use maps over the distances indicated. If the proposed future land use is

more “sensitive” than the current land use, evaluate this factor assuming the proposed future use is in

place. Agricultural land use is defined as uses of land where the activities are related to the productive

capability of the land or facility (e.g., greenhouse) and are agricultural in nature, or activities related to

the feeding and housing of animals as livestock. Residential/Parkland land uses are defined as uses of

land on which dwelling on a permanent, temporary, or seasonal basis is the activity (residential), as

well as uses on which the activities are recreational in nature and require the natural or human

designed capability of the land to sustain that activity (parkland). Commercial/Industrial land uses are

defined as land on which the activities are related to the buying, selling, or trading of merchandise or

services (commercial), as well as land uses which are related to the production, manufacture, or

storage of materials (industrial).

Rationale for Score

(document any assumptions, reports, or site-specific information;

provide references)

NOTE: If a score is assigned here for Known Exposure, then you can

skip Part B (Potential for Human Exposure) and go to Section 2 (Human Exposure Modifying Factors)

Within National Park.

Site is remote and controlled access.

Contaminated soil is currently beneath a building

Contaminated soil is currently beneath a building

CCME National Classification System for Contaminated Sites

(2008, 2010 v 1.2) Page 1 of 4

Page 188: SPECIFICATION Building Demolition and Remediation of

CCME National Classification System (2008, 2010 v 1.2)

(III) Exposure (Demonstrates the presence of an exposure pathway and receptors)

Mount Agassiz Ski Hill Facility

Definition Score Method Of Evaluation Notes

Rationale for Score

(document any assumptions, reports, or site-specific information;

provide references)

B. Potential for human exposure

iii) Ingestion (i.e., ingestion of food items, water and soils [for

children]), including traditional foods.

Drinking Water: Choose a score based on the proximity to a

drinking water supply, to indicate the potential for

contamination (present or future).

0 to 100 m 3

100 to 300 m 2.5

300 m to 1 km 2

1 to 5 km 1.5

No drinking water present

Do Not Know 2

No drinking water present

Score 0

Is an alternative water supply readily available?

Yes

No

Do Not Know Yes

Score 0

Is human ingestion of contaminated soils possible?

Yes

No

Do Not Know Yes

Score 3

Are food items consumed by people, such as plants,

domestic animals or wildlife harvested from the contaminated

land and its surroundings?

Yes

No

Do Not Know No

Score 0

Ingestion total 3

Human Health Total "Potential" Score 9

Allowed "Potential" Score 9

2. Human Exposure Modifying Factors

a) Strong reliance of local people on natural resources for survival

(i.e., food, water, shelter, etc.)No

Yes

No

Do Not Know

Known 0

Potential ---

Raw Human "known" total 0

Raw Human "potential" total 9

Raw Human Exposure Total Score 9

Human Health Total (max 22) 9.0

3. Ecological

A. Known exposure

Documented adverse impact or high quantified exposure which has or

will result in an adverse effect, injury or harm or impairment of the

safety to terrestrial or aquatic organisms as a result of the

contaminated site.

18

Some low levels of impact to ecological receptors are considered acceptable, particularly on

commercial and industrial land uses. However, if ecological effects are deemed to be severe, the site

may be categorized as class one (i.e., a priority for remediation or risk management), regardless of the

numerical total NCS score. For the purpose of application of the NCS, effects that would be

considered severe include observed effects on survival, growth or reproduction which could threaten

the viability of a population of ecological receptors at the site. Other evidence that qualifies as severe

adverse effects may be determined based on professional judgement and in consultation with the

relevant jurisdiction. If ecological effects are determined to be severe and an automatic Class 1 is

assigned, there is no need to proceed through the NCS. However, a scoring guideline (18) is provided

in case a numerical score for the site is still desired (e.g., for comparison with other Class 1 sites).

Same as above, but "Strongly Suspected" based on observations or

indirect evidence.12

This category can be based on the outcomes of risk assessments and applies to studies which have

reported Hazard Quotients >1. Alternatively, known impacts can also be evaluated based on a weight

of evidence assessment involving a combination of site observations, tissue testing, toxicity testing and

quantitative community assessments. Scoring of adverse effects on individual rare or endangered

species will be completed on a case-by-case basis with full scientific justification.

No quantified or suspected exposures/impacts in terrestrial or aquatic

organisms0

Go to Potential

Go to Potential

Score ---

---

If contaminated soils are located within the top 1.5 m, it is assumed that ingestion of soils is an

operable exposure pathway. Exposure to soils deeper than 1.5 m is possible, but less likely, and the

duration is shorter. Refer to human health risk assessment reports for the site in question.

Use human health risk assessment reports (or others) to determine if there is significant reliance on

traditional food sources associated with the site. Is the food item in question going to spend a large

proportion of its time at the site (e.g., large mammals may spend a very small amount of time at a

small contaminated site)? Human health risk assessment reports for the site in question will also

provide information on potential bioaccumulation of the COPC in question.

Note if a "Known" Human Health score is provided, the "Potential" score is

disallowed.

NOTE: If a score is assigned here for Known Exposure, then you can

skip Part B (Potential for Ecological Exposure) and go to Section 4 (Ecological Exposure Modifying Factors)

Wells draw from deep aquifer >5 m below clay layer

see above

Selected References:

Guidelines for Canadian Drinking Water Quality: www.hc-sc.gc.ca/hecs-

sesc/water/publications/drinking_water_quality_guidelines/toc.htm

Drinking water can be an extremely important exposure pathway to humans. If site groundwater or surface water is not

used for drinking, then this pathway is considered to be inoperable.

Consider both wild foods such as salmon, venison, caribou, as well as agricultural sources of food items if the

contaminated site is on or adjacent to agricultural land uses.

CCME, 1999: Canadian Water Quality Guidelines for the Protection of Aquatic Life. www.ccme.ca

CCME, 1999: Canadian Water Quality Guidelines for the Protection of Agricultural Water Uses. www.ccme.ca

Sensitive receptors- review: Canadian Council on Ecological Areas; www.ccea.org.

Ecological effects should be evaluated at a population or community level, as opposed to at the level of individuals. For

example, population-level effects could include reduced reproduction, growth or survival in a species. Community-level

effects could include reduced species diversity or relative abundances. Further discussion of ecological assessment

endpoints is provided in A Framework for Ecological Risk Assessment: General Guidance (CCME 1996).

Notes:

Someone experienced must provide a thorough description of the sources researched to classify the environmental

receptors in the vicinity of the contaminated site. This information must be documented in the NCS Site Classification

Worksheet including contact names, phone numbers, e-mail correspondence and/or reference maps/reports and other

resource such as internet links.

Review available site data to determine if drinking water (groundwater, surface water, private,

commercial or municipal supply) is known or suspected to be contaminated above Guidelines for

Canadian Drinking Water Quality. If drinking water supply is known to be contaminated, some

immediate action (e.g., provision of alternate drinking water supply) should be initiated to reduce or

eliminate exposure.

The evaluation of significant potential for exceedances of the water supply in the future may be based

on the capture zones of the drinking water wells; contaminant travel times; computer modelling of flow

and contaminant transport.

This category can be based on the outcomes of risk assessments and applies to studies which have

reported Hazard Quotients of less than 1 and no other observable or measurable sign of impacts.

Alternatively, it can be based on a combination of other lines of evidence showing no adverse effects,

such as site observations, tissue testing, toxicity testing and quantitative community assessments.

it is possible

No food items harvested

No strong reliance of local people on natural resources for survival.

CCME National Classification System for Contaminated Sites

(2008, 2010 v 1.2) Page 2 of 4

Page 189: SPECIFICATION Building Demolition and Remediation of

CCME National Classification System (2008, 2010 v 1.2)

(III) Exposure (Demonstrates the presence of an exposure pathway and receptors)

Mount Agassiz Ski Hill Facility

Definition Score Method Of Evaluation Notes

Rationale for Score

(document any assumptions, reports, or site-specific information;

provide references)

B. Potential for ecological exposure (for the contaminated portion of the

site)

a) Terrestrial

i) Land use

Agricultural (or Wild lands) 3

Residential/Parkland 2

Commercial 1

Industrial 0.5

Do Not Know 1.5

Residential/Parkland

Score 2

ii) Uptake potential

Direct Contact - Are plants and/or soil invertebrates likely

exposed to contaminated soils at the site?No

Yes

No

Do Not Know

Score 0

iii) Ingestion (i.e., wildlife or domestic animals ingesting

contaminated food items, soils or water)

Are terrestrial animals likely to be ingesting contaminated

water at the site?

Yes

No

Do Not Know No

Score 0

Are terrestrial animals likely to be ingesting contaminated

soils at the site?

Refer to an Ecological Risk Assessment report. Most animals will co-ingest some soil while eating

plant matter or soil invertebrates.

Yes

No

Do Not Know No

Score 0

Can the contamination identified bioaccumulate?

Yes

No

Do Not Know Yes

Score 1

Distance to sensitive terrestrial ecological area

0 to 300 m 3

300 m to 1 km 2

1 to 5 km 1

> 5 km 0.5

Do Not Know 1.5

0 to 300 m

Score 3

Raw Terrestrial Total Potential 6

Allowed Terrestrial Total Potential 6

B. Potential for ecological exposure (for the contaminated portion of the

site)

b) Aquatic

i) Classification of aquatic environment

Sensitive 3

Typical 1

Not Applicable (no aquatic environment

Do Not Know 2

Sensitive

Score 3

ii) Uptake potential

Does groundwater daylighting to an aquatic environment

exceed the CCME water quality guidelines for the protection

of aquatic life at the point of contact?Yes

No (or Not Applicable)

Do Not Know No

Score 0

Distance from the contaminated site to an important surface

water resource

Environmental receptors include: local, regional or provincial species of interest or significance, sensitive wetlands and

fens and other aquatic environments.0 to 300 m 3

300 m to 1 km 2

1 to 5 km 1

> 5 km 0.5

Do Not Know 1.5

0 to 300 m

Score 3

It is considered that within 300 m of a site, there is a concern for contamination. Therefore an

environmental receptor located within this area of the site will be subject to further evaluations. It is

also considered that any environmental receptor located greater than 5 km will not be a concern for

evaluation. Review Conservation Authority mapping and literature including Canadian Council on

Ecological Areas link: www.ccea.org.

If contaminated soils are located within the top 1.5 m, it is assumed that direct contact of soils with

plants and soil invertebrates is an operable exposure pathway. Exposure to soils deeper than 1.5 m is

possible, but less likely.

Bioaccumulation of contaminants within food items is considered possible if:

1) The Log(Kow) of the contaminant is greater than 4 (as per the chemical characteristics work sheet)

and concentrations in soils exceed the most conservative CCME soil quality guideline for the intended

land use, or 2) The contaminant in collected tissue samples exceeds the Canadian Tissue Residue

Guidelines.

Refer to an Ecological Risk Assessment for the site. If there is contaminated surface water at the site,

assume that terrestrial organisms will ingest it.

Bioaccumulation of food items is possible if:

1) The Log(Kow) of the contaminant is greater than 4 (as per the chemical characteristics work sheet)

and concentrations in sediments exceed the CCME ISQGs.

2) The contaminant in collected tissue samples exceeds the CCME tissue quality guidelines.

"Sensitive aquatic environments" include those in or adjacent to shellfish or fish harvesting areas,

marine parks, ecological reserves and fish migration paths. Also includes those areas deemed to have

ecological significance such as for fish food resources, spawning areas or having rare or endangered

species.

"Typical aquatic environments" include those in areas other than those listed above.

Environmental receptors include: local, regional or provincial species of interest or significance; arctic environments (on a

site specific basis); nature preserves, habitats for species at risk, sensitive forests, natural parks or forests.

It is considered that within 300 m of a site, there is a concern for contamination. Therefore an

environmental receptor or important water resource located within this area of the site will be subject to

further evaluation. It is also considered that any environmental receptor located greater than 5 km

away will not be a concern for evaluation. Review Conservation Authority mapping and literature

including Canadian Council on Ecological Areas link: www.ccea.org.

Groundwater concentrations of contaminants at the point of contact with an aquatic receiving

environment can be estimated in three ways:

1) by comparing collected nearshore groundwater concentrations to the CCME water quality guidelines

(this will be a conservative comparison, as contaminant concentrations in groundwater often decrease

between nearshore wells and the point of discharge).

2) by conducting groundwater modeling to estimate the concentration of groundwater immediately

before discharge.

3) by installing water samplers, "peepers", in the sediments in the area of daylighting groundwater.

Review zoning and land use maps. If the proposed future land use is more “sensitive” than the current

land use, evaluate this factor assuming the proposed future use is in place (indicate in the worksheet

that future land use is the consideration).

Agricultural land use is defined as uses of land where the activities are related to the productive

capability of the land or facility (e.g., greenhouse) and are agricultural in nature, or activities related to

the feeding and housing of animals as livestock. Wild lands are grouped with agricultural land due to

the similarities in receptors that would be expected to occur there (e.g., herbivorous mammals and

birds) and the similar need for a high level of protection to ensure ecological functioning.

Residential/Parkland land uses are defined as uses of land on which dwelling on a permanent,

temporary, or seasonal basis is the activity (residential), as well as uses on which the activities are

recreational in nature and require the natural or human designed capability of the land to sustain that

activity (parkland). Commercial/Industrial land uses are defined as land on which the activities are

related to the buying, selling, or trading of merchandise or services (commercial), as well as land uses

which are related to the production, manufacture, or storage of materials (industrial).

Note if a "Known" Ecological Effects score is provided, the "Potential" score is

disallowed.

Contaminated soils are beneath building.

No contaminated surface water

Contaminated soils are beneath building.

National park

Some of the PAH exceedances in Groundwater have log(Kow)>4

National park

No groundwater daylighting

CCME National Classification System for Contaminated Sites

(2008, 2010 v 1.2) Page 3 of 4

Page 190: SPECIFICATION Building Demolition and Remediation of

CCME National Classification System (2008, 2010 v 1.2)

(III) Exposure (Demonstrates the presence of an exposure pathway and receptors)

Mount Agassiz Ski Hill Facility

Definition Score Method Of Evaluation Notes

Rationale for Score

(document any assumptions, reports, or site-specific information;

provide references)

Are aquatic species (i.e., forage fish, invertebrates or plants)

that are consumed by predatory fish or wildlife consumers,

such as mammals and birds, likely to accumulate

contaminants in their tissues?

Yes

No

Do Not Know No

Score 0

Raw Aquatic Total Potential 6

Allowed Aquatic Total Potential 6

4. Ecological Exposure Modifying Factors

a) Known occurrence of a species at risk.

Consult any ecological risk assessment reports. If information is not present, utilize on-line databases

such as Eco Explorer. Regional, Provincial (Environment Ministries), or Federal staff (Fisheries and

Oceans or Environment Canada) should be able to provide some guidance.

Is there a potential for a species at risk to be present at the site?

Yes

No

Do Not Know Yes

2

Score ---

b) Potential impact of aesthetics (e.g., enrichment of a lake or tainting of

food flavor).

Is there evidence of aesthetic impact to receiving water bodies? NoDocumentation may consist of environmental investigation reports, press articles, petitions or other

records.

Yes

No 0

Do Not Know ---

Is there evidence of olfactory impact (i.e., unpleasant smell)? No

Yes

No 0

Do Not Know ---

Is there evidence of increase in plant growth in the lake or water

body?No

A distinct increase of plant growth in an aquatic environment may suggest enrichment. Nutrients e.g.,

nitrogen or phosphorous releases to an aquatic body can act as a fertilizer.

Yes

No 0

Do Not Know ---

Is there evidence that fish or meat taken from or adjacent to the

site smells or tastes different?No

Some contaminants can result in a distinctive change in the way food gathered from the site tastes or

smells.

