12
| Special Sponsorship | | Supporting Organizers |

Special Sponsorship | |Supporting Organizerscolumdae.com/wp-content/uploads/2011/04/ok_eng.pdf– Hyundai Heavy Industries, Daewoo Marine & Offshore Engineering, Samsung Heavy Industries,

  • Upload
    others

  • View
    2

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Special Sponsorship | |Supporting Organizerscolumdae.com/wp-content/uploads/2011/04/ok_eng.pdf– Hyundai Heavy Industries, Daewoo Marine & Offshore Engineering, Samsung Heavy Industries,

| Special Sponsorship |

| Supporting Organizers |

Page 2: Special Sponsorship | |Supporting Organizerscolumdae.com/wp-content/uploads/2011/04/ok_eng.pdf– Hyundai Heavy Industries, Daewoo Marine & Offshore Engineering, Samsung Heavy Industries,

I n v i t a t i o n

| Special Sponsorship |

Page 3: Special Sponsorship | |Supporting Organizerscolumdae.com/wp-content/uploads/2011/04/ok_eng.pdf– Hyundai Heavy Industries, Daewoo Marine & Offshore Engineering, Samsung Heavy Industries,

The 1st Offshore Korea will be held in Busan, the offshore and shipbuilding city in Korea, fromNov. 14 (Wed) to Nov. 16 (Fri) 2012 for 3 days under the special sponsorship by 4 largestshipbuilding companies (Hyundai, Daewoo, Samsung and STX) in Korea who are proud oftheir second-to-none offshore building technologies in the world leading the world's offshoreplant new building market. Korea, the largest offshore shipbuilding market and one of the biggest markets for thosebusinesses of the offshore and shipbuilding equipment and materials, has large shipyardswith their highest shipbuilding technologies.

Now, it is our pleasure to invite all of you who are specialized in the manufacture andsupply of the offshore plants and equipment all over the world to the exhibition which willbe the most active trading place for Korean shipbuilders who demand the offshore plantalong with the offshore and shipbuilding equipment manufacturers or suppliers.

OFFSHORE KOREA 2012 2 . 3

Page 4: Special Sponsorship | |Supporting Organizerscolumdae.com/wp-content/uploads/2011/04/ok_eng.pdf– Hyundai Heavy Industries, Daewoo Marine & Offshore Engineering, Samsung Heavy Industries,
Page 5: Special Sponsorship | |Supporting Organizerscolumdae.com/wp-content/uploads/2011/04/ok_eng.pdf– Hyundai Heavy Industries, Daewoo Marine & Offshore Engineering, Samsung Heavy Industries,

Korea is the center of large offshore plant construction, dominatingthe world’s new building market.

Korea is an undisputed world leader in new building of large offshore plant construction, with its top 4 shipyards– Hyundai Heavy Industries, Daewoo Marine & Offshore Engineering, Samsung Heavy Industries, STX Offshore& Shipbuilding – winning all global project orders issued in the first half of 2011.

Korean shipyards recorded 53.2% of the global new building market of offshore and shipbuilding projectin the first half of 2011. (Order Volume: 224 Projects – 8.92 Million CGT, Order Value: US$ 31.4 Billion)

■ Awarded the whole large offshore plant project contracts worldwide in the first half of 2011- Total of 25 projects (21 Drill-ships, 2 FPSOs, 2 LNG-FRSUs, excluding 7 in-house Drill-ship project placements in Brazil)

■ Order of 69 Large-size Container Ships (App. 75% of the world’s total project orders, over 8,000 TEU)■ Order of 19 LNG Carriers (App. 80% of the world’s total project orders, excluding 4 projects in China and 1 in Japan)

OK2012 is special sponsored by The world’s top 4 Koreanshipyards

OK2012 is sponsored by the 4 major shipyards in Korea – Hyundai, Daewoo, Samsung, and STX. Thesecompanies will provide full-scale support for the offshore plant and commercial ship models exhibitions,dispatch their shipbuilding and offshore procurement representatives, and participate in the offshoreconstruction conference, contributing greatly to the value and success of OK2012.

The world’s IOCs and NOCs, offshore plant owners, as well as the 4Korean major shipyards will participate in OK2012 as visitors, makingthe exhibition an invaluable opportunity to showcase products.

The shipbuilding and offshore procurement representatives of the 4 Korean major shipyards which currentlydominate the world market and IOCs and NOCs, offshore ship owners will directly participate in OK2012 asvisitors. Their participation makes OK2012 a great promotional opportunity for offshore and marine equipmentmanufactures seeking to enter and/or expand their business in the Korean offshore plant construction market.

