New Age of Electric Energy System brings a New Set of Challenges for Protection and Automation
Hans-Joachim Herrmann, Siemens AG, Energy Automation Division, Germany
Development of numerical protec-tion and automation
The available technology has a big impacted on the development of protection and automation de-vices. The electromechanical technology was over some decades the dominated technology. The de-velopment of the transistor as well as low integrat-ed circuits lead to the analog static technology, where the operational amplifiers, the comparators and timer circuits were the main measuring ele-ments. The development of the microprocessor technology in 1971 was the basis of a very new design of protection and automation devices as well as automation systems. Software determines the functionality of the equipments and can be found in all application areas like protection, con-trol, measurement and metering. The processing of algorithms (e.g. modeling of the electric system) is the basis of the functionality.
Figure 1 gives an overview of the different technol-ogy and the principal design of the devices.
Fig. 1 Development of protection technology
The series production of numerical protection as well as bay controller devices started close to 1990. Before this time some pilot installation and the first devices went into operation. Figure 1 show clearly that the numerical technology is under con-stant improvement and development. Technology, manufacturing aspects (cost reduction) and stand-ardization influences the further development. A couple of important aspects will be discussed in the following chapters.
Intelligent and multifunctional bay units
Microprocessor evolution will be the defining tech-nology in future. The necessities for real time pro-cessing as well as severe environmental require-ments (e.g. EMC) lead furthermore to embedded devices. Further development of technology toward
higher processor performance (several 100 MHz are available), larger memory size and higher memory density (from Mega to Gigabytes), high resolution and fast analog/digital converters (e.g. 24-bit resolution) as well as the utilization of cus-tomer specific circuit technologies (e.g. FPGAs) are apparent. A further trend is the rapid develop-ing communication technology.
Due to the current as well as the new structures, the electrical power system will become even more heterogeneous, so that the classic interfaces such as binary in- and outputs as well as voltage, cur-rent and analog inputs will be still required espe-cially for refurbishments. A flexible and a modular hardware design meet the application require-ments. Figure 2 shows such a possible system. The basis housing is a so called base module (1/3 19”) which can be extent by expansion modules (1/6 19”). The robust and special designed housing increases the safety (excellent heat dissipation and EMC design avoids interference). Depending on the application different front plates for visualiza-tion are available. With such a modular design high degree of flexibility can be reached.
Fig. 2 Hardware kit – Modular hardware meets applica-tion requirement
With the introduction of the IEC61850 substation automation standard, the object oriented approach for the selection of protection and control technol-ogy started. Depending on the requirements, the desired functionality is selected and assigned to the relevant device. This leads to a further func-tional integration. Figure 3 shows a possible func-tional scope. There are no longer classical protec-tion and control devices. Future devices will be re-ferred to an IED (intelligent electronic device), a name introduced by IEC61850.
Presentation 6.1
© OMICRON – Asia-Pacific Protection & Testing Conference 2014
However functional integration does not mean that all functions shown in Figure 3 have to be always contained in one device. Depending on the appli-cation and the requirements, functionalities can be combined in different ways. When selecting a de-vice, the classic design criteria apply, such as the adherence to the n-1 principle. For protection ap-plications in the transmission networks, a main pro-tection 1 and a main protection 2 with different functional principles is required. This means for example the application of distance and line differ-ential protection.
Fig. 3 Overview functional integration
Flexible communication is a key feature
Introduction, Basic design
Flexibility in communication is one important re-quirement of modern IEDs. On the application side there is a requirement that different hardware inter-faces as well as protocols are supported. In sub-station automation Ethernet was adapted as the preferred communication medium several years ago; since then there has been constant develop-ments in network technologies yielding higher throughputs (from Mbit to Gbit). On the protocol side a large number of protocols must be support-ed. The install-base influences the decision of the users, so migration towards new protocols (e.g. IEC61850) is progressive.
There are two main communication streams: Communication of the IEDs with a substation au-tomation system or control centre and the commu-nication between the devices (e.g. line differential protection via protection communication interface or Goose-Communication between different IEDs) as well as communication with intelligent sensors
(process bus). These requirements influence the hardware design of the communication hard-ware/Interfaces and the handling of different proto-cols. Figure 4 gives an example for design of the communication interfaces in modern IEDs. Like a Laptop there are different plug-in modules with dif-ferent designs.
Fig. 4 Flexible communication via plug-in module and protocol selection during the engineering
Benefits of standard IEC 61850
IEC 61850 is more than a substation control proto-col. It comprehensively defines functions, data and the communication systems for communication in networks of the power supply industry. Edition 2 extends the influence of the standard to further branches of the power supply industry. Where the standard is at present still mostly being used as a classic substation control protocol, the new pro-cesses will in future be used at the communication and engineering level.
The dynamic reporting establishes itself in com-munication between Client and Server. Using a configuration file (ICD or SCD – file) or online, by establishing a connection to the server, the client is able to subscribe to all data points, which the serv-er can potentially publish. The Client can read spe-cific monitoring data, alarms or measured values of a Server for a certain period of time. It is customary to establish and transmit data records via fixed communication links today; however this will be re-placed by dynamic processes in the near future. Setting values of functions can also be changed via the protocol. With super ceding systems, set-ting values can be checked and adapted to the condition in the Smart Grid.
With the GOOSE – Message the IEC 61850 de-fines the interoperable communication between Servers in the network. Not only binary values can be exchanged, measured values can also be transmitted. GOOSE – Messages are also ex-changed between substations. New protection philosophies, which will require peer to peer com-munication across wide area networks, will be a reality. The GOOSE – Message will replace propri-etary point to point connections for signal compari-son or directional comparison, and facilitates the data exchange between devices of different manu-facturers, including between substations.
Developments in Network technology
Network components with a very high availability are a prerequisite for IP based protocols both with-
Presentation 6.2
© OMICRON – Asia-Pacific Protection & Testing Conference 2014
in a substation and outside the substation. Today different forms of ring or star shaped network to-pologies and well as various methods to achieve redundancy are applied. These methods lack in-teroperability and will result in an interruption in the range between 30 ms to several hundred millisec-onds in the event of component failure. For critical applications such as the transfer of trip commands via GOOSE or the transfer of sampled measured values according to IEC 61850 9-2 for process bus applications these interruption intervals are not ac-ceptable. In the IEC 62439 ‘Highly Available Auto-mation Networks’ standard, now being adopted by IEC 61850 Edition 2 the High availability Seamless Redundancy Protocol (HSR) and the Parallel Re-dundancy Protocol (PRP) is described. It allows for interruption free switching (bumpless transfer) in the network with ring or star configurations. This technology will become established as standard for substation networks and process bus applications.
Furthermore there is a trend towards higher band-widths (from 100 MBit/s towards 1 GBit/s).