Yes 0

No ---

Do Not Know

Ecological Modifying Factors Total - Known 2

Ecological Modifying Factors Total - Potential ---

Raw Ecological Total - Known 2

Raw Ecological Total - Potential 12

Raw Ecological Total 14

Ecological Total (Max 18) 14.0

5. Other Potential Contaminant Receptors

a) Exposure of permafrost (leading to erosion and structural concerns)

Plants and lichens provide a natural insulating layer which will help prevent thawing of the permafrost during the summer.

Plants and lichens may also absorb less solar radiation. Solar radiation is turned into heat which can also cause

underlying permafrost to melt.

Are there improvements (roads, buildings) at the site dependant

upon the permafrost for structural integrity?No

Consult engineering reports, site plans or air photos of the site. When permafrost melts, the stability of

the soil decreases, leading to erosion. Human structures, such as roads and/or buildings are often

dependent on the stability that the permafrost provides.

Yes

No 0

Do Not Know ---

Is there a physical pathway which can transport soils released by

damaged permafrost to a nearby aquatic environment?Do Not Know

Yes

No ---

Do Not Know 1

Other Potential Receptors Total - Known 0

Other Potential Receptors Total - Potential 1

Exposure Total

Raw Human Health + Ecological Total - Known 2

Raw Human Health + Ecological Total - Potential 22

Raw Total 24

Exposure Total (max 34) 17.7

This Item will require some level of documentation by user, including contact names, addresses, phone numbers, e-mail

addresses. Evidence of changes must be documented, please attach copy of report containing relevant information.

Species at risk include those that are extirpated, endangered, threatened, or of special concern. For a list of species at

risk, consult Schedule 1 of the federal Species at Risk Act

(http://www.sararegistry.gc.ca/species/schedules_e.cfm?id=1). Many provincial governments may also provide regionally

applicable lists of species at risk. For example, in British Columbia, consult:

BCMWLAP. 2005. Endangered Species and Ecosystems in British Columbia. Provincial red and blue lists. Ministry of

Sustainable Resource Management and Water, Land and Air Protection. http://srmwww.gov.bc.ca/atrisk/red-blue.htm

Bioaccumulation of food items is possible if:

1) The Log(Kow) of the contaminant is greater than 4 (as per the chemical characteristics work sheet)

and concentrations in sediments exceed the CCME ISQGs.

2) The contaminant in collected tissue samples exceeds the CCME tissue quality guidelines.

Melting permafrost leads to a decreased stability of underlying soils. Wind or surface run-off erosion

can carry soils into nearby aquatic habitats. The increased soil loadings into a river can cause an

increase in total dissolved solids and a resulting decrease in aquatic habitat quality. In addition, the

erosion can bring contaminants from soils to aquatic environments.

Examples of olfactory change can include the smell of a COPC or an increase in the rate of decay in

an aquatic habitat.

Only includes "Allowed potential" - if a "Known" score was supplied under a

given category then the "Potential" score was not included.

Note if a "Known" Ecological Effects score is provided, the "Potential" score is

disallowed.

Bioaccumulatin not expected based on contaminants.

Not present

No permafrost

The national park is the core protected area of the Riding Mountain

Biosphere Reserve and provides critical habitat for species at risk, such as

the Chimney Swift, the Common Nighthawk, the Golden-winged Warbler,

the Olive-sided Flycatcher and the Red-headed Woodpecker.

No impact observed

None observed

None observed

None observed

CCME National Classification System for Contaminated Sites

(2008, 2010 v 1.2) Page 4 of 4

Page 191: SPECIFICATION Building Demolition and Remediation of

CCME National Classification System (2008, 2010 v 1.2)

Score Summary

Scores from individual worksheets are tallied in this worksheet.

Refer to this sheet after filling out the revised NCS completely.

I. Contaminant Characteristics Known Potential II. Migration Potential Known Potential III. Exposure Known Potential

1. Residency Media 2 1 1. Groundwater Movement 12 --- 1. Human Receptors

2. Chemical Hazard 8 --- 2. Surface Water Movement --- 10.1 A. Known Impact ---

3. Contaminant Exceedance Factor 4 --- 3. Soil 12 --- B Potential

4. Contaminant Quantity 2 --- 4. Vapour --- 12 a. Land Use 2

5. Modifying Factors 4 --- 5. Sediment Movement --- 4 b. Accessibility 0

6. Modifying Factors 4 0 c. Exposure Route

Raw Total Score 20 1 i. Direct Contact 0

Raw Total Score (Known + Potential) 21 Raw Total Score 28 26.1 ii. Inhalation 4

Raw Total Score (Known + Potential) 54.1 iii. Ingestion 3

Adjusted Total Score (Raw Total / 40 *33) 17.3 (max 33) 2. Human Receptors Modifying Factors 0 ---

Adjusted Total Score (Raw Total / 64 * 33) 27.9 (max 33) Raw Total Human Score 0 9

Raw Total Human Score (Known + Potential) 9

Adjusted Total Human Score 9.0 (maximum 22)

3. Ecological Receptors

A. Known Impact ---

B. Potential

a. Terrestrial 6

b. Aquatic 6

4. Ecological Receptors Modifying Factors 2 ---

Raw Total Ecological Score 2 12

Raw Total Ecological Score (Known + Potential) 14

Adjusted Total Ecological Score 14.0 (maximum 18)

5. Other Receptors 0 1

Total Other Receptors Score (Known + Potential) 1

Total Exposure Score (Human + Ecological + Other) 24.0

Adjusted Total Exposure Score (Total Exposure / 46 * 34) 17.7 (max 34)

Site ScoreMount Agassiz Ski Hill Facility Site Classification Categories*:

Site Letter Grade C Class 1 - High Priority for Action (Total NCS Score >70)

Certainty Percentage 69% Class 2 - Medium Priority for Action (Total NCS Score 50 - 69.9)

% Responses that are "Do Not Know" -2% Class 3 - Low Priority for Action (Total NCS Score 37 - 49.9)

Class N - Not a Priority for Action (Total NCS Score <37)

Total NCSCS Score for site 63.0 Class INS - Insufficient Information (>15% of responses are "Do Not Know")

Site Classification Category 2* NOTE: The term "action" in the above categories does not necessarily refer to remediation, but could also include

risk assessment, risk management or further site characterization and data collection.

CCME National Classification System for Contaminated Sites

(2008, 2010 v 1.2) Page 1 of 1

Page 192: SPECIFICATION Building Demolition and Remediation of

The information on Koc is used in Sheet II (Migration Potential), section 1,B,f (Hydraulic Conductivity)

CCME National Classification System for Contaminated Sites

(2008, 2010 v 1.2) 1 of 1

Page 193: SPECIFICATION Building Demolition and Remediation of

CCME National Classification System (2008, 2010 v 1.2)

Contaminant Hazard Ranking(Based on the Proposed Hazard Ranking developed for the FCSAP Contaminated Sites Classification System)

This information is used in Sheet I (Contaminant Characteristics), section 2 (Chemical Hazard).

Chemical/Parameter Hazard CEPA Carcinogenicity Notes

Acetaldehyde H * PHC

Acetone L

Acrolein H *

Acrylonitrile H * PHC

Alachlor M

Aldicarb H

Aldrin H

Allyl Alcohol H

Aluminum L

Ammonia L *

Antimony H

Arsenic H *

Atrazine M

Azinphos-Methyl H

Barium L

Bendiocarb H

Benzene H * CHC BTEX

Benzidine H * CHC

Beryllium H CHC

Biphenyl, 1,1- M

2,3,4,5-Bis(2-Butylene)tetrahydro-2-furfural H

Bis(Chloromethyl)Ether H * CHC

Bis(2-Chloroethyl)Ether H CHC

Bis(2-Chloroisopropyl)Ether H

Bis(2-Ethylhexyl)Phthalate H * PH

Boron L

Bromacil M

Bromate M

Bromochlorodifluoromethane M * HM

Bromochloromethane H * HM

Bromodichloromethane H HM

Bromoform (Tribromomethane) H PHC HM

Bromomethane M HM

Bromotrifluoromethane M * HM

Bromoxynil H

Butadiene, 1,3- H * CHC

Cadmium H * CHC

Carbofuran M

Carbon Tetrachloride (Tetrachloromethane) H PHC HM

Captafol M

Chloramines M *

Chloride L

CCME National Classification System for Contaminated Sites

(2008, 2010 v 1.2) 1 of 7

Page 194: SPECIFICATION Building Demolition and Remediation of

Chemical/Parameter Hazard CEPA Carcinogenicity Notes

Chloroaniline, P- H

Chlorobenzene (mono) M

Chlorobenzilate M

Chlorodimeform M

Chloroform H PHC HM

Chloromethane M

Chloromethyl Methyl Ether M *

(4-Chlorophenyl)Cyclopropylmethanone, O-((4-

Nitrophenyl)Methyl)Oxime H

Chlorinated Benzenes

Monochlorobenzene M

Dichlorobenzene, 1,2- (O-DCB) M

Dichlorobenzene, 1,3- (M-DCB) M

Dichlorobenzene, 1,4- (P-DCB) H

Trichlorobenzene, 1,2,3- M

Trichlorobenzene, 1,2,4- M

Trichlorobenzene, 1,3,5- M

Tetrachlorobenzene, 1,2,3,4- M

Tetrachlorobenzene, 1,2,3,5- M

Tetrachlorobenzene, 1,2,4,5- M

Pentachlorobenzene M

Hexachlorobenzene H

Chlorinated Ethanes

Dichloroethane, 1,1- M

Dichloroethane, 1,2- (Ethylene Dichloride (EDC)) H PHC

Trichloroethane, 1,1,1- H *

Trichloroethane, 1,1,2- M

Tetrachloroethane, 1,1,1,2- M

Tetrachloroethane, 1,1,2,2- M

Chlorinated Ethenes

Monochloroethene (Vinyl Chloride) H * CHC

Dichloroeth(yl)ene, 1,1- H

Dichloroeth(yl)ene, 1,2- (cis or trans) M

Trichloroeth(yl)ene (TCE) H *

Tetrachloroeth(yl)ene (PCE) H *

Chlorinated Phenols *

Monochlorophenols M

Chlorophenol, 2- M

Dichlorophenols

Dichlorophenol, 2,4- M

Trichlorophenols

Trichlorophenol, 2,4,5- H

Trichlorophenol, 2,4,6- H PHC

Tetrachlorophenols

Tetrachlorophenol, 2,3,4,6- H

Pentachlorophenol (PCP) H

Chloromethane M HM

Chlorophenol, 2- M CP

Chlorothalonil H

CCME National Classification System for Contaminated Sites

(2008, 2010 v 1.2) 2 of 7

Page 195: SPECIFICATION Building Demolition and Remediation of

Chemical/Parameter Hazard CEPA Carcinogenicity Notes

Chlorpyrifos H

Chromium (Total) M *

Chromium (III) L *

Chromium (VI) H * CHC

Coal Tar H CHC Refer to PAHs

Cobalt L

Copper L

Creosote M * Refer to PAHs

Crocidolite L

Cyanide (Free) H

Cyanazine M

Dibenzofuran H * DF

Dibromoethane, 1,2- (Ethylene Dibromide (EDB)) H PHC

1,2-Dibromo-3-Chloropropane H PHC

Dibromochloromethane M * HM

Dibromotetrafluoroethane M

Dichlorobenzene, 1,2- (O-DCB) M CB

Dichlorobenzene, 1,3- (M-DCB) M CB

Dichlorobenzene, 1,4- (P-DCB) H CB

Dichlorobenzidine, 3,3'- H PHC

DDD H

DDE H

DDT H PHC

Deltamethrin M

Diazinon M

Dicamba H

Dichloroethane, 1,1- H CEA

Dichloroethane, 1,2- (EDC) H PHC CEA

Dichloroeth(yl)ene, 1,1- H CEE

Dichloroeth(yl)ene, Cis-1,2- M CEE

Dichloroeth(yl)ene, Trans-1,2- M CEE

Dichloromethane (Methylene Chloride) H PHC HM

Dichlorophenol, 2,4- M CP

Dichloropropane, 1,2- H

Dichloropropene, 1,3- H PHC

Diclofop-Methyl H

Didecyl Dimethyl Ammonium Chloride H

Dieldrin H

Dimethoate H

Diethyl Phthalate M PH

Diethylene Glycol L GL

Dimethyl Phthalate M PH

Dimethylphenol, 2,4- L

Dinitrophenol, 2,4- M

Dinitrotoluene, 2,4- H

Dinoseb H

Di-n-octyl Phthalate H

Dioxane, 1,4- H PHC

Dioxins/Furans H

Diquat M

CCME National Classification System for Contaminated Sites

(2008, 2010 v 1.2) 3 of 7

Page 196: SPECIFICATION Building Demolition and Remediation of

Chemical/Parameter Hazard CEPA Carcinogenicity Notes

Diuron M

Endosulfan H

Endrin H

Ethylbenzene M BTEX

Ethylene Dibromide (EDB) H PHC

Ethylene Glycol L GL

Ethylene Oxide H CHC

Fluoroacetamide M

Fluorides L *

Glycols

Ethylene Glycol L

Diethylene Glycol L

Propylene Glycol L

Glyphosate M

Halogenated Methanes

Bromochlorodifluoromethane M *

Bromochloromethane M *

Bromodichloromethane H PHC

Bromomethane M

Bromotrifluoromethane M *

Chloroform M PHC HM

Chloromethane M

Dibromochloromethane M

Dichloromethane (Methylene Chloride) H PHC

Methyl Bromide M *

Tetrachloromethane (Carbon Tetrachloride) H

Tribromomethane (Bromoform) H

Trihalomethanes (THM) M

Heptachlor H

Heptachlor Epoxide H

Hexachlorobenzene H PHC

Hexachlorobutadiene H

Hexachlorocyclohexane, Gamma H PHC

Hexachloroethane H PHC

Hydrobromofluorocarbons (HBFCS) M *

Hydrochlorofluorocarbons (HCFCS) M *

3-Iodo-2-propynyl Butyl Carbamate H

Iron L

Lead H *

neurotoxins /

teratogens

Lead Arsenate H

Leptophos H

Lindane H

Linuron H

Lithium L

Malathion M

Manganese L

CCME National Classification System for Contaminated Sites

(2008, 2010 v 1.2) 4 of 7

Page 197: SPECIFICATION Building Demolition and Remediation of

Chemical/Parameter Hazard CEPA Carcinogenicity Notes

Mercury H *

Methamidophos H

Methoxylchlor H

Methyl Bromide (Bromomethane) M *

2-Methyl-4-chloro-phenoxy Acetic Acid M

Methyl Ethyl Ketone L

Methyl Isobutyl Ketone L

Methyl Mercury H

Methyl-Parathion H

Methyl Tert Butyl Ether (MTBE) M

Metolachlor M

Metribuzin H

Molybdenum L

Monochloramine M

Monocrotophos H

Nickel H * CEPA - inhalation

Nitrilotriacetic Acid H PHC

Nitrate L

Nitrite M

Nonylphenol + Ethoxylates H *

Organotins

Tributyltin H

Tricyclohexyltin H

Triphenyltin H

Parathion H

Paraquat (as Dichloride) H

Pentachlorobenzene M CB

Pentachlorophenol (PCP) H CP

Petroleum Hydrocarbons

Petroleum Hydrocarbons (Gasoline) H

Petroleum Hydrocarbons (Kerosene incl. Jet Fuels) H

Petroleum Hydrocarbons (Diesel incl Heating Oil) M

Petroleum Hydrocarbons (Heavy Oils) L

Petroleum Hydrocarbons (CCME F1) H

Petroleum Hydrocarbons (CCME F2) M

Petroleum Hydrocarbons (CCME F3) L

Petroleum Hydrocarbons (CCME F4) L

Phenol L

Phenoxy Herbicides M

Phorate H

Phosphamidon H

Phthalate Esters

Bis(2-Ethylhexyl)Phthalate H *

Diethyl Phthalate H

Dimethyl Phthalate H

Di-n-octyl Phthalate H

Polybrominated Biphenyls (PBB) H *

Polychlorinated Biphenyls (PCB) H

Ranking based

upon fraction of

toxic and mobile

components in

product. Lighter

compounds such

as benzene are

more toxic and

mobile.

