RM F Getting Started EC

Embed Size (px)

DESCRIPTION

bridge design software

Citation preview

  • RM Bridge Professional Engineering Software for Bridges of all Types

    RM-Bridge

    RM Bridge V8i

    Janvier 2009

    DEBUTER FACILEMENT AVEC - RM - EC ANALYSE

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C I

    Bentley Systems France

    Contents

    1 Gnral ......................................................................................................................... 1-1

    1.1 Lexemple ............................................................................................................ 1-2

    1.2 Modle Structurel ................................................................................................ 1-2

    1.2.1 Contrainte des appuis ....................................................................................... 1-3

    1.2.2 Section en T (Partie I) ...................................................................................... 1-3

    1.2.3 Gomtrie du cblage de base ......................................................................... 1-1

    1.2.4 Charactristique des cbles .............................................................................. 1-1

    1.2.5 Proprit des Matriaux ................................................................................... 1-2

    1.3 Chargement .......................................................................................................... 1-3

    1.3.1 Charges Permanentes ....................................................................................... 1-3

    1.3.2 Retrait et Fluage:.............................................................................................. 1-3

    1.3.3 Charges Additionelles ...................................................................................... 1-3

    1.3.4 Charge de Trafic .............................................................................................. 1-3

    2 Dmarrage du programme ........................................................................................... 2-4

    3 Passer du modle 3D au Modle structurel ................................................................. 3-5

    3.1 Recalculate ........................................................................................................... 3-5

    3.2 Premiers Rsultats ............................................................................................... 3-5

    4 Acier pour Cbles de Prcontrainte ............................................................................. 4-8

    4.1 Import de Matriau .............................................................................................. 4-8

    4.2 Dfinition de la Gomtrie de la Prcontrainte ................................................... 4-9

    4.3 Squence de mise en tension ............................................................................. 4-15

    5 Dfinition des Charges .............................................................................................. 5-18

    5.1 Gestion des cas de charge : Load Manager ................................................. 5-18

    5.2 Dfinition des cas de charge .............................................................................. 5-20

    6 Calendrier de Construction ........................................................................................ 6-26

    6.1 Actions et Activation des Phases ....................................................................... 6-26

    6.1.1 Dfinition de phases Individuelles................................................................. 6-26

    6.1.2 Activation des nouvelles phases .................................................................... 6-27

    6.1.3 Actions de calcul pour chaque chargement ................................................... 6-28

    7 Trafic.......................................................................................................................... 7-32

    7.1 Dfinition des Charges de Trafic ....................................................................... 7-32

    7.2 Calcul des Actions en tant que Phase ................................................................ 7-37

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C II

    Bentley Systems France

    8 Combinaison de Cas de charge pour vrification au Code ........................................ 8-39

    8.1 Table de Combinaison ....................................................................................... 8-39

    8.2 Actions de Calcul pour les Combinaisons de Cas de Charge ............................ 8-40

    9 Vrifications au Code ................................................................................................ 9-42

    9.1 Vrification de contrainte aux fibres (ELS)....................................................... 9-42

    9.1.1 Action de calcul de vrification des contraintes aux fibres ........................... 9-42

    9.2 Vrification aux tats limites ultimes (ELU) ..................................................... 9-43

    9.2.1 Action de Calcul pour vrification aux tats limites ultimes ......................... 9-43

    10 Lancement du calcul suivant calendrier .................................................................. 10-44

    10.1 Lancement du Calcul ....................................................................................... 10-44

    11 Prsentation des Rsultats Post-Processing .......................................................... 11-45

    11.1 Rsultats Numriques ...................................................................................... 11-45

    11.1.1 Listings Standards .................................................................................... 11-45

    11.1.2 Revue Interactive des Rsultats ............................................................... 11-45

    11.2 Rsultats Graphiques ....................................................................................... 11-47

    11.2.1 RMSets .................................................................................................... 11-47

    11.2.2 Diagrammes ............................................................................................. 11-49

    11.2.3 Listings .................................................................................................... 11-50

    11.2.4 Utilisation des RMSet dans le calendrier de construction ....................... 11-51

    11.3 Reprsentation Graphique des Rsultats ......................................................... 11-52

    11.3.1 Plot ........................................................................................................... 11-52

    11.3.2 Affichage de Profils (Plot Profiles) dans le calendrier de construction... 11-55

    11.3.3 Affichage Interactif des contraintes, efforts et dplacements:................. 11-56

    12 Export et Stockage ................................................................................................... 12-59

    12.1 Export du projet ............................................................................................... 12-59

    12.2 Quiter le Programme........................................................................................ 12-60

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 1-1

    Bentley Systems France

    1 Gnral

    Nous allons tudier les points suivants dans RM :

    Contenu:

    Dmarrage du programme

    Diffrence dinterface avec GP

    Import de la maquette GP hritage - ajouts

    Dfinition du systme structurel

    Gomtrie de la prcontrainte

    Dfinition du chargement

    Dfinition du trafic

    Dfinition dune phase de construction

    Vrification des contraintes aux fibres

    Vrification chargement ultime

    Analyse

    Sorties imprimes et schmas

    Ce manuel dcrit les entres dans RM. Simultanment le guide dutilisation de RM doit tre utilis pour le complment dinformation sur les fonctions utilises.

    La pratique de ce manuel doit permettre de traiter par la suite lexemple indiqu en moins de 30 minutes.

