AFRICAN DEVELOPMENT FUND

SENEGAL VIRTUAL UNIVERSITY SUPPORT PROJECT (PAUVS)

COUNTRY : REPUBLIC OF SENEGAL

PROJECT APPRAISAL REPORT

OSHD DEPARTMENT

November 2013

Translated Document

Page 2: Senegal - Senegal Virtual University Support Project - Appraisal Report … · 2019. 6. 29. · ANAQ-Sup National Quality Assurance for Higher Education Authority ANSD National Statistics

TABLE OF CONTENTS

Currency Equivalents, Fiscal Year, Weights and Measures, Acronyms and Abbreviations, Project Brief,

Results-Based Logical Framework, Implementation Schedule…………………… i - viii

I. STRATEGIC THRUST AND RATIONALE............................................................................................ 1

1.1 PROJECT LINKAGES WITH COUNTRY STRATEGY AND OBJECTIVES ................................................................... 1

1.2 RATIONALE FOR BANK’S INVOLVEMENT ........................................................................................................ 1

1.3. AID COORDINATION ................................................................................................................................... 2

II. PROJECT DESCRIPTION ................................................................................................................... 3

2.1 PROJECT COMPONENTS ............................................................................................................................... 3

2.2 TECHNICAL SOLUTIONS ADOPTED AND ALTERNATIVES EXPLORED ................................................................. 4

2.3. PROJECT TYPE ........................................................................................................................................... 5

2.4. PROJECT COST AND FINANCING ARRANGEMENT ........................................................................................... 5

2.5. PROJECT TARGET AREA AND BENEFICIARIES ................................................................................................ 6

2.6. PARTICIPATORY APPROACH IN PROJECT IDENTIFICATION, DESIGN AND IMPLEMENTATION ............................. 7

2.7. BANK GROUP EXPERIENCE AND LESSONS REFLECTED IN PROJECT DESIGN ..................................................... 7

2.8. KEY PERFORMANCE INDICATORS.................................................................................................................. 8

III. PROJECT FEASIBILITY ...................................................................................................................... 8

3.1. ECONOMIC AND FINANCIAL PERFORMANCE .................................................................................................. 8

3.2 ENVIRONMENTAL AND SOCIAL IMPACT ......................................................................................................... 9

IV. IMPLEMENTATION ........................................................................................................................... 12

4.1. IMPLEMENTATION ARRANGEMENTS ............................................................................................................... 12

4.2 MONITORING ............................................................................................................................................. 13

4.3 GOVERNANCE ............................................................................................................................................ 14

4.4 SUSTAINABILITY ......................................................................................................................................... 15

4.5 RISK MANAGEMENT. ................................................................................................................................... 15

4.6 KNOWLEDGE BUILDING .............................................................................................................................. 16

V. LEGAL FRAMEWORK ......................................................................................................................... 16

5.1 LEGAL INSTRUMENT .................................................................................................................................. 16

5.2 CONDITIONS ASSOCIATED WITH BANK INTERVENTION ................................................................................. 16

5.3 COMPLIANCE WITH BANK POLICIES ............................................................................................................ 17

VI. RECOMMENDATION ............................................................................................................................. 17

Page 3: Senegal - Senegal Virtual University Support Project - Appraisal Report … · 2019. 6. 29. · ANAQ-Sup National Quality Assurance for Higher Education Authority ANSD National Statistics

i

Currency Equivalents

(October 2013)

Currency Unit = CFAF

UA 1 = CFAF 754.231

UA 1 = USD 1.53481

UA 1 = EUR 1.18190

Fiscal Year

1 January – 31 December

Weights and Measures

1 metric tonne = 2204 pounds

1 kilogramme (kg) = 2.200 pounds

1 metre (m) = 3.28 feet

1 millimetre (mm) = 0.03937 inch

1 kilometre (km) = 0.62 mile

1 hectare (ha) = 2.471 acres

ACRONYMS AND ABBREVIATIONS

ADF African Development Fund

AfDB African Development Bank

ADIE State Computer Technology Agency

AFD French Development Agency

ANAQ-Sup National Quality Assurance for Higher Education Authority

ANSD National Statistics and Demography Agency

APR Annual Performance Report

ARTP Post and Telecommunications Regulatory Authority

BD Bidding Documents

BoD Board of Directors

CCB Consolidated Capital Budget

CNAES National Consultation on the Future of Higher Education

CSP Country Strategy Paper

DEEC Directorate of the Environment and Classified Establishments

DGES General Directorate of Higher Education

DWSS Drinking Water Supply and Sanitation

EES Higher Education Institution

ENO Open Digital Space

ESMP Environmental and Social Management Plan

GAFSP Food Safety Support Project in the Louga, Matam and Kaffrine Regions

ICT Information and Communication Technologies

ICTE Information and Communication Technologies for Education

IDB Islamic Development Bank

IMF International Monetary Fund

KOICA Korea International Cooperation Agency

LCB Local Competitive Bidding

M&E Monitoring and Evaluation

MEF Ministry of Economy and Finance

MESR Ministry of Higher Education and Research

Page 4: Senegal - Senegal Virtual University Support Project - Appraisal Report … · 2019. 6. 29. · ANAQ-Sup National Quality Assurance for Higher Education Authority ANSD National Statistics

ii

PACICE Inclusive Growth and Economic Competitiveness Support Programme

PADERCA Project to Support Rural Development in Casamance

PADTICE Project to Support ICT Development for Capacity-Building to Implement the Bachelors-Masters-

PhD Reform in WAEMU-based Higher Education Institutions

PAPEJF Project to Support Skills Development and Women’s and Youth Entrepreneurship for Employment

Promotion

PAPIL Small Local Irrigation Support Project

PAPSP Private Sector Promotion Support Project

PATS Technical Administrative and Service Personnel

PAUVS Senegal Virtual University Support Project

PCMU Project Coordination and Monitoring Unit

PDESR Higher Education and Research Development Plan

PEPAM Millennium Drinking Water and Sanitation Programme

PER Teaching and Research Staff

PGF-Sup Results-Based Higher Education Governance and Financing Project

PNPM National Procurement Procedures

PP Procurement Plan

PPC/PNDL Community Roads Project in Support of the National Local Development Programme

PREFELAC Project to Restore the Ecological and Economic Functions of Lake Guiers

SADC Southern African Development Community

SNDES National Economic and Social Development Strategy

TFP Technical and Financial Partner

UA Unit of Account

UADB Alioune Diop University of Bambey

UASZ Assane Seck University of Ziguinchor

UCAD Cheikh Anta Diop University of Dakar

UGB Gaston Berger University of Saint Louis

UNESCO United Nations Educational, Scientific and Cultural Organization

USAID United States Agency for International Development

USSK Sine Saloum University of Kaolack

UT University of Thiès

UVA African Virtual University

UVS Senegal Virtual University

VPN Virtual Private Network

VSME Very Small- and Medium-Sized Enterprise

WAEMU West African Economic and Economic Union

WB World Bank

Page 5: Senegal - Senegal Virtual University Support Project - Appraisal Report … · 2019. 6. 29. · ANAQ-Sup National Quality Assurance for Higher Education Authority ANSD National Statistics

iii

Project Brief

Client____________________________________________________________________

BORROWER : Republic of Senegal

EXECUTING AGENCY : Ministry of Higher Education and Research

Financing Plan__________________________________________________________________

Source Amount (UA) Instrument

ADF

3,380,000

Loan

Government 1,100,000 Counterpart

contribution TOTAL COST 4,480,000

Important ADF Financial Information________________________________________

Loan Currency: UA

Type of Interest: NA

Interest Rate Margin: NA

Commitment Fee: 0.50%

Service Fee: 0.75%

Maturity: 50 years

Grace Period: 10 years

ERR; NPV (baseline scenario) :

Time Frame – Key Milestones

(expected)______________________________________________

Concept Note Approval

October 2013

Negotiations November 2013

Project Approval December 2013

Effectiveness January 2014

Completion December 2016

Page 6: Senegal - Senegal Virtual University Support Project - Appraisal Report … · 2019. 6. 29. · ANAQ-Sup National Quality Assurance for Higher Education Authority ANSD National Statistics

iv

PROJECT SUMMARY

Project Overview

The Senegal Virtual University Support Project (UVS) aims to promote the equitable

access of young GCE ‘A’ Level holders of both sexes to higher education in Senegal and

foster their professional integration. The UVS technology-based approach rests on the

intensive use of ICTs. The five (5) Open Digital Spaces (ENO) planned in this phase will

make it possible to reach youth in the Dakar suburbs, Saint Louis, Thiès, Kaolack and

Ziguinchor. Scheduled to span three years, this project will help to establish a technological

platform (UVS head office and five ENOs), continue the design of training modules and train

trainers. Its total cost is UA 4.48 million, financed by an ADF loan (UA 3.38 million) and a

counterpart contribution by the Government of Senegal (UA 1.10 million). A total of 6,000

students can be admitted yearly as soon as the infrastructure is in place. Project support

measures will enable 5,000 students to have laptop computers through the “one student, one

PC” programme. Student’s access to the Internet will be facilitated by conventions with

private telecommunication service providers and the State’s Computer Technology Agency

(ADIE).