Cyber Security as Basis for secure operation of Networks
Because of the application of network technology the security within the network becomes a critical task. Security against internal threats and security against external attacks must be considered. Also in private networks it is possible that as a result of an accidental mal-operation the functioning of the network is placed at risk. The BDEW – Whitepaper [11] and NERC – CIP [12] address these topics. With IEC 62351 a standard is made available that describes methods for the end to end encryption as well as authentication between participants on the network in substation automation systems.
Development of electrical energy system The present changing in the primary system have a strong influence on protection and automation technology. Typical aspects will be discussed in the following pages.
The expected shortage of energy resources and the increasing environmental burden are a booster for a global change of thought in the field of energy politics. These changes of thought toward renewa-ble energy resources and new modes of usage have a deciding impact on the electrical-power-system. Electrical energy is developing into a de-ciding energy resource for the user.
Therefore a change is taking place in the naturally grown power system of the last decades, where energy production took place in close proximity to the user as well as according to user requirements, thereafter fed into the transmission network, and was then distributed. A structure of this kind is typi-cal for Central Europe.
The intention to effect a change is shown by the SMART GRID Initiative [1], [2], which deals with the new challenges regarding the individual voltage levels. The electrical power system is developing into a network, comparable to the Internet. The main difference to the Internet is the transmission of electrical energy instead of information. This constitutes an entirely different quality, as the bal-ance between production and use has to be main-tained. An imbalance necessarily leads to reduc-tion in the reliability of supply, which may result in local blackouts or supply shortages.
Alongside conventional power plants, renewable energy sources play a deciding role. They can however only be used where they are available. Considering the resource wind, it is available with certain constancy only close to shores and in the ocean. In the case of Offshore Windfarms, the en-ergy has to be transported on-shore and to the consumer. This makes a network expansion with combined transmission via cable and overhead line necessary, and possibly leads to an increase in DC current transmission, which requires intelligent en-ergy management. The deregulation and the trade with the commodity “electricity” result in a diverse power flows, which the systems have to control. Furthermore in the future there is a diversity of power producers. Producers may be found at all voltage levels, so that each network quasi as-sumes transmission tasks. In order for everything to work properly, intelligent control and monitoring solutions are essential. The protection and control technology makes a deciding contribution to this.
Figure 5 illustrates the contribution of renewable energy resources on consumption of electricity as well as the goal until the year 2020. Additional fig-ure 6 shows the distribution of the different renew-able resources [3].
Fig. 5 Development of renewable energy shares in Germany [3]
Presentation 6.3
© OMICRON – Asia-Pacific Protection & Testing Conference 2014
Fig. 6 Distribution of renewable energy sources [3]
Especially the altered form of electrical energy generation has an essential impact on the automa-tion solutions as well as on protection. These as-pects are discussed in the paper.
Four main subjects are selected and the challeng-es are addressed in the following chapters.
Large distances between genera-tion and load centers
Transportation of power via long dis-tances
The energy system is growth organically in the last century. Close to the generation stations (e.g. thermal as well nuclear power plants) the large load centers are established. Due to strategy of shut down of conventional power stations (e.g. coal, nuclear) the balance between generation and load is changed. The wind energy Onshore as well as Offshore is mainly available in the northern re-gion of Germany. Due to this situation there is a new necessity of electrical energy transportation. One technical solution is the application of the pre-sent transmission routes and the substitution of an AC line through a DC line. Figure 7 shows a planed transmission route concept. The transmis-sion of DC and AC on the same tower is an un-known technical territory. The planed DC transmis-sion will have a length of 340 km and the transmit-ted power is designed with 2.2 GW [4]. The voltage level is ±400 kV.
Fig. 7 AC and DC system on the same tower
A lot experiences are available since years regard-ing protections concepts separately for both sys-tems. If AC and DC are on the same tower the challenge is the detection of intersystem faults. That means faults between the DC and AC sys-tem. Figure 8 describes the situation. The faulty segment of the AC line system must be switched off selectively, because there are a lot of intersec-tions in the AC system. Line length of the AC sys-tem is between 50 km and 100 km. The DC line has a total length of 340 km without any interrup-tions. The protection challenge comes from the fast tripping time (< 1ms) of the DC protection and the fast disconnection of the DC line. For the following question an answer must be found. Do we have a change to find the faulty section in the AC system? To answer this question new technical solutions are required as well as practical test for present ideas are necessary.
Fig. 8 Possible fault scenarios
Results of practical testes showed, that the inter-ference of the AC system because of the Corona effect (resistive coupling from DC to AC) is uncriti-cal. This interference can have an influence on power transformers. At dry weather condition the current which can be coupled into the AC system is approximately 1mA/km. At rainy weather this cur-rent will be then times higher [4].
Voltage stability problems
A further problem ensures due to the lack of power generation close to the load centers. The required reactive power must be delivered by other sources, which can be synchronous condensers, switched capacitor banks (MSCDN, VSC, reactors) and oth-ers. A 400-kV-AC-line with a length of 100 km and a transported load of 1400 MW requires a reactive power of 310 Mvar to guarantee a constant voltage of 400 kV. At a transmission limit of approximately 1800 MW the need for reactive power raises pro-gressive to 560 Mvar.
A missing reactive power generation leads to volt-age dips and can finally result in a voltage col-lapse. Figure 9 shows exemplary the actual volt-age shape for one day in a load center region. The rated voltage level is 400 kV.
Presentation 6.4
© OMICRON – Asia-Pacific Protection & Testing Conference 2014
Fig. 9 Voltage shape in the Amprion region at one day [5]
Protection of capacitor banks
The voltage stability problem leads to an increased number of capacitor bank installations and the pro-tection gets more attention. In the past different devices are used for the protection tasks. With the modular devices design a high degree of flexibility can be reached and one device has the capability to protect a capacitor bank.
Typical protection functions for a capacitor bank are:
Overcurrent (OC) protection (50, 51, 50N, 51N)
The OC protection detects phase-to-phase or phase-to-ground short circuits and is mainly used as a backup function.
Differential protection (87)
The differential protection protects across the whole bank or sub-component against short cir-cuits within the installation. The function provides very fast and selective fault clearance.
Phase unbalance protection (46)
The phase unbalance protection will detect chang-es in the impedance of a phase. The function eval-uates the negative sequence current (I2).
Overload protection (49)
The overload protection monitors the thermal state of the capacitor, a coil or a resistor. Depending on the application requirements harmonics need to be considered. Typical requirements are the consid-eration of up to the 13th or 25th harmonic at SVC AC transmission systems and even up to the 50th harmonic at high-voltage direct current transmis-sion systems (on the AC side).
Capacitor peak overvoltage protection (59C)
The capacitor peak overvoltage function protects the capacitor-dielectric against too fast aging and even damage due to peak over-voltages. Voltage peaks caused by harmonics will also stress the ca-pacitor-dielectric. Consequently harmonics in the power system need to be considered by this func-tion. The peak voltage is obtained by the integra-tion of the phase current. The main reason is that a
current transformer damps harmonics much less than a voltage transformer.
