5
L L K K J J H H G G F F D D C C B B A A 1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 10 10 11 11 10.9 CR-AD201 A1 CR-AD201 D1 CR-AD201 B1 CR-AD201 F1 E E 01 03 03 03 03 02 02 02 03 02 04 02 06 08 03 03 03 03 02 02 02 10 11 12 13 03 03 03 03 03 03 03 03 05 05 05 05 02 02 05 05 05 03 05 I I 03 03 15 3'-0" 03 02 03 03 03 02 02 04 02 03 03 ALIGN F208 F211 F213 F214 SHEET TITLE SHEET NUMBER Ivy Tech Community College 50 W. Fall Creek Parkway N Drive Indianapolis, IN 46208 Owner RATIO Architects, Inc. 101 South Pennsylvania Street Indianapolis, Indiana 46204 317 - 633 - 4040 Architect CE Solutions Structural Engineer Mechanical / Electrical Engineer Civil Engineer 10 Shoshone Dr. Carmel, IN 46032 (317) 818 - 1912 Loftus Engineering, Inc. 201 South Capitol Ave. Suite 310 Indianapolis, Indiana 46225 (317) 352 - 5822 Cripe 3939 Priority Way South Dr. Indianapolis, Indiana 46240 (317) 844 - 6777 PROJECT NO. COPYRIGHT NOTICE: THIS ARCHITECTURAL AND ENGINEERING DRAWING IS GIVEN IN CONFIDENCE AND SHALL BE USED ONLY PURSUANT TO THE AGREEMENT WITH RATIO ARCHITECTS, INC. NO OTHER USE, DISSEMINATION OR DUPLICATION MAY BE MADE WITHOUT PRIOR WRITTEN CONSENT OF RATIO ARCHITECTS, INC. ALL COMMON LAW RIGHTS OF COPYRIGHT AND OTHERWISE ARE HEREBY SPECIFICALLY RESERVED. SHEET ISSUE NOT FOR CONSTRUCTION SEAL | DATE AV Consultant Design 27 5366 Winthrop Avenue Indianapolis, IN 46220 (317) 536 - 8000 7/23/2018 2:35:47 PM CR-AD101 FIRST FLOOR DEMO PLAN 17097.000 ITCC MUNCIE COWAN BLDG Muncie, IN 3/32" = 1'-0" CR-AD101 A1 FIRST LEVEL DEMOLITION PLAN GENERAL DEMOLITION NOTES A THESE GENERAL DEMOLITION NOTES APPLY TO DEMOLITION DRAWINGS. B FIELD VERIFY CONDITIONS AND COORDINATE DEMOLITION OR REMOVAL WORK WITH CORRESPONDING NEW CONSTRUCTION AND WITH APPROPRIATE TRADES PRIOR TO STARTING DEMOLITION WORK. IF DISCREPANCIES ARE FOUND BETWEEN CONTRACT DOCUMENTS AND ACTUAL FIELD CONDITIONS, NOTIFY ARCHITECT IMMEDIATELY. C OWNER WILL REMOVE LOOSE SALVAGEABLE ITEMS, I.E., EQUIPMENT, FURNITURE, CABINETRY, FILE CABINETS, WALL-MOUNTED PROJECTION SCREENS, ARTWORK, PLAQUES, ETC., PRIOR TO CONTRACTOR STARTING DEMOLITION WORK IN EACH AREA. OWNER WILL STORE AND REINSTALL SUCH ITEMS. D DEMOLISHED MATERIALS ARE THE PROPERTY OF THE CONTRACTOR UNLESS NOTED OTHERWISE AND SHALL BE PROMPTLY DISPOSED OF OFF-SITE. E ITEMS NOTED TO BE REMOVED AND TURNED OVER TO OWNER SHALL BE DELIVERED TO THE NEAREST EXTERIOR DOOR OF THE BUILDING FROM WHICH THE ITEM WAS REMOVED AS DIRECTED BY OWNER. F REMOVE ITEMS IN THEIR ENTIRETY UNLESS OTHERWISE INDICATED. DESCRIPTION OF PRIMARY ITEMS TO BE REMOVED IS GENERAL IN NATURE, AND REMOVAL OF SECONDARY COMPONENTS SUCH AS BLOCKING, SUPPORTS, ANCHORS, TRIM, ADHESIVE, PIPING, WIRING, ETC., RELATED TO PRIMARY