RPCC Business Plan - Feb 2011

Embed Size (px)

Citation preview

  • 8/7/2019 RPCC Business Plan - Feb 2011

    1/98

    Royal Park Hubbusiness plan february 2011

    ROYAL PARK

    COMMUNITY CONSORTIUM

  • 8/7/2019 RPCC Business Plan - Feb 2011

    2/98

  • 8/7/2019 RPCC Business Plan - Feb 2011

    3/98

    3

    table of contents

    he big idea 5

    the concept 5

    the location 6the site 7

    the impact 7

    the product 9

    commercial product 9

    community 11

    users 13the market 14

    office space market 14

    community space market 14

    demand data 14

    community demand 15

    price for office space 16

    the attraction 17

    the organisation and thepeople 18

    the management 18

    the staffing 21

    the operational model 21

    the capital phase 23

    the asset 23

    project phases 24

    the build process 25

    procurement process 25

    RPCC input 26

    risk management 27

    the financial model 28the model 28

    phase 1: start up 28

    phase 2: community centre 29

    phase 3: business centre 30after construction 30

    appendix a:cashflow forecast 31

    appendix b: architecturaldesigns 36

    appendix c: detailed

    cost plans 41appendix d: valuation 49

    appendix e: expressionsof interest 61

    appendix f: board ofdirectors biographies 79

    appendix g: managementbiographies 81

    appendix h:consultant team 83

    appendix h: publicconsultation 88

  • 8/7/2019 RPCC Business Plan - Feb 2011

    4/98

    ROYAL PARK

    COMMUNITY CONSORTIUM

    4

    RPCC objectives

    The Royal Park Community

    Consortium will work with residentsto build a safe, sustainable and

    vibrant community in Hyde Park,

    Leeds.

    Acquire local facilities for the

    use of social enterprises, local

    businesses and as a resource for

    the whole community.

    Develop local resources, talents

    and skills by supporting them and

    using them wherever possible and

    practicable.

    Empower the people of HydePark to take shared ownership

    of local assets and responsibility

    for decisions about our

    neighbourhood.

    Foster respect for the diversity

    of our community and each

    individual within it.

    Promote pride in the people and

    the neighbourhood of Hyde Park.

    Build balance and encourage

    connection between those

    who live, work and study in the

    community.

  • 8/7/2019 RPCC Business Plan - Feb 2011

    5/98

    5

    the big idea

    the concept

    The Royal Park Community Consortium (RPCC)have undertaken a project to restore the formerRoyal Park School (RPS) building and transformit into a vibrant community, business andenterprise centre right at the heart of our localarea.

    When the RPS building closed as a schoolin July 2004, local opposition was strong.Residents viewed the building as the heart ofthe community, hosting social events as well asclasses, and they turned out in their hundredsto protest the closure. Having stood empty eversince, the building is a stark reminder of theneglect that is felt by the community as a whole.

    Over the past few years the RPCCs effortshave come to a head with heightened mediaattention, waves of new supporters, significantpolitical developments and a membership ofover 300 and growing.

    We intend to capitalize on this support andtransform the former RPS building into avibrant and exciting hub, transforming the

    community as we do so. Our vision is to createa supportive environment for local businessesalongside flexible, community-focused spaceand long-term term office space for businessespredominantly within the high growth areasof the Creative, Digital and Environmentalindustries. The delivery of the project will beachieved through the application of a phaseddevelopment model. The initial phase will focuson making water tight and securing the mainbuilding, as well as refurbishing certain spacesand the former caretakers house located on the

  • 8/7/2019 RPCC Business Plan - Feb 2011

    6/98

    ROYAL PARK

    COMMUNITY CONSORTIUM

    6

    grounds. The subsequent stages will developthe community spaces on the ground floor and abusiness and enterprise centre on the first floor.

    the locationThe former Royal Park School building islocated in the heart of Hyde Park a district ofLeeds approximately three miles North of theCity Centre.

    Hyde Park is the most crowded area in Leeds.Hyde Park has a higher population densitythan the poorest areas of Moss Side (49 people

    per hectare) or Tower Hamlets (99 people perhectare). There are an average of 186 people perhectare living in Hyde Park where the averagein Leeds overall is 12.

    The school itself is situated between Kings Rd,Royal Park Rd and Queens Rd. On the forthside of the school building is the local MultiUse Games Area (MUGA) and an area of greenspace. Royal Park road is a busy bus route intothe city centre and a bus stop is located opposite

    the school building. This route is also a popularwalking route used by hundreds of students- making their way to and from the mainuniversity campus situated a short distanceaway - and numerous other residents andprofessionals who work in the city centre.

    Placed between the majority of Hyde Parkand the city centre limits is the large area ofparkland called Woodhouse Moor.

    Within the area there are a high number ofcafs and small restaurants as well as fast foodoutlets, garages and taxi ranks. ContinuingNorth down Queens Road leads to a Sainsburyslocal and cash machine facilities as well as theornate independent cinema: Hyde Park PictureHouse.

    The people living in Hyde Park come fromwildly different population groups. There are

    long-term (mainly British) residents, a strongcommunity of South Asians (some newlyimmigrated and some who have been in the area

    for generations), and a very large and growingstudent population. These groups have verydifferent customs, needs and living styles and

    this can provoke high levels of tension in thearea.

    The number of students and young peoplehas been growing each year for the last 10years and the rest of the population has beendeclining. Over 80% of the population in HydePark is aged 16-29. A quarter of the populationleaves the area every year to be replaced withnewcomers. This indicates a very weak level ofcommitment to the neighbourhood by a large

    portion of the population. Such low levels ofcommitment can be evidenced by the lack of carefor houses and gardens, rubbish and rubbishbins strewn on the streets and the detritus anddebris left after a weekend spent partying.

    Hyde Park also has a hidden layer of poverty.Although it is not one of the very lowest SuperOutput Areas (as per the last census), thetransitory population of students skews thecharacteristics of the neighbourhood. Oncepeople aged 18-24 are removed from theequation, Hyde Park may compare with someof the most impoverished areas of Leeds. Thejobless rate of 25 to 49 year olds is 1.5 timesthe average in Leeds. For those aged 50-65the jobless rate is more than twice the Leedsaverage. Only 21% of the population in HydePark is counted as being economically active.

    Crime, especially burglary and theft from

    vehicles, is a problem in Hyde Park. Wherecrime in Leeds overall has been reduced byover 9%, in Hyde Park, it grew by 11% in 2009.Theft from vehicles has increased by 90%. Inmonth-by-month comparison, during ten monthsof this year crime had increased over 2009. Theamount of anti-social behaviour has also risenthis year.

    Hyde Park is a diverse, vibrant and colourfulcommunity that faces significant social problems

    and lack of common space. This lack of space is

  • 8/7/2019 RPCC Business Plan - Feb 2011

    7/98

    7

    one of the factors holding the community backand preventing the tremendous potential that itcontains from being cultivated.

    the siteThe Royal Park School building is a largeVictorian school with a two main storeys, amezzanine fl oor and a partial lower ground

    fl oor. It sits on a slightly inclined site ofapproximately .75 acres with a three-bedroomed caretakers house within thegrounds. Parts of the school yard had becomeovergrown and unsightly until the RPCCsrecent community efforts saw them restored tosome form of tidiness and allowed preparationsfor the community gardening aspect of thedevelopment project to take place.

    The school itself, built in 1892, has classrooms

    accessed directly from two central halls and twomain entrances (labelled Boys and Girls) with

    two staircases. Upper fl oor extensions were builtin 1968 on the Eastern and Western ends ofthe building. The school has a series of pitchedroofs at differing levels, while the windows arepredominantly wooden framed single glazedunits.

    the impactThe main areas which this project will impactupon are social cohesion, community facilitiesand the local economy.

    By transforming the the iconic Royal ParkSchool building we will be sending out a clearmessage to individuals often disillusionedwith their community that this area isabout more than mass development and atransient population. By providing a space for

    community groups to run services, a base forlocal businesses and a space where residentscan relax and socialise, we will break down the

    PHASING KEY:

    PHASE 1

    PHASE 2

    PHASE 3

    HARD

    -

    STANDING

    (m)

    PHASE 1

    PHASE 2

    PHASE 3

    SOFTLAND-

    SCAPING

    (m)

    293

    -

    170

    238

    425

    75

    PARKING

    &

    ACCESS(m)

    400

    -

    280

    2

    4

    39

    1

    2624

    39a

    37

    PH

    9

    5

    74

    5

    64

    22

    7a

    1

    27

    19

    7b

    84

    5a

    20

    3

    49

    43

    40

    3

    8

    KING'SROAD

    HALLG

    ROVE

    ROYAL PARK ROAD

    Q U E E N ' S R O A D

    PLAY AREA

    NEW ACCESS

    MAINENTRANCE

    PARKING

    PARKING

    CYCLES

    BINS

    ACCESS RAMP

    GARDEN GARDEN

    EXISTING

    ACCESS

    GARDEN

    59.4m

    66.4m

    PARKING

    YCLES

    INS

    GARDEN

    PARKING

    ARDENGARDEN

    NORTH

    This design is copyright c

    REVISIONS

    HEADINGLEY

    LS6 2EN

    [email protected]

    0113 2844250

    e.mail

    facsimile

    telephone

    0113 2754000

    LEEDS

    5 NORTH HILL ROAD

    Scale:

    Checked:Date:

    Drawn: RS

    28.10.10

    1:500 @ A3

    KWB

    BASE MAPPING: Reproduction ofany Ordnance Survey Material is with the

    permission of the Controller HMSO Crown

    Copyright License No. 100020449. This

    drawing may contain information and/or

    mapping from a number of sources and its

    accuracy should be verified on site.

    R EV : D AT E: D RA WN : C HE CK ED :

    Dwg No:

    ROYAL PARK

    COMMUNITY CONSORTIUM

    ROYAL PARK

    PRIMARY SCHOOL

    ROYAL PARK ROAD, LEEDS

    PROPOSED

    SITE PLAN

    PHASING

    (01) A382/01 101

    A 19.01.11 GJ KWB

    ACCESS RAMP & GARDEN AREAS ADDED,

  • 8/7/2019 RPCC Business Plan - Feb 2011

    8/98

    ROYAL PARK

    COMMUNITY CONSORTIUM

    8

    barriers between the different aspects of thecommunity and create an accessible, inclusiveenvironment where positive relationships can

    flourish.