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 1-2

    Bentley Systems France

    1.1 Lexemple

    Nous continuons dans RMBridge lanalyse de la structure modlise prcdemment dans Modeleur, un pont simple 2 traves :

    1.2 Modle Structurel

    A1 A3 30m

    10x3m

    A2

    10x3m

    30m

    Fig. 1: Systme structurel

    Axe en plan: Partie 1: ligne droite: Pk: 0-60 m

    Profil en long: Partie 1: Ligne horizontale: Pk: 0-60 m altitude Z=Cste=0

    Numrotation: Nuds de tablier sur les centaines : 101-111-121 puis 201--- Elments Tablier: 101-110,111-120 puis 201--

    Support puis Piles sur les Milliers: 1100, 1200, 1300

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 1-3

    Bentley Systems France

    1.2.1 Contrainte des appuis

    Encastr sur la pile, libre en X et en rotation sur les cules

    A 1 A 2

    X

    Z

    101-110

    A 3

    111-120

    1100 1200 1300

    Fig. 2: Dfinition des Contraintes de Support

    1.2.2 Section en T (Partie I)

    8.00 m

    3.50 m 3.40 m

    0.10 m

    1.00 m

    2.0

    0 m

    1.6

    5 m

    0.2

    5 m

    0.1

    0 m

    Fig. 3: section en T

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 1-1

    Bentley Systems France

    1.2.3 Gomtrie du cblage de base

    Trave 1 101 (9 cbles) AT=1600mm2, AD=5000mm2 (101-112)

    Trave 2 102 (9 cbles) AT=1600mm2, AD=5000mm2 (109-120)

    1.2.4 Charactristique des cbles

    Pertes de friction: 0.20

    Friction en courbure: 0.20 [Deg/m]

    Enfoncement des clavettes: 6 mm = 0.006 m

    Contrainte admissible dans les cbles:

    Contrainte avant clavettesaprs Clav. Avant Clav aprs Clav

    fpk 1860000 0.8 0.7 1488000 1302000fp0.1k 1674000 0.9 0.8 1506600 1339200

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 1-2

    Bentley Systems France

    1.2.5 Proprit des Matriaux

    Material name :C_35/45 (import de GP)

    E-Modulus longitudinally 0.33300E+08

    Poisson`s ratio 0.20000

    Shear-Modulus 0.13875E+08

    Coeff. of thermal expansion 0.10000E-04

    Specific weight 25.00000

    Coeff. of consistency 2

    Degree of cement hardening 2

    Water cement ratio 0.40000

    Cement content in concrete 3.00000

    Char.compr. cylinder strength of concrete at 28 days 35000.00000

    Char.compr. cubic strength of concrete at 28 days 45000.00000

    Mean value of concrete compresive strength 43000.00000

    Mean value of axial tensile strength of concrete 3200.00000

    Tension split strength 2240.00000

    Material name :Fe500-S(A) (import de GP)

    E-Modulus longitudinally 0.20000E+09

    Poisson`s ratio 0.30000

    Shear-Modulus 0.76923E+08

    Coeff. of thermal expansion 0.10000E-04

    Specific weight 78.50000

    Yield strength of reinforcement 0.50000E+06

    Design yield strength of reinforcement 0.43478E+06

    Relaxation class 0

    Material name :St-1570/1770

    E-Modulus longitudinally 0.19500E+09

    Poisson`s ratio 0.30000

    Shear-Modulus 0.75000E+08

    Coeff. of thermal expansion 0.10000E-04

    Specific weight 78.50000

    E-Modulus of prestressing 0.19500E+09

    Stressing limit 0.12560E+07

    Tensile strength of prestressing steel 0.17700E+07

    Design tensile strength of prestressing steel 0.15391E+07

    Relaxation class 0

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 1-3

    Bentley Systems France

    1.3 Chargement

    1.3.1 Charges Permanentes

    Poids propre bton: 25,0 kN/m3

    Charges Permanentes: 30,0 kN/m

    1.3.2 Retrait et Fluage:

    Le retrait et le fluage seront tudis suivant lEC2.

    1.3.3 Charges Additionelles

    Temprature

    Coefficient thermique: 1e-5 m/ C

    Gradient de Temprature: +10C

    vent

    Vent latral: 2.00 kN/m2

    1.3.4 Charge de Trafic

    Afin de conserver un chargement simple un seul convoi sera tudi qui correspond un

    camion de 4.25 t et une charge uniforme sur 12m.

    15 [kN/m]

    200 [kN]

    2 [m] 2 [m]

    15 [kN/m]

    200 [kN]

    2 [m]

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 2-4

    Bentley Systems France

    2 Dmarrage du programme

    Comme indiqu prcdemment RMBridge dmarre par licne sur le bureau

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 3-5

    Bentley Systems France

    3 Passer du modle 3D au Modle structurel

    Une fois que lexport, Calculate, a t fait, vous pouvez entrer dans le modle structu-rel en tuant la fentre graphique de modeleur ou en appuyant sur nimporte laquelle des fonctions structurelles puis effacer le tableau en appuyant sur la croix en haut gauche. Le

    modle structurel saffichera alors dans la fentre principale. Attention le modle affich ne tient pas compte des inerties de section, il faut pour cela recalculer le modle.

