29
Science Museum Group - Building ONE Collection Storage Facility Pre-Application Enquiry - Design & Access Statement Prepared By: GWP Architecture 71-75 Shelton Street Borough of Camden London WC2H 9JQ 020 7470 8770 (t) www.gwp-arch.com [email protected] Document QA: Ref: (390)1716-GWP-A-4A-01 First Issue: 25.10.17 Purpose: Comment Revision: P05 Prepared for: Science Museum Group

Science Museum Group - Building ONE€¦ · DESIGN & ACCESS STATEMENT | PAGE 6 SCIENCE MUSEUM GROUP - BUILDING ONE 1.2 INTRODUCTION This document is submitted in support of a Pre-Application

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Science Museum Group - Building ONE€¦ · DESIGN & ACCESS STATEMENT | PAGE 6 SCIENCE MUSEUM GROUP - BUILDING ONE 1.2 INTRODUCTION This document is submitted in support of a Pre-Application

Science Museum Group - Building ONE

Collection Storage FacilityPre-Application Enquiry - Design & Access Statement

Prepared By:GWP Architecture71-75 Shelton StreetBorough of CamdenLondonWC2H 9JQ

020 7470 8770 (t)

[email protected]

Document QA:Ref: (390)1716-GWP-A-4A-01First Issue: 25.10.17Purpose: CommentRevision: P05

Prepared for:Science Museum Group

Page 2: Science Museum Group - Building ONE€¦ · DESIGN & ACCESS STATEMENT | PAGE 6 SCIENCE MUSEUM GROUP - BUILDING ONE 1.2 INTRODUCTION This document is submitted in support of a Pre-Application

[email protected]

© gwparchitecture 2017

D E S I G N & A C C E S S S T A T E M E N T | P A G E 2 S C I E N C E M U S E U M G R O U P - B U I L D I N G O N E

project ref

(390)1716

originator

gwp

volume

01

level

zz

type

pp

role

a

classification

4A

name

D&A

revision

P06

author

ta

checked

rt

date of issue

10.11.17

Disclaimer

This document has been prepared by GWP Architecture in accordance with the instructions of their client detailed above, for the sole use of the client and may contain confidential information.

Any information provided by third parties and referred to herein has not been checked or verified by GWP Architecture, unless otherwise expressly stated in the report.

No third party may rely upon this document without the prior express written agreement of GWP Architecture.

This document is the property of GWP Architecture. Copyright is reserved by them and the drawing is issued on the condition that it is not copied, reproduced, retained, or disclosed to any unauthorised person, either wholly or in part, without the consent in writing of GWP Architecture.

Page 3: Science Museum Group - Building ONE€¦ · DESIGN & ACCESS STATEMENT | PAGE 6 SCIENCE MUSEUM GROUP - BUILDING ONE 1.2 INTRODUCTION This document is submitted in support of a Pre-Application

[email protected]

© gwparchitecture 2017

D E S I G N & A C C E S S S T A T E M E N T | P A G E 3 S C I E N C E M U S E U M G R O U P - B U I L D I N G O N E

CONTENTS

DOCUMENT CONTROL

CONTENTS

SECTION 1.0INTRODUCTION

1.1 CLIENT & DESIGN TEAM1.2 INTRODUCTION

SECTION 2.0THE SITE

2.1 SITE LOCATION2.2 SITE LOCATION PLAN2.3 SITE PHOTOGRAPHS2.4 HISTORICAL CONTEXT

SECTION 3.0DESIGN PRINCIPLES - BUILDING LOCATION

3.1 BUILDING LOCATION & DEVELOPMENT3.2 PROPOSED SITE SECTIONS

SECTION 4.0DESIGN PRINCIPLES - BUILDING LAYOUT

4.1 INTERNAL ACCOMMODATION DEVELOPMENT4.2 FUNCTIONAL ADJACENCIES4.3 PROPOSED GROUND FLOOR PLAN4.4 PROPOSED MEZZANINE PLAN4.5 SUPPORT SPACE LAYOUT

SECTION 5.0DESIGN PRINCIPLES - BUILDING FORM

5.1 ROOF & FORM5.2 EXTERNAL PLANT BENEFITS5.3 PROPOSED ELEVATIONS5.4 3D PERSPECTIVE VIEW

SECTION 6.0EXTERNAL SPACES, SERVICING & ACCESS

6.1 EXTERNAL SPACES6.2 SERVICE ACCESS6.3 CAR PARKING & HIGHWAYS6.4 HGV LOADING6.5 REFUSE STORAGE6.6 EXTERNAL LIGHTING6.7 ACCESSIBILITY

Page 4: Science Museum Group - Building ONE€¦ · DESIGN & ACCESS STATEMENT | PAGE 6 SCIENCE MUSEUM GROUP - BUILDING ONE 1.2 INTRODUCTION This document is submitted in support of a Pre-Application

S M G B U I L D I N G O N E | D E S I G N & A C C E S S S T A T E M E N T

Section 1.0

Introduction

Page 5: Science Museum Group - Building ONE€¦ · DESIGN & ACCESS STATEMENT | PAGE 6 SCIENCE MUSEUM GROUP - BUILDING ONE 1.2 INTRODUCTION This document is submitted in support of a Pre-Application

[email protected]

© gwparchitecture 2017

D E S I G N & A C C E S S S T A T E M E N T | P A G E 5 S C I E N C E M U S E U M G R O U P - B U I L D I N G O N E

1 .1 CL I ENT & DES IGN T EAM

CLIENT

SCIENCE MUSEUM GROUP Red Barn Gate Wroughton Swindon SN4 9LT 01793 846 229 (t)

DESIGN TEAM

ARCHITECT

GWP ARCHITECTURE 71-75 Shelton Street Borough of Camden London WC2H 9JQ

020 7470 8770 (t)

STRUCTURAL / CIVIL ENGINEER

ATKINS Woodcote Grove Ashley Road Epsom KT18 5BW 01454 66 2843 (t)

BUILDING SERVICES ENGINEER

DESCO 5 Manchester Square London W1U 3PD 0207 299 2860 (t)

PROJECT MANAGER & QUANTITY SURVEYOR

FEASIBILITY LIMITED No 5 Hagley Court North The Waterfront Level Street Brierley Hill West Midlands DY5 1XF

01384 489 023 (t)

PLANNING CONSULTANT

PEGASUS GROUP First Floor, South Wing Equinox North Great Park Road Almondsbury Bristol BS32 4QL

01454 625945 (t)

Page 6: Science Museum Group - Building ONE€¦ · DESIGN & ACCESS STATEMENT | PAGE 6 SCIENCE MUSEUM GROUP - BUILDING ONE 1.2 INTRODUCTION This document is submitted in support of a Pre-Application

[email protected]

© gwparchitecture 2017

D E S I G N & A C C E S S S T A T E M E N T | P A G E 6 S C I E N C E M U S E U M G R O U P - B U I L D I N G O N E

1 .2 INTRODUCT ION

This document is submitted in support of a Pre-Application Enquiry for a new collections management facility to house objects for the Science Museum Group (SMG), at their site in Wroughton (SMGW).

