Maine Department of Transportation Work Plan for Calendar Years 2014-2015-2016
Work Plan Town Report 1 January 8, 2014
ScarboroughThis report shows the 2014-2016 Work Plan entries for Scarborough. The costs listed are the total cost of
these projects some of which may extend into neighboring towns. It also shows a listing of maintenance
work specifically recorded to Scarborough in 2013, as well as any 2013 Local Road Assistance payments.
Activities that are managed on a larger scale, such as snow & ice control, and maintenance work done by
contract are not listed. The maintenance accomplishments may also extend into neighboring towns, but are
listed in the first town where the work was reported. Finally, any capital projects that were completed in 2013
are also listed.
Planned Capital and Maintenance Work 2014-2016Work Plan Year:2014Municipalities(s):ScarboroughAsset(s):Eastern Corridor
Description:Design of gap Eastern Trail bicycle and pedestrian connection between the Nonesuch River in Scarborough toapproximately Pond View Drive and the South Portland city line.
ID019386.00
Scope of WorkBicycle/Pedestrian
Highway Corridor PriorityN/A
Estimated Funding$150,000
Work Plan Year:2014
Municipalities(s):ScarboroughAsset(s):Payne Road
Description:Beginning at Route 1 and extending 0.63 of a mile to Milken Road - PACTS sponsored.
ID020301.00
Scope of WorkHighway Preservation Paving
Highway Corridor Priority3
Estimated Funding$331,000
Work Plan Year:2014Municipalities(s):ScarboroughAsset(s):Mussey Road
Description:Beginning at Gorham Road and extending easterly 0.18 of a mile - PACTS sponsored.
ID018497.00
Scope of WorkHighway Preservation Paving
Highway Corridor Priority4
Estimated Funding$95,700
Work Plan Year:2014
Municipalities(s):ScarboroughAsset(s):Haigis Parkway
Description:Beginning 0.31 of a mile north of Route 1 and extending 1.08 miles to Payne Road.
ID020253.00
Scope of WorkHighway Preservation Paving
Highway Corridor Priority3
Estimated Funding$615,600
Work Plan Year:2014Municipalities(s):ScarboroughAsset(s):Payne Road
Description:Beginning at Ginn Road and extending northeasterly 1.06 miles to Mussey Road - PACTS sponsored.
ID020261.00
Scope of WorkHighway Preservation Paving
Highway Corridor Priority3
Estimated Funding$612,500
Work Plan Year:2014
Municipalities(s):ScarboroughAsset(s):Route 114
Description:Widening to install an exclusive left turn lane at Running Hill Road.
ID020208.00
Scope of WorkHighway Safety and Spot Improvements
Highway Corridor Priority3
Estimated Funding$335,000
Work Plan Year:2015-16Municipalities(s):ScarboroughAsset(s):Pine Point Crossing Br
8/13/2019 Scarborough Dot
2/2
Maine Department of Transportation Work Plan for Calendar Years 2014-2015-2016
Work Plan Town Report 2 January 8, 2014
Description:Pine Point Crossing Bridge (No. 5260) which carries Route 9 (Pine Point Road) over BandM Railroad andDepot Street Extension. Located 0.04 of a mile southeast of Holly Street.
ID018229.00
Scope of WorkBridge Construction
Highway Corridor Priority4
Estimated Funding$3,270,000
Work Plan Year:2015-16Municipalities(s):South Portland, ScarboroughAsset(s):Cummings Road
Description:Beginning at Payne Road and extending northerly 0.5 of a mile.ID
022530.00Scope of Work
Highway Preservation PavingHighway Corridor Priority
3Estimated Funding
$300,000
Work Plan Year:2015-16Municipalities(s):ScarboroughAsset(s):Holmes Road
Description:Upgrade to dual flashing beacons, large high retroreflectivity stop signs, and intersection warning signage atBeechridge Road.
ID022680.00
Scope of WorkHighway Safety and Spot Improvements
Highway Corridor Priority5
Estimated Funding$35,000
Local Road Assistance Fiscal Year 2013
$341,392
Maintenance Accomplishments 2013100.00 Linear Feet of Backhoe Ditching
63.45 Miles of Striping Applied
11.00 Emergency Event Responses
3.00 Drainage Structures Installed or Replaced
1.00 Bridge Inspection(s) Performed
7.25 Ton(s) of Cold Patch Applied
13.00 Minor Sign(s) Installed or Maintained
50.00 Linear Feet of Shoulder Rebuilt
11.00 Bridge(s) Washed262.00 Sq Feet of Pavement Legend Applied
54.05 Shoulder Miles of Mowing
87.50 Linear Feet of Guardrail or Fence Maintained17.74 Shoulder Miles of Sweeping
Completed Capital Projects 2013 016788.00 SCARBOROUGH-FALMOUTH, I-295 NB Highway Resurfacing: Beginning approximately 400 feet
northerly of the MTA toll booth and extending northerly 7.82 miles to the Portland - Falmouth town line. 017343.00 SCARBOROUGH, DUNSTAN CORNER Intersection Improvements without Signal: Located at the
intersection of Route 1, Payne Road, Pine Point Road and Broad Turn Road.