Science Museum Group - Building ONE
Collection Storage FacilityPre-Application Enquiry - Design & Access Statement
Prepared By:GWP Architecture71-75 Shelton StreetBorough of CamdenLondonWC2H 9JQ
020 7470 8770 (t)
Document QA:Ref: (390)1716-GWP-A-4A-01First Issue: 25.10.17Purpose: CommentRevision: P05
Prepared for:Science Museum Group
© gwparchitecture 2017
D E S I G N & A C C E S S S T A T E M E N T | P A G E 2 S C I E N C E M U S E U M G R O U P - B U I L D I N G O N E
project ref
(390)1716
originator
gwp
volume
01
level
zz
type
pp
role
a
classification
4A
name
D&A
revision
P06
author
ta
checked
rt
date of issue
10.11.17
Disclaimer
This document has been prepared by GWP Architecture in accordance with the instructions of their client detailed above, for the sole use of the client and may contain confidential information.
Any information provided by third parties and referred to herein has not been checked or verified by GWP Architecture, unless otherwise expressly stated in the report.
No third party may rely upon this document without the prior express written agreement of GWP Architecture.
This document is the property of GWP Architecture. Copyright is reserved by them and the drawing is issued on the condition that it is not copied, reproduced, retained, or disclosed to any unauthorised person, either wholly or in part, without the consent in writing of GWP Architecture.
© gwparchitecture 2017
D E S I G N & A C C E S S S T A T E M E N T | P A G E 3 S C I E N C E M U S E U M G R O U P - B U I L D I N G O N E
CONTENTS
DOCUMENT CONTROL
CONTENTS
SECTION 1.0INTRODUCTION
1.1 CLIENT & DESIGN TEAM1.2 INTRODUCTION
SECTION 2.0THE SITE
2.1 SITE LOCATION2.2 SITE LOCATION PLAN2.3 SITE PHOTOGRAPHS2.4 HISTORICAL CONTEXT
SECTION 3.0DESIGN PRINCIPLES - BUILDING LOCATION
3.1 BUILDING LOCATION & DEVELOPMENT3.2 PROPOSED SITE SECTIONS
SECTION 4.0DESIGN PRINCIPLES - BUILDING LAYOUT
4.1 INTERNAL ACCOMMODATION DEVELOPMENT4.2 FUNCTIONAL ADJACENCIES4.3 PROPOSED GROUND FLOOR PLAN4.4 PROPOSED MEZZANINE PLAN4.5 SUPPORT SPACE LAYOUT
SECTION 5.0DESIGN PRINCIPLES - BUILDING FORM
5.1 ROOF & FORM5.2 EXTERNAL PLANT BENEFITS5.3 PROPOSED ELEVATIONS5.4 3D PERSPECTIVE VIEW
SECTION 6.0EXTERNAL SPACES, SERVICING & ACCESS
6.1 EXTERNAL SPACES6.2 SERVICE ACCESS6.3 CAR PARKING & HIGHWAYS6.4 HGV LOADING6.5 REFUSE STORAGE6.6 EXTERNAL LIGHTING6.7 ACCESSIBILITY
S M G B U I L D I N G O N E | D E S I G N & A C C E S S S T A T E M E N T
Section 1.0
Introduction
© gwparchitecture 2017
D E S I G N & A C C E S S S T A T E M E N T | P A G E 5 S C I E N C E M U S E U M G R O U P - B U I L D I N G O N E
1 .1 CL I ENT & DES IGN T EAM
CLIENT
SCIENCE MUSEUM GROUP Red Barn Gate Wroughton Swindon SN4 9LT 01793 846 229 (t)
DESIGN TEAM
ARCHITECT
GWP ARCHITECTURE 71-75 Shelton Street Borough of Camden London WC2H 9JQ
020 7470 8770 (t)
STRUCTURAL / CIVIL ENGINEER
ATKINS Woodcote Grove Ashley Road Epsom KT18 5BW 01454 66 2843 (t)
BUILDING SERVICES ENGINEER
DESCO 5 Manchester Square London W1U 3PD 0207 299 2860 (t)
PROJECT MANAGER & QUANTITY SURVEYOR
FEASIBILITY LIMITED No 5 Hagley Court North The Waterfront Level Street Brierley Hill West Midlands DY5 1XF
01384 489 023 (t)
PLANNING CONSULTANT
PEGASUS GROUP First Floor, South Wing Equinox North Great Park Road Almondsbury Bristol BS32 4QL
01454 625945 (t)
© gwparchitecture 2017
D E S I G N & A C C E S S S T A T E M E N T | P A G E 6 S C I E N C E M U S E U M G R O U P - B U I L D I N G O N E
1 .2 INTRODUCT ION
This document is submitted in support of a Pre-Application Enquiry for a new collections management facility to house objects for the Science Museum Group (SMG), at their site in Wroughton (SMGW).
SMGW is the large object and library and archives for the SMG. The site is not open for public access, though research visits can be arranged to use the library and archive facilities, or to view the storage collection, by appointment.
The new building will be a fit-for-purpose facility that will house and manage the SMG collection and accommodate managed public visits, support object conservation work and provide staff facilities. The building will utilise the existing vehicular access to the site and its functions will also be supported by the existing SMG operational buildings on the wider site.
The information in this statement includes a description of the proposed facility and development site, an analysis of the design approach and application drawing extracts showing the location of the facility and it’s layout.
