    Basic Layout

  • 8/11/2019 shah_2 (1)_new

    3/21

    Bunkering Cycle

    Bunkers

    From

    W/T

    Bunkering Belts

    S

    Crusher House

  • 8/11/2019 shah_2 (1)_new

    4/21

    Crushing Process

    300 mm

    Double roller crusher Hammer crusher

    Attrition Impact

  • 8/11/2019 shah_2 (1)_new

    5/21

    Flow chart for designTender

    specifications

    Design of

    layout

    P

    req

    Selection of

    configuration

    and equipment

    Processdesign

    Client approval

    Structural

    design

    Load

    diagrams

    Inter-department clearance

    Mechanical

    Civil

  • 8/11/2019 shah_2 (1)_new

    6/21

    Flow sheet

    Two stage open/closed circuit

  • 8/11/2019 shah_2 (1)_new

    7/21

    equipments

  • 8/11/2019 shah_2 (1)_new

    8/21

    Flow sheet

    Three stage open/closed circuit

  • 8/11/2019 shah_2 (1)_new

    9/21

    Four stage open/closed circuit

  • 8/11/2019 shah_2 (1)_new

    10/21

    Three main steps in design1. Process design

    2. Equipment selection

    3. Layout

    4. Structural design

  • 8/11/2019 shah_2 (1)_new

    11/21

    Principal design parameters

    Production requirements

    Capital cost Ore characteristics

    Safety and environment

    Project location

    Life of mine/expansion plans Operational considerations

    Maintenance requirements

    Climatic conditions

  • 8/11/2019 shah_2 (1)_new

    12/21

    Production requirements

  • 8/11/2019 shah_2 (1)_new

    13/21

    Data required for design proce

    Geographic data

    Climatic data

    Civil design criteria

    Structural design criteria

    Process design data (process description, orecharacteristics)

    Mechanical design criteria

    Electrical/instrumentation design criteria.

  • 8/11/2019 shah_2 (1)_new

    14/21

    Equipment used

    Rock breaker

    Apron feeder to the primary crusher Overhead crane

    Dust collection/suppression system

    Freight elevator

    Eccentric trolley removal cart

    Service air compressor

    Man-lift elevator

    Sump pumps

    Air cannons

    Air vacuum clean up systems

    Water booster pumps

    Rock grapple

    Rock grapple

    Service trolleys Conveyor belt magnets

    Conveyor gravity take-up ser

    Conveyor belt metal detecto

    Conveyor belt rip detector

    Belt monitoring systems

    Conveyor belt weigh scales

    Belt feeders

    Vibratory feeders

    Screw feeders

    Lime/cement silos

    Bin ventilators

    Sampling stations.

  • 8/11/2019 shah_2 (1)_new

    15/21

    Plant layout and design

    Upper super structure

    Receiving hopper area

    Crusher floor level

  • 8/11/2019 shah_2 (1)_new

    16/21

    Structural design

    Input

    General arrangement

    Load diagrams

  • 8/11/2019 shah_2 (1)_new

    17/21

    Structural design

    The building super structurestructural ste

    Flooring-RCC.

    Crusher equipment foundation-RCC (indepebuilding

    structure and foundations) crusher foundations shall be provided with s

    and Visco-damper system.

  • 8/11/2019 shah_2 (1)_new

    18/21

    loads

    Dead loads

    -Self weight Live loads

    -weight of people, portable equipment and tools

    Impact loads

    -dynamic forces created by equipment

    Equipment loads

    -special structural member for major equipment Wind load

    -IS875 (part-3)

    Seismic loads

    -IS 1893

  • 8/11/2019 shah_2 (1)_new

    19/21

    Design procedure

    Select suitable load combinations

    Preliminary design

    structural analysis

    Staad pro, manual analysis

    Design of members Reinforced concrete structures IS: 456

    SteelIS 800

  • 8/11/2019 shah_2 (1)_new

    20/21

    Design requirments

    Maximum allowable deflection

    Natural frequency

    Foundations

    After the structural design the structural dra

    are prepared

  • 8/11/2019 shah_2 (1)_new

    21/21

    General arrangement plan