Capacitor unbalance protection (60C)
The capacitor unbalance protection detects inter-nal faults of single C-elements within the capacitor. The specific function to be applied depends on the capacitor design. An operational unbalance current caused by tolerances, aging or environmental con-ditions shall be eliminated by compensation to in-crease the pickup sensitivity. Applying several un-balance overcurrent elements in parallel is stand-ard. A further application is the counting of single defective C-elements. Counter elements will also be applied in parallel with different counter thresh-olds for alarming, delayed tripping and fast tripping.
Circuit-breaker (CB) failure protection (50BF)
The CB failure protection function monitors the tripping of the CB and generates a backup trip sig-nal if the CB fails.
Circuit-breaker restrike protection (50RS)
A useful add-on is the restrike protection, which monitors the phase current regarding restriking af-ter CB pole separation. The probability of restriking increases at capacitors since a fully loaded capaci-tor causes a double voltage amplitude over a CB pole after the pole separation.
The design of a compact capacitor bank protection shows figure 10. The used functions are described by ANSI numbers. Main 1 and main 2 require-ments are fulfilled by duplicating the devices.
Fig. 10 Example: protection of a MSCDN [13]
Presentation 6.5
© OMICRON – Asia-Pacific Protection & Testing Conference 2014
Supervision of the stability
The transmissible power of an overhead line has a limit which can by described with the PU character-istic (Nose curve). Such a curve shows figure 11. A critical situation for the voltage as well the risk of a voltage collapse exists at transmission lines with a heavy load. In such a case the actual operating point is right on the nose curve. If during heavy load a power plant is switch off due to a fault (see figure 11) two harmful effects can occur. The transmissible power in the resulting transmission line increases and operating point in the nose curve moves to right. The off power station doesn’t deliver the required active power and this leads to a new PU curve with a limited transmission capa-bility and finally to a risk of a voltage collapse. To avoid this control of load and generation fluctuation as well as the fast reactive power generation be-comes more and more important.
Fig. 11 Formation of a voltage collapse
The voltage as well as the power can be monitored with modern automation solutions and the PU curve can be evaluated. This is a possible applica-tion for the phasor measurement technology (PMU). On the load points the necessary data are measured very precise (GPS time synchronized) and transmitted to the evaluation center (e.g. SIG-URD PDC, [10]) which gives alarm and visualizes the actual load situation. Figure 12 illustrates such an evaluation.
Fig. 12 Nose curve evaluation with SIGUARD PDC [10]
The left side of the picture shows the location of phasor measurement units and the right side an example of a graphical analysis. The phasor
measurement function can be an add-on function in a protection or bay controller device and the measured values are transmitted via a local Ether-net infrastructure to the phasor data concentrator SIGUARD PDC.
Increased contribution from re-newable energy in generation
Due to the renewable energy generation the struc-ture of power generation is changed. Figure 13a shows the well known structure over one century. Synchronous generators supplies into the grid. The transient behavior during a fault is known (sub transient, transient and steady state fault current) and the protection devices consider this. For the fault clearing a sufficient fault current is available. The first step of changing came with windfarm and photovoltaic power stations. There is now a supply with converter stations. The power flow as well as the current during a fault depends on the design of the control function. The controller software con-siders grid requirements (e.g. fault ride through, contribution on voltage stability). Figure 13b illus-trates this changed situation. Due to the design of the converter station the short circuit current is lim-ited. The fault current is close to the rated current of the power station or can be smaller depending on the preload situation (less windfarms in ser-vice). In the case of a fault in the network the fault current contribution is much smaller compared with the conventional supply.
Due to the installation of Offshore windfarm there can be a very new situation which is shown in fig-ure 13c. There are AC sea cable connections be-tween the windfarms and the Offshore HVDC sta-tion. On both sides converter station are installed. In the case of a short circuit on the AC side the fault current is limited and can only reach values close to the rated current. This must be considered during design of the protection concept and the setting of the protection functions.
Fig. 13 Different network topologies
Presentation 6.6
© OMICRON – Asia-Pacific Protection & Testing Conference 2014
With the installation of the converter station an ad-ditional question arises up.
Which fault current will be delivered in the case of an unsymmetrical fault?
In the grid code is the fault ride through behavior specified. So the interpretation of the injected fault current is not really clear. Let us assume the sup-ply situation according figure 13c. HVDC converter station delivers a positive as well as negative se-quence fault current in the case of an unsymmet-rical fault. In the specification for the design of the controller for windfarms only a supply of a positive sequence current is required and this is realized in practice [6]. The technical consequence is no fault current in the case of unsymmetrical faults. Without negative sequence impedance the current path according figure 14 is not closed. Figure 14 de-scribes a simplified replica in the symmetrical components for a phase to earth fault on the cable side. The zero sequence impedance comes from earthed Wye side of the power transformer. The positive sequence source of a converter station is a current source. In contrast at synchronous gen-erators this is a voltage source.
Without any fault current there is a limited or no re-action of the protection. The controller for windfarm must be adapted and negative sequence source impedance must be provided. This subject is dis-cussed in the technical paper [7].
Fig. 14 Symmetrical components for a phase to earth short circuit
Figure 15 shows a record from a real fault in a transmission network. The network configuration was according figure 14b. On the left side was a supply from a windfarm and a phase to earth fault occurs in the HV network. The fault was cleared by a distance protection (see figure 15). In the record a pure zero sequence current on the Wye side of the transformer is visible. This effect is well known as the “Bauch paradox”. The same record will be possible, if there is an open circuit (no supply) on the delta side of the transformer. As conclusion
there was no relevant fault contribution from the windfarm side, because no negative sequence im-pedance was available (compare with figure 14). Only a positive sequence current close to the rated current was supplied from the windfarm.
Fig. 15 Fault record of a single phase fault on a high voltage line
Changed network topology
Additional challenges come with the changed net-work topologies. One point was addressed in figure 13c. The connection of windfarm via sea cable to HVDC station is now a typical application. Due to the large cable capacitances shunt reactors for compensation are necessary. During switching of LC circuits transients occurs. To understand all the effects a lot of simulation were performed. An ex-cerpt of test results shows the following pictures in figure 16. Figure 16a gives an overview of the sim-plified replica. The first interesting effect visualizes figure 16b. The cable is energized from one side. Due to the shunt reactors an inrush occurs. But the large time constant as well the switching conditions lead to an inrush current with no zero crossing. In that case a delayed trip is necessary to avoid stress with the circuit breakers. This must be con-sidered during the engineering or special function-ality must be developed. The next interesting topic illustrates figure 16c. There was a phase to earth fault simulated in the cable. The fault curve with the short circuit current shows a typical trend. But the faultless phases are influenced too and a large DC offset is visible. The current in both faultless phases have for some cycles no zero crossing. That means a delayed trip of faultless phases is necessary. In the protection devices an extension is required.