Supporting documentation will be included with this pre-application request comprising-• Planning Statement• Heritage Statement• Landscape and Visual Impact Assessment• Ecological Report• Transport Statement
S M G B U I L D I N G O N E | D E S I G N & A C C E S S S T A T E M E N T
Section 2.0
The Site
© gwparchitecture 2017
D E S I G N & A C C E S S S T A T E M E N T | P A G E 8 S C I E N C E M U S E U M G R O U P - B U I L D I N G O N E
Extract from Science Museum Group One Col lect ion Faci l i ty Cl ient Technical Br ief - Dated August 2017
Wroughton
Ae r ia l V i ew
Overtown
Aerial v iew of solar farm View of bui ldings A1, D4, D3 Bui lding A1 Motor Vehic le col lect ion in Bui lding D3Bui lding D4
Swindon
Newbury
2 .1 S I T E LOCAT ION
© gwparchitecture 2017
D E S I G N & A C C E S S S T A T E M E N T | P A G E 9 S C I E N C E M U S E U M G R O U P - B U I L D I N G O N E
2 .2 S I T E LOCAT ION P LAN
This drawing is the property of GWP Architecture. Copyright is reserved by themand the drawing is issued on the condition that it is not copied, reproduced,retained, or disclosed to any unauthorised person, either wholly or in part,without the consent in writing of GWP Architecture.
All drawings and specifications should be read in conjunction with the projecthealth and safety plan, any possible conflicts should be presented to the PlanningCoordinator.
All work to be carried out in accordance with current Building Regulations.
Site Location PlanScale
Name (390)1716-GWP-01-XX-DR-A-(PA)-0001SMG Building ONE
......................................................................................................................................................................................................................................................................................................................................................................................................
Contractors must verify all dimensions at the job before commencing any work ormaking shop drawings. Do not scale off drawing. Do not take digital dimensionsfrom this drawing. Written dimensions should be taken. Any discrepancies to bereported to the Architect. The design is subject to the following:
- Land Registry Confirmation - Full Structural Review- Planning Approval -Topographical Information- Review of Easements and Covenants - Rights of lights Issues- Building Regulations Approval / Fire Engineering Dr/Checked
Rev / Status
Date of Issue
A3/1:10000
TA / RT
P05 / S
15.09.17BIM Server: BIMServer-HP - BIM Server 20/One Collection (390)1716-GWP-01-XX-M3-A
House
1
Stone
Track
Track
178.0m
Stone
Dairy
Pond
Pond
Cottages
2
Stones
159.4m
Trac
k
The
201.2m
1
203.9m
Springs
164.9m
Stone
Clouts Wood
Mar
kham
Hill
186.2m
Sluice
Lodge
75
86
Issu
es
85
87
187.1m
12
63
59
66
21
22
192.3m
196.0m
181.4m
FS
Signal Square
181.2m
TCB
Stone
Lay
-by
FS
Stone
Hackpen
Stone
Trac
k
206.0m
Pat
h (
um
)
195.7m
187.1m
Cottage
House
New Cottages
3
Stone
4
Wiltshire
187.1m
Downs View
Midge's Close
197.5m
Uffcott
LB
White
2
1
193.5m
203.6m Red Barn Cottages
Pond
Stone
Path (um)
Elcombe
Stone
Drain
Issues
Lay-by
A 4
361
2
172.5m
Spring
Reservoir
(covered)
StoneStone
Stone
Stone
Path (um)
Track
A 4361
Engine Shed
The Ark
Mast (Telecommunication)
Mulberry House
The Old Store
House
The Wagon
Hone
ysuc
kle
Cottag
e
Highridge Cottage
2
1
Cottages
White House
Pond
Parsloes Barn
Science Museum
(dis)
Wroughton Airfield
Trac
k
Path
(um
)
Mar
kham
Bott
om
Co C
onst
, UA
& C
P B
dy
Boundary Cottages
2
1
Stone
Adit
Overtown
Adit
632
12
10
54
47
Issues
Issues
41
2
Coombe Bottom
27
12a
Manor
1
OV
ERTO
WN
HILL
Drain
Adit
Spring
Windshot
TCB
35
36
24
46
Drain
Stone
Shaft
LB
ESS
ESS
LB
Path (u
m)
Tanks
Chy
Dunnocks
Sports Facility
GP
Stone
Stone
Ash Cottage
Path
(um
)
Langton Park (Stables)
Solar Farm
Cottages
Merlin
1
2
ESS
Path
(um
)
ESS
ESS
ESS
ESS
ESS
ESS
Pat
h (
um
)
WB
Pond
181.1m
Drain
Hackpen
Farm
MS
Pond
Posts
Barbury Down House
Stone
ESS
Reservoir
Reservoir
(covered)
Path
(um)
Drain
Dra
in
Track
Ponds
Track
Solar Panels
El Sub Sta
PumpHouse
Stone
Path (um)
Spreads
Path (um)
Def
Tk
F
Tk F
Def
C Baulk
The Stables
58
Issues
92
157.9m
PRIO
R'S
HIL
L
94
35
77
78
8
73
17
41
Issues
A 4361
Ponds
Elcombe Hall
The Ivery
Tank
161.5m
1
Def
BS
Tk
F
Def
Thorney
53
Tank
98
Sinks
The Lodge
116
97
183.2m
1
4
Shelter
111
28
112
87
105
48
85
1
113
Issues
188.4m
185.0m
Track
23
49
72
92
16
Stone
67
LB
Park
GP
Issues
El Sub Sta
22
79
163.4m
52
62
137.2m
SNAPPS CLOSE
49
59
61
1
73
82
69a
69
90
Stables
28
15
Drain
Track
Stone
Ston
es
Stone
Dra
in
Issues
73a
Lay-b
y
8
Ailsa C
raig
Beth
eny
Elm Rise
Drain
2
Path
Markham Hill
84
76
78
66a
66
70
64
142.6m
0 100m 200 300 400 500N
Scale - 1:10,000 @A3
key
application site boundary
site ownership boundary
DRA
FT
This drawing is the property of GWP Architecture. Copyright is reserved by them and the
drawing is issued on the condition that it is not copied, reproduced, retained, or disclosed to
any unauthorised person, either wholly or in part, without the consent in writing of GWP
Architecture.