SMGW is the large object and library and archives for the SMG. The site is not open for public access, though research visits can be arranged to use the library and archive facilities, or to view the storage collection, by appointment.

The new building will be a fit-for-purpose facility that will house and manage the SMG collection and accommodate managed public visits, support object conservation work and provide staff facilities. The building will utilise the existing vehicular access to the site and its functions will also be supported by the existing SMG operational buildings on the wider site.

The information in this statement includes a description of the proposed facility and development site, an analysis of the design approach and application drawing extracts showing the location of the facility and it’s layout.

Supporting documentation will be included with this pre-application request comprising-• Planning Statement• Heritage Statement• Landscape and Visual Impact Assessment• Ecological Report• Transport Statement

Page 7: Science Museum Group - Building ONE€¦ · DESIGN & ACCESS STATEMENT | PAGE 6 SCIENCE MUSEUM GROUP - BUILDING ONE 1.2 INTRODUCTION This document is submitted in support of a Pre-Application

S M G B U I L D I N G O N E | D E S I G N & A C C E S S S T A T E M E N T

Section 2.0

The Site

Page 8: Science Museum Group - Building ONE€¦ · DESIGN & ACCESS STATEMENT | PAGE 6 SCIENCE MUSEUM GROUP - BUILDING ONE 1.2 INTRODUCTION This document is submitted in support of a Pre-Application

[email protected]

© gwparchitecture 2017

D E S I G N & A C C E S S S T A T E M E N T | P A G E 8 S C I E N C E M U S E U M G R O U P - B U I L D I N G O N E

Extract from Science Museum Group One Col lect ion Faci l i ty Cl ient Technical Br ief - Dated August 2017

Wroughton

Ae r ia l V i ew

Overtown

Aerial v iew of solar farm View of bui ldings A1, D4, D3 Bui lding A1 Motor Vehic le col lect ion in Bui lding D3Bui lding D4

Swindon

Newbury

2 .1 S I T E LOCAT ION

Page 9: Science Museum Group - Building ONE€¦ · DESIGN & ACCESS STATEMENT | PAGE 6 SCIENCE MUSEUM GROUP - BUILDING ONE 1.2 INTRODUCTION This document is submitted in support of a Pre-Application

[email protected]

© gwparchitecture 2017

D E S I G N & A C C E S S S T A T E M E N T | P A G E 9 S C I E N C E M U S E U M G R O U P - B U I L D I N G O N E

2 .2 S I T E LOCAT ION P LAN

This drawing is the property of GWP Architecture. Copyright is reserved by themand the drawing is issued on the condition that it is not copied, reproduced,retained, or disclosed to any unauthorised person, either wholly or in part,without the consent in writing of GWP Architecture.

All drawings and specifications should be read in conjunction with the projecthealth and safety plan, any possible conflicts should be presented to the PlanningCoordinator.

All work to be carried out in accordance with current Building Regulations.

Site Location PlanScale

Name (390)1716-GWP-01-XX-DR-A-(PA)-0001SMG Building ONE

......................................................................................................................................................................................................................................................................................................................................................................................................

Contractors must verify all dimensions at the job before commencing any work ormaking shop drawings. Do not scale off drawing. Do not take digital dimensionsfrom this drawing. Written dimensions should be taken. Any discrepancies to bereported to the Architect. The design is subject to the following:

- Land Registry Confirmation - Full Structural Review- Planning Approval -Topographical Information- Review of Easements and Covenants - Rights of lights Issues- Building Regulations Approval / Fire Engineering Dr/Checked

Rev / Status

Date of Issue

A3/1:10000

TA / RT

P05 / S

15.09.17BIM Server: BIMServer-HP - BIM Server 20/One Collection (390)1716-GWP-01-XX-M3-A

House

1

Stone

Track

Track

178.0m

Stone

Dairy

Pond

Pond

Cottages

2

Stones

159.4m

Trac

k

The

201.2m

1

203.9m

Springs

164.9m

Stone

Clouts Wood

Mar

kham

Hill

186.2m

Sluice

Lodge

75

86

Issu

es

85

87

187.1m

12

63

59

66

21

22

192.3m

196.0m

181.4m

FS

Signal Square

181.2m

TCB

Stone

Lay

-by

FS

Stone

Hackpen

Stone

Trac

k

206.0m

Pat

h (

um

)

195.7m

187.1m

Cottage

House

New Cottages

3

Stone

4

Wiltshire

187.1m

Downs View

Midge's Close

197.5m

Uffcott

LB

White

2

1

193.5m

203.6m Red Barn Cottages

Pond

Stone

Path (um)

Elcombe

Stone

Drain

Issues

Lay-by

A 4

361

2

172.5m

Spring

Reservoir

(covered)

StoneStone

Stone

Stone

Path (um)

Track

A 4361

Engine Shed

The Ark

Mast (Telecommunication)

Mulberry House

The Old Store

House

The Wagon

Hone

ysuc

kle

Cottag

e

Highridge Cottage

2

1

Cottages

White House

Pond

Parsloes Barn

Science Museum

(dis)

Wroughton Airfield

Trac

k

Path

(um

)

Mar

kham

Bott

om

Co C

onst

, UA

& C

P B

dy

Boundary Cottages

2

1

Stone

Adit

Overtown

Adit

632

12

10

54

47

Issues

Issues

41

2

Coombe Bottom

27

12a

Manor

1

OV

ERTO

WN

HILL

Drain

Adit

Spring

Windshot

TCB

35

36

24

46

Drain

Stone

Shaft

LB

ESS

ESS

LB

Path (u

m)

Tanks

Chy

Dunnocks

Sports Facility

GP

Stone

Stone

Ash Cottage

Path

(um

)

Langton Park (Stables)

Solar Farm

Cottages

Merlin

1

2

ESS

Path

(um

)

ESS

ESS

ESS

ESS

ESS

ESS

Pat

h (

um

)

WB

Pond

181.1m

Drain

Hackpen

Farm

MS

Pond

Posts

Barbury Down House

Stone

ESS

Reservoir

Reservoir

(covered)

Path

(um)

Drain

Dra

in

Track

Ponds

Track

Solar Panels

El Sub Sta

PumpHouse

Stone

Path (um)

