1 Neil McGuinness Manager, Smart Metering, ESB Networks June 2010 Smart Grid Demonstration Projects Update Interconnectors Independent Generators 2.3 million Customers ESB Generation Electricity Suppliers Transmission Transmission System Owner System Owner Distribution Distribution System Owner / System Owner / Operator Operator Market ESB Networks ESB Networks Republic of Ireland Electricity Industry Structure Commission for Energy Regulation

Smart Grid Demonstration Projects Update Customer Behavior Pilot.pdf · Smart Grid Demonstration Projects Update Interconnectors Independent Generators 2.3 million Customers ESB Generation

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Smart Grid Demonstration Projects Update Customer Behavior Pilot.pdf · Smart Grid Demonstration Projects Update Interconnectors Independent Generators 2.3 million Customers ESB Generation

1

Neil McGuinnessManager, Smart Metering, ESB Networks

June 2010

Smart Grid Demonstration Projects Update

Interconnectors

IndependentGenerators

2.3 millionCustomers

ESB Generation

ElectricitySuppliers

TransmissionTransmissionSystem OwnerSystem Owner

DistributionDistributionSystem Owner / System Owner /

OperatorOperator

Market

ESB NetworksESB Networks

Republic of Ireland Electricity Industry Structure …Commission for Energy Regulation

Page 2: Smart Grid Demonstration Projects Update Customer Behavior Pilot.pdf · Smart Grid Demonstration Projects Update Interconnectors Independent Generators 2.3 million Customers ESB Generation

2

ESBN Mission is to Efficiently deliver network infrastructure and services that support national economic growth and sustainability targets

10% of all Vehicles will be electric by 202020% improvement in energy efficiency40% Renewable Generation by 2020Smart Metering for all customers

Energy Flow

Information Flow

Renewables& Clean

Generation

SmartNetwork

Connected Home Distributed

Generation &Electric Vehicles

SmartMetering

Evolving ESB Smart Grids Strategic Model

“ESB Networks Roadmap for Smart Networks Integrating Distributed Energy Resources”

Distribution ConnectedWind FarmsOperationsESBN Roadmap for Smart Networks

ESBN/EPRI Smart Grid Demonstration Project

Page 3: Smart Grid Demonstration Projects Update Customer Behavior Pilot.pdf · Smart Grid Demonstration Projects Update Interconnectors Independent Generators 2.3 million Customers ESB Generation

3

ESB-EPRI Smart Grid Demonstration Project

Wind GenerationWind Generation

Smart Meter Customer Behaviour TrialsSmart Meter Customer Behaviour Trials

Smart Green CircuitsSmart Green Circuits

Electric VehiclesElectric Vehicles

1,260

ConnectedConnectedConnected

1,3601,360

Contracted

3,9903,990

Gate 3

6,610

InQueue

10,353

December ‘09

Connected

Post Gate 3

11,158

Wind Connections MW

System Demand Peak

Page 4: Smart Grid Demonstration Projects Update Customer Behavior Pilot.pdf · Smart Grid Demonstration Projects Update Interconnectors Independent Generators 2.3 million Customers ESB Generation

4

1941

2050

127

28

Operator MWNetwork

Connections

Gate 3 Connections

322MW ~ 50 Gate 3 Wind farm Connections will be 20kV

11MW ~ 4 Gate 3 Wind farm Connections will be 10kV

Climate Change Challenges

Page 5: Smart Grid Demonstration Projects Update Customer Behavior Pilot.pdf · Smart Grid Demonstration Projects Update Interconnectors Independent Generators 2.3 million Customers ESB Generation

5

ESBN/EPRI EV Project Objectives

Assess capacity of LV Network for EV

Assess potential barriers to future Vehicle to Grid

Assess possibility of using EV as ballast load for WIND,

Assess feasibility of faster charging on LV network by using Smart Meters to share charging capacity

Progress to date• Wind

– Follow up Use Case progressed further– 38kV Voltage Regulator currently being installed for Project 1– 1 Month 5sec Metering data collected for two Wind farms for Project 2– Single Transformer Station Design almost completed

• EV Project– Initial Use case progressed– Contract for EV’s purchase completed to arrive in Summer

• Green Smart Circuits– One Circuit provided to EPRI for initial Modelling– Amorphous Core Transformers Sourced– Lab testing of Micro-Planet completed

Page 6: Smart Grid Demonstration Projects Update Customer Behavior Pilot.pdf · Smart Grid Demonstration Projects Update Interconnectors Independent Generators 2.3 million Customers ESB Generation

6

EU and Irish Government Policy for Smart Meters

Implementation of EU directives

Program for Government proposes smart meters

Energy Regulator governed Phase 1 –National Smart Metering Plan (pilots and cost benefit analysis)

Significant gap between DNO costs and benefits

Regulator Needs to be assured smart meters can deliver demand management, overall consumption reduction and support of renewables.