A further discussed example shows a three phase fault current. During this test the controller was not optimal adapted. The consequence was a supply of a fault current with harmonics.
These harmonics must be tolerated by the protec-tion. Finally the reaction of the protection must be evaluated.
Presentation 6.7
© OMICRON – Asia-Pacific Protection & Testing Conference 2014
a) Simplified replica
b) Inrush current curve
c) Phase to earth fault in the cable
d) Three phase fault without optimized control
Fig. 16 Simulation of different transient conditions
A total new situation occurs with the requirement from energy line extension act (from 2009) in Ger-many. With this act a transmission corridor with cable sections is required. That means there is now a series connection of overhead lines, cable section and overhead line which is called a hybrid system. This is a new situation for transmission line protection. Single phase to earth faults during thunderstorm are the most fault types. A temporary arc fault is cleared with an auto reclosing. But if a single fault occurs in the cable section an auto re-closing must be avoided.
Figure 17 shows the protection concept which is preferred in the German utility Amprion [8]. The transmitted power via the overhead line is approx-imately 1800 MW. The length of such cable section is between 3 and 10 km and in sum 12 cables are in parallel connected. That means 4 times 3phase single-conductor cable. The necessary area for such an implementation is 25 m.
For each three phase cable a separate differential protection plus an overall differential protection with an integrated distance protection is chosen. A signal for blocking the auto reclosing function is send to the overhead line protection (distance pro-tection) in the case of a fault in the cable.
A second challenge was the design of the power supply for the protection devices. Figure 17 illus-trates the basic concept. One source is the redun-
dant voltage transformer on which the rectifier equipment is connected. Another path is the sup-ply from a local 400-V-AC source.
Fig. 17 Protection concept for a hybrid transmission sys-tem [8]
Unpredictable load flow due to fluctuating generation
Due to the volatile network the load flow is not any more constant and can be close to the thermal lim-its. The maximum load influences the protection functions. This situation has for example an impact on the setting of overload, overcurrent as well as distance protection. For the overload protection the critical hot spot temperature must be considered in the thermal model. Therefore a distributed temper-ature measurement is necessary on transmission lines. For overcurrent protection applications a dy-namic setting adaption is possible. A new parame-ter set can be activated as a simple solution. The reset value of an overcurrent stage shall be 0.95 or higher.
One big advantage of the distance protection is the back-up functionality. In this context the possible operating distance of protection is the main dis-cussed subject. To avoid an overfunction the im-pedance characteristic has a load cut out (see fig-ure 18). Figure 18 shows the calculated limits for a typical German 400 kV transmission line [9]. From practical experiences a typical fault resistance of lower than 30 Ω was found. The minimum voltage is 0.85* 400 kV with a maximum angle of 37°. With this assumption the maximum load limit is 3730 A. The selected relay setting value considers an addi-tional safety margin which is also illustrated in fig-ure 14 (small circle).
The necessity of load cut out was also discussed in Northern America during the blackout analysis and is known under the name “Zone 3 problem” (dotted circle in figure 18).
The question is now: Is there any possibility to in-crease the load range?
As figure 18 shows there is the conflict between the maximum load range and sensitivity at high-resistance fault. Well known is the impedance measuring problem if there is a fault with a fault re-sistance and the fault current is supplied from two sources.
Presentation 6.8
© OMICRON – Asia-Pacific Protection & Testing Conference 2014
To answer this question additional research work is necessary. One idea is the implementation of an adaptive characteristic. Another idea is the devel-opment of a new impedance measuring algorithm. This algorithm shall eliminate the resistive part and lead to a reduced setting in the R-direction.
Fig. 18 Impedance characteristic and load cut out
Summary and conclusion
The installation of renewable energy systems in Germany has a big impact on the electrical energy system. It influences the design as well as the op-eration of the primary system and has also an im-pact on protection and automation. In Germany there is now also the situation of large distances between generation and load centers. In this con-text a new concept for transmission of electrical energy was presented. AC and DC lines will be on one tower. This is a new design and the challenge for protection is the selectivity at intersystem faults.
Another addressed topic was the voltage stability. The necessary reactive power must be delivered from other resources such as synchronous con-densers, switched capacitor banks (MSCDN, VSC, reactors) and others. The protection of capacitor banks was shown. The phasor measurement tech-nology (PMU) is a possible method for voltage sta-bility supervision. If the limit of the nose curve is exceeded an alarm will be given.
With installation of renewable energy in generation the supply is realized by converter stations. This technology has limits in fault current contribution. In the case of a short circuit the supplied current is close to the rated current or sometime lower de-pending on the preload situation. The present technical realization follows the general require-ments of Grid code. For that reason only a sym-
metrical current is supplied. In the paper the situa-tion during unsymmetrical faults was discussed. The analysis showed the need for extension of the requirements. That means negative sequence im-pedance is required from renewable energy gen-eration.
With the installation of offshore windfarms a new network topology was discussed. It consists of windfarms with converter stations and an offshore HVDC station. The connection between both is re-alized via sea cable. In the paper transient phe-nomena are discussed during energization of the cable and short circuits. The possibility of currents without zero crossings must be considered in the design concept. The best solution is an intelligent tripping functionality in numerical devices. Another effect can be happen if the control system for the converter station is not correct adapted or compo-nents fail. During a fault in the cable a harmonic fault current can occur and that must be tolerated by the protection devices.
A further challenge for protection occurs if the transmission system becomes a hybrid system. Hybrid means the combination of overhead lines and short cable sections. A protection concept with available devices was presented.
The last addressed topic was the unpredictable load flow. That means the system reaches the thermal limits of primary equipments. This has an impact on new functions, like temperature meas-urement on overhead lines as well as the protec-tion concept. The distance protection is one main protection for overhead lines. One advantage is back-up functionality and in this regard the operat-ing distance of protection is a discussed subject. There is a conflict between the fault resistance (sensitivity) and the maximum possible load. The present technical solution is the load cut out in the impedance characteristic. Under discussion are new ideas like adaptive distance protection which considers the source impedance or new algorithm which eliminates the resistive part.
Smart grid influences the transmission grid and has an impact on protection and control. As shown in the introduction the numerical technology (flexi-ble hardware, powerful communication and modu-lar software structure) of modern intelligent elec-tronic devices (IED) is ready to fulfill the new chal-lenges. In some case only engineering work as well as testing is necessary. Other applications need additional investigation as well as research work to understand the new phenomena and to develop new additional functions or the modifica-tion of present functions. Summing up one can emphasize the following: To guarantee the system stability of Smart Grids additional investment in protection and control is necessary.
Presentation 6.9
© OMICRON – Asia-Pacific Protection & Testing Conference 2014
Literature
[1] www.smartgrids.eu, see folder documents of interests.
