    Maine Department of Transportation Work Plan for Calendar Years 2014-2015-2016

    Work Plan Town Report 1 January 8, 2014

    ScarboroughThis report shows the 2014-2016 Work Plan entries for Scarborough. The costs listed are the total cost of

    these projects some of which may extend into neighboring towns. It also shows a listing of maintenance

    work specifically recorded to Scarborough in 2013, as well as any 2013 Local Road Assistance payments.

    Activities that are managed on a larger scale, such as snow & ice control, and maintenance work done by

    contract are not listed. The maintenance accomplishments may also extend into neighboring towns, but are

    listed in the first town where the work was reported. Finally, any capital projects that were completed in 2013

    are also listed.

    Planned Capital and Maintenance Work 2014-2016Work Plan Year:2014Municipalities(s):ScarboroughAsset(s):Eastern Corridor

    Description:Design of gap Eastern Trail bicycle and pedestrian connection between the Nonesuch River in Scarborough toapproximately Pond View Drive and the South Portland city line.

    ID019386.00

    Scope of WorkBicycle/Pedestrian

    Highway Corridor PriorityN/A

    Estimated Funding$150,000

    Work Plan Year:2014

    Municipalities(s):ScarboroughAsset(s):Payne Road

    Description:Beginning at Route 1 and extending 0.63 of a mile to Milken Road - PACTS sponsored.

    ID020301.00

    Scope of WorkHighway Preservation Paving

    Highway Corridor Priority3

    Estimated Funding$331,000

    Work Plan Year:2014Municipalities(s):ScarboroughAsset(s):Mussey Road

    Description:Beginning at Gorham Road and extending easterly 0.18 of a mile - PACTS sponsored.

    ID018497.00

    Scope of WorkHighway Preservation Paving

    Highway Corridor Priority4

    Estimated Funding$95,700

    Work Plan Year:2014

    Municipalities(s):ScarboroughAsset(s):Haigis Parkway

    Description:Beginning 0.31 of a mile north of Route 1 and extending 1.08 miles to Payne Road.

    ID020253.00

    Scope of WorkHighway Preservation Paving

    Highway Corridor Priority3

    Estimated Funding$615,600

    Work Plan Year:2014Municipalities(s):ScarboroughAsset(s):Payne Road

    Description:Beginning at Ginn Road and extending northeasterly 1.06 miles to Mussey Road - PACTS sponsored.

    ID020261.00

    Scope of WorkHighway Preservation Paving

    Highway Corridor Priority3

    Estimated Funding$612,500

    Work Plan Year:2014

    Municipalities(s):ScarboroughAsset(s):Route 114

    Description:Widening to install an exclusive left turn lane at Running Hill Road.

    ID020208.00

    Scope of WorkHighway Safety and Spot Improvements

    Highway Corridor Priority3

    Estimated Funding$335,000

    Work Plan Year:2015-16Municipalities(s):ScarboroughAsset(s):Pine Point Crossing Br

  • 8/13/2019 Scarborough Dot

    2/2

    Maine Department of Transportation Work Plan for Calendar Years 2014-2015-2016

    Work Plan Town Report 2 January 8, 2014

    Description:Pine Point Crossing Bridge (No. 5260) which carries Route 9 (Pine Point Road) over BandM Railroad andDepot Street Extension. Located 0.04 of a mile southeast of Holly Street.

    ID018229.00

    Scope of WorkBridge Construction

    Highway Corridor Priority4

    Estimated Funding$3,270,000

    Work Plan Year:2015-16Municipalities(s):South Portland, ScarboroughAsset(s):Cummings Road

    Description:Beginning at Payne Road and extending northerly 0.5 of a mile.ID

    022530.00Scope of Work

    Highway Preservation PavingHighway Corridor Priority

    3Estimated Funding

    $300,000

    Work Plan Year:2015-16Municipalities(s):ScarboroughAsset(s):Holmes Road

    Description:Upgrade to dual flashing beacons, large high retroreflectivity stop signs, and intersection warning signage atBeechridge Road.

    ID022680.00

    Scope of WorkHighway Safety and Spot Improvements

    Highway Corridor Priority5

    Estimated Funding$35,000

    Local Road Assistance Fiscal Year 2013

    $341,392

    Maintenance Accomplishments 2013100.00 Linear Feet of Backhoe Ditching

    63.45 Miles of Striping Applied

    11.00 Emergency Event Responses

    3.00 Drainage Structures Installed or Replaced

    1.00 Bridge Inspection(s) Performed

    7.25 Ton(s) of Cold Patch Applied

    13.00 Minor Sign(s) Installed or Maintained

    50.00 Linear Feet of Shoulder Rebuilt

    11.00 Bridge(s) Washed262.00 Sq Feet of Pavement Legend Applied

    54.05 Shoulder Miles of Mowing

    87.50 Linear Feet of Guardrail or Fence Maintained17.74 Shoulder Miles of Sweeping

    Completed Capital Projects 2013 016788.00 SCARBOROUGH-FALMOUTH, I-295 NB Highway Resurfacing: Beginning approximately 400 feet

    northerly of the MTA toll booth and extending northerly 7.82 miles to the Portland - Falmouth town line. 017343.00 SCARBOROUGH, DUNSTAN CORNER Intersection Improvements without Signal: Located at the

    intersection of Route 1, Payne Road, Pine Point Road and Broad Turn Road.