Spreads

Path (um)

Def

Tk

F

Tk F

Def

C Baulk

The Stables

58

Issues

92

157.9m

PRIO

R'S

HIL

L

94

35

77

78

8

73

17

41

Issues

A 4361

Ponds

Elcombe Hall

The Ivery

Tank

161.5m

1

Def

BS

Tk

F

Def

Thorney

53

Tank

98

Sinks

The Lodge

116

97

183.2m

1

4

Shelter

111

28

112

87

105

48

85

1

113

Issues

188.4m

185.0m

Track

23

49

72

92

16

Stone

67

LB

Park

GP

Issues

El Sub Sta

22

79

163.4m

52

62

137.2m

SNAPPS CLOSE

49

59

61

1

73

82

69a

69

90

Stables

28

15

Drain

Track

Stone

Ston

es

Stone

Dra

in

Issues

73a

Lay-b

y

8

Ailsa C

raig

Beth

eny

Elm Rise

Drain

2

Path

Markham Hill

84

76

78

66a

66

70

64

142.6m

0 100m 200 300 400 500N

Scale - 1:10,000 @A3

key

application site boundary

site ownership boundary

DRA

FT

This drawing is the property of GWP Architecture. Copyright is reserved by them and the

drawing is issued on the condition that it is not copied, reproduced, retained, or disclosed to

any unauthorised person, either wholly or in part, without the consent in writing of GWP

Architecture.

All drawings and specifications should be read in conjunction with the project health and

safety plan, any possible conflicts should be presented to the Planning Coordinator.

All work to be carried out in accordance with current Building Regulations.

Site Location PlanScale

Name (390)1716-GWP-01-01-DR-A-(SK)-0001One Collection

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Contractors must verify all dimensions at the job before commencing any work or making

shop drawings. Do not scale off drawing. Do not take digital dimensions from this drawing.

Written dimensions should be taken. Any discrepancies to be reported to the Architect. The

design is subject to the following:

- Land Registry Confirmation - Full Structural Review

- Planning Approval - Topographical Information

- Review of Easements and Covenants - Rights of lights Issues

- Building Regulations Approval / Fire Engineering Drawn/Checked

Revision / Status

Date of Issue

A3/1:10,000

TA / RT

02 / S

15.09.17A R C H I T E C T U R E

/Volumes/Data/CAD/(390)1716 The Science Museum/A_Architects_(GWP)/Model/(390)1716-GWP-01-XX-M3-A-One_Collection.pln

House

1

Stone

Track

Track

178.0m

Stone

Dairy

Pond

Pond

Cottages

2

Stones

159.4m

Trac

k

The

201.2m

1

203.9m

Springs

164.9m

Stone

Clouts Wood

Mar

kham

Hill

186.2m

Sluice

Lodge

75

86

Issu

es

85

87

187.1m

12

63

59

66

21

22

192.3m

196.0m

181.4m

FS

Signal Square

181.2m

TCB

Stone

Lay

-by

FS

Stone

Hackpen

Stone

Trac

k

206.0m

Pat

h (

um

)

195.7m

187.1m

Cottage

House

New Cottages

3

Stone

4

Wiltshire

187.1m

Downs View

Midge's Close

197.5m

Uffcott

LB

White

2

1

193.5m

203.6m Red Barn Cottages

Pond

Stone

Path (um)

Elcombe

Stone

Drain

Issues

Lay-by

A 4

361

2

172.5m

Spring

Reservoir

(covered)

StoneStone

Stone

Stone

Path (um)

Track

A 4361

Engine Shed

The Ark

Mast (Telecommunication)

Mulberry House

The Old Store

House

The Wagon

Hone

ysuc

kle

Cottag

e

Highridge Cottage

2

1

Cottages

White House

Pond

Parsloes Barn

Science Museum

(dis)

Wroughton Airfield

Trac

k

Path

(um

)

Mar

kham

Bott

om

Co C

onst

, UA

& C

P B

dy

Boundary Cottages

2

1

Stone

Adit

Overtown

Adit

632

12

10

54

47

Issues

Issues

41

2

Coombe Bottom

27

12a

Manor

1

OV

ERTO

WN

HILL

Drain

Adit

Spring

Windshot

TCB

35

36

24

46

Drain

Stone

Shaft

LB

ESS

ESS

LB

Path (u

m)

Tanks

Chy

Dunnocks

Sports Facility

GP

Stone

Stone

Ash Cottage

Path

(um

)

Langton Park (Stables)

Solar Farm

Cottages

Merlin

1

2

ESS

Path

(um

)

ESS

ESS

ESS

ESS

ESS

ESS

Pat

h (

um

)

WB

Pond

181.1m

Drain

Hackpen

Farm

MS

Pond

Posts

Barbury Down House

Stone

ESS

Reservoir

Reservoir

(covered)

Path

(um)

Drain

Dra

in

Track

Ponds

Track

Solar Panels

El Sub Sta

PumpHouse

Stone

Path (um)

Spreads

Path (um)

Def

Tk

F

Tk F

Def

C Baulk

The Stables

58

Issues

92

157.9m

PRIO

R'S

HIL

L

94

35

77

78

8

73

17

41

Issues

A 4361

Ponds

Elcombe Hall

The Ivery

Tank

161.5m

1

Def

BS

Tk

F

Def

Thorney

53

Tank

98

Sinks

The Lodge

116

97

183.2m

1

4

Shelter

111

28

112

87

105

48

85

1

113

Issues

188.4m

185.0m

Track

23

49

72

92

16

Stone

67

LB

Park

GP

Issues

El Sub Sta

22

79

163.4m

52

62

137.2m

SNAPPS CLOSE

49

59

61

1

73

82

69a

69

90

Stables

28

15

Drain

Track

Stone

Ston

es

Stone

Dra

in

Issues

73a

Lay-b

y

8

Ailsa C

raig

Beth

eny

Elm Rise

Drain

2

Path

Markham Hill

84

76

78

66a

66

70

64

142.6m

Scale - 1:10,000 @A3

0 100m 200 300 400 500

N

PROJECT LOCATIONThe facility will be located in the northern section of SMGW. A feasibility study has determined that this location takes best advantage of level ground, proximity to services and existing road network.

LOCAL CONTEXTSMGW is located approximately 6.5 kilometres south of the centre of Swindon and 1.4 kilometres south of the intervening village of Wroughton.

The site falls within the North Wessex Downs Area of Outstanding Natural Beauty.

The single access point to the site is from the north-west via the A4361 (Avebury-Wroughton) road, which, in turn, is within close proximity and well connected to both Junction 15 and 16 of the M4 motorway.