ITEMS SHALL BE INCLUDED. G PROTECT EXISTING SURFACES TO REMAIN IN AREAS ADJACENT TO DEMOLITION WORK. H REPAIR FINISHES AND SURFACES LEFT EXPOSED BY DEMOLITION OR REMOVAL OF EQUIPMENT, USING NEW MATERIALS TO MATCH SURROUNDING SURFACES. REPAIR EXISTING FLOOR, BASE, WAINSCOT, WALL AND CEILING FINISHES TO CORRECT DEFECTS EITHER CAUSED OR EXPOSED BY DEMOLITION WORK OR EQUIPMENT REMOVAL. REPAIRED SURFACES SHALL BE SMOOTH AND UNDETECTABLE UNDER FINAL FINISHES. AREAS NOTED ON THE DRAWINGS TO BE REPAIRED OR PATCHED ARE GIVEN FOR REFERENCE AND SHALL NOT BE INTERPRETED TO LIMIT THE SCOPE OF WORK. J PATCH EXISTING FLOOR, WALL, CEILING AND ROOF CONSTRUCTION AT ABANDONED PENETRATION LOCATIONS WITH NEW MATERIALS AS REQUIRED TO RECEIVE NEW FINISHES AND TO MAINTAIN ORIGINAL FIRE RATING OF ASSEMBLY WHERE APPLICABLE. K PORTIONS OF EXISTING MASONRY WALLS NOTED TO BE REMOVED AND OPENINGS TO BE CUT INTO EXISTING MASONRY WALLS SHALL BE REMOVED BACK TO THE NEAREST VERTICAL MORTAR JOINT. PROVIDE A MINIMUM BEARING OF 8" AT EACH END FOR NEW MASONRY LINTELS AND FIELD VERIFY FINAL LENGTH. ALLOW A MINIMUM OF 4" NEW MASONRY AT JAMB CONDITIONS OR END WALL CONDITIONS OF MASONRY WALLS. REFER TO DEMOLITION PLANS FOR LOCATIONS OF WALL, FLOOR, CEILING OR ROOF OPENINGS. L PROVIDE SMOOTH TRANSITIONS BETWEEN FLOOR, WALL AND CEILING SURFACES PRIOR TO INSTALLING NEW FINISHES WHERE WALLS OR OTHER ITEMS ARE REMOVED. FILL FLOOR VOIDS WITH CONCRETE OR MATERIAL MATCHING ADJACENT MATERIALS AND LEVEL FLOOR SURFACES TO PROVIDE A SMOOTH TRANSITION FROM ONE SIDE OF WALL TO THE OTHER WHERE PORTIONS OF WALLS ARE REMOVED. M ADDITIONAL FLOOR TILE MAY BE PRESENT BENEATH FINISHES IN ROOMS WITH EXISTING FLOOR TILE OR CARPET. REMOVE ALL LAYERS OF EXISTING FLOOR COVERINGS TO PROVIDE APPROPRIATE SUBSTRATE FOR NEW FLOOR FINISHES. N SELECTIVE DEMOLITION FOR INSTALLATION OF NEW MECHANICAL OR ELECTRICAL WORK SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR OR TRADE REQUIRING THE DEMOLITION. THIS INCLUDES, BUT IS NOT LIMITED TO, FLOOR SLAB AND PAVEMENT CUTTING FOR UNDERGROUND PIPING, CORING FOR WALL AND FLOOR PENETRATIONS, ROOF PENETRATIONS, ETC. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL DEMOLITION INFORMATION. O DISCONNECT AND CAP-OFF OR REMOVE OBSOLETE EXISTING UTILITY AND SERVICE LINES PRIOR TO STARTING DEMOLITION WORK. P REMOVE ABANDONED UNDERGROUND UTILITIES AND INSTALL ENGINEERED FILL. Q IF EXISTING ITEMS TO BE REMOVED OR DISTURBED ARE SUSPECTED OR DISCOVERED TO CONTAIN ASBESTOS OR OTHER HAZARDOUS MATERIALS, STOP DEMOLITION AND NOTIFY OWNER AND ARCHITECT IMMEDIATELY. R REPAIR AND PATCH SPRAYED FIRE-RESISTIVE AND FIRESTOP MATERIALS WHERE DAMAGED DUE TO SELECTIVE DEMOLITION ACTIVITIES TO RESTORE ORIGINAL FIRE RATING UNLESS