www.intecsa-inarsa.es Engineering and technical consulting since 1965 ROADS AND MOTORWAYS

ROADS AND MOTORWAYS - Intecsa-Inarsa · ROADS AND MOTORWAYS // Slide 8 Quality certificates From the point of view of Quality, in November 1994, INTECSA-INARSA obtained the Certificate

  • Upload
    others

  • View
    9

  • Download
    0

Embed Size (px)

Citation preview

www.intecsa-inarsa.es

Engineering and

technical consulting since 1965

ROADS AND MOTORWAYS

Slide 2ROADS AND MOTORWAYS //

CONTENT

▪ Presentation .p04

▪ Intecsa-Inarsa in the World .p05

▪ Organization chart .p06

▪ Quality and environmental management. .p07

▪ Quality certificates.p08

▪ Recent awards.p09

GENERAL PRESENTATIONOF INTECSA-INARSA .p03

▪ Activity areas .p11

▪ Services .p12

▪ Clients .p14

ROADS andMOTORWAYS .p10

MAINREFERENCES .p15 CONTACT .p48

Chapter 01. Chapter 02. Chapter 03.

Slide 3ROADS AND MOTORWAYS //

PRESENTACIÓNGENERAL

1Intecsa-Inarsa

Slide 4ROADS AND MOTORWAYS //

Presentation

Headquarters : C/ Julián Camarillo, 53, 28037 Madrid, Spain.

Engineering and technical consulting since 1965

1965Establishmentof INTECSA

1998Acquisition & Merger of INTECSA by INARSA

2007Acquisitionby SNC Lavalin Group

2014INTECSA-INARSA returns to be a spanish company

Intecsa-Inarsa is a Spanish company specialising in consultancy and engineering with private capital, whichwas founded in 1965 on the basis of a limited number of technicians with wide experience in design andexecution of building work. Progressive growth has allowed the company to become one of the leading andmost diverse Spanish consultancy and engineering companies with powerful and prestigious internationalprojection.

The constant updating and ongoing innovation make it possible to offer made-to-measure solutions based onlatest-generation technology. Our company has been operating for fifty years in the sectors of Engineeringfor Linear Transport Works, Land Engineering, Underground Works and Structures; Port Engineering, MarineEnvironment and Coasts; Consultancy and Engineering of Water; Building Engineering and Urban Planningand Project Management.

Intecsa-Inarsa's technical team, trained and certified in a range of disciplines, is in permanent contact withUniversities and Research Centres which puts it on the front line of Technological Development, and offersanything from Feasibility Studies to Detailed Engineering.

Slide 5ROADS AND MOTORWAYS //

Intecsa-Inarsa in the world

HEADQUARTERS: MADRID

Julián Camarillo 53 Street, Madrid 28037Tlf: +34 915.67.38.00

Fax: +34 915.67.38.01/2/3/4/[email protected]

Branch Office: SAUDI ARABIA

Granada Business Park. Tower A4, 12th Floor, Office # 1230 East Ring Road, RiyadhTlf: +966 115 118 118, Ext. 8012

+966 115 118 111, +966 115 118 [email protected]

[email protected]

Branch Office: PANAMÁ

Manuel Maria Icaza St.PH PROCONSA 1 Building, 10B Floor.

Tlf: 507 693 66 [email protected]@intecsa-inarsa.es

Branch Office: COLOMBIA

93 Street # 18-28Office 404, Bogotá (Colombia)

Tlf: 571 645 12 [email protected]

[email protected]

Branch Office: ECUADOR

C.C. Comercial Laguna Plaza,Office 408, Vía a la Costa Km. 12,5

Guayaquil (Ecuador)Tlf: 593 97 908 55 50

[email protected]

Branch Office: PERU

Colina St.Office 1002.

Miraflores, Lima (Peru)Tlf: 51-1 24 29 005

[email protected]

Branch Office: CHILE

La Concepción Street, 191. Planta 6, Office 25, Santiago de Chile (Chile)

Tlf: +56 2 2903 3394Tlf: +56 9 7742 4492

[email protected]

Permanentoffices

Countries where there have been projects

Branch Office: MURCIA

Street: Madre Paula Gil Cano s/nEdif. Torre Jemeca 3º-4ªpta, 30009 - Murcia Tlf: +34 968 22 50 06, Fax: +34 679 956 495

[email protected]

Branch Office: MEXICO

Homero St. 906, 6th Floor,Polanco, Delegation Miguel HidalgoCiudad de México, Distrito Federal.

