SCLT Meeting
25th January 2012
Safety Brief
Agenda
Item No.
Time Item Mins
1 0800 Fire & Safety Brief 5
Dave Nicholls
2 0805 Co-Chair Introduction 5 Martin Ellins/Ken
Robertson
3 0810 Safety Moment 10
Neil McCulloch
4 0820 Oil & Gas UK update 10
Robert Paterson
5 0830 HSE update 15
Steve Walker
6 0845 Competence Workgroup – next steps 10 Neil
McCulloch/Peter 6 0845 Competence Workgroup – next steps 10 McCulloch/Peter Murphy
0855 Coffee break 10
7 0905 Asset Integrity Workgroup - update 20
Steve Bullock/Geoff
Holmes
8 0925 HSSG update 20
Alan Chesterman
9 0945 Industry Safety Leadership Day 20
Dave Nicholls
10 1005 Workforce Engagement 20
Mike Bowyer
11 1025 Support Team changes 15 Dave Nicholls 11 1040 AOB 10 All
Co-chair Introduction Martin Ellins
Welcomes & changes
Les Linklater – Support Team Project MgrLes Linklater – Support Team Project Mgr
Gillian Simpson – Business Analyst (from 1st Feb)
Eddie Perkins – Marine Safety Forum (replaces Karl Fear)
Jon Richards (Diamond Drilling) – IADC replaces Glenn White
Adrian Rose – (Transocean) replaces Paul King
Chris Bennet (Stena Drilling) – Safety Rep
Terry O’Halloran (Sodexo) – Safety Rep
Steve Walton (WoodgroupPSN) – Safety Rep
Safety Moment
Neil McCullochNeil McCulloch
BG Group
Oil & Gas UK update
Robert Paterson
Health & Safety Executive
UpdateUpdate
Steve Walker
Competence Workgroup
UpdatePeter Murphy & Neil McCulloch
SC Competence Initiatives - Overview
?
Project Activites Who 20 11 2012
1Q 2Q 3Q 4Q
MIST Feedback & Refine WG/Companies
Permit Develop standards & roll-out plan WG/Opito
Authority Approve Plan SCLT
Roll-out & industry implementation WG/Companies
Lifting Develop standards & roll-out plan WG/Opito
Standards & Approve Plan SCLT
Training Roll-out & industry implementation WG/Companies
Leadership Appraise ideas, select & justify project WG
Approve concept SCLT
?Approve concept SCLT
Develop standards & roll-out plan WG/Opito
Approve Plan SCLT
Roll-out & industry implementation WG/Companies
Mechanical Appraise ideas, select & justify project WG
Joint Approve concept SCLT
Integrity Develop standards & roll-out plan WG/Opito
Approve Plan SCLT
Roll-out & industry implementation WG/Companies
Key
Concept
decision
Ideas &
business case
Develop
concept
Decide to
implement
Industry
roll-out
Project
complete
Feed back
& improve
Questions & Requests
• How do we launch new products?
• Volunteers to join the Competence Work Group
• Need to consider new projects?– PAS55?
– Golden Golden Rules?– Golden Golden Rules?
• Leadership Project– Originally decided to move to Watch status
– OPITO/Open University confused
– Move project to Mentor status?
Tea and Coffee
Asset Integrity WorkgroupUpdate
Steve Bullock & Geoff Holmes
HCR DATA
Type/year 2010/11Nov 2011
(half year point for
2011/12)
Total HCRs 16791
Total HCRs 16791
(182 end 2011/12)
Major & Significant
7340
(80 end 2011/12)
Publication of HCR data
HCR Reduction – FPF/FPSOs Workgroup
Group membersJohn Fleming (co-chair),
Peter Main (Bluewater),
Chris Wray (Shell),
tbc (Premier Oil)
Adam Petersen (co-chair),
Bob Gilbert (Maersk FPSOs),
tbc (Maersk Oil),
Dave Nicholls (SC),
Ron Edgar (Petrofac),
Dave Austen (Chevron),
Meeting Schedule14th February
6th March
8th May
Initial kick-off
2nd Meeting
3rd Meeting
BP, Dyce
tbc
tbc8th May
14th August
16th October
3 Meeting
4th Meeting
5th Meeting
tbc
tbc
tbc
Objective1. To determine/ascertain common failure modes on FPF/FPSOs which lead to HCRs.
