15
Seite 1 28.04.22 Hier steht ein thematisches Foto European Workshop on HMWBs, 12-13 March 2009, Brussels European Workshop on HMWBs, 12-13 March 2009, Brussels Final designation of HWMBs in Final designation of HWMBs in Austria Austria for WBs impacted by for WBs impacted by Hydropower Hydropower Veronika Koller-Kreimel / Ministry for Agriculture, Forestry, Environment and Water Management

Seite 120.10.2015 Hier steht ein thematisches Foto European Workshop on HMWBs, 12-13 March 2009, Brussels Final designation of HWMBs in Austria for WBs

Embed Size (px)

Citation preview

Page 1: Seite 120.10.2015 Hier steht ein thematisches Foto European Workshop on HMWBs, 12-13 March 2009, Brussels Final designation of HWMBs in Austria for WBs

Seite 1 20.04.23

Hier steht ein thematisches Foto

European Workshop on HMWBs, 12-13 March 2009, Brussels European Workshop on HMWBs, 12-13 March 2009, Brussels

Final designation of HWMBs in AustriaFinal designation of HWMBs in Austriafor WBs impacted byfor WBs impacted by Hydropower Hydropower

Veronika Koller-Kreimel / Ministry for Agriculture, Forestry, Environment and Water Management

Page 2: Seite 120.10.2015 Hier steht ein thematisches Foto European Workshop on HMWBs, 12-13 March 2009, Brussels Final designation of HWMBs in Austria for WBs

Seite 2 Brussels, 12-13 March 2009HMWB-designation in Austria - Hydropower

Hydropower in AustriaHydropower in Austria

3 types causing different pressures and impacts• run-of-river plant ….. Impoundments (change of type)

• diversion plant……… residual flow • storage plant ……….. reservoir (peak load production/ … flow fluctuations ancillary services) … residual flow

…. continuity interruption

Page 3: Seite 120.10.2015 Hier steht ein thematisches Foto European Workshop on HMWBs, 12-13 March 2009, Brussels Final designation of HWMBs in Austria for WBs

Seite 3 Brussels, 12-13 March 2009HMWB-designation in Austria - Hydropower

Steps for final designation of HMWBsSteps for final designation of HMWBsin Austria in Austria

• Criteria for „substantially changed in character“

• List of restoration/mitigation measures for each pressure type

(Driver Hydropower)

• List of possible adverse effects on uses/wider environment

• Criteria for „significance“ of adverse effects

• Criteria for better environmental options

Page 4: Seite 120.10.2015 Hier steht ein thematisches Foto European Workshop on HMWBs, 12-13 March 2009, Brussels Final designation of HWMBs in Austria for WBs

Seite 4 Brussels, 12-13 March 2009HMWB-designation in Austria - Hydropower

Criteria for Criteria for substantial change in character* substantial change in character*

* HMWB Guidance: profound, permanent, irreversible

2- steps:

1) Screening by applying criteria, which are

- pressure related and / or

– impact related

leading to a „provisional identification of HMWB“

2) final decision – additional biological impact criteria has to be fulfilled

Page 5: Seite 120.10.2015 Hier steht ein thematisches Foto European Workshop on HMWBs, 12-13 March 2009, Brussels Final designation of HWMBs in Austria for WBs

Seite 5 Brussels, 12-13 March 2009HMWB-designation in Austria - Hydropower

Impact related criteriaImpact related criteria

specific threshold

• Length of river expected to be worse than good - small rivers: >1 km

due to hydromorphological alterations - large rivers: > 2 km

• Intensitiy of river fragmentation - highland: > 2 (number of migration barriers) - lowland: > 1

Page 6: Seite 120.10.2015 Hier steht ein thematisches Foto European Workshop on HMWBs, 12-13 March 2009, Brussels Final designation of HWMBs in Austria for WBs

Seite 6 Brussels, 12-13 March 2009HMWB-designation in Austria - Hydropower

Substantial change in character -Substantial change in character -Screening by Screening by ppressureressure related criteria (1) related criteria (1)

specific thresholds

Length of dammed section (impoundment) - small rivers: > 1km (change of type) - large rivers: > 2 km

morphology changed into reservoir - change of river category to lake any - enlargement of lake any

Height of weirs: (migration barrier) - highland: >70 cm - lowland: > 30 cm

change of hydrological regime - downsurge: surge > 1: 5 (small, medium)

due to water discharge from storage pp - any surge (large rivers)(Intensity of water flow fluctuations)

Reduction of flow as being part of a - residual water flow < MJNQt or storage plant system: - no ecological minimum flow guaranteed

Page 7: Seite 120.10.2015 Hier steht ein thematisches Foto European Workshop on HMWBs, 12-13 March 2009, Brussels Final designation of HWMBs in Austria for WBs

Seite 7 Brussels, 12-13 March 2009HMWB-designation in Austria - Hydropower

Substantial change in character – Substantial change in character – pressure related criteria (2)pressure related criteria (2)

Reduction of flow due to diversion plants = significant pressure causing singnifiant hydrological and morphological impacts,

but no substantial change in character:

» not irreversible » not permanent (will be changed when licence expires)

Basic requirement is not fulfilled – no designation as HMWB possible!