    3.1 Recalculate

    Veri

    fication e

    t calc

    ul des s

    ections

    Sta

    rt c

    alc

    ula

    tion

    Nous allons tout

    dabord relancer un calcul en appuyant sur

    licne :

    Les deux seules options

    cocher sont Cross section calculation et Structure check..

    Pressez Recalc.

    Sto

    p

    Pendant le calcul, dans

    la partie infrieure

    saffichent les tapes, et les messages

    dattention ou derreur linfo Calculation stop indique que le calcul sest fait et doit afficher 0 errors

    3.2 Premiers Rsultats

    Vous pouvez visualiser maintenant dans la fentre graphique, la structure aprs calcul.

    Dans le guide dutilisation, vous trouverez la description de toutes les commandes pour naviguer dans la vue et grer laffichage.

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 3-6

    Bentley Systems France

    Dpart

    La premire vue dans

    RM montre une struc-

    ture o les barres re-

    lient les nuds.

    Vis

    ualis

    ation

    Aprs calcul et gestion

    de laffichage pour voir les sections, on note

    que maintenant les

    barres sont bien posi-

    tionnes au centre de

    gravit de la section, et

    se trouve relies aux

    nuds par des parties indformables. Il en est

    de mme pour les res-

    sorts dappuis.

    Nous pouvons de mme visionner les caractristiques mcaniques des sections, vous trou-

    verez une description complte de ces fonctions dans le manuel:

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 3-7

    Bentley Systems France

    Section -

    In

    fo

    Par la touche Info sur la

    section qui a t trans-

    fre par GP, vous pouvez afficher tous les

    renseignements nces-

    saires.

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 4-8

    Bentley Systems France

    4 Acier pour Cbles de Prcontrainte

    4.1 Import de Matriau

    Tous les matriaux dfinis dans Modeleur ont t imports dans Analyse lors de lexport. Comme le cblage est dfini dans Analyse, il faut au pralable dfinir le matriau utilis pour les cbles.

    Import

    de

    Mat

    ria

    u

    Choisir File dans le menu principal et Re-load Default Proper-

    ties pour ouvrir la liste des matriaux stan-

    dards.

    Choisir au pralable les

    matriaux de la norme

    NF. Slectionnez

    lacier de prcontrainte voulu et appuyer sur

    pour le

    transfrer dans le projet

    en cours.

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 4-9

    Bentley Systems France

    4.2 Dfinition de la Gomtrie de la Prcontrainte

    La partie manquante de la structure est le cblage de prcontrainte que nous allons dfinir.

    Ceci est fait comme suit :

    Cble

    s

    Choisir dans le menu

    droulant Structure, Tendons pour ouvrir le menu de saisie des

    cbles.

    Gom

    tr

    ie d

    es C

    ble

    s

    La partie haute du me-

    nu indiquent les cbles

    qui ont t dfinis.

    Dans la partie basse

    pour chaque table, on

    va trouver les tronons

    de structure concerns :

    (assignation des l-

    ment) et la dfinition de

    la gomtrie

    Choisir licne dajout sur la partie haute du menu:

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 4-10

    Bentley Systems France

    Tendon -

    Pro

    pert

    ies

    Nous allons dfinir le

    cble 101, que forment

    9 units. Remplir les

    diffrents champs pour

    un cble et dfinir 9

    units. Utiliser les va-

    leurs rfrences en

    dbut de manuel et af-

    fiches ci-contre

    Confirmez

    Assig

    nation

    Nous allons dfinir les

    lments traverss par

    le cables 101. choisir

    Assignment.

    Choisir licne dinsertion des lments assigns.

    Assig

    nation

    Le cble 101 sera dfini

    sur les lments 101

    112, ceci correspond

    la premire phase

    dactivation

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 4-11

    Bentley Systems France

    Geom

    etr

    ie

    Passer dans la dfini-

    tion Geometry

    Les entres numrique peuvent tre controlles imdiatement par affichage dune vue grahique de la structure en appuyant sur la touche i.

    Gom

    tr

    ie d

    es C

    ble

    s

    Les lments slection-

    ns (101 112) sont

    affichs dans la fentre

    avec les sections stta-

    ches

    Gra

    phiq

    ue

    Vous pouvez, comme

    pour toutes les vues

    graphiques rorienter la

    vue.

    Choisir licne dajout sur la parte basse du menu.

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 4-12

    Bentley Systems France

    Gom

    tr

    ie d

    u C

    ble

    Le menu affich droite permet

    de:

    - Positionner le cble lintrieur de llment

    - De dfinir la tangente au point de passage.

    x/l est la position relative le

    long de llment du point de passage dfini.

    Plusieurs points de passage

    peuvent tre dfinis dans le

    mme lment.

    Bien choisir licne ajout aprs pour viter les retours en arrire du cble, ce qui ncessiterait un r ordonnancement des lignes par les flches. (haut-bas)

    Gom

    tr

    ie d

    u C

    ble

    Au tiers de la trave, le

    point de passage du

    cble est dfini par rap-

    port un point particulier

    de la section. Dans le

    cas prsent nous util-

    sons le point de

    contrainte bas FIB_INF

    avec une excentricit

    en Y de .25 (vertical)

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 4-13

    Bentley Systems France

    Continuer entrer le cble avec les entres suivantes:

    TA

    BLE

    DE

    S E

    N-

    TR

    EE

    S

    Cable Nunero: 101

    Type: Normal Normal Normal Normal Normal

    Ref. Elem.: 101 104 107 110 112

    CS Pnt: - FIB_INF FIB_INF - -

    x/l: 0 0 1 1 1

    eY [m]: 0.00 0.25 0.20 0.00 0.00

    eZ [m]: 0.00 0.00 0.00 0.00 0.00

    Relative to: Elem CS Pnt. CS Pnt. Elem Elem

    Alpha1: Free Value Value Value Free

    Value: - 0.00 0.00 0.00 -

    Alpha2: Free Value Value Value Free

    Value: - 0.00 0.00 0.00 -

    Relative to: Elem Elem Elem Elem Elem

    PR

    OP

    RIE

    TE

    CA

    BLE

    Le cble 102 peut

    tre ajout avec

    loption ajout aprs.