SITE CONTEXTThe main site is secured with a perimeter fence. The site is manned 24 hours a day, 7 days a week from Red Barn Gatehouse, in the north west of the site.

The development plot is predominantly flat improved grassland, bordered by disused concrete runways. The tarmac and concrete runways stretch to the edges of the plot and are connected by smaller perimeter roadways. The recent development of 73 hectares of solar panels now covers the western and southern parts of the main site.

Page 10: Science Museum Group - Building ONE€¦ · DESIGN & ACCESS STATEMENT | PAGE 6 SCIENCE MUSEUM GROUP - BUILDING ONE 1.2 INTRODUCTION This document is submitted in support of a Pre-Application

[email protected]

© gwparchitecture 2017

D E S I G N & A C C E S S S T A T E M E N T | P A G E 1 0 S C I E N C E M U S E U M G R O U P - B U I L D I N G O N E

2 .3 S I T E PHOTOGRAPHS

1.

5.

2.

3.

4.

2

3

1

5

4

P16-1396_02 Viewpoint PanoramasOctober 2017

Barbury Castle

Ridgeway

P16-1396_02 Viewpoint PanoramasOctober 2017

Entrance Road

Exit Road

P16-1396_02 Viewpoint PanoramasOctober 2017

Go Kart Parking

Go Kart Entrance

P16-1396_02 Viewpoint PanoramasOctober 2017

VP01

Red Gate B

P16-1396_02 Viewpoint PanoramasOctober 2017

PRoW

SE Offices

Page 11: Science Museum Group - Building ONE€¦ · DESIGN & ACCESS STATEMENT | PAGE 6 SCIENCE MUSEUM GROUP - BUILDING ONE 1.2 INTRODUCTION This document is submitted in support of a Pre-Application

[email protected]

© gwparchitecture 2017

D E S I G N & A C C E S S S T A T E M E N T | P A G E 1 1 S C I E N C E M U S E U M G R O U P - B U I L D I N G O N E

2 .4 H I S TOR ICAL CONTEXT

WROUGHTON AIRFIELD

The site was established in 1940 as an RAF airfield and consists of a number of runways and aircraft hangars. The hangars vary in construction: there are four of the ‘L’ type ‘Blister’ hangars (a steel framework with a concrete skin), four of the ‘D’ type hangars (steel reinforced concrete with an arching roof), and two ‘C’ type hangar (steel framework with an external cladding), within the land owned by SMG.

The Ministry of Defence commenced disposal of this site in 1979.

SMG AT WROUGHTON

The Science Museum Group took ownership of the 545-acre site in 1979, and has used it since this time as the storage facility for the largest objects of the Science Museum Group collections.

Over 35,000 3D and 500,000 2D objects from the national collection are currently stored on site, within nine former aircraft hangars and a purpose-built store. The collection ranges from the first hovercraft to MRI scanners, and science publications to (de-activated) nuclear missiles. The collections here are particularly notable for the extensive collection of very large aircraft, road transport vehicles, agricultural machinery and industrial collections.

In 1994 the Museum opened a new purpose-built facility at Wroughton, providing an environmentally controlled building for the storage of objects.

Since 2000 the freehold of the majority of the site has been owned byBoard of Trustees of the Science Museum.

Latterly SMG has undertaken a number of projects on site to refurbish hangars, construct award-winning innovative storage, work with universities and industry in research and development, and develop a large scale solar farm for electricity supply into the national grid. These projects along with extensive biodiversity enhancements have helped define the vision for SMGs long term use of the site.

The site is currently not open to the public due to the increased risks presented by the failing 1940s infrastructure and the lack of circulation space due to compression of the stores to enable additional collections to be accommodated.

Aerial photograph taken by the US Army Air Force in 1944

Boeing B17 at Wroughton Air Show - 1993

SMG large object storage within Aircraft Hangars Environmental ly control led purpose bui l t s torage faci l i ty

Wroughton Air Show - 1992

No 15 Maintenance Unit RAF Wroughton - 1968/69

Page 12: Science Museum Group - Building ONE€¦ · DESIGN & ACCESS STATEMENT | PAGE 6 SCIENCE MUSEUM GROUP - BUILDING ONE 1.2 INTRODUCTION This document is submitted in support of a Pre-Application

S M G B U I L D I N G O N E | D E S I G N & A C C E S S S T A T E M E N T

Section 3.0

Design Principles - Building Location

Page 13: Science Museum Group - Building ONE€¦ · DESIGN & ACCESS STATEMENT | PAGE 6 SCIENCE MUSEUM GROUP - BUILDING ONE 1.2 INTRODUCTION This document is submitted in support of a Pre-Application

[email protected]

© gwparchitecture 2017

D E S I G N & A C C E S S S T A T E M E N T | P A G E 1 3 S C I E N C E M U S E U M G R O U P - B U I L D I N G O N E

D4

A1

Runw

ay /

Acce

ss R

oad

Runway 22

Car park

Grasscrete Plant Access / Service Route

External Plant Towers

Waste Store

Service Yard

Future Expansion Space6,000 m2

D4

A1

Runw

ay /

Acce

ss R

oad

Runway 22

Car park

Grasscrete Plant Access / Service Route

External Plant Towers

Waste Store

Service Yard

Future ExpansionSpace

6,000 m2

3 .1 BU I LD ING LOCAT ION & DEVELOPMENT

The location for the new collections management facility has been identified through assessment of access requirements for the building - both from the main entrance to site (utilising existing roadways and former runways) and in the context of the SMG operational facilities on the wider site. Consideration has also been given to the orientation of the building, its proximity to existing services and the topography of the site. This evaluation has led to the development site running perpendicular to the former runway as shown.

Si te Layout Proposal

Building ONE

91.5 Meters

289 Meters

D4

A1

Runw

ay /

Acce

ss R

oad

Runway 22

Car park

Grasscrete Plant Access / Service Route

External Plant Towers

Waste Store

Service Yard

Future ExpansionSpace

6,000 m2

Page 14: Science Museum Group - Building ONE€¦ · DESIGN & ACCESS STATEMENT | PAGE 6 SCIENCE MUSEUM GROUP - BUILDING ONE 1.2 INTRODUCTION This document is submitted in support of a Pre-Application

[email protected]

© gwparchitecture 2017

D E S I G N & A C C E S S S T A T E M E N T | P A G E 1 4 S C I E N C E M U S E U M G R O U P - B U I L D I N G O N E

This drawing is the property of GWP Architecture. Copyright is reserved by themand the drawing is issued on the condition that it is not copied, reproduced,retained, or disclosed to any unauthorised person, either wholly or in part,without the consent in writing of GWP Architecture.