    Local residents will be included in as manystages of development and planning as possibleand volunteer labour from the community willbe called upon wherever practical. In doingso we will foster the existing sense of localownership of the project and establish the RoyalPark Hub as a powerful catalyst for increasedsocial cohesion in Hyde Park.

    This project will also have a huge impact onthe scale and potential of community facilitiesavailable within Hyde Park. There are no otherbuildings within the areaare comparable withthe schools size, history, prime geographiclocation and functionality; as such it presentsthe perfect opportunity to meet the demandsfor space for an increasing range of activitiesdesired by the community and local businesses.The large performance space is unique to thearea. It offers a huge range of social and culturalpossibilities for the community. The Royal ParkHub will be flexible enough to ensure that theneeds of smaller organisations and companiesare also met. The cafe and market areas createan important social hub within the area.

    For the local economy, the project will providea much-needed boost. One of the maineconomic problems in Hyde Park is the lackof appropriate facilities and support for small

    businesses and the exodus of training andwealth that occurs every year when studentstake the knowledge they have learned inLeeds to other cities and wealthier areas. Byencouraging graduates to stay and work withintheir community, and providing the facilities tomake that a viable and attractive option, we canfoster positive economic and social relationshipsbetween traditionally disparate sections ofthe population. This will also ensure that thecommunity benefits from the skills they have

    learned during their time here and the moneyand innovation those skills can bring.

  • 8/7/2019 RPCC Business Plan - Feb 2011

    9/98

    9

    the product

    What the RPCC intends to offer is a spectacularcombination of vibrant community space,creative office space, usable workshop space,with a market area and a conference hall in amulti-purpose building that will become the hubof the Hyde Park community.

    commercial productThere are a number of Commercial productson offer within the proposed Royal Park Hub.The top floor will house a multi-space businesscentre comprising of eight offices and a 150seated capacity conference hall with a stage. Alarge event-catering kitchen is also located onthis floor.

    The business centre will house one large anchortenant as well as smaller individual businessesand an incubation space for fledgling businesseson this floor. As such office space is availableto rent both as individual units and as largeclusters.

    Other spaces will be let throughout the buildingbut it is anticipated that the top floor offices willform the mainstay of the rental income.

    In physical and monetary terms the RPCC areoffering approximately 733m2 of office spaceacross the building that will be let at pricesbetween 100 150 m2 per year.

    In renting office space within the Royal ParkHub our tenants will realise the businessbenefits of an enterprise centre based in the

  • 8/7/2019 RPCC Business Plan - Feb 2011

    10/98

    ROYAL PARK

    COMMUNITY CONSORTIUM

    10

    heart of a community. The collaborative spiritof the centre, the media attention and the iconicprestige of the building will help those housed

    in the centre to thrive. In this spirit the RPCCaims to collaborate with its business tenants inthe delivery of its many projects to a mutuallybeneficial end.

    There will also be a number of office spaceslocated within the incubator centre that will beavailable to rent. This start up space will haveaccess to the centres business support workerand other resources as part of their rentalagreement.

    In addition to the office space available for rentthe Royal Park Hub will have one shop unitand two workshop units available. These willbe available at proportionally lower rental pricethan the offices. The shop unit will be located ina prime retail position with high visibility fromthe busy Royal Park Rd. The workshops will beself contained, accessible from the Queens Rd

    car park at the exposed basement level duringthe first phase of development and will beequipped to a basic standard to suit the market.

    So who will use the space?In line with the RPCCs business and fundingstrategies, businesses within the Creative,Digital and Environmental industries will befavoured. In addition to this, preference willbe given to businesses that help to achieve itscore objectives. For example, local businesswill be favoured as long as a balance betweenupholding the objectives of the RPCC andcreating financial security and longevity can be

    reached.

    One large commercial tenant will providefinancial security for the wider aspects of theproject whilst not compromising our core aims.Social enterprises and smaller businesses willalso form a key role in the rental mix both asstart up businesses entering into individual

    KITCHENETTE

    OFFICE

    CONFERENCEHALL

    OFFICE

    GALLERY

    KITCHEN

    WC

    CH

    LOCKERS

    DRESSINGROOM

    OFFICE

    OFFICE OFFICE

    OFFICEOFFICE OFFICE

    14

    13

    12 11

    78 9

    10

    STAGE

    ST

    WC (M)WC (F)

    FIRST FLOOR PLANSCALE 1:200

    This design is copyright c

    REVISIONS

    HEADINGLEY

    LS6 2EN

    [email protected]

    0113 2844250

    e.mail

    facsimile

    telephone

    0113 2754000

    LEEDS

    5 NORTH HILL ROAD

    Scale:

    Checked:Date:

    Drawn: RS

    28.10.10

    1:200 @ A3

    KWB

    REV: A DATE: 04/11/10 DRAWN: RS CHECKED: NW

    WCs AMENDED. STAGE AREA ADDED TO EVENT HALL

    REV: B DATE: 07/01/11 DRAWN: NW CHECKED: KWB

    EXTENSION WINGS REMOVED

    REV: C DATE: 18/01/11 DRAWN: GJ CHECKED: KWB

    EXTENSION WINGS REINSTATED, PHASING AMENDED.

    Dwg No:

    ROYAL PARK

    COMMUNITY CONSORTIUM

    ROYAL PARK

    PRIMARY SCHOOL

    ROYAL PARK ROAD, LEEDS

    PROPOSED

    FIRST FLOOR PLAN

    (01) C382/01 002

  • 8/7/2019 RPCC Business Plan - Feb 2011

    11/98

    11

    tenancy after moving through the incubationcentre and as stand-alone organisationsrequiring office space.

    It is our intention that a large portion ofthe start up businesses accessing the centrethrough the incubation space will be universitygraduates who are being encouraged to settle inthe area. Strong links to the Universities arealready being forged to this end.

    communityThe flexible spaces will be available to hire an a

    number of configurations:

    Meeting room configuration with centraltables, chairs, flip chart etc available uponrequest.

    Rehearsal configuration with no tables orchairs and cd-player facilities available on

    'A'

    WORKSHOP/

    OFFICE

    PLANT

    NEWDOOR

    WORKSHOP

    1

    2

    STORAGE WC &

    KITCHENETTE

    WC

    OFFICE OFFICE

    OFFICE/

    FLEXIBLE SPACEOFFICE/

    FLEXIBLE SPACE3

    4

    5 6

    MEZZANINE FLOOR PLANSCALE 1:200

    BASEMENT FLOOR PLANSCALE 1:200

    This design is copyright c

    REVISIONS

    HEADINGLEY

    LS6 2EN

    [email protected]

    0113 2844250

    e.mail

    facsimile

    telephone

    0113 2754000

    LEEDS

    5 NORTH HILL ROAD

    Scale:

    Checked:Date:

    Drawn: RS

    28.10.10

    1:200 @ A3

    KWB

    REV: A DATE: 04/11/10 DRAWN: RS CHECKED: NW

    STORAGE SPACE ADDED WITHIN BASEMENT

    REV: B DATE: 29/11/10 DRAWN: MAB CHECKED: KWB

    STORAGE SPACE ADDED WITHIN BASEMENT

    REV: C DATE: 18/01/11 DRAWN: GJ CHECKED: KWB

    EXTENSION WINGS REINSTATED, PHASING AMENDED.

    Dwg No:

    ROYAL PARK

    COMMUNITY CONSORTIUM

    ROYAL PARK

    PRIMARY SCHOOL

    ROYAL PARK ROAD, LEEDS

    PROPOSED

    BASEMENT & MEZZAINE

    FLOOR PLANS

    (01) C382/01 003

    request

    Lecture configuration with rows of chairs, flipchart and white board etc.

    Activities configuration with classroom styleseparate tables and chairs for the users

    RPCC will aim to strike a balance betweenlucrative bookings from funded organisationsand small local groups needing access to spaceat low cost.

    The market and conference halls will also beavailable for community use in a number of

    guises. Functions extending over both floors ofthe building can utilize these two spacious hallsallowing weddings and other celebrations to beheld in the Royal Park Hub as they once were.The conference hall can also house theatreproductions or large classes and the downstairshall can regularly be used as a market placewith filled with stalls from local businesses.

  • 8/7/2019 RPCC Business Plan - Feb 2011

    12/98

    ROYAL PARK

    COMMUNITY CONSORTIUM

    12

    Projects delivered or supported by the RPCCwill be able to access the flexible and hall spacesin the Royal Park Hub at discounted rates. This

    will allow individuals, other organisations andRPCC members to use the Hub and its facilitiesto deliver services that positively effect the localarea and or provide services that would otherwise be inaccessible.

    The centre will also provide space forindependently-run services that will benefit thelocal community. The dance studio will act as agreat connective space between the student andlocal resident communities. By programming

    classes ranging from yoga to contemporarydance it will help to promote a healthy lifestylefor Hub users as well as providing much soughtafter rehearsal and training space.

    The cafe space will also be run by a localbusiness and will represent an affordableand healthy dining option for the area and an

    accessible social space at the heart of the RoyalPark Hub.

    The incubation space and the conference hallwill function as part of the business centrebut will be dedicated to fulfilling the RPCCscore aims for providing space for local use andfostering start up businesses to promote localeconomic growth.

    Outside the centre, the community garden

    and caretakers home will be a showcase forenvironmental and sustainable living. Thegarden will be maintained by volunteers andcommunity groups and will provide compostingfacilities and educational programmes. Theformer caretakers house will utilize volunteerlabour during its refurbishment and upkeep,serving the dual purpose of educating

    R.P.C.C.OFFICE

    COMMUNITY SPACE

    MAINENTRANCE

    MARKET HALL / FLEXIBLE SPACE

    CLASSROOM/

    FLEXIBLE SPACE 2

    DANCE STUDIO

    LOBBY

    ST

    CRECHE CHILD

    WC

    ST

    WCLOCKERS CH

    CH

    LOBBY

    LOBBY

    OFFICE

    OFFICEMILK

    PREP

    RECEPTION

    ST

    SERVERY

    KITCHEN

    CAFE

    ST

    ST

    WC (F)WC (M)D WC

    2

    NEWENTRANCE

    LOBBY

    CLASSROOM/FLEXIBLE SPACE 1

    SH

    GROUND FLOOR PLANSCALE 1:200

    This design is copyright c

    REVISIONS

    HEADINGLEY

    LS6 2EN

    [email protected]

    0113 2844250

    e.mail

    facsimile

    telephone

    0113 2754000

    LEEDS

    5 NORTH HILL ROAD

    Scale:

    Checked:Date:

    Drawn: RS

    28.10.10

    1:200 @ A3

    KWB

    REV: A DATE: 04/11/10 DRAWN: RS CHECKED: NW

    WCs AMENDED. CAFE/KITCHEN ARANGEMEN ALTERED.

