Demolition Work Plan (SSD-9579147 Condition B10 Demolition) Prepared for: Taylor Construction Group Re: Pendle Hill High School, Binalong Road, Toongabbie, NSW, 2146 Site Details: Planned start date: 08/11/2021 PF Civil has been engaged by Taylors Construction Group to demolish trees, security fencing, kerbs, gutters, asphalt, and concrete footpaths. This demolition work plan details the method for the safe execution of the demolition. All works will be carried out under the licence holder: PF Civil Pty Ltd demolition licence #: AD212205 Nominated supervisor: Brendan Roots Demolition work completed for Pendle Hill High School, Toongabbie shall comply with the provisions of AS2601:2001 – The demolition of Structures. (Standards Australia, 2001). Prior to the commencement of construction, demolition work plans required by AS 2601-2001 The demolition of structures (Standards Australia, 2001) must be accompanied by a written statement from a suitably qualified person that the proposals contained in the work plan comply with the safety requirements of the Standard. The work plans and the statement of compliance must be submitted to the Certifier and Planning Secretary. PROCEDURE: Location & disconnection of services. Exclusion zone to be established. Machinery will be used to perform removal of existing trees, security fencing, kerbs, gutters, asphalt and concrete footpaths. Debris will be loaded on to trucks with excavator. Debris will be disposed of at a licensed waste facility. The demolition has at time frame of approximately two weeks. All persons working within the exclusion zone are supplied with appropriate PPE, have been inducted into the site & will carry out works as per the SWMS on site. The exclusion zone is no less than four metres from the demolition area & is fenced with safety fencing. I certify that the proposals contained in the plan comply with the safety requirements of the standards. Kind Regards, Brendan Roots

Demolition Work Plan (SSD-9579147 Condition B10 Demolition)

  • Upload
    others

  • View
    30

  • Download
    1

Embed Size (px)

Citation preview

Demolition Work Plan (SSD-9579147 Condition B10 Demolition)

Prepared for: Taylor Construction Group

Re: Pendle Hill High School, Binalong Road, Toongabbie, NSW, 2146

Site Details: Planned start date: 08/11/2021

PF Civil has been engaged by Taylors Construction Group to demolish trees, security fencing, kerbs, gutters, asphalt, and concrete footpaths. This demolition work plan details the method for the safe execution of the demolition.

All works will be carried out under the licence holder:

PF Civil Pty Ltd demolition licence #: AD212205

Nominated supervisor: Brendan Roots

Demolition work completed for Pendle Hill High School, Toongabbie shall comply with

the provisions of AS2601:2001 – The demolition of Structures. (Standards Australia,

2001). Prior to the commencement of construction, demolition work plans required by

AS 2601-2001 The demolition of structures (Standards Australia, 2001) must be

accompanied by a written statement from a suitably qualified person that the

proposals contained in the work plan comply with the safety requirements of the

Standard. The work plans and the statement of compliance must be submitted to the

Certifier and Planning Secretary.

PROCEDURE:

• Location & disconnection of services.

• Exclusion zone to be established.

• Machinery will be used to perform removal of existing trees, security fencing,

kerbs, gutters, asphalt and concrete footpaths.

• Debris will be loaded on to trucks with excavator.

• Debris will be disposed of at a licensed waste facility.

• The demolition has at time frame of approximately two weeks.

• All persons working within the exclusion zone are supplied with appropriate PPE, have been inducted into the site & will carry out works as per the SWMS on site.

• The exclusion zone is no less than four metres from the demolition area & is

fenced with safety fencing.

I certify that the proposals contained in the plan comply with the safety requirements

of the standards.

Kind Regards, Brendan Roots

Resume: Brendan Roots

Experience :

• Pf Civil

- Director, 2015 – current

• Pro-form Excavations

- Manager, 2006 – 2015

• Landscaper

- 2000 – 2006

Qualifications:

• Contractors Licence 282647C

• Supervisors Certificate 75274S

• Demolition Licence AD212205

• Asbestos Licence AD212210

• High Risk Work Licence HRW190160

• WC CGI01409844SEQ1

• Certificate III in civil Construction Plant Opertations RII30815

GSPublisherVersion 1673.5.5.100

100

50

50 100 150mm @ A1

150m

m @

A1

SYDNEYLevel 3, 35 Spring StreetPO Box 1669Bondi Junction, NSW 2022

t. (02) 8383 5151e. [email protected]

www.fultontrotter.com.au

DIRECTORSGreg Isaac raia NSW 6855 QLD 2920Justine Ebzery raia QLD 3313John Ward raia VIC 18804 NSW 8371 QLD 3847Katerina Dracopoulos raia QLD 4529Mark Trotter fraia VIC 17691 NSW 4421 QLD 1870Paul Sekava raia NSW 7180 QLD 3108Paul Trotter fraia NSW 7177 QLD 2646Ryan Loveday raia QLD 4500

BRISBANESYDNEY

plot date: Friday, 22 October 2021, 3:12 PM file location: BIMcloud: SYDBIM23 - BIMcloud Basic for ARCHICAD 23/7107TO01 - PHHS - SITE

REVISIONDRAWING NUMBER

PROJECT NUMBER CHECKEDDIRECTOR

PRO

JEC

TC

LIEN

T

A-EXT-1001

Figured dimensions take precedence overscale dimensions. Contractors must verifyall dimensions on site before commencingany work or making shop drawings.