[2] Electric Transmission and Distribution Program. Five year program plan (2008 – 2012) US Department of Energy, August 2006
[3] Development of renewable energy sources in Germany 2012 (version December 2013). Working group on Renewable Energy-Statistics (AGEE Stat)
[4] Rusek,J;Jürgens, I.; Braun, A. Kleinekorte, K. Joswig, R.: Technik für das Ultranet (Technology for the Ultranet), EW Jg. 112 (2013), Heft 3, S. 52-56
[5] Kamanenschikow, D.; Lösing, M.; Vennemann, K.: Spannungshaltung und Blindleistungsbereitstellung in hochaus-gelasteten 380-kV-Netzen (Voltage stability and reactive power supply in high loaded 380-kV networks), 11. ETG/GMA Fachtagung, 11.06-12.06.2013, München (Germany)
[6] BMU - Ordinance on System Services by Wind Energy Plants (System Service Ordinance – SDLWindV), Germany, 27.05.2009, http://www.bmub.bund.de/en/service/publications/downloads
[7] Erlich,I.; Schegner P.: Wind turbine negative sequence current control and its effect on power system protection. IEEE PES GM Vancouver 2013
[8] Wührmann, B.: Anforderungen an die Sekundärtechnik bei teilverkabelten EnLAG-Leitungen und einer HGÜ-Übertragung (Requirement on protection at hybrid systems (OHL + cable sections) and a HVDC-Trans-mission). Omicron User Conference 11.06 -13.06.2013, Ulm (Germany)
[9] Oechsle, F.; Kühn;H.; Föhring, H.; Hausschild, J.: Höherauslastung der Über-tragungsnetze. Gibt es Grenzen für das Distanzschutzprinzip? (Increased load in transmission networks. There are limits for distance protection) 7. ETG/FNN Tutorial „Schutz und Leittechnik“, 14.02.-15.02. 2012, Mainz (Germany); www.schutz-leittechnik.de
[10] Wache, M.: Monitoring-System mit Synchron-zeigern (Monitoring system with synchronous phasor). 8. ETG/FNN Tutorial „Schutz und Leittechnik“, 05.02.-06.02. 2014, Düsseldorf (Germany); www.schutz-leittechnik.de
[11] White Paper – Requirements for Secure Control and Telecommunication Systems”, BDEW, June 2008, Version 1
[12] CIP–002–1 through CIP–009–1, “Critical Infrastructure Protection (CIP) Cyber Security Standards”, NERC¸ June 2006,
[13] SIPROTEC 5 Overcurrent Protection 7SJ82/ 7SJ85 V5.00 , Siemens AG, Device manual C53000-G5040-C017-4
About the Author
Hans-Joachim Herrmann stud-ied electrical engineering and electronics on Technical Universi-ty of Dresden. From 1977 to 1991 he was an assistant professor on the Technical University of Zittau in the relay protection depart-ment. During this time he wrote
two theses with the subject “Algorithms of line pro-tection” (1984 Dr-Ing.) and “Protection and meas-uring technique” (1991 Dr.-Ing. habil.). In 1991 he joined Siemens as a member of the product man-agement protection in energy automation division. He is a principal key expert protection and was in-volved in all developments of the numerical SI-PROTEC devices. He did a lot of trainings in nu-merical protection with main topics transformer and generator protection. In 1997 he published a book with the title “Numerical Protection” (in German) and in his carrier more than 90 contributions on conferences and technical papers. From 2004 to 2012 he was the chairman of German national SC B5 (protection and automation) CIGRE committee and a member of different working groups (relay testing, transformer and generator protection, pro-tection requirements on transient response of volt-age and current digital acquisition chain (process bus)).
Presentation 6.10
© OMICRON – Asia-Pacific Protection & Testing Conference 2014
Un
rest
rict
ed ©
Sie
men
s A
G 2
013
All
rig
hts
res
erve
d.
An
swer
s fo
r in
fras
tru
ctu
re a
nd
cit
ies.
New
Ag
e o
f E
lect
ric
En
erg
y S
yste
m
bri
ng
s a
New
Set
of
Ch
alle
ng
es f
or
Pro
tect
ion
an
d A
uto
mat
ion
Pre
sent
er: H
ans-
Joac
him
Her
rman
n, G
erm
any
/ 15-
16 O
ctob
er 2
014
2014
Oct
ober
15-
16
Un
rest
rict
ed ©
Sie
men
s A
G 2
014
All
rig
hts
res
erve
d.
Pag
e 2
Dr.
H-J
. Her
rman
n / I
C S
G E
A P
RO
Tab
le o
f C
on
ten
t
R
evie
w o
f d
evel
op
men
t in
P
rote
ctio
n
T
ec
hn
olo
gy
of
IED
s
C
han
ge
of
En
erg
y S
yste
m
C
hal
len
ges
an
d S
olu
tio
n f
or
Pro
tect
ion
an
d C
on
tro
l
A
C a
nd D
C o
n on
e to
wer
V
olta
ge s
tabi
lity
(rea
ctiv
e po
wer
)
Sho
rt c
ircui
ts w
ith n
ew g
ener
atio
n so
urce
s; t
rans
ient
s
Com
bina
tion
of o
verh
ead
line
&
cabl
es
Influ
ence
of
tem
pora
ry o
verlo
ad
S
um
mar
y, C
on
clu
sio
n
2014
Oct
ober
15-
16
Un
rest
rict
ed ©
Sie
men
s A
G 2
014
All
rig
hts
res
erve
d.
Pag
e 3
Dr.
H-J
. Her
rman
n / I
C S
G E
A P
RO
Dev
elo
pm
ent
in P
rote
ctio
n
Mic
ropr
oces
sor
tech
nolo
gy c
hang
ed th
e w
orld
of P
rote
ctio
n an
d A
utom
atio
nM
ultif
unct
ion
devi
ces
with
pow
erfu
l com
mun
icat
ion
are
stat
e of
the
art
Ava
ilabl
e te
chno
logy
has
an
impa
ct o
n pr
otec
tion
and
auto
mat
ion
devi
ces
2014
Oct
ober
15-
16
Un
rest
rict
ed ©
Sie
men
s A
G 2
014
All
rig
hts
res
erve
d.
Pag
e 4
Dr.