    REV: B DATE: 29/11/10 DRAWN: MAB CHECKED: KWB

    WCs AND FLEXIBLE SPACE 2 SWITCHED

    REV: C DATE: 07/01/11 DRAWN: NW CHECKED: KWB

    EXTENSION WINGS REMOVED

    REV: D DATE: 18/01/11 DRAWN: GJ CHECKED: KWB

    EXTENSION WINGS REINSTATED, PHASING AMENDED.

    Dwg No:

    ROYAL PARK

    COMMUNITY CONSORTIUM

    ROYAL PARK

    PRIMARY SCHOOL

    ROYAL PARK ROAD, LEEDS

    PROPOSED

    GROUND FLOOR PLAN

    (01) D382/01 001

  • 8/7/2019 RPCC Business Plan - Feb 2011

    13/98

    13

    volunteers in environmentally sustainableliving and serving as a permanent examplefor these techniques after its completion. The

    community refurbishment and letting of thisspace will serve as a symbolic progressionfor the regeneration of the area and will aimto illustrate the fi rst step of many needed toreaddress the balance between student housingand long-term residential lettings in the area.

    users

    The services that we are offering will be usedby all elements of the community. Individual

    people and groups of all ages, genders, racesand religious backgrounds who require space,from individual desks to a room for a largegathering, will fi nd their needs met in anaffordable and supportive manner. By providingthem with both a physical space and the support

    PHASING KEY:

    PHASE 1

    PHASE 2

    PHASE 3

    HARD-

    STANDING

    (m)

    PHASE 1

    PHASE 2

    PHASE 3

    SOFTLAND-

    SCAPING

    (m)

    293

    -

    170

    238

    425

    75

    PARKING

    &

    ACCESS(m)

    400

    -

    280

    2

    4

    39

    1

    2624

    39a

    37

    PH

    9

    5

    74

    5

    64

    22

    7a

    1

    27

    19

    7b

    84

    5a

    20

    3

    4

    9

    43

    40

    3

    8

    KING'SROAD

    HAL

    LGROV

    E

    ROYAL PARK ROAD

    Q U E E N ' S

    R O A D

    PLAY AREA

    NEW ACCESS

    MAINENTRANCE

    PARKING

    PARKING

    CYCLES

    BINS

    ACCESS RAMP

    GARDEN GARDEN

    EXISTINGACCESS

    GARDEN

    59.4m

    66.4m

    PARKING

    YCLES

    BINS

    GARDEN

    GARDENGARDEN

    NORTH

    This design is copyright c

    REVISIONS

    HEADINGLEY

    LS6 2EN

    [email protected]

    0113 2844250

    e.mail

    facsimile

    telephone

    0113 2754000

    LEEDS

    5 NORTH HILL ROAD

    Scale:

    Checked:Date:

    Drawn: RS

    28.10.10

    1:500 @ A3

    KWB

    BASE MAPPING: Reproduction ofany Ordnance Survey Material is with the

    permission of the Controller HMSO Crown

    Copyright License No. 100020449. This

    drawing may contain information and/or

    mapping from a number of sources and its

    accuracy should be verified on site.

    R EV : D AT E: D RA WN : C HE CK ED :

    Dwg No:

    ROYAL PARK

    COMMUNITY CONSORTIUM

    ROYAL PARK

    PRIMARY SCHOOL

    ROYAL PARK ROAD, LEEDS

    PROPOSED

    SITE PLAN

    PHASING

    (01) A382/01 101

    A 19.01.11 GJ KWB

    ACCESS RAMP & GARDEN AREAS ADDED,

    of a creative, inclusive environment, we willempower the community and allow exciting newprojects showcasing fresh talent to emerge.

    Local people and members of the RPCC lookingto improve on their skills and employability willbenefi t from the opportunities to get involved involunteer projects both inside and outside thebuilding. They will also benefi t from the manyevents and activities that will take place withinthe hub, and from the various socioculturalbenefi ts associated with housing successful,fl ourishing businesses within the heart of theircommunity.

  • 8/7/2019 RPCC Business Plan - Feb 2011

    14/98

    14

    inroads into the graduate and post-graduatestudent communities to support new businessideas from Leeds students looking to stay inHyde Park.

    community space market

    The Royal Park Hub may attract organisationsfrom the wider Leeds area, but our primarymarket for flex space will be from the localcommunity and from within the universityand college communities. A secondary marketmay be from larger organisations with classeselsewhare looking to expand into the Hyde Parkarea. We also expect that the two halls willattract local people and former students lookingto host weddings and other social events.

    demand data

    overall demandAlthough we are still feeling the affects of oneof the deepest recessions in decades, recentgrowth across the UK is expected to continuein the coming years. The Office of BudgetResponsibility (OBR) forcasted that GDP growthwould rise to 2.9 in 2013. Similarly, in anOctober 2010 report, PwC explained its outlookfor the UK economy, The Q2 and Q3 data

    suggest that the UK has continued to climb outof recession with cumulative growth of around2.8% over this period of recovery. We can expect

    the market

    overviewLeeds is a diverse, vibrant and growing city.As the most densely-populated part of the citywith a largely transient population, Hyde Parkattracts many newcomers - both students andimmigrants. For many who come to live inLeeds and the surrounding area, Hyde Park is

    the portal to the city.We have combined data from residents of ourcommunity, community centres, office lettingslistings and commercial property research inorder to develop an analysis of demand for theRoyal Park Hub project.

    The RPCC will be targetting two main marketsfor its offerings: businesses looking for officespaces, and organisations or people looking for

    space to hold events, meetings or classes.

    office space market

    The RPCC will be looking across Leeds toatract established businesses into the firstfloor business centre. As part of our mandateto promote high growth industries, we willnetwork with and target the creative, digitaland environmental business communitiesin Leeds. We expect that our smaller local

    businesses, such as small creative home-basedbusinesses from within Hyde Park, will takeupthe small office spaces. We also will make

  • 8/7/2019 RPCC Business Plan - Feb 2011

    15/98

    15

    that across the UK demand for commercialproperty will also increase. The OBR suggeststhat commercial property prices will continue togrow strongly to reach a peak in 2012-2013.

    Regionally, Yorkshire Forward reports thatOverall performance has remained stable orimproved for a majority of businesses. andstates that encouragingly, a clear majority of

    businesses expect to maintain their future levelsof investment.

    Leeds is the centre of economic activity for theYorkshire region and as such we can expectthat trends for growth will emerge here.GVA Grimley says that in Leeds by 2012 anundersupply rather than oversupply is likely tobe a market feature and that the current lack

    of new-build development raises thelikelihood of grade-A supply shortageswhen the occupier market returns.

    As we move out of recession, we see arising level of demand for commercialproperty supported by steadygrowth in the UK economy, withcommensurate levels of growth bothregionally and locally.

    community demand

    Our market research (for the full

    report see the appendix) showed thatHyde Park residents overwhelminglybelieved the area had a need for

    resources or facilities that could potentially behoused in the former Royal Park School. Theysuggested that spaces be made available in thecommunity for activities such as: dance, artsand crafts, child care, adult education, outdooractivities, independent shops, theatre space, acafe, studio space, and many more uses. Over athird of respondents were willing to volunteer in

    the building. This shows that their interest is inmore than passive usage.

    To determine the level of demand andcompetition for community spaces, communitycentres and halls in the North West Leeds areawere contacted and asked about their pricingand demand levels. This data is amassed andtabulated below.

    Demand for halls and meeting spacesAverage demand rating (10 = fully

    booked)7

    Price range per hour 0 - 150

    Average lower price 20

    Average upper price 27

    Median price 16

    There is strong demand and a healthy price

    level for event and meeting space in NorthWest Leeds, and room in the market for furtherspaces.

  • 8/7/2019 RPCC Business Plan - Feb 2011

    16/98

    ROYAL PARK

    COMMUNITY CONSORTIUM

    16

    price for office space

    While the average cost of office space in theHyde Park and Headingley area is below theaverage cost for Leeds city centre, we believe

    that an iconic and beautiful high spec spacecan overcome some of the price barriers due todistance and neighbourhood.

    We found records of 112 office properties inLeeds and compared the cost per square metre.The full list of office prices can be found in theappendix, however a list of average prices byneighbourhood is below.

    expressions of interestIn recent weeks we have received over15 expressions of interest covering morethan 240% of the office space, 4 householdsinterested in renting the caretakers house, andseveral organisations - from large educationalinstitutions to theatre groups and communitygroups - looking to regularly hire spaces forevents. Expressions of interest and letters ofintent continue to be solicited and received frombusinesses, organisations and people for spaceswithin the proposed Royal Park Hub.

    Our full expressions ofinterest are available in theappendicies, but the table

    below shows the amountof space requested by eachpotential tenant. This level ofinterest shows a clear gap inthe market within this areaof Leeds for a dynamic andvibrant space at the centre ofHyde Park.

    competitive overview

    Currently, there are few largebuildings offering office spacein the immediate area. Thelargest office development inHyde Park is the HeadingleyOffice Park with uninspiring

    medium-rise office buildings set back from thestreet and separated from the community. Thereare also smaller-scale buildings that houseoffices along Headingley Lane.The Leeds Innovation Centre is within ashort distance from the Royal Park Schooland also offers similar business support toLeeds University students. However, theiroffering is targeted towards scientific andtechnical businesses - with lab facilities and aninnovation hub - instead of towards creative,digital and environmental businesses. Theinnovation centre has strong ties to LeedsUniversity and does not provide support directlyto students or graduates of other educational

    institutions.

    In the wider Leeds area there are someinteresting spaces developed - particularly aspart of the Holbeck Urban Village, at Shine andHillside and in some smaller developments inredeveloped mill and warehouse spaces. None ofthese spaces will offer the same mix of artisticand creative business, community involvementand high-spec accommodation.

