Roadway CAD Manual March 25, 2019
3.0 - Title Sheet and Index, Layout Sheets, and Survey Data Sheets
3-1
Volume 1
3.0 - Title Sheet and Index, Layout Sheets, and Survey Data Sheets
Index
Number Subject
Page
Number
3.1 Overview 3-3
3.2 Development 3-3
Fig. 3-1 Title Sheet Seed File 3-4
Fig. 3-2 Title Sheet Call Out 3-5
Fig. 3-3 Sample Continuation Sheet A02 3-6
Fig. 3-4 Information From Cache (cache_tse.dgn) 3-7
Fig. 3-5 Example of Multi-Site Project Title Sheet 3-8
Fig. 3-6 Title Sheet Scope of Work 3-9
Fig. 3-7 Example Of Extra Work Outside Project Limits 3-12
Fig. 3-8 Example Of Multiple Extra Work Locations Outside Project
Limits 3-12
Fig. 3-9 Example Of Extra Work Outside Project Limits With No Ex-
tra Work On Bridge 3-13
3.2.1 Axiom Office Importer Method For Standard Drawind List 3-13
Fig. 3-10 Standard Drawing List from cache_tse,dgn 3-17
3.3 Completion of The Title Sheet 3-18
3.4 V-Number 3-18
Fig. 3-11 Local System & V-Number Example 3-18
3.5 Additional “A” Series Plan Sheets 3-18
3.6 Plan Sheet Layout 3-19
3.7 Geotechnical Layout 3-19
3.8 Survey Control Data 3-20
3.9 Check List 3-21
Roadway CAD Manual
Roadway CAD Manual March 25, 2019
3.0 - Title Sheet and Index, Layout Sheets, and Survey Data Sheets
3-2
Volume 1
————————This page intentionally left blank—————————–-
Roadway CAD Manual March 25, 2019
3.0 - Title Sheet and Index, Layout Sheets, and Survey Data Sheets
3-3
Volume 1
3.1 Overview
The title sheet is the first sheet of a plan set and it sets the format and style of
ODOT construction plans. In addition there are requirements that must be includ-
ed on the title sheet for federal funding.
Title sheet development begins with the name of the project. The official name of
a project is shown in the Statewide Transportation Improvement Program (STIP).
The name in the STIP may contain abbreviations and may not contain the word
Section or Project at the end. The name in the STIP also follows capitalization
rules of American English. The project title is to match the STIP when spoken. For
example “RD.” and “ROAD” are spoken the same when read aloud. The format for
contract plans is all capital letters. Due to character limits, the words “Section” or
“Project” may be left off of the STIP name but must be included on the plans.
A “section” is defined as a continuous piece of roadway from one location to an-
other. A “project” is defined as a single or multiple spot locations.
Standard abbreviations are allowed to be used for space and appearance require-
ments with both the title sheet and the plan sheet title block. The name on the
title sheet and in the plan sheet title blocks must be exactly the same. If abbrevi-
ations are necessary, use the standard abbreviations shown in Chapter 7 of the
Contract Plans Manual (CPM). The following is a partial list of the more common
abbreviations:
3.2 Development
The files listed on the next few pages are available for the development of the title
sheets, which aid in adhering to CAD standards. See Figures 3-1 through 3-4
(pages 3-4 through 3-7).
Beginning Begin.
Boulevard Blvd.
Directions N S E W NW ect.
Illumination Ill.
Intersection Int.
North City Limits NCL
Overcrossing Oxing.
Project Proj.
River R.
Road Rd.
Section Sec.
South City Limits SCL
Undercrossing Uxing.
Various Var.
Roadway CAD Manual March 25, 2019
3.0 - Title Sheet and Index, Layout Sheets, and Survey Data Sheets
3-4
Volume 1
3.2 Development (Cont.)
Always create both Sheet A01 and Sheet A02. The Index of Sheets and Standard
Drawing Nos. will be shown on Sheet A02, see Figure 3-3 (page 3-6).
On very large project, additional sheets will be required for the Index of Sheets
and standard drawing numbers but this is rare.
