Key figures Ključne brojke THE CROATIAN ASSOCIATION OF TOLL MOTORWAYS CONCESSIONAIRES 2019 ISSN: 1848-0993

MOTORWAYS CONCESSIONAIRES Ključne brojke · 2 418 Duljina mreže po broju trakova / Length by number of lanes Autoceste / Poluautoceste u prometu Motorways / Semi-motorways in service

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: MOTORWAYS CONCESSIONAIRES Ključne brojke · 2 418 Duljina mreže po broju trakova / Length by number of lanes Autoceste / Poluautoceste u prometu Motorways / Semi-motorways in service

Key figuresKljučne brojke

THE CROATIAN ASSOCIATION OF TOLL MOTORWAYS CONCESSIONAIRES

2019

ISSN: 1848-0993

Page 2: MOTORWAYS CONCESSIONAIRES Ključne brojke · 2 418 Duljina mreže po broju trakova / Length by number of lanes Autoceste / Poluautoceste u prometu Motorways / Semi-motorways in service

2

418

Duljina mreže po broju trakova / Length by number of lanes

Autoceste / Poluautoceste u prometuMotorways / Semi-motorways in service 1.306,5 kmNove dionice otvorene u 2019.New stretches opened in 2019 10,6* km

Nove dionice – otvorenje u 2020.New stretches scheduled in 2020

0,3 km 10,3** km

Ukupna duljina mostovaTotal length of bridges

64,88 km

Duljina zidova za zaštitu od bukeLength of noise protection walls

99,23 km

57,1 1.228,6 20,8 km km km

2x1 trak / lanes 2x2 traka / lanes 2x3 traka / lanes

Broj mostova i vijadukata / Number of bridges and viaducts

Mreža autocesta Motorway network

14

Prijelazi za divlje životinje / Crossings for wild animals

*dionice državnih cesta koje gradi HAC i nakon izgradnje predaje na upravljanje Hrvatskim cestama (HC) / stretches of state roads that will not be integrated into motrway network, built by HAC and handed over to Croatian Roads Authority (HC) ** dopuna do punog profila autoceste / upgrade to full motorway profile

Page 3: MOTORWAYS CONCESSIONAIRES Ključne brojke · 2 418 Duljina mreže po broju trakova / Length by number of lanes Autoceste / Poluautoceste u prometu Motorways / Semi-motorways in service

0

3

Duljina mreže po broju trakova / Length by number of lanes

Razvoj mreže / Development of networkPo godinama (km) / By years (km)

2018.-’20.

2017.-’18.

2015.-’16.

2013.-’14.

2011.-’12.

2009.-’10.

2008.

2007.

2006.

2005.

2004.

2003.

2002.

2001.

2000.

1999.

1998.

1997.

1996.0 200 400 600 800 1.000 1.200 1.400

1.306,5

1.313,8

1.313,8

1.289,4

1.250,7

1.240,7

1.201,3

1.159,9

1.078,9

1.035,2

942,9

747,6

598,6

559,0

540,8

522,5

466,9

418,2

394,3

Po godinama (km) / By years (km)

Otvoreno novih autocesta / New motorways opened to traffic

100

50

02007. 2008. 2009. 2010. 2011. 2012. 2013. 2014. 2015. 2016. 2017. 2018. 2019.

81

41,439,4

0 0 0 0 010

32,524,4

0

Page 4: MOTORWAYS CONCESSIONAIRES Ključne brojke · 2 418 Duljina mreže po broju trakova / Length by number of lanes Autoceste / Poluautoceste u prometu Motorways / Semi-motorways in service

4

Broj nesreća u tunelima / Number of accidents in

tunnels

85

Udio nesreća u tunelima u ukupnom broju nesreća / Portion of accidents in tunnels in the total accidents

3,1 %

50

455

Broj tunela / Number of tunnels

7> 1 km

2> 2 km

3> 5 km

Ukupna duljina tunela u jednom smjeru Total length of tunnels in one direction 50,31 km