All drawings and specifications should be read in conjunction with the project health and
safety plan, any possible conflicts should be presented to the Planning Coordinator.
All work to be carried out in accordance with current Building Regulations.
Site Location PlanScale
Name (390)1716-GWP-01-01-DR-A-(SK)-0001One Collection
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Contractors must verify all dimensions at the job before commencing any work or making
shop drawings. Do not scale off drawing. Do not take digital dimensions from this drawing.
Written dimensions should be taken. Any discrepancies to be reported to the Architect. The
design is subject to the following:
- Land Registry Confirmation - Full Structural Review
- Planning Approval - Topographical Information
- Review of Easements and Covenants - Rights of lights Issues
- Building Regulations Approval / Fire Engineering Drawn/Checked
Revision / Status
Date of Issue
A3/1:10,000
TA / RT
02 / S
15.09.17A R C H I T E C T U R E
/Volumes/Data/CAD/(390)1716 The Science Museum/A_Architects_(GWP)/Model/(390)1716-GWP-01-XX-M3-A-One_Collection.pln
House
1
Stone
Track
Track
178.0m
Stone
Dairy
Pond
Pond
Cottages
2
Stones
159.4m
Trac
k
The
201.2m
1
203.9m
Springs
164.9m
Stone
Clouts Wood
Mar
kham
Hill
186.2m
Sluice
Lodge
75
86
Issu
es
85
87
187.1m
12
63
59
66
21
22
192.3m
196.0m
181.4m
FS
Signal Square
181.2m
TCB
Stone
Lay
-by
FS
Stone
Hackpen
Stone
Trac
k
206.0m
Pat
h (
um
)
195.7m
187.1m
Cottage
House
New Cottages
3
Stone
4
Wiltshire
187.1m
Downs View
Midge's Close
197.5m
Uffcott
LB
White
2
1
193.5m
203.6m Red Barn Cottages
Pond
Stone
Path (um)
Elcombe
Stone
Drain
Issues
Lay-by
A 4
361
2
172.5m
Spring
Reservoir
(covered)
StoneStone
Stone
Stone
Path (um)
Track
A 4361
Engine Shed
The Ark
Mast (Telecommunication)
Mulberry House
The Old Store
House
The Wagon
Hone
ysuc
kle
Cottag
e
Highridge Cottage
2
1
Cottages
White House
Pond
Parsloes Barn
Science Museum
(dis)
Wroughton Airfield
Trac
k
Path
(um
)
Mar
kham
Bott
om
Co C
onst
, UA
& C
P B
dy
Boundary Cottages
2
1
Stone
Adit
Overtown
Adit
632
12
10
54
47
Issues
Issues
41
2
Coombe Bottom
27
12a
Manor
1
OV
ERTO
WN
HILL
Drain
Adit
Spring
Windshot
TCB
35
36
24
46
Drain
Stone
Shaft
LB
ESS
ESS
LB
Path (u
m)
Tanks
Chy
Dunnocks
Sports Facility
GP
Stone
Stone
Ash Cottage
Path
(um
)
Langton Park (Stables)
Solar Farm
Cottages
Merlin
1
2
ESS
Path
(um
)
ESS
ESS
ESS
ESS
ESS
ESS
Pat
h (
um
)
WB
Pond
181.1m
Drain
Hackpen
Farm
MS
Pond
Posts
Barbury Down House
Stone
ESS
Reservoir
Reservoir
(covered)
Path
(um)
Drain
Dra
in
Track
Ponds
Track
Solar Panels
El Sub Sta
PumpHouse
Stone
Path (um)
Spreads
Path (um)
Def
Tk
F
Tk F
Def
C Baulk
The Stables
58
Issues
92
157.9m
PRIO
R'S
HIL
L
94
35
77
78
8
73
17
41
Issues
A 4361
Ponds
Elcombe Hall
The Ivery
Tank
161.5m
1
Def
BS
Tk
F
Def
Thorney
53
Tank
98
Sinks
The Lodge
116
97
183.2m
1
4
Shelter
111
28
112
87
105
48
85
1
113
Issues
188.4m
185.0m
Track
23
49
72
92
16
Stone
67
LB
Park
GP
Issues
El Sub Sta
22
79
163.4m
52
62
137.2m
SNAPPS CLOSE
49
59
61
1
73
82
69a
69
90
Stables
28
15
Drain
Track
Stone
Ston
es
Stone
Dra
in
Issues
73a
Lay-b
y
8
Ailsa C
raig
Beth
eny
Elm Rise
Drain
2
Path
Markham Hill
84
76
78
66a
66
70
64
142.6m
Scale - 1:10,000 @A3
0 100m 200 300 400 500
N
PROJECT LOCATIONThe facility will be located in the northern section of SMGW. A feasibility study has determined that this location takes best advantage of level ground, proximity to services and existing road network.
LOCAL CONTEXTSMGW is located approximately 6.5 kilometres south of the centre of Swindon and 1.4 kilometres south of the intervening village of Wroughton.
The site falls within the North Wessex Downs Area of Outstanding Natural Beauty.
