SAN DIEGO UNIFIED SAN DIEGO UNIFIED SCHOOL DISTRICT SCHOOL DISTRICT Ad Hoc Task Force on the Bond Meeting #3 June 2, 2008

SAN DIEGO UNIFIED SCHOOL DISTRICTold.sandi.net/board/committees/adhocbond/0708/0602...San Diego Unified School District Ten-Year Major Repair & Replacement Plan; 2008-09 Repair & Replacement

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SAN DIEGO UNIFIED SCHOOL DISTRICTold.sandi.net/board/committees/adhocbond/0708/0602...San Diego Unified School District Ten-Year Major Repair & Replacement Plan; 2008-09 Repair & Replacement

SAN DIEGO UNIFIED SAN DIEGO UNIFIED SCHOOL DISTRICTSCHOOL DISTRICT

Ad Hoc Task Forceon the Bond

Meeting #3

June 2, 2008

Page 2: SAN DIEGO UNIFIED SCHOOL DISTRICTold.sandi.net/board/committees/adhocbond/0708/0602...San Diego Unified School District Ten-Year Major Repair & Replacement Plan; 2008-09 Repair & Replacement

2

Meeting #3 -- Agenda

WelcomeApproval of Meeting #2 (May 31) minutesDebrief of Meeting #2 bus tourAddress “Parking Lot” issues from Meeting #1

Bond financingProp. MM lessons learned

Long-Range Facilities Master Plan timelineMajor Repair & Replacement PlanPublic commentNext Steps & closing

Page 3: SAN DIEGO UNIFIED SCHOOL DISTRICTold.sandi.net/board/committees/adhocbond/0708/0602...San Diego Unified School District Ten-Year Major Repair & Replacement Plan; 2008-09 Repair & Replacement

3

Bond Financing

Mark Young, SDUSD financial counsel

Page 4: SAN DIEGO UNIFIED SCHOOL DISTRICTold.sandi.net/board/committees/adhocbond/0708/0602...San Diego Unified School District Ten-Year Major Repair & Replacement Plan; 2008-09 Repair & Replacement

4

Prop. MM Lessons Learned

From the beginning, focus on the goal of keeping ourpromises to the voters and the schools.Ensure that the implementation program has qualityleadership. Continue to solicit stakeholder input and participation.

Augment Design Task Force membership.Expand neighbor noticing.Send courtesy letters to neighbors adjacent to sites, providing advance notice on scope and duration of work, and possible impacts.

Be fiscally responsible, ensuring the budget iswell managed.

Design to the budget.Use up-to-date construction estimates that reflect theSan Diego marketplace.Ensure that all of the scope is in the budget, and includea contingency for the unknown.

Page 5: SAN DIEGO UNIFIED SCHOOL DISTRICTold.sandi.net/board/committees/adhocbond/0708/0602...San Diego Unified School District Ten-Year Major Repair & Replacement Plan; 2008-09 Repair & Replacement

5

Prop. MM Lessons Learned (continued)

Strategically and tactically manage theproject tasks.

Have some projects ready to begin constructionphase soon after the bond passes.Compose core district team, and supplementwith contracted staff for peak periods.Speeding up the work can add cost and increase risk.Only add work if there is a compellingrequirement (regulatory or code).Include all of the work on the project schedule for better coordination and to avoid rework.

Page 6: SAN DIEGO UNIFIED SCHOOL DISTRICTold.sandi.net/board/committees/adhocbond/0708/0602...San Diego Unified School District Ten-Year Major Repair & Replacement Plan; 2008-09 Repair & Replacement

6

Prop. MM Lessons Learned (continued)

Leverage technology to provide managementreporting and analysis.

Optimize database and accounting softwaresystems.Reconcile project costs and payments tocontractors in a timely manner.Obtain comprehensive software to providemonthly updates on project/program budget and scheduling.Develop a bridge to other software programs,e.g., Physical Plant Operations and PeopleSoft. Use exception-based reporting to flag the datathat is out of the norm.