Needs Assessment

State-sponsored higher education in Senegal faces a two-fold challenge: regional and

gender-based disparities in access and a high rate of unemployment among graduates,

standing at around 15.9%. Regions that are home to GCE “A” Level holders lack sufficient

higher education structures to accommodate all of them. Women represent only 33.23% of

student enrolments whereas they constitute 52% of the total population. Public higher

education institutions are saturated and the recent policy of transferring GCE ‘A’ level

holders to private establishments has not helped to satisfy growing needs. In this context, and

faced with the problem of unemployed graduates, alternatives must be found urgently to not

only increase higher education offer but also ensure its adequacy with job market needs.

Created by Decree No. 2013-1294 of 25 September 2013, UVS bases itself on the national

ICT-friendly context to propose alternatives.

Bank’s Value Added

The Bank has several education sector interventions whose useful lessons are reflected in

this operation. The project supplements the four projects already financed by the Bank in the

education/training sector in Senegal (Education Projects I, II, III and IV) and which

contributed to improving primary and secondary access and quality. The Bank’s portfolio

performance in Senegal was deemed satisfactory overall (scoring 2.49 on a scale from 0 to 3).

The main lessons reflected in this project’s design concern the need to not only tailor

curricula to real job market needs, but to also strengthen the quality and relevance of the

training of trainers and emphasize the need to monitor construction works. Further, the

project’s design also benefited from experience acquired regionally through various projects

designed to support the African Virtual University (AVU), Higher Education in WAEMU

countries and the development of distance training in Southern African countries (SADC), all

of which have virtual education components. The national context is conducive since Senegal

has good international connectivity and solid network infrastructure nationally. This project

also supplements the Youth and Women’s Employment Promotion Support Project (PAPEJF)

approved in 2013, since UVS contributes to the employability of youths and women who, as

project developers, can also be eligible to PAPEJF financing.

Page 7: Senegal - Senegal Virtual University Support Project - Appraisal Report … · 2019. 6. 29. · ANAQ-Sup National Quality Assurance for Higher Education Authority ANSD National Statistics

v

Knowledge Building

The project design process offers a source of knowledge for the Bank in terms of setting

up a virtual university in a national context. This experience supplements the one acquired

through regional operations (UVA projects and SADC Project). This operation, undertaken in

a country that is doing much to implement the ICTs, will be of help in adapting similar

interventions to less favourable contexts. Information on this experience will be put at the

disposal of the public via the Bank’s communication channels.

Page 8: Senegal - Senegal Virtual University Support Project - Appraisal Report … · 2019. 6. 29. · ANAQ-Sup National Quality Assurance for Higher Education Authority ANSD National Statistics

vi

Senegal: Senegal Virtual University Support Project (PAUVS)

Results-Based Logical Framework

Country and Project Name: Senegal Virtual University Support Project

Project Goal: To contribute to the development of human capital through certificate-based and efficient training that favours better integration of young graduates

Results Chain PERFORMANCE INDICATORS MEANS OF

VERIFICATION

RISKS/

MITIGATION MEASURES Indicator (including CSIs) Baseline

Situation

Target

IMP

AC

T

Improvement of the socio-

professional integration of young

graduates

1.Unemployment rate of higher education graduates

2. Integration rate of UVS graduates three years on

15.9% in 2011

NA* in 2013

12% in 2020

80% of graduates in 2020 (85% among girls)

- Higher Education Statistical Directory

- Employment study and survey

reports - Surveys on graduates

EF

FE

CT

S

1.

Admission of freshmen into EES increases

1. Proportion of new students enrolled in UVS (including % of girls)

2. Number of higher education students

per 100,000 people

0 in 2013

906 students /100,000

people in 2012

8% (including 40% of

girls) in 2016

1,414 students for 100,000

people in 2018

Higher Education Statistical

Directory

Risk: Inadequacy between training and

job market needs

Mitigation measure: Selection of

training streams with high employability

potential

2.

Young UVS graduates are better

integrated in professional life

1.Pass rate among UVS final year students

(Bachelors Y3)

2. Percentage of UVS graduates having

found employment 12 months after graduation (including percentage of girls)

Non-existent in

2013

NA in 2013

75% in 2018, or 77%

among girls in 2018

50% of graduates in 2018

(60% among girls)

Higher Education Statistical

Directory

OU

TC

OM

ES

Component 1: Establishment of the UVS Platform

1. 1 Central structure of UVS and 5 ENOs are

established

1. Central structure operational

2. ENOs operational

3. UVS strategic plan finalized

1. Non-existent in

2013

2. 0 in 2013

3. Non-existent in

2013

1. 01 in 2014 2. 05 in 2015

3. 01 in 2014

UVS progress reports

Risk: Delays in building the ENOs and

the central structure

Mitigation measure: Early design of

BDs for selection of a specialized

consulting firm and control bureau for

construction works

Risk: An unstable electricity network

may prevent permanent access to good

connection

Mitigation measure: There are plans by

ENO to procure a power generator

1..2. Creation of digital

library

1) Number of FO digital libraries

2) Percentage of UVS students having a

laptop computer (including % of girls)

1) 0 in 2014

2) 0 in 2013

1) 01 in 2016

2) 100% (including 40%

of girls) in 2016 Higher Education

Statistical Directory

Component 2: Capacity-Building

2.1. Legal framework Adoption of instruments on UVS Decree adopted

in 2013

All implementing

instruments of the

decree in 2014

Official Gazette

Page 9: Senegal - Senegal Virtual University Support Project - Appraisal Report … · 2019. 6. 29. · ANAQ-Sup National Quality Assurance for Higher Education Authority ANSD National Statistics

vii

2.2. The capacity of higher education staff is

strengthened

1. Percentage of UVS PER (including %

of women) having participated in at least 3

seminars on distance education 2. Percentage of UVS PAT (including

percentage of women) trained in the

design of distance education modules

1) 0% in 2013

2) 0% in 2013

1) 100% (including 40%

of women) in 2016;

2) 60% (40% women) in

2016

UGP progress reports,

ANSD surveys

Risk: Teachers are slow/reticent to

adjust to new approaches

Mitigation measure:

Sensitization and training

2.3. Access to electronic

resources is facilitated for various socio-professional

groups in regional

development poles

1. Percentage of students in public and

private universities using the electronic resources of UVS;

2. Percentage of socio-economic groupings of ENO-based localities using

UVS’s electronic resources

1) 0% in 2013

2) 0% in 2013

1. 30% in 2016

3. 30% in 2016

Progress reports; surveys

Component 3: Management and Coordination

3.1. Project coordination

and management

1. Contract staff recruited

2. Equipment procured

3. Periodic reports produced 4. Audit reports produced

1. NA in 2013

2. NA in 2013 3. NA in 2013

4. NA in 2013

In 2014

1. 100% contract staff

2. 100% of equipment 3. 4 reports yearly

4. 1 report yearly

Progress and audit reports

COMPONENTS RESOURCES

Component 1: Establishment of UVS platform ADF: UA 3.38 million: Government: UA 1.10 million

Comp.1: 3.82

Comp.2: 0.22 Comp. 3: 0.44

Component 2: Capacity-building

Component 3: Project coordination and management

*NA = Not Applicable

Page 10: Senegal - Senegal Virtual University Support Project - Appraisal Report … · 2019. 6. 29. · ANAQ-Sup National Quality Assurance for Higher Education Authority ANSD National Statistics

viii

Project Implementation Schedule

Page 11: Senegal - Senegal Virtual University Support Project - Appraisal Report … · 2019. 6. 29. · ANAQ-Sup National Quality Assurance for Higher Education Authority ANSD National Statistics

1

REPORT AND RECOMMENDATION OF MANAGEMENT CONCERNING A PROPOSAL

TO GRANT A LOAN TO THE REPUBLIC OF SENEGAL TO FINANCE THE SENEGAL

VIRTUAL UNIVERSITY SUPPORT PROJECT

Management hereby submits this report and recommendations concerning a proposal to grant

an ADF loan of UA 3.38 million to the Republic of Senegal, to finance the Senegal Virtual

University Support Project (PAUVS).

I STRATEGIC THRUST AND RATIONALE

1.1 Project Linkages with Country Strategy and Objectives

1.1.1 The project is consistent with Government’s objective of making higher

education the main lever for socio-economic development. It is based on Priority I

(“employment, SME/SMI development, infrastructure and food security”) of the National

Economic and Social Development Strategy (SNDES, 2013-2017) centred on growth,

productivity and wealth-creation, Priority 2 of same (“human capital, social protection and

sustainable development”) and Pillar I of CSP 2010-2015 (“support for inclusive growth

through diversification and economic integration”), revised at mid-term. It is against this

backdrop that Senegal in April 2013 organized a National Consultation on the Future of

Higher Education (CNAES), which led to the Higher Education and Research Development

Programme (PDESR 2013-2017). The Presidential Decisions on higher education and

research give precise guidelines on the implementation of PDESR, focusing particularly on

practical training better tailored to employment.

1.1.2 Disparities at the level of higher education

access and the high unemployment rate of

graduates are the two main worries of higher

education in Senegal. Current student enrolments are

estimated at over ninety thousand (90,000 of which

33.23% women) in the public sector and about 35,000

in the private sector, with a rapid increase in the

current number of GCE “A” Level holders from

secondary education eligible for higher education.

Higher education offer is unevenly distributed

nationwide. With regard to gender, women are under-

represented in public universities (33.23% of

enrolments on average) whereas they constitute close

to 52% of the country’s population. Besides, the rate

of unemployment of higher education graduates

(close to 16%) is the highest in the education and training system. UVS aims to contribute to

the solution of these two thorny issues.