OTHERWISE INDICATED. S THE FOLLOWING DEMOLITION WORK SHALL BE PERFORMED AS PART OF THE WORK UNDER THE APPROPRIATE PROJECT MANUAL SECTIONS: A.) REMOVAL OF EXISTING ROOFING. B.) REMOVAL OF EXISTING WINDOWS, TEMPORARY WINDOW OPENING CLOSURES AND OPENING PREPARATION TO RECEIVE NEW WINDOW UNITS. T REFER TO WALL SECTIONS NOTED ON DEMOLITION PLANS FOR ADDITIONAL DEMOLITION INFORMATION. KEYNOTES - DEMOLITION 01 REMOVE EXISTING STUD WALLS, FURRING, INTERIOR DOORS, DOOR FRAMES, CASEWORK AND HARDWARE IN THEIR ENTIRETY, TYPICAL. 02 REMOVE PORTION OF EXTERIOR WALL TO CREATE NEW OPENING AS REQUIRED FOR NEW CONSTRUCTION. REFER TO PROPOSED PLANS FOR EXACT LOCATION. 03 REMOVE EXISTING EXTERIOR DOOR/WINDOW IN THEIR ENTIRETY. REPAIR/RESTORE EXISTING OPENING TO RECEIVE NEW EXTERIOR DOOR/WINDOW. PATCH/INFILL EXTERIOR MATERIAL TO MATCH ADJACENT MATERIAL AS REQUIRED. 04 REMOVE METAL PANELING IN INDICATED AREA (HATCHED) TO CREATE NEW OPENING. SALVAGE METAL PANELING FOR REUSE. REFER TO DEMOLITION ELEVATIONS AND DOOR/WINDOW SCHEDULES FOR MORE INFORMATION. 05 REMOVE EXISTING GUTTERS AND DOWNSPOUTS IN THEIR ENTIRETY. EXISTING UNDERGROUND STORM PIPING TO BE RE-USED WHERE POSSIBLE. COORDINATE WITH PROPOSED PLANS. 06 REMOVE ALL PLUMBING FIXTURES, TOILET ACCESSORIES AND PARTITIONS IN THEIR ENTIRETY. SEE PLUMBING DRAWINGS. 07 REMOVE EXISTING CONCRETE SLAB AS INDICATED (SHADED). PREPARE TO RECEIVE NEW CONCRETE AS REQUIRED TO PROVIDE FLUSH FINISH FLOOR. 08 REMOVE PORTION OF EXISTING BUILDING IN ITS ENTIRETY (HATCHED AREA). PATCH/REPAIR ADJACENT SUBSTRATES AND MATERIALS AS REQUIRED PER NEW CONSTRUCTION DRAWINGS. 09 REMOVE EXISTING MEZZANINE FLOOR, WALLS AND ACCESS STAIRS/LADDER IN THEIR ENTIRETY. REMOVE EXISTING MECHANICAL, ELECTRICAL AND PLUMBING LOCATED ON MEZZANIENS IN THEIR ENTIRETY. 10 REMOVE EXISTING EQUIPMENT, INCLUDING MACHINERY, IN IT'S ENTIRETY PRIOR TO CONSTRUCTION COMMENCEMENT. 11 REMOVE EXISTING INSULATION FROM UNDERSIDE OF ROOF DECK. 12 REMOVE EXISTING ELECTRICAL SERVICE PANELS AND ASSOCIATED WIRING. SEE ELECTRICAL DRAWINGS. TYPICAL. 13 REMOVE EXISTING HVAC EQUIPMENT AND ASSOCATED DUCTWORK. SEE MECHANICAL DRAWINGS. TYPICAL. 14 REMOVE EXISTING STUCCO WALL FINISH AND ASSOCIATED SHEATHING. REPLACE WITH VERTICAL METAL SIDING TO MATCH WALL ABOVE. 15 EXISTING CONCRETE SLAB ON GRADE TO REMAIN. COORDINATE SLAB PREP FOR NEW TOPPING SLAB PER STRUCTURAL DRAWINGS AND SPECIFICATIONS. COORDINATE TRENCHES FOR UNDER-SLAB ELEC. AND PLUMB. PER PROPOSED DRAWINGS AND SPECS. 16 REVIEW EXISTING ROOF PENETRATION LOCATIONS FOR POTENTIAL RE-USE. REMOVE AND PATCH ABANDONED PENETRATIONS (APPPROXIMATELY 30 TOTAL). 17 EXISTING ROOF HATCH TO REMAIN. REMOVE LADDER AND SALVAGE FOR RE-USE (IF POSSIBLE). 1 07/23/18 ISSUED FOR BID 07/23/18

