18
Silicon-Organic hybrid Fabrication platform for Integrated circui 1 SOFI SOFI Silicon-Organic hybrid Fabrication platform for Integrated c Meeting in Turin, 2010

Silicon-Organic hybrid Fabrication platform for Integrated circuits 1 Meeting in Turin, 2010

Embed Size (px)

Citation preview

Page 1: Silicon-Organic hybrid Fabrication platform for Integrated circuits 1 Meeting in Turin, 2010

Silicon-Organic hybrid Fabrication platform for Integrated circuits1

SOFI

SOFI Silicon-Organic hybrid Fabrication platform for Integrated circuits

Meeting in Turin, 2010

Page 2: Silicon-Organic hybrid Fabrication platform for Integrated circuits 1 Meeting in Turin, 2010

Silicon-Organic hybrid Fabrication platform for Integrated circuits2

SOFIParticpants

UKA: Juerg Leuthold, Luca Alloatti

SELEX: Alberto Secchi (design)Massiliano Dispenza (not here, head)Luigi (not here)

IMEC: Pieter Dumon, (instead of Wim Bogarts)Hui Yu

RB: Peter GünterGO: Giulio Cangini,

Jörg Wieland, perhaps Raluca Dinu

AIT: Ioannis TomkosArvind Mishra (not attend)

CUDOS: Ben Eggleton

Page 3: Silicon-Organic hybrid Fabrication platform for Integrated circuits 1 Meeting in Turin, 2010

Silicon-Organic hybrid Fabrication platform for Integrated circuits3

SOFIAGENDA

9am - 4pm1. Administrative remarks2. Partner presentations (activities, publications, expenses)

1. UKA (KIT)2. Australia-Partner3. GO 4. IMEC5. SELEX6. RB7. AIT

3. Deadlines4. Open Issues?5. Summary and action items

Page 4: Silicon-Organic hybrid Fabrication platform for Integrated circuits 1 Meeting in Turin, 2010

SOFI Silicon-Organic hybrid Fabrication platform for Integrated circuits

Meeting in Turin 09/24/2010

Administrative Remarks

Page 5: Silicon-Organic hybrid Fabrication platform for Integrated circuits 1 Meeting in Turin, 2010

Silicon-Organic hybrid Fabrication platform for Integrated circuits5

SOFIShort Remarks

Practical:• Meeting room fees collected?

• 280€ room (i.4. 40 € per Partner), 25€ lunch per person• Who has to leave when today?

Adminstrative:• Hand in your QMR3 contribution as soon as possible!

QMR3 must be send to EC on Thursday next week.

• Send publications referring to SOFI to coordinator, to be made available online (link).

• Soon: Brussels concertation meeting 20.10.2010 (G. Cangini, D. Korn)• SOFI project will be presented• In this context some standard SOFI presentation slides will be

created, your input (1-2 slides) might be requested soon

Page 6: Silicon-Organic hybrid Fabrication platform for Integrated circuits 1 Meeting in Turin, 2010

Silicon-Organic hybrid Fabrication platform for Integrated circuits6

SOFI• Alloatti will write the Protocol• Mojca: status of LETI produced chips – promised until September /

October (even though not with perfectly covered single crystalline domains)

• SELEX needs to be doing to do optical packaging. Concept must be handed in. • 1) RF-packaging, i.e. how to get the signal from cable onto some

electrical lines on the chip, • 2) RF-design of the modulator electrodes, i.e. how to get the

signal of the lines from 1) to the actual modulator electrodes, and how to design these electrodes. (KIT & Selex)

• Robert Palmer to visit SELEX  soon

Page 7: Silicon-Organic hybrid Fabrication platform for Integrated circuits 1 Meeting in Turin, 2010

Silicon-Organic hybrid Fabrication platform for Integrated circuits7

SOFI• Giulio (GO ) white paper: Suggest him to come up with a draft• CUDOS:

• Whento start task 4.4 “Deposition of electro-optic chalcogenide glasses” (From DoW); how does this work? (contact person Steve Madden)

• In WP5 CUDOS will characterize chips with their material; Who is going to follow Christelle Monat (CUDOS), she was the scientific contact for SOFI?

• CUDOS will be handed out the contract

• Luca: Ask Pieter about Si-Carbide layer! MMI reflectivities…

Page 8: Silicon-Organic hybrid Fabrication platform for Integrated circuits 1 Meeting in Turin, 2010

Silicon-Organic hybrid Fabrication platform for Integrated circuits8

SOFINext Meetings

• Leuven / Gent / Karlsruhe / Rome / Zurich, beginning next year (preparation of review) (e.g. January 14, 2011)

• Brussels review meeting (after submission of annual report)

• OFC 2011 (March 6-10, 2011), Los Angles

• ECOC 2011 (September 18-22, 2011), Geneva

Vote!

Page 9: Silicon-Organic hybrid Fabrication platform for Integrated circuits 1 Meeting in Turin, 2010

SOFI Silicon-Organic hybrid Fabrication platform for Integrated circuits

Partner Presentations

Meeting in Turin 09/24/2010

Page 10: Silicon-Organic hybrid Fabrication platform for Integrated circuits 1 Meeting in Turin, 2010

Silicon-Organic hybrid Fabrication platform for Integrated circuits10

SOFIPartner Presentations

1. AIT

2. IMEC

3. RB

4. UKA

5. SELEX

6. GO

Page 11: Silicon-Organic hybrid Fabrication platform for Integrated circuits 1 Meeting in Turin, 2010

Silicon-Organic hybrid Fabrication platform for Integrated circuits11

SOFIChecklist

Have these points been addressed?

•CUDOS: Deposition possibilities

•IMEC: SiC layer consequences for poling

•IMEC & SELEX: CMOS microwave integrated circuit design with respect to metalization

•SELEX: RF and optical packaging

• UKA-SELEX meeting at Rome?