Page 7: SAN DIEGO UNIFIED SCHOOL DISTRICTold.sandi.net/board/committees/adhocbond/0708/0602...San Diego Unified School District Ten-Year Major Repair & Replacement Plan; 2008-09 Repair & Replacement

7

Prop. MM Lessons Learned

Coordinate work at a school to minimizeclassroom disruptions. Make sure the scope is completed, contracts areclosed, costs are reconciled, and records areupdated and submitted to the Division of theState Architect.Continually evaluate and improve performance –replicate successful Prop. MM implementationpractices and improve practices that weren’teffective/successful.

Page 8: SAN DIEGO UNIFIED SCHOOL DISTRICTold.sandi.net/board/committees/adhocbond/0708/0602...San Diego Unified School District Ten-Year Major Repair & Replacement Plan; 2008-09 Repair & Replacement

8

Long-Range Facilities Master PlanTimeline

2/07 3/07 4/07 5/07 6/07 7/07 8/07 9/07 10/07 11/07 12/07 1/08 2/08 3/08 4/08 5/08 6/08 7/08 8/08 9/08 10/08 11/08

1/07 11/08

San Diego Unified School DistrictLong Range Facilities Master Plan Timeline

2/02 - 8/03FCA Study

2/07 - 3/08ICOC Ad Hoc Subcommittee on MRR

Over 8 meetings

12/07 - 7/08LRFMP Task Force

9/07 - 6/08FCA Validation Update

1/03 1/04 1/05 1/06

5/05 - 6/05First Principal

Facilities Needs Survey

8/03 - 12/06FCA Update

4/07 - 6/07Second Principal

Facilities Needs Survey

10/04LRFMP Initiated

4/8/2008BOE adopts

MRR Policy ChangesRecommended by

ICOC

5/20/2008ICOC Approves

MRR Recommendationsto BOE

6/20/2008MRR Update

to BOE

7/8/2008First Reading

Resolution to PlaceGO Bond on Ballot

8/5/2008Anticipated BOE Action

to Place GO Bond on Ballot

8/27/2006LRFMP Update

BOE Workshop #1

8/07LRFMP Update

BOE Workshop #2

2/08LRFMP

Update BOEWorkshop #3

11/4/2008Bond Election

11/072nd Voter Survey

5/083rd Voter Survey

5/08 - 6/08Ad Hoc Task Force On the Bond

5 meetings

4/08 - 6/0817 High School Cluster

Group Meetings

Acronyms

BOE - Board of EducationFCA - Facilities Condition AssessmentGO - General ObligationICOC - Independent Citizens’ Oversight CommitteeLRFMP - Long Range Facilities Master PlanMRR - Major Repair and Replacement

9/051st Voter Survey

Page 9: SAN DIEGO UNIFIED SCHOOL DISTRICTold.sandi.net/board/committees/adhocbond/0708/0602...San Diego Unified School District Ten-Year Major Repair & Replacement Plan; 2008-09 Repair & Replacement

San Diego Unified School District

Ten-Year Major Repair & Replacement Plan;

2008-09 Repair & Replacement Plan

Board of Education Presentation

June 20, 2008

Facilities ManagementDrew Rowlands, Physical Plant Operations Director

Chuck Brown, Facilities Planning and Construction DirectorTom Wright, Support Services Director, Physical Plant Operations

Evan Leslie, Facilities Development Project Coordinator, Project Management Dept.

Page 10: SAN DIEGO UNIFIED SCHOOL DISTRICTold.sandi.net/board/committees/adhocbond/0708/0602...San Diego Unified School District Ten-Year Major Repair & Replacement Plan; 2008-09 Repair & Replacement

Report on Study ResultsReport on Study Results

Facility Condition Assessment (FCA)●

Major Repair & Replacement (MRR) 10-Year Plan

●Major Repair & Replacement and Repair & Replacement (MRR/RR)

2008-09 Implementation Plan

Page 11: SAN DIEGO UNIFIED SCHOOL DISTRICTold.sandi.net/board/committees/adhocbond/0708/0602...San Diego Unified School District Ten-Year Major Repair & Replacement Plan; 2008-09 Repair & Replacement