KEYNOTES - DEMOLITION GENERAL DEMOLITION NOTES ITCC …

  • Upload
    others

  • View
    20

  • Download
    0

Embed Size (px)

Citation preview

UP

L

L

K

K

J

J

H

H

G

G

F

F

D

D

C

C

B

B

A

A

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

9 9

10 10

11 1110.9

CR-AD201

A1

CR-AD201D1

CR-AD201

B1

CR-AD201F1

E

E

01

03 03 03

03

02

02

02

03

02

04

02

06

08 03

0303030302 02 02

10

11

12

13

03

03

03

03

03

03

03

03

05050505 02 02

05 05 05 0305

II

03 03

07

15

3'-0

"

3'-0"

03

02

030303 02

02

04

02

03

03

ALIGN

ALIGN

F203

F201

F209

F208

F211

F213

F214

F215

SHEET TITLE

SHEET NUMBER

Ivy Tech Community College50 W. Fall Creek Parkway N DriveIndianapolis, IN 46208

Owner

RATIO Architects, Inc.101 South Pennsylvania StreetIndianapolis, Indiana 46204317-633-4040

Architect

CE Solutions

Structural Engineer

Mechanical / Electrical Engineer

Civil Engineer

10 Shoshone Dr.Carmel, IN 46032(317) 818-1912

Loftus Engineering, Inc.

201 South Capitol Ave. Suite 310Indianapolis, Indiana 46225(317) 352-5822

Cripe

3939 Priority Way South Dr.Indianapolis, Indiana 46240(317) 844-6777

PROJECT NO.

COPYRIGHT NOTICE: THIS ARCHITECTURAL AND ENGINEERING DRAWING IS GIVEN IN CONFIDENCE AND SHALL BE USED ONLY PURSUANT TO THE AGREEMENT WITH RATIO ARCHITECTS, INC. NO OTHER USE, DISSEMINATION OR DUPLICATION MAY BE MADE WITHOUT PRIOR WRITTEN CONSENT OF RATIO ARCHITECTS, INC. ALL COMMON LAW RIGHTS OF COPYRIGHT AND OTHERWISE ARE HEREBY SPECIFICALLY RESERVED.