    City Centre

    175.84 16.34

    Burley/Little Woodhouse136.06 12.64

    Hyde Park/Headingley

    156.68 14.56

    Chapeltown/Meanwood

    150.19 13.95

    Roundhay177.60 16.50

    Armley

    103.60 9.63

    Outer Leeds

    133.50 12.35

  • 8/7/2019 RPCC Business Plan - Feb 2011

    17/98

    17

    the attraction

    The Royal Park Hub will offer fresh andcreative working spaces for innovative

    and inspired businesses in Hyde Park inan unrivalled mix at the beating heart ofa thriving community.

    youth & intellectOur neighbourhood is overhelminglyyoung, with 80% of the populationbetween the ages of 16 and 29. The largenumber of students also affords a strongconnection with the universities in Leeds.With several expressions of interest fromeducational institutions it is evident thatthere will be a large number of young,urban and educated people using theRoyal Park Hub. a supply of young, educated and local

    employees for our business tenants

    many student volunteers and dozens ofstudent organisations as part of thecommunity using the flex spaces

    beauty & excitementThere is also strong core of artistic andcreative people in the Hyde Park area.The facilities of the Royal Park Hubwill attract the creative focus - not onlythrough community spaces, but alsoin the creative and digital office areasabove.

    a vibrant population within the building

    with hosting entertaining and excitingevents will bring in foot traffic and generatebuzz to encourage further happenings in theRoyal Park Hub

    creative and innovative companies inspire andare inspired by being surrounded by creativeand artistic endeavours

    people & partnerships

    The mix of tenants, users and customers at

    the Royal Park Hub is key to the success of theproject. We have already seen potential tenantsenthuse about the possibility of working with

    each other. We have already had hundreds of

    people in the community jump in to help withour volunteer events. As a hub and not justanother office space or community centre, theRPCC hopes to facilitate connections betweenbusiness, community, and individuals for thebenefit of all in Hyde Park.

    facilitated collaboration on projects

    building-wide collaborative programmesadvantageous to tenants and centre users

    Rockstar Leeds Al l of top f loor offices 1025 151

    Leeds Music College

    The flex spaces-

    assumed 12 hrs per

    week + 119.1

    Leeds City College

    The flex spaces-

    assumed 12 hrs per

    week + 119.1

    Sri Baba Vishvarkarma

    Sabha Office 6 and office 4 72.5 100

    Leeds Hackspace Office 2 41.8 124

    Re-cycle engineering

    Basement (workshops

    1 + 2) 240.3 100

    Scrap, Recycle, Reuse. Basement space 150 80

    The Dance Studio Leeds Dance studio 112.5 125

    Butterfingers Shop unit 63 125

    Butterfingers Market stall

    50 per

    day

    Talia office 5 11.5 150

    Faz

    Dance studio- holistic

    health and fitness 112.5 125

    Baraka (Gym)

    Basement (workshops

    1 + 2)- Gym 228.9 100

    Page Catering Catering/caf 140 75

    Baraka Caf 59.2

    Cloth Cat

    studio 185 81

    Ladybird Project

    under negotiation, 12

    hrs+) 119.1

    3000 per

    yearLeeds University Union Flex space 250

    Suzi Marsh Caretaker's house 900

    Elizabeth Page Caretaker's house 900

    Tara Cleveland & family Caretaker's house 900

    Andy Ross and Stella Darby Caretaker's house 900

    TOTAL 607.3 2442.2 111

    Total Event space (m2) 186

    Total f lex space (m2) 468

    Total long-term office

    space (m2) 942

  • 8/7/2019 RPCC Business Plan - Feb 2011

    18/98

    18

    the organisation and the people

    The RPCC is a company limited by guarantee.It was incorporated in June 2009. Beforeincorporation the RPCC existed for 5 years asa group of campaigners and local residents.During November 2009 the RPS building wasoccupied by local residents and opened to thepublic to demonstrate its potential use forthe community. This generated a new wave ofsupport for the RPCC and its work towards

    securing the RPS building and transforming itinto a community hub.

    A year later and the RPCC is governed by aboard of directors and run by a managementcommittee. Steadily growing in size andcapability the organisation is moving towardsdevelopment trust status and intends to becomea registered charity with trading arm in 2011.Currently the management committee alsoincludes two part-time development workers.

    the management

    the board of directorsSue BuckleCommunity leader having taught in Leeds Highschools for 37 years, active campaigner withinHyde Park for over 20 years.

    Tara Cleveland (Financial Director)Web and graphic designer, fundraiser, withskills in marketing. Has run own internationalbusiness for 14 years and is studyingdevelopment management and accounting

    Jake England-Johns (Chair)Media spokesperson, Artistic director of awardwinning company with back ground in tourbooking and PR.

  • 8/7/2019 RPCC Business Plan - Feb 2011

    19/98

    19

    Stella DarbyProject manager with previous council andschool redevelopment experience, event co-

    ordination and fi nancial administrstion andexperienced in volunteer management.

    Maged HannaBuilding engineer specializing in sustainability,consultant specializing on the design andmodeling of low carbon buildings

    Paul HudsonExperienced treasurer, governor, teacher andhead of department for fi fteen years with strong

    knowledge of fi nancial planning

    Mohammed IsmailExperience working for Leeds City Counciladministrating community projects, Localbusinessman and experienced propertydeveloper currently working in the area, expupil of the Royal Park School and youngmuslims youth club worker

    Tony HoldichCEO of the Newlands Community Association inBradford. Tony has worked on one of the largestregeneration projects in the UK for many years.

    The board of directors is made up of nineprofessionals from the community whoseexperience and skills allow them to steerthe company through its current path ofdevelopment.

    The board itself is governed by the companiesarticles of incorporation and by the directorscode of conduct.

    The RPCC has an ongoing dedication tostrengthening its board of directors througha process of acquiring additional training forexisting directors as well as seeking new boardmembers to join our team.

    The board of directors meets monthly andits decisions are passed down to the RPCCmanagement committee. Some individuals aremembers of both the board of directors and themanagement committee.

    the management committee

    Committee positions are listed below with themain aims of the role outlined beneath them.

    Volunteer CoordinatorResponsible for developing and maintaininga strong and dynamic volunteer programthat benefi ts both the RPCC and the widercommunity.

    Communications and PublicityCoordinator

    Responsible for the development and

    Board of directors

    Volunteers and

    members

    Development

    workers

    Working Groups

    Management Committee

  • 8/7/2019 RPCC Business Plan - Feb 2011

    20/98

    ROYAL PARK

    COMMUNITY CONSORTIUM

    20

    implementation of marketing strategy and formaintaining and building upon the RPCCsexisting media contacts.

    Meetings CoordinatorResponsible for the administration requirementsof all RPCC meetings, including booking rooms,taking notes and writing and distributingminutes.

    Funding & Fundraising CoordinatorResponsible for supporting the developmentworkers in researching and writing funding bidsfor the RPCC. Also responsible for developing

    and coordinating a fundraising campaign toraise funds from the local community.

    Memebership CoordinatorResponsible for developing and implementing arecruitment drive within the community withthe aim of reaching 2000+ members by the endof 2012, as well as administration of the memberdatabase.University LiaisonResponsible for developing and maintainingongoing relationships between the RPCC andthe student population at all levels, as well aspromoting the RPCC and its projects within theuniversity.

    Events CoordinatorResponsible for developing, promoting andoverseeing all events held under the banner ofthe RPCC.

    Community Outreach CoordinatorResponsible for developing and implementinga community outreach strategy aimed atmaximising engagement from all sections of thecommunity.

    Compliance OfficerResponsible for overseeing the RPCCs policiesand procedures, ensuring compliance withexisting laws and regulations and updating and

    reviewing them wherever needed.

    Development WorkersAs well as the nine roles listed above, twofreelance part-time development workers are

    currently engaged by the RPCC and form part ofthe management committee.

    The Development Workers have been engagedspecifically to meet the needs of the RoyalPark Hub project and to facilitate the RPCCsfurther development. They are responsiblefor overseeing all aspects of the projectsdevelopment on a day-to-day basis. Morespecifically their role requires them to identifysources of funding, develop business strategies

    and conduct research as well as functioning asthe visible face of the RPCC.

    Daily they act as the RPCCs first point ofcontact for funders, local authorities and theproject design team and other consultants. Thismeans that they are sanctioned to perform theirday to day roles with the necessary freedom andflexibility, however they are still governed andsteered by the management committee and theboard of directors to whom they report. Theyare also responsible for delegating tasks tovolunteers and workers where applicable, andensuring that the projects development targetsare met. One of the primary aims of their role isto ensure the longevity of the RPCC by accessingfunding for the Royal Park Hub project and forthe salaries of the staff required to deliver it.

    Management committee decisions are madeat weekly briefings and via online systems.

    Briefings are informed by the day-to-dayactions of the development workers and RPCCvolunteers.

    work groupsIn addition to the board of directors,management committee and developmentworkers, the RPCC draws on variousworkgroups and advisors to complete tasks anddeliver support.

  • 8/7/2019 RPCC Business Plan - Feb 2011

    21/98

    21

    Decisions and tasks are disseminated to theworkgroups via either the committee memberresponsible, a working group representative

    attending the weekly briefing or the onlinecommunication systems. Responsibility forseeing tasks delivered however falls to thecommittee member who leads the workinggroup that will be delivering it. The workgroupseach consist of between 2-10 RPCC Memberswho regularly donate time within their area ofexpertise on an ad hock basis.

    Working groups exist for the following areas:Publicity and media, Events, Community

    Projects, Grant writing and Legal advice. Otherwork groups are created dependant on the needsof the RPCC.

    the staffingDuring phase 1 the RPCC will require only thedevelopment workers as point of contact for thetenants due to the small rental space available,the self sufficient nature of the units on offer

    and the lack of need for management of thebuilding itself.

    During the development phases the projectwill require additional staffing in the form of aconstruction project manager and towards theend of the final development period a marketingand sales manager.

    Once the refurbishment is completed in August2012 the centre be run and managed by acentre manager, and full-time receptionist. Thereceptionist will act as front of house for theRoyal Park Hub and the role will also includegeneral administrative tasks.

    Housed in the Business Centre in the top floor,the incubation space will require a full-timebusiness support worker to oversee the start-upsmoving into the building and their programmesinitiated.