México. Tlf: +525 552 575 [email protected]

[email protected]

Slide 6ROADS AND MOTORWAYS //

Organization ChartIntecsa-InarsaCEO

Deputy General Manager

C.F.O.

Human Resources Manager

Proposals and Contracting Dept.

Tunnelsand Structures Department

Executive Vice PresidentInternational Expansion

Legal Department

Quality Management

IT Support Dept.

Subcontracting Dept.

International

C.M. Peru

B.D.M. Chile

C.M. Colombia

Director C. America/MexicoOperations Director

Railwaysand RoadsDepartment

Ports / Coastsand LogisticsDepartment

Water andEnvironmentDepartment

Safety and Health Dept.

B.D.M. Ecuador

B.D.M. Panama

Director MEA

B.D.M. Mea

Slide 7ROADS AND MOTORWAYS //

Quality and environmental management

INTECSA-INARSA'S environmental experience in all kinds of building has beenrecognised for decades and its designs include systems which respect theenvironment and with high energy efficiency.

INTECSA-INARSA'S experts accompany their customers in such global matters as:

• LEED (Leadership in Energy and Environmental Design)• High Environmental Quality (HQE, from the French abbreviation)• BREEAM (BRE Environmental Assessment Method)• MINERGIE• PAASIVHAUS.

INTECSA-INARSA contributes unbeatable knowledge to the design and operationof facilities including environmental parameters. Furthermore, it has dealt withnumerous projects of considerable energy efficiency and exemplary landscapeintegration.

The powerful commitment related with sustainable development is put intoeffect for all kinds of project.

Slide 8ROADS AND MOTORWAYS //

Quality certificates

From the point of view of Quality, in November 1994, INTECSA-INARSA obtainedthe Certificate of Company Registration No. ER-0244/1/94 from AENOR, the SpanishAssociation for Standardisation and Certification, accrediting the recognition of theQuality Assurance System applied in the company with the UNE-EN ISO 9001Regulation.

It likewise obtained the corresponding European Certification, the Quality SystemCertificate from EQNET (European Network for Quality Assessment andCertification), with the identical accreditation number.

From the environmental point of view, in August 1998, the Certificate of CompanyRegistration No. CGM-98/051 was obtained from AENOR, which accredits that theEnvironmental Management System applied to Intecsa-Inarsa is adapted toregulation UNE-EN ISO 14001. It likewise obtained the corresponding EuropeanCertificate from EQNET with the same accreditation number.

In 2006, INTECSA-INARSA integrated its Quality Management and EnvironmentalManagement Systems. Likewise, in 2011, the System for Prevention of OccupationalRisks was implemented according to the standards of rule OHSAS 18001-2007.

Slide 9ROADS AND MOTORWAYS //

Recent awards

Finalist at The Fleming Awards 2014 by British Geotechnical Association:-”Barcelona High Speed Railway Tunnel Project – Protecting World Heritage Buildings”.(Barcelona, Spain). Highest budget consultancy contract awarded by ADIF.

Best Civil Public Work 2013 by Madrid College of Civil Engineers:- “Railway Access to Barajas airport” Project (Madrid, Spain).

Aqueduct of Segovia Award 2011:- “General System Regeneration and Reuse of Urban Wastewater”

(Murcia, Spain)

Prize of the Madrid Civil Engineers Association to the technical office of the “Best PublicWork in Madrid. 2012”:- “Refurbishment of the Serrano street and construction of 3 underground parking lots”

(Madrid, Spain)

SNC Lavalin 2013 Awards of excellence:- “SR99 Alaskan Way Tunnel en Seattle”

(Seattle, USA). Øexcavation = 17.50 m (World Record)

Fidic Awards 2014:- “Burying of M-30 Highway and Madrid-Río”, (Madrid, Spain)

Slide 10ROADS AND MOTORWAYS //

ROADS AND MOTORWAYS

2General Information

Slide 11ROADS AND MOTORWAYS //

2 ROADS AND MOTORWAYS

Madrid - A Coruña Motorway (A-6). Madrid

ACTIVITY AREAS

▪ Roads and motorways.

▪ Arterial networks and intermodal junctions.

▪ Service, toll and maintenance areas.

▪ Communications, signage, markings and lighting.

Slide 12ROADS AND MOTORWAYS //

2 ROADS AND MOTORWAYS

Madrid - A Coruña Motorway (A-6). Madrid

SERVICES

▪ Feasibility studies.

▪ Alternatives studies.

▪ Preliminary designs.

▪ Detailed designs.

▪ Detailed designs for Tenders.