•GO: Whitepaper on “Progress in Silicon Photonics”

Page 12: Silicon-Organic hybrid Fabrication platform for Integrated circuits 1 Meeting in Turin, 2010

Silicon-Organic hybrid Fabrication platform for Integrated circuits12

SOFIDeadlines - Soon

UKA D1.10 Quarterly Management Report (QMR) Sep 30 '10

UKA D1.5a First year annual report. (within 60 days after reporting period)This deliverable is most critical for the subsequent review!!!

Dec 31 '10+ 60d

UKA D1.5b Public executive summary of the first year annual report. Dec 31 '10+ 60d

UKA D3.1 Report on design and fabrication of active waveguides (first device run).

Dec 31 '10

IMEC D3.2 Silicon wafers with active waveguides (first device run). Dec 31 '10

IMEC M3.2 First-stage process for integrated slot waveguides with contacts... Dec 31 '10

RB M4.1 Optimized processes for electro-optic polymers and epitaxial self-assembly with sufficient yield

Dec 31 '10

GO D6.1 First report on SOFI dissemination and promotion activities. Dec 31 '10

AIT D6.2 First report on SOFI exploitation activities. Dec 31 '10

GO D6.3 Mirror Deliverable of D6.1 , which will be available to the public on the website.

Dec 31 '10

Page 13: Silicon-Organic hybrid Fabrication platform for Integrated circuits 1 Meeting in Turin, 2010

Silicon-Organic hybrid Fabrication platform for Integrated circuits13

SOFIDeadlines – Next Year 1GO/AIT M6.3 Identification of possible contributions to the industrial partners for commercialization and

standardization. Mar 31 '11

RB,GO D4.1 Silicon-organic chips with electro-optic waveguides (first device run). Mar 31 '11

UKA D1.11 Quarterly Management Report (QMR) Mar 31 '11

UKA M3.3 Decision on QAM modulator designs (for second device run, with modulators modelled to perform better than in M3.1

Apr 30 '11

AIT D6.11 Intermediate report on recent achievements. Jun 30 '11

UKA M5.1 Identification of optimal phase modulator structure promising 100 Gbit/s operation at 1 V Jun 30 '11

UKA D5.1 Report on electro-optical characterizations of SOH waveguide structures with RF probes (UKA).

Jun 30 '11

CUDOS M4.2 Processes for chalcogenides. Jun 30 '11

AIT M2.4 Derivation of the system-level specification of the developed hybrid components. Jun 30 '11

AIT M2.3 Development of a system and device simulation platform. Jun 30 '11

UKA D1.12 Quarterly Management Report (QMR) Jun 30 '11

SELEX M5.2 Optimized RF package design with optical and electrical performances suitable for 100 Gbit/s operation

Aug 31 '11

RB M4.3 Identification of optimal electro-optic materials with respect to optical and electro-optical properties and to thermal stab

Aug 31 '11

Page 14: Silicon-Organic hybrid Fabrication platform for Integrated circuits 1 Meeting in Turin, 2010

Silicon-Organic hybrid Fabrication platform for Integrated circuits14

SOFIDeadlines – Next Year 2IMEC D3.4 Silicon wafers with QAM modulators (second device run). Sep 30 '11

UKA D3.3 Report on design and fabrication of QAM modulators (second device run). Sep 30 '11

UKA D1.13 Quarterly Management Report (QMR) Sep 30 '11

GO D6.6 Mirror Deliverable of D6.4 which will be available to the public on the website. Dec 31 '11

AIT D6.5 Second report on SOFI exploitation activities. Dec 31 '11

GO D6.4 Second report on SOFI dissemination and promotion activities. Dec 31 '11

RB M4.4 Identification of optimal electro-optic materials with respect to integration into silicon... Dec 31 '11

RB,GO D4.3 Silion-organic QAM modulator chips (second device run). Dec 31 '11

RB D4.2 Report on full potential and limitations of the electro-optic materials for hybrid integration. Dec 31 '11

AIT D2.2 Investigation of system-level specifications. Dec 31 '11

UKA D1.6b Public executive summary of the second year annual report Dec 31 '11

UKA D1.6a Second year annual report Dec 31 '11

SELEX D5.2 Report on device measurements of RF packaged phase modulators and benchmarking against reference LiNbO3 modulators.

Jan 31 '12

Page 15: Silicon-Organic hybrid Fabrication platform for Integrated circuits 1 Meeting in Turin, 2010

SOFI Silicon-Organic hybrid Fabrication platform for Integrated circuits

Open Issues?

Meeting in Turin 09/24/2010

Page 16: Silicon-Organic hybrid Fabrication platform for Integrated circuits 1 Meeting in Turin, 2010

SOFI Silicon-Organic hybrid Fabrication platform for Integrated circuits

Summary & Action Items

Meeting in Turin 09/24/2010

Page 17: Silicon-Organic hybrid Fabrication platform for Integrated circuits 1 Meeting in Turin, 2010

Silicon-Organic hybrid Fabrication platform for Integrated circuits17

SOFISummary & Action Items

• Hand in your QMR3 contribution as soon as possible, including expenses information!

• Review this deliverable of September (D1.10 QMR3) on Wednesday next week

List to be extended during meeting!

Page 18: Silicon-Organic hybrid Fabrication platform for Integrated circuits 1 Meeting in Turin, 2010

Silicon-Organic hybrid Fabrication platform for Integrated circuits18

SOFIEggleton:Collaboration with Saphicon

Follow up on IMEC: Implants need to be discussed (p, n and what (P, As, P))IMEC schedule: Oct. KIT needs to provide Ion Implang masks and

metallization