2. To determine/ascertain the reasons behind why FPF/FPSOs incur disproportionate
HCRs.
Deliverables1. To provide guidance to industry on areas of focus for both brownfield units and new-
build FPF/FPSOs in order to eliminate HCRs.
Success criteria1. Development and issue of bespoke asset integrity guidelines to be utilised on
floating installations.
Summary TOR
HCR Prevention Workgroup
• Workgroup established with good representation from Operators (12), Key Contractors and HSE
• TOR established, deliverables and work-plan defined:
– Prioritised common root causes mapped to solutions
– HCR Prevention Improvement Plan template / model
– Mechanisms for sharing best practice
• Web site• Web site
• Seminars and Workforce Engagement Events
– HCR Prevention DVD (designed to engage hearts and minds)
• Supporting O&GUK Seminar in March
• Establishing links with other workgroups (FPSO, Competence, Technical Authorities, Verification) to ensure alignment
Key steps :
• Pull together a working group, (cross section of industry- Client and service companies)
• Use a simple Continuous Improvement model as our framework fro the workgroup, see example in last slide....
• Define the problem we are looking to resolve....
• Gather data/info :
– Survey what is currently operational across the industry
TA Workgroup
– Survey what is currently operational across the industry
– Engage with H&S executive on their thoughts and experience
– Review different models structure and roles and accountabilities
– Review competency models
• Do we/should we have a common set of competency assessments standards for core disciplines ?
• How do we as an industry gain assurance that specialist TAs such as lifting has the capability and competency to deliver on the Oil & Gas needs both now and looking forward
TA Workgroup ToR
• Understand the implementation of the TA role in the UK Oil & Gas sector.
• Define key attributes of the role of a TA
• Report on the role of TA in individual companies
• Build on previous questionnaire on TAs, under taken post KP3
• Prepare a single document outlining guidance on role and responsibilities of a TA
• Report to AI steering group by End of Q1
• Prepare draft guidance by end Q3 2012
23 February 2012
Pictures / details of current situation; Data charts etc....
Compare results to target.Identify & implement what is
needed to sustain the
What did we learn from doing this project?
What could we do better next time?Where else could this improvement be
applied?
Continuous Improvement
What is wrong / With what / By how much / What’s the benefit to the business ?
Goal Statement: Scope, improvement goal, metric, by when.
Always Start at this point
CI Process
19
Brainstorm list of ideas and prioritise/select
Improvement actions with actionees & target dates.
Track progress regular basis
needed to sustain the improvement. Improvement
CycleWhy is this happening? X 5
etc...
Verification subgroup
• 3-tier document structure
– Leadership - complete
– Workforce – in preparation
– Practitioner – draft review complete
• Promotion
– March 15th HCR seminar
• Well integrity
– WLCPF input into all tiers of guidance
• Challenges
– Tech authoring after 9th March
SCLT Meeting
HSSG Update
25-Jan-2012
Update topics
• AAIB G-REDL report
• Other Work
• 2012 Project Plan
G-REDL Update
• AAIB report published 24 November.
• A special HSSG meeting was held 5 December to discuss
recommendations, following which a newsletter was issued.
• Six of the 17 recommendations appeared in the interim
reports released in 2009 and were addressed immediately.
• 11 new recommendations are largely technical; responsibility
for implementation oversight is with CAA and HSSG will
monitor.
• CAA were issued 2 recommendations – accepted one and
deferred other to EASA
Other Issues
• Helideck integrity standards project planned to commence
2012.
• Weather data network - fully operational as of 1st November.
• Helideck Lighting – there had been some problems following • Helideck Lighting – there had been some problems following
installation for the trial period but these are rectifiable and
CAA will be publishing amendments to CAP 437 in Q2 2012.
Industry Safety Leadership DayDave Nicholls
Safety Leadership Day
• Format & duration
– same as last year
– fancy a change? Suggestions?
• Content
AgendaTime Item Mins Description Presenter
0800 Fire and Safety Brief 5 0805 Warm-up voting session 5 • General questions x 2 Martin Ellins/Ken Robertson
0810 Step Change – a look back and the way 25 forward
• Safety performance overview
• Overview of 2011
• Focus for 2012
• Scene setting session.
• Kick off with a review of industry safety performance (could be a separate session to start).