Slide 13ROADS AND MOTORWAYS //

2 ROADS AND MOTORWAYS

SERVICES (last 15 years)

FEASIBILITY

STUDIES AND

ALTERNATIVES

STUDIES.

•3 Projects

•152,4 Km

PRELIMINARY

DESIGNS.

•8 Projects

•58 Km

DETAILED

DESIGNS.

•14 Projects

•284,3 Km

DETAILED

DESIGNS FOR

TENDERS.

•8 Projects

•648 Km

1 2 3 4

Slide 14ROADS AND MOTORWAYS //

2 ROADS AND MOTORWAYS

Interchange.

CLIENTS

PUBLICS PRIVATES

Slide 15ROADS AND MOTORWAYS //

ROADS AND MOTORWAYS

3Main References

Slide 16ROADS AND MOTORWAYS //

Main References

3 ROADS AND MOTORWAYS

Client:

OHL

Drawing of 3 sections in variant and 2 sections of duplication.

PRELIMINARY DESIGNS ICA-QUILCA. (Peru)

Object:

• Preliminary design for duplication of

two sections of the Panamerican

Highway and three sections in variant.

Relevant data:

• Total Length: 139.55 km.

• Developed Alternatives: 12 Unit.

• Bridges / Viaducts: 8 Unit.

• Overpasses: 6 Unit.

• Footbridges: 1 Unit.

• Type Overpasses: 12 Unit.

• Type Underpasses: 12 Unit.

• Budget of Project: 0.72 M€.

• Budget of Works: 330 M€.

• Date: 2015.

Slide 17ROADS AND MOTORWAYS //

Main References

3 ROADS AND MOTORWAYS

Client:

Ministry

of Public Works.

Highway Agency

Aerial photography of the path. Previous to Project.

UPGRADING THE ROAD N-260.STRETCH: CONGOSTO VENTAMILLO - CAMPO. (ARAGÓN, SPAIN)

Object:

• Project of pre-dimensioning and Detail

of the road N-260.

Relevant data:

• Total Length: 11,97 Km.

• Junction: 2 Unit.

• Structures: 7 Unit (320m).

• Cantilevered structure: 2.364 Unit.

• Tunnels: 2 Unit (265/540 m)

• Drainage Works: 9 Unit.

• Budget of Project: 1.9 M€.

• Budget of Works: 25.5 M€.

• Date: 2008 – On going.

Slide 18ROADS AND MOTORWAYS //

Main References

3 ROADS AND MOTORWAYS

Client:

OHL CONCESIONES

CHILE

Location of the Costanera Highway.

STUDY PHASE II – PRIVATE INITIATIVE Nº 359.COSTANERA HIGHWAY CENTRAL. (CHILE)

Object:

• Advanced Preliminary Design.

Optimized project from Phase I.

Relevant Data:

• Stretch of highway in urban area.

• Length = 21.7 Km with 3 lane lines perdirection. (Underground: 18.5 Km).

• Typical section with overlappingroadways and variable separation.

• Budget of project: 5,00 M€.

• Budget of works: 1500 M$.

• Date: 2014-2016.

Slide 19ROADS AND MOTORWAYS //

Main References

3 ROADS AND MOTORWAYS

Client:

Ministry

of Public Works.

Highway Agency

General plant on orthophoto.

PRELIMINARY DESIGN AND DETAILED DESIGN OF THE HIGHWAY A-15. STRETCH: ÁGREDA (EAST) – BORDER OF ZARAGOZA WITH NAVARRA. (ARAGÓN, SPAIN)

Object:

• Preliminary Design and detailed design

of the highway A-15.

Relevant data:

• Total Length: 16.7 Km.

• Interchange: 1 Unit.

• Viaducts: 2 Unit.

• Overpasses: 8 Unit.

• Underpasses: 8 Unit.

• Toll Gate: 1 Unit.

• Budget of Project: 1,6 M€.

• Budget of Works: 53,5 M€.

• Date: 2014 – On going.

Slide 20ROADS AND MOTORWAYS //

Main References

3 ROADS AND MOTORWAYS

Client:

“Ingeniería y

Construcción”

General view of the location of the project.

IMPROVING PEDESTRIAN AND VEHICULAR TRANSIT IN EVITAMIENTO AVENUE. SUPERVISION TECHNICAL FILE. (CUSCO, PERU)

Object:

• 186 Technical Supervision reports of

Detail Design.

• Access road to Cusco.

• Dual carriageway.

• 2 lanes in each direction and lateral

service roads.

Relevant data:

• Total Length: 9.5 Km.

• Overpasses/Crosswalks: 7/4 Unit.

• Budget of Project: 0.2 M€.