    A part-time Caretaker will also be employedto service mechanical aspects of the building,secure the property at the end of the day and

    re-open it in the morning.

    In addition to the paid staff there will bevolunteer staffing roles within the Royal ParkHub. These roles will be designed to supportareas of the centre management that eitherrequire more occasional attention or that allowthe centre to remain frugal in its initial stagesof development.

    the operational modelThis operational model reflects the nearcompleted refurbishment of the Royal Park Hubbuilding from the end of phase 2 developmentonwards.

    Royal Park Hub opening times8 am 9pm weekdays (sometimes later forclasses and events)9 am 9pm weekends (sometimes later for

    classes and events)

    Business Centre opening timesThe business centre will be accessible byelectronic key card system to our businesstenants 24 hours a day 7 days a week. However,normal hours of operation for the centre wouldbe:7 am 6 pm weekdays and as required atweekends

    The building will be unlocked at 7am bythe caretaker or early-start reception staffdependant on their shift patterns. This willallow staff for the various ground floor tenantsto arrive and for the building to be up and readyfor public opening at 8 am.

    On weekends the centre will be opened in asimilar fashion to the weekdays though slightlylater.

  • 8/7/2019 RPCC Business Plan - Feb 2011

    22/98

    ROYAL PARK

    COMMUNITY CONSORTIUM

    22

    The reception staff and part-time caretaker willhave primary responsibility for the opening ofthe building and disabling of alarms etc and

    the same will be true of the buildings closedown procedures. In order to allow a systemof flexible working hours the centre managerand business support worker will also be able toclose the building for the night.

    In addition to this, volunteer staff will beemployed to fill in the gaps and allow sufficientstaff to be available at high use periods andto ensure that the paid workers are not overstretched. None the less a flexible work pattern

    will be required in order to allow sufficientpaid staff to be present during normal high useperiods or to accommodate events held in thebuilding.

    Volunteer workers will be afforded benefitsincluding subsidised use of services within thebuilding to reflect their hours worked at theRoyal Park Hub.

    The business support worker will work regularoffice hours of 9 5.30 and will for the most partdeliver their role from within the incubationcentre full-time. At times of high businessusage, for example conferences and during theinitial start up period, the business supportworker will be able to perform roles outside ofthe centre and provide support to the centermanager.

    The centre manager will also work the

    conventional hours of 9 5.30 but will be likelyto move between this and a flexible workingpattern to accommodate the later eveningevents and weekend demands as necessary.The managers responsibilities will includethe delivery of a smooth running Hub overall,balancing the different needs of the communityelements and the business centre and managingthe staff to that effect. They will also act asthe face of the Royal Park Hub and representthe RPCCs flagship presence in the Hyde Park

    area. The center manager will also form part ofthe RPCC Management committee in the sameway that the development workers currently do.

  • 8/7/2019 RPCC Business Plan - Feb 2011

    23/98

    23

    the capital phase

    the assetRoyal Park School was built in 1892. By

    the time of its closure in 2004, it housedapproximately 140 pupils, ranging in age from 4to 11 years old.

    Purpose built as a school, the building is a twostorey Victorian structure built on a slopingsite. A third storey extension was added in the1960s. There are playgrounds to both sides ofthe school and a good-sized Victorian caretakershouse within the grounds. Both the school andthe caretakers house are constructed from loadbearing 9 thick solid brickwork. The school hasa series of pitched roofs at differing levels, whilethe windows are predominantly wooden framedsingle glazed units.

    The net internal area of the building isapproximately 2450.6 m2; the gross internalarea is approximately 2633.8 m2. Within thebuilding are a number of classrooms rangingin size from 45 m2 to 97 m2, two large halls of

    approximately 222 m2 and a variety of smallerstore rooms and ancillary spaces.

    The building is not listed and does not fallwithin a conservation area.

    With six years of neglect and disuse, thebuilding has fallen into a state of disrepair. Ourstructural engineer is concurs generally withthe 2004 Condition Survey report commissionedby Education Leeds before the schools closure.He suggests that the failed window head lintelto the rear elevation being the only item in needof remedial action . He also says that althoughthere is some water damage, that both hallshave joist timber in good condition and that the

    load bearing masonry appears to be generallyin good condition. The engineers surveybrought up the following points that may needaddressing:

    a specialist timber survey be carried out atsome stage to determine if there is any fungal

  • 8/7/2019 RPCC Business Plan - Feb 2011

    24/98

    ROYAL PARK

    COMMUNITY CONSORTIUM

    24

    project phases

    The project to refurbish theformer Royal Park Schooland transform it into theRoyal Park Hub will occur in4 stages.

    0 Setting it to rightsIn this phase we willpurchase the building,achieve planningpermission, completesurveys and fix the roof

    and the external windowsand doors.

    1 Start UpPhase 1 will allow us tobring parts of the mainbuilding into use andrefurbish the caretakershouse. This partialrefurbishment will allowus to seek further funding,

    while ensuring that wecan service our debts andoccupy the building.

    2 Community CentreThis phase sees theground floor of thebuilding complete and inuse. The ground floor ofthe building includes the

    child care area, the dancestudio, flex spaces, markethall and the communitycafe.

    3 Business Enterprise AreaThe final phase of thebuild process will be thefirst floor and mezzaninefloor business offices,start-up spaces, business

    support areas andconference hall.

  • 8/7/2019 RPCC Business Plan - Feb 2011

    25/98

    25

    damage to the timber

    the dance studio floor for the frequency/response of the construction

    a more in-depth condition check of the joistfiller concrete slab on the mezzanine floor

    a condition and construction survey to verifythe roof structure

    David Moor, an experienced chartered surveyor,has valued the building currently at 250,000.He says,

    I have been given a projected incomestream producing an annual income

    of 343, 412 per annum and in myopinion this figure is a realisticreflection of a potential rental incomefor the building taking into accountvoids. The running costs projectionshave been calculated at 81,317 or5.04 per sq metre. Again in myopinion these costs are realistic intodays market place. The total netincome exclusive of loan repaymentcostslies in the order of 262,095 perannum.... Indications of interest havegiven rise to the belief that there would

    be a good take up of space within theproposed unit. In my opinion the yieldfor this type of property would be 8.5%.

    the build processtype of build processWe intend to use a traditional build processfor the Royal Park Hub project, using separate

    teams for the design and build stages of theprocess.

    We have consulted with a highly experiencedlocal design team including an architect,a mechanical engineer and sustainabilityconsultant, a structural engineer, and a quantitysurveyor as part of the feasibility stage of theproject. We have still to start the procurementprocess for the full architectural and surveyworks and the construction and repair of thebuilding.

    construction costsThrough the phases of the project the costs

    of the building lease/purchase, construction,professional fees and related surveys pluscontingencies and VAT. we estimate to be asoutlined in the table below. A total build cost of2.65 million over 2 years is estimated.

    Phase Cost

    Phase 0 (building purchase andfabric repair)

    337,700

    Phase 1 (refurbishment ofbasement and caretakers

    house)

    443,092

    Phase 2 (refurbishment ofcommunity areas)

    753,911

    Phase 3 (refurbishment of officespace and conference hall)

    1,112,207

    Total 2,646,910

    procurement process

    As we intend to apply for funding from the

    European Regional Development Fund(ERDF), our procurement process mustmeet their exacting standards. We plan touse a procurement panel to tender for worksto be completed by our major suppliers. Aprocurement panel will ensure the process iscompleted speedily and with a minimum ofhassle.

    our consultant team

    We have currently engaged a consultantteam to provide advice and design work. Ourprofessional team have been recommended byKeith Brewster and have agreed to work at riskin return for the opportunity to bid for tenderwhen funds are secured to proceed further withthe project.

    Architect - Brewster Bye Architects

    Brewster Bye Architects is an award winning

    architecture and design practice based inHeadingley, Leeds with a reputation forproducing high quality, creative and cost

  • 8/7/2019 RPCC Business Plan - Feb 2011

    26/98

    ROYAL PARK

    COMMUNITY CONSORTIUM

    26

    efficient design solutions across Residential,Health, Education, Community and Commercialsectors.

    Quantity Surveyor - Bernard WilliamsAssociates

    Bernard Williams Associates (BWA) are a firm ofCost Consultants and Building Economists withover 35 years experience of Arts, communityand publicly funded projects. The practice wasestablished in 1969 and currently comprises 30qualified surveyors based in Leeds, Barnsley,and London.

    Mechanical and electrical engineersand sustainability consultants - LeedsEnvironmental Design Associates Ltd

    The engineering input LEDA can provide toclients and architects goes beyond standardbuilding services design. Their knowledge ofdesign issues such as solar gains, daylighting,natural ventilation and air tightness helps thedesign team create low-energy buildings with apleasant and healthy internal climate.

    Structural and civil engineers - AdeptConsulting Engineers

    Adept are an experienced Chartered Civil& Structural Engineering company withhands on experience in the design and projectmanagement of multi-storey steel and concreteframed buildings, warehouses and majorrefurbishment projects.

    RPCC input

    As part of the implementation of the project, twopart-time development workers and one part-time building project manager will be employed.They will make day-to-day decisions and ensurethe project runs smoothly while protecting theinterests of the RPCC and the wider community.

    The main decisions about the construction of theRoyal Park Hub will be guided by decisions fromthe Board of Directors and strategic decisions

    will be made by the RPCC managementcommittee in weekly meetings.

    Ongoing community consultations will ensurethat the project meets the needs and asperationsof the Hyde Park community.