The single access point to the site is from the north-west via the A4361 (Avebury-Wroughton) road, which, in turn, is within close proximity and well connected to both Junction 15 and 16 of the M4 motorway.
SITE CONTEXTThe main site is secured with a perimeter fence. The site is manned 24 hours a day, 7 days a week from Red Barn Gatehouse, in the north west of the site.
The development plot is predominantly flat improved grassland, bordered by disused concrete runways. The tarmac and concrete runways stretch to the edges of the plot and are connected by smaller perimeter roadways. The recent development of 73 hectares of solar panels now covers the western and southern parts of the main site.
© gwparchitecture 2017
D E S I G N & A C C E S S S T A T E M E N T | P A G E 1 0 S C I E N C E M U S E U M G R O U P - B U I L D I N G O N E
2 .3 S I T E PHOTOGRAPHS
1.
5.
2.
3.
4.
2
3
1
5
4
P16-1396_02 Viewpoint PanoramasOctober 2017
Barbury Castle
Ridgeway
P16-1396_02 Viewpoint PanoramasOctober 2017
Entrance Road
Exit Road
P16-1396_02 Viewpoint PanoramasOctober 2017
Go Kart Parking
Go Kart Entrance
P16-1396_02 Viewpoint PanoramasOctober 2017
VP01
Red Gate B
P16-1396_02 Viewpoint PanoramasOctober 2017
PRoW
SE Offices
© gwparchitecture 2017
D E S I G N & A C C E S S S T A T E M E N T | P A G E 1 1 S C I E N C E M U S E U M G R O U P - B U I L D I N G O N E
2 .4 H I S TOR ICAL CONTEXT
WROUGHTON AIRFIELD
The site was established in 1940 as an RAF airfield and consists of a number of runways and aircraft hangars. The hangars vary in construction: there are four of the ‘L’ type ‘Blister’ hangars (a steel framework with a concrete skin), four of the ‘D’ type hangars (steel reinforced concrete with an arching roof), and two ‘C’ type hangar (steel framework with an external cladding), within the land owned by SMG.
The Ministry of Defence commenced disposal of this site in 1979.
SMG AT WROUGHTON
The Science Museum Group took ownership of the 545-acre site in 1979, and has used it since this time as the storage facility for the largest objects of the Science Museum Group collections.
Over 35,000 3D and 500,000 2D objects from the national collection are currently stored on site, within nine former aircraft hangars and a purpose-built store. The collection ranges from the first hovercraft to MRI scanners, and science publications to (de-activated) nuclear missiles. The collections here are particularly notable for the extensive collection of very large aircraft, road transport vehicles, agricultural machinery and industrial collections.
In 1994 the Museum opened a new purpose-built facility at Wroughton, providing an environmentally controlled building for the storage of objects.
Since 2000 the freehold of the majority of the site has been owned byBoard of Trustees of the Science Museum.
Latterly SMG has undertaken a number of projects on site to refurbish hangars, construct award-winning innovative storage, work with universities and industry in research and development, and develop a large scale solar farm for electricity supply into the national grid. These projects along with extensive biodiversity enhancements have helped define the vision for SMGs long term use of the site.
The site is currently not open to the public due to the increased risks presented by the failing 1940s infrastructure and the lack of circulation space due to compression of the stores to enable additional collections to be accommodated.
Aerial photograph taken by the US Army Air Force in 1944
Boeing B17 at Wroughton Air Show - 1993
SMG large object storage within Aircraft Hangars Environmental ly control led purpose bui l t s torage faci l i ty
Wroughton Air Show - 1992
No 15 Maintenance Unit RAF Wroughton - 1968/69
S M G B U I L D I N G O N E | D E S I G N & A C C E S S S T A T E M E N T
Section 3.0
Design Principles - Building Location
© gwparchitecture 2017
D E S I G N & A C C E S S S T A T E M E N T | P A G E 1 3 S C I E N C E M U S E U M G R O U P - B U I L D I N G O N E
D4
A1
Runw
ay /
Acce
ss R
oad
Runway 22
Car park
Grasscrete Plant Access / Service Route
External Plant Towers
Waste Store
Service Yard
Future Expansion Space6,000 m2
D4
A1
Runw
ay /
Acce
ss R
oad
Runway 22
Car park
Grasscrete Plant Access / Service Route
External Plant Towers
Waste Store
Service Yard
Future ExpansionSpace
6,000 m2
3 .1 BU I LD ING LOCAT ION & DEVELOPMENT
The location for the new collections management facility has been identified through assessment of access requirements for the building - both from the main entrance to site (utilising existing roadways and former runways) and in the context of the SMG operational facilities on the wider site. Consideration has also been given to the orientation of the building, its proximity to existing services and the topography of the site. This evaluation has led to the development site running perpendicular to the former runway as shown.
Si te Layout Proposal
Building ONE
91.5 Meters
289 Meters
D4
A1
Runw
ay /
Acce
ss R
oad
Runway 22
Car park
Grasscrete Plant Access / Service Route
External Plant Towers
Waste Store
Service Yard
Future ExpansionSpace
6,000 m2
© gwparchitecture 2017
D E S I G N & A C C E S S S T A T E M E N T | P A G E 1 4 S C I E N C E M U S E U M G R O U P - B U I L D I N G O N E
This drawing is the property of GWP Architecture. Copyright is reserved by themand the drawing is issued on the condition that it is not copied, reproduced,retained, or disclosed to any unauthorised person, either wholly or in part,without the consent in writing of GWP Architecture.
All drawings and specifications should be read in conjunction with the projecthealth and safety plan, any possible conflicts should be presented to the PlanningCoordinator.