• Budget of Works: 68.4 M€.

• Date: 2013.

Slide 21ROADS AND MOTORWAYS //

Main References

3 ROADS AND MOTORWAYS

Client:

“Ingeniería y

Construcción”

General view of the location of the project.

STUDY OF SOLUTIONS, METRADOS AND FEASIBILITY STUDIES OF “VÍA EXPRESA”. EXPRESS OF CUSCO.(CUSCO, PERU)

Object:

• Competitive bidding for works “Vía

Expresa de Cusco”.

• Odebrecht, tenderer participant. Basic

level development Study of the

solutions studied. Geometric Design,

Structures, Geology and Geotechnics,

Pavements, Drainage and Signaling.

Relevant data:

• Total Length: 7 Km.

• Junctions: 2 Unit.

• Overpasses: 8 Unit.

• Budget of Project: 0.12 M€.

• Budget: (only bill of quantities).

• Date: 2013.

Slide 22ROADS AND MOTORWAYS //

Main References

3 ROADS AND MOTORWAYS

Client:

JOIN VENTURE:

ALTEC

ROVER ALCISA

SNC-LAVALIN

Plan view of the project.

BID CONSTRUCTION PROJECTS FOR THE A-66 CONCESSION.STRETCH: BENAVENTE-ZAMORA. (EXTREMADURA, SPAIN)

Object:

• Execution of the Traffic Study, Bid

project, Risk analysis and Sensitivity,

Maintenance and Replacement

Schedule (Capex y Opex), constructive

Technical Reports.

Relevant data:

• Total Length 49 Km.

• Interchanges 9 Unit.

• Viaducts: 6 Unit.

• Overpasses: 32 Unit.

• Underpasses: 17 Unit.

• Drainage works: 109 Unit.

• Budget: (only bill of quantities).

• Date: 2011.

Slide 23ROADS AND MOTORWAYS //

Main References

3 ROADS AND MOTORWAYS

Client:

Dragados S.A.

Virtual image of the project..

TENDER CONSTRUCTION PROJECT FOR ACCESS TO THE LOGISTICS AREA. (ASTURIAS, SPAIN)

Object:

• Tender detailed design for Access to

the logistics and industrial activities

area in Asturias (ZALIA) from the high-

capacity network, Section: AS-II - ZALIA,

for the Principality of Asturias.

Relevant data:

• Total Length: 3.0 Km.

(Underground: 0.8 km).

• Junction: 1 Unit.

• Viaduct: 1 Unit (double 106 m).

• Drainage works: 7 Unit.

• Budget of Project: 0.25 M€.

• Budget of Works: 41.3 M€.

• Date: 2011.

Slide 24ROADS AND MOTORWAYS //

Main References

3 ROADS AND MOTORWAYS

Client:

Morgan Stanley

Infrastructure

Aerial photo of toll.

REVIEW OF THE TECHNICAL PROPOSAL FOR THE PR-22 AND PR-5. (PUERTO RICO)

Object:

• Review of the Concession Scope in

order to confirm the Concessionaire’s

capacity to meet the technical

obligations established therein.

Relevant data:

• Review of the OpEx and CapEx Model.

• Review of the scope of the concession.

• Length 88 Km y 26 junctions.

• Assessment of road conditions,

maintenance strategies, investment

expenditure forecast, revised cash flow

model etc.

• Budget of Project: 0.05 M€.

• Budget of Works: 25.6 M€.

• Date: 2011.

Slide 25ROADS AND MOTORWAYS //

Main References

3 ROADS AND MOTORWAYS

Client:

Ministry

of Public Works.

Highway Agency

Section of the structure.

DETAILED DESIGN OF RESERVED CARRIAGEWAYS FOR PUBLIC TRANSPORTATION. A-42 HIGHWAY. STRETCH M-45 AND M-50. (MADRID, SPAIN)

Object:

• The project consists of burying

underground the A-42 highway

between the junctions with M-45 and

M-50 highways.

Relevant data:

• Total Length: 5.8 Km

(Underground: 4.2 Km).

• Interchanges 4 Unit.

• Overpasses: 5 Unit.

• Transversal crossing over structure: 10

• Ramp for Public Transport: 6 Unit.

• Drainage Works: 2 pumping wells.

• Emergency exits: 74 Unit.

• Budget of Project: 2.5 M€.

• Budget of Works: 446.2 M€.

• Date: 2007-2012.

Slide 26ROADS AND MOTORWAYS //

Main References

3 ROADS AND MOTORWAYS

Client:

Dragados S.A.