Keep in mind that some projects extend over considerable time and the infor-
mation shown on Title Sheet may change. Always review the title sheet to make
sure the names shown are current:
Oregon Transportation Commission
ODOT’s Chief Engineer
ODOT’s Chief Engineer (Acting ) *.
* There may also be an occasion where the ODOT Chief Engineer will not be
available to sign the title sheet and another person’s signature will need to
be used along with their title designation (i.e. Acting ).
Figure 3-1 Title Sheet Seed File
Do not add lines to this list on sht. A01. When standard drawing num-bers do not begin on sht. A02, edit the description of sht. A02 to re-move “& Std. Dwg. Nos.”
Use consultant block if plans prepared by consultant and move utility note to alternate location.
Vicinity map area
Remove for multiple site projects
Roadway CAD Manual March 25, 2019
3.0 - Title Sheet and Index, Layout Sheets, and Survey Data Sheets
3-5
Volume 1
For local agency projects, the local approving authority signs.
For local agency projects, use “AASHTO design standards” language.
3.2 Development (Cont.)
Figure 3-2 Title Sheet (Call out)
Federal Aid project number, location, only needs to appear once on sheet A01. If no fed-eral funds are used, then type “STATE” for the project number.
Federal Aid project number, only needs to appear once, on sheet A01.
For ODOT projects, the Tech-nical Center Manager signs.
For ODOT projects, use “ODOT design standards" language.
Roadway CAD Manual March 25, 2019
3.0 - Title Sheet and Index, Layout Sheets, and Survey Data Sheets
3-6
Volume 1
3.2 Development (Cont.)
Figure 3-3 Sample Continuation Sheet A02
“Sta
ndard
dra
win
g lis
t fr
om
cache o
r fr
om
axio
m
import
er .
Roadway CAD Manual March 25, 2019
3.0 - Title Sheet and Index, Layout Sheets, and Survey Data Sheets
3-7
Volume 1
3.2 Development (Cont.)
Figure 3-4 Information from cache (cache_tse.dgn)
Roadway CAD Manual March 25, 2019
3.0 - Title Sheet and Index, Layout Sheets, and Survey Data Sheets
3-8
Volume 1
3.2 Development (Cont.)
Figure 3-5 Example of Multi-Site Project Title Sheet
Roadway CAD Manual March 25, 2019
3.0 - Title Sheet and Index, Layout Sheets, and Survey Data Sheets
3-9
Volume 1
3.2 Development (Cont.)
Title Sheet Process
Step 1 — Edit Place Holders
Edit the place holders on left side of the border for project Expenditure Account
(EA) number. Continue editing the file to reflect the project on which you are
working. In the main title sheet text, two individual lines have been allowed for
scope of work and project name, see Figure 3-1 (page 3-4).
The scope of work needs to follow the order shown in Figure 3-6 (below). Deter-
mine whether one or two lines will be needed. Use the number of lines required
and adjust to fit. Include major headings whenever those items appear in the
plans. Include minor headings only when that item is 10% or greater of the con-
struction dollar value of the project. The specification writer will help determine
the scope of work items. Add the project arrow to the state map at the upper right
corner, length of project, township & range, vicinity map, and project limits.
Figure 3-6 Title Sheet Scope of Work
ODOT TITLE SHEET SCOPE OF WORK
Use the 10 major headings below if the type of work is included in the project. Items
below each major heading are examples of work included in that major heading.
Use the minor headings only if that item itself makes up 10% or more of the con-
struction dollar value of the project.
Items listed on the title sheet are shown in the
“Oregon Standard Specifications for Construction” order.
1. Grading
2. Drainage
Fish Passage Culverts
Culvert Rehabilitation Less Than 48”
Diameter
Storm Sewer System
3. Structure(s)
Bridge Rehabilitation
Bridge Replacement
Deck Overlay
Joint Repair
Bridge Railing
Retaining Walls
Box Culvert
Culverts in excess of 48” Dia. and
larger
Sound walls
4. Paving
Inlay / Overlay
Emulsified Oil Mat
Ramp Rehabilitation
Walks, Driveways, Curbs
Cold Planning
ACP / Concrete Surfacing
Major Headings
Roadway CAD Manual March 25, 2019
3.0 - Title Sheet and Index, Layout Sheets, and Survey Data Sheets
3-10
Volume 1
3.2 Development (Cont.)
The Federal Aid project number will be placed in the active file on sheet A01 in the
box marked project number. If no Federal Aid is included then the project number
shown is “STATE”.