1.2 Rationale for Bank’s Involvement

1.2.1 UVS constitutes a key link in the operationalization of PDESR as far as fairer

access and professionalization are concerned. The current situation stems from the poor

diversification of offer, which leaves young ‘A’ Level holders with few options and limits

their employability after school. Public offer of education is mainly based on long-duration

general training (BA/Masters) in general streams, with very few short-duration professional

5

4

3

2

1

#DIV/0! 8,6%11,8%

13,9%12,7%15,9%

0,0%

10,0%

20,0%

30,0%

40,0%

50,0%

60,0%

70,0%

Combined unemployment

and under-employment

rate

Figure 1: The more educated, the higher the unemployment rate, 2011 (ANSD and calculations)

Source: ANSD et calculs des auteurs, à partir des données de l'ESPS de 2011.

Page 12: Senegal - Senegal Virtual University Support Project - Appraisal Report … · 2019. 6. 29. · ANAQ-Sup National Quality Assurance for Higher Education Authority ANSD National Statistics

2

and technical training courses1. In most public universities in the country, the traditional

method of teaching and training is based on physical presence, despite the clear benefits of

the virtual approach. UVS’s action is underpinned by several levers, including: (i) the

opening of short-duration professional training streams2; and (ii) the creation of para-

scientific courses that will receive students from the arts series and train them in

technical/scientific trades. Additional information on training streams is attached as

Technical Annex B1.2.

1.2.2 The national context is favourable to the development of e-learning. Senegal has

good international connectivity and solid networking infrastructure nationally. As part of

UVS, a partnership agreement was signed with the State Computer Technology Agency,

(ADIE), which manages Government intranet whose optic fibre network covers 75% of the

country and will offer its services to UVS. The country also has a good number of private

telecommunication service providers, including mobile services, which can offer quality

services to UVS. It also has experience in distance education: (i) through its cooperation with

Agence Universitaire de la Francophone (Francophone University Association - AUF); (ii) at

UGB where the African Virtual University Centre is established; and (iii) with the African

Distance Education Network (RESEFAD) by using e-learning to improve the quality of

continuing training of lecturers, and several initiatives at the level of UCAD, Ecole des

Bibiliothécaires et des Archivistes [Institute of Librarians and Archivists] (EBAD) and

CESAG. Lessons from these experiences were reflected in the design of PAUVS.

1.2.3 The project is in line with the Bank’s strategies and strengthens its role as the

country’s key stakeholder in skills development. UVS seeks to impart life skills to the

youths – which is consistent with the “Skills and technology” operational priority of the

Bank’s Long-Term Strategy 2013-2022. This project also supplements PAPEJF since UVS

contributes to the employability of youths and women who, as project developers, can

become eligible for PAPEJF financing. The Bank plays an essential catalytic role by

supporting the establishment of UVS’s central structure and the first 5 ENOs.

1.3 Aid Coordination

Several development partners are involved in education – particularly higher

education and training. Dialogue with Government is within the enlarged G-50 Group that

the Bank currently co-chairs with USAID. The Bank also regularly takes part in the

Education Thematic Group, chaired by USAID and comprising the Government and technical

and financial partners (TFPs). Several on-going operations financed by TFPs offer a potential

of synergy with UVS. The Results-Based Higher Education Governance and Financing

Project (PGF-Sup) financed by the World Bank supports governance reforms, quality

assurance, greater access, the upgrading of existing networks, the establishment of a

centralized information system and balancing of the budget for universities. The same is true

of Canada’s budget support operation to implement new reforms in the sector. Further, the

Education and Agriculture Research Project (ERA) financed by USAID centres on

agriculture-based higher education training, research and governance. The following table

presents the main amounts currently committed in higher education in Senegal.

1 National Consultation on the Development of Higher Education in Senegal (April 2013) 2 Several training streams were defined based on the needs identified. These are short-duration training courses (professional BA) aimed

at giving basic notions in sustained streams for the development of skills corresponding to job market needs (cf. Technical Annex

B.1.2).

Page 13: Senegal - Senegal Virtual University Support Project - Appraisal Report … · 2019. 6. 29. · ANAQ-Sup National Quality Assurance for Higher Education Authority ANSD National Statistics

3

Table 1

Development Partners’ Contribution

Sector or sub-sector* Scope

GDP Exports Labour

Higher educ. sub-sector 7.2% 19% (2011) Approx. 70%

Stakeholders – Public Expenditure (on-going programmes or projects)

Government Donors Amounts (CFAF billion) Period

CFAF 102.5 to 141 billion

(2014-2017)

AfDB 20

Active Portfolio

2009-2013

WB 50 Portfolio 2012-2016

Other TFPs

(Canada, IDB,

Commodity

Aid, KOIKA)

78.7

Active Portfolio

2014-2018

Level of Aid Coordination

Existence of thematic working groups Yes

Existence of a comprehensive sector-based programme Yes, PAQUET prepared

II. PROJECT DESCRIPTION

2.1 Project Components

2.1.1 The overall objective of the project is to contribute to human capital

development through efficient training that leads to qualification, to foster better

integration of young graduates. Specifically, the project aims to establish the UVS, its

physical terminals and the ENOs so as to increase access to higher education and strengthen

the professionalization of teaching and training.

2.1.2 Project implementation will span three years. Its components and activities are

summarized in the following table.

Table 2:1 : Project Components Component Cost Description

1. Establishment

of the UVS

platform

UA 3.824 million This component seeks to build and equip the UVS head office and the 5 Open

Digital Spaces (ENOs). The main activity areas are: construction and

equipment of the UVS head office; construction and equipment of the ENOs;

opening of a digital library to facilitate access of public and private university

students to electronic resources.

2. Capacity

building

UA 0.22 million The concern here is to put in place the UVS institutional and pedagogic

framework, pursuant to the decree establishing the UVS adopted on

23/09/2013. The main activity areas are: draft instruments governing these

new degrees; design new curricula and training benchmarks; train teaching

and research staff (PER) and technical administrative and service staff

(PATS) in distance education; sensitize and train socio-economic groups on

the use of ENO resources (men and women).

3. Project

coordination

and

management

UA 0.44 million

This component seeks to establish an appropriate arrangement to coordinate

and monitor project implementation and ensure its sound operation. The main

activity areas for project implementation are: staff recruitment; equipment;

technical assistance; monitoring/evaluation; audit; operation of the executing

agency; capacity-building of the executing agency and other stakeholders

involved; communication.

Page 14: Senegal - Senegal Virtual University Support Project - Appraisal Report … · 2019. 6. 29. · ANAQ-Sup National Quality Assurance for Higher Education Authority ANSD National Statistics

4

2.1.3 The UVS head office will be constructed in Cité du Savoir (“City of

Knowledge”) at Diamniadio (30 km from Dakar). UVS is a public university created by

decree and enjoys the same advantages as other State universities. Its programmes are aligned

on the national BMD programmes. The Cité du Savoir3 will accommodate public and private

institutions. The new General Directorate of Higher Education (DGES) and the National

Authority for Quality Assurance in Higher Education (ANAQ-Sup) are expected to be

constructed there in 2014 with PGF-Sup financing (World Bank). The UVS head office will

benefit from a State intranet connection managed by ADIE (covering over 75% of the

country), facilitating its link with the ENOs.

2.1.4 The location of the first ENOs to be constructed primarily considers the

geographic distribution of most GCE “A” Level holders having UVS as their first

choice. Further, State intranet is available in these zones. Measures are being taken to extend

Intranet coverage to virtually the whole country in 2014. The platform of national private

operators is expected to be used in zones not covered by Intranet.

2.1.5 The UVS technological platform operates on the basis of the following general

principles:

Pedagogic content produced at the UVS head office is dispatched via the

ADIE Data Centre where the UVS infrastructure is hosted. The UVS head

office and the ENOs are linked by ADIE’s Virtual Private Network (VPN).

Students access the UVS data platform through their laptop computers

connected by 3G key to the ADIE network. The specificity of this network is

that it does not depend on the Internet. It involves ADIE’s high-speed Intranet

network and guarantees the free flow of communication. Students can also

occasionally go to their ENOs to work.

ADIE is connected to the Internet via SONATEL, meaning that through their

3G key, students’ Internet access requests will be properly routed. In this way,

they can access digital libraries and other resources not hosted on the ADIE

Data Centre.

2.2 Technical Solutions Adopted and Alternatives Explored

The technical solution adopted aims to increase and diversify the public offer of

higher education (mostly for GCE “A” Level holders). The planned diversification is

underpinned by training courses that can improve the employability of youths through

identified value chains. The following table presents alternatives explored and reasons for

their rejection.

3 A Smart City that is eco-friendly and sustainable, combining ICTs and renewable energies

Page 15: Senegal - Senegal Virtual University Support Project - Appraisal Report … · 2019. 6. 29. · ANAQ-Sup National Quality Assurance for Higher Education Authority ANSD National Statistics

5

Table 2.2

Project Alternatives Explored and Reasons for their Rejection

Alternative Solution Brief Description Reason for Rejection Continuation of

Government’s policy

of transferring GCE

“A” Level holders to

private higher

education institutions

Confronted by

saturated public

universities, the

State has recently

been transferring

new “A” Level

holders to private

institutions, paying

their fees along

with scholarships

like all others.

Although conducive to private sector development, this

approach is not viable since it is very costly and hampers

the development of public universities. Further, since

most private establishments are located in Dakar and its

environs, this option does not favour social inclusion

because it does not facilitate access to higher education

for GCE “A” level holders from distant areas.