CCME National Classification System for Contaminated Sites

(2008, 2010 v 1.2) 5 of 7

Page 198: SPECIFICATION Building Demolition and Remediation of

Chemical/Parameter Hazard CEPA Carcinogenicity Notes

Polychlorinated Terphenyls H *

Polycyclic Aromatic Hydrocarbons H * PHC

Acenaphthene M

Acenaphthylene M

Acridine H

Anthracene M

Benzo(a)anthracene H PHC

Benzo(a)pyrene H PHC

Benzo(b)fluoranthene H PHC

Benzo(g,h,i)perylene H

Benzo(k)fluoranthene H PHC

Chrysene M

Dibenzo(a,h)anthracene H PHC

Fluoranthene M

Fluorene M

Indeno(1,2,3-c,d)pyrene H PHC

Methylnaphthalenes M

Naphthalene M

Phenanthrene M

Pyrene M

Quinoline H

Propylene Glycol L GL

Radium H

Radon H

Selenium M

Silver L

Simazine M

Sodium L

Strontium-90 H

Strychnine H

Styrene H

Sulphate L

Sulphide L

2,3,7,8-Tetrachlorodibenzo-p-dioxins (TCDD) H * DF

Tebuthiuron H

Tetrachloroeth(yl)ene (PCE) H * CEE

Tetraethyl Lead H

Tetrachlorobenzene, 1,2,3,4- H CB

Tetrachlorobenzene, 1,2,3,5- H CB

Tetrachlorobenzene, 1,2,4,5- H CB

Tetrachloroethane, 1,1,1,2- M CEA

Tetrachloroethane, 1,1,2,2- M CEA

Tetrachlorophenol, 2,3,4,6- H CP

Tetramethyl Lead H *

Thallium M

Thiophene M

Tin L

Toluene M BTEX

Toxaphene H

CCME National Classification System for Contaminated Sites

(2008, 2010 v 1.2) 6 of 7

Page 199: SPECIFICATION Building Demolition and Remediation of

Chemical/Parameter Hazard CEPA Carcinogenicity Notes

Triallate M

Tribromomethane (Bromoform) H HM

Tributyltetradecylphosphonium Chloride H *

Trichlorobenzene, 1,2,3- H CB

Trichlorobenzene, 1,2,4- H CB

Trichlorobenzene, 1,3,5- H CB

Trichloroethane, 1,1,1- H * CEA

Trichloroethane, 1,1,2- M CEA

Trichloroeth(yl)ene (TCE) H * CEE

Tricyclohexyltin Hydroxide H

Trichlorophenol, 2,4,5- H CP

Trichlorophenol, 2,4,6- H PHC CP

Trifluralin H

Trihalomethanes (THM) M

Tris(2,3-Dibromopropyl)phosphate H

Tritium L

Uranium (Non-radioactive) / (Radioactive) M/H

Vanadium M

Vinyl Chloride H * CHC CEE

Xylenes M BTEX

Zinc L

H = High Hazard

M = Medium Hazard

L = Low Hazard

Hazard ratings based on a number of factors including potential human and ecological health effects.

PHC = Potential Human Carcinogen

CHC = Confirmed Human Carcinogen

BTEX = benzene, toluene, ethylbenzene, and xylenes

CB = chlorobenzenes

CEA = chlorinated ethanes

CEE = chlorinated ethenes

CP = chlorophenols

DF = dioxins and furans

GL = glycols

HM = halomethanes

PAH = polycyclic aromatic hydrocarbons

PH = phthalate esters

CCME National Classification System for Contaminated Sites

(2008, 2010 v 1.2) 7 of 7

Page 200: SPECIFICATION Building Demolition and Remediation of

CCME National Classification System (2008, 2010 v 1.2)

Reference Material (Information to assist in scoring)

Examples of Persistent Substances

This information is used in Sheet I (Chemical Characteristics), section 5 (Modifying Factors).

aldrin dieldrin PCBs

benzo(a)pyrene hexachlorobenzene PCDDs/PCDFs (dioxins and furans)

chlordane methylmercury toxaphene

DDT mirex alkylated lead

DDE octachlorostyrene

Examples of Substances in the Various Chemical Classes

This information is used in Sheet I (Chemical Characteristics), section 5 (Modifying Factors).

Chemical Class

inorganic substances (including metals)

volatile petroleum hydrocarbons

phthalate esters

pesticides

light extractable petroleum hydrocarbons

chlorinated hydrocarbons

DDT, hexachlorocyclohexane

* Note: Specific chemicals that belong to the various classes are not limited to those listed in this table. These lists are not exhaustive

and are meant just to provide examples of substances that are typically encountered.

Examples *

arsenic, barium, cadmium, hexavalent chromium, copper, cyanide, fluoride, lead, mercury,

nickel, selenium, sulphur, zinc; brines or salts

benzene, toluene, ethylbenzene, xylenes, PHC F1

PHC F2

di-isononyl phthalate (DINP), di-isodecyl phthalate (DIDP), di-2-ethylhexyl phthalate

(DEHP)

heavy extractable petroleum hydrocarbons

PAHs

phenolic substances

PCBs, tetrachloroethylene, trichloroethylene, dioxins and furans, trichlorobenzene,

tetrachlorobenzene, pentachlorobenzene, hexachlorobenzene

PHC F3

Benzo(a)anthracene, benzo(b)fluoranthene, benzo(k)fluoranthene, benzo(a)pyrene,

dibenz(a,h0anthracene, indeno(1,2,3-c,d)pyrene, naphthalene, phenanthrene, pyrene

phenol, pentachlorophenol, chlorophenols, nonchlorinated phenols (e.g., 2,4-dinitrophenol,

cresol, etc.)

carbon tetrachloride, chloroform, dichloromethanehalogenated methanes

CCME National Classification System for Contaminated Sites

(2008, 2010 v 1.2) 1 of 4

Page 201: SPECIFICATION Building Demolition and Remediation of

CAS No. Compound

Solubility in Water @

20-25°C (mg/L)

Henry's Law Constant

(atm-m3/mol)

Dimensionless Henry's law

constant (HLC [atm-m3/mol] * 41)

(25 °C). log Kow

Log Koc

(L/kg)

83-32-9 Acenaphthene 4.24E+00 1.55E-04 6.36E-03 3.92 3.85

67-64-1 Acetone 1.00E+06 3.88E-05 1.59E-03 -0.24 -0.24

309-00-2 Aldrin 1.80E-01 1.70E-04 6.97E-03 6.5 6.39

120-12-7 Anthracene 4.34E-02 6.50E-05 2.67E-03 4.55 4.47

56-55-3 Benz(a)anthracene 9.40E-03 3.35E-06 1.37E-04 5.7 5.6

71-43-2 Benzene 1.75E+03 5.55E-03 2.28E-01 2.13 1.77

205-99-2 Benzo(b)fluoranthene 1.50E-03 1.11E-04 4.55E-03 6.2 6.09

207-08-9 Benzo(k)fluoranthene 8.00E-04 8.29E-07 3.40E-05 6.2 6.09

65-85-0 Benzoic acid 3.50E+03 1.54E-06 6.31E-05 1.86 —

50-32-8 Benzo(a)pyrene 1.62E-03 1.13E-06 4.63E-05 6.11 6.01

111-44-4 Bis(2-chloroethyl)ether 1.72E+04 1.80E-05 7.38E-04 1.21 1.19

117-81-7 Bis(2-ethylhexyl)phthalate 3.40E-01 1.02E-07 4.18E-06 7.3 7.18

75-27-4 Bromodichloromethane 6.74E+03 1.60E-03 6.56E-02 2.1 1.74

75-25-2 Bromoform 3.10E+03 5.35E-04 2.19E-02 2.35 1.94

71-36-3 Butanol 7.40E+04 8.81E-06 3.61E-04 0.85 0.84

85-68-7 Butyl benzyl phthalate 2.69E+00 1.26E-06 5.17E-05 4.84 4.76

86-74-8 Carbazole 7.48E+00 1.53E-08 6.26E-07 3.59 3.53

75-15-0 Carbon disulfide 1.19E+03 3.03E-02 1.24E+00 2 1.66

56-23-5 Carbon tetrachloride 7.93E+02 3.04E-02 1.25E+00 2.73 2.24

57-74-9 Chlordane 5.60E-02 4.86E-05 1.99E-03 6.32 5.08

106-47-8 p-Chloroaniline 5.30E+03 3.31E-07 1.36E-05 1.85 1.82

108-90-7 Chlorobenzene 4.72E+02 3.70E-03 1.52E-01 2.86 2.34

124-48-1 Chlorodibromomethane 2.60E+03 7.83E-04 3.21E-02 2.17 1.8

67-66-3 Chloroform 7.92E+03 3.67E-03 1.50E-01 1.92 1.6

95-57-8 2-Chlorophenol 2.20E+04 3.91E-04 1.60E-02 2.15 —

218-01-9 Chrysene 1.60E-03 9.46E-05 3.88E-03 5.7 5.6

72-54-8 DDD 9.00E-02 4.00E-06 1.64E-04 6.1 6

72-55-9 DDE 1.20E-01 2.10E-05 8.61E-04 6.76 6.65

50-29-3 DDT 2.50E-02 8.10E-06 3.32E-04 6.53 6.42

53-70-3 Dibenz(a,h)anthracene 2.49E-03 1.47E-08 6.03E-07 6.69 6.58

84-74-2 Di-n-butyl phthalate 1.12E+01 9.38E-10 3.85E-08 4.61 4.53

95-50-1 1,2-Dichlorobenzene 1.56E+02 1.90E-03 7.79E-02 3.43 2.79

106-46-7 1,4-Dichlorobenzene 7.38E+01 2.43E-03 9.96E-02 3.42 2.79

Chemical-specific Properties

(Adapted from USEPA Soil Screening Criteria)

The information on Koc is used in Sheet II (Migration Potential), section 1,B,a (Relative Mobility).

The information on the dimensionless Henry's law constant is used in Sheet II (Migration Potential), section 4,B,a (Relative Volatility).

The information on log Kow is used in Sheet III (Exposure), section 3,B,a,iii (Potential for Ecological Exposure - terrestrial ingestion), and section 3,B,b,ii

(Potential for Ecological Exposure - aquatic uptake potential).

CCME National Classification System for Contaminated Sites

(2008, 2010 v 1.2) 2 of 4

Page 202: SPECIFICATION Building Demolition and Remediation of

CAS No. Compound

Solubility in Water @

20-25°C (mg/L)

Henry's Law Constant

(atm-m3/mol)

Dimensionless Henry's law

constant (HLC [atm-m3/mol] * 41)

(25 °C). log Kow

Log Koc

(L/kg)

91-94-1 3,3-Dichlorobenzidine 3.11E+00 4.00E-09 1.64E-07 3.51 2.86

75-34-3 1,1-Dichloroethane 5.06E+03 5.62E-03 2.30E-01 1.79 1.5

107-06-2 1,2-Dichloroethane 8.52E+03 9.79E-04 4.01E-02 1.47 1.24

75-35-4 1,1-Dichloroethylene 2.25E+03 2.61E-02 1.07E+00 2.13 1.77

156-59-2 cis-1,2-Dichloroethylene 3.50E+03 4.08E-03 1.67E-01 1.86 1.55

156-60-5 trans-1,2-Dichloroethylene 6.30E+03 9.38E-03 3.85E-01 2.07 1.72

120-83-2 2,4-Dichlorophenol 4.50E+03 3.16E-06 1.30E-04 3.08 —

78-87-5 1,2-Dichloropropane 2.80E+03 2.80E-03 1.15E-01 1.97 1.64

542-75-6 1,3-Dichloropropene 2.80E+03 1.77E-02 7.26E-01 2 1.66

60-57-1 Dieldrin 1.95E-01 1.51E-05 6.19E-04 5.37 4.33

84-66-2 Diethylphthalate 1.08E+03 4.50E-07 1.85E-05 2.5 2.46

105-67-9 2,4-Dimethylphenol 7.87E+03 2.00E-06 8.20E-05 2.36 2.32

51-28-5 2,4-Dinitrophenol 2.79E+03 4.43E-07 1.82E-05 1.55 —

121-14-2 2,4-Dinitrotoluene 2.70E+02 9.26E-08 3.80E-06 2.01 1.98

606-20-2 2,6-Dinitrotoluene 1.82E+02 7.47E-07 3.06E-05 1.87 1.84

117-84-0 Di-n-octyl phthalate 2.00E-02 6.68E-05 2.74E-03 8.06 7.92

115-29-7 Endosulfan 5.10E-01 1.12E-05 4.59E-04 4.1 3.33

72-20-8 Endrin 2.50E-01 7.52E-06 3.08E-04 5.06 4.09

100-41-4 Ethylbenzene 1.69E+02 7.88E-03 3.23E-01 3.14 2.56

206-44-0 Fluoranthene 2.06E-01 1.61E-05 6.60E-04 5.12 5.03

86-73-7 Fluorene 1.98E+00 6.36E-05 2.61E-03 4.21 4.14

76-44-8 Heptachlor 1.80E-01 1.09E-03 4.47E-02 6.26 6.15

1024-57-3 Heptachlor epoxide 2.00E-01 9.50E-06 3.90E-04 5 4.92

118-74-1 Hexachlorobenzene 6.20E+00 1.32E-03 5.41E-02 5.89 4.74

87-68-3 Hexachloro-1,3-butadiene 3.23E+00 8.15E-03 3.34E-01 4.81 4.73

319-84-6 a-HCH (a-BHC) 2.00E+00 1.06E-05 4.35E-04 3.8 3.09

319-85-7 b-HCH (b-BHC) 2.40E-01 7.43E-07 3.05E-05 3.81 3.1

58-89-9 g -HCH (Lindane) 6.80E+00 1.40E-05 5.74E-04 3.73 3.03

77-47-4 Hexachlorocyclopentadiene 1.80E+00 2.70E-02 1.11E+00 5.39 5.3

67-72-1 Hexachloroethane 5.00E+01 3.89E-03 1.59E-01 4 3.25

193-39-5 Indeno(1,2,3-cd)pyrene 2.20E-05 1.60E-06 6.56E-05 6.65 6.54

78-59-1 Isophorone 1.20E+04 6.64E-06 2.72E-04 1.7 1.67

7439-97-6 Mercury — 1.14E-02 4.67E-01 — —

72-43-5 Methoxychlor 4.50E-02 1.58E-05 6.48E-04 5.08 4.99

74-83-9 Methyl bromide 1.52E+04 6.24E-03 2.56E-01 1.19 1.02

75-09-2 Methylene chloride 1.30E+04 2.19E-03 8.98E-02 1.25 1.07

95-48-7 2-Methylphenol 2.60E+04 1.20E-06 4.92E-05 1.99 1.96

91-20-3 Naphthalene 3.10E+01 4.83E-04 1.98E-02 3.36 3.3

98-95-3 Nitrobenzene 2.09E+03 2.40E-05 9.84E-04 1.84 1.81

86-30-6 N-Nitrosodiphenylamine 3.51E+01 5.00E-06 2.05E-04 3.16 3.11

CCME National Classification System for Contaminated Sites

(2008, 2010 v 1.2) 3 of 4

Page 203: SPECIFICATION Building Demolition and Remediation of

CAS No. Compound

Solubility in Water @

20-25°C (mg/L)

Henry's Law Constant

(atm-m3/mol)

Dimensionless Henry's law

constant (HLC [atm-m3/mol] * 41)

(25 °C). log Kow

Log Koc

(L/kg)

