SEZ Development Plans of Myanmar & Opportunities for Korea Investors
Presented by
Thurane Aung (Christopher) Dagon International Ltd
SEZ Authority The Central Body is the main authority of all the Special Economic Zones in Myanmar and is chaired by the President of the Republic of the Union of Myanmar. Under the Central Body, there is the Central Working Body, chaired by a Vice President of the Republic of the Union of Myanmar. Then the Management Committees of each SEZ in Myanmar are established as the investment licensing authorities of their respective SEZs in Myanmar.
Why Develop in Dawei?
Kyauk Phyu SEZ
9
THILAWA SEZ
Presented by Thurane Aung (Christopher), Project Director
1) Outline
Developer
Project Area
Schedule
Contractor
: Myanmar Japan Thilawa Development Ltd. (Established on 10th January 2014) -Japanese Consortium : 39% -Japanese Government (JICA): 10%
-Myanmar Consortium : 41% -Myanmar Government : 10%
: 396ha (Class A. Advanced development area) *Including 35ha of residential / commercial area *Total area = 2,400ha
: November 2014 – Start handing over the land June 2015 – Completion of Phase 1 project
: PENTA-SUNTAC PARTNERSHIP
2) Organization Chart
Japan Consortium
39%
Regional Community
Admin & HR
Myanmar Japan
Joint Venture BOD
SEZ Management
Committee
10%
Myanmar Consortium
41%
Vice President Vice President
Operation Sales & Marketing
Officers Myanmar
Japan
President
Finance
Deputy CFO
Japan : 49% Myanmar : 51%
JICA (scheduled)
10%
29 Oct 2013
PRESIDENT U THEIN SEIN VISIT TO THILAWA SEZ
VICE PRESIDENT U NYAN TUN VISIT TO THILAWA SEZ
3) Location
23km southeast of Yangon city
Nearly 1 hour drive
4) Construction
• Land Grading : Cut 1,400,000m3 / Fill 1,140,000m3 • Internal Road (Total length 7,464m) • Drainage (Total length 12,318m)
*Retention pond will be set up • Water Supply System (Total length 1,430m)
*Water purification plant (6,000m3/day) *Will be expanded in the future
• Sewerage Treatment System (4,800m3/day) *Will be expanded in the future
• Power Supply System (Total length 7,777m) : 33kV distribution line
• Telecommunication : Optical Fiber Cable
5) Others
• Solid Waste Treatment Facility Operated by Japanese Company
• One Stop Service Center (OSSC) The locators can complete almost all the governmental procedures at One Stop Service Center
• Vocational Training Center Vocational Training Center operated by Japanese Company
• Surrounding Infrastructure 50MW Power Plant will be constructed soon by Myanmar Government
6) Phasing for Zone A
20
Phase 2
Phase 1
R&C
Expansion of Road
Substation
Distribution Line (33kV)
Gas Pipeline Water Supply Pipe
New Container Port
Current Substation
Power Plant (50MW)
Transmission Line (230kV)
Current Thilawa Railway
Current Thilawa Int’l Port
7) Infrastructure (To be improved by JICA yen loan)
Current Zar Mani Dam
8) Layout of Zone A
Administrative Building
Water Purification Plant
Sewerage Treatment Plant
Retention Pond
Water purification plant
6,000t/day(Beginning)
Sewerage treatment plant
3,600t/day(Beginning)
Phase 1
Phase 2
Phase 3 Residential / Commercial
9) Schedule
*The above schedule is changeable depending on the situation
Subject Oct
2013 Nov 2013
Dec 2013
Jan 2014
Early 2014
Latter 2014
Middle 2015
Joint venture agreement
Ground-breaking ceremony
Establishment of JV company
Start construction
Completion of phase 1 project
Start selling
Start handing over the land
★ 29th Oct
★ 30th Nov
★
★
★
★
★
10) Sales Progress
Signed Reservation Agreement41 Japan 21 Myanmar 5 Taiwan 4 Thailand 3 Singapore 2 China 1 Sweden 1 USA 1 Australia 1 Hong Kong 1 Malaysia 1
Signed Sublease Agreement 25 • 12 Japanese Investors
manufacturing such as Glove, Garment, Stuffed Toy, Radiator, Audio Equipment and Waste Treatment
• 1 China Garment Manufacturing • 1 USA, Aluminum Can
Manufacturing • 3 Thailand, Steel Products • 1 Singapore, PET preform • 1 Sweden, Garment • 4 Taiwan, Steel Structure • 1 Myanmar, Plastic Household
product • 1 Myanmar, for R&C property
development • 1 Hong Kong, Garment
Manufacturing
as of 13th Mar 2014
as of 13th Mar 2014
as of 13th Mar 2014
as of 13th Mar 2014
as of 13th Mar 2014
as of 13th Mar 2014
as of 13th Mar 2014
as of 13th Mar 2014
as of 13th Mar 2014
as of 13th Mar 2014
as of 13th Mar 2014
as of 13th Mar 2014
as of 13th Mar 2014
as of 13th Mar 2014
as of 13th Mar 2014
as of 13th Mar 2014
as of 13th Mar 2014
as of 13th Mar 2014
as of 13th Mar 2014
as of 13th Mar 2014
as of 13th Mar 2014
as of 13th Mar 2014
as of 13th Mar 2014
38 40B THILAWA SEZ RESIDENTIAL AND COMMERCIAL AREA August 2014
46L THILAWA SEZ RESIDENTIAL AND COMMERCIAL AREA August 2014
46E THILAWA SEZ RESIDENTIAL AND COMMERCIAL AREA August 2014
46F THILAWA SEZ RESIDENTIAL AND COMMERCIAL AREA August 2014