• A 10 min overview of the key achievements of 2011 (explaining more detail in poster sessions with workgroups)
• Look forward at 2012
• Introduce annual review
Martin Ellins/Ken Robertson
0835 Warm-down voting session 5 • General questions x 2 Martin Ellins/Ken Robertson
0840 Regulatory perspective 15 HSE perspective. SW to provide a steer but Steve Walker 0840 Regulatory perspective 15 HSE perspective. SW to provide a steer but would be good to include:
• Workforce engagement (sets up WE session)
• HCRs/AI
• Impact of Macondo incident
Steve Walker
0855 Workforce engagement-voting session 5 • Lead-in questions for WE session x 2 Ian Sharp
0900 Workforce Engagement 60 • Background to WE survey tool project
• Project status and roll-out plan
• Request for support/involvement (sign up sheet in room during day)
• Maturity model validation – involve delegates in scoring survey. Ideally using voting button system or paper-based (gets buy-in to tool) – 15 mins
Ian Sharp
Agenda
1000 Workforce engagement-voting session 5 • Follow-up questions x 2 Ian Sharp
1005 Coffee & networking 20 •
1025 AI voting session 5 • Lead-in questions x 2
1030 Asset Integrity 30
• HCR target & industry progress
• Data sharing – public HCR data + HCR plans
• HCRs – work of subgroups
• Verification workgroup
Geoff Homes/Steve Bullock
1100 Sharing – the challenge of legal privilege Paul & Williamson 20
• Legal privilege – the issues
• Options to promote sharing
Rona Jamieson
1120 AI voting session 5 •
1125 Workgroup Poster Session 60 Poster session – options:
• 5 posters – all groups (last year)
All
• 5 posters – all groups (last year)
• 3 posters – only groups not presenting
1225 Lunch 45 1320 WLCPF – links with Step Change 10
or SCLT Safety Rep session Brief presentation on work of WLCPF
WLCPF team member
1300 Industry Leadership – the way forward 30
Open forum session to obtain feedback and ask some key questions e.g. why are we not Step Changing? What help do you need from Step Change? Are we working on the right things?
Martin Ellins/Ken Robertson
1400 Close
Workforce Engagement
WorkgroupUpdate – January 2012
Progress Highlights• Pilot survey is now complete
– 830 returns
• Practical guide available in Draft form
• Close out workshop held with pilot participants to capture their input
– Input very positive and lessons learned will be incorporated in practical guide
– Participants expressed a desire to attend a follow up work shop
– Subsequent feedback suggests that the survey provides data not available from internal
surveys
• Subsea community will run follow up pilot in Q1 2012. Data will be
integrated with existing data already gathered.
• Focus in 1st half of ‘12 will be the successful launch and roll out of the
engagement survey tool
• Work Group strongly recommends we proceed and is now looking for SCLT
endorsement of the “go forward” plan
Survey Summary
Site Contact Installation Company Survey Dates Status
Returns as at
21st November
HSE Manager Denmore Road Facilities Cosalt Offshore 8th September - 30th September Closed 150
Offshore Operations Supervisor Dunlin Amec 7th October - 4th November Closed 110
OIM Maersk Curlew Maersk FPSOs 13th October - mid November Closed 35
OIM GP3 (FPSO) Maersk Oil North Sea 26th September - late October Closed 51
OIM Buzzard Nexen Petroleum Mid October - late November Closed 85
OIM Northern Producer Petrofac 12th September - 19th October Closed 81OIM Northern Producer Petrofac 12th September - 19th October Closed 81
OIM Kittiwake Petrofac 20th September - mid October Closed 66
OIM Brent Charlie Shell 21st September - 31st October Closed 121
Production & Wells Supt’ North Alwyn Total E&P 30th September - mid October Closed 67
NRS Division HR Manager Sedco 714 Transocean 1st October - mid November Closed 64
Grand Total 830
Example of Feedback
at Work Site Levelat Work Site Level
External benchmark report: Detailed dimension resultsA detailed view of the distribution of results for each dimension
Number of
responses
Missing
/ NA% Unf % Neu % Fav
Difference between %
Fav & industry
average
Industry
lowest
Industry
average
Industry
highest
Visibility 113 2 8 22 70 -3% 58% 73% 80%
Communication 113 8 5 23 72 -4% 61% 76% 83%
Involvement 113 4 7 16 77 -3% 65% 80% 87%
8
5
7
22
23
16
70
72
77
The overall number of
responses obtained in
the survey
The number of negative (UNFavourable),
NEUtral, and positive (FAVourable) results
divided by the total number of responses
For the sake of simplicity, all industry
benchmarks are made on the percentage
favourable scores
Support 113 7 6 26 68 -7% 60% 75% 82%
Participation 113 8 6 14 80 +8% 57% 72% 79%
Challenge 112 8 8 17 75 +2% 58% 73% 80%
6
6
8
26
14
17
68
80
75
The average number of
questions that were
missed in each dimension
Difference between the industry
average and percentage of
favourable responses
Details for all Workforce Engagement dimensions
Example of results for the PARTICIPATION dimension
What’s Next?