H-J
. Her
rman
n / I
C S
G E
A P
RO
Tec
hn
olo
gy:
Sta
te o
f th
e A
rtM
od
ern
Inte
llig
ent
Ele
ctro
nic
Dev
ices
(IE
Ds)
M
icro
proc
esso
r ba
sed
devi
ces
with
pow
erfu
l com
mun
icat
ion
are
stat
e of
the
art
T
his
tech
nolo
gy is
rea
dy f
or t
he n
ew r
equi
rem
ents
Mo
du
lari
ty i
n c
om
mu
nic
atio
ndi
ffere
nt p
lug-
in m
odul
es,
prot
ocol
s M
od
ula
r h
ard
war
eF
lexi
ble
conf
igur
atio
n (I
Os)
Mo
du
lari
ty o
f F
un
ctio
ns
Acc
ordi
ng to
the
appl
icat
ion
the
nece
ssar
yfu
nctio
ns c
an b
e as
sign
ed to
the
dev
ice
durin
g th
e en
gine
erin
g pr
oces
s
SIP
RO
TE
C
DIG
SI
67
21
63
40
79
27
51
N4
9
81
87
T
32
R2
16
7G
87
N5
1
40
79
59
51
N6
4
63
…3
7
51
V
64
R4
9
67
87
L5
1G
49
T
79
50
N5
02
7
63
50
24
86
81
81
50
50
21
87
50
…
Dev
ice
Eng
inee
ring
Tool
Presentation 6.11
© OMICRON – Asia-Pacific Protection & Testing Conference 2014
2014
Oct
ober
15-
16
Un
rest
rict
ed ©
Sie
men
s A
G 2
014
All
rig
hts
res
erve
d.
Pag
e 5
Dr.
H-J
. Her
rman
n / I
C S
G E
A P
RO
Ch
ang
e o
f E
lect
ric
En
erg
y S
yste
m h
as a
big
Im
pac
t o
n P
rote
ctio
n a
nd
Au
tom
atio
n
Sho
rtag
e of
ene
rgy
reso
urce
s an
d th
e in
crea
sing
env
ironm
enta
l bur
den
are
a bo
oste
r fo
r a
glob
al c
hang
e of
tho
ught
in th
e fie
ld o
f en
ergy
pol
itics
.
Exa
mpl
e: O
ffsh
ore
Win
d F
arm
&
HV
DC
Tra
nsm
issi
on
2014
Oct
ober
15-
16
Un
rest
rict
ed ©
Sie
men
s A
G 2
014
All
rig
hts
res
erve
d.
Pag
e 6
Dr.
H-J
. Her
rman
n / I
C S
G E
A P
RO
Ch
ang
e o
f E
lect
rica
l En
erg
y S
yste
mIn
flu
ence
on
Pro
tect
ion
an
d A
uto
mat
ion
Lar
ge
dis
tan
ce b
etw
een
Gen
erat
ion
an
d L
oad
Cen
ters
N
ew s
olut
ions
for
ener
gy t
rans
port
(ov
erla
y ne
twor
k, u
ltran
et)
P
rote
ctio
n c
on
cep
ts
Rea
ctiv
e po
wer
pro
blem
s (v
olta
ge s
tabi
lity)
S
up
ervi
sio
n v
ia P
MU
s
Incr
ease
d C
on
trib
uti
on
fro
m R
ene
wab
le E
ner
gy
in G
ener
atio
n
Incr
ease
d nu
mbe
r of
con
vert
er s
tatio
ns
Sm
all s
ho
rt c
ircu
it c
urr
ents
F
luct
uatin
g ge
nera
tion
Wid
e ra
ng
e o
f fa
ult
cu
rren
ts
Ch
ang
ed N
etw
ork
To
po
log
y
Tapp
ed li
nes;
Sea
cab
les
betw
een
stat
ions
(ch
argi
ng c
apac
itanc
es)
N
ew t
ran
sien
t ef
fect
s
Com
bina
tion
of o
verh
ead
lines
and
sho
rt c
able
s
Pro
tect
ion
co
nce
pts
Un
pre
dic
tab
le L
oad
Flo
w d
ue
to F
luct
uat
ing
Gen
erat
ion
O
verlo
ad p
robl
ems
(set
ting
of p
rote
ctio
n)
Ad
apti
ve p
rote
ctio
n
Sou
rce:
Sie
men
s pa
per
2013
-07
2014
Oct
ober
15-
16
Un
rest
rict
ed ©
Sie
men
s A
G 2
014
All
rig
hts
res
erve
d.
Pag
e 7
Dr.
H-J
. Her
rman
n / I
C S
G E
A P
RO
Ove
rlay
Net
wo
rk –
AC
/DC
on
th
e S
ame
To
wer
Infl
uen
ce o
n t
he
Pro
tect
ion
DC
-Sys
tem
±40
0 kV
AC
380
kV
AC
110
kV
+
-k
HV
DC
: ±
400
kVP
ower
: 2,
2 G
W; L
engt
h: 3
40 k
m
AC
110
kVU
ltran
etbe
twee
n A
mpr
ion
and
Tra
nsne
t BW
Cor
ona
effe
ct :
nonc
ritic
al in
fluen
ce o
f ohm
icco
uplin
g fr
om D
C to
AC
for
tran
sfor
mer
s
Test
res
ults
: dry
wea
ther
: 1m
A/k
m, r
ainy
10m
A/k
m
Inte
rsys
tem
fau
lts
(AC
/DC
)
Ver
y fa
st f
ault
clea
ring
via
DC
pro
tect
ion
D
etec
tion
on th
e A
C-s
ide
?
Avo
id th
e ris
k of
an
over
fun
ctio
n
Inve
stig
atio
ns
are
nec
essa
ry
2014
Oct
ober
15-
16
Un
rest
rict
ed ©
Sie
men
s A
G 2
014
All
rig
hts
res
erve
d.
Pag
e 8
Dr.
H-J
. Her
rman
n / I
C S
G E
A P
RO
Lar
ge
Dis
tan
ce -
Gen
erat
ion
an
d L
oad
Cen
ters
R
eact
ive
Po
wer
Su
pp
ly -
Vo
ltag
e S
tab
ility
Pro
ble
ms
Pla
ce o
f ge
nera
tion
and
load
flow
in
fluen
ces
the
volta
ge b
and
385
kV
Ove
rhea
d lin
e: D
eman
d of
Q =
f(P
)e.
g.:
380
kV
(11
0 km
);n-
0: 1
400
MW
, 300
Mva
r;
n-1:
180
0 M
W, 5
50 M
var
Rea
ctiv
e po
wer
sup
port
is n
eces
sary
(Gen
erat
ors,
MS
CD
N, V
SC
,..)
422
kV
Pro
tect
ion
of a
Cap
acito
r B
ank
Mod
ern
IED
incl
udes
al
l nec
essa
ry f
unct
ions
7SJ8
5BB
QA1
MP
I-3p
h 1
FG
Cap
.ban
k 1
I-3ph
V-3p
h
50
FG
CB
I-3ph
MP
I-3p
h 2
MP
I-3p
h 5
60C
4950
N 3759
C
50BF
Ctrl
MP
I-3p
h 3
BI BOM
P I-
3ph
4
MP
I-3p
h 6
MP
I-3p
h 7
FG
Sid
e
I-3ph
46
FG
Diff
.pro
t.