Step 2 — Vicinity Map
The Federal Highway Administration Guidelines for Preparation of Plans, Specifica-
tions, and Estimates provides guidance to States for the title sheets used for pro-
jects financed with Federal-aid highway funds. The guideline for contract plans
title sheet indicates that a location sketch should be placed on the title sheet “with
sufficient identifying information so that the project may be easily located on a
county or State map”.
Detailed information will be provided for this step soon. Until then use the pro-
cess outlined by Engineering Applications Support Team (EAST)
http://www.oregon.gov/ODOT/CS/east/Pages/TipsAndWorkflows.aspx
5. Curb Ramps
6. Signing
7. Illumination
8. Signal(s)
Pole Relocation
Loop Replacement
Traffic Signals
Automatic Traffic Recorder
9. Intelligent Transportation System
Dynamic Message Signs
Cameras
Road and Weather Information
systems
Active Traffic Management Systems
Highway Advisory Radio
Traffic sensors
Communications
10. Roadside Development
Landscaping
Irrigation Systems
Major Headings (Cont.)
Minor Headings
Historic Preservation
Guardrail
Haz-Mat Abatement
Rock Production
Pavement Markings
RR Xing Improvements
Barrier
Buildings
Painting
Utilities Relocation
Riprap
Protective Screening
Roadway CAD Manual March 25, 2019
3.0 - Title Sheet and Index, Layout Sheets, and Survey Data Sheets
3-11
Volume 1
3.2 Development (Cont.)
Step 3 — Sheet Index
As information is supplied, you will be able to edit the title sheet with it. The big-
gest part of the title sheet editing will be the inclusion of the sheet index. The
sheet index has a prescribed order and needs to be followed, see Contract Plans
Manual (CPM) Chapter 2 for specific plan sheet order. If the sheets are not fol-
lowing this order, they should be referred back to the spec writer or project lead-
er. The sheet index provides the order that the plans will be printed and assem-
bled.
Select and copy the “Index of Sheets” box from the Cache. Match text symbology
to add text into the box. To increase the number of lines in the “Index of Sheet
Cont.” box, copy parallel the bottom line 15 feet, when using 1”-100’ scale. There
will rarely be more than two sheets for the title sheet section of the “A” series of
plan sheets. See Figure 3-4 (page 3-7) for index information cache.
Step 4 — Project Limits
For projects that are along a section of highway, the Beginning of the Project will
be the mainline centerline station at the start of full depth surfacing. Usually this
will be the lowest number in the stationing for the project. The End of the Project
will be the mainline centerline station at the end of the full depth surfacing and
usually the highest number in the stationing for the project. Surfacing tapers,
ramp surfacing, and incidental work is not included in the project limits. When
there is permanent incidental work such as signs or guardrail that is beyond pro-
ject’s mainline centerline station, use “Beginning of Contract” or “End of Contract”
and include the station for that work.
For projects at a single site or multiple site use “Project Site” and generally the sta-
tion at the center of the site. For project sites greater than ¼ mile in length show
the beginning and ending station limits of the site.
Where there are “No Work Areas” in a section, show the beginning and end sta-
tions of the “No Work Area”
The project limits on the section of highway helps Federal Highway Administration
(FHWA) identify the number lane miles of surfacing that they have funded. The
incidental work and surfacing tapers are not intended to be included in the lane
miles even though they are project costs.