All drawings and specifications should be read in conjunction with the projecthealth and safety plan, any possible conflicts should be presented to the PlanningCoordinator.

All work to be carried out in accordance with current Building Regulations.

Proposed Site SectionsScale

Name (390)1716-GWP-01-XX-DR-A-(PA)-0008SMG Building ONE

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Contractors must verify all dimensions at the job before commencing any work ormaking shop drawings. Do not scale off drawing. Do not take digital dimensionsfrom this drawing. Written dimensions should be taken. Any discrepancies to bereported to the Architect. The design is subject to the following:

- Land Registry Confirmation - Full Structural Review- Planning Approval -Topographical Information- Review of Easements and Covenants - Rights of lights Issues- Building Regulations Approval / Fire Engineering Dr/Checked

Rev / Status

Date of Issue

A3/1:1250

TA / RT

P06 / S

24.10.17BIM Server: BIMServer-HP - BIM Server 20/One Collection (390)1716-GWP-01-XX-M3-A

building A1 accessroad Proposed Building ONE facility (approx. 289m overall building length) runwaycar parking

& entrance grass / open areaA1 access grassmargin

Extent of mezzanine structure

A1 Store D4 Hangar D3 Hangar

runway Proposed Building ONE facility(approx. 91.5m overall building width)grass / open area grass / open areaservice

zone

Extent of mezzanine structure

A1 Store D4 Hangar

Site Section A1:1250 @ A3

Key Plan

Site Section B1:1250 @ A3

Scale - 1:1250 @A3

0 10m 20 30 40 50N

Approx. 13mApprox. 12m

Approx. 12m

Approx. 16m

Approx. 16mApprox. 13m

A1

D4

D3

Approx. 4.15m

A

B

This drawing is the property of GWP Architecture. Copyright is reserved by themand the drawing is issued on the condition that it is not copied, reproduced,retained, or disclosed to any unauthorised person, either wholly or in part,without the consent in writing of GWP Architecture.

All drawings and specifications should be read in conjunction with the projecthealth and safety plan, any possible conflicts should be presented to the PlanningCoordinator.

All work to be carried out in accordance with current Building Regulations.

Proposed Site SectionsScale

Name (390)1716-GWP-01-XX-DR-A-(PA)-0008SMG Building ONE

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Contractors must verify all dimensions at the job before commencing any work ormaking shop drawings. Do not scale off drawing. Do not take digital dimensionsfrom this drawing. Written dimensions should be taken. Any discrepancies to bereported to the Architect. The design is subject to the following:

- Land Registry Confirmation - Full Structural Review- Planning Approval -Topographical Information- Review of Easements and Covenants - Rights of lights Issues- Building Regulations Approval / Fire Engineering Dr/Checked

Rev / Status

Date of Issue

A3/1:1250

TA / RT

P02 / S

24.10.17BIM Server: BIMServer-HP - BIM Server 20/One Collection (390)1716-GWP-01-XX-M3-A

building A1 accessroad Proposed Building ONE facility (approx. 289m overall building length) runwaycar parking

& entrance grass / open areaA1 access grassmargin

runway Proposed Building ONE facility(approx. 91.5m overall building width)grass / open area grass / open areaservice

zone

Site Section A1:1250 @ A3

Key Plan

Site Section B1:1250 @ A3

Scale - 1:1250 @A3

0 10m 20 30 40 50N

Approx. 13m Approx. 12m

Approx. 12m

A

B

3 .2 PROPOSED S I T E S ECT IONS

Page 15: Science Museum Group - Building ONE€¦ · DESIGN & ACCESS STATEMENT | PAGE 6 SCIENCE MUSEUM GROUP - BUILDING ONE 1.2 INTRODUCTION This document is submitted in support of a Pre-Application

S M G B U I L D I N G O N E | D E S I G N & A C C E S S S T A T E M E N T

Section 4.0

Design Principles - Building Layout

Page 16: Science Museum Group - Building ONE€¦ · DESIGN & ACCESS STATEMENT | PAGE 6 SCIENCE MUSEUM GROUP - BUILDING ONE 1.2 INTRODUCTION This document is submitted in support of a Pre-Application

[email protected]

© gwparchitecture 2017

D E S I G N & A C C E S S S T A T E M E N T | P A G E 1 6 S C I E N C E M U S E U M G R O U P - B U I L D I N G O N E

The layout of the internal space has been defined by the building orientation and the operational adjacencies for the functional spaces within the superstructure. These rooms have been optimised to provide high quality collections management services, maximise the storage capability of the building and minimise operational costs.

4 .1 INTE RNAL ACCOMMODAT ION L AYOUT

1

1

A A

B B

C C

2

2

3

3

4

4

5

5

6

6

7

7

8

8

9

9

10

10

11

11

12

12

13

13

14

14

15

15

16

16

17

17

18

18

19

19

20

20

21

21

22

22

23

23

24

24

25

25

26

26

27

27

28

28

29

29

30

30

31

31

32

32

A A

B B

33

33

34

34

35

35

36

36

37

37

38

38

39

39

40

40

41

41

13

13

14

14

15

15

16

16

17

17

18

18

19

19

20

20

21

21

22

22

23

23

24

24

25

25

26

26

27

27

28

28

29

29

30

30

31

31

32

32

33

33

34

34

35

35

36

36

37

37

38

38

39

39

40

40

41

41

45,00

045

,000

7,200 7,200 7,200

45,00

0

7,200 7,200 7,200

Store (High Bay)15,150 m2

91.5

met

res

ConservationLaboratory200 m2

289 metres

ConservationWorkshop

500m2

Store (Low Bay)8,370 m2

GROUND FLOOR26,000 m2

MEZZANINE LEVEL9,000 m2

InwardTransit

Freezer

202.5 metres

CollectionsStudy200 m2

Photography Studio160 m2

External Plant Gantry(Mezz AHUs)

Electrical substation/HV/LV Switch

BoilerPlantAHU

Chillers

External Plant Gantry(Mezz AHUs)

External Plant Gantry(Mezz AHUs)

External Plant Gantry(Mezz AHUs)

ProposedSprinklers

AHUChillers

Coldwaterpump

Radioactive/HighExplosives Store

ProposedSprinklers

External Plant Gantry(Mezz AHUs)

EntranceLobby

Welfare70 m2

Toilets30 m2

TransitStorage

OutwardTransit

Conditioned Store850 m2

Mezzanine Store (Low Bay)8,200 m2

Stairs

Page 17: Science Museum Group - Building ONE€¦ · DESIGN & ACCESS STATEMENT | PAGE 6 SCIENCE MUSEUM GROUP - BUILDING ONE 1.2 INTRODUCTION This document is submitted in support of a Pre-Application