87
FG
U/I
3ph
I-3ph
∑++
FG
U/I
3ph
I-3ph
∑+-
50 49
1)
CB
MP
V-3
ph 1
59
Res
trike
50
I-unb
al.
FG
Ca
p.ba
nk 2
I-3ph
V-3p
h
60C
59C
I-unb
al.
49
Presentation 6.12
© OMICRON – Asia-Pacific Protection & Testing Conference 2014
2014
Oct
ober
15-
16
Un
rest
rict
ed ©
Sie
men
s A
G 2
014
All
rig
hts
res
erve
d.
Pag
e 9
Dr.
H-J
. Her
rman
n / I
C S
G E
A P
RO
Rea
ctiv
e P
ow
er S
up
ply
–S
ynch
ron
ou
s C
on
den
ser
Op
erat
ion
of
a G
ener
ato
r in
a N
ucl
ear
Po
wer
Pla
nt
Nuc
lear
pow
er p
lant
was
shu
t do
wn
1500
MV
A g
ener
ator
del
iver
s no
w t
he n
eces
sary
rea
ctiv
e po
wer
(sy
nchr
onou
s co
nden
ser)
Syn
chro
nous
Gen
erat
or(M
otor
ope
ratio
n)
Ope
ratin
g ra
nge:
-40
0Mva
r (u
nder
exc
ited)
+ 9
00M
var
(ove
r ex
cite
d)
Dyn
amic
rea
ctio
n d
uri
ng
a r
eal
even
t
Sys
tem
vol
tage
Sys
tem
dis
turb
ance
in T
urk
ey
Rea
ctiv
e po
wer
infe
edvi
a th
e sy
nchr
onou
s co
nden
ser
Fas
t rea
ctio
n of
the
sync
hron
ous
cond
ense
r an
d st
abili
zatio
n of
the
volta
ge
2014
Oct
ober
15-
16
Un
rest
rict
ed ©
Sie
men
s A
G 2
014
All
rig
hts
res
erve
d.
Pag
e 10
Dr.
H-J
. Her
rman
n / I
C S
G E
A P
RO
Lar
ge
Dis
tan
ce -
Gen
erat
ion
an
d L
oad
Cen
ters
R
eact
ive
Po
wer
Su
pp
ly -
Vo
ltag
e S
tab
ility
Pro
ble
ms
PM
U p
art o
f mod
ern
IED
s M
onito
ring
with
SIG
UA
RD
PD
P(P
DP
: P
haso
r D
ata
Pro
cess
ing)
Sup
ervi
sion
of t
he
Nos
e (P
U)
Cur
veN
ET
OLT
C
Load
GP
Pla
nt;Q
Pla
nt
PN
et;Q
Net
Tran
sfor
mer
tapp
ing
Ope
ratin
g po
int
befo
re th
e e
vent
No
sta
ble
ope
ratin
g p
oint
afte
r th
e e
vent
PP
lant
Act
ive
Po
we
rP
Net
volta
ge
PU
cur
ve
befo
re th
e ev
ent
PU
cur
ve
afte
r th
e e
vent
2014
Oct
ober
15-
16
Un
rest
rict
ed ©
Sie
men
s A
G 2
014
All
rig
hts
res
erve
d.
Pag
e 11
Dr.
H-J
. Her
rman
n / I
C S
G E
A P
RO
Co
nve
rter
Sta
tio
n -
Fau
lt C
urr
ents
Wh
ich
fau
lt c
urr
ent
is s
een
by
the
pro
tect
ion
?
Co
nve
rter
sup
ply
fro
m o
ne
sid
eF
ault
curr
ent
will
be
deliv
ered
by
the
sync
hron
ous
gene
rato
rs;
limite
d fa
ult
curr
ent
(app
.1*
I rat
edor
Ipr
eloa
d) c
omes
e.
g. f
rom
the
win
d fa
rm
Co
nve
rter
sup
ply
fro
m b
oth
sid
esF
ault
curr
ent
is li
mite
d fr
om b
oth
side
s (a
pp.
1*I r
ated
or lo
wer
)
Cri
tica
l ar
e u
nsy
mm
etri
cal
fau
lts:
SD
LWin
dV
: re
quire
s re
activ
e po
wer
(p
ositi
ve s
yste
m)
+ f
ault
ride
thro
ugh
supp
ort
HV
DC
: F
ault
curr
ent
of 1
* I r
ated
with
a
posi
tive
and
nega
tive
syst
em im
peda
nce
Co
nve
nti
on
al s
up
ply
Suf
ficie
nt f
ault
curr
ent
will
be
deliv
ered
for
al
l fau
lts v
ia t
he s
ynch
rono
us g
ener
ator
s
2014
Oct
ober
15-
16
Un
rest
rict
ed ©
Sie
men
s A
G 2
014
All
rig
hts
res
erve
d.
Pag
e 12
Dr.
H-J
. Her
rman
n / I
C S
G E
A P
RO
Co
nve
rter
Sta
tio
n -
Fau
lt C
urr
ents
W
hic
h f
ault
cu
rren
t is
see
n b
y th
e p
rote
ctio
n?
Pre
sent
des
ign
of t
he c
ontr
ol:
Con
vert
ers
supp
ly a
pos
itive
seq
uenc
e cu
rren
t (S
DLW
indV
)
Wit
ho
ut
neg
ativ
e se
qu
ence
imp
edan
ce
and/
or c
onve
rter
impe
danc
e th
ere
is n
o sh
ort-
circ
uit
curr
ent
–ev
en if
all
tran
sfor
mer
sta
r po
ints
are
ear
thed
T
he
con
tro
l sy
stem
of
con
vert
ers
mu
st b
e ad
apte
d if
nec
essa
ry.
A n
egat
ive
seq
uen
ce s
ou
rce
imp
edan
ce is
req
uir
ed.
P
rote
ctio
n b
ehav
ior
mu
st b
e ev
alu
ated
(si
mu
lati
on
+ t
est)
L1-
E
No
neg
ativ
e se
qu
ence
cu
rren
t I2
Presentation 6.13
© OMICRON – Asia-Pacific Protection & Testing Conference 2014
2014
Oct
ober
15-
16
Un
rest
rict
ed ©
Sie
men
s A
G 2
014
All
rig
hts
res
erve
d.
Pag
e 13
Dr.
H-J
. Her
rman
n / I
C S
G E
A P
RO
Co
nve
rter
Sta
tio
n -
Fau
lt C
urr
ents
Pra
ctic
al f
ault
cas
e
Pha
se t
o ea
rth
faul
t on
the
OH
L
curr
ent vo
ltage
Zer
o s
equ
ence
cu
rren
t is
onl
y de
liver
ed f
rom
the
tra
nsfo
rmer
No
faul
t cu
rren
t co
ntrib
utio
n fr
om t
he w
ind
farm
21 Z<
2014
Oct
ober
15-
16
Un
rest
rict
ed ©
Sie
men
s A
G 2
014
All
rig
hts
res
erve
d.