Udio tunela u ukupnoj mreži u oba smjera Portion of tunnels in total network in both directions

6,9 %

Najduži tunel The longest tunnel 5,8 kmMala Kapela A1

Page 5: MOTORWAYS CONCESSIONAIRES Ključne brojke · 2 418 Duljina mreže po broju trakova / Length by number of lanes Autoceste / Poluautoceste u prometu Motorways / Semi-motorways in service

5

Ukupno / Total

1.306,5 km

Dijelom autoceste A1 od Zagreba do Bosiljeva upravlja ARZ d.d. / Part of the motorway A1 from Zagreb to Bosiljevo is operated by ARZ d.d.ARZ d.d. upravlja dijelom autoceste A7 / Part of the motorway A7 is operated by ARZ d.d.

918,5 km

187,0 km

141,0 km

60,0 km

U prometu In service

U izgradnji In construction

U planiranju In project

D10 i D12 predane su na upravljanje Hrvatskim cestama d.o.o. i nisu pod naplatom / D10 i D12 were handed over to Croatian Roads Authority

Page 6: MOTORWAYS CONCESSIONAIRES Ključne brojke · 2 418 Duljina mreže po broju trakova / Length by number of lanes Autoceste / Poluautoceste u prometu Motorways / Semi-motorways in service

6

Autocesta – poluautocesta / Motorway – Semi motorwayU prometu /

In service 31/12/2019

Otvoreno / Open in

2019

U izgradnji / In con-struction 31/12/2019

Početak izgradnje / Start of const. in

2020

Ukupno /Total 2020

Otvaranje / Opening in

2020

HRVATSKE AUTOCESTE d.o.o.

A1 Bosiljevo 2 – Split – Dubrovnik 415.30 - - - 415.30 -A3 Bregana – Zagreb – Lipovac 306.40 - - - 306.40 -A4 Zagreb – Goričan 96.90 - - - 96.90 -A5 Beli Manastir – Osijek – granica s BiH 58.70 - - - 58.70 - Most Drava - - 2.50 - - - poddionica Most Halasica – Most Drava - - 0.80 - - - dionica most Drava – čvor Osijek - - 3.80 - - - Most Sava - - 0.70 - 0.30 0.30 poddionica Beli Manastir – Most Halasica - - 17.50 - - -A7 Križišće – Žuta Lokva poddionica Selce – Novi Vinodolski (Obilaznica Novog Vinodolskog) - - - 6.50 - -

A10 Granica BIH – čvor Metković 8.50 - - - 8.50 -A11 Zagreb – Sisak 32.70 - - - 32.70 -D12 Brza cesta Podravski ipsilon - - - - - - Vrbovec – Farkaševac*** 10.60*** 10.60*** - - 10.60*** -Ukupno / Total 918.50 10.60*** 25.30 6.50 918.80 0.30

AUTOCESTA RIJEKA-ZAGREB d.d.A1 Bosiljevo 2 – Zagreb 65.25 - - - 65.25 - A6 Rijeka – Bosiljevo 2 81.25 - - - 81.25 -A7 Rupa – Matulji – Diračje – Orehovica 28.00 - - - 28.00 -D102 Most Krk i pristupne ceste 12.53 - - - 12.53 -D6 Neretić – čvor NovigradUkupno / Total 187.03 - - - 187.03 -

BINA-ISTRA d.d.A8 Kanfanar – Matulj 64.20 - - - 64.20 -

Kanfanar – Pazin (čvor Rogovići) 18.13 - - - 18.13 - Pazin – Matulji* 46.08 - 10.30** 12.62** 46.08 10.30**

A9 Umag – Pula 76.80 - - - 76.80 - Umag – Medaki 41.84 - - - 41.84 - Medaki – Kanfanar 7.36 - - - 7.36 - Kanfanar – Vodnjan jug 20.70 - - - 20.70 - Vodnjan jug – Pula 6.90 - - 6.90 -