Highway A-2 (Stretch in concession).

DETAILED DESIGN FOR AUMECSA CONCESSIONAIRE. (MOTORWAY A-2. STRETCH-3).STRETCH K.M. 139.5 TO K.M. 232.8. (SPAIN)

Object:

• Refurbishment and First Establishment

Projects (7 Preliminary and 3 Detailed

Designs).

Relevant data:

• 63,3 Km Refurbishment length.

• 30,0 Km First Establishment length.

• Total Length: 93.3 Km.

• Junction: 13 Unit.

• Viaducts (new/refurbishment): 7/5 U.

• Overpasses / Under.: 62 / 20 Unit.

• Drainage Works: 86 Unit.

• Budget of Project: 1.8 M€.

• Budget of Works: 211.4 M€.

• Date: 2007-2013.

Slide 27ROADS AND MOTORWAYS //

Main References

3 ROADS AND MOTORWAYS

Client:

Ministry

of Public Works.

Highway Agency

Plant view of the project. Interchange.

DETAILED DESIGN OF THE A-11 DUAL CARRIAGEWAY.STRETCH: LOS RÁBANOS – LA MALLONA. (MADRID, SPAIN)

Object:

• Detailed Design developing the

guidelines previously defined in the

Preliminary Design.

Relevant data:

• Length: 19.8 Km.

• Interchanges: 3 Unit.

• Viaducts: 3 Unit.

• Overpasses: 8 Unit.

• Underpasses: 15 Unit.

• Wildlife Crossing: 2 Unit.

• Drainage works: 39 Unit.

• Budget of Project: 1.8 M€.

• Budget of Works: 82.3 M€.

• Date: 2007-2010.

Slide 28ROADS AND MOTORWAYS //

Main References

3 ROADS AND MOTORWAYS

Client:

Ministry

of Public Works.

Highway Agency

Current view of the A-6 Motorway.

ALTERNATIVES STUDY FOR THE A-6 MOTORWAY, LAS ROZAS BYPASS. (MADRID, SPAIN)

Object:

• Drawing-up of the Alternatives study.

Relevant data:

• Length: 8.5 Km.

• Current situation assessment.

• Alternatives definition and comparative

analysis.

• Viaducts: 3 Unit.

• Cut and Cover: 3 Unit.

• Overpasses: 11 Unit.

• Underpasses: 8 Unit.

• Interchanges: 2 Unit.

• Budget of Project: 0.37 M€.

• Budget of Works: 215.6 M€.

• Date: 2006-2010.

Slide 29ROADS AND MOTORWAYS //

Main References

3 ROADS AND MOTORWAYS

Client:

Ministry

of Public Works.

Highway Agency

Current view of the A-6 Motorway.

DETAILED DESIGN OF CARRIAGEWAYS RESERVED FOR PUBLIC TRANSPORT. (MADRID, SPAIN)

Object:

• Urban permeability increase.

Relevant data:

• Improvement of service roads.

• Length: 20 Km.

• Junctions: 10 Unit.

• Viaducts: 2 Unit.

• Overpasses: 10 Unit.

• Underpasses: 35 Unit.

• Cut and Cover: 2 Unit.

(865 m + 588 m)

• Budget of Project: 1.9 M€.

• Budget of Works: 325.8 M€.

• Date: 2006-2012.

Slide 30ROADS AND MOTORWAYS //

Main References

3 ROADS AND MOTORWAYS

Client:

JOIN VENTURE

OHL

TEIXEIRA DUARTE

VENGOA

Project outline.

ALIGNMENT AND STRUCTURES FOR THE EAST-WEST INTERCHANGES. SECTION: RN1 TOLL MOTORWAY AND 2ND ALGIERS RING ROAD. (ALGERIA)

Object:

• Definition of the alignment and

structures for the East-West

Interchanges between RN1 toll

motorway and 2nd Algiers Ring Road.

Relevant data:

• Length of highway: 9.7 Km.

• Interchanges: 2 Unit.

• Overpasses: 3 Unit.

• Underpasses: 2 Unit.

• Conceptual design and basic

engineering.

• Detailed Design.

Slide 31ROADS AND MOTORWAYS //

Main References

3 ROADS AND MOTORWAYS

Client:

Ministry

of Public Works.

Highway Agency

Drawing of the selected alternative.

ALTERNATIVES STUDY.N-232 ROAD.STRETCH: FIGUERUELAS - MALLÉN. (ARAGÓN, SPAIN)

Object:

• Alternatives study for changing N-232

from National highway to motorway

between Figueruelas and Mallén (N-

232).