  • 8/7/2019 RPCC Business Plan - Feb 2011

    27/98

    27

    0.625

    CommunityBuildersrejectsapplicatio

    nmedium

    high

    en

    surethatconditionsfromLCCinclude

    aprovisionfortimetosecurefurtherf

    unding

    wo

    rkcloselywithadvisorstomeettherequirementsofCommunitybuilders

    0.625

    delayindeliveryofwindows&doors

    medium

    high

    *sta

    rttenderprocessforprocurementofwindowsanddoorsasearlyaspossible

    *prio

    ritizeatopographicalsurveytoallowforearlyorderingofwindowsanddoo

    rs

    0.5

    furtherdeteriorationoverthewinter

    duetowaterdamagerequires

    remedialworks

    medium

    medium

    *wo

    rkwithcounciltocoverrooftotempo

    rarilystopwateringress

    *wo

    rkwithsurveyorstoidentifypossiblewo

    rksanddevelopacontingencyplan

    and

    budgettodealwithpotentialproblems

    0.5

    tenderprocessdoesnotfittimescale

    s

    low

    high

    useaprocurementpaneltocutdowno

    ntenderingtime

    forewarnallpartnersandstakeholdersofthetighttimescalesandaddressthem

    aheadof

    time

    0.5

    costoverruns

    medium

    medium

    de

    velopcontractsandresponsibilitiesto

    ensurethatcostincreasesareminimizedand

    thatriskofcostincreasesisshared

    0.5

    ourplanslosesupportofthewider

    community

    low

    high

    co

    ntinuewitharegularplanofcommun

    ityoutreach,communicationofourp

    lanswithin

    thec

    ommunityandconsultationswiththecommunitytoensurethatthewiderc

    ommunity

    isaw

    areofourplansandhasinputintothe

    project

    0.5

    plannersrequiremajorchangesto

    plan

    medium

    medium

    meetwithplanningdepartmentandde

    signteamtoensureproblemsaredea

    ltwith

    early

    intheprocess

    lob

    bycouncillorsonplanspanelfortheirsupport

    havea'PlanB'forallflaggedplanningconcerns

    ensurePlanBmeetsbudgetrequirements

    de

    veloprelatioshipmanagementplanf

    orkeystakeholderrelationship

    de

    velopapublicrelationsandlobbyingstrategytodealwithdissentingvoices

    ou

    treachtomembersofthecommunity

    thatsupportotherusesofthebuilding

    go

    vernance,policiesareadheredtobymanagement

    low

    medium

    smallgroupsfromthecommunitywho

    disagreewithourplanscausedispute

    s

    anddelaystotheproject

    0.375

    risk management

    Some level of risk is

    inherent in any project ofthis size and complexity.The key to project success isto identify and mitigate riskbefore damage occurs.

    To the right is a tableof identified risks andstrategies for mitigation.Also included arecontingency plans in caseswhere mitigation may notbe sufficient to eradicate theimpact of risk.

  • 8/7/2019 RPCC Business Plan - Feb 2011

    28/98

    28

    the financial model

    the model

    The RPCC intends to combine a vibrantcommunity-focused centre with creative, digitaland environmental businesses in high spec officespaces in the dynamic and iconic Royal ParkHub.

    The capital stages of the project involve

    purchasing the building, repairing it so that itcannot deteriorate further, refurbishing the firstareas to ensure the sustainability of the project,constructing the community centre, and finallybuilding the business centre.

    phase 0: setting it to rightsThis phase is about acquiring the buildinginvolves completion of detailed surveys tocomplete RIBA stage D, purchase of thebuilding, legal and other professional feesinvolved.

    phase 1: start up

    Phase 1 involves refurbishing 169 m2 of officespace, 353 m2 of workshop space, 63m2 ofcommunity flex space and the low-carbonrefurbishment of the caretakers house. Thisphase will result in a total estimated monthlyrental amount of 4465. The revenue from therental available from the areas refurbishedunder Phase 1 of the project will satisfy the

    Communitybuilder loan payments.

    There has been very strong demand expressedthrough multiple expressions of interest forthe spaces available in phase 1 (please see theappendicies for a detailed table of interests andthe copies of letters from potential tenants).We expect that these areas will be filled almostimmediately upon completion.

    PHASE 0

    PHASE 1

    Communitybuilders

    grant/loan

    800,000+

    BigLottery &

    IA Ziff fund

    630,000PHASE 2

    PHASE 3

    RUNNING

    ERDF

    1,000,000

    Communitybuilders payments4100/month

    Capital cost Phase 0337,700

    Capital cost Phase 1

    443,092

    Capital Cost Phase 2

    753,911

    Construction Cost Phase 3

    1,112,207

    monthly revenue

    4465

    monthly revenue10,682

    monthly revenue

    19,942

    monthly revenue

    22,890

  • 8/7/2019 RPCC Business Plan - Feb 2011

    29/98

    29

    Rental Revenue Breakdown

    Whats included? 2011 2012 2013 2014 2015

    flex space

    profit-making (50% of

    usage)

    multimedia

    facilites, flip

    chart, catering

    available, pens

    & paper, tea and

    coffee facilities

    2,920 12,319 31,481 32,850 32,850

    non-profit/charity (50%

    of usage) 1,460 6,159 15,471 16,425 16,425

    workshops utilities, security 8,010 27,787 35,300 35,300 35,300

    office space utilities, security 16,930 32,980 78,244 96,300 96,300

    conference/event hall

    lecturn, PA,

    seating, tables,catering available 10,950 29,054 31,390 36,464

    market space/flex space 20,075 29,054 31,390 31,390

    services (caf/creche) utilities 8,325 11,100 16,356 16,356

    caretakers house uti lities 6,400 9,600 9,600 9,600 9,600

    Total Revenue 35,720 128,195 239,304 269,611 274,685

    phase 2: community centre

    Phase 2 will be primarily financed with a grantof 500,000 from the new buildings stream ofthe BigLottery Reaching Communites fund.Phase 3 will be financed primarily by an ERDFgrant for just under 1million. As Phases 2and 3 are completed, the revenue from theseadditional areas will go towards running costs,program costs for the business support area andwhen the loan is completed, towards fundingadditional community initiatives.

    In Phase 2 it is assumed that the occupancy

    rates for the flex spaces and market hall willslowly increase over the first year to 18 monthswith seasonal variations including a slowdownduring university holidays and an increaseover the Christmas period. We have also hadexpressions of interest from several individualsfor running the service areas (caf andchildcare). Various types of interest have beenexpressed in the dance studio area - includingpossible long-term tenancies as well as flexiblehourly rentals for weekly classes. We expect

    that all areas in the community centre willprogress to a satisfactory level of capacity.

    Fund Phase Amount

    LEGI All 10,000

    Caird Bardon All 60,000

    Communitybuilders 0 & 1 800,000

    BigLottery Fund:ReachingCommunities(Building stream)

    2 500,000

    IA Ziff fund 2 160,000

    Lankelly ChaseFund

    2 75,000

    Leeds CommunityFoundation

    ERDF fund

    3 10,000

    Wades Charity 2 5,000

    Tudor Trust Grand All 27,000

    R&S CohenFoundation

    3 75,000

    John ArmitageTrust

    2 & 3 62,000

    ERDF 3 995,955

    Total 2,779,955

  • 8/7/2019 RPCC Business Plan - Feb 2011

    30/98

    ROYAL PARK

    COMMUNITY CONSORTIUM

    30

    phase 3: business centre

    Upon completion of phase 3 the Royal Park Hubwill contain:

    642 m2 of office space

    353 m2 of workshop space

    182 m2 of flex space

    242 m2 conference hall

    158 m2 of flex hall/market space

    a cafe

    a creche a low-carbon, energy efficient 3-bedroomed

    house

    Our goal is to secure an anchor tenant forPhase 3 of the project. Several businesses andorganisations have met with us or expressed aformal interest in a large portion of the Phase3 space and would serve as the main tenant.(please see appendix for the letters of intent

    and expressions of interest). We currently haveexpressions of interest accounting for : 184% of the office space,

    4 potential tenants for the caretakershouse,

    and several compelling tenants for the flexspace.

    after construction

    Once the construction phases are complete, we

    anticipate that flex space capacity and rentaluptakes will increase over the following years.We hope that any profits will allow the RPCCto continue to invest in projects and events thatimprove Hyde Park for all of its residents andvisitors.

  • 8/7/2019 RPCC Business Plan - Feb 2011

    31/98

    31

    appendix a: cashflow forecast

    CashflowFo

    recast2011

    Year1/AnnualCashflow

    Forecast

    Jan-11

    Feb-11

    Mar-11

    Apr-11

    May-11

    Jun-11

    Jul-11

    Aug-11Sep-11

    Oct-11

    Nov-11

    Dec-11

    Year1

    Year2

    Year

    3

    OPENINGBALANCE

    4,050

    5,834

    14,318

    36,195

    48,929

    55,578

    62,262

    69,6117

    8,211

    86,397

    156,997

    240,347

    4,050

    308,782

    142,865

    Revenue

    Income(revenue)

    Fundraising

    5,100

    5,300

    5,100

    5,300

    5,100

    5,300

    5,100

    5,300

    5,100

    5,300

    5,100

    5,300

    62,400

    6

    3,700

    0

    flex-space(forprofit)

    365

    365

    365

    365

    365

    365

    365

    365

    2,920

    1

    3,416

    31,481

    flex-space(non-profit/

    charity)

    183

    183

    183

    183

    183

    183

    183

    183

    1,460

    6,704

    15,741

    workshopspacerental

    1,001

    1,001

    1,001

    2,003

    2,003

    2,003

    2,003

    2,003

    13,016

    2

    7,792

    35,300

    officespacerental

    2,116

    2,116

    2,116

    2,116

    2,116

    2,116

    2,116

    2,116

    16,930

    3

    2,980

    78,244

    conference

    hall

    1

    0,950

    29,054

    marketspace

    2

    0,075

    29,054

    services(ca

    f/creche)

    8,325

    11,100

    caretakers

    houserental

    900

    900

    900

    900

    900

    900

    900

    900

    7,200

    1

    0,800

    10,800

    0

    0

    TOTALINCO

    ME

    5,100

    5,300

    5,100

    5,300

    9,665

    9,865

    9,665

    10,8661

    0,666

    10,866

    10,666

    10,866

    103,926

    194,742

    240,774

    Expenditure

    (revenue)

    0

    Fundraisingcosts

    1,276

    176

    341

    176

    176

    341

    176

    176

    341

    176

    176

    341

    3,872

    2,772

    2,772

    Businessexp

    enses

    190

    140

    190

    140

    190

    140

    190

    140

    190

    140

    190

    140

    1,980

    1,020

    1,020

    Runningco

    sts

    400

    450

    450

    450

    450

    450

    450

    450

    3,550

    8

    8,524

    88,524

    PTdevelopmentworker

    750

    750

    750

    750

    750

    750

    750

    750

    750

    750

    750

    750

    9,000

    6,000

    0

    PTdevelopmentworker

    750

    750

    750

    750

    750

    750

    750

    750

    750

    750

    750

    750

    9,000

    6,000

    0

    constructionagent/

    manager

    750

    750

    750

    750

    3,000

    6,750

    0

    salesandm

    arketing

    manager

    8,250

    0

    0

    0

    centremanager

    0

    1

    2,000

    18,000

    receptionstaff(2FT)