Roadway CAD Manual March 25, 2019
3.0 - Title Sheet and Index, Layout Sheets, and Survey Data Sheets
3-12
Volume 1
Example of extra work, outside of project limits
Figure 3-7 Example of extra work outside project limits
Figure 3-8 Example of multiple extra work locations outside project limits
Example of multiple ex-tra work locations out extra work out side of project limits
Roadway CAD Manual March 25, 2019
3.0 - Title Sheet and Index, Layout Sheets, and Survey Data Sheets
3-13
Volume 1
Step 5 — Standard Drawings
Standard drawing numbers are listed after the index of sheets and listed in this
sequence:
1. RD numbered drawings
2. BR numbered drawings
3. TM numbered drawings
Standard drawing numbers have been set up as cache in the reference file
cache_tse.dgn and are copied and edited for the required drawing numbers and
sections. When listing the standard drawing numbers, list only the drawings ref-
erenced in the plan set. Additional references made to standard drawings from a
standard drawing are not listed. See Figure 3-3 (page 3-6) for an example.
3.2.1 Axiom Office Importer Method.
As an alternate method for getting the standard drawing list into the Title Sheet,
Excel files are developed that have all of the Oregon Standard Drawings ready for
selection.
Example of extra work, outside of project limits with no extra work on bridge
Figure 3-9 Example of extra work outside project limits with no extra work on bridge
Roadway CAD Manual March 25, 2019
3.0 - Title Sheet and Index, Layout Sheets, and Survey Data Sheets
3-14
Volume 1
3.2 Development (Cont.)
3.2.1 Axiom Office Importer Method (Cont.)
The Standard Drawing List Master file is found in F:ODOT_DATA\USERCFG\data
folder for internal users and in the ODOT workspace for external users. The file
name format is date_Standard_Drawing_List.xlsx where “date” is the first day of
the effective date of the drawings. The file name 2018-06_Standard_Drawing_List
contains all of the Oregon Standard Drawings, by number and title, where the ef-
fective date begins June 1, 2018. Any project that is scheduled to be bid between
June 1, 2018 and the next file date would use this file for that specific project.
Copy the Master file into the project directory and name using the ProjectWise
naming tool.
There are five tabs at the bottom of the Excel file to note: The Instruction Sheet,
RD, BR, TM, and Axiom.
The Instruction Sheet tab includes some brief instructions for using the spread
sheet.
The RD, BR, TM tabs contain a list of standard drawings like this shown from the
RD tab:
Roadway CAD Manual March 25, 2019
3.0 - Title Sheet and Index, Layout Sheets, and Survey Data Sheets
3-15
Volume 1
3.2 Development (Cont.)
3.2.1 Axiom Office Importer Method (Cont.)
By placing an “x” in the “required” column the selected drawing number and title
will appear in column “E” under the heading of “Selected Drawings”. The selected
drawing numbers and titles will also appear in the AXIOM tab, grouped together.
The Axiom tab will look like this when drawings are selected in the RD, BR, and/or
TM tabs:
In the MicroStation file, the AXIOM Office Importer is located under “ODOT” when
using the ODOT Workspace:
In the Excel file, select a group of drawings. This might be all of the drainage Or-
egon Standard Drawings in a numbered series such as all of the RD300s or all of
Roadway CAD Manual March 25, 2019
3.0 - Title Sheet and Index, Layout Sheets, and Survey Data Sheets
3-16
Volume 1
3.2 Development (Cont.)
3.2.1 Axiom Office Importer Method (Cont.)
the TM800s. Generally there is a space between each series of drawings, for ex-
ample a space between the RD100 series and the RD200 series. By selecting these
groups of drawings, it is easier to control the amount of space. If there are just a
few standard drawing, less than 15, the space between the series can be omitted.
When this occurs, like the RD series shown below, select the whole RD series of
Oregon Standard Drawings.
Use the “Copy” command in Excel or the Ctrl+c key combination to copy the se-
lection to the clipboard.
In the MicroStation file, attach the reference file cache_tse.dgn and match the text
attributes of the standard drawing list.
Roadway CAD Manual March 25, 2019
3.0 - Title Sheet and Index, Layout Sheets, and Survey Data Sheets
3-17
Volume 1
3.2 Development (Cont.)
3.2.1 Axiom Office Importer Method (Cont.)
Use the AXIOM Office Importer tool to place the selection inside of the MicroSta-
tion file.