Restoration of ecological minimum flow might mean a significant adverse effect on use (electricity production ) - but that would be a reason for applying an exemption acc. to Art. 4 (4) or 4(5) WFD

Page 8: Seite 120.10.2015 Hier steht ein thematisches Foto European Workshop on HMWBs, 12-13 March 2009, Brussels Final designation of HWMBs in Austria for WBs

Seite 8 Brussels, 12-13 March 2009HMWB-designation in Austria - Hydropower

Substantial changed in characterSubstantial changed in character22nd nd step - final decision step - final decision

Proven biological impact:

„good ecological status“ is really failed (with high confidence)

due to hydromorphological alterations

In case that the „good ecological status“ is already achieved in the water body, the application of Art. 4 (3) test would make no sense!

„Changes to hydromorphological characteristics which would be necessary for achieving good ecological status would have a significant adverse effect ….“

Page 9: Seite 120.10.2015 Hier steht ein thematisches Foto European Workshop on HMWBs, 12-13 March 2009, Brussels Final designation of HWMBs in Austria for WBs

Seite 9 Brussels, 12-13 March 2009HMWB-designation in Austria - Hydropower

Measures to restore GES in wb impacted by Measures to restore GES in wb impacted by hydropower hydropower

might have anmight have an significant adverse effect on use significant adverse effect on use

Storage for power generation:• Significant* losses of electricity production base load

(*more than natural variation due to natural flow variations)

• Decrease of peak load production and ancillary services

• Decrease in security of electricity supply on regional or national level

Flood Protection: • decrease of protection level (HQ 100) for settlements• endangering infrastructure (railways, highways)

Investment costs (e.g. for habitat improvement/creaation) were considered to have no significant adverse effect on hydropower use !

Page 10: Seite 120.10.2015 Hier steht ein thematisches Foto European Workshop on HMWBs, 12-13 March 2009, Brussels Final designation of HWMBs in Austria for WBs

Seite 10 Brussels, 12-13 March 2009HMWB-designation in Austria - Hydropower

No significant adverse effectNo significant adverse effecton hydropower useon hydropower use

fish passes for upstream migration

Production losses are always much smaller than natural variation at the site

Fish pass for upstream migration is state of art/BEP.

Measure to improve the morphological situation/habitat creation

balance reservoirs

There might be significant costs

-> question of exemption Art. 4.4. (or Art. 4.5.) WFD

Page 11: Seite 120.10.2015 Hier steht ein thematisches Foto European Workshop on HMWBs, 12-13 March 2009, Brussels Final designation of HWMBs in Austria for WBs

Seite 11 Brussels, 12-13 March 2009HMWB-designation in Austria - Hydropower

Better environmental option forBetter environmental option forhydropower generationhydropower generation

• Can hydropower production be shifted to another site? NO – as any new hydropower plant of comparable size would cause a deterioriation of ecological status in any case

• Can electricty production (base load) be replaced by other renewables or saving? (oil, gas, coal could never be a a better environmental option! ) national scale: 40% of Austrian electricity production is generated in run-of-river plants – no chance for replacement/saving – in particular under the pressure to increase the share of renewables up to 2020 (Renewables Directive)

• Can peak load production/ancillary services be replaced by another energy source

Theoretically only by „non-Renewables (gas), but that is not „environmental

friendly“ – therefore answer is NO

Page 12: Seite 120.10.2015 Hier steht ein thematisches Foto European Workshop on HMWBs, 12-13 March 2009, Brussels Final designation of HWMBs in Austria for WBs

Seite 12 Brussels, 12-13 March 2009HMWB-designation in Austria - Hydropower

ConclusionConclusion

In case that to achieve GES hydromorphological

measures are needed which would mean a

decrease in electricity production

(base or peak load/ ancillary services )

no better environmental option does exist

Page 13: Seite 120.10.2015 Hier steht ein thematisches Foto European Workshop on HMWBs, 12-13 March 2009, Brussels Final designation of HWMBs in Austria for WBs

Seite 13 Brussels, 12-13 March 2009HMWB-designation in Austria - Hydropower

ResultResult(wb failing good status with high confidence)(wb failing good status with high confidence)

• all impoundments (small rivers > 1 km, large rivers > 2 km)

• all river water bodies which belong to the complex system of a storage power plant (hydropeaking)

• all lakes which were changed into storage reservoirs

were designated as HMWBas all requirements of Art. 4 (3) were fulfilled

300 river water bodies, 6 lakes

Page 14: Seite 120.10.2015 Hier steht ein thematisches Foto European Workshop on HMWBs, 12-13 March 2009, Brussels Final designation of HWMBs in Austria for WBs

Seite 14 Brussels, 12-13 March 2009HMWB-designation in Austria - Hydropower

Thank you for your attention

Page 15: Seite 120.10.2015 Hier steht ein thematisches Foto European Workshop on HMWBs, 12-13 March 2009, Brussels Final designation of HWMBs in Austria for WBs

Seite 15 Brussels, 12-13 March 2009HMWB-designation in Austria - Hydropower

99%

1%

Provisional identification HMWBProvisional identification HMWB

48%

32%

20%not identified

provisionallyidentified HMWB

not yet decided

Rivers > 10 km2

Length or river network : 31.500 kmLakes > 50 ha (1036 km2)

designated HMWB 1%

10%designated HMWB already