11

Definitions, Notes and Assumptions

Facility Condition Assessment (FCA)DMJM Report

Major Repair & Replacement10-Year Plan2008-09 Implementation Plan

Recommendations

Major Repair & Replacement

Contents

Page 12: SAN DIEGO UNIFIED SCHOOL DISTRICTold.sandi.net/board/committees/adhocbond/0708/0602...San Diego Unified School District Ten-Year Major Repair & Replacement Plan; 2008-09 Repair & Replacement

12

Facility Condition AssessmentDefinitions (ICOC BOE Presentation 2/12/08)

DEFINITIONS

Programmatic upgrades to meet educational needs, district programs and curriculum, and significantchange of systems technology (i.e. replacement ofheating units with package air conditioning systems, andassociated new energy efficient windows and buildinginsulation, etc.).

Replacements and upgrades of systems, such as new roofsystem, building enclosures, etc. Often considered a partof modernization or renovation of a building, generallywith a life expectancy of 20 or more years.

Repair and/or replacement of items generally with a life expectancy of less than 20 years.

Minor repairs, as reported from sites, resulting fromnormal wear and tear on buildings such as toilets, locks,light switches, etc.

Maintenance such as inspections and lubrications of systems designed to prevent deterioration into disrepair.

TERMS

Capital Improvements (CI):

Major Repair/Replacement (MRR):

Repair/Replacement (RR):

Regular Maintenance (RM):

Preventive Maintenance (PM):

Page 13: SAN DIEGO UNIFIED SCHOOL DISTRICTold.sandi.net/board/committees/adhocbond/0708/0602...San Diego Unified School District Ten-Year Major Repair & Replacement Plan; 2008-09 Repair & Replacement

13

Facility Condition Assessment

Definitions (continued)

DEFINITIONS

A Facility Condition Assessment (FCA) is an identification and quantification of any real time building systems deficienciesthat will impact the building’s operational performance.

The total maintenance requirements to replace, repair orfix any ASTM Uniformat systems used to categorizethe district’s buildings. This includes terms such as backlog, deferred maintenance and work classified as Capital Improvements (CI), Major Repair/Replacement(MRR), Repair/Replacements (RR), Regular Maintenance (RM) or Preventive Maintenance (PM).

A national standard that uses the ratio (as %) of the total cost of facility repair needs to current replacement value. FCI less than5% is good; between 5% and 10% is fair; greater than 10% is poor.

A recognized national standard (American Society for Testing and Materials) that establishes a classification of buildingelements and related site work elements delineated into majorcomponents common to most buildings.

TERMS

Facility Condition Assessment (FCA)

Total Facility Needs:

Facility Condition Index (FCI):

ASTM Uniformat II:

Page 14: SAN DIEGO UNIFIED SCHOOL DISTRICTold.sandi.net/board/committees/adhocbond/0708/0602...San Diego Unified School District Ten-Year Major Repair & Replacement Plan; 2008-09 Repair & Replacement

14

1,488 permanent building12.3 million square feet

2,350 portable buildings2.4 million square feet

2003 3DI FCA$500 Million in identified deficiencies

2006 Adjusted 3DI FCA$670 Million in identified deficiencies

Facility Condition Assessment

District

Page 15: SAN DIEGO UNIFIED SCHOOL DISTRICTold.sandi.net/board/committees/adhocbond/0708/0602...San Diego Unified School District Ten-Year Major Repair & Replacement Plan; 2008-09 Repair & Replacement

15

Facility Condition Assessment

Facility Condition Assessment (FCA): 2006 Adjusted 3DI FCA used as source data Categorized into five “buckets”Categorization aligned with funding sources16 representative detailed sites surveyedAdded items excluded in 3DI FCANormal operating maintenance and services not included in the FCA

Assumptions

CI MRR RR RM PM

Page 16: SAN DIEGO UNIFIED SCHOOL DISTRICTold.sandi.net/board/committees/adhocbond/0708/0602...San Diego Unified School District Ten-Year Major Repair & Replacement Plan; 2008-09 Repair & Replacement

16

Facility Condition Assessment

Assumptions (continued)