DR

AWIN

GAD

DR

ESS

66 BINALONG ROADPENDLE HILL, NSW, 2146

7107TO01

PENDLE HILL HIGH SCHOOL

SCHOOL INFRASTRUCTURE NSW

EXISTING & DEMOLITION SITEPLAN

JW

Copyright

This drawing shows design features and elements of a design prepared byFulton Trotter Architects and is to be used only for work authorised inwriting by the designers. It cannot be copied directly or indirectly, in wholeor in part, nor shall it be used for any other building purposes. Unauthoriseduse will be considered an infringement of these rights.

PHAS

E DESIGN DEVELOPMENT

05

REV. DESCRIPTION DATE INIT.

05

04

03

02

01

ISSUED FOR CC

ISSUED FOR 100% DD SIGNOFF

BCA / DDA / ACOUSTIC REVIEW ISSUE

DESIGN DEVELOPMENT SUBMISSION (70%)

ISSUED FOR INFORMATION

PRELIMINARY ISSUE

22/10/2021

08/10/2021

07/09/2021

18/08/2021

04/06/2021

AP

AP

AP

AP

AP

AP

82

84

97

95

93

91

87/89

85

83

83A

81

84

84

84

99

1,865 17,330

EXISTING CONCRETE PATH AND FENCINGTO BE REMOVED

EXISTING VEHICULAR ENTRY OFF CORNOCK AVENUE

RELOCATION OF GAS MAIN ANDDEMOLITION OF EXISTING BRICKWORK ENCLOSURE

EXISTING CONCRETE DISH DRAINTO BE RETAINED

EXISTING 1,900 WIDE FOOTPATH

EXISTING SUBSTATION

EXISTING 1.8M HIGH TIMBER FENCE

EXISTING 2100 HIGH DIPLOMAT FENCE OUT OFPROPOSED WORK ZONE TO BE RETAINED

EXISTING RETAINING WALL

DEMOLITION OF EXISTING STAIR AND GATEAND FENCE TOWARDS NORTHERN BOUNDARY

REMOVAL OF EXISTING 2100 HIGH FENCINGTO BE REMOVED IN AREA OF PROPOSED WORKS

T143

T147

T146

T142

T151

T150

T149

T148

T145

T143

T165T166

T167

T158

KNOXSTREET

LEVE

L ONE

WAL

KWAY

ABO

VE

EXISTINGRAMPS

EXISTINGRAMPS

LEVE

L ONE

COV

ERED

WAL

KWAY

EXIS

TING

ENT

RY P

ATH

FROM

FAV

ELL S

TREE

T

21191715131109

22201816141210

COVEREDAREAS

COVEREDAREAS

01

25

42

EXIS

TING

SPA

CES

= 12

EXIS

TING

SPA

CES

= 11

+ 1x

ACC

ESSI

BLE

EXIS

TING

SPA

CES

= 17

EXIS

TING

SPA

CES

= 11

53

EXISTING SPACES = 15

LEVEL ONE WALKWAY ABOVE

LEVEL ONE WALKWAY ABOVE

EXISTING TWOSTOREY DWELLING

02

03

04

05

06

07

08

09

10

11

12

14

13

15

16

17

18

19

20

21

22

23

24

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

43

44

45

46

47

48

49

50

51

52

54 55 56 57 58 59 60 61 62 63 64 65 66 67

TOTA

L EXI

STIN

G PA

RKIN

G SP

ACES

= 67

PROPOSED GROUND LEVELINTERNAL REFURBISHMENT

APPROVED UNDERSEPERATE APPLICATION

62.50

61.0060.50

59.50

60.50

60.00

60.00

60.5061.00

61.00

61.50

EXISTING TREES TO BE REMOVEDSHOWN DASHED

EXISTING PEDESTRIAN ENTRY OFF KNOX STREET

EXISTING MAIN PEDESTRIAN ENTRY OFF CORNOCK AVENUE

EXISTING PEDESTRIAN ENTRY OFF BINALONG ROAD

EXISTING WASTE COLLECTION AREA (DASHED)REFER OPERATIONAL WASTE MANAGEMENT PLAN

EXISTING SCHOOL SIGNAGETO BE REMOVED

BUILDING DGROUND RL 61.56

LEVEL ONE RL 64.64

BUILDING EGROUND RL 59.79

LEVEL ONE RL 62.90

BUILDING BGROUND RL 60.25

LEVEL ONE RL 63.32

BUILDING CGROUND RL 61.15

LEVEL ONE RL 64.30

BUILDING AGROUND RL 61.58LEVEL ONE RL 64.64

LOT 101DP 1141329

OVAL

CENTRALASSEMBLY

AREA

BI

NA

LO

NG

RO

AD

C O R N O C K A V ESTAFF

CARPARKENTRY

LIFT

62.00

STAIR

B O R A P L A C E

7°55

'20"

42.

855

277°56'00" 16.655

32.240

187°

53'2

0" 3

1.89

518

7°53

'20"

24.

310

97°53'20" 38.100

187°

53'2

0" 6

7.05

5

97°54'20" 62.490

97°54'30" 137.18

187°

55'3

0" 1

00.5

9

97°54'00" 61.050

187°

52'2

0" 1

15.3

7

277°54'00" 62.485

7°54

'00"

3.0

00

277°54'00" 62.485277°54'00"

15.240

1

3

17

OUTDOORPLAY SPACE

0.000

EXISTING SITE PLAN LEGEND

EXISTING SPOT LEVEL

EXISTING PAVING

ELEMENTS TO BE DEMOLISHED

EXISTING BUILDINGS

EXISTING SITE CONTOURS (500MM)

EXISTING TREES

TREES TO BE REMOVED

EXISTING ASPHALT

EXISTING LANDSCAPING

EXISTING FENCING

PLAN1EXISTING SITE PLANSCALE: 1:500