All work to be carried out in accordance with current Building Regulations.
Proposed Site SectionsScale
Name (390)1716-GWP-01-XX-DR-A-(PA)-0008SMG Building ONE
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Contractors must verify all dimensions at the job before commencing any work ormaking shop drawings. Do not scale off drawing. Do not take digital dimensionsfrom this drawing. Written dimensions should be taken. Any discrepancies to bereported to the Architect. The design is subject to the following:
- Land Registry Confirmation - Full Structural Review- Planning Approval -Topographical Information- Review of Easements and Covenants - Rights of lights Issues- Building Regulations Approval / Fire Engineering Dr/Checked
Rev / Status
Date of Issue
A3/1:1250
TA / RT
P06 / S
24.10.17BIM Server: BIMServer-HP - BIM Server 20/One Collection (390)1716-GWP-01-XX-M3-A
building A1 accessroad Proposed Building ONE facility (approx. 289m overall building length) runwaycar parking
& entrance grass / open areaA1 access grassmargin
Extent of mezzanine structure
A1 Store D4 Hangar D3 Hangar
runway Proposed Building ONE facility(approx. 91.5m overall building width)grass / open area grass / open areaservice
zone
Extent of mezzanine structure
A1 Store D4 Hangar
Site Section A1:1250 @ A3
Key Plan
Site Section B1:1250 @ A3
Scale - 1:1250 @A3
0 10m 20 30 40 50N
Approx. 13mApprox. 12m
Approx. 12m
Approx. 16m
Approx. 16mApprox. 13m
A1
D4
D3
Approx. 4.15m
A
B
This drawing is the property of GWP Architecture. Copyright is reserved by themand the drawing is issued on the condition that it is not copied, reproduced,retained, or disclosed to any unauthorised person, either wholly or in part,without the consent in writing of GWP Architecture.
All drawings and specifications should be read in conjunction with the projecthealth and safety plan, any possible conflicts should be presented to the PlanningCoordinator.
All work to be carried out in accordance with current Building Regulations.
Proposed Site SectionsScale
Name (390)1716-GWP-01-XX-DR-A-(PA)-0008SMG Building ONE
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Contractors must verify all dimensions at the job before commencing any work ormaking shop drawings. Do not scale off drawing. Do not take digital dimensionsfrom this drawing. Written dimensions should be taken. Any discrepancies to bereported to the Architect. The design is subject to the following:
- Land Registry Confirmation - Full Structural Review- Planning Approval -Topographical Information- Review of Easements and Covenants - Rights of lights Issues- Building Regulations Approval / Fire Engineering Dr/Checked
Rev / Status
Date of Issue
A3/1:1250
TA / RT
P02 / S
24.10.17BIM Server: BIMServer-HP - BIM Server 20/One Collection (390)1716-GWP-01-XX-M3-A
building A1 accessroad Proposed Building ONE facility (approx. 289m overall building length) runwaycar parking
& entrance grass / open areaA1 access grassmargin
runway Proposed Building ONE facility(approx. 91.5m overall building width)grass / open area grass / open areaservice
zone
Site Section A1:1250 @ A3
Key Plan
Site Section B1:1250 @ A3
Scale - 1:1250 @A3
0 10m 20 30 40 50N
Approx. 13m Approx. 12m
Approx. 12m
A
B
3 .2 PROPOSED S I T E S ECT IONS
S M G B U I L D I N G O N E | D E S I G N & A C C E S S S T A T E M E N T
Section 4.0
Design Principles - Building Layout
© gwparchitecture 2017
D E S I G N & A C C E S S S T A T E M E N T | P A G E 1 6 S C I E N C E M U S E U M G R O U P - B U I L D I N G O N E
The layout of the internal space has been defined by the building orientation and the operational adjacencies for the functional spaces within the superstructure. These rooms have been optimised to provide high quality collections management services, maximise the storage capability of the building and minimise operational costs.
4 .1 INTE RNAL ACCOMMODAT ION L AYOUT
1
1
A A
B B
C C
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
13
13
14
14
15
15
16
16
17
17
18
18
19
19
20
20
21
21
22
22
23
23
24
24
25
25
26
26
27
27
28
28
29
29
30
30
31
31
32
32
A A
B B
33
33
34
34
35
35
36
36
37
37
38
38
39
39
40
40
41
41
13
13
14
14
15
15
16
16
17
17
18
18
19
19
20
20
21
21
22
22
23
23
24
24
25
25
26
26
27
27
28
28
29
29
30
30
31
31
32
32
33
33
34
34
35
35
36
36
37
37
38
38
39
39
40
40
41
41
45,00
045
,000
7,200 7,200 7,200
45,00
0
7,200 7,200 7,200
Store (High Bay)15,150 m2
91.5
met
res
ConservationLaboratory200 m2
289 metres
ConservationWorkshop
500m2
Store (Low Bay)8,370 m2
GROUND FLOOR26,000 m2
MEZZANINE LEVEL9,000 m2
InwardTransit
Freezer
202.5 metres
CollectionsStudy200 m2
Photography Studio160 m2
External Plant Gantry(Mezz AHUs)
Electrical substation/HV/LV Switch
BoilerPlantAHU
Chillers
External Plant Gantry(Mezz AHUs)
External Plant Gantry(Mezz AHUs)
External Plant Gantry(Mezz AHUs)
ProposedSprinklers
AHUChillers
Coldwaterpump
Radioactive/HighExplosives Store
ProposedSprinklers
External Plant Gantry(Mezz AHUs)
EntranceLobby
Welfare70 m2
Toilets30 m2
TransitStorage
OutwardTransit
Conditioned Store850 m2
Mezzanine Store (Low Bay)8,200 m2
Stairs
© gwparchitecture 2017
D E S I G N & A C C E S S S T A T E M E N T | P A G E 1 7 S C I E N C E M U S E U M G R O U P - B U I L D I N G O N E
KEY: object staff public external glazing pedestrian entrance vehicle entrance rooflights
store (low bay)
collections study
entrance
welfarewc
conservation laboratory
photography studio
conservation workshop
freezerinward transit loading area
outward transit
transit storage
mezzanine store (low bay)
conditioned store
store (high bay)
Ground Floor
Mezzanine level
stais / lift
4 .2 FUNCT IONAL ADJACENC I ES
© gwparchitecture 2017
D E S I G N & A C C E S S S T A T E M E N T | P A G E 1 8 S C I E N C E M U S E U M G R O U P - B U I L D I N G O N E
This drawing is the property of GWP Architecture. Copyright is reserved by themand the drawing is issued on the condition that it is not copied, reproduced,retained, or disclosed to any unauthorised person, either wholly or in part,without the consent in writing of GWP Architecture.