SHEET ISSUE

NOT FOR CONSTRUCTION

SEAL | DATE

AV Consultant

Design 27

5366 Winthrop AvenueIndianapolis, IN 46220(317) 536-8000

7/2

3/2

018 2

:35:4

7 P

M

CR-AD101

FIRST FLOOR DEMOPLAN

17097.000

ITCC MUNCIECOWAN BLDG

Muncie, IN

3/32" = 1'-0"CR-AD101

A1 FIRST LEVEL DEMOLITION PLAN

GENERAL DEMOLITION NOTES

A THESE GENERAL DEMOLITION NOTES APPLY TO DEMOLITIONDRAWINGS.

B FIELD VERIFY CONDITIONS AND COORDINATE DEMOLITIONOR REMOVAL WORK WITH CORRESPONDING NEWCONSTRUCTION AND WITH APPROPRIATE TRADES PRIOR TOSTARTING DEMOLITION WORK. IF DISCREPANCIES AREFOUND BETWEEN CONTRACT DOCUMENTS AND ACTUALFIELD CONDITIONS, NOTIFY ARCHITECT IMMEDIATELY.

C OWNER WILL REMOVE LOOSE SALVAGEABLE ITEMS, I.E.,EQUIPMENT, FURNITURE, CABINETRY, FILE CABINETS,WALL-MOUNTED PROJECTION SCREENS, ARTWORK,PLAQUES, ETC., PRIOR TO CONTRACTOR STARTINGDEMOLITION WORK IN EACH AREA. OWNER WILL STORE ANDREINSTALL SUCH ITEMS.

D DEMOLISHED MATERIALS ARE THE PROPERTY OF THECONTRACTOR UNLESS NOTED OTHERWISE AND SHALL BEPROMPTLY DISPOSED OF OFF-SITE.

E ITEMS NOTED TO BE REMOVED AND TURNED OVER TOOWNER SHALL BE DELIVERED TO THE NEAREST EXTERIORDOOR OF THE BUILDING FROM WHICH THE ITEM WASREMOVED AS DIRECTED BY OWNER.

F REMOVE ITEMS IN THEIR ENTIRETY UNLESS OTHERWISEINDICATED. DESCRIPTION OF PRIMARY ITEMS TO BEREMOVED IS GENERAL IN NATURE, AND REMOVAL OFSECONDARY COMPONENTS SUCH AS BLOCKING, SUPPORTS,ANCHORS, TRIM, ADHESIVE, PIPING, WIRING, ETC., RELATEDTO PRIMARY ITEMS SHALL BE INCLUDED.

G PROTECT EXISTING SURFACES TO REMAIN IN AREASADJACENT TO DEMOLITION WORK.

H REPAIR FINISHES AND SURFACES LEFT EXPOSED BYDEMOLITION OR REMOVAL OF EQUIPMENT, USING NEWMATERIALS TO MATCH SURROUNDING SURFACES. REPAIREXISTING FLOOR, BASE, WAINSCOT, WALL AND CEILINGFINISHES TO CORRECT DEFECTS EITHER CAUSED OREXPOSED BY DEMOLITION WORK OR EQUIPMENT REMOVAL.REPAIRED SURFACES SHALL BE SMOOTH ANDUNDETECTABLE UNDER FINAL FINISHES. AREAS NOTED ONTHE DRAWINGS TO BE REPAIRED OR PATCHED ARE GIVENFOR REFERENCE AND SHALL NOT BE INTERPRETED TO LIMITTHE SCOPE OF WORK.

J PATCH EXISTING FLOOR, WALL, CEILING AND ROOFCONSTRUCTION AT ABANDONED PENETRATION LOCATIONSWITH NEW MATERIALS AS REQUIRED TO RECEIVE NEWFINISHES AND TO MAINTAIN ORIGINAL FIRE RATING OFASSEMBLY WHERE APPLICABLE.