[email protected]

© gwparchitecture 2017

D E S I G N & A C C E S S S T A T E M E N T | P A G E 1 7 S C I E N C E M U S E U M G R O U P - B U I L D I N G O N E

KEY: object staff public external glazing pedestrian entrance vehicle entrance rooflights

store (low bay)

collections study

entrance

welfarewc

conservation laboratory

photography studio

conservation workshop

freezerinward transit loading area

outward transit

transit storage

mezzanine store (low bay)

conditioned store

store (high bay)

Ground Floor

Mezzanine level

stais / lift

4 .2 FUNCT IONAL ADJACENC I ES

Page 18: Science Museum Group - Building ONE€¦ · DESIGN & ACCESS STATEMENT | PAGE 6 SCIENCE MUSEUM GROUP - BUILDING ONE 1.2 INTRODUCTION This document is submitted in support of a Pre-Application

[email protected]

© gwparchitecture 2017

D E S I G N & A C C E S S S T A T E M E N T | P A G E 1 8 S C I E N C E M U S E U M G R O U P - B U I L D I N G O N E

This drawing is the property of GWP Architecture. Copyright is reserved by themand the drawing is issued on the condition that it is not copied, reproduced,retained, or disclosed to any unauthorised person, either wholly or in part,without the consent in writing of GWP Architecture.

All drawings and specifications should be read in conjunction with the projecthealth and safety plan, any possible conflicts should be presented to the PlanningCoordinator.

All work to be carried out in accordance with current Building Regulations.

Proposed Ground Floor PlanScale

Name (390)1716-GWP-01-GF-DR-A-(PA)-0004SMG Building ONE

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Contractors must verify all dimensions at the job before commencing any work ormaking shop drawings. Do not scale off drawing. Do not take digital dimensionsfrom this drawing. Written dimensions should be taken. Any discrepancies to bereported to the Architect. The design is subject to the following:

- Land Registry Confirmation - Full Structural Review- Planning Approval -Topographical Information- Review of Easements and Covenants - Rights of lights Issues- Building Regulations Approval / Fire Engineering Dr/Checked

Rev / Status

Date of Issue

A3/1:1000

TA / RT

P04 / S

24.10.17BIM Server: BIMServer-HP - BIM Server 20/One Collection (390)1716-GWP-01-XX-M3-A

approx. 289m Overall Building Length

ap

pro

x. 9

1.5

m O

vera

ll Bu

ildin

g W

idth

SW0007

NE0007

SE

00

07

NW

00

07

GROUND FLOOR26,000 m2

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 321a1b1c1d1e1f1g1h1j

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41

A

B

C

Z1

Z

A1

A2

A3

A4

A5

B1

B2

B3

B4

B5

A

B

C

Z1

Z

A1

A2

A3

A4

A5

B1

B2

B3

B4

B5

Ground Floor GA Plan1:1000 @ A3

NOTES

Room Types:

1. Object Store (23,534m2)

2. Entrance Lobby (75m2)

3. Unisex & DDA toilets (30m2)

4. Staff Welfare Suite (70m2)

5. Conservation Laboratory (200m2)

6. Photography Studio (160m2)

7. Conservation Workshop (500m2)

8. Freezer (116m2)

9. Inward transit (250m2)

10. Loading bay (320m2)

11. Transit storage (260m2)

12. Outward transit (200m2)

13. Special Collections Store (160m2)

14. Collections Study (200m2)

Transit storage ExtentsExternal Plant Allocation:

A. Proposed Sprinkler

B. Chiller compound

C. Chilled Water Pump

D. Electrical Sub Station/HV/LV Switch rooms

E. Boiler house

ALL PLANT LOCATIONS TO BE COORDINATED WITHBUILDING SERVICES ENGINEER

N

Scale - 1:1000 @A3

0 10m 20 30 40 50

14

2

43

5

7

6

9

11

8

10

12

13

A B C D EB

1

4 .3 GROUN D F LOOR P LAN

Page 19: Science Museum Group - Building ONE€¦ · DESIGN & ACCESS STATEMENT | PAGE 6 SCIENCE MUSEUM GROUP - BUILDING ONE 1.2 INTRODUCTION This document is submitted in support of a Pre-Application

[email protected]

© gwparchitecture 2017

D E S I G N & A C C E S S S T A T E M E N T | P A G E 1 9 S C I E N C E M U S E U M G R O U P - B U I L D I N G O N E

4 .4 ME ZZAN INE P LAN

This drawing is the property of GWP Architecture. Copyright is reserved by themand the drawing is issued on the condition that it is not copied, reproduced,retained, or disclosed to any unauthorised person, either wholly or in part,without the consent in writing of GWP Architecture.

All drawings and specifications should be read in conjunction with the projecthealth and safety plan, any possible conflicts should be presented to the PlanningCoordinator.

All work to be carried out in accordance with current Building Regulations.

Proposed Mezzanine PlanScale

Name (390)1716-GWP-01-M1-DR-A-(PA)-0005SMG Building ONE

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Contractors must verify all dimensions at the job before commencing any work ormaking shop drawings. Do not scale off drawing. Do not take digital dimensionsfrom this drawing. Written dimensions should be taken. Any discrepancies to bereported to the Architect. The design is subject to the following:

- Land Registry Confirmation - Full Structural Review- Planning Approval -Topographical Information- Review of Easements and Covenants - Rights of lights Issues- Building Regulations Approval / Fire Engineering Dr/Checked

Rev / Status

Date of Issue

A3/1:1000

TA / RT

P04 / S

24.10.17BIM Server: BIMServer-HP - BIM Server 20/One Collection (390)1716-GWP-01-XX-M3-A

SW0006

NE0006

SE0006

NW

0006

MEZZANINE FLOOR9,000 m2

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 321a1b1c1d1e1f1g1h1j

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41

A

B

C

Z1

Z

A1

A2

A3

A4

A5

B1

B2

B3

B4

B5

A

B

C

Z1

Z

A1

A2

A3

A4

A5

B1

B2

B3

B4

B5

NOTES

Room Types:

15. Mezzanine lobby (65m2)

16. Conditioned Store (904m2)

17. Mezzanine Store (Low Bay) (8,200m2)

Void space

External Plant Allocation:

F. Air Handling Units

ALL PLANT LOCATIONS TO BE COORDINATED WITHBUILDING SERVICES ENGINEER

Mezzanine Floor GA Plan1:1000 @ A3

N

Scale - 1:1000 @A3

0 10m 20 30 40 50

17

15

16

F F F FFF

Page 20: Science Museum Group - Building ONE€¦ · DESIGN & ACCESS STATEMENT | PAGE 6 SCIENCE MUSEUM GROUP - BUILDING ONE 1.2 INTRODUCTION This document is submitted in support of a Pre-Application