Ukupno / Total 141.00 - 10.30** 12.62** 141.00 10.30**

AUTOCESTA ZAGREB-MACELJ d.o.o.A2 Zagreb – Macelj 60.00 - - - 60.00 - Zagreb – Krapina 42.80 - - - 42.80 - Krapina – Macelj 13.40 - - - 13.40 - Dio dionice Krapina – Đurmanec* 3.80* - - - 3.80* -Ukupno / Total 60.00 - - - 60.00 -

Ukupno sve autoceste / Total all motorways 1,306.53 10.60*** 25.3010.30**

6.5012.62** 1,306.83 0.30

10.30**

*poluautocesta/brza cesta / semi motorway/rapid road **dopuna do punog profila / upgrade to full motorway profile***dionice državnih cesta koje gradi HAC i nakon izgradnje predaje na upravljanje Hrvatskim cestama (HC)

Page 7: MOTORWAYS CONCESSIONAIRES Ključne brojke · 2 418 Duljina mreže po broju trakova / Length by number of lanes Autoceste / Poluautoceste u prometu Motorways / Semi-motorways in service

7

Autocesta – poluautocesta / Motorway – Semi motorwayU prometu /

In service 31/12/2019

Otvoreno / Open in

2019

U izgradnji / In con-struction 31/12/2019

Početak izgradnje / Start of const. in

2020

Ukupno /Total 2020

Otvaranje / Opening in

2020

HRVATSKE AUTOCESTE d.o.o.

A1 Bosiljevo 2 – Split – Dubrovnik 415.30 - - - 415.30 -A3 Bregana – Zagreb – Lipovac 306.40 - - - 306.40 -A4 Zagreb – Goričan 96.90 - - - 96.90 -A5 Beli Manastir – Osijek – granica s BiH 58.70 - - - 58.70 - Most Drava - - 2.50 - - - poddionica Most Halasica – Most Drava - - 0.80 - - - dionica most Drava – čvor Osijek - - 3.80 - - - Most Sava - - 0.70 - 0.30 0.30 poddionica Beli Manastir – Most Halasica - - 17.50 - - -A7 Križišće – Žuta Lokva poddionica Selce – Novi Vinodolski (Obilaznica Novog Vinodolskog) - - - 6.50 - -

A10 Granica BIH – čvor Metković 8.50 - - - 8.50 -A11 Zagreb – Sisak 32.70 - - - 32.70 -D12 Brza cesta Podravski ipsilon - - - - - - Vrbovec – Farkaševac*** 10.60*** 10.60*** - - 10.60*** -Ukupno / Total 918.50 10.60*** 25.30 6.50 918.80 0.30

AUTOCESTA RIJEKA-ZAGREB d.d.A1 Bosiljevo 2 – Zagreb 65.25 - - - 65.25 - A6 Rijeka – Bosiljevo 2 81.25 - - - 81.25 -A7 Rupa – Matulji – Diračje – Orehovica 28.00 - - - 28.00 -D102 Most Krk i pristupne ceste 12.53 - - - 12.53 -D6 Neretić – čvor NovigradUkupno / Total 187.03 - - - 187.03 -

BINA-ISTRA d.d.A8 Kanfanar – Matulj 64.20 - - - 64.20 -

Kanfanar – Pazin (čvor Rogovići) 18.13 - - - 18.13 - Pazin – Matulji* 46.08 - 10.30** 12.62** 46.08 10.30**

A9 Umag – Pula 76.80 - - - 76.80 - Umag – Medaki 41.84 - - - 41.84 - Medaki – Kanfanar 7.36 - - - 7.36 - Kanfanar – Vodnjan jug 20.70 - - - 20.70 - Vodnjan jug – Pula 6.90 - - 6.90 -

Ukupno / Total 141.00 - 10.30** 12.62** 141.00 10.30**

AUTOCESTA ZAGREB-MACELJ d.o.o.A2 Zagreb – Macelj 60.00 - - - 60.00 - Zagreb – Krapina 42.80 - - - 42.80 - Krapina – Macelj 13.40 - - - 13.40 - Dio dionice Krapina – Đurmanec* 3.80* - - - 3.80* -Ukupno / Total 60.00 - - - 60.00 -