All drawings and specifications should be read in conjunction with the projecthealth and safety plan, any possible conflicts should be presented to the PlanningCoordinator.
All work to be carried out in accordance with current Building Regulations.
Proposed Ground Floor PlanScale
Name (390)1716-GWP-01-GF-DR-A-(PA)-0004SMG Building ONE
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Contractors must verify all dimensions at the job before commencing any work ormaking shop drawings. Do not scale off drawing. Do not take digital dimensionsfrom this drawing. Written dimensions should be taken. Any discrepancies to bereported to the Architect. The design is subject to the following:
- Land Registry Confirmation - Full Structural Review- Planning Approval -Topographical Information- Review of Easements and Covenants - Rights of lights Issues- Building Regulations Approval / Fire Engineering Dr/Checked
Rev / Status
Date of Issue
A3/1:1000
TA / RT
P04 / S
24.10.17BIM Server: BIMServer-HP - BIM Server 20/One Collection (390)1716-GWP-01-XX-M3-A
approx. 289m Overall Building Length
ap
pro
x. 9
1.5
m O
vera
ll Bu
ildin
g W
idth
SW0007
NE0007
SE
00
07
NW
00
07
GROUND FLOOR26,000 m2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 321a1b1c1d1e1f1g1h1j
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41
A
B
C
Z1
Z
A1
A2
A3
A4
A5
B1
B2
B3
B4
B5
A
B
C
Z1
Z
A1
A2
A3
A4
A5
B1
B2
B3
B4
B5
Ground Floor GA Plan1:1000 @ A3
NOTES
Room Types:
1. Object Store (23,534m2)
2. Entrance Lobby (75m2)
3. Unisex & DDA toilets (30m2)
4. Staff Welfare Suite (70m2)
5. Conservation Laboratory (200m2)
6. Photography Studio (160m2)
7. Conservation Workshop (500m2)
8. Freezer (116m2)
9. Inward transit (250m2)
10. Loading bay (320m2)
11. Transit storage (260m2)
12. Outward transit (200m2)
13. Special Collections Store (160m2)
14. Collections Study (200m2)
Transit storage ExtentsExternal Plant Allocation:
A. Proposed Sprinkler
B. Chiller compound
C. Chilled Water Pump
D. Electrical Sub Station/HV/LV Switch rooms
E. Boiler house
ALL PLANT LOCATIONS TO BE COORDINATED WITHBUILDING SERVICES ENGINEER
N
Scale - 1:1000 @A3
0 10m 20 30 40 50
14
2
43
5
7
6
9
11
8
10
12
13
A B C D EB
1
4 .3 GROUN D F LOOR P LAN
© gwparchitecture 2017
D E S I G N & A C C E S S S T A T E M E N T | P A G E 1 9 S C I E N C E M U S E U M G R O U P - B U I L D I N G O N E
4 .4 ME ZZAN INE P LAN
This drawing is the property of GWP Architecture. Copyright is reserved by themand the drawing is issued on the condition that it is not copied, reproduced,retained, or disclosed to any unauthorised person, either wholly or in part,without the consent in writing of GWP Architecture.
All drawings and specifications should be read in conjunction with the projecthealth and safety plan, any possible conflicts should be presented to the PlanningCoordinator.
All work to be carried out in accordance with current Building Regulations.
