Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
Team CLSTeam members: Edwin Ayon, Jesus
Farias, Julian Peña, Diego Rios, Gavin Short, Alexis Valdivia, Joseph Vasquez
The Project
2
What we have to do
3
▰ Make a masterplan for the the 40 acres▻ Make exhibits, with main focus on one
specific exhibit▻ Renovate Old Rustler’s Restaurant into
new welcome center▰ Make an exhibit that works as an education
center where students from our k-6 client can go and learn about nature and specifically Lake Success and the land around it
The Clients
4
Army Corps of Engineer
Mission▰ The U.S. Army Corps of Engineer's mission
is to provide vital public engineering services in peace and war to strengthen our Nation's security, energize the economy, and reduce risks from disasters.
5
Army Corps of Engineer
▰ Made up of 37,000 civilians and soldiers▰ Deliver engineering services to 130
different countries▰ Develop research and technology for
soldiers while using their engineering expertise to promote stability
▰ Provide recreational opportunities at their campgrounds, lakes, and marinas
6
K-6 School
▰ Our k-6 client is Mr. Pena from Kohn Elementary School
▰ Second grade teacher
7
What They Need?
Army Corps Of Engineers
▰ Renovation of old rustlers restaurant
▰ Plan for 40 acres of land▻ Adding exhibits with
educational and recreational uses
▰ Storage area
8
K-6 Client
▰ Classroom to seat 40 students, teachers, and/or army corps of engineer
▰ Room for many desks▻ Flexible seating
▰ A connection with nature▻ Windows and natural
views
The Research
9
The Brain and How it Learns ▰ The brain acts as a dense network of fiber
pathways that consists of neurons▰ The part of the brain that is responsible is
the cerebrum. ▰ When it comes to learning you gain
connections in your neurons, that if the memory is used often, it will be easier to remember it and thus you learn.
10
Wildlife Research
▰ White pelicans▰ Canadian geese▰ Hawks and eagles▰ Rabbits▰ Deer▰ Foxes▰ Bobcats
11
▰ Various fish in lake including:▻ Smallmouth bass▻ White catfish▻ Coastal rainbow trout▻ Bluegill Sunfish
Habitat Research
▰ Lake is surrounded by 70% open grassland, 20% Riparian in the different coves of the Lake, and 10% Oak woodland.
12
The Weather and Climate
13
Wind
14
Rain
15
Snow
16
Temperature
17
Sunlight
18
The Masterplan
19
Our Theme
20
10 Year plan on site
Years 1-3▰ Renovate the old restaurant ▰ Start on museum▰ Set up campground▰ Start on trails and roads
21
10 Year plan on site
Years 4-6▰ Finish construction of the museum▰ Finishing up trail and roads▰ Connect trails
22
10 Year plan on site
Years 7-9▰ Remove non-native plants/animals▰ Add native plants/animals to the site▰ Add more exhibits
23
10 Year plan on site
Year 10▰ Finish the undone and place the last final
touches to the area▰ Complete construction
24
The Exhibits
25
The New Connections
▰ New Trail that connects to museum and other trails
▰ Roads for easy/emergency access throughout land
26
Other Exhibits
▰ Campground▰ Museum▰ Outdoor Amphitheatre ▰ Different types of gardens along trails
▻ Pollination▻ Etc.
27
Outdoor Amphitheatre
28
The Welcome Center
29
The Old Building
A
30
AB
C
DEF
GRR
The Renovations to the building
▰ Fix roofing▰ Adding windows in the viewing room▰ Windows in office area▰ Break wall through side of entrance that
leads to hallway▰ Modernize the inside▰ Fix outside walls
31
The New Floorplan
32
Viewing Room
OfficesInformation Room
=Windows
=Entrance/doors
RR
Storage
Enter
KEY
AB
C
DFE G
33
A
B
C
D
E
F
R
RG
34
Areas A-C
▰ Area A▻ Entrance: wheelchair accessible, connects
to restrooms through hallway ▰ Area B
▻ Information Room: Payment for activities, info on activities, general help
▰ Area C▻ Viewing Room: See most of 40 acres, map
on one wall, windows on the rest. Info on what your looking at. Eye pleasing room 35
E
C B
A
F
D
R RG
Areas D-G
▰ Area D▻ Office: for Ranger, space for one desk
▰ Area E▻ Offices: for Rangers, nice windows,
enough space for up to 3 desks▰ Area F
▻ Storage: gear for rangers, extra things, anything reasonably sized
▰ Area G▻ Hallway: connects entrance to restrooms 36
E
C B
A
F
D
R RG
Restrooms
▰ Single stall restrooms▰ Wheelchair accessible▰ 1 toilet, 1 urinal, and 1 sink in each
37
E
C B
A
F
D
R RG
The Main Exhibit
38
Areas
▰ Area 1: Lobby/Entrance (760 Ft^2)▰ Area 2: Museum (1,616 Ft^2)▰ Area 3: Gift Shop (361 Ft^2)▰ Area 4: Hallway (252 Ft^2)▰ Area 5: Class/Meeting Room (1,054 Ft^2)▰ Area 6: Storage (475 Ft^2)▰ Total Square Footage=4,518 Ft^2
39
40
Top View
12
3
6 5
4
41
12
3
456
42
Info on Museum
▰ 24 windows▻ 16: 3ft✕3ft (Right & Left
Walls/Classroom)▻ 4: 3ft✕5ft (Front Wall)▻ 3: 6ft✕4ft (Bottom of Classroom)▻ 1: 2ft✕2ft (Center Front Wall)
▰ 7 Doors▻ 3: 3ft✕8ft (Hallway/Classroom)▻ 2: 5ft✕10ft (Entrance)▻ 2: 4ft✕10ft (Storage) 43
Areas 1-3
▰ Area 1▻ Lobby: first place everyone goes to
▰ Area 2 ▻ Museum: contains exhibit on history of
lake, dam, native inhabitants; plants, animals, & people, and info on Army Corps of Engineers
▰ Area 3▻ Gift shop: souvenirs, postcards, etc.
44
1
2
3
6 5
4
Areas 4-6
▰ Area 4▻ Hallway: Path to classroom, secure so
not just anyone can get into classroom▰ Area 5
▻ Classroom: Serves as a classroom or meeting area, secure and seperated
▰ Area 6▻ Storage: Room to store things like;
gear, museum equipment, gift store items 45
1
2
3
6 5
4
More Info on Museum
▰ Connected to Trail▰ Environmentally Friendly▰ Secure for schools and children▰ Wheelchair accessible▰ Raised in case of flood ▰ Sloped roof
46
Conclusion
47
Where Everything Goes
48
Key=Campground=New Trail=Trail Connections
=Museum
=Parking
=Gardens
=New Roads=Outdoor Amphitheatre
Thanks For Watching