Ukupno sve autoceste / Total all motorways 1,306.53 10.60*** 25.3010.30**

6.5012.62** 1,306.83 0.30

10.30**

***stretches of state roads that will not be integrated into motrway network, built by HAC and handed over to Croatian Roads Authority (HC)

Page 8: MOTORWAYS CONCESSIONAIRES Ključne brojke · 2 418 Duljina mreže po broju trakova / Length by number of lanes Autoceste / Poluautoceste u prometu Motorways / Semi-motorways in service

8

Usluge Services

Benzinske postaje / Filling

stations

74

Odmorišta / Rest areas

124

Hoteli / Hotels

9

Cafe barovi / Caffe bars

87

Restorani / Restaurants

27

Dinamički informacijski

paneli / VMS

136

COKP Centri održ. i kont. prometa /

MTCC Maint. & Traffic Control

Centres

27

Parkirališna mjesta LV /

Parking places LV

6.746

Parkirališna mjesta TV /

Parking places HV

2.122

Broj intervencija vatrogasnih

jedinica / Number of firebrigade interventions

1.738

Broj nadzornih video kamera /

Number of CCTV cameras

1.596

Broj ralica / Number of

snowplowers

213

Page 9: MOTORWAYS CONCESSIONAIRES Ključne brojke · 2 418 Duljina mreže po broju trakova / Length by number of lanes Autoceste / Poluautoceste u prometu Motorways / Semi-motorways in service

9

Društvo Company

%19./18.

%19./18.

Total % 19./18.

HAC 37.942.756 5,5 5.961.335 6,9 5,7

ARZ 22.056.892 4,2 2.407.576 -0,2 3,8

BINA-ISTRA 9.705.121 2,5 926.922 11,8 3,3

AZM 6.788.205 6,3 871.208 10,3 6,7

Ukupno Total 76.492.974 4,8 10.167.041 5,8 4,9

SVEUKUPNO TOTAL 86.660.015 4,9

Promet Traffic

Broj vozila u područjima naplate / Number of vehicles in toll collection zones

86.660 mil./mio.

4,9 %

2019. / 2018.

Udio LV i TV u ukupnom broju vozila / Portion of LV & HV in total no. of vehicles

88,3 %

11,7 %

Rast broja vozila u područjima naplate / Increase in number of vehicles in toll

collection zones

Page 10: MOTORWAYS CONCESSIONAIRES Ključne brojke · 2 418 Duljina mreže po broju trakova / Length by number of lanes Autoceste / Poluautoceste u prometu Motorways / Semi-motorways in service

10

Društvo Company

HAC 13.304 2.672 15.976

ARZ 19.401 2.355 21.756

BINA-ISTRA 17.349 1.657 19.006

AZM 16.800 2.168 18.968

Ukupno Total 14.695 2.496 17.191

PGDP po tvrtkama / AADT by companies

Po tvrtkama / By companies

Broj voznih kilometara / Number of km travelled

Ukupno / Total

Broj vozila u područjima naplate / Number of vehicles in toll collection zones

U mil. voz. / In Mio. veh.

90

85

80

75

70

65

60

55

50

76,0

79,9

2016. 2017. 2018. 2019.

82,6 86,7

5.312,8 HAC

1.294,4 ARZ

978,2 BINA-ISTRA

415,4 AZM

8.000,8 106 x km

Page 11: MOTORWAYS CONCESSIONAIRES Ključne brojke · 2 418 Duljina mreže po broju trakova / Length by number of lanes Autoceste / Poluautoceste u prometu Motorways / Semi-motorways in service

11

Broj vozila koja su sudjelovala u nesrećama / Number of vehicles involved in accidents

3.458

Sigurnost SafetyPGDP po tvrtkama / AADT by companies

Nesreće po tvrtkama / Accidents by companies

Ukupno nesreće po vrstama / Total accidents by type

1.854 HAC (918 km)

629 ARZ (178 km)

89 BINA-ISTRA (141 km)

125 AZM (60 km)

2016. 2017. 2018. 2019.