What is left to do?
Workforce Engagement Survey
Portal
20 days + Atlas development
Workforce Engagement
Toolkit (Practical Guide)
Project -related Communications
30 days + design & publishing
10 days + workshop delivery
The practical guide to workforce
engagement• “Behaviours Supporting Workforce Engagement – Obstacles to Workforce
Engagement = Improved Workforce Engagement Culture”
• The practical guide to workforce engagement (with related toolkit and
access to the Workforce Engagement Questionnaire) provides clear
guidance and practical support to implement the above. It provides the
WHY, the WHAT, and the HOW to increase workforce engagement in WHY, the WHAT, and the HOW to increase workforce engagement in
member organisations
• In short, the practical guide to workforce engagement exists to help every
worker participate in and challenge how safety is managed where they
work
• It is intended to provide an industry-specific, effective and holistic
approach that is flexible enough to meet the specific requirements of any
organisation
Workforce Engagement Work Group Project Plan
Project Activities Who 2011 2012
Workforce
Engagement
Assessment Tool
Survey Trial
Evaluate
Post survey workshop
Recommendation
Subsea Safety Forum
sponsored survey
System finalisation
Public launch
Worksites
WG
WG
WG/SCLT
SSF
WG
SCLTPublic launch SCLT
Practical
Engagement Guide
Finalise draft (80:20)
Workshop
Recommendation
Guide finalisation
Public launch
WG
WG
WG/SCLT
WG
SCLT
Ideas and business case Concept Decision WG activities SCLT DecisionSurvey Pilot EvaluateSystem development
Detailed Project plan and progress
Back Up Slides
Survey Feedback – Top bits of feedback on the Survey
and/or Guide
Positives:
• Main positive factor is that the survey is independent of all other Company surveys;
• The Survey is short, concise and simple to use;
• The Pilot has highlighted the need and usefulness in utilising the ESR’s in the Survey process;
Opportunities for improvement:Opportunities for improvement:
• The Survey was found to be very simple to use, however we need to ensure that there is a
more robust system for the collection and collating of paper copies;
• There was an issue regarding the tracking of Survey responses. This probably has more to do
with the anticipated feedback. There was an expectation amongst some that the location
issues would be reported back on a weekly basis;
• Some locations found that offering small incentives to complete helped with the uptake (i.e.
work break times dedicated to completing the survey; cokes and mars bars issued when
copies were handed in, etc).
Survey Feedback - Tips for anyone who is attempting
to run the survey for the first time
• Ensure thorough preparation has been undertaken
• Test the web link, etc
• Focal Points need to be prepared in advance of the Survey roll out;
• Ensure that they are aware of the difference between this Survey and the multitude of other
Survey’s that are in circulation. Also ensure that all participants are fully aware that the Survey
maintains complete anonymity.
• Need for ESR involvement from the outset and for each location to have clear and •
dedicated Focal Points;
• Before anybody completes the Survey, ensure that they are aware of the purpose
and objectives.
Survey Feedback - Tips on how best to launch the
Survey / Guide
• Decide who will be rolling out the Survey on an Organisational basis. Support
needs to come from the top all the way through the Organisation;
• The message needs to highlight that the Survey / Exercise is ‘solutions based’ and
not just another Survey;
• Set expectations from the outset – What do we want to achieve and clarify the
accountabilities;
• Plan the best time to undertake the Survey – outwith the Survey and Shutdown
season;
• Advertise and market in advance so people know that it is coming;
• Provide Workshop’s for the ESR’s and Focal Points in advance of the roll out.