K PORTIONS OF EXISTING MASONRY WALLS NOTED TO BEREMOVED AND OPENINGS TO BE CUT INTO EXISTINGMASONRY WALLS SHALL BE REMOVED BACK TO THENEAREST VERTICAL MORTAR JOINT. PROVIDE A MINIMUMBEARING OF 8" AT EACH END FOR NEW MASONRY LINTELSAND FIELD VERIFY FINAL LENGTH. ALLOW A MINIMUM OF 4"NEW MASONRY AT JAMB CONDITIONS OR END WALLCONDITIONS OF MASONRY WALLS. REFER TO DEMOLITIONPLANS FOR LOCATIONS OF WALL, FLOOR, CEILING OR ROOFOPENINGS.

L PROVIDE SMOOTH TRANSITIONS BETWEEN FLOOR, WALLAND CEILING SURFACES PRIOR TO INSTALLING NEWFINISHES WHERE WALLS OR OTHER ITEMS ARE REMOVED.FILL FLOOR VOIDS WITH CONCRETE OR MATERIALMATCHING ADJACENT MATERIALS AND LEVEL FLOORSURFACES TO PROVIDE A SMOOTH TRANSITION FROM ONESIDE OF WALL TO THE OTHER WHERE PORTIONS OF WALLSARE REMOVED.

M ADDITIONAL FLOOR TILE MAY BE PRESENT BENEATHFINISHES IN ROOMS WITH EXISTING FLOOR TILE OR CARPET.REMOVE ALL LAYERS OF EXISTING FLOOR COVERINGS TOPROVIDE APPROPRIATE SUBSTRATE FOR NEW FLOORFINISHES.

N SELECTIVE DEMOLITION FOR INSTALLATION OF NEWMECHANICAL OR ELECTRICAL WORK SHALL BE THERESPONSIBILITY OF THE CONTRACTOR OR TRADEREQUIRING THE DEMOLITION. THIS INCLUDES, BUT IS NOTLIMITED TO, FLOOR SLAB AND PAVEMENT CUTTING FORUNDERGROUND PIPING, CORING FOR WALL AND FLOORPENETRATIONS, ROOF PENETRATIONS, ETC. REFER TOMECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONALDEMOLITION INFORMATION.

O DISCONNECT AND CAP-OFF OR REMOVE OBSOLETEEXISTING UTILITY AND SERVICE LINES PRIOR TO STARTINGDEMOLITION WORK.

P REMOVE ABANDONED UNDERGROUND UTILITIES ANDINSTALL ENGINEERED FILL.

Q IF EXISTING ITEMS TO BE REMOVED OR DISTURBED ARESUSPECTED OR DISCOVERED TO CONTAIN ASBESTOS OROTHER HAZARDOUS MATERIALS, STOP DEMOLITION ANDNOTIFY OWNER AND ARCHITECT IMMEDIATELY.

R REPAIR AND PATCH SPRAYED FIRE-RESISTIVE ANDFIRESTOP MATERIALS WHERE DAMAGED DUE TO SELECTIVEDEMOLITION ACTIVITIES TO RESTORE ORIGINAL FIRERATING UNLESS OTHERWISE INDICATED.

S THE FOLLOWING DEMOLITION WORK SHALL BE PERFORMEDAS PART OF THE WORK UNDER THE APPROPRIATE PROJECTMANUAL SECTIONS: A.) REMOVAL OF EXISTING ROOFING. B.)REMOVAL OF EXISTING WINDOWS, TEMPORARY WINDOWOPENING CLOSURES AND OPENING PREPARATION TORECEIVE NEW WINDOW UNITS.

T REFER TO WALL SECTIONS NOTED ON DEMOLITION PLANSFOR ADDITIONAL DEMOLITION INFORMATION.

KEYNOTES - DEMOLITION

01 REMOVE EXISTING STUD WALLS, FURRING, INTERIORDOORS, DOOR FRAMES, CASEWORK AND HARDWARE INTHEIR ENTIRETY, TYPICAL.

02 REMOVE PORTION OF EXTERIOR WALL TO CREATE NEWOPENING AS REQUIRED FOR NEW CONSTRUCTION. REFERTO PROPOSED PLANS FOR EXACT LOCATION.