621-64-7 N-Nitrosodi-n-propylamine 9.89E+03 2.25E-06 9.23E-05 1.4 1.38

1336-36-3 PCBs — — — 5.58 5.49

87-86-5 Pentachlorophenol 1.95E+03 2.44E-08 1.00E-06 5.09 —

108-95-2 Phenol 8.28E+04 3.97E-07 1.63E-05 1.48 1.46

129-00-0 Pyrene 1.35E-01 1.10E-05 4.51E-04 5.11 5.02

100-42-5 Styrene 3.10E+02 2.75E-03 1.13E-01 2.94 2.89

79-34-5 1,1,2,2-Tetrachloroethane 2.97E+03 3.45E-04 1.41E-02 2.39 1.97

127-18-4 Tetrachloroethylene 2.00E+02 1.84E-02 7.54E-01 2.67 2.19

108-88-3 Toluene 5.26E+02 6.64E-03 2.72E-01 2.75 2.26

8001-35-2 Toxaphene 7.40E-01 6.00E-06 2.46E-04 5.5 5.41

120-82-1 1,2,4-Trichlorobenzene 3.00E+02 1.42E-03 5.82E-02 4.01 3.25

71-55-6 1,1,1-Trichloroethane 1.33E+03 1.72E-02 7.05E-01 2.48 2.04

79-00-5 1,1,2-Trichloroethane 4.42E+03 9.13E-04 3.74E-02 2.05 1.7

79-01-6 Trichloroethylene 1.10E+03 1.03E-02 4.22E-01 2.71 2.22

95-95-4 2,4,5-Trichlorophenol 1.20E+03 4.33E-06 1.78E-04 3.9 —

88-06-2 2,4,6-Trichlorophenol 8.00E+02 7.79E-06 3.19E-04 3.7 —

108-05-4 Vinyl acetate 2.00E+04 5.11E-04 2.10E-02 0.73 0.72

75-01-4 Vinyl chloride 2.76E+03 2.70E-02 1.11E+00 1.5 1.27

108-38-3 m-Xylene 1.61E+02 7.34E-03 3.01E-01 3.2 2.61

95-47-6 o-Xylene 1.78E+02 5.19E-03 2.13E-01 3.13 2.56

106-42-3 p-Xylene 1.85E+02 7.66E-03 3.14E-01 3.17 2.59

CAS = Chemical Abstracts Service

Kow = Octanol/water partition coefficient

Source: United States Environmental Protection Agency. 1996. Soil Screening Guidance: Technical Background Document. EPA/540/R-95/128

(http://www.epa.gov/superfund/resources/soil/toc.htm#p5)

CCME National Classification System for Contaminated Sites

(2008, 2010 v 1.2) 4 of 4

Page 204: SPECIFICATION Building Demolition and Remediation of

Supplemental Phase II ESA

Former Agassiz Ski Lodge

Riding Mountain National Park, Manitoba

DST File No. OE-WG-017795

Appendix D

Photographs

Page 205: SPECIFICATION Building Demolition and Remediation of

Supplemental Phase II ESA Former Agassiz Ski Lodge Riding Mountain National Park, Manitoba DST File No. OE-WG-017795

DST CONSULTING ENGINEERS INC.

Photograph 1: View of Agassiz Ski Lodge.

Photographs 2: Drilling Exterior Boreholes.

Page 206: SPECIFICATION Building Demolition and Remediation of

Supplemental Phase II ESA Former Agassiz Ski Lodge Riding Mountain National Park, Manitoba DST File No. OE-WG-017795

DST CONSULTING ENGINEERS INC.

Photograph 3: Crawlspace borehole.

Photograph 4: Floor drain.

Page 207: SPECIFICATION Building Demolition and Remediation of

Supplemental Phase II ESA Former Agassiz Ski Lodge Riding Mountain National Park, Manitoba DST File No. OE-WG-017795

DST CONSULTING ENGINEERS INC.

Photograph 5: Borehole BH14-3.

Photograph 6: Groundwater Sampling.

Page 208: SPECIFICATION Building Demolition and Remediation of

HAZARDOUS MATERIALS SURVEY

Former Mount Agassiz Ski Resort Riding Mountain National Park

Manitoba, Canada

Prepared for: Public Works Government Services Canada

Telus Plaza North, 5th Floor, 10025 Jasper Avenue Edmonton, Alberta T5J 1A6

September 29, 2014

FINAL

DST File No.: OE-WG-017795

DST Consulting Engineers Inc. 9353 50th Street, Suite 15, Edmonton, AB T6B 2L5

Tel.: (780)454-2120 Fax: (780) 454-2150 E-mail: [email protected]

Page 209: SPECIFICATION Building Demolition and Remediation of

Hazardous Materials Survey September 29, 2014 Former Mount Agassiz Ski Resort Riding Mountain National Park, Manitoba DST File No.: OE-WG-017795 Page ii

DST Consulting Engineers Inc.

TABLE OF CONTENTS

1.0 INTRODUCTION .................................................................................................. 1

2.0 SCOPE OF WORK AND METHODOLOGY ......................................................... 1

2.1 Site Description Assessment ________________________________________________ 1

2.2.1 Asbestos Survey .......................................................................................................... 2

2.2.2 Lead Survey ................................................................................................................. 2

3.0 survey REsults ................................................................................................... 2

3.1 Asbestos _______________________________________________________________ 2

3.1.1 Friable Asbestos-Containing Materials ........................................................................ 4

3.1.2 Non-Friable Asbestos-Containing Materials ................................................................ 4

3.1.3 Suspected Asbestos-Containing Materials .................................................................. 5

3.1.4 Non Asbestos-Containing Materials ............................................................................. 5

3.2 Lead ___________________________________________________________________ 5

3.3 Mercury ________________________________________________________________ 6

3.4 Silica __________________________________________________________________ 6

3.5 Polychlorinated Biphenyls (PCBs)____________________________________________ 6

3.6 Ozone Depleting Substances _______________________________________________ 6

3.7 Other Hazardous Materials _________________________________________________ 7

3.7.1 Mould (Visual Estimation) ............................................................................................ 7

3.7.2 Animal Matter (feces and dead carcass) ..................................................................... 7

4.0 CONCLUSIONS AND RECOMMENDATIONS .................................................... 7

4.1 Asbestos _______________________________________________________________ 7

4.2 Lead ___________________________________________________________________ 8

4.3 Mercury ________________________________________________________________ 9

4.4 PCB’s __________________________________________________________________ 9

4.5 Ozone Depleting Substances _______________________________________________ 9

4.6 Silica __________________________________________________________________ 9

4.5 Other Hazardous Materials ________________________________________________ 10

4.5.1 Mould ............................................................................................................................ 10

4.5.2 Animal Matter (feces and dead carcass) ....................................................................... 10

5.0 LIMITATIONS OF REPORT ............................................................................... 11

6.0 CLOSURE .......................................................................................................... 12

7.0 References ........................................................................................................ 13

Attachments Appendix A Selected Photographs Appendix B Laboratory Reports of Analysis

Page 210: SPECIFICATION Building Demolition and Remediation of

Hazardous Materials Survey September 29, 2014 Former Mount Agassiz Ski Resort Riding Mountain National Park, Manitoba DST File No.: OE-WG-017795 Page 1

DST Consulting Engineers Inc.

1.0 INTRODUCTION

DST Consulting Engineers Inc. (DST) was retained by Public Works Government Services Canada (PWGSC) to conduct a Hazardous Materials Survey (HMS) of the former Mount Agassiz Ski Resort located in the Riding Mountain National Park, Manitoba. The objectives of this HMS was to identify hazardous building materials located in each building at this former Ski Resort. The hazardous materials that were part of this survey were: Asbestos (both friable and non-friable), Lead, Mercury, Silica, Polychlorinated Biphenyls (PCBs); and Ozone Depleting Substances. Although not expressly part of DST’s scope of work, any other hazardous materials identified as part of the survey that were considered to be a potential risk to human health and/or the environment were noted (e.g. mould and animal feces). 2.0 SCOPE OF WORK AND METHODOLOGY

2.1 Site Description Assessment

DST performed the site visit for the Mount Agassiz Ski Resort on March 17th and 18th, 2014. The Main Lodge is a two storey building with a basement and was constructed in 1961. The Buffalo Bar Lounge is a one storey building constructed in in the 1970’s. There are two garages and two lift station buildings that also reside on this site; these were constructed in 1979 (Parks Canada, 2012). This Ski Resort was operational until 2000 when it was abandoned due to bankruptcy. The lodge has undergone vandalism, surface and rain water infiltration and habitation of birds. The Buffalo Bar and two lift sheds have undergone vandalism; the garages have been untouched. The survey included a walkthrough assessment of all accessible areas of the building. While on site, DST personnel:

Collected and analyzed a representative number of suspect asbestos containing materials (ACM) samples;

Collected paint chip samples of representative paint coatings and analyzed them for lead;

Defined the extent of Hazardous Materials in the buildings; and

Collected sufficient information to subsequently enable DST to recommend appropriate measures for future building demolition or renovation to mitigate risks to human health and/or the environment.

Visual identification of materials suspected to contain asbestos in building materials or lead in paints was supported by the collection and analysis of a limited number of representative samples. Selected Photographs are included in Appendix A. Laboratory Reports of Analysis are included in Appendix B.

Page 211: SPECIFICATION Building Demolition and Remediation of

Hazardous Materials Survey September 29, 2014 Former Mount Agassiz Ski Resort Riding Mountain National Park, Manitoba DST File No.: OE-WG-017795 Page 2

DST Consulting Engineers Inc.

2.2.1 Asbestos Survey

In Manitoba, asbestos identification and handling falls under the Workplace Safety and Health Act, 2006 (Part 37) and the “Guideline for Working with Asbestos”, 2008. An ACM is defined as a material that has a minimum asbestos content of 0.1 per cent (%) by dry weight for friable materials and asbestos content of 1.0% by dry weight for non-friable materials. A friable ACM is a material that can be crumbled, powdered, or pulverized by hand pressure and can readily release fibres when disturbed. A non-friable ACM is a material that cannot be crumbled by hand pressure. To manage the removal of asbestos this is to be governed as per “Parks Canada Asbestos Management Guide, 2014” and will be further described in Section 4.1. The number of samples to be collected for each material type to ensure representative sampling is not outlined in the “Guideline for Working with Asbestos” nor the “Parks Canada Asbestos Management Guide, 2014”. To ensure representative sampling of each material, DST followed section 5.6.4.1 of the Alberta Asbestos Abatement Manual (2012). Thirty-six (36) bulk sample layers of suspected ACMs were collected by DST during the site investigation. Bulk samples of suspected ACMs collected by DST during the site investigation were analyzed for their asbestos content at EMSL Analytical in Mississauga, Ontario (EMSL). The bulk asbestos samples were analyzed using Polarised Light Microscopy (PLM). This analytical method complies with the United States Environmental Protection Agency (U.S. EPA) Method 600/R-93/116 dated July, 1993. EMSL is certified under the National Institute of Science and Technology’s National Voluntary Laboratory Accreditation Program (NVLAP) to perform asbestos bulk sample analysis (NVLAP No. 200812-0).

2.2.2 Lead Survey

The Province of Manitoba does not include criteria for the classification of lead-paint. Instead, it uses presumed airborne lead concentrations for specific tasks as criteria for classifying work. Manitoba does reference the Federal Canada Consumer Product Safety Act where the allowable concentration of lead in paints for new consumer products as 90 parts per million (ppm). For the purposes of this survey program and reporting, paints having detectable concentrations of lead above 90 ppm will be considered a lead-containing paint. Sixteen (16) painted finishes were sampled and submitted to EMSL by DST for lead, content analysis. The samples were analyzed by EMSL using Flame Atomic Absorption Spectrometry (FLAA) in accordance with method SW 849, 605B/7000B.

3.0 SURVEY RESULTS

The following sections outline the findings from the survey completed by DST of all hazardous materials assessed at the Mount Agassiz Ski Resort in the Riding Mountain National Park, Manitoba.

3.1 Asbestos

Thirty-six (36) bulk samples of building materials suspected to contain regulated concentrations of asbestos were collected by DST during the site investigation. The results of the asbestos survey are provided in Table 1.0 a to c.

Page 212: SPECIFICATION Building Demolition and Remediation of

Hazardous Materials Survey September 29, 2014 Former Mount Agassiz Ski Resort Riding Mountain National Park, Manitoba DST File No.: OE-WG-017795 Page 3

DST Consulting Engineers Inc.

Table 1a: Summary of Bulk Samples Analyzed for Asbestos – Ski Lodge

Sample I.D. Sample Location Material Description Friability

(F, NF)

Asbestos

Content

Lodge-W-

DJC-1

Equipment room, wall by outside

door

Drywall joint

compound F None Detected

Lodge-W-

DJC-2

Equipment room, wall right

middle

Lodge-W-

DJC-3 2nd floor lounge, wall by stairway

Lodge-C-

DJC-1 Equipment room ceiling

Drywall joint

compound F None Detected

Lodge-C-

DJC-2 Equipment room ceiling

Lodge-C-

DJC-3 Equipment room ceiling

Lodge-F-

VSF-1

2nd floor lounge, floor in women’s

washroom

Vinyl sheet flooring NF

None Detected

Lodge-F-

VSF-2

2nd floor lounge, floor in men’s

washroom None Detected

Lodge-F-

VSF-3 2nd floor lounge, kitchen floor 15% Chrysotile

Lodge-W-M-1 Women’s washroom wall Mortar behind ceramic

tile NF None Detected Lodge-W-M-2 Women’s washroom wall

Lodge-W-M-3 Men’s washroom wall

Lodge-C-CT-

1

2nd floor kitchen Ceiling tiles F None Detected Lodge-C-CT-

1

Lodge-C-CT-

1

Lodge-R-TP-

1 Inner roof layer Black Tar Paper F None Detected

Lodge-R-TP-

2

Lodge-R-S-1 Inner roof layer Shingle NF None Detected

Lodge-R-S-2

Bar-F-VFT-1

Kitchen floor Vinyl floor tiles NF

None Detected

Bar-F-VFT-2 2% Chrysotile

Bar-F-VFT-3 None Detected

Bar-F-VFT-1

Kitchen Floor Black Mastic under

VFT NF None Detected Bar-F-VFT-2

Bar-F-VFT-3

017795-2A

Chalet, exterior 2nd layer of roofing

shingle

NF

None Detected

017795-2B None Detected

017795-2C None Detected

Page 213: SPECIFICATION Building Demolition and Remediation of

Hazardous Materials Survey September 29, 2014 Former Mount Agassiz Ski Resort Riding Mountain National Park, Manitoba DST File No.: OE-WG-017795 Page 4

DST Consulting Engineers Inc.

Table 1a: Summary of Bulk Samples Analyzed for Asbestos – Ski Lodge

Sample I.D. Sample Location Material Description Friability

(F, NF)

Asbestos

Content

017795-3A

Chalet, exterior 1st layer of roofing

shingle

None Detected

017795-3B None Detected

017795-3C None Detected

Table 1b: Summary of Bulk Samples Analyzed for Asbestos – Buffalo Bar Lounge

Sample I.D. Sample Location Material Description Friability

(F, NF)

Asbestos

Content

Bar-F-VSF-1

Women’s washroom floor Vinyl sheet flooring NF

None Detected

Bar-F-VSF-2 20% Chrysotile

Bar-F-VSF-3 35% Chrysotile

Bar-W-M-1 Women’s washroom wall Ceramic Tile Mortar NF None Detected

Bar-W-M-2

Bar-W-T-1

Wallboard in utility room Transite wallboard NF

15% Chrysotile

Bar-W-T-2 10% Chrysotile

Bar-W-T-3 10% Chrysotile

Bar-P-PW-1 Crawl space under utility room Pipe wrap canvass

and glue F None Detected

017795-1A Bar, exterior

Tar Roof NF

None Detected

017795-1B None Detected

017795-1C None Detected

Table 1c: Summary of Bulk Samples Analyzed for Asbestos – Large Lift Shed

Sample I.D. Sample Location Material Description Friability

(F, NF)

Asbestos

Content

Lg. Shed-R-S Large Lift Shed, exterior roof Shingle NF None

Detected

Lg. Shed-R-S Large Lift Shed, exterior roof Tar Paper F None

Detected

The following sections outline the findings from the survey with regards to ACMs (friable and non-friable), suspected ACMs, and materials identified as not containing asbestos following laboratory analysis.