S poginulima With fatalities 27 20 30 25

S ozlijeđenima With injuries 315 332 316 256

S materijalnom štetom With material damage 2.055 2.113 2.455 2.416

Ukupno Total 2.397 2.465 2.801 2.697

Ukupno prometne nesreće / Total traffic accidents

2.697

- 3,7 %

2019. / 2018.

Pad prometnih nesreća /Decrease in traffic accidents

Page 12: MOTORWAYS CONCESSIONAIRES Ključne brojke · 2 418 Duljina mreže po broju trakova / Length by number of lanes Autoceste / Poluautoceste u prometu Motorways / Semi-motorways in service

12

31

Pad broja poginulih / Decrease in fatalities2019. / 2018.

- 8,8 %

Ukupno poginuli / Total of fatalities

Poginuli prema porijeklu registarske pločice vozila / Fatalities by origin of vehicle registration plates

50

40

30

20

10

02016. 2017. 2018. 2019.

Ukupno poginuli / Total of fatalities

Vozila registrirana izvan RH International registration plates

Vozila registrirana

u RH Croatian

registration plates

Stupanj opasnosti od smrtnog stradavanja (10⁹ voz. km) / Rate of dead (10⁹ km travelled)

4,26

22 HAC

5 ARZ

3 BINA-ISTRA

1 AZM

18 13

36

23

34 31

Page 13: MOTORWAYS CONCESSIONAIRES Ključne brojke · 2 418 Duljina mreže po broju trakova / Length by number of lanes Autoceste / Poluautoceste u prometu Motorways / Semi-motorways in service

13

Prometne nezgode službe održavanja / Traffic accidents of Maint. Service Staff

Poginuli prema porijeklu registarske pločice vozila / Fatalities by origin of vehicle registration plates

Ukupno poginuli / Total of fatalities

Broj nesreća pri idealnim uvjetima vožnje / The number of accidents in

ideal driving conditions

2.006

Stupanj sigurnosti / Safety ratios

HAC BINA-ISTRA

ARZ AZM RHCroatia

RH %19./18.

Nesreća s ozlijeđenima Personal injury rate 33.50 12.13 39.50 19.25 35.16 -18.99

Nesreća s poginulima Fatal accident rate 3.01 0.00 3.45 2.40 3.43 -16.67

Koeficijent poginulih Rate of dead 4.14 0.00 3.46 2.40 4.26 -8.82

5 Ukupno nezgode Total accidents

6 Lakše ozlijeđeni Injuries without hospitalisation

0 Teže ozlijeđeni Injuries with hospitalisation

0 Poginuli Fatalities

Najčešći uzroci Most frequent causes Nepažnja vozača / Driver’s distraction

Najčešće posljedice Most frequent consequences

Materijalna šteta / Material damage

Najkritičniji mjesec The most critical month Kolovoz / August

Na 10⁹ voz. km / Per 10⁹ km travelled

Page 14: MOTORWAYS CONCESSIONAIRES Ključne brojke · 2 418 Duljina mreže po broju trakova / Length by number of lanes Autoceste / Poluautoceste u prometu Motorways / Semi-motorways in service

14

Porast prihoda od cestarine / Increase in toll revenues

4,9 %

Postaje / Plazas

108

Ekonomija Economy

Naplata / Toll

712Trakovi / Lanes

Pretplatnici / Subscribers

14,4 %Uređaji / OBUs

12,6%

Povećanje / Increase2019. / 2018.

Prihodi od cestarine (bez PDV-a) / Toll revenues (without VAT)

425,7 mil./mio. eur

ENC / ETC

Pokrivenost Coverage (km) 1.246Trakovi Lanes 505Uređaji OBUs 788.278Pretplatnici Subscribers 461.445

269,0 HAC

90,5 ARZ

34,4 BINA-ISTRA

31,8 AZM

2019. / 2018.