Increase the higher

education offer

generally

Construct new

universities and

offer training using

the traditional

method

This option does not consider the worldwide revolutions

underway in terms of higher education offer and the role

of ICTs in improving access, effectiveness and

efficiency.

2.3 Project Type

This is an autonomous investment project. This method was adopted (instead of

budget support, for instance) due to the project’s innovative and specific nature, and the

specific activities to be implemented (contracts to be awarded) over an average duration with

private sector involvement - which calls for pro-activeness and strict monitoring.

2.4 Project Cost and Financing Arrangement

2.4.1 The total cost of the project, net of taxes and customs duties, is estimated at UA

4.48 million, of which UA 2.24 million (50%) in foreign exchange and UA 2.24 million

(50%) in local currency. This cost is financed by an ADF loan of UA 3.38 million (75.4%)

and by the Government of Senegal for UA 1.10 million (24.6%). The ADF financing includes

UA 1.94 million from the ADF 12 country allocation and UA 1.44 million from cancelled

loans.

2.4.2 Costs were determined based on information obtained from official structures,

various national procurement stakeholders and ICT operators. A price escalation

provision of 1.5% and 3% was made for foreign exchange and local currency costs,

respectively, as well as for physical contingencies ranging from 3 to 4%, depending on the

category. Tables 2.3, 2.4 and 2.5 below present the project costs by component, source of

financing and expenditure category, and Table 2.6, the expenditure schedule by component.

The detailed costs are attached as Technical Annex B.2.

Page 16: Senegal - Senegal Virtual University Support Project - Appraisal Report … · 2019. 6. 29. · ANAQ-Sup National Quality Assurance for Higher Education Authority ANSD National Statistics

6

Table 2.3

Project Cost by Component COMPONENTS (CFAF Million) (UA Million) %

L.C. For. Exch. Total L.C.

For.

Exch. Total

For.

Exch.

Establishment of the UVS

technological platform 1,187.13 1,470.24 2,657.37 1.59 1.97 3.57 55

Capacity building 126.60 30.40 157.00 0.17 0.04 0.21 19

Project coordination and

management 249.24 56.06 305.30 0.33 0.08 0.41 18

Total Base Cost 1,562.97 1,556.70 3,119.67 2.10 2.09 4.19 50

Physical contingencies 53.10 56.94 110.04 0.07 0.08 0.15 52

Price escalation 53.89 56.25 110.15 0.07 0.08 0.15 51

Total Cost 1,669.96 1,669.90 3,339.86 2.24 2.24 4.48 50

Table 2.4

Source of Financing (UA Million)

Sources of Financing L.C. For. Exch. Total

%

of Total

ADF 2.24 1.14 3.38 75.4

Government 0.00 1.10 1.10 24.6

Total Cost 2.24 2.24 4.48 100.0

Table 2.5

Project Cost by Expenditure Category (UA Million)*

For. Exch. L.C.

Total

% For.

Exch.

1. WORKS 1.00 1.30 2.30 44

2. GOODS 0.96 0.27 1.23 78

3. SERVICES 0.08 0.31 0.39 20

4. OPERATING COST 0.05 0.21 0.27 20

Base Cost 2.09 2.10 4.19 50

Physical contingencies 0.08 0.07 0.15 52

Price escalation 0.08 0.07 0.15 51

Total Cost 2.24 2.24 4.48 50

Table 2.6

Expenditure Schedule by Component (UA Million)

COMPONENTS 2014 2015 2016 Total

Establishment of UVS technological platform 1.36 2.31 0.15 3.82

Capacity building 0.08 0.07 0.07 0.22

Project coordination and management 0.17 0.14 0.13 0.44

Total Cost 1.62 2.51 0.35 4.48

2.4.4 The ADF will finance all foreign exchange costs and participate in funding all

expenditure categories, while the Government will partly finance goods (vehicles), works and

operating costs. Table B.2.2.6 (Technical Annex B.2) summarizes activities by expenditure

category and source of financing.

2.5 Project Target Area and Beneficiaries

2.5.1 The zones of implantation of the five ENOs are: Dakar suburbs, Saint-Louis,

Thiès, Kaolack and Ziguinchor. The UVS head office (central administration) will be inside

the Cité du Savoir at Diamniadio (30 km from Dakar). The zones of implantation of the

ENOs were defined based on the strategic guidelines of the steering committee set up during

the National Consultations on the Future of Higher Education in Senegal and discussions

Page 17: Senegal - Senegal Virtual University Support Project - Appraisal Report … · 2019. 6. 29. · ANAQ-Sup National Quality Assurance for Higher Education Authority ANSD National Statistics

7

with interested stakeholders. A total of 6,000 students could be admitted therein yearly as

soon as the infrastructure is in place. The project support measures will allow for providing

laptop computers to 5,000 students through the SAMA PC (“My PC”) Programme

2.5.2 While targeting young GCE “A” Level holders essentially, the project offers the

opportunity of higher education access to several socio-economic categories. In fact, the

university map currently comprises 5 public universities. Baccalauréat examination results

for the 2000-2012 period have shown that GCE A Level holders are mainly concentrated in

the West of the country in Dakar, Thiès, Ziguinchor, Saint-Louis and Kaolack regions. It is

noteworthy that 37.89 % of students come from the Dakar region and 85% of students from

public schools attend UCAD, whose intake capacity has already been exceeded. The other

beneficiary socio-economic categories are: (i) educated women who see in UVS a model that

can receive and maintain them in higher education; (ii) GCE A Level holders (admission in

L1) and “A” Level+2 certificate holders wishing to further their studies (admission in L3);

(iii) professionals in active service, either on a private basis or as part of training contracts

based on multiple modalities: certifying or certificate-based training; development of

experience acquired; validation of professional and personal achievements; (iv) special

categories of persons with difficulties in being physically present in school: people with

disabilities (mobility impairment, etc.), people far from large urban centres; people who are

subject to high geographic mobility; and (v) the international public, as part of training or

capacity-building programmes. In the medium term, the UVS aims to be a regional training

establishment.

2.6 Participatory Approach in Project Identification, Design and Implementation

The project design benefited from the fruits of the consultative process that

culminated in the PDESR, the 23 September 2013 decree and the results of the

Presidential Council of October 2013. The UVS concept was adopted after the national

consultations that led to PDESR 2013-2017 in April 2013. Bank missions consulted key

stakeholders, namely: ministries, the Chairperson of the UVS Steering Committee, higher

education institutions already involved in e-learning, private higher education, ICT and

development partners. These consultations allowed for understanding stakeholders’

expectations, past experiences, successes obtained, difficulties encountered and best

practices. They also helped to identify possible synergies with the interventions of other TFPs

that support higher education (the World Bank, USAID, IDB, Indian Cooperation) or hope to

do so, such as Korean Cooperation (KOICA) and private sector interests (SONATEL, Korean

Telecom) interested in accompanying the Government in implementing the UVS project.

2.7 Bank Group Experience and Lessons Reflected in Project Design

2.7.1 The Bank already had a number of education sector interventions whose

implementation provided useful lessons for this operation. The project supplements the

four projects already financed by the Bank in the education/training sector in Senegal

(Education Project I, II, III and IV) and that contributed to improving primary and secondary

education access and quality. The performance of the Bank’s portfolio in Senegal is deemed

satisfactory overall. Lessons from these operations that will be reflected in this project

concern the need to adapt curricula to real employment needs, strengthen the quality and

relevance of trainers’ training and emphasize the monitoring of construction works.

2.7.2 The Bank also has experience in the design, financing and monitoring of higher

education projects, particularly in ICT-based distance education. The following on-going

regional projects can be mentioned in that regard: Support for the African Virtual University

Page 18: Senegal - Senegal Virtual University Support Project - Appraisal Report … · 2019. 6. 29. · ANAQ-Sup National Quality Assurance for Higher Education Authority ANSD National Statistics

8

(AVU), Support for Higher Education in WAEMU Countries and Development of Distance

Training in Southern African Countries (SADC), which all have virtual education

components. These were reflected in this project’s design. Besides, Senegal builds on

experience garnered in distance and virtual education as summarized in paragraph 1.2.2 of

this report. Lessons from these experiences, reflected in this project’s design, include: (i)

effectiveness of ICTs in improving access to higher education; (ii) impact of such an ICT-

driven project on the design and adoption of national ICT policies; and (iii) existence of an

untapped potential of African university lecturers in designing content and applying distance

training methods.

2.7.3 The experience of other partners supporting higher education was also useful in

the project design. Worthy of note is the PGF-Sup Project already presented above, which

provides comprehensive higher education support in Senegal. The main lesson here is the

importance of institutionalizing project implementation in the relevant technical directorate of

MESR (DGES) and involving national institutions in implementing activities concerning

them at the local level. Further, all past and recent experiences accumulated by other partners

involved in distance education/training projects in Senegal were explored and lessons learned

were reflected in the project design.