3.1.1 Friable Asbestos-Containing Materials

Based on visual observations and laboratory analysis, all friable materials were identified to be below the regulatory limit of 0.1% for asbestos content.

3.1.2 Non-Friable Asbestos-Containing Materials

Based on visual observations and laboratory analysis, the following non-friable asbestos-containing materials were identified as being above the regulatory limit of 1.0% for asbestos content:

Page 214: SPECIFICATION Building Demolition and Remediation of

Hazardous Materials Survey September 29, 2014 Former Mount Agassiz Ski Resort Riding Mountain National Park, Manitoba DST File No.: OE-WG-017795 Page 5

DST Consulting Engineers Inc.

Vinyl sheet flooring located in the Ski Lodge on the 2nd floor;

Vinyl floor tiles located in the kitchen of the Buffalo Bar;

Vinyl sheet flooring located in the washrooms of the Buffalo Bar;

Transite wallboard located in the utility room of the Buffalo Bar.

3.1.3 Suspected Asbestos-Containing Materials

Roof felt layers of the Ski Lodge (outer roof layer), Buffalo Bar, and Garage2 and Small Lift Shed located at Former Mount Agassiz Ski Resort are suspected to contain asbestos. These materials were not sampled during the March 2014 survey as access was unsafe due to winter weather conditions. These materials were sampled during DST’s site visit in the Spring of 2014, the results are detailed in the tables below. Pipe materials were not identified during the site survey at the Ski Lodge. Should materials be identified within the wall cavities they are to be assumed as suspect for asbestos until confirmation by laboratory analysis.

3.1.4 Non Asbestos-Containing Materials

Based on visual observations and laboratory analysis, DST has determined that the following materials do not contain regulated amounts of asbestos:

Drywall joint compound on walls and ceilings at the Ski Lodge;

Ceramic tile mortar on the walls at the Ski Lodge;

Ceiling tiles in the kitchen at the Ski Lodge;

Inner roof tar paper and shingles at the Ski Lodge;

Black floor mastic under vinyl floor tiles in the Buffalo Bar;

Ceramic tile mortar on the washroom wall in the Buffalo Bar;

Pipe length wrap in the crawl space of the Buffalo Bar; and

Roof shingles and tar paper of the Large Lift Shed.

3.2 Lead

Sixteen (16) representative paint finish samples were collected by DST and analyzed for lead content. Table 2.0 summarizes the lead paint results.

Table 2.0: Summary of Paint Chip Samples Analyzed for Lead Content

Sample I.D. Sample Location Paint Chip

Colour

Lead Content

(ppm)

Lodge- LP1 Lodge - Equipment Room walls Yellow 100

Lodge-LP2 Lodge - Equipment Room wood Dark Brown 310

Lodge-LP3 Lodge - Equipment room walls Orange <90

Lodge-LP4 Lodge - 2nd floor lounge, wallboard Orange 160

Lodge-LP5 Lodge - 2nd floor lounge, wood floors Burgundy 700

Bar-LP1 Buffalo Bar - Wood walls Light brown 12,000

Bar-LP2 Buffalo Bar - Wood walls and trim Dark brown 1,200

Garage1-LP1 Garage 1 - Exterior wood Dark brown 280

Garage1-LP2 Garage 1 - Pressure system inside

garage Green 18,000

Page 215: SPECIFICATION Building Demolition and Remediation of

Hazardous Materials Survey September 29, 2014 Former Mount Agassiz Ski Resort Riding Mountain National Park, Manitoba DST File No.: OE-WG-017795 Page 6

DST Consulting Engineers Inc.

Table 2.0: Summary of Paint Chip Samples Analyzed for Lead Content

Sample I.D. Sample Location Paint Chip

Colour

Lead Content

(ppm)

Garage1-LP3 Garage 1 - Pipes inside garage Red 10,000

Garage2-LP1 Garage 2 - Exterior wood Dark Brown <90

LiftShed-LP1 Lift Shed – Exterior wood Dark brown 3,600

LiftShed-LP2 Lift Shed – Exterior wood White 24,000

LiftShed-LP3 Lift Shed – Interior wood walls White 100

Lg.LiftShed-

LP1 Large Lift Shed – Exterior wood Dark Brown 41,000

Lift Station Ski Hill Lift Station Green 11,000

Bold item exceeds regulated amounts of lead content of 90 ppm.

Based upon the historic composition of building materials, lead is also expected to be present in:

Solder on the joints of copper piping;

Glazing on ceramic tiles in the building washroom(s);

Emergency light batteries; and

Caulking in the joints of cast iron drainage pipes.

3.3 Mercury

Mercury is present within fluorescent light tubes that contain a single droplet of mercury which vaporizes when the tube is energized. Fluorescent light tubes were observed in the Ski Lodge, the Buffalo Bar, and Garage 1. Mercury was also identified in thermostats located in the Ski Lodge (two) and the Buffalo Bar (two).

3.4 Silica

Based on the historic composition of building materials at this site, silica is expected to be present in:

Concrete elements of the building;

Ceramic tiles in washroom areas; and

Gypsum wallboard.

3.5 Polychlorinated Biphenyls (PCBs)

Parks Canada and Environment Canada both provide documentation that outlines lighting ballast coding for the identification of PCB’s. In the Ski Lodge, lighting ballasts were inspected and the ballast code that ends with ‘EW’ was documented, as per Environment Canada the code ‘EW’ does not contain PCB`s. However, the ballasts identified in the Buffalo Bar has a ending code of ‘A’ and are likely to contain PCB’s. See Appendix A for photo documentation.

3.6 Ozone Depleting Substances

Ozone depleting substances (ODS) are suspected to be in refrigerators and freezers located in the Ski Lodge and in the Buffalo Bar Lounge. A total of three refrigerators and three freezers were identified on the second floor of the Ski Lounge in the kitchen area. One refrigerator was

Page 216: SPECIFICATION Building Demolition and Remediation of

Hazardous Materials Survey September 29, 2014 Former Mount Agassiz Ski Resort Riding Mountain National Park, Manitoba DST File No.: OE-WG-017795 Page 7

DST Consulting Engineers Inc.

identified in the kitchen of the Buffalo Bar Lounge. Only one unit, the Coca Cola refrigerator in the Ski Lounge, had labelling that clearly identified R-12 as the refrigerant. Fire extinguishers were identified in the in the Ski Lodge and in the Buffalo Bar Lounge `Dry Chemicals` contents were identified on these extinguishers and are not suspect for ODS.

3.7 Other Hazardous Materials

Based on visual observations, additional hazardous materials were observed in the building have the potential to pose a health risk. Selected Photos are available in the Appendix A.

3.7.1 Mould (Visual Estimation)

Although not expressly part of DST’s scope of work, suspected mould-impacted materials were observed in the following locations:

In the Ski Lodge on wallboard materials in the equipment room and basement areas was greater than 10 square meters of mould contaminated materials.

3.7.2 Animal Matter (feces and dead carcass)

Although not expressly part of DST’s scope of work, animal feces and dead carcass materials were observed in the following locations:

In the Ski Lodge, located throughout the 2nd floor, dead bird carcasses and pigeon bird droppings were identified.

4.0 CONCLUSIONS AND RECOMMENDATIONS

4.1 Asbestos

The disturbance of asbestos-containing materials in the Province of Manitoba is governed by Safe Work - Guideline for Working with Asbestos” (2008). As this site is under the control of Parks Canada the “Parks Canada Asbestos Management Guide, 2014” will be adhered to. Both the Parks Canada and Manitoba Guidelines classify all asbestos disturbances as either Low Risk (Type 1), Moderate Risk (Type 2), or High Risk (Type 3), each of which has defined precautionary measures. All asbestos materials are subject to specific handling and disposal precautions, and must be removed prior to demolition. DST recommends the following precautionary measures in accordance with the Parks Canada Asbestos Management Guide, 2014”:

Type 1 - Asbestos Operation for the removal of vinyl sheet flooring located in the Ski Lodge on the 2nd floor, vinyl floor tiles, vinyl sheet flooring and Transite wallboard located in the Buffalo Bar. The removal of these materials is to be conducted without the use of power tools. Should power tools be required, increase precautionary measures to a Type 2 Asbestos Operation. All precautionary and disposal measures are to be in accordance with regulatory requirements.

Page 217: SPECIFICATION Building Demolition and Remediation of

Hazardous Materials Survey September 29, 2014 Former Mount Agassiz Ski Resort Riding Mountain National Park, Manitoba DST File No.: OE-WG-017795 Page 8

DST Consulting Engineers Inc.

Should suspect asbestos containing pipe materials be identified within the wall cavities, these materials are to be removed as a Type 2 – Glove Bag Asbestos Operation.

Materials that have not been analyzed, but are visibly similar to other materials identified as asbestos-containing, must be considered asbestos-containing unless proven otherwise by laboratory analysis. Removal of asbestos containing materials are be conducted by qualified asbestos abatement personnel.

4.2 Lead

The Province of Manitoba and Parks Canada do not have a guidance document nor legislation for the handling of lead for construction projects. However, Occupational Health and Safety Branch of the Ontario Ministry of Labour has published “Guideline: Lead on Construction Projects” and Work Safe BC has published “Lead Containing Paints and Coatings – Preventing Exposure in the Construction Industry”. These document classifies all lead disturbance as either Type 1 (Low Risk), Type 2a (low-moderate risk), Type 2b (moderate-risk), Type 3a (moderate-high risk) or Type 3b (high-risk) work, and assigns different levels of respiratory protection and work procedures for each classification. In the absence of specific legislation for Manitoba, these guidelines would serve as a reasonable, peer reviewed standard for work procedures. The following paints were identified to contain elevated concentrations of lead:

Yellow paint, on the wallboard in the Ski Lodge equipment room;

Dark brown paint, on the wood in the Ski Lodge equipment room;

Orange paint, on the wallboard of the 2nd floor lounge in the Ski Lodge;

Burgundy paint, on the wood floor of the 2nd floor lounge in the Ski Lodge;

Light brown paint, on the wood walls of the Buffalo Bar;

Dark brown paint, on the wood walls of Buffalo Bar;

Dark brown paint, on the exterior wood of Garage 1;

Green paint, on the pressure system inside of Garage 1;

Red paint, on the pipes inside of Garage 1;

Dark brown paint, on the exterior wood of the Lift Shed;

White paint; on the exterior wood trim of the Lift Shed;

White paint; on the interior wood walls of the Lift Shed;

Dark brown paint; on the exterior wood walls of the Large Lift Shed; and

Green paint, on the Lift Station.

Although the Canada Consumer Product Safety Act’s Surface Coating Materials Regulations SOR/2005-109, as amended, has set a limit of 90 parts per million (ppm) for lead in surface coating materials, there may be a potential for exposure to high levels of lead depending on the activities performed that disturb the lead-containing materials, even at low lead concentrations. Dust control procedures, which are typical of any well executed demolition project, are recommended, to control airborne lead levels associated with paints. DST recommends that any future disturbance should avoid operations that generate high levels of dust (e.g. sanding, grinding) and that should these operations be required, appropriate precautionary measures be implemented for worker exposure.

Page 218: SPECIFICATION Building Demolition and Remediation of

Hazardous Materials Survey September 29, 2014 Former Mount Agassiz Ski Resort Riding Mountain National Park, Manitoba DST File No.: OE-WG-017795 Page 9

DST Consulting Engineers Inc.

The disposal of construction waste containing lead is dependent on leachate testing, as governed by Manitoba Regulation 282/87 “The Dangerous Goods Handling and Transportation Act”, and outlines the disposal requirements for the province of Manitoba. This regulation outlines the Leachate Quality Criteria, Table 1 for the disposal of lead-containing materials. It is recommended that building materials identified as lead-containing undergo leachate testing prior to their disposal. If required at some future date, to accommodate demolition activities, the following procedures would be appropriate:

Copper piping can be cut a small distance (e.g. 50 mm) from the joints to avoid direct disturbance of the lead solder;

Cast iron drain pipes can be cut away from the joints to avoid direct disturbance of the lead caulking (and possibly asbestos packings) in the joints; and

Ceramic tiles identified in the bathrooms of the Ski Lodge and the Buffalo Bar can be removed using Type 1 work procedures and respiratory protection provided that only non-powered hand tools are used.

4.3 Mercury

There are no regulations that specifically govern the disturbance of mercury on construction projects. Mercury is classified as hazardous waste under Manitoba Act 282/87, as amended. Transport of the waste to a disposal site is controlled by Act 282/87 and by the federal TDGA. It is now common practice to recycle fluorescent light tubes, thermostats, thermometers, and other items containing mercury, recovering the component materials, and avoiding the generation of hazardous waste. Mercury-containing equipment should be disposed of accordingly.

4.4 PCB’s

PCBs are classified as Hazardous Waste as per Manitoba Act 282/87 and the “Parks Canada Environmental – Polychlorinated Biphenyls (PCB’s) Guideline, 2009”. The lighting ballasts identified as containing PCB’s in the Buffalo Bar are to be removed, stored then disposed of accordingly.

4.5 Ozone Depleting Substances

Ozone depleting substances are governed by the Federal Halocarbon Management Plan which outlines the types of halocarbons considered a ODS as well as a schedule to phase out these substances. The phase-out of the refrigerators and freezers identified are to be managed in accordance with this federal regulation. These substances are to be recovered and disposed of by qualified personnel.

4.6 Silica

Safe Work Manitoba does not have a written directive when working with silica. However, the Guideline for Chemical and Biological Exposure, 2010 can be used as a guide for worker respiratory protection. Work procedures and personal protective equipment must be used to ensure that workers are not exposed to airborne silica levels that exceed this time-weighted average exposure level (TWAEL).

Page 219: SPECIFICATION Building Demolition and Remediation of

Hazardous Materials Survey September 29, 2014 Former Mount Agassiz Ski Resort Riding Mountain National Park, Manitoba DST File No.: OE-WG-017795 Page 10

DST Consulting Engineers Inc.

Dust control procedures, which are typical of any well executed demolition project, are usually sufficient to control airborne silica levels. As a general rule, it is preferable to use more stringent dust suppression techniques and engineering controls as opposed to relying on respiratory protection to control worker exposure. Respiratory protection should only be relied on as a last resort when dust suppression techniques and engineering controls fail to control worker exposure to silica. Silica is present in cement building materials, wallboard and ceramic tiles within the Ski Lodge and Buffalo Bar.

4.5 Other Hazardous Materials

4.5.1 Mould

The types of mould present were not delineated for this survey; however the extent of visible mould growth (greater than 10 m2) identified on the wallboard in the Ski Lodge warrants precautionary measures during demolition activities. Precautionary measures should be in accordance with “Mould Guidelines for the Canadian Construction Association”, 2004 by The Canadian Construction Association. Based on this guideline mould removal should be in accordance with a section 9.2.6 for a “large scale” mould removal project.

4.5.2 Animal Matter (feces and dead carcass)

The visual identification of dead pigeon bird carcass and its fecal matter poses concerns with Histoplasma capsulatum which is fungus that has the potential to grow in the bird droppings. When this material is disturbed for cleanup, dust control measures to reduce dust creation of the fecal matter is recommended. In addition, worker-worn personal protective equipment such as: half-face respirators (with a minimum of 0.3 micron pore size filter), disposable gloves, disposable coveralls with booties are recommended. (www.cdc.gov). Respiratory protection (N/P-100) is recommended for any future access and activities when entering the Ski Lodge to protect against mould spores and bird dropping fungus.

Page 220: SPECIFICATION Building Demolition and Remediation of

Hazardous Materials Survey September 29, 2014 Former Mount Agassiz Ski Resort Riding Mountain National Park, Manitoba DST File No.: OE-WG-017795 Page 11

DST Consulting Engineers Inc.