Prosječan broj godišnjih

transakcija po ENC uređaju /

Average annual

number of transactions

per OBU

32

Page 15: MOTORWAYS CONCESSIONAIRES Ključne brojke · 2 418 Duljina mreže po broju trakova / Length by number of lanes Autoceste / Poluautoceste u prometu Motorways / Semi-motorways in service

15

2.594,932.876,60

mil./mio.Ukupan broj transakcija / Total number of transactions 86,7

Prihodi od cestarine / Toll revenuesU mil. KN / In Mio. KN

2016. 2017. 2018. 2019.

3.000

1.500

0

Udio načina plaćanja u ukupnim transakcijama / Breakdown of transactions by payment mode

Prosječni godišnji tečaj HNB u 2019. / Average annual exchange rate in 2019, Source: Croatian National Bank)

1 EUR = 7,41 KN

3.013,67 3.154,70

SMART KARTICE SMART CARDS

3,1%

GOTOVINA CASH

46,1%

KREDITNE KARTICE CREDIT CARDS

22,3%

ENC ETC*

AZM nema ENC AZM has no ETC

27,2%

OSTALO OTHER

1,3%

Ukupno investicije / Total investments mil./mio. eur111,26

U nove dionice Into new sections 58,67U izgrađene dionice Into existing sections 52,62

*Bez AZM-a udio ENC-a iznosi 36,3% / Without AZM penetration of ETC is 36,3%

Page 16: MOTORWAYS CONCESSIONAIRES Ključne brojke · 2 418 Duljina mreže po broju trakova / Length by number of lanes Autoceste / Poluautoceste u prometu Motorways / Semi-motorways in service

16

Ukupno investicije / Total investments

31,99 HAC

9,41 ARZ

3,33 BINA-ISTRA

7,88 AZM

Investicije u izgrađene dionice / Investments into existing sections 52,62

mil./mio. eur

185,90 mil./mio. eur

Investicije u nove dionice* /Investments into new sections*

*AZM i ARZ nisu imale investicija u nove dionice / AZM and ARZ had no investments into new sections

U mil. KN / In Mio. KN

U nove dionice Into new sections 96,69U izgrađene dionice Into existing sections 89,21

900

450

02016. 2017. 2018. 2019.

376,3341,61

676,90824,47

Prosječni godišnji tečaj HNB u 2019. / Average annual exchange rate in 2019, Source: Croatian National Bank)

1 EUR = 7,41 KN

58,65

11,85HAC

48,80BINA-ISTRA

mil./mio. eur

Plan investicija za 2020. / Investment plan for 2020

Page 17: MOTORWAYS CONCESSIONAIRES Ključne brojke · 2 418 Duljina mreže po broju trakova / Length by number of lanes Autoceste / Poluautoceste u prometu Motorways / Semi-motorways in service

17

Zaposlenici Workforce

U društvima upraviteljima autocesta / In managing motorway companies

490192

298

428 HAC***

40 ARZ**

12 BINA-ISTRA

10 AZM

Podjela po društvima upraviteljima / Breakdown by managing motorway companies

*Od 1.12.2017. HAC je i upravitelj i operater / As of 1.12.2017. HAC became managing comp. and operator**Od 1.12.2017. ARZ je samo upravitelj, a ostale poslove preuzeo je HAC / As of 1.12.2017. ARZ became managing comp. while tolling and maintenance were handed over to HAC***Sve službe HAC-a osim naplate i održavanja / HAC staff without tolling and maintenance workforce

Stalno zaposleni / Total workforce

U društvima upraviteljima autocesta i njihovim operaterima / In motorway companies and their operators

3.048

651

2.397

2.639 HAC*

40 ARZ**

230 BINA-ISTRA

139 AZM(i/and BIUO)

(i/and EGIS)

Page 18: MOTORWAYS CONCESSIONAIRES Ključne brojke · 2 418 Duljina mreže po broju trakova / Length by number of lanes Autoceste / Poluautoceste u prometu Motorways / Semi-motorways in service