    0

    1

    7,600

    26,400

    businesssupportworker

    0

    6,000

    18,000

    caretaker

    0

    6,000

    9,000

    NIC

    0

    5,512

    5,484

    TOTALEXPENDITURE

    2,966

    1,816

    2,781

    2,566

    3,016

    3,181

    2,316

    2,266

    2,481

    2,266

    2,316

    2,431

    30,402

    166,428

    169,200

    OperatingS

    urplus/deficit

    2,134

    3,484

    2,319

    2,734

    6,649

    6,684

    7,349

    8,600

    8,185

    8,600

    8,350

    8,435

    73,524

    28,314

    71,574

    CashflowFo

    recast2011

    Year1/AnnualCashflow

    Forecast

    Jan-11

    Feb-11

    Mar-11

    Apr-11

    May-11

    Jun-11

    Jul-11

    Aug-11Sep-11

    Oct-11

    Nov-11

    Dec-11

    Year1

    Year2

    Year

    3

    Capitalp

    roject

  • 8/7/2019 RPCC Business Plan - Feb 2011

    32/98

    ROYAL PARK

    COMMUNITY CONSORTIUM

    32

    Income(ca

    pital)

    Grants

    5,000

    10,000

    62,000

    75,000

    60,000

    212,000

    24

    0,000

    0

    BigLotteryFund

    0

    50

    0,000

    ERDF

    0

    93

    1,888

    0

    LEGI

    0

    0

    0

    Community

    BuildersGrant

    320,000

    320,000

    0

    0

    Community

    BuildersLoan

    480,000

    480,000

    0

    0 0

    TotalIncom

    e

    0

    5,000

    800,000

    10,000

    0

    0

    0

    0

    0

    62,000

    75,000

    60,0001,012,0001,67

    1,888

    0

    Expenditure

    (capital)

    01,86

    6,119

    0

    leasepurchaseincluding

    legal&VAT

    267,500

    267,500

    surveys(inc

    lVAT)

    14,472

    14,472

    1

    0,260

    statutoryfees

    350

    2,750

    3,100

    5,000

    professiona

    lfees(inclVAT)

    62,100

    62,100

    20

    2,711

    fabricrepairphase0(incl

    VAT)

    70,200

    70,200

    buildcostsphase1(incl

    VAT)

    363,420

    363,420

    buildcostsphase2(incl

    VAT)

    0

    67

    2,532

    buildcostsphase3(incl

    VAT)

    0

    97

    5,616

    Totalexpen

    diture

    350

    0

    780,442

    0

    0

    0

    0

    0

    0

    0

    0

    0

    780,7921,86

    6,119

    0

    Balance

    1,784

    8,484

    21,877

    12,734

    6,649

    6,684

    7,349

    8,600

    8,185

    70,600

    83,350

    68,435

    304,732(165,918)

    71,574

    BALANCEC

    ARRIED

    FORWARD

    5,834

    14,318

    36,195

    48,929

    55,578

    62,262

    69,611

    78,2118

    6,397

    156,997

    240,347

    308,782

    308,782

    142,865

    214,439

  • 8/7/2019 RPCC Business Plan - Feb 2011

    33/98

    33

    CASHFLOWFORECAST2012

    Year2

    Jan-12

    Feb

    -12

    Mar-12

    Apr-12

    May-12

    Jun-12

    Jul-12

    Aug-12

    Sep-12

    Oct-12

    Nov-12

    Dec-12

    Year2

    OPENING

    BALANCE

    308,782

    945,616

    923,007

    808,973

    722,902

    65

    4,110

    654,737

    571,948

    467,233

    340,568

    219,126

    167,423

    308,782

    Revenu

    e

    Income(revenue)

    0

    Fundraisin

    g

    3,300

    3,300

    4,800

    5,300

    5,300

    5,300

    5,300

    5,300

    5,900

    5,300

    7,300

    7,300

    63,700

    flex-space(forprofit)

    365

    365

    365

    1,369

    1,369

    1,369

    1,369

    1,369

    1,369

    1,369

    1,369

    1,369

    13,416

    flex-space(non-profit/charity)

    183

    183

    183

    684

    684

    684

    684

    684

    684

    684

    684

    684

    6,704

    workshop

    spacerental

    2,003

    2,003

    2,003

    2,003

    2,003

    2,003

    2,003

    2,003

    2,942

    2,942

    2,942

    2,942

    27,792

    officespa

    cerental

    2,116

    2,116

    2,116

    2,116

    2,116

    2,116

    2,116

    2,116

    4,013

    4,013

    4,013

    4,013

    32,980

    conferencehall

    1,825

    1,825

    3,650

    3,650

    10,950

    marketsp

    ace

    1,825

    1,825

    1,825

    1,825

    1,825

    1,825

    1,825

    3,650

    3,650

    20,075

    services(caf/creche)

    925

    925

    925

    925

    925

    925

    925

    925

    925

    8,325

    caretakershouserental

    900

    900

    900

    900

    900

    900

    900

    900

    900

    900

    900

    900

    10,800 0

    TOTALINC

    OME

    8,867

    8,867

    10,367

    15,122

    15,122

    1

    5,122

    15,122

    15,122

    20,383

    19,783

    25,433

    25,433

    194,742

    Expenditu

    re(revenue)

    0

    Fundraisin

    gcosts

    176

    176

    341

    176

    176

    341

    176

    176

    341

    176

    176

    341

    2,772

    Businesse

    xpenses

    110

    60

    110

    60

    110

    60

    110

    60

    110

    60

    110

    60

    1,020

    Runningc

    osts

    7,377

    7,377

    7,377

    7,377

    7,377

    7,377

    7,377

    7,377

    7,377

    7,377

    7,377

    7,377

    88,524

    PTdevelo

    pmentworker

    750

    750

    750

    750

    750

    750

    750

    750

    6,000

    PTdevelo

    pmentworker

    750

    750

    750

    750

    750

    750

    750

    750

    6,000

    construct

    ionagent/manager

    750

    750

    750

    750

    750

    750

    750

    750

    750

    6,750

    salesand

    marketingmanager

    750

    750

    750

    750

    750

    750

    750

    750

    750

    750

    750

    8,250 0

    centrem

    anager

    1,500

    1,500

    1,500

    1,500

    1,500

    1,500

    1,500

    1,500

    12,000

    receptionstaff(2FT)

    2,200

    2,200

    2,200

    2,200

    2,200

    2,200

    2,200

    2,200

    17,600

    business

    supportworker

    1,500

    1,500

    1,500

    1,500

    6,000

    caretake

    r(part-time)

    750

    750

    750

    750

    750

    750

    750

    750

    6,000

    NIC

    605

    605

    605

    605

    797

    797

    797

    701

    5,512 0

    TOTALEXPENDITURE

    10,663

    10,613

    10,828

    10,613

    15,718

    1

    5,833

    15,718

    15,668

    16,075

    15,110

    15,160

    14,429

    166,428

  • 8/7/2019 RPCC Business Plan - Feb 2011

    34/98

    ROYAL PARK

    COMMUNITY CONSORTIUM

    34

    Operating

    Surplus/deficit

    (1,797)

    (1,7

    47)

    (462)

    4,509

    (596)

    (711)

    (596)

    (546)

    4,308

    4,673

    10,273

    11,004

    28,314

    CASHFLOWFORECAST2012

    Year2

    Jan-12

    Feb

    -12

    Mar-12

    Apr-12

    May-12

    Jun-12

    Jul-12

    Aug-12

    Sep-12

    Oct-12

    Nov-12

    Dec-12

    Year2

    Capitalproject

    0

    Income(capital)

    Grants

    160,000

    75,000

    5,000

    240,000

    BigLotter

    yFund

    500,000

    500,000

    ERDF

    21,130

    87,547

    108,231

    80,897

    61,526

    1,338

    73,747

    92,661

    114,688

    133,085

    78,964

    78,074

    931,888

    LEGI

    0

    TotalInco

    me

    681,130

    162,547

    113,231

    80,897

    61,526

    1,338

    73,747

    92,661

    114,688

    133,085

    78,964

    78,0741,671,888

    Expenditu

    re(capital)

    leasepurchaseincluding

    legal&VAT

    0

    surveys(inclVAT)

    10,260

    10,260

    statutory

    fees

    2,000

    1,500

    1,500

    5,000

    profession

    alfeesphase3(incl

    VAT)

    25,920

    19,440

    22,140

    19,440

    19,440

    16,951

    123,331

    profession

    alfeesphase2(incl

    VAT)

    40,500

    22,140

    16,740

    79,380

    fabricrep

    airphase0(inclVAT)

    0

    buildcostsphase1(inclVAT)

    0

    buildcostsphase2(inclVAT)

    161,269

    210,064

    171,477

    129,722

    672,532

    buildcostsphase3(inclVAT)

    118,260

    177,390

    222,021

    239,760

    121,500

    96,685

    975,616 0

    Totalexpenditure

    42,500

    183,409

    226,804

    171,477

    129,722

    0

    155,940

    196,830

    245,661

    259,200

    140,940

    113,6361,866,119

    Balance

    636,834

    (22,6

    09)(114,035)

    (86,071)

    (68,792)

    627

    (82,789)(104,715)(126,665)(1

    21,442)

    (51,703)

    (24,558)(165,918)

    BALANCE

    CARRIEDFORWARD

    945,616

    923,007

    808,973

    722,902

    654,110

    65

    4,737

    571,948

    467,233

    340,568

    219,126

    167,423

    142,865

    142,865

  • 8/7/2019 RPCC Business Plan - Feb 2011

    35/98

    35

  • 8/7/2019 RPCC Business Plan - Feb 2011

    36/98

    36

    appendix b: architectural designs

  • 8/7/2019 RPCC Business Plan - Feb 2011

    37/98

    37

    R.P.C.C.

