31
1 Using an innovative free fall sediment profiler for measuring mud and sediment layers to support tests on a new maintenance concept in the port of Rotterdam

Sediment and object interaction - lonestarhsc.org · mud was created by 8 hours of WID dredging. • The total of loose mud was not fully mobilized due to the shape of the bed of

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Sediment and object interaction - lonestarhsc.org · mud was created by 8 hours of WID dredging. • The total of loose mud was not fully mobilized due to the shape of the bed of

1

Using an innovative free fall sediment profiler for measuring mud and sediment layers to support tests

on a new maintenance concept in the port of Rotterdam

Page 2: Sediment and object interaction - lonestarhsc.org · mud was created by 8 hours of WID dredging. • The total of loose mud was not fully mobilized due to the shape of the bed of

2

Port of Rotterdam

• Surface of dredging areas: 3.155 ha (30 km²)

• Maintenance depths: 3,65 – 24,00 m (cd)

• Annually dredged quantity 4 – 7 million m³, done by hopper dredgers

Page 3: Sediment and object interaction - lonestarhsc.org · mud was created by 8 hours of WID dredging. • The total of loose mud was not fully mobilized due to the shape of the bed of

3

Port of Rotterdam: Maintenance concept

Page 4: Sediment and object interaction - lonestarhsc.org · mud was created by 8 hours of WID dredging. • The total of loose mud was not fully mobilized due to the shape of the bed of

4

Step1: Over depth creation in the central navigation channels

• In the middle of the main navigation channels an over-depth is created of 1 to 1,5 m on a depth of 24m.

• The trench is installed by a hopper dredger.

Page 5: Sediment and object interaction - lonestarhsc.org · mud was created by 8 hours of WID dredging. • The total of loose mud was not fully mobilized due to the shape of the bed of

5

Step 2: Liquefaction and mobilisation of the sediment

• Liquefaction of the zones around the trench by WID

• Mobilisation in steps towards the trench

• Creation of an angle of repose

• Creation of density flows by a step by step dredging procedure towards the trench

Page 6: Sediment and object interaction - lonestarhsc.org · mud was created by 8 hours of WID dredging. • The total of loose mud was not fully mobilized due to the shape of the bed of

6

Step 3: Consolidation in the over depth and follow up

• In the over depth the liquefied mud can consolidate and the over depth acts as a buffer

• In the over depth a nautical depth criterion can be installed

• The follow up of the consolidation process is done by a free fall penetrometer

Page 7: Sediment and object interaction - lonestarhsc.org · mud was created by 8 hours of WID dredging. • The total of loose mud was not fully mobilized due to the shape of the bed of

7

WID dredging towards the trench

Page 8: Sediment and object interaction - lonestarhsc.org · mud was created by 8 hours of WID dredging. • The total of loose mud was not fully mobilized due to the shape of the bed of

8

Tests

• Test 1: Evaluate of novel measurement equipment to measure in situ mud rheology by a free fall penetrometer

• Test 2: Erosion and liquefaction of underwater sediment– Zone in the beerchannel at 23m

– Followed up with multibeam echosounder and GraviProbe

• Test 3: Mobilisation of the sediment towards an over depth– Zone near the Amazonehaven on a turning circle at 23 m

– Followed up with multibeam echosounder and GraviProbe

Page 9: Sediment and object interaction - lonestarhsc.org · mud was created by 8 hours of WID dredging. • The total of loose mud was not fully mobilized due to the shape of the bed of

9

Free fall penetrometer

Page 10: Sediment and object interaction - lonestarhsc.org · mud was created by 8 hours of WID dredging. • The total of loose mud was not fully mobilized due to the shape of the bed of

10

GraviProbe

The rheological conditions of the soil layers are determining the probe’s dynamical behavior. The data acquired from on-board accelerometers, inclinometers and pressure sensors is feeding a dynamical model which determines the rheological and density parameters of the intruded.

Measurement principle

Page 11: Sediment and object interaction - lonestarhsc.org · mud was created by 8 hours of WID dredging. • The total of loose mud was not fully mobilized due to the shape of the bed of

11

GraviProbe

As a result the GraviProbe is able to very accurately distinguish the depth of the fluid mud and consolidated mud layers, even in gassy environments.

Measurement principle

Page 12: Sediment and object interaction - lonestarhsc.org · mud was created by 8 hours of WID dredging. • The total of loose mud was not fully mobilized due to the shape of the bed of

12

GraviProbe

Every measerement point is registered with a bluetooth gps module, the position of the drop can be processed on a map for visualization purposes.

Measurement principle

Page 13: Sediment and object interaction - lonestarhsc.org · mud was created by 8 hours of WID dredging. • The total of loose mud was not fully mobilized due to the shape of the bed of

13

Sediment profiler Mud Map

Page 14: Sediment and object interaction - lonestarhsc.org · mud was created by 8 hours of WID dredging. • The total of loose mud was not fully mobilized due to the shape of the bed of

14

Working principle

• Acceleration

• Speed

• Position

• Tip resistance

• Shear stress

Fshear= τshear.A

Fgravity = m.g

Fcone= τcone.V/d

∆z

∆z

∆z

Newtonian equation

F=ma=mg – Ftip - Fshear

Page 15: Sediment and object interaction - lonestarhsc.org · mud was created by 8 hours of WID dredging. • The total of loose mud was not fully mobilized due to the shape of the bed of

15

GraviProbe compared to a standard CPT measurement

Page 16: Sediment and object interaction - lonestarhsc.org · mud was created by 8 hours of WID dredging. • The total of loose mud was not fully mobilized due to the shape of the bed of