2.8 Key Performance Indicators

The logical framework specifies the project’s performance indicators in light of

the objectives of SNDES and PDESR 2013-2017. Impact indicator: (i) unemployment rate

of higher education graduates; (ii) rate of integration of UVS graduates three years after their

graduation. Effect indicator: (i) proportion of new GCE “A” Level holders enrolled in the

UVS (including percentage of girls); (ii) number of higher education students for 100,000

people; (iii) success rate of final year UVS students; (iv) number of UVS graduates who find

employment within 12 months of graduation (including percentage of girls). Outcome

indicators: (i) central structure operational; (ii) ENOs operational; (iii) strategic plan of the

UVS finalized; (iv) number of FO digital libraries; (v) percentage of UVS students with a PC;

(including percentage of girls); (vi) adoption of texts on the UVS; (vii) percentage of PER

(including percentage of women) intervening on behalf of the UVS having participated in at

least 3 seminars on distance education; (viii) percentage of UVS’s PAT (including percentage

of women) trained in the design of distance education modules; (ix) percentage of public and

private university students using the electronic resources of the UVS; and (x) percentage of

socio-economic groupings of ENO localities using the electronic resources of the UVS

Implementation monitoring will be based on an effective monitoring and evaluation system

(MES), which will facilitate decision-taking in critical cases for sound project management.

III. PROJECT FEASIBILITY

3.1 Economic and Financial Performance

3.1.1 The project will have a significant impact on the development of Senegal since

it will offer a diversified and efficient alternative to the traditional approach to training

human resources at the higher level. Due to the nature of this project, the analysis of

development prospects were adopted over standard quantitative methods (updated net value,

internal economic rate of return). This approach stems from the difficulties involved in

assessing project benefits since the unit costs of all students trained (graduates) will be

homogenous for training in each ENO. However, the graduates can enter different job

markets. Calculations made using data obtained from a study conducted in Senegal in 2007

indicate that in the formal sector, workers having undergone higher education earn 58% times

Page 19: Senegal - Senegal Virtual University Support Project - Appraisal Report … · 2019. 6. 29. · ANAQ-Sup National Quality Assurance for Higher Education Authority ANSD National Statistics

9

more than those limited to secondary education, and that in the informal sector, the difference

is slightly more pronounced and stands at 60%4. The social and economic benefits are

presented in paragraphs 3.2.3 to 3.2.8.

3.1.2 The preliminary

feasibility analyses indicate that

the UVS is more viable

compared to other university

models. The UVS is a public

university created by decree and,

like all other universities, benefits

from State subsidies based on a

performance contract. According

to forecasts, State subsidies to the

UVS will rapidly stabilize in

2015, then fall as from 2016/2017. Equity resources (coming from miscellaneous services)

are expected to represent 68% of the UVS sources of financing as from 2016/2017. Its unit

costs are projected to be relatively low initially (almost two times lower than the national

average, and nearly four times less than UGB or UADB - see Figure 2). Later, the trend will

be downward (nearly 34% in 2014/2015). The difference between the unit costs of 2013/2014

and those of succeeding years stems from the weight of start-up costs (those borne during the

first fiscal year).

3.2 Environmental and Social Impact

Environment

3.2.1 The project is classified in Environmental Category 2, pursuant to Bank’s

conservation policies. An environmental assessment was conducted, which clearly identified

the negative impacts of works and proposed mitigation measures. During the construction

phase, these measures include: (i) ensuring materials and rubble management, and tackling

possible nuisances (dust, noise); (ii) making arrangements for appropriate facilities (ramps,

board) to facilitate access to buildings for blind people or those with impaired mobility; and

(iii) using eco-friendly technologies that can improve the energy efficiency of the ENOs. In

the operation phase of the ENOs, the concern will also be to keep the premises clean by

putting in place an adequate arrangement for collection and elimination of garbage and liquid

wastes. The ENOs will be equipped with security arrangements comprising an emergency

evacuation plan and first intervention equipment (fire extinguishers, other tools and first aid

box). ENO staff will be trained to activate the evacuation plan and use intervention tools. All

advocated measures and means for implementing them are detailed in the Environmental and

Social Management Plan whose summary is attached to this report as Technical Annex B.8.

The Directorate of the Environment and Establishments (DEEC) will support the project by

supervising the ESMP implementation. The financial impact of ESMP implementation was

estimated at CFAF 10,000,000 (ten million) and incorporated in the project cost under

monitoring and evaluation cost.

4 Senegal: Research and Employment – Path to Prosperity , Country Economic Memorandum, (World Bank, PREM 4 Africa Region,

September 2007)

420 000

1 009 471

850 000

600 000

242 764

0

200 000

400 000

600 000

800 000

1 000 000

1 200 000

Nationalaverage

UGB UADB EPES (Private) Simulation ofthe UVS

operatingbudget

Fig 2 : Comparison of Unit Operating Costs

Page 20: Senegal - Senegal Virtual University Support Project - Appraisal Report … · 2019. 6. 29. · ANAQ-Sup National Quality Assurance for Higher Education Authority ANSD National Statistics

10

Climate Change

3.2.2 The small surface areas of the UVS and the ENOs will not significantly raise

Senegal’s greenhouse gas emissions. According to official reports, per capita CO2 emission

levels in Senegal are the lowest in the world. Changes in CO2 emissions therein will

normally be very slow and, with the implementation of this project, impact on climate change

will not be significant. For IT and communication equipment, thin clients which consume

less energy and can use solar power are expected, alongside laptop computers. In the same

vein, cloud computing will allow for limiting to the minimum the use of heavy equipment

(servers). It will be recalled that the UVS head office will be built in Cité du Savoir (a smart,

eco-friendly and sustainable city combining ICTs with renewable energies).

Gender

3.2.3 The project will foster the access of over 40% of young female “A” Level

holders to higher education and contribute to greater inclusion. Women constitute 52% of

the total population and 48% of the labour force, most of whom live below the poverty line,

especially in rural areas. About 28% of households headed by a woman are extremely poor,

against 25% for households headed by a man. There are wide regional disparities, except for

the Dakar region where there are more girl “A” level holders than boys. Girls are also under-

represented in public universities (33.23% of enrolments on average). The UVS takes into

account some major constraints confronting women in the pursuit of their studies and which

explain their poor representation in higher education. In particular, these include constraints

linked to long distances and the absence of accommodation for those having to go to town

where they have no one (not to mention married women and/or those raising children).

3.2.4 Therefore, the project will help to widen girls’ access to higher education

through several incentive measures. These measures include the granting of scholarships to

girls from underprivileged social backgrounds and the provision of appropriate pedagogic

and digital equipment. The UVS will offer flexible study spaces and the possibility for

married girls to study at home or in an ENO situated in their locality of residence. Since girls

in Senegal are more inclined to vocational training (3 years at most after the “A” level), the

UVS training programmes will attract them, with opportunities for acquiring skills to

improve their employability. These measures will be implemented concurrently with a series

of actions geared towards improving the upstream information and guidance system for

steering girls towards the more promising science, technology and professional streams. With

regard to quality, the UVS will establish a gender-sensitive quality assurance arrangement in

institutional and academic practices. The training plan of lecturers and trainers will include

gender modules. An internal assessment will be conducted every two years to measure the

effectiveness of the system.

3.2.5 Further, the UVS will negotiate corporate internship positions during training

in partnership with the private sector, the priority being to integrate female graduates.

The latter will in turn contribute to sensitize and mentor other girls wishing to enrol in the

UVS. In the long run, the system will help to ensure a higher integration rate for girls. Lastly,

by offering training to female students and female workers wishing to upgrade their level of

qualification, the UVS will catalyse access to opportunities for women’s social inclusion.

Page 21: Senegal - Senegal Virtual University Support Project - Appraisal Report … · 2019. 6. 29. · ANAQ-Sup National Quality Assurance for Higher Education Authority ANSD National Statistics

11

Social and Economic Impact

3.2.6 The project will allow for fairer access to higher education. As indicated above,

the implantation zones of the ENOs are those with the greatest number of “A” Level holders.

The 5 ENOs will contribute to address the growing demand, allowing at the outset for the

yearly admission of 5,000 high school leavers into the public higher education system.

Hence, the project will help to keep youths in their regions of origin by promoting income-

generating activities and the creation of VSME, on the one hand, and mitigate student

demands and frequent social tensions caused by the non-guidance of new “A” level holders

for want of space, on the other. The project will also contribute to the quantitative and

qualitative development of higher education in Senegal, making it possible to open up,

decentralize and diversify the supply of training. The UVS will absorb close to 20,000

students by 2018, thus helping to standardize university enrolments and improve the quality

of pedagogic supervision. It will also lessen pressure on traditional public universities whose

intake capacity has stretched to saturation point. In view of the country’s economic fabric that

does not allow for offering sufficient quality jobs to higher education graduates, the project is

based on the promotion of entrepreneurship as a sure lever for innovation, competiveness and

self-employment. This thrust will help to boost the internal and external efficiency, especially

by raising the quality of teaching and relations with the labour community.

3.2.7 Through the promotion of ICTs, the UVS will contribute to Senegal’s transition to

the information society. In fact, the information society opens untold prospects in many

fields of daily life. For this to materialize, access to the digital culture must be widespread.

Schools, in general, and universities, in particular, as basis of the “information society”, can

make a decisive contribution in this regard. The concern for education and training is not only

inclusion in the information society (e-inclusion) but also consideration of new skills needs –

essential for competitiveness – and the innovative capacity of national economies, notably the

mastery of the use of ICT in the professional context. The UVS provides such a context since

it allows for: (i) devising a public strategy of support to innovation and assistance to digital

development; (ii) providing an appropriate response to the challenge posed to higher

education by the new digital environment, and geared toward the production of digital skills;

(iii) proposing an appropriate and relevant establishment model for the “digital native”

generation; (iv) proposing a tool for training quality human resources; (v) tackling the

demographic pressure suffered by standard higher education establishments; and (vi) having

a regional development tool.