Proposed Mezzanine PlanScale
Name (390)1716-GWP-01-M1-DR-A-(PA)-0005SMG Building ONE
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Contractors must verify all dimensions at the job before commencing any work ormaking shop drawings. Do not scale off drawing. Do not take digital dimensionsfrom this drawing. Written dimensions should be taken. Any discrepancies to bereported to the Architect. The design is subject to the following:
- Land Registry Confirmation - Full Structural Review- Planning Approval -Topographical Information- Review of Easements and Covenants - Rights of lights Issues- Building Regulations Approval / Fire Engineering Dr/Checked
Rev / Status
Date of Issue
A3/1:1000
TA / RT
P04 / S
24.10.17BIM Server: BIMServer-HP - BIM Server 20/One Collection (390)1716-GWP-01-XX-M3-A
SW0006
NE0006
SE0006
NW
0006
MEZZANINE FLOOR9,000 m2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 321a1b1c1d1e1f1g1h1j
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41
A
B
C
Z1
Z
A1
A2
A3
A4
A5
B1
B2
B3
B4
B5
A
B
C
Z1
Z
A1
A2
A3
A4
A5
B1
B2
B3
B4
B5
NOTES
Room Types:
15. Mezzanine lobby (65m2)
16. Conditioned Store (904m2)
17. Mezzanine Store (Low Bay) (8,200m2)
Void space
External Plant Allocation:
F. Air Handling Units
ALL PLANT LOCATIONS TO BE COORDINATED WITHBUILDING SERVICES ENGINEER
Mezzanine Floor GA Plan1:1000 @ A3
N
Scale - 1:1000 @A3
0 10m 20 30 40 50
17
15
16
F F F FFF
© gwparchitecture 2017
D E S I G N & A C C E S S S T A T E M E N T | P A G E 2 0 S C I E N C E M U S E U M G R O U P - B U I L D I N G O N E
Entance Lobby
Collections Study
200 m2
Ground F loor
15,250 5,900
1,800
7,900 16,000
6,000
28,7
00
11,400
14,5
00
12,6
65 9,00
0
1266
5
43,3
00
Welfare70 m2
Conservation Laboratory
200 m2
Store (Low Bay)8,370 m2
Unisex WCs
DDA WCLift
Conservation Workshop
500 m2
PhotoStudio160 m2
Mezzanine Store (Low Bay)8,200 m2
Conditioned Store
850 m2
Stair Lobby
Mezzanine Level
15,250
58,0
00
4 .5 SUPPORT SPACE LAYOUT
S M G B U I L D I N G O N E | D E S I G N & A C C E S S S T A T E M E N T
Section 5.0
Design Principles - Building Form
© gwparchitecture 2017
D E S I G N & A C C E S S S T A T E M E N T | P A G E 2 2 S C I E N C E M U S E U M G R O U P - B U I L D I N G O N E
5 .1 ROOF & FORM
ROOF & CLADDING
- Industry standard approaches to design of this building are essential to produce a cost effective structure for SMG.
- Constructed around a portal frame, a shallow sloping roof will fall from a ridge height of approximately 12m to an external eaves of approximately 8m.
- Longitudinal walls will be clad in the same fabric as the roof and wrap over the south-west and north-east elevations, Gable walls will be similar in colour and nature.
- The roof and external walls will likely be sinusoidal cladding in muted colours. Designed to blend in with the ground from the elevated viewpoints surrounding the site and minimise its visual impact.
- Highly focused proprietary warehouse materials are being used to create construction efficiencies, drive sustainability and maximise storage capacity.
© gwparchitecture 2017
D E S I G N & A C C E S S S T A T E M E N T | P A G E 2 3 S C I E N C E M U S E U M G R O U P - B U I L D I N G O N E
5 .2 EXTE RNAL P LANT S TRATEGY
REQUIREMENTS
This building is being designed for the storage of collections protected under the National Heritage Act (1983). SMG has specific requirements to meet the needs of the collection. These include (amongst other elements): humidity control and an air-tight structure to provide an internal condition meeting the brief specifications; good levels of security; fire detection and minimised risk of leaks/water ingress. By installing the plant externally to the main structure of the building the following benefits are derived:
ACCESS TO PLANT
- Externally mounted plant and services can be easily installed, accessed, maintained and replaced from the perimeter of the building.
- This reduces the need for maintenance staff to enter the main building to maintain & service plant.- Improves security of the collection by reducing the number of personnel who access the building for
maintenance.
EQUIPMENT, PERFORMANCE & SAFETY
- Air handling units mounted externally have a ready supply of fresh air for intake, reducing the quantity of ducting and improving their performance.
- Minimises the number of penetrations to the building envelope, which improves the performance of the building envelope.
- Maximises the internal space for the storage of the collections. - Reduces risk of damage to the collection caused by potential leaks & faults of the equipment, minimises
fluctuations in humidity and helps to manage vermin and pest control.- External plant is naturally ventilated – protecting against unwanted heat gain within the building and reducing
the need for additional ventilation.- Limits the risk of a fire inside the main store should a problem with the plant arise, improving safety for the
objects and people. Removes the requirement for fire rated internal plant spaces / compartmentation of plant spaces.
- Fire escape from the internal collection stores and plant areas are kept separate. Direct fire escape for maintenance personnel from external plant areas.
© gwparchitecture 2017
D E S I G N & A C C E S S S T A T E M E N T | P A G E 2 4 S C I E N C E M U S E U M G R O U P - B U I L D I N G O N E
This drawing is the property of GWP Architecture. Copyright is reserved by themand the drawing is issued on the condition that it is not copied, reproduced,retained, or disclosed to any unauthorised person, either wholly or in part,without the consent in writing of GWP Architecture.
All drawings and specifications should be read in conjunction with the projecthealth and safety plan, any possible conflicts should be presented to the PlanningCoordinator.
All work to be carried out in accordance with current Building Regulations.
Proposed ElevationsScale
Name (390)1716-GWP-01-XX-DR-A-(PA)-0007SMG Building ONE
......................................................................................................................................................................................................................................................................................................................................................................................................