[email protected]

© gwparchitecture 2017

D E S I G N & A C C E S S S T A T E M E N T | P A G E 2 0 S C I E N C E M U S E U M G R O U P - B U I L D I N G O N E

Entance Lobby

Collections Study

200 m2

Ground F loor

15,250 5,900

1,800

7,900 16,000

6,000

28,7

00

11,400

14,5

00

12,6

65 9,00

0

1266

5

43,3

00

Welfare70 m2

Conservation Laboratory

200 m2

Store (Low Bay)8,370 m2

Unisex WCs

DDA WCLift

Conservation Workshop

500 m2

PhotoStudio160 m2

Mezzanine Store (Low Bay)8,200 m2

Conditioned Store

850 m2

Stair Lobby

Mezzanine Level

15,250

58,0

00

4 .5 SUPPORT SPACE LAYOUT

Page 21: Science Museum Group - Building ONE€¦ · DESIGN & ACCESS STATEMENT | PAGE 6 SCIENCE MUSEUM GROUP - BUILDING ONE 1.2 INTRODUCTION This document is submitted in support of a Pre-Application

S M G B U I L D I N G O N E | D E S I G N & A C C E S S S T A T E M E N T

Section 5.0

Design Principles - Building Form

Page 22: Science Museum Group - Building ONE€¦ · DESIGN & ACCESS STATEMENT | PAGE 6 SCIENCE MUSEUM GROUP - BUILDING ONE 1.2 INTRODUCTION This document is submitted in support of a Pre-Application

[email protected]

© gwparchitecture 2017

D E S I G N & A C C E S S S T A T E M E N T | P A G E 2 2 S C I E N C E M U S E U M G R O U P - B U I L D I N G O N E

5 .1 ROOF & FORM

ROOF & CLADDING

- Industry standard approaches to design of this building are essential to produce a cost effective structure for SMG.

- Constructed around a portal frame, a shallow sloping roof will fall from a ridge height of approximately 12m to an external eaves of approximately 8m.

- Longitudinal walls will be clad in the same fabric as the roof and wrap over the south-west and north-east elevations, Gable walls will be similar in colour and nature.

- The roof and external walls will likely be sinusoidal cladding in muted colours. Designed to blend in with the ground from the elevated viewpoints surrounding the site and minimise its visual impact.

- Highly focused proprietary warehouse materials are being used to create construction efficiencies, drive sustainability and maximise storage capacity.

Page 23: Science Museum Group - Building ONE€¦ · DESIGN & ACCESS STATEMENT | PAGE 6 SCIENCE MUSEUM GROUP - BUILDING ONE 1.2 INTRODUCTION This document is submitted in support of a Pre-Application

[email protected]

© gwparchitecture 2017

D E S I G N & A C C E S S S T A T E M E N T | P A G E 2 3 S C I E N C E M U S E U M G R O U P - B U I L D I N G O N E

5 .2 EXTE RNAL P LANT S TRATEGY

REQUIREMENTS

This building is being designed for the storage of collections protected under the National Heritage Act (1983). SMG has specific requirements to meet the needs of the collection. These include (amongst other elements): humidity control and an air-tight structure to provide an internal condition meeting the brief specifications; good levels of security; fire detection and minimised risk of leaks/water ingress. By installing the plant externally to the main structure of the building the following benefits are derived:

ACCESS TO PLANT

- Externally mounted plant and services can be easily installed, accessed, maintained and replaced from the perimeter of the building.

- This reduces the need for maintenance staff to enter the main building to maintain & service plant.- Improves security of the collection by reducing the number of personnel who access the building for

maintenance.

EQUIPMENT, PERFORMANCE & SAFETY

- Air handling units mounted externally have a ready supply of fresh air for intake, reducing the quantity of ducting and improving their performance.

- Minimises the number of penetrations to the building envelope, which improves the performance of the building envelope.

- Maximises the internal space for the storage of the collections. - Reduces risk of damage to the collection caused by potential leaks & faults of the equipment, minimises

fluctuations in humidity and helps to manage vermin and pest control.- External plant is naturally ventilated – protecting against unwanted heat gain within the building and reducing

the need for additional ventilation.- Limits the risk of a fire inside the main store should a problem with the plant arise, improving safety for the

objects and people. Removes the requirement for fire rated internal plant spaces / compartmentation of plant spaces.

- Fire escape from the internal collection stores and plant areas are kept separate. Direct fire escape for maintenance personnel from external plant areas.

Page 24: Science Museum Group - Building ONE€¦ · DESIGN & ACCESS STATEMENT | PAGE 6 SCIENCE MUSEUM GROUP - BUILDING ONE 1.2 INTRODUCTION This document is submitted in support of a Pre-Application

[email protected]

© gwparchitecture 2017

D E S I G N & A C C E S S S T A T E M E N T | P A G E 2 4 S C I E N C E M U S E U M G R O U P - B U I L D I N G O N E

This drawing is the property of GWP Architecture. Copyright is reserved by themand the drawing is issued on the condition that it is not copied, reproduced,retained, or disclosed to any unauthorised person, either wholly or in part,without the consent in writing of GWP Architecture.

All drawings and specifications should be read in conjunction with the projecthealth and safety plan, any possible conflicts should be presented to the PlanningCoordinator.

All work to be carried out in accordance with current Building Regulations.

Proposed ElevationsScale

Name (390)1716-GWP-01-XX-DR-A-(PA)-0007SMG Building ONE

......................................................................................................................................................................................................................................................................................................................................................................................................