    OFFICE

    COMMUNITYSPA

    CE

    MAIN

    ENTRANCE

    MARKETHALL/FLEXIBLESPACE

    CLASSROOM/

    FLEXIBLESPACE2

    DANCESTUDIO

    LOBBY

    ST

    CRECHE

    CHILD

    WC

    ST

    WC

    LOCKERS

    CH

    CH

    LOBBY

    LOBBY

    OFFICE

    OFF

    ICE

    MILK

    PREP

    RECEPTION

    ST

    SERVERY

    KITCHEN

    CAFE

    ST

    ST

    WC(F)

    WC(M)

    DWC

    2

    NEW

    ENTRANCE

    LOBBY

    CLASSROOM/

    FLEXIBLESPACE1

    SH

    GROUNDFLOORPLAN

    SCALE1:200

    Thisdesigniscopyrightc

    REVISIONS

    HEADINGLEY

    LS62EN

    [email protected]

    01132844250

    e.mail

    facsimile

    telephone

    01132754000

    LEEDS

    5NORTHHILLROAD

    Scale:

    Checked:

    Date:

    Drawn:

    RS

    28.10.10

    1:200@A3

    KWB

    REV:ADATE:04/11/10

    DRAWN:RS

    CHECKED:NW

    WCsAMENDED.CAFE/KITCHENAR

    ANGEMENALTERED.

    REV:BDATE:29/11/10

    DRAWN:MAB

    CHECKED:KWB

    WCsANDFLEXIBLESPACE2SWITCHED

    REV:CDATE:07/01/11

    DRAWN:NW

    CHECKED:KWB

    EXTENSIONWINGSREMOVED

    REV:DDATE:18/01/11

    DRAWN:GJ

    CHECKED:KWB

    EXTENSIONWINGSREINSTATED,P

    HASINGAMENDED.

    DwgNo:

    ROYALPA

    RK

    COMMUNITYCON

    SORTIUM

    ROYALPA

    RK

    PRIMARYSCHOOL

    ROYALPARKROAD,LEEDS

    PROPOSE

    D

    GROUNDFLOO

    RPLAN

    (01)

    D

    382/01

    001

  • 8/7/2019 RPCC Business Plan - Feb 2011

    38/98

    ROYAL PARK

    COMMUNITY CONSORTIUM

    38

    KITCHENETTE

    OFFICE

    CONFERENCE

    HALL

    OFFICE

    GALLE

    RY

    KITCHEN

    WC

    CH

    LOCKERS

    DRESSING

    ROOM

    OFFICE

    OFFICE

    OFFICE

    OFFICE

    OFFICE

    OFFICE

    14

    13

    12

    11

    7

    8

    9

    10

    STAGE

    ST

    WC(M)

    WC(F)

    FIRSTFLOORPLAN

    SCALE1:200

    Thisdesigniscopyrightc

    REVISIONS

    HEADINGLEY

    LS62EN

    [email protected]

    01132844250

    e.mail

    facsimile

    telephone

    01132754000

    LEEDS

    5NORTHHILLROAD

    Scale:

    Checked:

    Date:

    Drawn:

    RS

    28.10.10

    1:200@A3

    KWB

    REV:ADATE:04/11/10

    DRAWN:RS

    CHECKED:NW

    WCsAMENDED.STAGEAREAADDEDTOEVENTHALL

    REV:BDATE:07/01/11

    DRAWN:NW

    CHECKED:KWB

    EXTENSIONWINGSREMOVED

    REV:CDATE:18/01/11

    DRAWN:GJ

    CHECKED:KWB

    EXTENSIONWINGSREINSTATED,P

    HASINGAMENDED.

    DwgNo:

    ROYALPA

    RK

    COMMUNITYCON

    SORTIUM

    ROYALPA

    RK

    PRIMARYSCHOOL

    ROYALPARKROAD,LEEDS

    PROPOSE

    D

    FIRSTFLOOR

    PLAN

    (01)

    C

    382/01

    002

  • 8/7/2019 RPCC Business Plan - Feb 2011

    39/98

    39

    'A'

    WO

    RKSHOP/

    O

    FFICE

    PLANT

    NEW

    DOOR

    WORKSHOP

    1

    2

    STORAGEWC&

    KITCHENETTE

    WC

    OFFICE

    OFFICE

    OFFICE/

    FLEXIBLESPACE

    OFFICE/

    FLEXIBLESPACE

    3

    4

    5

    6

    ME

    ZZANINEFLOORPLAN

    SCA

    LE1:200

    BASEME

    NTFLOORPLAN

    SCALE1:200

    Thisdesigniscopyrightc

    REVISIONS

    HEADINGLEY

    LS62EN

    [email protected]

    01132844250

    e.mail

    facsimile

    telephone

    01132754000

    LEEDS

    5NORTHHILLROAD

    Scale:

    Checked:

    Date:

    Drawn:

    RS

    28.10.10

    1:200@A3

    KWB

    REV:ADATE:04/11/10

    DRAWN:RS

    CHECKED:NW

    STORAGESPACEADDEDWITHINB

    ASEMENT

    REV:BDATE:29/11/10

    DRAWN:MAB

    CHECKED:KWB

    STORAGESPACEADDEDWITHINB

    ASEMENT

    REV:CDATE:18/01/11

    DRAWN:GJ

    CHECKED:KWB

    EXTENSIONWINGSREINSTATED,P

    HASINGAMENDED.

    DwgNo:

    ROYALPA

    RK

    COMMUNITYCON

    SORTIUM

    ROYALPA

    RK

    PRIMARYSCHOOL

    ROYALPARKROAD,LEEDS

    PROPOSE

    D

    BASEMENT&MEZZAINE

    FLOORPLA

    NS

    (01)

    C

    382/01

    003

  • 8/7/2019 RPCC Business Plan - Feb 2011

    40/98

    ROYAL PARK

    COMMUNITY CONSORTIUM

    40

    PHASING

    KEY

    :

    PHASE1

    PHASE2

    PHASE3

    HARD-

    STANDING(m)

    PHASE1

    PHASE2

    PHASE3

    SOFTLAND-

    SCAPING(m)

    293

    -170

    238

    425

    75

    PARKING&

    ACCESS(m)

    400

    - 280

    2 4

    39

    1

    26

    24

    39a

    37

    PH

    9

    5

    74

    5

    64

    22

    7a

    1

    27197b

    84

    5a

    20

    3

    4943

    40

    3

    8

    KING'S ROAD

    HALL GROVE

    ROYALPA

    RK

    ROAD

    QUEEN'SROAD

    PLAY

    AREA

    NEW

    ACCESSM

    AIN

    ENTRANCE

    PARKING

    PARKING

    CYCLES

    BINS

    ACCESSRAMP

    GARD

    EN

    GARDEN

    EXISTING

    ACCESS

    GARDEN

    59.4m

    66.4m

    PARKING

    Y

    L

    IN

    PLAY

    AREA

    GARDEN

    PARKING

    GARDEN

    GARD

    EN

    NORTH

    Thisdesigniscopyrightc

    REVISIONS

    HEADINGLEY

    LS62EN

    [email protected]

    01132844250

    e.mail

    facsimile

    telephone

    01132754000

    LEEDS

    5NORTHHILLROAD

    Scale:

    Checked:

    Date:

    Drawn:

    RS

    28.10.10

    1:500@A3

    KWB

    BASEMAPPING:Reproductionof

    anyOrdnanceS

    urveyMaterialiswiththe

    permissionoftheControllerHMSOCrown

    CopyrightLicenseNo.100020449.This

    drawingmaycontaininformationand/or

    mappingfromanumberofsourcesandits

    accuracyshould

    beverifiedonsite.

    REV:

    DATE:

    DRAWN:

    CHECKED:

    DwgNo:

    ROYALPA

    RK

    COMMUNITYCON

    SORTIUM

    ROYALPA

    RK

    PRIMARYSCHOOL

    ROYALPARKROAD,LEEDS

    PROPOSE

    D

    SITEPLA

    N

    PHASING (

    01)

    A

    382/01

    101

    A

    19.01.11

    GJ

    KWB

    ACCESSRAMP&GARDENAREA

    SADDED,

  • 8/7/2019 RPCC Business Plan - Feb 2011

    41/98

    41

    appendix c: detailed cost plans

    RUNNING COSTS

    ITEM COST per m2 YEARLY COST MONTHLY COST

    cleaning common areas 13.30 10,809 901

    window cleaning 1.10 2,873 239

    waste management 1.40 3,656 305

    pest control etc 1.20 3,134 261

    building fabric maintenance 3.40 8,879 740

    grounds maintenance 0.60 1,567 131

    M&E maintenance 5.70 14,885 1,240

    energy costs 13.60 35,515 2,960

    Total Costs 5.04 81,317 6,776

    These cost plans are based on initialestimates from our quantity surveyor andare expected to change as surveys are

    completed and plans progress.

  • 8/7/2019 RPCC Business Plan - Feb 2011

    42/98

    ROYAL PARK

    COMMUNITY CONSORTIUM

    42

    PHASE 1 - STARTUP

    Element TOTALCOST

    PHASE 1COST

    Brief Scope of Works

    Sanitary and plumbinginstallations 7,500

    New incoming water supply (PS 7,500)

    Electrical installations20,000

    Upgrade electrical switch gear adjacent to the incoming supply (PS20,000)

    Drainage installation5,000

    Overhaul surface water drainage (PS 5,000), new foul drainsincluding drains, manholes, etc

    External repairs32,500 32,500

    Demolitions andalterations 8,500

    Form and block up sundry door openings, remove internal walls,hack off loose plaster.

    External doors andwindows 4,500

    New double doors to plant room, aluminium powder coated louvresand sundry new windows.

    Internal walls 2,250 New blockwork walls

    Internal doors 2,250 New internal paint grade double and single doors.

    Wall finishes

    3,500

    Thermal board dry lining to external walls, plaster to new blockworkwalls, overhaul existing plaster, ceramic tile splashbacks to two toilets,service riser.

    Floor finishes 2,500 Vinyl throughout, softwood skirtings

    Decorations 5,500 Gloss and emulsion decorations.

    Fixtures and fittings1,750

    2 No teapoints (PS 1,500), sanitary fittings (2 No wc, 2 No basins PS1,000), signage building and statutory (PS 250).

    Sanitary and plumbinginstallations 2,500

    Hot, cold and waste water pipework to 2 No wcs, 2 No basins and 2No sinks (PS 2,500).

    Heating and ventilationinstallations

    13,000

    Individual basement boiler and radiators (PS 12,500) note assumedseparate system to the res