18

2.211 HAC*

218 BIUO

129 EGIS

0 ARZ**

Podjela po operaterima / Breakdown by operators

Podjela zaposlenika po poslovima / Breakdown of workforce by job

Naplata Toll collection 1.048Održavanje Maintenance staff 1.263Ophodari Patrol service 183Uprava Management board 13Ostali Other 51

Zaposlenici društava operatera / Workforce in operating companies

2.558

4592.099

*HAC zaposlenici na poslovima naplate i održavanja / HAC workforce in tolling and maintenance sector**Od 1.12.2017. ARZ je samo upravitelj, a ostale poslove preuzeo je HAC / As of 1.12.2017. ARZ became managing comp. while tolling and maintenance were handed over to HAC

Page 19: MOTORWAYS CONCESSIONAIRES Ključne brojke · 2 418 Duljina mreže po broju trakova / Length by number of lanes Autoceste / Poluautoceste u prometu Motorways / Semi-motorways in service

ARZ – Autocesta Rijeka-Zagreb d.d.Širolina 4 10 000 Zagreb - HRtel.: + 385 1 65 15 100 fax: + 385 1 65 15 110e-mail: [email protected] www.arz.hr

Miro ŠkrgatićPredsjednik Uprave / President of the Managing BoardTomislav TkalčićČlan Uprave / Member of the Managing Board

BINA-ISTRA – Bina-Istra d.d.Savska cesta 106 10 000 Zagreb - HRtel.: + 385 1 61 38 300 fax: + 385 1 61 38 301e-mail: [email protected] www.bina-istra.com

Dario Silić Generalni direktor / General Manager

Članovi / Members

Širolina 4, 10 000 Zagreb - HR; tel.: + 385 1 65 15 375; e-mail: [email protected], [email protected] www.huka.hr

Miloš Savić, Predsjednik Udruge / PresidentDario Silić, Potpredsjednik Udruge / Vice-president

Hrvatska udruga koncesionara za autoceste s naplatom cestarine / The Croatian Association of Toll Motorways Concessionaires

HAC – Hrvatske autoceste d.o.o.

Širolina 4, 10 000 Zagreb - HRtel.: + 385 1 46 94 400 fax: + 385 1 46 94 505e-mail: [email protected] www.hac.hr

Boris Huzjan Predsjednik Uprave / President of the Managing BoardStjepan BaranašićČlan Uprave / Member of the Managing Board

AZM – Autocesta Zagreb-Macelj d.o.o.

Garićgradska 18, 10 000 Zagreb - HRtel.: + 385 1 36 89 600 fax: + 385 1 36 89 620e-mail: [email protected] www.azm.hr

Miloš Savić Predsjednik Uprave / President of the Managing BoardIvica Mlinarević Član Uprave / Member of the Managing Board

Page 20: MOTORWAYS CONCESSIONAIRES Ključne brojke · 2 418 Duljina mreže po broju trakova / Length by number of lanes Autoceste / Poluautoceste u prometu Motorways / Semi-motorways in service

Izdavač / Publisher: HUKA

Uređivački odbor / Editorial Board: Miloš Savić, glavni i odgovorni urednik / Editor in Chief

Brankica Bajić, tehnička urednica / Technical Editor

Grafičko oblikovanje / Graphic design: Modacom plus d.o.o.

Fotografije / Photographs: Arhiva HUKA

Tisak / Printed by: Kerschoffset Zagreb d.o.o.

Datum izdanja / Published: Srpanj 2020. / July 2020

Page 21: MOTORWAYS CONCESSIONAIRES Ključne brojke · 2 418 Duljina mreže po broju trakova / Length by number of lanes Autoceste / Poluautoceste u prometu Motorways / Semi-motorways in service

THE CROATIAN ASSOCIATION OF TOLL MOTORWAYS CONCESSIONAIRES

HRVATSKA UDRUGA KONCESIONARA ZA AUTOCESTE S NAPLATOM CESTARINE

www.huka.hr