Contractors must verify all dimensions at the job before commencing any work ormaking shop drawings. Do not scale off drawing. Do not take digital dimensionsfrom this drawing. Written dimensions should be taken. Any discrepancies to bereported to the Architect. The design is subject to the following:

- Land Registry Confirmation - Full Structural Review- Planning Approval -Topographical Information- Review of Easements and Covenants - Rights of lights Issues- Building Regulations Approval / Fire Engineering Dr/Checked

Rev / Status

Date of Issue

A3/1:750

TA / RT

P06 / S

24.10.17BIM Server: BIMServer-HP - BIM Server 20/One Collection (390)1716-GWP-01-XX-M3-A

South-West Elevation1:750 @ A3

North-East Elevation1:750 @ A3

South-East Elevation1:750 @ A3

North-West Elevation1:750 @ A3

0 10m 20m

Scale - 1:750 @A3

3 6 75421 7 21

721

21

KEY

1 Roof Covering

2 Facade Cladding

3 Loading Door

4 Personnel Door

5 Windows

6 Pedestrian Entrance

7 Plant Gantry

8 Look-a-like panel band

8

5 .3 E L E VAT IONS

Page 25: Science Museum Group - Building ONE€¦ · DESIGN & ACCESS STATEMENT | PAGE 6 SCIENCE MUSEUM GROUP - BUILDING ONE 1.2 INTRODUCTION This document is submitted in support of a Pre-Application

[email protected]

© gwparchitecture 2017

D E S I G N & A C C E S S S T A T E M E N T | P A G E 2 5 S C I E N C E M U S E U M G R O U P - B U I L D I N G O N E

5 .4 3D P ERSPECT IVE V I EW

Page 26: Science Museum Group - Building ONE€¦ · DESIGN & ACCESS STATEMENT | PAGE 6 SCIENCE MUSEUM GROUP - BUILDING ONE 1.2 INTRODUCTION This document is submitted in support of a Pre-Application

S M G B U I L D I N G O N E | D E S I G N & A C C E S S S T A T E M E N T

Section 6.0

External Spaces, Servicing & Access

Page 27: Science Museum Group - Building ONE€¦ · DESIGN & ACCESS STATEMENT | PAGE 6 SCIENCE MUSEUM GROUP - BUILDING ONE 1.2 INTRODUCTION This document is submitted in support of a Pre-Application

[email protected]

© gwparchitecture 2017

D E S I G N & A C C E S S S T A T E M E N T | P A G E 2 7 S C I E N C E M U S E U M G R O U P - B U I L D I N G O N E

6 .1 EXTE RNAL SPACES

The external spaces surrounding the facility will mainly be located in front of the South-East entrance elevation and consist of the following spaces:

• car parking facilities for staff and visitors• service yard for object delivery vehicles and service vehicles• pedestrian access routes• limited external grassed areas

It is proposed that these spaces will be developed within the footprint of the existing runway to the South-East of the building.

6 .2 S E RV ICE ACCESS

Service (including vehicles) access to the building will be via the existing site entrance at Red Barn Gate. People will be required to sign in at the main gate, before accessing the site through a secure barrier, in line with current site operations.

Service vehicle will be able to access the service yard at the front of the facility, with sufficient space for HGV turning and parking. A Grasscrete (or similar) service route will be provided parallel to the north-east facade of the building, providing access for service vehicles to plant gantries.

6 .3 CAR PARK ING & H IGHWAYS

Vehicle access to the site will be in line with current operations - signing in via the Red Barn Gate and along the existing vehicular routes. Car parking is proposed adjacent to the pedestrian entrance on the south-east side of the building. Car parking is provided predominantly for building staff. Visitors accessing the facility by appointment will park at the existing visitor area on site, before being escorted to the proposed building.

A total of 12no parking spaces are proposed, including 2no DDA spaces.

6 .4 HGV LOAD ING

HGV access for the delivery and collection of objects to be stored in the facility will be in line with current site operations and as noted in the Service Access section (6.2).

HGVs will access the facility via the service yard. A large insulated sectional roller loading door is proposed on the south-east elevation, allowing delivery vehicle to drive into an air lock area located within the building. Within this airlock, the delivery vehicles will be loaded / unloaded via forklift, pallet truck or by hand (dependant on object size). Level access will provided to allow the vehicles to drive into the airlock. Whilst deliveries are expected to be infrequent, the service yard allows sufficient space for HGV parking in the case that HGVs are queued / waiting for the air lock to be cleared to allow for vehicle access.

The existing access routes and proposed service yard are sufficiently sized for two 18-tonne HGVs. The proposed loading door and airlock space are also sufficiently sized for access for an 18-tonne HGV, with space for loading / unloading.

6 .5 R E FUSE S TORAGE

A covered refuse storage area is proposed, adjacent to the grasscrete service route and the existing runway access, for waste storage and collection. The storage area consists of space for four Euro bins, as well as space for loading and un-loading two 18 cubic yard skips

6 .6 EXTERNAL L IGHT ING

Generally the service illuminance for the external lighting installation will be in accordance with the society of light and lighting (SLL) codes for lighting and with particular reference to the CIBSE lighting guide LG6: the outdoor environment.

Careful consideration will be given to the dark skies nature of the site, reducing light spill and the duration that lighting operates.

All luminaires will be of external quality, suitable for the installed environment and be of robust design and vandal resistant. Final selection of these luminaires will be in accordance with the architect’s requirements.

Each escape door will be provided with emergency lighting externally above or adjacent tothe door.

External lighting will be controlled via photoelectric cell and central time clock, where applicable motion sensing external systems will be used.

Page 28: Science Museum Group - Building ONE€¦ · DESIGN & ACCESS STATEMENT | PAGE 6 SCIENCE MUSEUM GROUP - BUILDING ONE 1.2 INTRODUCTION This document is submitted in support of a Pre-Application

[email protected]

© gwparchitecture 2017

D E S I G N & A C C E S S S T A T E M E N T | P A G E 2 8 S C I E N C E M U S E U M G R O U P - B U I L D I N G O N E

6 .7 ACCE SS I B I L I TY

The proposals will provide an inclusive environment for the widest range of users possible within the constraints of the project. The design includes the following key features which will facilitate and enhance disabled users experience of the building:

• Provision of accessible parking bay

• Level pedestrian access walkways to the building allow two way wheelchair use

• Pedestrian entrance with level thresholds to allow access for wheelchair users into the building.

• Fire escape exits with ramped access to current standards

• Provision of an accessible WC, in line with Approved Document M standards

• Provision of fixed induction loops to relevant spaces

• All access and egress routes will be step free, limiting the need for assisted evacuation

• Provision of a personnel lift, with sufficient space for wheelchair access (including assistance)

• Provision of disabled refuge and call point within the main stair lobby.

Page 29: Science Museum Group - Building ONE€¦ · DESIGN & ACCESS STATEMENT | PAGE 6 SCIENCE MUSEUM GROUP - BUILDING ONE 1.2 INTRODUCTION This document is submitted in support of a Pre-Application

LEEDS

bracken house1 l idgett lane

leedsls8 1pq

0113 266 6044 (t)

[email protected]

CARDIFF

15TH f loorbrunel house

2 f i tzalan roadcardiff , cf24 0eb

02921 303 322 (t)

[email protected]

LONDON

71-75 shelton streetborough of camden

londonwc2h 9jq

020 7470 8770 (t)

[email protected]

MANCHESTER

46 barton arcadedeansgatemanchester

m3 2bh

0161 962 4882 (t)

[email protected]