3.2.8 The project contributes to the country’s economic development by

strengthening the professionalization of higher education and its accessibility to various

segments of society. Diversifying higher education offer through short- and medium-

duration (3 years) certificate-based training courses accessible to the public and in streams

responding to market needs will strengthen the employability of youths and improve the

quality of human capital needed to achieve the production objectives assigned in the SNDES.

The capacity of higher education staff will be strengthened for 100% of PER (40% of them

women) as well as for 60% of PATs (40% of them women). The ENOs will also be open

spaces, user-friendly work places that will offer their resources to students and other society

stakeholders. Technical Annex B.1.2 presents the list of streams and the corresponding

trades.

3.2.9 The UVS offers Senegal an efficient model that can be replicated for skills

development in higher education. The innovative university model proposed by the project

will also enable the Government to standardize this approach which will ultimately make it

possible to obtain substantial savings on expenditure items related to heavy infrastructure

Page 22: Senegal - Senegal Virtual University Support Project - Appraisal Report … · 2019. 6. 29. · ANAQ-Sup National Quality Assurance for Higher Education Authority ANSD National Statistics

12

(faculties, libraries…). As a flexible, hands-on and economical solution for accessing

knowledge and opportunities for skills development, the UVS will enable thousands of young

Senegalese to develop their know-how, strengthen their employability and find a job.

Forceful Resettlement

3.2.10. The project activities will not lead to any forceful population displacement.

They will have no impact or restrict access to goods or to means of livelihood.

IV. IMPLEMENTATION

4.1 Implementation Arrangement

Executing Agency

4.1.1 The project will be supervised by the Ministry of Higher Education and

Research (MESR) and implemented by the General Directorate of Higher Education

(DGES), which coordinates higher education projects, including the PGF-Sup project

(World Bank). DGES’s capacity in the technical and financial management of projects was

assessed. This assessment, details of which are attached as Technical Annex B5.3, indicates

that DGES has experience in implementing sector projects and that it can satisfactorily

coordinate the implementation of this project. However, to enable it cope with the additional

specific tasks under this new project, it will be strengthened with a light team led by a

coordinator whose appointment must be submitted for Bank approval. The project

coordinator will establish an adequate fiduciary framework and operational arrangement and

will be responsible for monitoring and evaluation. He/she will benefit from the support of an

accountant and procurement expert to be recruited on a competitive basis.

Steering Committee

4.1.2 The Government will set up a steering committee to conduct the UVS design phase.

The committee will be chaired by the Minister of Higher Education and comprise

representatives of the private higher education sector, employers, representatives of

ministries, universities and higher education institutions as well as institutions responsible for

ICT regulation and management. This steering committee will ensure compliance with the

general orientation of the project and facilitate consultations. It will validate annual work

plans and the corresponding budget, and approve the technical and financial reports of each

year.

Procurement Arrangement

4.1.3 Procurements financed by Bank resources will be done pursuant to national

procedures for local competitive bidding (goods and works), in accordance with Decree

No. 2011-1048 of 27 July 2011 instituting the Public Procurement Code. This provision

arises from the conclusions of the assessment of Senegal’s national procurement procedures

conducted by the Bank in March 2010. Procurements will comply with Bank Rules and

Procedures (May 2008 edition, revised in July 2012) and will use standard Bank documents

for international competitive bidding (goods and works) and consultations by shortlist

(services). The project’s procurement plan (PP) was drafted for a period of 18 months based

on the Bank’s model. A summary of procurement methods is given in Annex IV, while the

details and the PP are attached as Technical Annex 5.

Page 23: Senegal - Senegal Virtual University Support Project - Appraisal Report … · 2019. 6. 29. · ANAQ-Sup National Quality Assurance for Higher Education Authority ANSD National Statistics

13

Disbursement Arrangements and Financial Management

4.1.4 Loan resources will be disbursed using three methods: special account, direct

payment and reimbursement. The Government will open: (i) a special account in the name

of the project to receive the ADF loan resources meant to finance recurrent operating and

training expenses; and (ii) an account bearing the project’s name into which counterpart

funds are transferred. The Letter of Disbursement will specify additional instructions and

detailed procedures to be complied with for the withdrawal of funds. The Bank reserves the

right to take precautionary measures pursuant to the General Conditions for, among other

things, the suspension of disbursement of funds in case of non-compliance with its fiduciary

requirements.

Financial Management

4.1.5 An accounting system will be put in place. It must at least comprise modules of

budgetary accounting, general accounting and cost accounting. The executing agency will

keep project books and accounts, in conformity with the principles of double entry

commitment accounting, while taking into account the specificities of development projects.

As soon as the financing is approved, the Ministry of Higher Education and Research will

engage the following actions: (i) establishment of the project management team within the

General Directorate of Higher Education (DGES) and appointment of the unit coordinator;

(ii) recruitment of financial management and procurement experts; (iii) design of the

administrative, financial and accounting procedures manual; (iv) procurement of the

accounting software (multi-projects), configuration of the software and training of staff; (v)

recruitment of an external auditor; and (vi) opening of a special account in a commercial

bank acceptable to the Bank. Detailed data on financial management and disbursement are

provided in Annex B.6.

Audit

4.1.6 Annual financial statements prepared by the executing agency as well as the internal

control system will be audited by an audit firm in line with terms of reference approved by

the Bank. The executing agency must submit accounts audit and internal control reports to

the Bank within six months of the end of the financial year.

4.2 Monitoring

4.2.1 Project activities and indicators defined in the project logical framework will be

monitored internally by the Project Manager, who should have monitoring/evaluation

skills. The executing agency shall draft quarterly progress and annual reports, and submit

same to the Bank. All reports must be compliant with the Bank’s formats. On project

completion, the executing agency will, with the support of a consultant, draft and forward a

completion report to the Bank. Quarterly and annual reports will be prepared pursuant to the

relevant Bank guidelines. Gender-disaggregated data will be provided in the reports.

Complementary basic data will be collected where applicable, according to the performance

indicators adopted for the project. Monitoring of the ESMP will be included in quarterly and

annual reports.

4.2.2 The external monitoring/evaluation system will be designed based on the output

and outcome indicators defined in the logical framework. The Bank will undertake at least

two (2) supervision missions each year. The Banks’ Field Office in Senegal (SNFO) will

Page 24: Senegal - Senegal Virtual University Support Project - Appraisal Report … · 2019. 6. 29. · ANAQ-Sup National Quality Assurance for Higher Education Authority ANSD National Statistics

14

coordinate monitoring missions and also closely oversee the project implementation. After

fifteen (15) months of implementation, the project will be subject to a mid-term review that

will consider the progress achieved in relation to the logical framework indicators and annual

activity plans.

4.2.3 Impact assessment will be an integral part of monitoring/evaluation through

surveys scheduled as a means of verifying the indicators. In this regard, the project will

support the establishment of a system to help collect relevant data as activities are

implemented. Impact will also be measured by comparing performance in terms of academic

results, on the one hand, and the employability (integration rate) of graduates of traditional

universities and the UVS, on the other. The project completion report will be prepared jointly

by the Borrower and the Bank. The implementation schedule of the main activities is

summarized as follows.

Table 4.2

Implementation Schedule of Main Monitoring Activities

Activities Period Responsibility

Loan Approval December 2013 ADF

General Procurement Note December 2013 ADF

Signature of Loan Agreement January 2014 ADF/GOV

Loan Effectiveness January 2014 ADF

Start-up of Project Mission February 2014 ADF/GOV/PROJECT TEAM

Mid-term Review Mission July 2015 ADF/GOV/PROJECT TEAM

Recruitment of CF for UVS and ENO Studies March 2014 PROJECT TEAM

Design Studies and BD May 2014 PROJECT TEAM

Publication of Works Pre-selection Notice June 2014 PROJECT TEAM

Implementation of Works Nov. 2014 – May 2016

BETWEEN../FIRMS/PROJECT

TEAM

Design BD for equipment of UVS Head Office and the ENOs March 2014 PROJECT TEAM

Publication of BDs June 2014 PROJECT TEAM

Submission, Evaluation of Bids and Contract Award August 2014 PROJECT TEAM

Equipment Delivery December 2014 SUPPLIERS/ PROJECT TEAM

PER and PATS Training April 2014 – June 2015 SPECIALIZED INSTITUTIONS

Annual Audit Missions From March 2015 AUDIT FIRM

4.3 Governance

4.3.1 Since the advent of the second changeover in March 2012, the State of Senegal

has been working in earnest to clean up public finances and gradually put in place

institutional mechanisms to improve political, economic and financial governance. This

enabled the country to improve its ranking on the Corruption Perception Index 2012, moving

from the 124th

position in 2011 to 94th

in 2012. The Bank also notes that the management of

projects has improved and that control mechanisms in force are deemed satisfactory overall.

The overall score of the Bank portfolio rose from 2.01 in 2009 to 2.49 in 2012 on a scale of 0

to 3. The assessment of the national procurement system conducted by the Bank in 2011 led

to the conclusion that Senegal’s national procurement procedures are generally satisfactory.

4.3.2 In the specific area of higher education, profound reforms are being

implemented under PDESR with World Bank support. PGF-Sup supports reforms dealing

with the following and other aspects: quality assurance; wider access; upgrading of existing

ICT networks; installation of a centralized information system and balancing of university

budgets. Established in 2013, the CampuSen platform allows for the online registration of

students (after the GCE A Level), and an efficient centralized management of flows including

scholarships, making stricter and more transparent monitoring possible. All these reforms

contribute to strengthening governance in the sector.