Pag
e 14
Dr.
H-J
. Her
rman
n / I
C S
G E
A P
RO
Ch
ang
ed N
etw
ork
To
po
log
yS
ea C
able
Ap
plic
atio
n i
n O
ffsh
ore
Win
d F
arm
s
Thi
s co
nfig
urat
ion
lead
s to
tr
ansi
ents
Clo
sin
g t
he
CB
fro
m o
ne
sid
e:In
rush
cur
rent
with
NO
zer
o cr
ossi
ng
de
laye
d tr
ip n
eces
sary
to
avoi
d st
ress
with
the
CB
Fau
lt c
urr
ent
is n
ot
sin
uso
idal
:D
epen
ding
on
desi
gn o
f th
e co
ntro
l ha
rmon
ics
may
be
poss
ible
re
actio
n of
the
pro
tect
ion
mus
t be
eva
luat
ed
1-p
has
e fa
ult
in
th
e ca
ble
:F
aulty
pha
se h
as z
ero
cros
sing
s, b
ut
unfa
ulte
d ph
ases
don
’t ha
ve z
ero
cros
sing
dela
yed
trip
of
unfa
ulte
d ph
ases
(
exte
nsio
n in
pro
tect
ion)
2014
Oct
ober
15-
16
Un
rest
rict
ed ©
Sie
men
s A
G 2
014
All
rig
hts
res
erve
d.
Pag
e 15
Dr.
H-J
. Her
rman
n / I
C S
G E
A P
RO
Ch
ang
ed N
etw
ork
To
po
log
yO
verh
ead
Lin
e in
Co
mb
inat
ion
wit
h C
able
s
Req
uire
men
t fr
om t
he E
nerg
y Li
ne E
xten
sion
Act
(20
09):
Pilo
t pr
ojec
t w
ith c
able
sec
tions
(pow
er:
1.80
0 M
W, c
able
leng
th:
3 an
d 10
km
, in
sum
12
cabl
es in
par
alle
l N
ew s
itu
atio
n f
or
pro
tect
ion
(au
to r
eclo
sin
g m
ust
be
avo
ided
at
cab
le f
ailu
res)
Pro
tect
ion
co
nce
pt
is f
easi
ble
.D
evic
es a
re a
vaila
ble
on t
he m
arke
tN
ew:
Saf
e p
ow
er s
up
ply
for
pro
tect
ion
dev
ices
So
urc
e:
Wü
hrm
an
nA
mp
rion
87
87
87 21
87 21
Pro
tect
ion
Inte
rfa
ce
OH
L
Cab
le
21
21
Pro
tect
ion
com
mun
icat
ion
Blo
ckin
g of
AR
Pow
er S
upp
lyD
evi
ces
+-
400
V A
C
VT
1V
T2
Fau
lt lo
catio
n (o
ptio
n)
OH
L
2014
Oct
ober
15-
16
Un
rest
rict
ed ©
Sie
men
s A
G 2
014
All
rig
hts
res
erve
d.
Pag
e 16
Dr.
H-J
. Her
rman
n / I
C S
G E
A P
RO
Un
pre
dic
tab
le L
oad
Flo
wT
emp
ora
ry O
verl
oad
in
flu
ence
s P
rote
ctio
n S
etti
ng
s
Max
imum
load
has
an
influ
ence
on
prot
ectio
n fu
nctio
ns
Set
tings
mus
t be
eva
luat
ed:
Ove
rload
, ov
ercu
rren
t an
d di
stan
ce p
rote
ctio
n
Dis
tan
ce P
rote
ctio
n:
Load
influ
ence
ver
sus
sens
itivi
ty a
t h
igh
-res
isti
vefa
ults
Dis
cuss
ion
du
rin
g E
TG
co
nfe
ren
ce i
n 2
012:
Mea
sure
d fa
ult
res
ista
nce
< 3
0 Ω
(400
kV
)U
min
= 0
,85*
400k
V,
=37
°,
+ s
afet
y m
argi
nLi
mit:
ILo
adm
ax=
373
0 A
Dis
cuss
ion
in
No
rth
Am
eric
aZ
one
3 pr
oble
m
Max
imu
m l
oad
an
d m
inim
um
sh
ort
-cir
cuit
cu
rren
t in
flu
ence
th
e ch
arac
teri
stic
des
ign
Impr
ovem
ent
of t
he d
ista
nce
prot
ectio
n is
ne
cess
ary
(Res
earc
h)
Ada
ptiv
e ch
arac
teris
tic
New
mea
surin
g m
etho
ds f
or h
igh-
resi
stiv
e fa
ults
Lo
ad r
an
ge
373
0 A
Prot
ectio
nlim
it ra
nge
Pic
k-u
p zo
ne
Sa
fety
ma
rgin
loa
d
Arc
-lim
it
R
jX
Presentation 6.14
© OMICRON – Asia-Pacific Protection & Testing Conference 2014
2014
Oct
ober
15-
16
Un
rest
rict
ed ©
Sie
men
s A
G 2
014
All
rig
hts
res
erve
d.
Pag
e 17
Dr.
H-J
. Her
rman
n / I
C S
G E
A P
RO
Su
mm
ary,
Co
ncl
usi
on
S
mar
t G
rid in
fluen
ces
the
tran
smis
sion
grid
and
has
add
ition
al in
fluen
ce o
n pr
otec
tion
and
cont
rol.
T
he p
rese
nt t
echn
olog
y (h
ardw
are,
com
mun
icat
ion
and
softw
are
stru
ctur
e) o
f IE
Ds
is r
eady
to
fulfi
ll th
e ne
w c
halle
nges
.
In
som
e ap
plic
atio
ns th
e pr
esen
t te
chno
logy
/ de
vice
s ca
n be
use
d. O
nly
engi
neer
ing
wor
k is
req
uire
d (e
.g.
over
head
line
–ca
ble
com
bina
tion)
.
O
ther
app
licat
ions
nee
d ad
ditio
nal i
nves
tigat
ion/
res
earc
h w
ork
to u
nder
stan
d th
e ne
w p
heno
men
a, t
o de
velo
p ad
ditio
nal f
unct
iona
lity
or m
odify
pre
sent
fu
nctio
ns.
F
or s
elec
tive
oper
atio
n th
e pr
otec
tion
need
s fa
ult c
urre
nts.
To
impr
ove
the
cont
rol o
f co
nver
ters
as
wel
l the
pro
tect
ion
sim
ulat
ions
and
tes
ts a
re n
eces
sary
.
To g
uar
ante
e th
e sy
stem
sta
bili
ty o
f S
mar
t G
rid
s ad
dit
ion
al
inve
stm
ent
in p
rote
ctio
n a
nd
co
ntr
ol
is n
eces
sary
.
Presentation 6.15
© OMICRON – Asia-Pacific Protection & Testing Conference 2014