Contractors must verify all dimensions at the job before commencing any work ormaking shop drawings. Do not scale off drawing. Do not take digital dimensionsfrom this drawing. Written dimensions should be taken. Any discrepancies to bereported to the Architect. The design is subject to the following:
- Land Registry Confirmation - Full Structural Review- Planning Approval -Topographical Information- Review of Easements and Covenants - Rights of lights Issues- Building Regulations Approval / Fire Engineering Dr/Checked
Rev / Status
Date of Issue
A3/1:750
TA / RT
P06 / S
24.10.17BIM Server: BIMServer-HP - BIM Server 20/One Collection (390)1716-GWP-01-XX-M3-A
South-West Elevation1:750 @ A3
North-East Elevation1:750 @ A3
South-East Elevation1:750 @ A3
North-West Elevation1:750 @ A3
0 10m 20m
Scale - 1:750 @A3
3 6 75421 7 21
721
21
KEY
1 Roof Covering
2 Facade Cladding
3 Loading Door
4 Personnel Door
5 Windows
6 Pedestrian Entrance
7 Plant Gantry
8 Look-a-like panel band
8
5 .3 E L E VAT IONS
© gwparchitecture 2017
D E S I G N & A C C E S S S T A T E M E N T | P A G E 2 5 S C I E N C E M U S E U M G R O U P - B U I L D I N G O N E
5 .4 3D P ERSPECT IVE V I EW
S M G B U I L D I N G O N E | D E S I G N & A C C E S S S T A T E M E N T
Section 6.0
External Spaces, Servicing & Access
© gwparchitecture 2017
D E S I G N & A C C E S S S T A T E M E N T | P A G E 2 7 S C I E N C E M U S E U M G R O U P - B U I L D I N G O N E
6 .1 EXTE RNAL SPACES
The external spaces surrounding the facility will mainly be located in front of the South-East entrance elevation and consist of the following spaces:
• car parking facilities for staff and visitors• service yard for object delivery vehicles and service vehicles• pedestrian access routes• limited external grassed areas
It is proposed that these spaces will be developed within the footprint of the existing runway to the South-East of the building.
6 .2 S E RV ICE ACCESS
Service (including vehicles) access to the building will be via the existing site entrance at Red Barn Gate. People will be required to sign in at the main gate, before accessing the site through a secure barrier, in line with current site operations.
Service vehicle will be able to access the service yard at the front of the facility, with sufficient space for HGV turning and parking. A Grasscrete (or similar) service route will be provided parallel to the north-east facade of the building, providing access for service vehicles to plant gantries.
6 .3 CAR PARK ING & H IGHWAYS
Vehicle access to the site will be in line with current operations - signing in via the Red Barn Gate and along the existing vehicular routes. Car parking is proposed adjacent to the pedestrian entrance on the south-east side of the building. Car parking is provided predominantly for building staff. Visitors accessing the facility by appointment will park at the existing visitor area on site, before being escorted to the proposed building.
A total of 12no parking spaces are proposed, including 2no DDA spaces.
6 .4 HGV LOAD ING
HGV access for the delivery and collection of objects to be stored in the facility will be in line with current site operations and as noted in the Service Access section (6.2).
HGVs will access the facility via the service yard. A large insulated sectional roller loading door is proposed on the south-east elevation, allowing delivery vehicle to drive into an air lock area located within the building. Within this airlock, the delivery vehicles will be loaded / unloaded via forklift, pallet truck or by hand (dependant on object size). Level access will provided to allow the vehicles to drive into the airlock. Whilst deliveries are expected to be infrequent, the service yard allows sufficient space for HGV parking in the case that HGVs are queued / waiting for the air lock to be cleared to allow for vehicle access.
The existing access routes and proposed service yard are sufficiently sized for two 18-tonne HGVs. The proposed loading door and airlock space are also sufficiently sized for access for an 18-tonne HGV, with space for loading / unloading.
6 .5 R E FUSE S TORAGE
A covered refuse storage area is proposed, adjacent to the grasscrete service route and the existing runway access, for waste storage and collection. The storage area consists of space for four Euro bins, as well as space for loading and un-loading two 18 cubic yard skips
6 .6 EXTERNAL L IGHT ING
Generally the service illuminance for the external lighting installation will be in accordance with the society of light and lighting (SLL) codes for lighting and with particular reference to the CIBSE lighting guide LG6: the outdoor environment.
Careful consideration will be given to the dark skies nature of the site, reducing light spill and the duration that lighting operates.
All luminaires will be of external quality, suitable for the installed environment and be of robust design and vandal resistant. Final selection of these luminaires will be in accordance with the architect’s requirements.
Each escape door will be provided with emergency lighting externally above or adjacent tothe door.
External lighting will be controlled via photoelectric cell and central time clock, where applicable motion sensing external systems will be used.
© gwparchitecture 2017
D E S I G N & A C C E S S S T A T E M E N T | P A G E 2 8 S C I E N C E M U S E U M G R O U P - B U I L D I N G O N E
6 .7 ACCE SS I B I L I TY
The proposals will provide an inclusive environment for the widest range of users possible within the constraints of the project. The design includes the following key features which will facilitate and enhance disabled users experience of the building:
• Provision of accessible parking bay
• Level pedestrian access walkways to the building allow two way wheelchair use
• Pedestrian entrance with level thresholds to allow access for wheelchair users into the building.
• Fire escape exits with ramped access to current standards
• Provision of an accessible WC, in line with Approved Document M standards
• Provision of fixed induction loops to relevant spaces
• All access and egress routes will be step free, limiting the need for assisted evacuation
• Provision of a personnel lift, with sufficient space for wheelchair access (including assistance)
• Provision of disabled refuge and call point within the main stair lobby.
LEEDS
bracken house1 l idgett lane
leedsls8 1pq
0113 266 6044 (t)
CARDIFF
15TH f loorbrunel house
2 f i tzalan roadcardiff , cf24 0eb
02921 303 322 (t)
LONDON
71-75 shelton streetborough of camden
londonwc2h 9jq
020 7470 8770 (t)
MANCHESTER
46 barton arcadedeansgatemanchester
m3 2bh
0161 962 4882 (t)