Page 25: Senegal - Senegal Virtual University Support Project - Appraisal Report … · 2019. 6. 29. · ANAQ-Sup National Quality Assurance for Higher Education Authority ANSD National Statistics

15

4.4 Sustainability

4.4.1 The sustainability of the UVS rests on the fact that the technological platform is

based on a well-established national network and on the contributory potential of

national and international partners. Government made the UVS an integral part of the

national public higher education system and the higher education reform programme.

Moreover, through ADIE and SONATEL, the national infrastructure in place facilitates

students’ and lecturers’ access to UVS’s digital resources. The memorandum of

understanding signed with Korean Telecom offers bright prospects for consolidating the

technology platform and training of trainers.

4.4.2 The involvement of private stakeholders at various levels contributes to the

relevance and sustainability of the UVS. The UVS design is the fruit of collaboration

between national stakeholders from higher education, ICT and production sectors with a high

job-creating potential (represented by employers). All these stakeholders are part of the

Steering Committee put in place by the Government to define the institutional and academic

framework of the UVS (including identification of trades and hence, the necessary skills and

streams). Private telecommunication operators are indispensable partners for the development

of the UVS for which ICTs are the backbone. The partnership with private stakeholders will

be continued through their involvement in the steering committee, their participation in

periodic needs reviews and training programmes, the organization of industrial internships,

assistance in setting up incubators, and the offer of scholarships and equipment. This

partnership will also be extended to all production stakeholders wishing to contribute to and

benefit from local skills development.

4.4.3 Support measures are implemented by the Government to back the UVS

approach. One of these measures with a decisive impact on the sustainability of the UVS is

the “one student, one PC” programme put in place by universities with Government support.

This will enable students to easily procure a subsidized laptop. The PC is subsidizes 50% by

the State and the remaining 50% balance is reimbursed by instalment by students over 24

months. There are plans to strengthen this national programme called “one student, one PC”,

which will facilitate students’ access to the internet and the UVS programme. Further, the

Government will exceptionally grant scholarships to students from poor backgrounds

alongside a special reduction of registration fees for girls. These social benefits will help to

boost access to the UVS and encourage the target categories to remain in the training system

until they obtain their certificates.

4.4.4 After initial capital costs, the UVS unit costs will be lower than those of

traditional universities. As indicated earlier (paragraph 3.1.2), forecasts and comparisons of

unit costs show that costs at the UVS are by far lower than in current universities. In addition

to allowing for greater access to higher education, UVS represents a less costly approach.

4.5 Risk Management

To ensure the success of the project, mitigation measures are planned to

address the risks identified. The main risks presented in the following table are indicated in

the results-based logical framework matrix.

Page 26: Senegal - Senegal Virtual University Support Project - Appraisal Report … · 2019. 6. 29. · ANAQ-Sup National Quality Assurance for Higher Education Authority ANSD National Statistics

16

Table 4.5

Risks and Mitigation Measures

Risk Level Mitigation Measure

Inadequacy between training and

employment needs

Moderate Selection of training streams with a high

potential in terms of employability

Delay in the construction of the

ENOs and the central structure

Moderate Early design of BDs for the selection of a

specialized consulting firm to monitor

the construction works

Unstable electricity network

preventing permanent access to

good connection

Moderate There are plans by the ENO to procure a

power generator; the students are

provided with PCs with extensive battery

autonomy

Lecturers are slow/unwilling to

adapt

Moderate Sensitization and training

4.6 Knowledge Building

This project design process offers the Bank a source of knowledge on putting in

place a virtual university in a national context. This experience supplements those

acquired through regional operations (AVU projects and the SADC Project). Undertaken in a

country where efforts are being made in the ICT sector, this operation could help to adapt

similar interventions in a less favourable context. Information on this experience will be

available to the public via the Bank’s communication channels.

V. LEGAL FRAMEWORK

5.1 Legal Instrument

The project will be financed by an ADF (the Fund) loan of UA 3.38 million and a

UA 1.10 million counterpart contribution from the Republic of Senegal (the Borrower). The

project’s legal framework will be a Loan Agreement to be concluded between the Republic of

Senegal and the Bank.

5.2 Conditions Associated with the Bank’s Intervention

5.2.1 Conditions precedent to effectiveness. Effectiveness of the Loan Agreement shall be

subject to fulfilment by the Borrower of the conditions defined in Section 12.01 of the General

Conditions Applicable to Loan Agreements and Guarantee Agreements (sovereign entities).

5.2.2 Conditions precedent to first disbursement of loan resources. The obligation for the

Fund to effect the first disbursement of the loan shall be subject to effectiveness of the Loan

Agreement, pursuant to the provisions of paragraph 5.2.1 above, and to evidence of fulfilment,

to the satisfaction of the Bank both in form and substance, of the following specific conditions:

i) Submit to the Fund evidence of opening an account in a bank or banks deemed

acceptable by the Fund, meant to receive a part of loan resources intended to

finance operating costs.

Page 27: Senegal - Senegal Virtual University Support Project - Appraisal Report … · 2019. 6. 29. · ANAQ-Sup National Quality Assurance for Higher Education Authority ANSD National Statistics

17

5.2.3 Other conditions: The Borrower shall also submit to the Fund:

i) At most three (3) months after first disbursement of the loan, the project

administrative and financial procedures manual; and

ii) Not later than three (3) months following effectiveness, evidence of recruiting

senior staff of the project team, comprising a Project Coordinator, an

Accountant and a Procurement Specialist whose qualifications and experience

shall be approved beforehand by the Fund. (4.1.1).

5.2.4 Commitments. In addition, the Borrower undertakes to:

(i) Implement the Environmental and Social Management Plan (ESMP), and

submit in a form acceptable to the Fund, quarterly reports on the

implementation progress of this plan.

5.3 Compliance with Bank Policies

This project complies with all applicable Bank policies. It will be implemented as

part of the Bank’s intervention strategy in Senegal defined in the CSP (2010-2015), reviewed

at mid-term and approved by the Board in April 2013 as well as the Bank’s (2013-2022) Ten-

Year Strategy.

VI. RECOMMENDATION

By contributing to improving the access of youths (girls and boys) to higher

education through the use of ICTs at the national level and by strengthening their

employability through training adapted to market needs, the project constitutes a major

support to Senegal as it strives to build a knowledge-based economy and greater social

inclusion. Management hereby recommends that the Board of Directors approve the proposal

to grant a loan of UA 3.38 million to the Government of Senegal for the purpose and under

the terms defined in this report.

Page 28: Senegal - Senegal Virtual University Support Project - Appraisal Report … · 2019. 6. 29. · ANAQ-Sup National Quality Assurance for Higher Education Authority ANSD National Statistics

Annex I

Country’s Comparative Socio-Economic Indicators

Year Senegal Africa

Develo-

ping

Countries

Develo-

ped

Countries

Basic Indicators

Area ( '000 Km²) 2011 197 30 323 98 458 35 811Total Population (millions) 2012 13,7 1 070,1 0,0 0,0Urban Population (% of Total) 2012 42,8 40,8 47,1 78,0Population Density (per Km²) 2012 64,9 34,5 69,8 23,5GNI per Capita (US $) 2012 1 040 1 604 3 795 37 653Labor Force Participation - Total (%) 2012 40,5 37,8 68,7 72,0Labor Force Participation - Female (%) 2012 43,9 42,5 38,9 44,5Gender -Related Dev elopment Index Value 2007-2011 0,457 0,525 0,694 0,911Human Dev elop. Index (Rank among 187 countries)2008-2012 154 ... ... ...Popul. Liv ing Below $ 1.25 a Day (% of Population)2009-2011 29,6 40,0 20,6 ...

Demographic Indicators

Population Grow th Rate - Total (%) 2012 2,9 2,3 1,3 0,3Population Grow th Rate - Urban (%) 2012 3,6 3,4 2,6 0,7Population < 15 y ears (%) 2012 43,5 40,0 28,5 16,4Population >= 65 y ears (%) 2012 3,0 3,6 6,0 16,6Dependency Ratio (%) 2012 84,3 77,3 52,6 49,2Sex Ratio (per 100 female) 2012 96,1 100,0 103,3 94,3Female Population 15-49 y ears (% of total population) 2012 24,4 49,8 53,3 45,6Life Ex pectancy at Birth - Total (y ears) 2012 63,3 58,1 68,2 77,7Life Ex pectancy at Birth - Female (y ears) 2012 64,7 59,1 70,1 81,1Crude Birth Rate (per 1,000) 2012 38,1 33,3 21,4 11,3Crude Death Rate (per 1,000) 2012 7,7 10,9 7,6 10,3Infant Mortality Rate (per 1,000) 2012 49,6 71,4 40,9 5,6Child Mortality Rate (per 1,000) 2012 74,3 111,3 57,7 6,7Total Fertility Rate (per w oman) 2012 5,0 4,2 2,6 1,7Maternal Mortality Rate (per 100,000) 2006-2010 370,0 415,3 240,0 16,0Women Using Contraception (%) 2012 13,9 34,5 62,4 71,4