5.0 LIMITATIONS OF REPORT

This report is intended for client use only. Any use of this document by a third party, or any reliance on or decisions made based on the findings described in this report, are the sole responsibility of such third parties, and DST Consulting Engineers Inc. accepts no responsibility for damages, suffered by any third party as a result of decisions made or actions conducted based on this report. No other warranties are implied or expressed.

The data, conclusions and recommendations which are presented in this report, and the quality thereof, are based on a scope of work authorized by the client. The sampling program included asbestos bulk sampling and paint chip sampling in select representative areas for laboratory analysis. There is a practical limitation on the number of representative samples that can be made in an occupied building. This requires the investigator to extrapolate observations and analytical results between test cut locations. The uncertainty, and inherent risk, associated with this necessity increases with the distance between sampling locations. Note, however, that no scope of work, no matter how exhaustive, can guarantee to identify all contaminants. This report therefore cannot warranty that all building conditions are represented by those identified at specific locations. Recommendations, when included, are made in good faith and are based on several successful experiences. DST is not in a position to evaluate the health risks associated with exposure to the mould referenced in this report. Since human reactions to mould exposure vary widely amongst individuals, and specific segments of the population are generally recognized to be more susceptible than others, an evaluation of health risks can only be made on an individual basis and even then, only by a licensed medical practitioner equipped with knowledge of the individual’s medical history. Any use of this report by the client and any other party is contingent upon their understanding and acceptance of the following condition:

“Mould is a naturally occurring substance and regardless of the results of an assessment or how completely it is removed, it could reoccur.”

The scope of services provided by DST for this assignment did not include a detailed evaluation of the thermal and moisture management characteristics of the exterior wall assembly, or a detailed building envelope investigation to ascertain every potential root cause of the water infiltration that created an environment favourable to mould proliferation. Similarly, DST has not been engaged to provide detailed designs for the reinstatement of building finishes or for improvements to the building envelope.

Note also that standards, guidelines and practices related to DST’s scope of work may change with time. Those which were applied at the time of this program may be obsolete or unacceptable at a later date.

Any comments given in this report on potential remediation problems and possible methods are intended only for the guidance of the designer. The scope of work may not be sufficient to determine all of the factors that may affect construction, clean-up methods and/or costs. Contractors bidding on this project or undertaking clean-ups should, therefore, make their own

Page 221: SPECIFICATION Building Demolition and Remediation of

Hazardous Materials Survey September 29, 2014 Former Mount Agassiz Ski Resort Riding Mountain National Park, Manitoba DST File No.: OE-WG-017795 Page 12

DST Consulting Engineers Inc.

interpretation of the factual information presented and draw their own conclusions as to how the conditions may affect their work.

Any results from an analytical laboratory or other subcontractor reported herein have been carried out by others, and DST Consulting Engineers Inc. cannot warranty their accuracy. Similarly, DST cannot warranty the accuracy of information supplied by the client.

6.0 CLOSURE

We trust that the information contained herein meets your needs. Should you have any questions or comments, please do not hesitate to contact us. DST CONSULTING ENGINEERS INC. Per:

Trudy Lucas, B.Sc. Bill Martin

Project Manager Sector Head, Building Environments

[email protected] [email protected]

Page 222: SPECIFICATION Building Demolition and Remediation of

Hazardous Materials Survey September 29, 2014 Former Mount Agassiz Ski Resort Riding Mountain National Park, Manitoba DST File No.: OE-WG-017795 Page 13

DST Consulting Engineers Inc.

7.0 REFERENCES

“Alberta Asbestos Abatement Manual”, Alberta Government, 2012. “Asbestos Management Guide”, Parks Canada 2014. “Control of Health Hazards Associated with Bird and Bat Droppings”, New Jersey Department of Health, April 2000. http://www.cdc.gov/niosh/nas/rdrp/appendices/chapter6/a6-133.pdf “Federal Halocarbon Management Plan”, Environment Canada, 2003 “Guideline for Chemical and Biological Exposure”, SafeWork Manitoba, 2010. “Guideline for Working with Asbestos”, SafeWork Manitoba, 2008. “Guideline: Lead on Construction Projects”, Ontario Ministry of Labour, 2011. “Identification of Lamp Ballasts Containing PCB’s”, Environment Canada, 1991. “Lead Containing Paints and Coatings – Preventing Exposure in the Construction Industry”, WorkSafe BC. “Surface Coating Materials Regulations SOR/2005-109, Canada Consumer Product Safety Act’s, Health Canada, 2005 as amended (2011). “The Dangerous Goods Handling and Transportation Act”, Manitoba Regulation, 282/87, 2010 as amended. “Mount Agassiz Feasibility Study”, Parks Canada, 2012. Mould Guidelines for the Canadian Construction Association”, The Canadian Construction Association, 2004. “PCB Guidelines”, Parks Canada, 2009. Workplace Safety and Health Act, (Part 37), SafeWork Manitoba, 2006.

Page 223: SPECIFICATION Building Demolition and Remediation of

Hazardous Materials Survey September 29, 2014 Former Mount Agassiz Ski Resort Riding Mountain National Park, Manitoba DST File No.: OE-WG-017795

Appendix A

Selected Photographs

Page 224: SPECIFICATION Building Demolition and Remediation of

Hazardous Materials Survey September 29, 2014 Former Mount Agassiz Ski Resort Riding Mountain National Park, Manitoba DST File No.: OE-WG-017795

Photo 1a: Overview of Ski Resort, photo depicting the Ski Lodge

Photo 1b: Overview of Ski Report, photo depicting Lift Stations and Garages. From left to right

(Garage 1, Garage2, Large Lift Station, and Small Lift Station)

Page 225: SPECIFICATION Building Demolition and Remediation of

Hazardous Materials Survey September 29, 2014 Former Mount Agassiz Ski Resort Riding Mountain National Park, Manitoba DST File No.: OE-WG-017795

DST Consulting Engineers Inc.

Photo 2: Asbestos-containing vinyl floor tiles in the kitchen and washrooms inside the Ski Lodge

Photo 3: Asbestos-containing vinyl floor tiles located in the kitchen in the Buffalo Bar

Page 226: SPECIFICATION Building Demolition and Remediation of

Hazardous Materials Survey September 29, 2014 Former Mount Agassiz Ski Resort Riding Mountain National Park, Manitoba DST File No.: OE-WG-017795

DST Consulting Engineers Inc.

Photo 4: Asbestos-containing vinyl sheet flooring located in the washrooms in the Buffalo Bar

Photo 5: Asbestos-containing Transite wallboard located in the utility room of the Buffalo Bar

Page 227: SPECIFICATION Building Demolition and Remediation of

Hazardous Materials Survey September 29, 2014 Former Mount Agassiz Ski Resort Riding Mountain National Park, Manitoba DST File No.: OE-WG-017795

DST Consulting Engineers Inc.

Photo 6: Lead-containing yellow paint in the Ski Lodge equipment room

Photo 7: Lead-containing brown wall paint located in the Ski Lodge

Page 228: SPECIFICATION Building Demolition and Remediation of

Hazardous Materials Survey September 29, 2014 Former Mount Agassiz Ski Resort Riding Mountain National Park, Manitoba DST File No.: OE-WG-017795

DST Consulting Engineers Inc.

Photo 8 : Lead-containing burgundy floor paint and orange wallboard on the 2nd floor of the Ski

Lodge

Photo 9: Lead-containing light brown and dark brown wood walls in the Buffalo Bar

Page 229: SPECIFICATION Building Demolition and Remediation of

Hazardous Materials Survey September 29, 2014 Former Mount Agassiz Ski Resort Riding Mountain National Park, Manitoba DST File No.: OE-WG-017795

DST Consulting Engineers Inc.

Photo 10: Lead-containing dark brown paint located on the exterior wood of Garage 1, Garage

2, Lift Shed, and Large Lift Shed

Photo 11: Lead-containing green paint on the pressure system located inside of Garage 1

Page 230: SPECIFICATION Building Demolition and Remediation of

Hazardous Materials Survey September 29, 2014 Former Mount Agassiz Ski Resort Riding Mountain National Park, Manitoba DST File No.: OE-WG-017795

DST Consulting Engineers Inc.

Photo 12: Lead-containing red pipe paint inside Garage 1

Photo 13: Lead-containing white paint located on the exterior of the Lift Shed

Page 231: SPECIFICATION Building Demolition and Remediation of

Hazardous Materials Survey September 29, 2014 Former Mount Agassiz Ski Resort Riding Mountain National Park, Manitoba DST File No.: OE-WG-017795

DST Consulting Engineers Inc.

Photo 14: Lead-containing green paint located on the Lift Station

Photo 15: Potential PCB-containing light ballast in the Buffalo Bar

Page 232: SPECIFICATION Building Demolition and Remediation of

Hazardous Materials Survey September 29, 2014 Former Mount Agassiz Ski Resort Riding Mountain National Park, Manitoba DST File No.: OE-WG-017795

DST Consulting Engineers Inc.

Photo 16a: Refrigeration Units containing ozone depleting substances

Photo 16b: Refrigeration Units containing ozone depleting substances

Page 233: SPECIFICATION Building Demolition and Remediation of

Hazardous Materials Survey September 29, 2014 Former Mount Agassiz Ski Resort Riding Mountain National Park, Manitoba DST File No.: OE-WG-017795

DST Consulting Engineers Inc.

Photo 17: An example of mercury-containing thermostats

Photo 18: An example of mould contaminated wallboard in the Ski Lodge utility room

Page 234: SPECIFICATION Building Demolition and Remediation of

Hazardous Materials Survey September 29, 2014 Former Mount Agassiz Ski Resort Riding Mountain National Park, Manitoba DST File No.: OE-WG-017795

DST Consulting Engineers Inc.

Photo 19: An example of bird droppings from pigeons on the second floor of the Ski Lodge

Page 235: SPECIFICATION Building Demolition and Remediation of

Hazardous Materials Survey September 29, 2014 Former Mount Agassiz Ski Resort Riding Mountain National Park, Manitoba DST File No.: OE-WG-017795

Appendix B

Laboratory Reports of Analysis

Page 236: SPECIFICATION Building Demolition and Remediation of

EMSL Canada Inc.10 Falconer Drive, Unit #3, Mississauga, ON L5N 3L8

Phone/Fax: 289-997-4602 / (289) 997-4607

http://www.EMSL.com [email protected]

551401949

CustomerID: 55DST51A

CustomerPO: OE-WG-017795

ProjectID:

EMSL Canada Or

Attn: Trudy Lucas

DST Consulting Engineers, Inc.

9353 - 50th Street NW

Suite 15, Parkwood Office Centre

Edmonton, AB T6B 2L5

Received: 03/20/14 10:12 AM

OE-WG-017795

Fax:

Phone: (780) 454-2120

Project:

3/26/2014Analysis Date:

Collected:

Sample Description Appearance % Type

AsbestosNon-Asbestos

% Fibrous % Non-Fibrous

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using

Polarized Light Microscopy

LODGE-W-DJC-1

551401949-0001

DRYWALL JOINT

COMPOUND,

WALL BY DOOR,

EQUIPMENT RM

White/Yellow None Detected

Non-Fibrous

Homogeneous

Non-fibrous (other)100%

LODGE-W-DJC-2

551401949-0002

DWJC, WALL BY

RIGHT MIDDLE -

EQUIPMENT

ROOM

White/Yellow None Detected

Non-Fibrous

Homogeneous

Non-fibrous (other)100%

LODGE-W-DJC-3

551401949-0003

DWJC, WALL BY

STAIRWAY - 2ND

FLOOR LOUNGE

White None Detected

Non-Fibrous

Homogeneous

Non-fibrous (other)100%

LODGE-C-DJC-1

551401949-0004

DWJC, CEILING -

EQUIPMENT

ROOM

Gray/White None Detected

Non-Fibrous

Homogeneous

Non-fibrous (other)100%

LODGE-C-DJC-2

551401949-0005

DWJC, CEILING -

EQUIPMENT

ROOM

Gray/White None Detected

Non-Fibrous

Homogeneous

Non-fibrous (other)100%

LODGE-C-DJC-3

551401949-0006

DWJC, CEILING -

EQUIPMENT

ROOM

White None Detected

Non-Fibrous

Homogeneous

Non-fibrous (other)100%

LODGE-F-VSF-1

551401949-0007

VSF - 2ND

FLOOR

WOMEN'S

WASHROOM

Brown/Gray None Detected

Non-Fibrous

Homogeneous

Non-fibrous (other)100%

LODGE-F-VSF-2

551401949-0008

VSF - 2ND

FLOOR, MEN'S

WASHROOM

Gray/Beige None Detected

Non-Fibrous

Homogeneous

Non-fibrous (other)100%

1Test Report PLM-7.28.9 Printed: 3/26/2014 3:56:36 PM

Kevin Pang

or other approved signatory

Analyst(s)

EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Samples received in good condition unless otherwise noted. Estimated accuracy, precision and uncertainty data available upon request. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Reporting limit is 1%

Samples analyzed by EMSL Canada Inc. Mississauga, ON NVLAP Lab Code 200877-0

Initial report from 03/26/2014 15:56:36

Jon Delos Santos (14)Matthew Davis (22)

Page 237: SPECIFICATION Building Demolition and Remediation of

EMSL Canada Inc.10 Falconer Drive, Unit #3, Mississauga, ON L5N 3L8

Phone/Fax: 289-997-4602 / (289) 997-4607

http://www.EMSL.com [email protected]

551401949

CustomerID: 55DST51A

CustomerPO: OE-WG-017795

ProjectID:

EMSL Canada Or

Attn: Trudy Lucas

DST Consulting Engineers, Inc.

9353 - 50th Street NW

Suite 15, Parkwood Office Centre

Edmonton, AB T6B 2L5

Received: 03/20/14 10:12 AM

OE-WG-017795

Fax:

Phone: (780) 454-2120

Project:

3/26/2014Analysis Date:

Collected:

Sample Description Appearance % Type

AsbestosNon-Asbestos

% Fibrous % Non-Fibrous

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using

Polarized Light Microscopy

LODGE-F-VSF-3

551401949-0009

VSF - 2ND

FLOOR, KITCHEN

Brown/Gray/Variou

s

Non-Fibrous

Homogeneous

Chrysotile15%Non-fibrous (other)85%

LODGE-W-M-1

551401949-0010

CERAMIC TILE

MORTAR -

WASHROOMS

Gray None Detected

Non-Fibrous

Homogeneous

Non-fibrous (other)100%

LODGE-W-M-2

551401949-0011

CERAMIC TILE

MORTAR -

WASHROOMS

Gray None Detected

Non-Fibrous

Homogeneous

Non-fibrous (other)100%

LODGE-W-M-3

551401949-0012

CERAMIC TILE

MORTAR -

WASHROOMS

White/Various None Detected

Non-Fibrous

Homogeneous

Non-fibrous (other)100%

LODGE-C-CT-1

551401949-0013

CEILING TILES Tan/White None Detected

Fibrous

Homogeneous

Cellulose80% Non-fibrous (other)20%

LODGE-C-CT-2

551401949-0014

CEILING TILES Tan/White None Detected

Fibrous

Homogeneous

Cellulose80% Non-fibrous (other)20%

LODGE-C-CT-3

551401949-0015

CEILING TILES Tan/White None Detected

Fibrous

Homogeneous

Cellulose80% Non-fibrous (other)20%

LODGE-R-TP-1

551401949-0016

INNER TAR

PAPER

Black None Detected

Non-Fibrous

Homogeneous

Non-fibrous (other)100%

2Test Report PLM-7.28.9 Printed: 3/26/2014 3:56:36 PM

Kevin Pang

or other approved signatory

Analyst(s)

EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Samples received in good condition unless otherwise noted. Estimated accuracy, precision and uncertainty data available upon request. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Reporting limit is 1%

Samples analyzed by EMSL Canada Inc. Mississauga, ON NVLAP Lab Code 200877-0

Initial report from 03/26/2014 15:56:36

Jon Delos Santos (14)Matthew Davis (22)

Page 238: SPECIFICATION Building Demolition and Remediation of

EMSL Canada Inc.10 Falconer Drive, Unit #3, Mississauga, ON L5N 3L8

Phone/Fax: 289-997-4602 / (289) 997-4607

http://www.EMSL.com [email protected]

551401949

CustomerID: 55DST51A

CustomerPO: OE-WG-017795

ProjectID:

EMSL Canada Or

Attn: Trudy Lucas

DST Consulting Engineers, Inc.

