1
Area Managers Coill, Welding, Black Iron, and Sheetmetal Shops Common Areas of Building - Mark Swearingen Machine Maintenance Shop - Richard E.Atkinson Machine Shop - Denise Larsen Magnetic Measurements - ZacharyWolf Production Hub - Bill Misson Alignment Shop - Georg Gassner Radioactive Materials Storage - Mark Swaringen Chemcial Storage Area - Ali Farvid Building Manger: Rich E. Atkinson Assistant Building Manger: Randy Ralston Magnetic Measurements Laboratory Coil Shop Coil Shop Coil Shop Weld Shop Black Iron Shop Sheetmetal Shop Radioactive Material Storage Area Alignment Shop Machine Shop Machine Maintenance Shop Offices Kicker Assembly Room Kicker Potting Room Production Hub Epoxy mixing Winder Pit Office Office B/4096 Second Floor Building 026 Heavy Fabrication 100 101 Mezzanine 109 105 112 103 102 109A 110 111 108 106 204 202 203 205 201 206 207 M1 W1 208 107 Building 499 1/21/2011

Shop treatment plant - Luis Juarez alternate = Jeff Jones Yellow Areas Jeff Jones alternate = Luis Juarez Sweepers treatment plant Lead 26-FC-2 26-FC-3 26-FC- 9 26-FC-8 26-FC- 6 26-FC-7

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Shop treatment plant - Luis Juarez alternate = Jeff Jones Yellow Areas Jeff Jones alternate = Luis Juarez Sweepers treatment plant Lead 26-FC-2 26-FC-3 26-FC- 9 26-FC-8 26-FC- 6 26-FC-7

Permitted Hotwork Areas

Black Metal Shop (2000 ft2)

Kicker Magnet

Shop

Fire Alarm Control Panel

Fire Water Shutoff

mobile

Kicker Magnet Shop

On interior roof

= Fire extinguisher

= Alarm horn

A

A

A

A

A

A

on post

A

A

A = Fire alarm pull

002

043

026

027

001

003

012

069

054

002 each trolly 25 tons

(50,000 lbs)Bridge 50 tons

(100,000 lbs)

028

068

008

N

070

Legend

capacity unknown

20 ton (40,000 lbs)

50 ton (100,000 lbs)

1/2 ton (1,000 lbs)

1 ton (2,000 lbs)

5 ton (10,000 lbs)

001 = crane #

door #16

door #17

door #15

door #14

door #12

door #13

door #10

door #9

door #11

door #8

door #6

door #5

door #7

door #4

door #3

door #1

door #2

door #24

door #23

door #21

door #22

door #20

door #18

door #19

Ar = Argon A = Air (compressed)

E = Electrical CTW = Cooling Tower Water

G = Gas (natural) He = Helium

C = Chiller water

H = Hydrogen HW = Hot Water LCW = Low Conductivity Water N = NitorgenO = Oyxgen P = Propate W = Waterdomestic & fire)

Legend =shutoff

R =Riser (fire sprinkler)

FA =Fire alarm panel T =Telephone panel

E W HW LCW A G

G R

FA T

E PL/A-7-A PL/DP-5A PL/A-7-B

G A

E PWR2

E PWR1 PWR1A

E electrical shutoff for B026 @ substation 026S

X

X X X X

X

X

X

X

X X

X

X

Area Managers

Coill, Welding, Black Iron, and Sheetmetal ShopsCommon Areas of Building - Mark Swearingen

Machine Maintenance Shop - Richard E. Atkinson

Machine Shop - Denise Larsen

Magnetic Measurements - Zachary Wolf

Production Hub - Bill Misson

Alignment Shop - Georg Gassner

Radioactive Materials Storage - Mark Swaringen

Chemcial Storage Area - Ali Farvid

Building Manger: Rich E. AtkinsonAssistant Building Manger: Randy Ralston

Equipment Types

grinder

manual mill

lathe

saw

hydraulic press

drill press

sander

oven

degreaser

shear welder

16924

17530

17521

15570

15136

1697

5

1761

6

1744

7

2138

0

17321

16184

17537

44159 37239

20150

abrasive wheel

21084 17480

1753

3

20409

16507

17781

16944 17553

17545

17359

16930 ?????

46376

18535

17460

17457

17468

21101 20854 18254

20703

21689

1911

7

deburrer

16591

1735

0

1744

3

1744

5

bender

17476

17348

17349

punch

20461

17354

17444

17041

winder

18428

18433

17518

17510

17505 17502

17507

17511

mixer

17327

17325

plasma cutter

19387

21536

15326

dust collector

2173

0

steam generator

1733

2

1750

4

pump

2007

1

vacuum chamber

17330

brake press

17352

17506

floor crane

hydraulic pump

positioner

1657

4

2077

4 18

426

17672

B/216

Green AreasLuis Juarez

alternate = Jeff Jones

Yellow AreasJeff Jones

alternate = Luis Juarez

Sweepers

B/216 t

reat

men

t p

lan

t

Lead

26-FC-2

26-FC-3

26-FC- 9

26-FC-8

26-FC- 626-FC-7

26-FC-1

26-C

G-1

1

26-C

G-9

26-G

C-1

0

26-CG-2

26-C

G-6

26-CG-5(entire shaded area)

26-FC-10

26-HW-1

26-HW- 3

26-HW-4

26-HW- 2

499-OC-1(entire shaded area)

499-OC-2(entire shaded area)

HM #6(entire building)

26-FC-1126-OC-1(entire shaded area)

EW26-1

EW26-2

26 CG 7

26-CG-1

26-CG-3

26-CG-8 26-CG-4

Column 12

Column 10

Column 9

Column 8

Column 7

Column 6

Column 5

Column 4

Column 2

Column 3

Column 11

Row

A

Row

B

Row

C

Row

D

Row

E

Column 1

Magnetic Measurements

Laboratory

Coil Shop

Coil Shop

Coil Shop

Weld Shop Black Iron

Shop

Sheetmetal Shop

RadioactiveMaterial

Storage Area

AlignmentShop

Machine Shop

Machine Maintenance

Shop

Offices

Kic

ker

Ass

emb

ly

Ro

om

Kic

ker

Pott

ing

Ro

om

Production Hub

Epox

y m

ixin

g

Winder Pit

Office

Office

B/4

096

Second Floor

Building 026Heavy Fabrication

100

101

Mezzanine

109

105

112

103

102

109A

110

111

108

106

204

202 203

205

201

206

207

M1 W1

208

107

Bui

ldin

g 49

9