Relevant data:

• Length of study: 240 km.

• Selected alternative:

• Length: 28.9 Km.

• Junction: 6 Unit.

• Overpasses: 11 Unit.

• Underpasses: 11 Unit.

• Drainage Works: 40 Unit.

• Budget of Project: 0.55 M€.

• Budget of Works: 86.5 M€.

• Date: 2006-2009

Slide 32ROADS AND MOTORWAYS //

Main References

3 ROADS AND MOTORWAYS

Client:

JOIN VENTURE

DRAGADOS A.G.

J.M.

Future turn off road.

BID DETAILED DESIGN OF FERRERÍAS BYPASS ROAD. STRETCH: ME-1 (P.K. 26+250 A P.K. 30+480). (P. MALLORCA, SPAIN)

Object:

• Drawing-up of the Bid Construction

Project of the Ferrerías bypass road,

promoted by the Consell Insular de

Menorca.

Relevant data:

• Length: 4.2 Km.

• Junction: 3 Unit.

• Viaducts: 1 Unit.

• Tunnels: 1 Unit. (185 m)

• Overpasses: 6 Unit.

• Drainage Works: 14 Unit.

• Budget of Project: 0.19 M€.

• Budget of Works: 25.3 M€.

• Date: 2009.

Slide 33ROADS AND MOTORWAYS //

Main References

3 ROADS AND MOTORWAYS

Client:

Ministry

of Public Works.

Highway Agency

New corridor Mediterráneo - Cantábrico

ALTERNATIVES STUDY OF DOS MARES MOTORWAY. STRETCH: A-67 – AP-68. (SPAIN)

Object:

• Drawing-up of the Alternatives Study

at scale 1:25,000, 1:5,000 and 1:2,000.

Relevant data:

• Studies for putting out to tender the

concession of Dos Mares toll

motorway.

• Economic and Environmental studies.

• Section length: 120 Km. Junction: 5 U.

• Viaducts/ Overp. / Underp: 49/40/41.

• Tunnels: 2 U. (1.140 m + 5.500 m)

• Drainage Works: 454 Unit.

• Budget of Project: 0.9 M€.

• Budget of Works: 673.7 M€.

• Date: 2007-2012.

Slide 34ROADS AND MOTORWAYS //

Main References

3 ROADS AND MOTORWAYS

Client:

Ministry

of Public Works.

Highway Agency

Several drawings of the project. Cut and Cover and Viaduct.

CONCEPTUAL AND DETAILED DESIGNS OF A-8 MOTORWAY. STRETCH : OTUR – VILLAPEDRE. (ASTURIAS, SPAIN)

Object:

• Preliminary Design and Detailed

Design of the stretch of A-8 Motorway.

Relevant data:

• Total Length: 9,4 Km.

• Interchanges: 2 Unit.

• Viaducts: 1 Unit. (650 m)

• Overpasses: 4 Unit.

• Underpasses: 10 Unit.

• Tunnels: 1 (286 m).

• Cut and cover: 3 Unit.

• Drainage Works: 17 Unit.

• Budget of Project: 1.5 M€.

• Budget of Works: 80.7 M€.

• Date: 2003-2008.

Slide 35ROADS AND MOTORWAYS //

Main References

3 ROADS AND MOTORWAYS

Client:

Dragados S.A.

First Generation Motorway (a bidden stretch).

7 BID DETAILED DESIGN OF FIRST GENERATION MOTORWAY SECTIONS. (SPAIN)

Object:

• Drawing-up of the Technical

documentation for the Bid

Construction Projects submitted by the

Joint Venture: Iridium, Dragados,

ImesApi and Intecsa-Inarsa, for the First

generation motorways concession

contracts.

Relevant data:

• Area 1 (First Establishment and

refurbishment projects): 7 Projects.

• Area 2 (Replacements y Great Repairs)

• Total Length: 641.45 Km.

• Budget of Project: 1.5 M€.

• Budget of Works: 809.4 M€.

• Date: 2007.

Slide 36ROADS AND MOTORWAYS //

Main References

3 ROADS AND MOTORWAYS

Client:

Dragados S.A.

Turn of in construction.

DETAILED DESIGN OF AP-7 MOTORWAY.STRETCH: EL CAMPELLO – A31. (VALENCIA, SPAIN)

Object:

• Development of the tender previous

study in 1 draft design and 12

construction projects.

Relevant data:

• Project final design: 28 Km.

• New connection: 4 Km.

• Interchanges: 7 Unit.

• Toll Gate: 1 Unit. Service Area: 1 Unit.

• Tunnel:180 m. Cut and cover: 450 m.