9353 - 50th Street NW

Suite 15, Parkwood Office Centre

Edmonton, AB T6B 2L5

Received: 03/20/14 10:12 AM

OE-WG-017795

Fax:

Phone: (780) 454-2120

Project:

3/26/2014Analysis Date:

Collected:

Sample Description Appearance % Type

AsbestosNon-Asbestos

% Fibrous % Non-Fibrous

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using

Polarized Light Microscopy

LODGE-R-TP-2

551401949-0017

INNER TAR

PAPER

Black/Silver None Detected

Non-Fibrous

Homogeneous

Non-fibrous (other)100%

LODGE-R-S-1

551401949-0018

INNER SHINGLE Black None Detected

Fibrous

Homogeneous

Cellulose20% Non-fibrous (other)80%

LODGE-R-S-2

551401949-0019

INNER SHINGLE Black None Detected

Fibrous

Homogeneous

Cellulose10% Non-fibrous (other)90%

BAR-F-VFT-1

551401949-0020

VFT AND BLACK

MASTIC

Beige None Detected

Non-Fibrous

Homogeneous

Non-fibrous (other)100%

BAR-F-VFT-1-

MASTIC

551401949-0020A

VFT AND BLACK

MASTIC

Black None Detected

Non-Fibrous

Homogeneous

Non-fibrous (other)100%

BAR-F-VFT-2

551401949-0021

VFT AND BLACK

MASTIC

Tan

Non-Fibrous

Homogeneous

Chrysotile2%Non-fibrous (other)98%

BAR-F-VFT-2-

MASTIC

551401949-0021A

VFT AND BLACK

MASTIC

Black None Detected

Non-Fibrous

Homogeneous

Non-fibrous (other)100%

BAR-F-VFT-3

551401949-0022

VFT AND BLACK

MASTIC

Tan

Non-Fibrous

Homogeneous

Chrysotile2%Non-fibrous (other)98%

3Test Report PLM-7.28.9 Printed: 3/26/2014 3:56:36 PM

Kevin Pang

or other approved signatory

Analyst(s)

EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Samples received in good condition unless otherwise noted. Estimated accuracy, precision and uncertainty data available upon request. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Reporting limit is 1%

Samples analyzed by EMSL Canada Inc. Mississauga, ON NVLAP Lab Code 200877-0

Initial report from 03/26/2014 15:56:36

Jon Delos Santos (14)Matthew Davis (22)

Page 239: SPECIFICATION Building Demolition and Remediation of

EMSL Canada Inc.10 Falconer Drive, Unit #3, Mississauga, ON L5N 3L8

Phone/Fax: 289-997-4602 / (289) 997-4607

http://www.EMSL.com [email protected]

551401949

CustomerID: 55DST51A

CustomerPO: OE-WG-017795

ProjectID:

EMSL Canada Or

Attn: Trudy Lucas

DST Consulting Engineers, Inc.

9353 - 50th Street NW

Suite 15, Parkwood Office Centre

Edmonton, AB T6B 2L5

Received: 03/20/14 10:12 AM

OE-WG-017795

Fax:

Phone: (780) 454-2120

Project:

3/26/2014Analysis Date:

Collected:

Sample Description Appearance % Type

AsbestosNon-Asbestos

% Fibrous % Non-Fibrous

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using

Polarized Light Microscopy

BAR-F-VFT-3-

MASTIC

551401949-0022A

VFT AND BLACK

MASTIC

Black None Detected

Non-Fibrous

Homogeneous

Non-fibrous (other)100%

BAR-F-VSF-1

551401949-0023

VINYL SHEET

FLOORING

Gray/Various/Beige None Detected

Fibrous

Heterogeneous

Cellulose25% Non-fibrous (other)75%

BAR-F-VSF-2

551401949-0024

VINYL SHEET

FLOORING

Gray/Various/Beige

Fibrous

Heterogeneous

Chrysotile20%Non-fibrous (other)80%

BAR-F-VSF-3

551401949-0025

VINYL SHEET

FLOORING

Tan/White

Non-Fibrous

Homogeneous

Chrysotile35%Non-fibrous (other)65%

BAR-W-M-1

551401949-0026

CERAMIC TILE

MORTAR

White None Detected

Non-Fibrous

Homogeneous

Non-fibrous (other)100%

BAR-W-M-2

551401949-0027

CERAMIC TILE

MORTAR

White None Detected

Non-Fibrous

Homogeneous

Non-fibrous (other)100%

BAR-W-T-1

551401949-0028

TRANSITE

WALLBOARD

Gray

Fibrous

Homogeneous

Chrysotile15%Non-fibrous (other)85%

BAR-W-T-2

551401949-0029

TRANSITE

WALLBOARD

Gray/White

Fibrous

Homogeneous

Chrysotile10%Non-fibrous (other)90%

4Test Report PLM-7.28.9 Printed: 3/26/2014 3:56:36 PM

Kevin Pang

or other approved signatory

Analyst(s)

EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Samples received in good condition unless otherwise noted. Estimated accuracy, precision and uncertainty data available upon request. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Reporting limit is 1%

Samples analyzed by EMSL Canada Inc. Mississauga, ON NVLAP Lab Code 200877-0

Initial report from 03/26/2014 15:56:36

Jon Delos Santos (14)Matthew Davis (22)

Page 240: SPECIFICATION Building Demolition and Remediation of

EMSL Canada Inc.10 Falconer Drive, Unit #3, Mississauga, ON L5N 3L8

Phone/Fax: 289-997-4602 / (289) 997-4607

http://www.EMSL.com [email protected]

551401949

CustomerID: 55DST51A

CustomerPO: OE-WG-017795

ProjectID:

EMSL Canada Or

Attn: Trudy Lucas

DST Consulting Engineers, Inc.

9353 - 50th Street NW

Suite 15, Parkwood Office Centre

Edmonton, AB T6B 2L5

Received: 03/20/14 10:12 AM

OE-WG-017795

Fax:

Phone: (780) 454-2120

Project:

3/26/2014Analysis Date:

Collected:

Sample Description Appearance % Type

AsbestosNon-Asbestos

% Fibrous % Non-Fibrous

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using

Polarized Light Microscopy

BAR-W-T-3

551401949-0030

TRANSITE

WALLBOARD

Gray/White

Fibrous

Homogeneous

Chrysotile10%Non-fibrous (other)90%

BAR-P-PW-1

551401949-0031

PIPE LENGTH

WRAP

Gray/Black/Silver None Detected

Fibrous

Heterogeneous

Cellulose40%

Glass10%

Non-fibrous (other)50%

LG.SHED-R-S

551401949-0032

LARGE SHED -

ROOF SHINGLE

Black None Detected

Non-Fibrous

Homogeneous

Non-fibrous (other)100%

L.SHED-R-S

551401949-0033

LG SHED - ROOF

TAR PAPER

Brown/Tan None Detected

Non-Fibrous

Homogeneous

Non-fibrous (other)100%

5THIS IS THE LAST PAGE OF THE REPORT.Test Report PLM-7.28.9 Printed: 3/26/2014 3:56:36 PM

Kevin Pang

or other approved signatory

Analyst(s)

EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Samples received in good condition unless otherwise noted. Estimated accuracy, precision and uncertainty data available upon request. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Reporting limit is 1%

Samples analyzed by EMSL Canada Inc. Mississauga, ON NVLAP Lab Code 200877-0

Initial report from 03/26/2014 15:56:36

Jon Delos Santos (14)Matthew Davis (22)

Page 241: SPECIFICATION Building Demolition and Remediation of

EMSL Canada Inc.413 Forge Road, SE, Calgary, AB T2H 0S9

Phone/Fax: 403-879-1149 / (403) 879-1152

http://www.EMSL.com [email protected]

651400356

CustomerID: 55DST52

CustomerPO:

ProjectID:

EMSL Canada Or

Attn: Geoff Lake

DST Consulting Engineers

1351-D Unit 6

Kelley Lake Road

Sudbury, ONT, ON P3E5P5

Received: 07/07/14 8:46 AM

OE - WG - 017795

Fax: (705) 523-6690

Phone:

Project:

7/7/2014Analysis Date:

6/20/2014Collected:

Sample Description Appearance % Type

AsbestosNon-Asbestos

% Fibrous % Non-Fibrous

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using

Polarized Light Microscopy

017795 - 1A

651400356-0001

ROOFING - BAR -

TAR ROOF

Black None Detected

Fibrous

Homogeneous

Cellulose25% Non-fibrous (other)75%

017795 - 1B

651400356-0002

ROOFING - BAR -

TAR ROOF

Black None Detected

Fibrous

Homogeneous

Cellulose25% Non-fibrous (other)75%

017795 - 1C

651400356-0003

ROOFING - BAR -

TAR ROOF

Black None Detected

Fibrous

Homogeneous

Cellulose30% Non-fibrous (other)70%

017795 - 2A

651400356-0004

CHALET 2ND

LAYER -

ROOFING

SHINGLES

Black None Detected

Fibrous

Homogeneous

Cellulose25% Non-fibrous (other)75%

017795 - 2B

651400356-0005

CHALET 2ND

LAYER -

ROOFING

SHINGLES

Black None Detected

Fibrous

Homogeneous

Cellulose25% Non-fibrous (other)75%

017795 - 2C

651400356-0006

CHALET 2ND

LAYER -

ROOFING

SHINGLES

Black None Detected

Fibrous

Homogeneous

Cellulose30% Non-fibrous (other)70%

017795 - 3A

651400356-0007

CHALET 1ST

LAYER -

ROOFING

SHINGLES

Black None Detected

Fibrous

Homogeneous

Cellulose25% Non-fibrous (other)75%

1Test Report PLM-7.28.9 Printed: 7/21/2014 8:45:12 AM

Jefferson Salvador, Laboratory Manager

or other approved signatory

Analyst(s)

EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Samples received in good condition unless otherwise noted. Estimated accuracy, precision and uncertainty data available upon request. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Reporting limit is 1%

Samples analyzed by EMSL Canada Inc. Calgary, AB

Initial report from 07/21/2014 08:45:12

Jefferson Salvador (3)Kate Heim (6)

Page 242: SPECIFICATION Building Demolition and Remediation of

EMSL Canada Inc.413 Forge Road, SE, Calgary, AB T2H 0S9

Phone/Fax: 403-879-1149 / (403) 879-1152

http://www.EMSL.com [email protected]

651400356

CustomerID: 55DST52

CustomerPO:

ProjectID:

EMSL Canada Or

Attn: Geoff Lake

DST Consulting Engineers

1351-D Unit 6

Kelley Lake Road

Sudbury, ONT, ON P3E5P5

Received: 07/07/14 8:46 AM

OE - WG - 017795

Fax: (705) 523-6690

Phone:

Project:

7/7/2014Analysis Date:

6/20/2014Collected:

Sample Description Appearance % Type

AsbestosNon-Asbestos

% Fibrous % Non-Fibrous

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using

Polarized Light Microscopy

017795 - 3B

651400356-0008

CHALET 1ST

LAYER -

ROOFING

SHINGLES

Black None Detected

Fibrous

Homogeneous

Cellulose25% Non-fibrous (other)75%

017795 - 3C

651400356-0009

CHALET 1ST

LAYER -

ROOFING

SHINGLES

Black None Detected

Fibrous

Homogeneous

Cellulose30% Non-fibrous (other)70%

2THIS IS THE LAST PAGE OF THE REPORT.Test Report PLM-7.28.9 Printed: 7/21/2014 8:45:12 AM

Jefferson Salvador, Laboratory Manager

or other approved signatory

Analyst(s)

EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Samples received in good condition unless otherwise noted. Estimated accuracy, precision and uncertainty data available upon request. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Reporting limit is 1%

Samples analyzed by EMSL Canada Inc. Calgary, AB

Initial report from 07/21/2014 08:45:12

Jefferson Salvador (3)Kate Heim (6)

Page 243: SPECIFICATION Building Demolition and Remediation of

Client Sample Description ConcentrationLab ID AnalyzedLead

Collected

EMSL Canada Inc.10 Falconer Drive, Unit #3, Mississauga, ON L5N 3L8

Phone/Fax: 289-997-4602 / (289) 997-4607

http://www.EMSL.com [email protected]

Attn: Kris Tuuttila

DST Consulting Engineers, Inc.

9353 - 50th Street NW

Suite 15, Parkwood Office Centre

Edmonton, AB T6B 2L5

Received: 03/20/14 10:12 AM

OW-WG-017795

Fax:

Phone: (780) 454-2120

Project:

Collected:

Test Report: Lead in Paint Chips by Flame AAS (SW 846 3050B/7000B)*

551401948

CustomerID: 55DST51A

CustomerPO: OW-WG-017795

ProjectID:

EMSL Canada Or

Site: YELLOW WALL PAINT - EQUIPMENT ROOM

0001LODGE-LP1 100 ppm3/24/2014

Site: DARK BROWN WOOD PAINT - EQUIPMENT ROOM

0002LODGE-LP2 310 ppm3/24/2014

Site: ORANGE WALL PAINT - EQUIPMENT ROOM

0003LODGE-LP3 <90 ppm3/24/2014

Site: ORANGE WALL PAINT - 2ND FLOOR LOUNGE

0004LODGE-LP4 160 ppm3/24/2014

Site: BURGUNDY FLOOR PAINT - 2ND FLOOR

0005LODGE-LP5 700 ppm3/24/2014

Site: LIGHT BROWN WALL PAINT

0006BAR-LP1 12000 ppm3/24/2014

Site: DARK BROWN WALL PAINT

0007BAR-LP2 1200 ppm3/24/2014

Site: GARAGE 1, DARK BROWN EXTERIOR PAINT

0008GARAGE1-LP1 280 ppm3/24/2014

Site: GARAGE 1, GREEN PAINT ON PRESSURE SYSTEM

0009GARAGE1-LP2 18000 ppm3/24/2014

Site: GARAGE 1, RED PIPE PAINT

0010GARAGE1-LP3 10000 ppm3/24/2014

Site: GARAGE 2, DARK BROWN EXTERIOR PAINT

0011GARAGE2-LP1 <90 ppm3/24/2014

Site: LIFT SHED - DARK BROWN EXTERIOR PAINT

0012LIFTSHED-LP1 3600 ppm3/24/2014

Site: LIFT SHED - WHITE EXTERIOR PAINT

0013LIFTSHED-LP2 24000 ppm3/24/2014

Site: LIFT SHED - WHITE INTERIOR WALL PAINT

0014LIFTSHED-LP3 100 ppm3/24/2014

Site: LG. LIFT SHED - DARK BROWN EXTERIOR PAINT

0015LG.LIFTSHED-LP1 41000 ppm3/24/2014

Page 1 of 2

Kevin Pang

or other approved signatory

Test Report ChmSnglePrm/nQC-7.21.0 Printed: 3/24/2014 5:42:34 PM

*Analysis following Lead in Paint by EMSL SOP/Determination of Environmental Lead by FLAA. Reporting limit is 0.010 % wt based on the minimum sample weight per our SOP. Unless noted, results in this report are not blank corrected. EMSL bears no responsibility for sample collection activities. Samples received in good condition unless otherwise noted. * slight modifications to methods applied. "<" (less than) result signifies that the analyte was not detected at or above the reporting limit. Measurement of uncertainty is available upon request. The QC data associated with the sample results included in this report meet the recovery and precision requirements established by the AIHA-LAP, unless specifically indicated otherwise

Samples analyzed by EMSL Canada Inc. Mississauga, ON A2LA Accredited Environmental Testing Cert #2845.08

Initial report from 03/24/2014 17:42:34

Page 244: SPECIFICATION Building Demolition and Remediation of

Client Sample Description ConcentrationLab ID AnalyzedLead

Collected

EMSL Canada Inc.10 Falconer Drive, Unit #3, Mississauga, ON L5N 3L8

Phone/Fax: 289-997-4602 / (289) 997-4607

http://www.EMSL.com [email protected]

Attn: Kris Tuuttila

DST Consulting Engineers, Inc.

