Introduction
1- Geotechnical investigation2- Various field test
8/4/2019 Seminar on Site Investigation
3/25
GEOTECHNICAL INVESTIGATION
1-Site Exploration
2- Measurements of Soil Properties
3- Field Instrumentation4- Identifying Engineering Problems
8/4/2019 Seminar on Site Investigation
4/25
Site Exploration
1-Define the depth of the proposed foundation2- Evaluate the load-bearing capacity of the foundation3- Estimate the probable settlement4- Identify potential foundation problems5- Define ground water conditions
8/4/2019 Seminar on Site Investigation
5/25
The site exploration programshould include the following
1-Data Collection2- Terrain Analysis3-Site Reconnaissance4-Subsurface Sectioning5-Sample Recovery
8/4/2019 Seminar on Site Investigation
6/25
DATA COLLECTION
1- Type of structure
2- General use of the structure3- Column load4- Column spacing5- Building code
8/4/2019 Seminar on Site Investigation
7/25
TERRAIN ANALYSIS
1- Geomorphic characteristics of the site (Landform)2- Relief amplitudes3- Drainage basins4- Vegetation5- Climate conditions, weathering, frost action, erosion, and masswasting.
8/4/2019 Seminar on Site Investigation
8/25
SITE RECONNAISSANCE
1- General topography, existing of drainage, ditches, etc.2- General conditions of the soil
3- Type of vegetation4- Surface water condition5- Accessibility of the site
8/4/2019 Seminar on Site Investigation
9/25
SUBSURFACE SECTIONING
1-Seismic refraction (For large areas)2- Test pits (for shallow depths)3- Auger boring (Manual, Mechanical)4- Wash boring5- Core boring
8/4/2019 Seminar on Site Investigation
10/25
Test boring is the most usablemethod
1- Equipment Selection2- Boring Spacing3- Boring Depths
8/4/2019 Seminar on Site Investigation
11/25
Equipment Selection
This depends on:
1- Terrain features2- Accessibility
3- Geologic Conditions4- Boring depths5- Sample types6- Nature of the project
8/4/2019 Seminar on Site Investigation
12/25
Boring Spacing
The spacing usually range from 30 ft to 1600 ft.
8/4/2019 Seminar on Site Investigation
13/25
Depth of Boring
1- In general, boring should be extended to at least 1.5 to 2 timesthe minimum width of the loaded area.
2- In the case of very heavy structures (bridges), boring in most
cases are extended to bed rock, or at least one boring should be
extended to bedrock.
8/4/2019 Seminar on Site Investigation
14/25
SAMPLE RECOVERY
1-Disturbed2- Undisturbed
8/4/2019 Seminar on Site Investigation
15/25
Methods Of Sample Recovery
1- By hand2- Split spoon3- Scraper bucket4- Thin wall tube (Shelby tube)
8/4/2019 Seminar on Site Investigation
16/25
METHODS OF EXPLORATION
1-Direct and semi-direct methods
2-Indirect methods
8/4/2019 Seminar on Site Investigation
17/25
DIRECT AND SEMI DIRECT
METHODS
1-Test pits2-Auger boring3-Wash boring4-Percussion drilling5-Rotary drilling
8/4/2019 Seminar on Site Investigation
18/25
PLANNING AND EXPLORATION
PROGRAMME
1- Site plan of the area2- A layout plan of proposed structure3- Location of bore holes and field tests4- Planning of other field tests
8/4/2019 Seminar on Site Investigation
19/25
PLANNING AND EXPLORATIONPROGRAMME
1- Depth of boring
2-soil sampling
8/4/2019 Seminar on Site Investigation
20/25
FIELD TESTS
1-Standard Penetration Tests (SPT)2-Dynamic Cone penetration Tests (DCPT)3-Plate Load Tests
8/4/2019 Seminar on Site Investigation
21/25
STANDARD PENETRATION TEST
1- Determination of insitu parameters of soil2- Determination of bearing capacity
8/4/2019 Seminar on Site Investigation
22/25
DYNAMIC CONE PENETRATIONTEST
1-Investigation of compactness of sub-soil layer with out making aborehole
2-Penetration resistance of soils is used for estimation of bearingcapacity
8/4/2019 Seminar on Site Investigation
23/25
PLATE LOAD TEST
1- Determination of allowable bearing capacity of sub soil2- Suitable for gravel/boulder strata when SPT and DCPT does notgive dependable results3- Also used to determine the modules of subgrade reaction (K)useful for design of rigid pavements
8/4/2019 Seminar on Site Investigation
24/25
Conclusion
Steps mentioned above should be followed,in order to have proper foundation.