Both methods, either copy the reference file cache text or the AXIOM Office Im-
porter, are acceptable methods for getting the list of Oregon Standard Drawings
into the title sheet index.
After the list of standard drawing numbers, the right of way map number(s) for the
project are listed. If there are no R/W impacts on the project, the notation of “No
R/W maps” is used.
Figure 3-10 Standard Drawing List From cache_tse.dgn
Roadway CAD Manual March 25, 2019
3.0 - Title Sheet and Index, Layout Sheets, and Survey Data Sheets
3-18
Volume 1
3.3 Completion of the Title Sheet
Edits to the title sheets are required at each phase of the project. When the pro-
ject is at the final stage, edits to be made to the title sheet come from the specifi-
cations writer while they are compiling the completed project plan sheets. Final
Title Sheet PDFs are normally not created until the specification writer has received
all PDF plan sheets from all disciplines working on the project.
The drawing scale supplied in the seed_tse.dgn file should not be changed in the
project title sheet file or model. The drawing scale sets the print scale and the
print scale affects the relative distance between elements on the final PDF file.
3.4 V-Number
The V-number is a file number for the A-H, and Q-Z series plan sheets.
Local Agency projects that do not intersect or touch the state highway system do
not receive a V-number. Use “Local System” in the V-number location.
Near the end of project development, a V-number is assigned to the project. The
V-Number is requested by completing the 734-2623 MAPP Center Document
Number Request at the link below.
http://www.oregon.gov/ODOT/ETA/Pages/Tools.aspx
Figure 3-11 Local System & V-Number examples
The V-number format is XXV-XXX
3.5 Additional “A” Series Plan Sheets
When a project has additional plan sheets in the “A” series, Layout sheets or Sur-
vey Data sheets, it is recommended that a second letter is used for each group of
plans. For example, Roadway layout sheets would use AA# sheet numbers, the
geotechnical layout sheets would use AB# sheet numbers, and Survey Data would
use AC# sheet numbers. Often in project development a sheet will get added or
dropped. Using an additional letter to group these additional “A” series plan sheet
will limit the number of sheets that are renumbered during the development of
the project. The additional letters are not fixed with the group, but dynamic with
the project.
Roadway CAD Manual March 25, 2019
3.0 - Title Sheet and Index, Layout Sheets, and Survey Data Sheets
3-19
Volume 1
3.6 Plan Sheet Layout
Following the index of plan sheets and the standard drawing list in the “A” series
of plan sheets is the Roadway plan sheet layout. This plan sheet occurs on more
complex projects where multiple alignments are shown and match lines are used.
The entire project area is shown with outlines of the various plan sheets are la-
beled. This gives the user a quick overview of the project and approximate plan
sheets numbering to view.
3.7 Geotechnical Layout
The Geotechnical Layout sheets are similar to the Roadway layout sheets giving an
overview of the whole project with references to specific sheet locations. These
layout sheets are created by the Geotechnical discipline and are placed in the “A”
series plan sheets.
Roadway CAD Manual March 25, 2019
3.0 - Title Sheet and Index, Layout Sheets, and Survey Data Sheets
3-20
Volume 1
3.8 Survey Control Data
The survey control data sheets are developed by the Survey discipline and placed
in the “A” series plan sheets.
Roadway CAD Manual March 25, 2019
3.0 - Title Sheet and Index, Layout Sheets, and Survey Data Sheets
3-21
Volume 1
3.9 Check List
Title Sheet Check List
Project title, Highway name, County name
Scope of work
Bid let date
State map and project arrow
Overall length of project (Remove or multi-site project)
Township and range
Vicinity map with project location highlighted
EA charge number in margin of sheet A01
Oregon Transportation Commission listing of names and
“Approving Authority” name and title
Attention stamp for “Oregon Utility Notification” and “Safety First”
Consultant that prepared the plan set
V” number or “Local System”
Index of sheets
Standard drawing numbers used in project
R/W map number
Title block, sheet numbers, and Federal Aid number or “STATE”