Data presented is based on field observationsSystems replacement costs projected overthe next 10 yearsCosts escalated over 10 yearsPreventive Maintenance (PM) estimatedNon-construction costs (design) from 3DI FCACategorized using ASTM Uniformat II

CI MRR RR RM PM

Page 17: SAN DIEGO UNIFIED SCHOOL DISTRICTold.sandi.net/board/committees/adhocbond/0708/0602...San Diego Unified School District Ten-Year Major Repair & Replacement Plan; 2008-09 Repair & Replacement

Clarifying Questions on the Facility Condition

Assessment

Page 18: SAN DIEGO UNIFIED SCHOOL DISTRICTold.sandi.net/board/committees/adhocbond/0708/0602...San Diego Unified School District Ten-Year Major Repair & Replacement Plan; 2008-09 Repair & Replacement

18

MRR 10-Year Plan

1

2

3

4

5

Priority 3 - Items that can be addressed by years 3 to 5(Short-term conditions)

Priority 4 - Items that can be addressed in years 6 to 10(Long-term requirements)

Priority 5 - Items to be addressed beyond the next 10 years(Enhancements)

Priorities

Priority 1 - Items that should be addressed in year 1 (Mission critical concerns, immediate)

Priority 2 – Items that can be addressed in year 2(Indirect impact to educational mission)

Page 19: SAN DIEGO UNIFIED SCHOOL DISTRICTold.sandi.net/board/committees/adhocbond/0708/0602...San Diego Unified School District Ten-Year Major Repair & Replacement Plan; 2008-09 Repair & Replacement

19

MRR 10-Year PlanFindings (DMJM study to be available online)

Estimated 10-Year Cost*

CI $285MMRR $280MSubtotal $565MRR $115MRM $ 75M Subtotal $190MTotal $755M

The total prioritized FCA 10-year needs:

Capital Improvements (CI), Major Repair/Replacement (MRR), Repair/Replacements (RR), RegularMaintenance (RM), Preventive Maintenance (PM). *An estimate of probable cost based on 20%accuracy as per the DMJM Harris 95% submission of the Facility Condition Assessment & Major Repair and Replacement 10-year plan.

Page 20: SAN DIEGO UNIFIED SCHOOL DISTRICTold.sandi.net/board/committees/adhocbond/0708/0602...San Diego Unified School District Ten-Year Major Repair & Replacement Plan; 2008-09 Repair & Replacement

20

MRR 10-Year Plan

Average FCI By Year Built

Average Building Age: 39 Years

0%

5%

10%

15%

20%

25%

<1940

1940

to 19

50

1950

to 19

60

1960

to 19

70

1970

to 19

80

1980

to 19

90

1990

to 20

0020

00 to

pres

ent

FCIAverage

7%Target FCI 5% - 7%

Page 21: SAN DIEGO UNIFIED SCHOOL DISTRICTold.sandi.net/board/committees/adhocbond/0708/0602...San Diego Unified School District Ten-Year Major Repair & Replacement Plan; 2008-09 Repair & Replacement

21

MRR 10-Year Plan

Facility Condition Index (FCI)*

* Graph does not include necessary recurring funds (i.e. Preventive Maintenance)

10-Year FCI Goal: 5%-7%

Prop. MM &

District Funds

Page 22: SAN DIEGO UNIFIED SCHOOL DISTRICTold.sandi.net/board/committees/adhocbond/0708/0602...San Diego Unified School District Ten-Year Major Repair & Replacement Plan; 2008-09 Repair & Replacement

22

MRR 10-Year PlanRecommendations

DMJM Calculated FCI 10-Year GoalOptimum

CI $285M $143M***MRR $280M $358MSubtotal $565M $501MRR/RM (FCA) $190M $190M**

Total $755M* $691M

AnnualDistrictFunds

Proposed GO Bond Source

Capital Improvements (CI), Major Repair/Replacement (MRR), Repair/Replacements (RR).* An estimate of escalated probable cost based on 20% accuracy as per the DMJM Harris 95% submission

of the Facility Condition Assessment & Major Repair and Replacement 10-year plan. Numbers rounded off. ** Based on DMJM Study results. This number will change based on the annual

designated district funds allocated. *** Estimated that 50% of Bond capital improvement expenditure will supplement CI.