• Overpasses / Underpasses: 15/10 Unit.

• Structures / Viaducts: 19/9 Unit.

• Budget of Project: 2.9 M€.

• Budget of Works: 236.9 M€.

• Date: 2004-2007.

Slide 37ROADS AND MOTORWAYS //

Main References

3 ROADS AND MOTORWAYS

Client:

Ministry

of Public Works.

Highway Agency

View of Works.

DETAILED DESIGN OF A-27.TARRAGONA – MONTBLANC.STRETCH: VALLS - MONTBLANC. (ASTURIAS, SPAIN)

Object:

• Detailed Design.

Relevant data:

• Length: 7,3 Km.

• Interchanges: 1 Unit (at N-420).

• Viaduct: 3 Unit.

• Overpasses: 2 Unit.

• Underpasses: 2 Unit.

• Tunnel: 1 Unit

(Urban bi-tube of 1.57 Km.)

• Drainage Works: 4 Unit.

• Budget of Project: 1.6 M€.

• Budget of Works: 105.7 M€.

• Date: 2005-2008.

Slide 38ROADS AND MOTORWAYS //

Main References

3 ROADS AND MOTORWAYS

Client:

CASTELLANA DE

AUTOPISTAS

Location of the project.

DETAILED DESIGN OF AP-6 EXTENSION, NEW LANE PER CARRIAGEWAY. STRETCH: LAS ROZAS (N) –VILLALBA – ENLACE VALLE DE LOS CAÍDOS. (MADRID, SPAIN)

Object:

• Detailed Design.

Relevant data:

• Length: 24,7 Km.

• Interchanges: 7 Unit.

• Overpasses (news/enlargement): 5 /

22 Unit.

• Footbridges: 3 Unit.

• Demolition and reconstruction of

Overpass. Retaining walls: 10 Units.

• Refurbishment of the current service

area accesses.

• Budget of Project: 2.4 M€.

• Budget of Works: 92.0 M€.

• Date: 2000-2004.

Slide 39ROADS AND MOTORWAYS //

Main References

3 ROADS AND MOTORWAYS

Client:

Madrid City Council

Embajadores street tunnel to M-30.

DETAILED DESIGN OF EMBAJADORES STREET CONNECTION TO THE M-40 HIGHWAY.(MADRID, SPAIN)

Object:

• Detailed Design.

Relevant data:

• The suggested solution is made up of

two branches: Exit branch

Embajadores – Nudo M-40 Access

branch to the Madrid South bus station

Improvement proposal to the M-40 M-

30 north junction

• Length of Tunnel: 4.285 Km.

• Structures: 8 Unit.

• Budget of Project: 1.5 M€.

• Budget of Works: 138.2 M€.

• Date: 2004

Slide 40ROADS AND MOTORWAYS //

Main References

3 ROADS AND MOTORWAYS

Client:

Madrid City Council

Avenue Portugal tunnel between Paseo de Extremadura and M-30.

DETAILED DESIGN OF BURYING UNDERGROUND OF THE PORTUGAL AVENUE (M-30). (MADRID, SPAIN)

Object:

• Detailed Design.

Relevant data:

• Cut Retaining walls and cover between

walls for four lanes to A-5 motorway.

• Total Length: 2.3 Km (Underground).

• Width: 17.3 m.

• Retaining walls: 108.577 m2.

• Emergency exits: 13 Unit.

• Budget of Project: 0.46 M€.

• Budget of Works: 89.4 M€.

• Date: 2003.

Slide 41ROADS AND MOTORWAYS //

Main References

3 ROADS AND MOTORWAYS

Client:

Madrid City Council

Avenue. Ilustración Tunnel and Avenue Ventisquero de la Condesa.

DETAILED DESIGN IN ORDER TO CONNECT AVENUE DE LA ILUSTRACIÓN TO AVENUE VENTISQUERO DE LA CONDESA (M-40). (MADRID, SPAIN)

Object:

• Detailed Design.

Relevant data:

• Connection of M-40 Motorway with

Barrio del Pilar.

• Tunneling construction method

adapted to the specific characteristics

of the tunnel section (Belgian method

or between diaphragm walls).

• Total Length: 1.9 Km (Underground).

• Emergency exits: 2 Unit.

• Budget of Project: 0.6 M€.

• Budget of Works: 65.3 M€.

• Supervision Works.

• Date: 2003.

Slide 42ROADS AND MOTORWAYS //

Main References

3 ROADS AND MOTORWAYS

Client:

JOIN VENTURE

RADIAL 2

DRAGADOS S.A.