    Il peut tre aussi reco-

    pi de 101 .

    On aurait pu encore les

    dfinir tous les deux

    grce la dfinition

    multiple 101 102 par

    pas de 1

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 4-14

    Bentley Systems France

    Assig

    nation

    Passer sur la ligne

    Elements pour d-

    finir les assignations.

    Assigner le cble 102

    aux lments 109

    120.

    Geom

    etr

    ie

    Passer sur la ligne

    geometry

    Par ajout aprs, entrer les valeurs ci-dessous dans la table.

    TA

    BLE

    DE

    S E

    N-

    TR

    EE

    S

    Tendon No.: 102

    Type Normal Normal Normal Normal Normal

    Ref. Elem.: 109 110 113 117 120

    C Pkt: - - FIB_INF FIB_INF -

    x/l: 0 1 1 1 1

    eY [m]: 0.00 0.00 0.20 0.25 0.00

    eZ [m]: 0.00 0.00 0.00 0.00 0.00

    Relative to: Elem Elem CS Pnt CS Pnt Elem

    Alpha1: Free Value Value Value Free

    Value: - 0.00 0.00 0.00 -

    Alpha2: Free Value Value Value Free

    Value: - 0.00 0.00 0.00 -

    Relative to: Elem Elem Elem Elem Elem

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 4-15

    Bentley Systems France

    4.3 Squence de mise en tension

    Les deux groupes de cbles tant dfinis dans leur gomtrie et leur donnes structurelles

    nous pouvons regarder la squence de mise en tension

    Toutes les actions sont dcrites dans la table suivante, attention de bien les ordonner !

    Definir les actions suivantes :

    1. Mise en tension du groupe 101 un facteur 1.06 (6% de surcontrainte tem-poraire) du cot gauche (left).

    2. Pertes dues lenfoncement des clavettes du cot gauche (left) de 6 mm.

    3. Mise en tension du groupe 101 un facteur 1.06 (6% de surcontrainte tem-poraire) du cot droit (right).

    4. Pertes dues lenfoncement des clavettes du cot droit (right) de 6 mm.

    .

    Constr

    uction

    phasage

    choisir Schedule du menu principal et

    Stages en suite

    Cable

    Choisir la ligne Ten-don Action pour ou-vrir le menu

    Choisir licne dajout pour dfinir la premire action

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 4-16

    Bentley Systems France

    Action C

    ble

    Comme nous lavons dcrit au dessus nous

    tendons les cbles 101

    par la gauche (PREL)

    dun facteur 1.06

    Limpact sur la structu-re sera stock sous le

    nom de Tension1.

    Action

    Cble

    Puis nous relchons le

    cble qui vient

    simmobiliser aprs une entre des clavettes de

    6mm (WEDL)

    Limpact sur la structu-re sera aussi stock

    sous le nom de ten-sion1.

    Les deux actions suivantes, son tune rptition des mmes actions pour le cot droit.

    .

    A chaque action choisir ajouter aprs et renplir les champs comme indiqu dans le ta-

    bleau ci-dessous:

    Table

    Stress/Release: PREL - PRER -

    Force/Factor: Factor - Factor -

    Wedge slip: - WEDL - WEDR

    Tendon: 101 101 101 101

    Fact of SIGmax: 1.06 1 1

    Wedge slip: - 0.006 - 0.006

    Stress label: Tension1 Tension1 Tension1 Tension1

    Description: Mise en tension

    Gauche Entre clavettes

    Gauches Mise en tension

    Droite Entre clavettes

    Droites

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 4-17

    Bentley Systems France

    Choisir Ajout Aprs pour dfinir la squence pour les cbles 102. Tout se fera du cot droit car on suppose lancrage gauche noy. Dautre part, nous stockerons les effets dans Tension2.

    Table

    Stress/Release: PRER -

    Force/Factor: Factor -

    Wedge slip: - WEDR

    Kabel: 102 102

    Fact of SIGmax: 1 1

    Wedge slip: - 0.006

    Stress label: tension2 Tension2

    Description: Mise en tension

    Droite Entre clavettes

    Droites

    Mis

    es e

    n T

    ensio

    n

    Lensemble des actions pour les cbles (101 et

    102) sont rpertories

    dans le tableau haut, le

    dtail pour chaque c-

    ble apparait en bas.

    Un contrle graphique de la tension en tout point du cble peut tre obtenue en appuyant

    sur le bouton i . Choisir la ligne dsire, lensemble des effets antrieurs sont dcrits. Ce shma permet de vrifier si la gomtrie na pas des coudes ou des points de rebrousse-ment dus au lissage du cble.