03 REMOVE EXISTING EXTERIOR DOOR/WINDOW IN THEIRENTIRETY. REPAIR/RESTORE EXISTING OPENING TORECEIVE NEW EXTERIOR DOOR/WINDOW. PATCH/INFILLEXTERIOR MATERIAL TO MATCH ADJACENT MATERIAL ASREQUIRED.

04 REMOVE METAL PANELING IN INDICATED AREA (HATCHED)TO CREATE NEW OPENING. SALVAGE METAL PANELING FORREUSE. REFER TO DEMOLITION ELEVATIONS ANDDOOR/WINDOW SCHEDULES FOR MORE INFORMATION.

05 REMOVE EXISTING GUTTERS AND DOWNSPOUTS IN THEIRENTIRETY. EXISTING UNDERGROUND STORM PIPING TO BERE-USED WHERE POSSIBLE. COORDINATE WITH PROPOSEDPLANS.

06 REMOVE ALL PLUMBING FIXTURES, TOILET ACCESSORIESAND PARTITIONS IN THEIR ENTIRETY. SEE PLUMBINGDRAWINGS.

07 REMOVE EXISTING CONCRETE SLAB AS INDICATED(SHADED). PREPARE TO RECEIVE NEW CONCRETE ASREQUIRED TO PROVIDE FLUSH FINISH FLOOR.

08 REMOVE PORTION OF EXISTING BUILDING IN ITS ENTIRETY(HATCHED AREA). PATCH/REPAIR ADJACENT SUBSTRATESAND MATERIALS AS REQUIRED PER NEW CONSTRUCTIONDRAWINGS.

09 REMOVE EXISTING MEZZANINE FLOOR, WALLS AND ACCESSSTAIRS/LADDER IN THEIR ENTIRETY. REMOVE EXISTINGMECHANICAL, ELECTRICAL AND PLUMBING LOCATED ONMEZZANIENS IN THEIR ENTIRETY.

10 REMOVE EXISTING EQUIPMENT, INCLUDING MACHINERY, INIT'S ENTIRETY PRIOR TO CONSTRUCTION COMMENCEMENT.

11 REMOVE EXISTING INSULATION FROM UNDERSIDE OF ROOFDECK.

12 REMOVE EXISTING ELECTRICAL SERVICE PANELS ANDASSOCIATED WIRING. SEE ELECTRICAL DRAWINGS. TYPICAL.

13 REMOVE EXISTING HVAC EQUIPMENT AND ASSOCATEDDUCTWORK. SEE MECHANICAL DRAWINGS. TYPICAL.

14 REMOVE EXISTING STUCCO WALL FINISH AND ASSOCIATEDSHEATHING. REPLACE WITH VERTICAL METAL SIDING TOMATCH WALL ABOVE.

15 EXISTING CONCRETE SLAB ON GRADE TO REMAIN.COORDINATE SLAB PREP FOR NEW TOPPING SLAB PERSTRUCTURAL DRAWINGS AND SPECIFICATIONS.COORDINATE TRENCHES FOR UNDER-SLAB ELEC. ANDPLUMB. PER PROPOSED DRAWINGS AND SPECS.

16 REVIEW EXISTING ROOF PENETRATION LOCATIONS FORPOTENTIAL RE-USE. REMOVE AND PATCH ABANDONEDPENETRATIONS (APPPROXIMATELY 30 TOTAL).

17 EXISTING ROOF HATCH TO REMAIN. REMOVE LADDER ANDSALVAGE FOR RE-USE (IF POSSIBLE).

1 COWAN ROAD - 95% REVIEW SET 05/09/18

2 COWAN ROAD - BID SET 07/23/18

07/23/18

ISSUED FOR BID 07/23/18