NECSO

Aerial view of the project. Previous the project.

DETAILED DESIGN OF M-50 RING ROAD. STRETCH: HIGHWAY N-II – HIGHWAY N-I. (MADRID, SPAIN)

Object:

• Detailed Design.

Relevant data:

• Length: 27.4 Km.

• Length of branches: 24.9 km.

• Overpasses /Underpasses: 17/2 U.

• Viaducts: 5 Unit.

• Box culverts / Gantry: 1 / 1 Unit.

• Embankment: 706,040 m3

• Cut: 634,192 m3

• Budget of Project: 2.5 M€.

• Budget of Works: 197.9 M€.

• Date: 2000-2003.

Slide 43ROADS AND MOTORWAYS //

Main References

3 ROADS AND MOTORWAYS

Client:

Generalitat

Valenciana

Park Highway N-232 (Torrevieja – Pilar de la Horadada)

DETAILED DESIGN OF PARK HIGHWAY N-332.STRETCH: TORREVIEJA – PILAR DE LA HORADADA. (VALENCIA, SPAIN)

Object:

• Conceptual and detailed design. The

project consists of the highway N-332

duplication in order to convert it into a

great urban axis.

Relevant data:

• Length: 11 Km.

• Interchanges: 4 Unit. (dumbbell type)

• Culverts: 6 Units. Overpasses: 1 Unit.

• Bicycle structures: 2 Unit.

• Box culverts: 3 Unit.

• Footbridges: 1 Unit.

• Budget of Project: 0.7 M€.

• Budget of Works: 27.7 M€.

• Date: 1999-2009.

Slide 44ROADS AND MOTORWAYS //

Main References

3 ROADS AND MOTORWAYS

Client:

Ministry

of Public Works.

Highway Agency

New Highway. Stretch: Zurita - Parbayón.

ALTERNATIVES STUDY AND PRELIMINARY DESIGN OF TOLL MOTORWAY.STRETCH: ZURITA - PARBAYÓN. (CATALUÑA, SPAIN)

Object:

• Drawing-up of the Alternatives study

at scale 1:25,000 in phase A and

1:5,000 in phase B. Preliminary design

at scale 1:2,000.

Relevant data:

• Solution developed: 15.5 Km.

• Interchanges: 2 Unit.

• Overpasses/Underpasses: 7/7 Unit.

• Viaducts: 10 U. Cut and cover: 1 U.

• Environmental assessment, economic

and feasibility studies.

• Budget of Project: 0.6 M€.

• Budget of Works: 109 M€.

• Date: 2000-2003.

Slide 45ROADS AND MOTORWAYS //

Main References

3 ROADS AND MOTORWAYS

Client:

Ministry

of Public Works.

Highway Agency

Execution of drainage work (box culvert).

DETAILED DESIGN OF LA PLATA HIGHWAY.STRETCH: ALDEANUEVA DEL CAMINO – VILLAR DE PLASENCIA. (EXTREMADURA, SPAIN)

Object:

• Detailed Design.

Relevant data:

• Length: 12.5 Km.

• Interchanges: 5 Unit.

• Viaducts (doubles): 8 Unit.

• 2 junctions by using pergola structures.

• Overpasses: 4 Unit.

• Underpasses: 13 Unit.

• Affecting factors: numerous rivers

which crosses the alignment.

• Budget of Project: 0.2 M€.

• Budget of Works: 35.7 M€.

• Date: 2002-2005.

Slide 46ROADS AND MOTORWAYS //

Main References

3 ROADS AND MOTORWAYS

Client:

Canary Govern.

Santa Cruz de Tenerife in Canary Island.

DETAILED DESIGN FOR THE 3TH LANE OF MOTORWAY TF-1.STRETCH: SANTA CRUZ DE TENERIFE – GÜIMAR . (ISLAS CANARIAS, SPAIN)

Object:

• Preliminary Design and Detailed

Design of additional lane.

Relevant data:

• Length: 20.4 Km.

• Interchanges: 14 Unit.

• Overpasses / Underpasses: 14/2

• Pergolas: 4 Unit.

• Structures extension: 4 Unit.

• Footbridges: 2 Unit.

• Environmental assessment.

• Road safety study.

• Detailed and construction engineering

• Budget of Works: 89.5 M€.

• Date: 2002.

Julián Camarillo, 53

28037 | Madrid | Spain

T +34 915 673 800

F +34 915 673 805

www.intecsa-inarsa.es

©2

01

7 In

te

csa-In

arsa. T

od

os lo

s d

ere

ch

os re

se

rvad

os.