    Tensio

    n C

    ble

    Evolution de la tension,

    effort normal appliqu

    par la prcontrainte sur

    le pont en tout Pk.

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 5-18

    Bentley Systems France

    5 Dfinition des Charges

    Chaque charge est dfinie en tant que cas de charge unique.

    Une accumulation automatique des cas de charge est disponible grce lutilisation du Load manager .

    Les rsultats des charges peuvent aussi tre combins par des combinaisons de charge.

    Les combinaisons calcules peuvent tre combins avec dautres combinaisons pour crer des enveloppes.

    Des facteurs de multiplication (Coefficient de scurit) peuvent tre assigns tout rsultat

    de combinaison en utilisant une table de combinaison.

    5.1 Gestion des cas de charge : Load Manager

    Cale

    ndrier

    Choisir Schedule dans le menu principal

    puis loption Load Definition.

    LM

    ana

    ge

    Choisir Load Mana-ger pour afficher la table des cas de charge.

    Choisir Ajout aprs pour dfinir le premier cas de charge. (G1).

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 5-19

    Bentley Systems France

    LM

    ana

    ge

    G1

    Nous crons un identi-

    fiant G1 (haut du ta-

    bleau Load Manag;) Tous les cas de charge

    qui comporteront

    lidentifiant G1 comme LoadInfo seront cumuls dans les

    cas de charge in-

    ternes :

    PP1 qui dans notre cas accumulera les r-

    sultats dus au poids

    propre (gravitaire),

    mais aussi dans le cas

    de charge PERM-

    SUM qui totalise

    lensemble des actions permanentes.

    Rajouter les cas suivants par ajout aprs (G1).G2 regroupe les charges gravitaires sup-

    plmentaires(superstructure), PT regroupera les charges de prcontrainte, RF, les efforts

    dus au retrait et fluage

    Table

    Load Manag.: G1 G2 PT RF

    Load Case 1: PP1 PP2 PT RF

    Type: Total Total Total Total

    Load Case 2: PERM-SUM PERM-SUM PERM-SUM PERM-SUM

    Type: Total Total Total Total

    Load Case 3: - - - -

    Type: Total Total Total Total

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 5-20

    Bentley Systems France

    5.2 Dfinition des cas de charge

    LC

    ase

    Choisir la ligne

    Load Case dans larborescence.

    Ajouter dans le tableau du haut le cas de charge (G1-101).

    LC

    ase

    G1

    Ce cas de charge G1-

    Ph1, sera utilis pour la

    premire phase de

    construction du tablier.

    Nota : si vous cochez

    Load only elements, activated in current

    stage Le chargement se fera automatique-

    ment sur les lments

    actifs uniquement.

    Le type de chargement

    est choisi comme char-

    ge permanente, donc

    pris en compte pour le

    fluage, dautre part, le fait de lui donner

    lattribut G1, permettra de stocker les rsultats

    dans PP1 et dans

    PERM-SUP, comme

    nous lavons vu prc-demment

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 5-21

    Bentley Systems France

    Lis

    te d

    es C

    as d

    e C

    harg

    e

    Le cas de charge appa-

    rait ainsi dans le ta-

    bleau du haut.

    Dans le tableau du bas,

    nous allons dcrire ce

    cas de charge. Ceci

    peut tre fait par des

    Load Set ensemble

    de charges sur divers

    lments, ou plus sim-

    plement par une des-

    cription directe du

    chargement sans passer

    par un load set , ce

    que nous allons faire :

    Dans le tableau du bas de definition de (G1-101), demander lajout dune charge.

    Type d

    e C

    he

    rge

    Choisir Uniform load et Self weight-just as load pour de-finir le type de charge.

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 5-22

    Bentley Systems France

    Poid

    s P

    ropre

    Dfinir les lments

    dont on va prendre en

    compte le poids propre.

    Le vecteur est vertical

    vers le bas (-Y), il nest pas ncessaire de red-

    finir la densit si nous

    prenons celle par dfaut

    du bton. Cette valeur

    peut permettre de tenir

    compte le cas chant

    de bossages ou paissi-

    cements locaux des

    mes et hourdis. Nota:

    Tous les lments sont

    cits car nous avons

    coch Load only ele-ments, activated in cur-

    rent stage.

    Tous les autres chargements sont effectus de la mme manire.

    Choisir Ajout Aprs pour dfinir un cas de charge supplmentaire. Nota : cocher. Load only elements, activated in current stage!

    Table

    Name: G1-Ph1 G1-Ph2

    Duration-Type: Permanent Permanent

    Loadmanag.: G1 G1

    Description: Poids Propre Phase 1 Poids propre Phase 2

    Choisir Ajout Aprs pour dfinir un cas de charge supplmentaire.

    Table

    Name: G2-Sup

    Duration-Type: Permanent

    Loadmanag.: G2

    Description: Charges Permanentes Addition-

    nelles

    Choisir Ajout Aprs pour dfinir deux cas de charge supplmentaires.

    Table

    Name: PT-Cab1 PT-Cab2

    Duration-Type: Permanent Permanent

    Loadmanag.: PT PT

    Description: Prcontrainte Phase 1 Prcontrainte Phase

    2

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 5-23

    Bentley Systems France

    Choisir Ajout Aprs pour dfinir trois cas de charge supplmentaires.