01

OFFSHORE KOREA 2012 4 . 5

03

02

Page 6: Special Sponsorship | |Supporting Organizerscolumdae.com/wp-content/uploads/2011/04/ok_eng.pdf– Hyundai Heavy Industries, Daewoo Marine & Offshore Engineering, Samsung Heavy Industries,

6 . 7 OFFSHORE KOREA 2012

Under the budget support of the Korean Government, OK2012provides participants with substantive opportunities to enter theKorean offshore plant construction market through its variousevents such as IOCs and NOCs invitation and conferences.

OK2012 is supported budget by the Korean government and will include various events such as IOCs and NOCsinvitation, conferences, strategic technical meetings, and trips to key industry sites all aimed at bridging theneeds of participating businesses and buyers, and assisting companies in tapping into the Korean offshore plantconstruction market.

A grand scale of international conference with prestigious panelswill provide a glimpse into where the world’s offshore plant-related technology stands today.

The main players of corporations leading different areas of the global offshore plant equipment industry willcomprise the conference’s panel, sharing their expertise and information on the latest technology – in particularthe world-leading offshore plant construction technology owned by the 4 Korean major shipyards.

■ Basic Concept : World-leading offshore plant construction technology owned by the top 4 shipbuilding yards■ Key Themes : Petroleum development market trends and forecasts, shipbuilding and construction

technology, boring, production, petrochemical, oil & gas, etc.■ Key Panel Guests : Members of the engineering & design divisions of the 4 Korean major shipyards,

representatives from IOCs & NOCs, engineering companies, scientists from the US and Europe, majorclassifications, Ship operation companies, etc.

OK2012 will assist participants’ building footholds to enter theKorean offshore new building market through arranging strategictechnical cooperation with Korean offshore and marine equipmentmanufacturers that own excellent infrastructures.

OK2012 will organize technical business meetings to establish the bases for joint ventures, licensing production, M&A,and other strategic technical cooperation between overseas offshore and marine equipment manufacturers seeking toforay into the Korean market and Korean equipment manufacturers that possess superior distribution networks withKorea’s large shipyards and advanced production capability. Companies will have opportunities to make cost-effectiveinvestments to acquire production bases in Korea’s mammoth offshore plant construction market.

04

06

05

Page 7: Special Sponsorship | |Supporting Organizerscolumdae.com/wp-content/uploads/2011/04/ok_eng.pdf– Hyundai Heavy Industries, Daewoo Marine & Offshore Engineering, Samsung Heavy Industries,
Page 8: Special Sponsorship | |Supporting Organizerscolumdae.com/wp-content/uploads/2011/04/ok_eng.pdf– Hyundai Heavy Industries, Daewoo Marine & Offshore Engineering, Samsung Heavy Industries,

OFFSHORE KOREA 2012

OVERVIEW●

Nov. 14 (Wed) - 16 (Fri), 2012 / 3 Days (Every Even-numbered Year)

BEXCO new exhibition hall, convention hall and multi-purpose hall

Korean government(Ministry of Knowledge Economy / Ministry of Land, Transport and Maritime Affairs)Local government body (Busan Metropolitan City)

Busan Marine Equipment Association / Korea Trade-Investment Promotion Agency / BEXCO Co., Ltd. / Kyungyon Exhibition Corp.

Korea Gas Corp. / Korea National Oil Corp. / Daewoo International Co., Ltd. / Korea Industrial Complex Corp. / Busan Economic Promotion Agency / Korean Register of Shipping / Korea Maritime Institute /The Korean Society of Marine Engineering / Korea Marine Equipment Research Institute /Korea Marketing & Retailing Consulting

Period

Venue

Hosted by

Organized by

Supported by

Other sponsors

Specialsponsorship

Page 9: Special Sponsorship | |Supporting Organizerscolumdae.com/wp-content/uploads/2011/04/ok_eng.pdf– Hyundai Heavy Industries, Daewoo Marine & Offshore Engineering, Samsung Heavy Industries,

● OK Exhibition

Offshore Plant

Marine ResourcesExploration &Development

Relevant Equipment& Materials

Marine EnvironmentPreservation &

Protection

Exhibition Scale 2 exhibition halls in BEXCO (App. 15,000㎡)

Products on Display Offshore UP/MD/DOWN-STREAM and Marine Wind Energy/Wave Power, HSE, Greenship,

Construction, Plants, Equipment, Machineries and Materials

OFFSHORE KOREA 2012

DETAILS OF THE EXHIBITION

OFFSHORE KOREA 2012 8 . 9

·Exploration & Production ㆍEnergy storage, Transportation, RefineryㆍOffshore Plant/Structural/Structure construction

·Use of ocean space ·Ocean energy·Offshore exploration ·Extraction of marine resources·Remotely operated underwater vehicle ·Drilling and mining engineering and system ·Submerged marine structure ·Wave power and offshore wind power generation system