9353 - 50th Street NW

Suite 15, Parkwood Office Centre

Edmonton, AB T6B 2L5

Received: 03/20/14 10:12 AM

OW-WG-017795

Fax:

Phone: (780) 454-2120

Project:

Collected:

Test Report: Lead in Paint Chips by Flame AAS (SW 846 3050B/7000B)*

551401948

CustomerID: 55DST51A

CustomerPO: OW-WG-017795

ProjectID:

EMSL Canada Or

Site: LIFT STATION - GREEN PAINT

0016LIFTSTATION-LP1 11000 ppm3/24/2014

Page 2 of 2

Kevin Pang

or other approved signatory

Test Report ChmSnglePrm/nQC-7.21.0 Printed: 3/24/2014 5:42:34 PM

*Analysis following Lead in Paint by EMSL SOP/Determination of Environmental Lead by FLAA. Reporting limit is 0.010 % wt based on the minimum sample weight per our SOP. Unless noted, results in this report are not blank corrected. EMSL bears no responsibility for sample collection activities. Samples received in good condition unless otherwise noted. * slight modifications to methods applied. "<" (less than) result signifies that the analyte was not detected at or above the reporting limit. Measurement of uncertainty is available upon request. The QC data associated with the sample results included in this report meet the recovery and precision requirements established by the AIHA-LAP, unless specifically indicated otherwise

Samples analyzed by EMSL Canada Inc. Mississauga, ON A2LA Accredited Environmental Testing Cert #2845.08

Initial report from 03/24/2014 17:42:34

Page 245: SPECIFICATION Building Demolition and Remediation of

APPENDIX C

LEACHABLE LEAD RESULTS – PAINTED SURFACES

Page 246: SPECIFICATION Building Demolition and Remediation of

MAXXAM JOB #: B4B3014Received: 2014/12/12, 14:30

CERTIFICATE OF ANALYSIS

Your P.O. #: 0125-076-01Your Project #: AGASSIZ

Report Date: 2014/12/16Report #: R1715693

Version: 1 - Final

Attention:PETER BOHONOS

EGE ENGINEERING LTD.511 PEPPERLOAF CRESCENTWINNIPEG, MBCANADA R3R 1E6

Your C.O.C. #: A046881

LODGESite Location:

Sample Matrix: Paint# Samples Received: 1

Analytical MethodLaboratory MethodDateAnalyzed

DateExtractedQuantityAnalyses

EPA 6020a R1 mBBY7SOP-000012014/12/162014/12/161Metals - TCLP (1)

EPA 1311 R1992 mBBY7SOP-000202014/12/16N/A1TCLP pH Measurements (<100g sample used) (1)

* RPDs calculated using raw data. The rounding of final results may result in the apparent difference.

(1) This test was performed by Maxxam Vancouver

Encryption Key

Please direct all questions regarding this Certificate of Analysis to your Project Manager.Janelle Kochan, B.Sc., Project ManagerEmail: [email protected]# (204)772-7276 Ext:2209==================================================================== Maxxam has procedures in place to guard against improper use of the electronic signature and have the required "signatories", as per section 5.10.2 of ISO/IEC 17025:2005(E), signing the reports. For Service Group specific validation please refer to the Validation Signature Page.

Total Cover Pages : 1Page 1 of 7

Maxxam Analytics International Corporation o/a Maxxam Analytics Winnipeg: Unit D, 675 Berry Street R3H 1A7 Telephone (204) 772-7276 Fax (204) 772-2386

Page 247: SPECIFICATION Building Demolition and Remediation of

Maxxam Job #: B4B3014Report Date: 2014/12/16

EGE ENGINEERING LTD.Client Project #: AGASSIZ

LODGESite Location:

Your P.O. #: 0125-076-01

RESULTS OF CHEMICAL ANALYSES OF PAINT

RDL = Reportable Detection Limit

77559250.103.41mg/LLEACHATE Lead (Pb)

Metals

QC BatchRDLLP-6Units

A046881COC Number

2014/12/10Sampling Date

LJ1999Maxxam ID

Page 2 of 7

Maxxam Analytics International Corporation o/a Maxxam Analytics Winnipeg: Unit D, 675 Berry Street R3H 1A7 Telephone (204) 772-7276 Fax (204) 772-2386

Page 248: SPECIFICATION Building Demolition and Remediation of

Maxxam Job #: B4B3014Report Date: 2014/12/16

EGE ENGINEERING LTD.Client Project #: AGASSIZ

LODGESite Location:

Your P.O. #: 0125-076-01

ELEMENTS BY ATOMIC SPECTROSCOPY (PAINT)

(1) Insufficient sample received to determine pH. Fluid 1 usedfor extraction.

77545894.92pHpH of Leaching Fluid

77545896.05pHFinal pH of Leachate

7754589 SEE NOTE (1)pHpH after HCl

7754589 SEE NOTE (1)pHInitial pH of Sample

TCLP Extraction Procedure

QC BatchLP-6Units

A046881COC Number

2014/12/10Sampling Date

LJ1999Maxxam ID

Page 3 of 7

Maxxam Analytics International Corporation o/a Maxxam Analytics Winnipeg: Unit D, 675 Berry Street R3H 1A7 Telephone (204) 772-7276 Fax (204) 772-2386

Page 249: SPECIFICATION Building Demolition and Remediation of

Maxxam Job #: B4B3014Report Date: 2014/12/16

EGE ENGINEERING LTD.Client Project #: AGASSIZ

LODGESite Location:

Your P.O. #: 0125-076-01

GENERAL COMMENTS

Each temperature is the average of up to three cooler temperatures taken at receipt

17.8°CPackage 1

Sample LJ1999-01 : Insufficient sample received to use standard sample weight (100g) for TCLP extraction as per Reference Method EPA 1311 R1992.The uncertainty of the analysis may be increased.

Results relate only to the items tested.

Page 4 of 7

Maxxam Analytics International Corporation o/a Maxxam Analytics Winnipeg: Unit D, 675 Berry Street R3H 1A7 Telephone (204) 772-7276 Fax (204) 772-2386

Page 250: SPECIFICATION Building Demolition and Remediation of

EGE ENGINEERING LTD.Client Project #: AGASSIZ

Your P.O. #: 0125-076-01LODGESite Location:

Maxxam Job #: B4B3014Report Date: 2014/12/16

QUALITY ASSURANCE REPORT

UnitsValueQC Limits% RecoveryQC Limits% RecoveryDateParameterQC Batch

Method BlankSpiked BlankMatrix Spike

mg/L<0.1075 - 1259575 - 125962014/12/16LEACHATE Lead (Pb)7755925

Method Blank: A blank matrix containing all reagents used in the analytical procedure. Used to identify laboratory contamination.

Spiked Blank: A blank matrix sample to which a known amount of the analyte, usually from a second source, has been added. Used to evaluate method accuracy.

Matrix Spike: A sample to which a known amount of the analyte of interest has been added. Used to evaluate sample matrix interference.

Page 5 of 7

Maxxam Analytics International Corporation o/a Maxxam Analytics Winnipeg: Unit D, 675 Berry Street R3H 1A7 Telephone (204) 772-7276 Fax (204) 772-2386

Page 251: SPECIFICATION Building Demolition and Remediation of

Maxxam Job #: B4B3014Report Date: 2014/12/16

EGE ENGINEERING LTD.Client Project #: AGASSIZ

LODGESite Location:

Your P.O. #: 0125-076-01

VALIDATION SIGNATURE PAGE

The analytical data and all QC contained in this report were reviewed and validated by the following individual(s).

Rob Reinert, Data Validation Coordinator

Maxxam has procedures in place to guard against improper use of the electronic signature and have the required "signatories", as per section 5.10.2 of ISO/IEC17025:2005(E), signing the reports. For Service Group specific validation please refer to the Validation Signature Page.

Page 6 of 7

Maxxam Analytics International Corporation o/a Maxxam Analytics Winnipeg: Unit D, 675 Berry Street R3H 1A7 Telephone (204) 772-7276 Fax (204) 772-2386

Page 252: SPECIFICATION Building Demolition and Remediation of

Page 7 of 7

Page 253: SPECIFICATION Building Demolition and Remediation of

MAXXAM JOB #: B4A9597Received: 2014/12/02, 14:20

CERTIFICATE OF ANALYSIS

Your Project #: 012507601Site#: LODGE

Report Date: 2014/12/09Report #: R1701838

Version: 1 - Final

Attention:PETER BOHONOS

EGE ENGINEERING LTD.511 PEPPERLOAF CRESCENTWINNIPEG, MBCANADA R3R 1E6

Your C.O.C. #: N000515

AGASSIZSite Location:

Sample Matrix: Solid# Samples Received: 4

Analytical MethodLaboratory MethodDateAnalyzed

DateExtractedQuantityAnalyses

EPA 6020a R1 mBBY7SOP-000012014/12/092014/12/084Metals - TCLP (1)

EPA 1311 R1992BBY7SOP-000052014/12/09N/A2TCLP pH Measurements (1)

EPA 1311 R1992 mBBY7SOP-000202014/12/09N/A2TCLP pH Measurements (<100g sample used) (1)

* RPDs calculated using raw data. The rounding of final results may result in the apparent difference.

(1) This test was performed by Maxxam Vancouver

Encryption Key

Please direct all questions regarding this Certificate of Analysis to your Project Manager.Janelle Kochan, B.Sc., Project ManagerEmail: [email protected]# (204)772-7276 Ext:2209==================================================================== Maxxam has procedures in place to guard against improper use of the electronic signature and have the required "signatories", as per section 5.10.2 of ISO/IEC 17025:2005(E), signing the reports. For Service Group specific validation please refer to the Validation Signature Page.

Total Cover Pages : 1Page 1 of 7

Maxxam Analytics International Corporation o/a Maxxam Analytics Winnipeg: Unit D, 675 Berry Street R3H 1A7 Telephone (204) 772-7276 Fax (204) 772-2386

Page 254: SPECIFICATION Building Demolition and Remediation of

Maxxam Job #: B4A9597Report Date: 2014/12/09

EGE ENGINEERING LTD.Client Project #: 012507601

AGASSIZSite Location:

Sampler Initials: PB

RESULTS OF CHEMICAL ANALYSES OF SOLID

RDL = Reportable Detection Limit

77484590.100.46<0.10<0.10<0.10mg/LLEACHATE Lead (Pb)

Metals

QC BatchRDLLP-5LP-4LP-2LP-1Units

N000515N000515N000515N000515COC Number

2014/12/022014/12/022014/12/022014/12/02Sampling Date

LH1688LH1687LH1686LH1685Maxxam ID

Page 2 of 7

Maxxam Analytics International Corporation o/a Maxxam Analytics Winnipeg: Unit D, 675 Berry Street R3H 1A7 Telephone (204) 772-7276 Fax (204) 772-2386

Page 255: SPECIFICATION Building Demolition and Remediation of

Maxxam Job #: B4A9597Report Date: 2014/12/09

EGE ENGINEERING LTD.Client Project #: 012507601

AGASSIZSite Location:

Sampler Initials: PB

ELEMENTS BY ATOMIC SPECTROSCOPY (SOLID)

77466884.9277466854.9277466884.9277466854.92pHpH of Leaching Fluid

77466885.8477466856.2177466885.4377466856.76pHFinal pH of Leachate

77466881.5777466852.6077466881.4277466852.29pHpH after HCl

77466889.4377466858.5177466888.1177466858.61pHInitial pH of Sample

TCLP Extraction Procedure

QC BatchLP-5QC BatchLP-4QC BatchLP-2QC BatchLP-1Units

N000515N000515N000515N000515COC Number

2014/12/022014/12/022014/12/022014/12/02Sampling Date

LH1688LH1687LH1686LH1685Maxxam ID

Page 3 of 7

Maxxam Analytics International Corporation o/a Maxxam Analytics Winnipeg: Unit D, 675 Berry Street R3H 1A7 Telephone (204) 772-7276 Fax (204) 772-2386

Page 256: SPECIFICATION Building Demolition and Remediation of

Maxxam Job #: B4A9597Report Date: 2014/12/09

EGE ENGINEERING LTD.Client Project #: 012507601

AGASSIZSite Location:

Sampler Initials: PB

GENERAL COMMENTS

Each temperature is the average of up to three cooler temperatures taken at receipt

17.3°CPackage 1

Samples LH1686 and LH1688: Not possible to reduce sample to standard particle size for pH determination for TCLP.

Sample LH1686-01 : Insufficient sample received to use standard sample weight (100g) for TCLP extraction as per Reference Method EPA 1311R1992. The uncertainty of the analysis may be increased.

Sample LH1688-01 : Insufficient sample received to use standard sample weight (100g) for TCLP extraction as per Reference Method EPA 1311R1992. The uncertainty of the analysis may be increased.

Results relate only to the items tested.

Page 4 of 7

Maxxam Analytics International Corporation o/a Maxxam Analytics Winnipeg: Unit D, 675 Berry Street R3H 1A7 Telephone (204) 772-7276 Fax (204) 772-2386

Page 257: SPECIFICATION Building Demolition and Remediation of

EGE ENGINEERING LTD.Client Project #: 012507601

Sampler Initials: PBAGASSIZSite Location:

Maxxam Job #: B4A9597Report Date: 2014/12/09

QUALITY ASSURANCE REPORT

QC LimitsValue (%)UnitsValueQC Limits% RecoveryQC Limits% RecoveryDateParameterQC Batch

RPDMethod BlankSpiked BlankMatrix Spike

N/A2.7pH4.922014/12/09Final pH of Leachate7746685

N/A0.092pH4.922014/12/09Initial pH of Sample7746685

N/A1.42014/12/09pH after HCl7746685

N/A0pH4.922014/12/09pH of Leaching Fluid7746685

35NCmg/L<0.1075 - 12510175 - 125932014/12/09LEACHATE Lead (Pb)7748459

NC (Duplicate RPD): The duplicate RPD was not calculated. The concentration in the sample and/or duplicate was too low to permit a reliable RPD calculation (one or both samples < 5x RDL).

Method Blank: A blank matrix containing all reagents used in the analytical procedure. Used to identify laboratory contamination.

Spiked Blank: A blank matrix sample to which a known amount of the analyte, usually from a second source, has been added. Used to evaluate method accuracy.

Matrix Spike: A sample to which a known amount of the analyte of interest has been added. Used to evaluate sample matrix interference.

Duplicate: Paired analysis of a separate portion of the same sample. Used to evaluate the variance in the measurement.

N/A = Not Applicable

Page 5 of 7

Maxxam Analytics International Corporation o/a Maxxam Analytics Winnipeg: Unit D, 675 Berry Street R3H 1A7 Telephone (204) 772-7276 Fax (204) 772-2386

Page 258: SPECIFICATION Building Demolition and Remediation of

Maxxam Job #: B4A9597Report Date: 2014/12/09

EGE ENGINEERING LTD.Client Project #: 012507601

AGASSIZSite Location:

Sampler Initials: PB

VALIDATION SIGNATURE PAGE

The analytical data and all QC contained in this report were reviewed and validated by the following individual(s).

Andy Lu, Data Validation Coordinator

Maxxam has procedures in place to guard against improper use of the electronic signature and have the required "signatories", as per section 5.10.2 of ISO/IEC17025:2005(E), signing the reports. For Service Group specific validation please refer to the Validation Signature Page.

Page 6 of 7

Maxxam Analytics International Corporation o/a Maxxam Analytics Winnipeg: Unit D, 675 Berry Street R3H 1A7 Telephone (204) 772-7276 Fax (204) 772-2386

Page 259: SPECIFICATION Building Demolition and Remediation of

Page 7 of 7