    Table

    Name: RF-1 RF-2 RF-inf

    Duration-Type: P P P

    Loadmanag.: RF RF RF

    Description: Retrait et Fluage

    Phase1 Retrait et Fluage

    Phase 2 Retrait et Fluage

    t=oo

    Choisir Ajout Aprs pour dfinir deux cas de charge supplmentaires.

    Table

    Name: LC-GT LC-V

    Duration-Type: Non Permanent Non Permanent

    Loadmanag.: - -

    Description: Gradient de Temprature

    (+10C) Vent

    Pour chaque cas de charge cr, nous allons maintenant dfinir les chargements propres

    appliquer

    Confre les tables ci-dessous

    Dans la table du bas, le cas de charge tant slectionn dans la table du haut, presses

    Ajout aprs.

    LC

    P

    oid

    s p

    rop

    re

    Loading Case: G1-Ph1 G1-Ph2

    Insert: Tableau Bas Tableau Bas

    Actual loading: Uniform load Uniform load

    Loading type: Self Weight Self Weight

    Confirm: OK OK

    From: 101 101

    To: 120 120

    Step: 1 1

    Rx: - -

    Ry: -1 -1

    Rz: - -

    Type: Real length Real length

    Confirm: OK OK

    Tous les lments

    ont t slectionns

    car Load only elements, activated

    in current stage

    est activ

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 5-24

    Bentley Systems France

    Toujours dans le tableau bas, aprs activation de G2-299. Charge concentrique rpartie

    LC

    C

    ha

    rges P

    erm

    anente

    s

    Loading case: G2-Sup

    Insert: Tableau bas

    Actual load: Uniform load

    Loading type: Concentric load

    Confirm: OK

    From: 101

    To: 120

    Step: 1

    Qx: -

    Qy: -30.0

    Qz: -

    Type1: Global

    Type2: Real length

    Type3: Load/Length

    unit

    Confirm: OK

    Toujours dans le tableau bas, aprs activation des cas PT- ???. Charge concentrique r-

    partie

    LC

    P

    rcontr

    ain

    te

    Loading case: PT-Cab1 PT-Cab2

    Insert: Tableau Bas Tableau Bas

    Actual load: Pre-

    stressing Pre-

    stressing

    Loading type: Stress tendon Stress tendon

    Confirm: OK OK

    From: 101 102

    To: 101 102

    Step: 1 1

    Type: Increment -

    Force Increment -

    Force

    Confirm: OK OK

    Pour le retrait Fluage, aucune charge locale dfinir, seul le temps sera entr.

    LC

    R

    F

    Loading case: RF-1 RF-2 RF-Inf

    Insert: Pas dentre ncessaire

    Pas dentre ncessaire

    Pas dentre ncessaire

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 5-25

    Bentley Systems France

    Toujours dans le tableau bas, aprs activation des cas indiqus. Charge de temprature et

    de vent

    Ch

    arg

    es P

    erm

    an

    ente

    s A

    dd

    itio

    nne

    lles

    Loading case: LC-GT Loading case: LC-V

    Insert: Lower Listing Insert: Lower Listing

    Actual Load: Initial

    Stress/Strain Actual Load: Uniform Load

    Load Type: Temperature

    load Load Type: Concentric load

    Confirm: OK Confirm: OK

    From: 101 From: 101

    To: 120 To: 120

    Step: 1 Step: 1

    Alpha (1/C): 1e-005 Qx: -

    DT-G (C): 10.0 Qy: -

    DT-Y (C): - Qz: 2.00

    H-Y (m): - Typ1: Global

    DT-Z (C): - Typ2: Real Length

    H-Z (m): - Typ3: Qz multiply

    Load with Cs depth

    Confirm: OK Confirm: OK

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 6-26

    Bentley Systems France

    6 Calendrier de Construction

    Tous ce qui est ncessaire pour dfinir le phasage de construction se trouve sous ce para-

    graphe. Les lments seront activs selon le calendrier.

    Le tableau haut indique les phases proprement parl, leur ordre doit tre correct !

    Le tableau bas va indiquer les lments nouvellement actives dans cette phase avec lage du bton ce moment l.

    6.1 Actions et Activation des Phases

    6.1.1 Dfinition de phases Individuelles

    Con

    str

    . S

    tages

    Choisir Schedule et Stages pour dfinir une nouvelle phase.

    Apuyer sur Ajout Aprs dans le tableau haut

    Constr

    . S

    tage

    Choisir un numro ou

    un nom court pour la

    phase (Phase1).

    Insrer de mme les phases suivantes

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 6-27

    Bentley Systems France

    Table

    Name: Phase1 Phase2 Phase3 AjoutCharge

    List: - - - -

    Duration: - - - -

    Descrip-tion:

    Phase 1 Phase 2 Phase 3 Ajout Charges Supplmentaires

    6.1.2 Activation des nouvelles phases

    Constr

    . S

    tage

    Pour chaque phase

    nous allons dfinir les

    lments active pour

    cette phase

    Positionner vous sur la

    premire ligne du ta-

    bleau haut, et choisir

    activation dans

    larborescence.

    Dans le menu du bas, ajouter les activations:

    Activation

    Pour la phase 1, nous

    activerons les lments

    de tablier 101 112

    sans oublier les sup-

    ports 1100 et 1200!

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 6-28

    Bentley Systems France

    Faire de mme pour la phase 2!