ㆍTelecommunications, IT and electric/electronic ㆍSetting up operating system for structuresㆍComponents (Interior materials), steel and plants ㆍRaw materials for structure, equipment and materials

·Technology for preventing marine accident ·VTS·Hazardous cargo vessels and cleaning technology ·Prevention and countermeasure of marine pollution ·Operation control and rescue/Concerned government organizations

Page 10: Special Sponsorship | |Supporting Organizerscolumdae.com/wp-content/uploads/2011/04/ok_eng.pdf– Hyundai Heavy Industries, Daewoo Marine & Offshore Engineering, Samsung Heavy Industries,

Scale 2 keynote speech, 2 panel discussion, 8 sessions, 24 technical programs (for 2 days)Kyenote Speech Offshore energy: an infinite of possibilities, Advancement in offshore plant technology

Trends and prospects of oil&gas price, Open innovation strategy: M&A - Government lead projectOffshore project trends and prospects, FPSO, Subsea TechnologyⅠ, FLNG, Drilling & Platform,Offshore wind power energy, Offshore equipment development, Deepsea mining

Panels&Speakers Oil majors (IOCs&NOCs), E&P, shipowners, the 4 Korean shipyards, EPC companies, packagemodule manufacturers, equipment suppliers, material suppliers, services, organizations andinstitutes, etc.

Panal DiscussionSessions

Invitation 5 IOCs (Super majors) & 7 NOCs (New 7 sisters)Contents Vendor registration session, industrial visit, participate in the OK conference and receptions.

● Oil Majors Invitation

The Purpose Strategic alliance for technical & sourcing tie-up through 1:1 meeting in the offshore plant fieldbetween overseas and local companies for equipment and materials (Joint-venture, technicallicense, M&A, etc.)

Participants 50 overseas EPCs, Package module manufacturers / local companies for equipment and materials.Contents Product demonstration, industrial visit, participate in the OK conference and receptions.

● OK Technical & Sourcing Meeting

● OK Conference

OFFSHORE KOREA 2012

CONFERENCES & EVENTS

Page 11: Special Sponsorship | |Supporting Organizerscolumdae.com/wp-content/uploads/2011/04/ok_eng.pdf– Hyundai Heavy Industries, Daewoo Marine & Offshore Engineering, Samsung Heavy Industries,

● Application Deadline Tuesday, July 31, 2012 (The deadline may be earlier if all booths run out)

● Registration Process

● Booth Fee

Classification Price Remarks

shell package USD 280/㎡ (Minimum 9㎡ / You can apply more space by adding 9㎡ basis ONLY)

raw space USD 230/㎡ (Minimum 36㎡ / You can apply more space by adding 18㎡ basis ONLY)

ApplicationSubmission / Deposit

Payment (50%) /Booth Assignment

Online Registration /Amenity & Facility

Request

Full Payment(Remaining 50% afterdeposit) and Amenity& Facility Fee Payment

Display Item/ BoothInstallation

OK2012 Opening

within 7 days ofapplication submission

▼Deadline:

Sept. 28, 2012

▼Deadline:

Oct. 15, 2012

▼Nov. 12~13, 2012

▼Nov. 14, 2012

OFFSHORE KOREA 2012

INFORMATION

OFFSHORE KOREA 2012 10 . 11

Page 12: Special Sponsorship | |Supporting Organizerscolumdae.com/wp-content/uploads/2011/04/ok_eng.pdf– Hyundai Heavy Industries, Daewoo Marine & Offshore Engineering, Samsung Heavy Industries,

Exhibition Team

BEXCO(Busan Exhibition & Convention Center)43 APEC-Ro, Haeundae-gu,Busan, KoreaTel. 82-51-740-7484Fax. 82-51-740-7360Email. [email protected]

Kyungyon Exhibition CorporationRm. 501, Geumsan Bldg., 750, Gukhoe-daero (17-1, Yeouido-dong),Yeongdeungpo-gu, Seoul, 150-727, KoreaTel. 82-2-785-4771Fax. 82-2-785-6117/8Email. [email protected]. www.kyungyon.co.kr

Conference & Event Team

BMEA(Busan Marine Equipment Association)1540-2, Songjeong-dong, Gangseo-gu, Busan, KoreaTel. 82-51-831-5100Fax. 82-51-831-5104Email. [email protected]

KOTRA(Korea Trade-Investment Promotion Agency)13, Heolleungno, Seocho-gu, Seoul, 137-749, KoreaTel. 82-2-3460-7834Fax. 82-2-3460-7933Email. [email protected]

KIMEX Group(135-726) #404 Geopyoung Town,129 Bongeunsa-ro, Nonhyeon-dong,Gangnam-gu, Seoul, KoreaTel. 82-2-515-3154Fax. 82-2-515-3108Email. [email protected]