Survey Feedback – Comments
• A very valuable survey, and going forward my personal opinion is that it will bring what is
required to the industry
• the results are encouraging, as always more to do but the quality and readability are really
good
• We both have enjoyed participating and would like to continue to do so
• As predicted they "did not see anything they did not already know" and there was a fair bit
of defensive discussion initially. As the discussion went on there was more recognition of the of defensive discussion initially. As the discussion went on there was more recognition of the
issues
• The Practical guide is very good and we like the format which is similar to the Human factors
data
Question results for the VISIBILITY dimension
Question results for the COMMUNICATION dimension
Question results for the INVOLVEMENT dimension
Question results for the SUPPORT dimension
Question results for the PARTICIPATION dimension
Question results for the CHALLENGE dimension
Proposed conceptual framework for the WEQ
The survey framework
Understanding the results
Developing action plan
How and when do surveys
add value to worksites?
Running the survey
Results feedback
Delivering improvements
We need to ensure very practical support for these critical phases!
Overall workforce engagement resultsA summary of workforce engagement, with overall maturity set by lowest dimension
Level 1 Level 2 Level 3 Level 4 Level 5
Visibility• Key strength
• Key development point
Communication• Key strength
• Key development point
Involvement• Key strength
• Key development point
Support• Key strength
• Key development point
Participation• Key strength
• Key development point
Challenge• Key strength
• Key development point
Overall• Key strength
• Key development point
Engagement Behaviours
• These are the key behaviours that can be adopted to help
improve engagement at your worksite and within your
organisation.
• The Engagement Behaviours have been divided into six
key elements:
Workforce Engagement Continuous
Improvement Cycle
Overview of Workforce Engagement Reporting
ApproachApproach
A maturity model approach to reportingPresenting results in a way that focusses on meaning, not numbers
LEVEL 3WORKFORCE ENGAGEMENT
LEVEL 4 WORKFORCE ENGAGEMENT
Workforce and management working
LEVEL 5 WORKFORCE ENGAGEMENT
Workforce leading the safety improvement
effort
LEVEL 1 WORKFORCE ENGAGEMENT
Workforce disengaged with the
safety effort
LEVEL 2 WORKFORCE ENGAGEMENT
Workforce partially engaged with the
safety effort
ENGAGEMENT
Workforce routinely engaged with the
safety effort
management working in partnership to improve safety
Each maturity level will include a description
of what the Workforce Engagement dimensions
look like at that level
Support TeamLes Linklater
Support Team, delivery model
Team Lead
Business Business Business
Project Manager
Team Lead: in post,
departing 9th Mar
Project Manager: in post, 3rd Jan
Business Analyst: recruited,
in post 1st Feb
Business Analyst: to be recruited
• Challenge – churn in team / transition, ability to maintain current expected levels of support.
• Opportunity – additional BA resource to be added, BA model will provide additional support
capabilities in mid-term.
Business Support
Business Analyst
Business Analyst
Business Analyst: to be recruited
Business Support: in post
Jan Feb March April May June July August Sep Oct Nov Dec
Leadership
TeamPlanning Day
Workforce
Engagement
Human
Factors
Competence
Helicopter
Safety
2012 CALENDAR
25 7 25 6 22 31 1226
19
26
11 29 13 29 10 3010
? ? ? ??
1 30 5
28 10 231122 05 6
22 24 26 2927
Safety
Asset
Integrity
Network
Meeting
Events
Incident
Analysis /
Root Cause
Industry
Leadership
Safety Day
Safety Awards Share Fair
Incident
Analysis /
Root Cause
Incident
Analysis /
Root Cause
15
14 18
2
20
12 21
28 27
24
28 22 28 30
1 30 5
15 16
Events, Focus & Rationalisation
Key Event Schedule (Current)
15/2 Network meeting #1 cancelled
14/3 Incident / RCA Workshop
15/3 Hydrocarbon Prevention Seminar
28/3 Industry Leadership Safety Day
Key Event Schedule (Proposed)
15/3 Hydrocarbon Prevention Seminar
28/3 Industry Leadership Safety Day
2/5 Network / WG Share Fair – tbc
20/6 WG Share Fair – Workforce Engagement
2/5 Network #2
20/6 Share Fair
27/6 Incident / RCA Workshop
12/9 Network #3
24/10 Incident / RCA Workshop
21/11 Network #4
12/9 Network / WG Share Fair – tbc
21/11 Network / WG Share Fair – tbc
• Network / Mini Share Fair concept
• Event boiler plate to be developed
• Workgroup lead
• Update, Launch, Share lessons ...
AOBAOB