    Activation

    Constr. Stage: Phase1 Phase1

    Insert: Tableau bas Tableau bas

    Type: Active Active

    From: 101 1100

    To: 112 1200

    Step: 1 100

    Age: 14 14

    ts: - -

    Confirm: OK OK

    Activation

    Constr. Stage: Phase2 Phase2

    Insert: Tableau bas Tableau bas

    Type: Active Active

    From: 113 1300

    To: 120 1300

    Step: 1 100

    Age: 14 14

    ts: - -

    Confirm: OK OK

    6.1.3 Actions de calcul pour chaque chargement

    Action

    Dans larborescence, passer de activa-

    tion Schedule

    Actions

    Aprs avoir slectionn la Phase 1 dans le tableau du bas, presser licne dajout du ta-bleau bas

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 6-29

    Bentley Systems France

    Actions

    Parmi toutes les actions

    disponibles, il en est

    une qui peut se faire de

    2 manires. Nous avons

    dfini des cas de charge

    avec des stockage par

    somme. Ces fichiers

    doivent tre initialiss

    par des 0 toutes les

    valeurs. Ceci peut se

    faire par la commande

    LcInit.

    Mais cela peut aussi se

    faire automatiquement

    au moment de lancer

    les calculs en cochant

    Init Load Manager.

    Attention ces deux op-

    tions sont exclusives

    car un fichier ne peut

    tre initialis quune seule fois. Par contre la

    commande LcInit per-

    met ventuellement

    dinitialiser un cas de charge avec des valeurs

    dj calcules.

    Actions

    Si vous choisissez LcI-

    nit, le Input 1 peut

    tre un cas de charge

    existant. Dans notre

    cas, il suffit de marquer

    le fichier de sortie G1

    Confirm

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 6-30

    Bentley Systems France

    Si vous choisissez dinitialiser en bloc au moment du calcul, ignorez le premier tableau suivant

    Actions

    Phase1

    Constr. Stage: Phase1 Phase1 Phase1 Phase1 Phase1

    Insert: Tableau Bas Tableau Bas Tableau Bas Tableau Bas Tableau Bas

    Action: LC/Envelope Actions

    LC/ En-velope Ac-

    tions

    LC/ En-velope Ac-

    tions

    LC/ En-velope Ac-

    tions

    LC/ En-velope Ac-

    tions

    Type: LcInit LcInit LcInit LcInit LcInit

    Confirm: OK OK OK OK OK

    Input 1: - - - - -

    Input 2: - - - - -

    Input 3: - - - - -

    Output 1: G1 G2 PT RF PERM-SUM

    Output 2: - - - - -

    Delta-T: - - - - -

    Description: - - - - -

    Confirm: OK OK OK OK OK

    Actions

    Phase

    1

    Constr. Stage: Phase1 Phase1 Phase1 Phase1 Phase1

    Insert: Tableau Bas Tableau Bas Tableau Bas Tableau Bas Tableau Bas

    Action: Calcula-tion (Static)

    Calcula-tion (Static)

    Calcula-tion (Static)

    Calcula-tion (Static)

    Calcula-tion (Static)

    Type: Calc Stress Calc Grout Creep

    Confirm: OK OK OK OK OK

    Input 1: G1-Ph1 - PT-Cab1 101 1

    Input 2: - Tension1 - - -

    Input 3: - - - - -

    Output 1: - - - - RF-1

    Output 2: * - * - *

    Delta-T: - - - - 28

    Description: - - - - -

    Confirm: OK OK OK OK OK

    Puis dfinir pour la phase 2

    Actions

    Sta

    ge2

    Constr. Stage: Phase2 Phase2 Phase2 Phase2 Phase2

    Insert: Tableau Bas Tableau Bas Tableau Bas Tableau Bas Tableau Bas

    Action: Calcula-tion (Static)

    Calcula-tion (Static)

    Calcula-tion (Static)

    Calcula-tion (Static)

    Calcula-tion (Static)

    Type: Calc Stress Calc Grout Creep

    Confirm: OK OK OK OK OK

    Input 1: G1-Ph2 - PT-Cab2 102 1

    Input 2: - Tension2 - - -

    Input 3: - - - - -

    Output 1: - - - - RF-2

    Output 2: * - * - *

    Delta-T: - - - - 28

    Description: - - - - -

    Confirm: OK OK OK OK OK

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 6-31

    Bentley Systems France

    Remplissons la phase3, qui reprsente la livraison de louvrage et son vieillissement

    Actions

    Sta

    ge99

    Constr. Stage: Phase3 Phase3

    Insert: Tableau Bas Tableau Bas

    Action: Calcula-tion (Static)

    Calcula-tion (Static)

    Type: Calc Creep

    Confirm: OK OK

    Input 1: G2-Sup 3

    Input 2: - -

    Input 3: - -

    Output 1: - RF-Inf

    Output 2: * *

    Delta-T: - 10000

    Description: - -

    Confirm: OK OK

    Enfin les charges variables. Pour le vent nous ferons un fichier enveloppe ne prenant en

    compte que les effets dfavorables du vent quite a appliquer le vent contraire (-

    )(SupAndXLc)

    Actions

    AddL

    oads

    Constr. Stage: AjoutCharge AjoutCharge AjoutCharge AjoutCharge

    Insert: Tableau Bas Tableau Bas Tableau Bas Tableau Bas

    Action: Calcula-tion (Static)

    Calcula-tion (Static)

    LC/envelope actions

    LC/ en-velope ac-

    tions

    Type: Calc Calc SupInit SupAndXLc

    Confirm: OK OK OK OK

    Input 1: LC-GT LC-V - Vent.sup

    Input 2: - - - LC-V

    Input 3: - - - -

    Output 1: - - Vent.sup -

    Output 2: * * - *

    Delta-T: - - - -

    Description: - - - -

    Confirm: OK OK OK OK

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 7-32

    Bentley Systems France

    7 Trafic

    7.1 Dfinition des Charges de Trafic

    Le trafic dans notre cas ne correspond pas un convoi standard dun code quelconque.