National Smart Meter Customer Behaviour TrialObjective is ‘to ascertain the potential for smart metertechnology to effect measurable change in consumerbehaviour’

Q4 2008-Recruitment

6400 statistically representative customersOne year profile data per customer (at least 6 actual months) for benchmark period

One year of stimuli and new time of use tariffs

Final conclusions by CER based on ESRI National Business Case Study

Technical challenge to deliver daily validated ToU data to be used for real billing

Q2 2009 Meters Installed

Q4 2009 Benchmark ends

Q1 2010 ToU TariffsStimuli

Q1 2011 Trial endsAnalysis of results

Page 7: Smart Grid Demonstration Projects Update Customer Behavior Pilot.pdf · Smart Grid Demonstration Projects Update Interconnectors Independent Generators 2.3 million Customers ESB Generation

7

Break down of Tariffs and stimulii

20% more customers added to allow for fallout

Also there is a trial of small businesses

Tariff Night Day Peak (M-F)

Year

Pure 10.7 14.8 18.9 € 570.7

TA 13.0 14.0 18.0 € 571.0 TB 11.5 13.5 25.0 € 568.0 TC 10.5 13.0 32.0 € 570.4 TD 9.0 12.5 39.0 € 567.5

Wholesale Market price

Annual electricity energy charges

Behavioural Trial Stimuli

Page 8: Smart Grid Demonstration Projects Update Customer Behavior Pilot.pdf · Smart Grid Demonstration Projects Update Interconnectors Independent Generators 2.3 million Customers ESB Generation

8

ESBN Solution for Behaviour Trial

Solution will also be used forprepayment trial

EI ServerMeter Mgt,Data Mgt,

Data Storage

EI ServerMeter Mgt,Data Mgt,

Data Storage

RetailerRetailer

B B RetailerRetailer

A A

Meter Work ManagementMeter Work Managementand Delivery Systems and Delivery Systems

868 Mhz

Elster AS230Smart meterCombined GPRS /RF module

GPRS overVodafoneMobile operatorsnetworks Retailers pull down

daily data

Customer receives billbased onprofile data

Master DataReadings for market

Elster In-homedisplay

Daily file with 24hrsof profile data

SAP ISUCustomer and Metermaster data

SecureWebsite

Daily Consumption Profile Data as Captured by smart meter

Page 9: Smart Grid Demonstration Projects Update Customer Behavior Pilot.pdf · Smart Grid Demonstration Projects Update Interconnectors Independent Generators 2.3 million Customers ESB Generation

9

ESBN’s Smart Metering Project to Date

Customer Behaviour Trial of 6,500 customers under wayIHD developed and deliveredToU bills based on half hourly profile data issuesAll systems performing well and no negative reaction to ToUIncreased competition in retail market has impacted on projectTechnology Trials of 3,500 customersUnique duel fuel smart metering trialPre payment trial

We have delivered, tested and implemented systems, meters and display in line with required CER timetable and within budget

Technology Challenges for ESBN

Population DistributionFunctional Requirements Meter PositionsSmart Grid compatiblePLC viability?Will wireless work?Lack of Standards and product immaturity

190,000800,000Rural

20,0001,300,000Urban

18,000250,0000Villages

Distribution transformers

CustomersLocation

Page 10: Smart Grid Demonstration Projects Update Customer Behavior Pilot.pdf · Smart Grid Demonstration Projects Update Interconnectors Independent Generators 2.3 million Customers ESB Generation

10

868 Mhz Wireless

2.4Ghz Wireless mesh

Trilliant / Iskra

Systems in place, 2,500 installed

DLC – SFSK

SAGEM

System in place, 2,000 meters installed

ESBN Dual fuel trial BGN

Meter Mgt,Data Mgt,

Data Storage

Meter Mgt,Data Mgt,

Data Storage

BGN

Meter Work ManagementMeter Work Managementand Delivery Systems and Delivery Systems

M-Bus 868 Mhz

Iskra GPRS /M –Bus module

GPRS overVodafoneMobile operatorsnetworks

Master Data

Daily file with Gas profile

and use dataEvents and alarms

LegacyCustomer system

SecureWebsite

ESBN Systems

Page 11: Smart Grid Demonstration Projects Update Customer Behavior Pilot.pdf · Smart Grid Demonstration Projects Update Interconnectors Independent Generators 2.3 million Customers ESB Generation

11

Policy Makers and Customer supportEmergence of open standards and interoperabilityManagement of IT risks and costsResources and direction to R&D activities

EPRI project is important in addressing some of these issues

New industry skill sets and expertise

A significant Challenge with PotentiallyA significant Challenge with PotentiallyHuge Benefits for Ireland and Electricity CustomersHuge Benefits for Ireland and Electricity Customers

Smart Grid Strategic Challenges & Issues