Health & Nutrition Indicators

Phy sicians (per 100,000 people) 2004-2010 5,9 49,2 103,7 291,9Nurses (per 100,000 people)* 2004-2009 42,0 133,0 168,7 734,3Births attended by Trained Health Personnel (%) 2006-2010 65,1 53,7 64,3 ...Access to Safe Water (% of Population) 2011 73,4 67,8 86,5 99,1Access to Health Serv ices (% of Population) 2000 90,0 65,2 80,0 100,0Access to Sanitation (% of Population) 2011 51,4 40,2 56,8 96,1Percent. of Adults (aged 15-49) Liv ing w ith HIV/AIDS 2011 0,7 4,6 0,9 0,5Incidence of Tuberculosis (per 100,000) 2011 136,0 234,6 146,0 23,0Child Immunization Against Tuberculosis (%) 2011 95,0 81,6 83,9 95,4Child Immunization Against Measles (%) 2011 82,0 76,5 83,7 93,5Underw eight Children (% of children under 5 y ears) 2006-2011 19,2 19,8 17,0 1,4Daily Calorie Supply per Capita 2009 2 479 2 481 2 675 3 285Public Ex penditure on Health (as % of GDP) 2010-2011 3,5 5,9 2,9 7,4

Education Indicators

Gross Enrolment Ratio (%)

Primary School - Total 2009-2012 86,2 107,0 107,8 102,7 Primary School - Female 2009-2012 89,0 103,1 106,2 102,3 Secondary School - Total 2009-2012 42,1 46,3 66,4 100,4 Secondary School - Female 2009-2012 40,3 41,9 65,1 100,0Primary School Female Teaching Staff (% of Total) 2009-2012 30,6 39,2 58,6 81,3Adult literacy Rate - Total (%) 2009 49,7 71,5 80,2 …Adult literacy Rate - Male (%) 2009 61,8 78,4 85,9 …Adult literacy Rate - Female (%) 2009 38,7 64,9 74,8 …Percentage of GDP Spent on Education 2008-2010 5,6 5,3 4,5 5,5

Environmental Indicators

Land Use (Arable Land as % of Total Land Area) 2011 20,0 7,6 10,7 10,8Annual Rate of Deforestation (%) 2000-2009 0,7 0,6 0,4 -0,2Forest (As % of Land Area) 2011 43,8 23,0 28,7 40,4Per Capita CO2 Emissions (metric tons) 2009 0,4 1,2 3,0 11,6

Sources : AfDB Statistics Department Databases; World Bank: World Development Indicators; last update :

UNAIDS; UNSD; WHO, UNICEF, WRI, UNDP; Country Reports.

Note : n.a. : Not Applicable ; … : Data Not Available.

COMPARATIVE SOCIO-ECONOMIC INDICATORS

Senegal

october 2013

0102030405060708090

2004

2005

2006

2007

2008

2009

2010

2011

2012

Infant Mortality Rate( Per 1000 )

Senegal Africa

0

200

400

600

800

1000

1200

1400

1600

1800

2003

2004

2005

2006

2007

2008

2009

2010

2011

GNI Per Capita US $

Senegal Africa

0,0

0,5

1,0

1,5

2,0

2,5

3,0

3,5

2004

2005

2006

2007

2008

2009

2010

2011

2012

Population Growth Rate (%)

Senegal Africa

111213141516171

2004

2005

2006

2007

2008

2009

2010

2011

2012

Life Expectancy at Birth (years)

Senegal Africa

Page 29: Senegal - Senegal Virtual University Support Project - Appraisal Report … · 2019. 6. 29. · ANAQ-Sup National Quality Assurance for Higher Education Authority ANSD National Statistics

Annex II

Table of the Bank’s Public Sector Portfolio in Senegal

(Portfolio of Active National Projects as at 23 October 2013)

Sector

Project Name

Approval

Date

Amount

(UA) Type

Disbursement

Rate Classification*

1

TRANSPORT

Dakar – Diamniadio Highway

15/07/2009 45,000,000 ADF

Loan 96.9 Non PP/Non PPP

2

3

WATER AND SANITATION

Second Rural DWSS Sub-programme

(PEPAM II)

Project to Improve the Management and

Value of Sludge in Ziguinchor

18/02/2009

23/04/2013

30,000,000

1,395,086

ADF

Loan

AWF

Grant

71.9

-

Non PP/Non PPP

-

4

5

6

7

8

AGRICULTURE

Small Local Irrigation Support Project

(PAPIL) – supplementary loan

Rural Development Support Project in

Casamance (PADERCA)

Food Security Support Project in the

Louga, Matam and Kaffrine Regions

(GAFSP)

Community Roads Project in Support of

the National Local Development

Programme (PPC/PNDL)

Project to Restore the Ecological and

Economic Functions of Lake Guiers

(PREFELAC)

31/01/2011

19/10/2005

26/04/2013

17/07/2013

04/09/2013

8,400,000

20,000,000

2,000,000

15,000,000

15,000,000

ADF

Loan

ADF

Loan

ADF

Loan

ADF

Loan

ADF

Loan

59.4

75.2

-

-

-

Non PP/Non PPP

Non PP/Non PPP

-

-

-

9

ENERGY

Rural Electrification Project

13/10/2004 9,580,000 ADF

Loan 38.3 PPP

10

SOCIAL

Project to Support Skills Development

and Youth and Women’s

Entrepreneurship for the Promotion of

Employment (PAPJEF)

23/10/2013 21,190,000 ADF

Loan - -

11

12

GOVERNANCE

Private Sector Promotion Support Project

(PAPSP)

Inclusive Growth and Economic

Competitiveness Support Programme

(PACICE)

10/09/2012

19/06/2013

4,040,000

25,540,000

ADF

Loan

ADF

Loan

5.0

-

Non PP/ Non PPP

Non PP/ Non PPP

TOTAL 197,145,087 45.2 1 ARP / 12

* Classification (extracted from SAP): PP Problematic Project

PPP Potentially Problematic Project

ARP At-Risk Project (project classified as PP or PPP)

Page 30: Senegal - Senegal Virtual University Support Project - Appraisal Report … · 2019. 6. 29. · ANAQ-Sup National Quality Assurance for Higher Education Authority ANSD National Statistics

Annex III

Key Interventions of the State and Development

Partners in Higher Education Relevant to the UVS

Partners Project or

Document

Amounts

(CFAF)

Spheres of Activity Period

State of Senegal CCB 800 million Project counterpart with AfDB

2014

1.2 billion For UVS equipment

400 million Interconnection (UVS will benefit

from this just as other the

universities)

1.5 billion Cité du savoir (UVS will benefit

from this just like other

universities)

1 billion One Student - One Computer

Project (UVS will benefit from

this just like the other universities)

200 million New budget chapter for the

recruitment of a consulting or

assistance firm (UVS will benefit

from this just like the other

universities)

World Bank PGF-Sup 50 billion UVS will also benefit from the

following activities :

– Higher education governance

and financing

– Interconnection

– ICT development

2012-

2016

IDB Request

submitted

2,500,000,000 Construction of ENO From

2014

KOICA Request

submitted

- Construction of ENO From …

Korean telecom MOU - Support for the establishment of a

Cloud Computing Centre

Construction of Cité du savoir –

City of Knowledge

Construction of ENO

As from

2014

Seoul Cyber University - Pedagogic support

Capacity-building

2014

Commodity Aid (ITALY) Financing

Agreement

500,000,000 Construction of ENO 2014

China (Huawei) Technical support

Construction of ENO

-

India - - Provision of professional training

courses in diverse fields

2014

Sonatel, Tigo, Expresso - - Interconnection -

ADIE - - Technical support +

interconnection

-

ARTP Agreement - Technical support -

UVA - - Support -

UNESCO (Project to Support ICT

Development in Higher Education

Institutions of WAEMU countries -

PADTICE)

- - Technical support and equipment

(UVS will benefit from this just

like the other universities)

-

Page 31: Senegal - Senegal Virtual University Support Project - Appraisal Report … · 2019. 6. 29. · ANAQ-Sup National Quality Assurance for Higher Education Authority ANSD National Statistics

Annex IV

Diagram of UVS Technological Platform

Page 32: Senegal - Senegal Virtual University Support Project - Appraisal Report … · 2019. 6. 29. · ANAQ-Sup National Quality Assurance for Higher Education Authority ANSD National Statistics

Annex V

Summary of Procurement Modalities

Project Expenditure Categories UA Million

Use of National

Procurement

Arrangements

Use of Bank

Rules and

Procedures

Contracts

Financed by

the Bank

Total

WORKS

Construction of the UVS Head Office and the ENOs 2.46 (1.40) 2.46 (1.40)

GOODS

IT Equipment

1.1 (1.1)

1.1 (1.1)

Office Furniture and Equipment 0.23 (0.23) 0.23 (0.23)

SERVICES

Study and Works Control 0.07 0.07)

0.07 (0.07)

Strategic Plan and Business Plan 0.03 (0.03) 0.03 (0.03)

Individual Consultants 0.23 0.23) 0.23 (0.23)

Monitoring/Evaluation 0.03 (0.03) 0.03 (0.03)

Audit (0.05) 0.05 (0.05)

Operating Costs 0.28 (0.28) 0.28 (0.28)

Total 2.97 (1.91) 1.51 (1.51)

4.48 (3.38)

Note: Figures in parenthesis ( ) concern amounts financed by ADF

Page 33: Senegal - Senegal Virtual University Support Project - Appraisal Report … · 2019. 6. 29. · ANAQ-Sup National Quality Assurance for Higher Education Authority ANSD National Statistics

Annex VI

Administrative Map of Senegal with Intervention Zones

This map is provided by the African Development Bank exclusively for the use of the readers of the report to which it is attached. The names used

and the borders shown do not imply on the part of the Bank and its members any judgment concerning the legal status of the territory nor any

approval or acceptance of these borders.