16

Port of Rotterdam: Test zones

1

2

Page 17: Sediment and object interaction - lonestarhsc.org · mud was created by 8 hours of WID dredging. • The total of loose mud was not fully mobilized due to the shape of the bed of

17

Multibeam and GraviProbe locations

Before WID After WID

Page 18: Sediment and object interaction - lonestarhsc.org · mud was created by 8 hours of WID dredging. • The total of loose mud was not fully mobilized due to the shape of the bed of

18

Dynamic cone resistance over time

Page 19: Sediment and object interaction - lonestarhsc.org · mud was created by 8 hours of WID dredging. • The total of loose mud was not fully mobilized due to the shape of the bed of

19

Interpolated strength profiles

AcousticsignalLoose

mud

Consolidatedmud

Page 20: Sediment and object interaction - lonestarhsc.org · mud was created by 8 hours of WID dredging. • The total of loose mud was not fully mobilized due to the shape of the bed of

20

What sediment volume can be affected by the cutting nozzles?

• Pressure = 1 bar = 100kPa• Flow = 12000 m³/h• Water nozzle speed = 23 m/s• Ship speed = 1,25 knots (2340m/h)• Beam width = 14 m

Fshear= τshear.A

Fgravity = m.g

Fcone= τcone.V/d

• Tip resistance = 1kPa to 2MPa• Falling speed = 7 m/s

Page 21: Sediment and object interaction - lonestarhsc.org · mud was created by 8 hours of WID dredging. • The total of loose mud was not fully mobilized due to the shape of the bed of

21

Influence depth

(transport potential)

• Accurate cutting depth of water injection at 100 kPa pressure

Dillution to 1,1 t/m³

(transport quantity)

• Accurate bulk density measurements on low and high density sediments

Performance estimators for WID

DensXGraviProbe

Page 22: Sediment and object interaction - lonestarhsc.org · mud was created by 8 hours of WID dredging. • The total of loose mud was not fully mobilized due to the shape of the bed of

22

Transport potential Transport quantity

Practical example

100 kPa

Strength (volume estimator) + Density (quantity estimator) = injection quantity per square meter m³H2O / m²

1.5 m³/m²

Page 23: Sediment and object interaction - lonestarhsc.org · mud was created by 8 hours of WID dredging. • The total of loose mud was not fully mobilized due to the shape of the bed of

23

Transport potential Transport quantity

Practical example

100 kPa

12000 (m³H2O/h) / (14 (m) * 2340 (m/h)) = 0.366 m³H2O/m²

1.5 m³/m²

1.5 / 0.366 = 4.1 injections

Page 24: Sediment and object interaction - lonestarhsc.org · mud was created by 8 hours of WID dredging. • The total of loose mud was not fully mobilized due to the shape of the bed of

24

Transport potential Transport quantity

Practical example

100 kPa

12000 (m³H2O/h) / (14 (m) * 2340 (m/h)) = 0.366 m³H2O/m²

At least 4 injectionsneeded

Page 25: Sediment and object interaction - lonestarhsc.org · mud was created by 8 hours of WID dredging. • The total of loose mud was not fully mobilized due to the shape of the bed of

25

Port of Rotterdam: Test zones

1

2

Page 26: Sediment and object interaction - lonestarhsc.org · mud was created by 8 hours of WID dredging. • The total of loose mud was not fully mobilized due to the shape of the bed of

26

Multibeam top mud

Before WID After WID

• On the entrance of the Amazonehaven there is a natural collection of sediment.

• A multibeam image was taken of the area of investigation. In yellow green the accumulated sediment area is visible.

Page 27: Sediment and object interaction - lonestarhsc.org · mud was created by 8 hours of WID dredging. • The total of loose mud was not fully mobilized due to the shape of the bed of

27

-26

-25,5

-25

-24,5

-24

-23,5

-23

-22,5

-22

-1 9 19 29 39 49

Die

pte

(m)

TCPR (kPa)

TCPR vs t 008D

TCPR t0

TCPR t1

TCPR t2

Top mud measured by multibeam

4kPa level before and after WID

Page 28: Sediment and object interaction - lonestarhsc.org · mud was created by 8 hours of WID dredging. • The total of loose mud was not fully mobilized due to the shape of the bed of

28

4kPa level map

Before WID After WID

Page 29: Sediment and object interaction - lonestarhsc.org · mud was created by 8 hours of WID dredging. • The total of loose mud was not fully mobilized due to the shape of the bed of

29

Cross section

• A pocket of loose mud is created. In total a volume of 190.000 m3 of loose mud was created by 8 hours of WID dredging.

• The total of loose mud was not fully mobilized due to the shape of the bed of channel. In this case a distance of 600m needs to be bridged between agitated area and the over depth area.

Page 30: Sediment and object interaction - lonestarhsc.org · mud was created by 8 hours of WID dredging. • The total of loose mud was not fully mobilized due to the shape of the bed of

30

Conclusions

• Operational• Erosion and liquefaction of sediment with

WID is feasible and efficiency is proven• Mobilisation of sediment needs to be done

under correct repose angels and control over the distance

• Upcoming full scale test by installation of a central trench in the Beerchannel

• Advantages• Predictability of the maintenance• From corrective to preventive

maintenance• Smoothening of the navigation channel• Nautical depth criterion in the over

depth trench • Optimal balance between WID and

hopper dredgers

Page 31: Sediment and object interaction - lonestarhsc.org · mud was created by 8 hours of WID dredging. • The total of loose mud was not fully mobilized due to the shape of the bed of

31

Company Introduction