The recommended 10-year expenditure to reach the FCI goal of5% to 7%, excluding normal maintenance and operations orpreventive maintenance requirements:

Page 23: SAN DIEGO UNIFIED SCHOOL DISTRICTold.sandi.net/board/committees/adhocbond/0708/0602...San Diego Unified School District Ten-Year Major Repair & Replacement Plan; 2008-09 Repair & Replacement

Clarifying Questions on the Major Repair and

Replacement 10-Year Plan

Page 24: SAN DIEGO UNIFIED SCHOOL DISTRICTold.sandi.net/board/committees/adhocbond/0708/0602...San Diego Unified School District Ten-Year Major Repair & Replacement Plan; 2008-09 Repair & Replacement

24

Annual Maintenance Planning RR/MRR Needs

Review of Repair HistoryFacility Review and Inspections

Facility Condition AssessmentSite Annual Review by PlannersFeedback from the SitesFeedback from the Repair Categories

MRR/RR 2008-09 PlanMethodology

Page 25: SAN DIEGO UNIFIED SCHOOL DISTRICTold.sandi.net/board/committees/adhocbond/0708/0602...San Diego Unified School District Ten-Year Major Repair & Replacement Plan; 2008-09 Repair & Replacement

25

MRR/RR 2008-09 PlanImplementation

The figures below are based on:Historical funding of $25 million annually$20 million in district funds$5 million in state-deferred maintenance funds510 projects at 163 district sites

2008-09 CostMRR $10.3MRR $14.7MTotal $25.0M

Page 26: SAN DIEGO UNIFIED SCHOOL DISTRICTold.sandi.net/board/committees/adhocbond/0708/0602...San Diego Unified School District Ten-Year Major Repair & Replacement Plan; 2008-09 Repair & Replacement

26

Electrical Lighting, fixture replacement and distribution systems $1,812,226

Grounds Asphalt, concrete, fence, irrigation, landscape, masonryand recreational equipment $7,146,341

$1,983,775

$5,647,257

$4,080,391

$4,202,198

Plumbing Fixture replacement, re-pipe, storm drainage, sewer andgas line replacement and restroom rehabilitation

General Carpentry, flooring, doors and locks, paint, plasterand roofing

Low Voltage Audiovisual, fire/intrusion, time/signal and voice/data

Mechanical HVAC, sheet metal, steam systems and heating systems

MRR/RR 2008-09 Plan

Repair Categories

Page 27: SAN DIEGO UNIFIED SCHOOL DISTRICTold.sandi.net/board/committees/adhocbond/0708/0602...San Diego Unified School District Ten-Year Major Repair & Replacement Plan; 2008-09 Repair & Replacement

Clarifying Questions on the MRR/RR 2008-09 Implementation Plan

Page 28: SAN DIEGO UNIFIED SCHOOL DISTRICTold.sandi.net/board/committees/adhocbond/0708/0602...San Diego Unified School District Ten-Year Major Repair & Replacement Plan; 2008-09 Repair & Replacement

28

Ten-Year Major Repair & Replacement Plan and 2008-09 Repair & Replacement Plan

Recommendations to the Board of Education

Accept the DMJM Facility Condition Assessment

Approve the ICOC recommended FacilityCondition Index (FCI) of 5% to 7% as a 10-yeargoal and the corresponding escalated Major Repair and Replacement (MRR) expenditureof $358M during that time period be accepted.

Approve the 2008-09 Repair and Replacement (RR) Plan as presented.

Page 29: SAN DIEGO UNIFIED SCHOOL DISTRICTold.sandi.net/board/committees/adhocbond/0708/0602...San Diego Unified School District Ten-Year Major Repair & Replacement Plan; 2008-09 Repair & Replacement

29

Public Comment

Page 30: SAN DIEGO UNIFIED SCHOOL DISTRICTold.sandi.net/board/committees/adhocbond/0708/0602...San Diego Unified School District Ten-Year Major Repair & Replacement Plan; 2008-09 Repair & Replacement

30

Next Steps & Closing