    Cale

    ndrier

    Dans Schedule choi-sir Load Definition .

    Voie

    s

    Choisir Traffic La-nes pour afficher les voies de circulation

    dj dfinies (Vide).

    Ajouter une dfinition de voie

    Voie

    1

    Choisir 1 pour la voie

    1. Le rsultat sera stoc-

    k dans le fichier la-

    ne0001.lst

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 7-33

    Bentley Systems France

    Choisir Insrer aprs pour dfinir la position de la voie1

    Voie

    1

    Des MACROS sont

    disponibles pour mo-

    dliser les voies de cir-

    culation sur les l-

    ments. Les macros ci-

    tes dans le tableau

    assure le calcul de ligne

    dinfluence pour une charge unitaire dans les

    conditions dfinies par

    la Macro.

    Choisir Macro2 pour des voies excentres

    sur le tablier

    pressez

    Voie

    1

    Un tableau vide est

    affich

    pressez ajout aprs pour dfinir la srie

    dlments

    Voie

    1

    Remplir le tableau avec

    les valeurs ainsi dfi-

    nies.

    Ces entres correspon-

    dent une voie excen-

    tre de -2m le long des

    lments101 120.

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 7-34

    Bentley Systems France

    La

    ne

    1

    La voie est dfinie dans

    le tableau du haut, le

    chargement unitaire

    correspondant est dfini

    dans le tableau du bas.

    Confirmez et ajouter

    une nouvelle Voie

    La deuxime voie est identique mais avec une excentricit de +2m.

    La

    ne

    2

    Remplir le menu com-

    me indiqu.

    Pressez

    La dfinition des voies est maintenant finie.

    Ltape suivante consiste dfinir le convoi.

    LT

    rain

    Choisir Load Trains dans larborescence pour dfinir le convoi.

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 7-35

    Bentley Systems France

    Tous les convois sont montrs dans la partie haute du tableau. Chaque convoi est dtaill

    dans la partie basse.

    Ajouter aprs, dans le tableau bas pour dfinir le premier convoi

    LT

    rain

    Accepter les valeurs

    par dfaut 1.

    Note: Certains codes

    ont des facteurs diff-

    rents pour les valeurs

    minimales et maximales

    de charges.

    .

    Confirmez

    LT

    rain

    Nous entrons les char-

    ges de trafic dcrites en

    dbut de manuel.

    Appuyer sur licne dajout aprs

    15 [kN/m]

    200 [kN]

    2 [m] 2 [m]

    15 [kN/m]

    200 [kN]

    2 [m]

    Entre 1

    Entre 2

    Entre 3

    Entre 4

    Entre 5

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 7-36

    Bentley Systems France

    LT

    rain

    Dfinir une charge re-

    partie de 15KN qui sera

    applique dans les zo-

    nes dfinies par le cal-

    cul de ligne dinfluence

    Confirmez

    Insrez les valeurs suivantes du tableau.

    Table

    Load train: 1 1 1 1 1

    Insert: Tableau Bas Tableau Bas Tableau Bas Tableau Bas Tableau Bas

    Q [kN/m]: -15.0 - - - -15.0

    F [kN]: - - -200.0 -200.0 -

    Input 1: - - - - -

    Input 2: Free

    Length - - -

    Free

    Length

    L-from: - 2 2 2 -

    L-to: - 2 2 2 -

    L-step: - 2 2 2 -

    Confirm: OK OK OK OK OK

    Vous pouvez vrifier

    laspect du convoi en appuyant sur i

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 7-37

    Bentley Systems France

    7.2 Calcul des Actions en tant que Phase

    Constr

    . S

    chedule

    Choisir Schedule and Stages et Activa-tions pour dfinir une nouvelle phase TRA-

    FIC

    Choisir ajout aprs

    Table

    Name: TRAFIC

    List: -

    Duration.: -

    Description: Charge de trafic

    Pas dactivation puisque lensemble des lments est dj actif

    Action

    Choisir Schedule Ac-tion pour dfinir ce que le logiciel doit cal-

    culer

    Ajouter aprs dans le tableau du bas, et initialiser les fichiers enveloppe.

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 7-38

    Bentley Systems France

    Table

    Constr. stage: TRAFIC TRAFIC TRAFIC

    Insert: Tableau Bas Tableau Bas Tableau Bas

    Action: LC/Envelope action

    LC/Envelope action

    LC/Envelope action

    Type: SupInit SupInit SupInit

    Confirm: OK OK OK

    Input 1: - - -

    Input 2: - - -

    Input 3: - - -

    Output 1: Voie1.sup Voie2.sup Trafic.sup

    Output 2: - - -

    Delta-T: - - -

    Description: - - -

    Confirm: OK OK OK

    Ajouter Aprs, les calculs de charge de trafic en fonction des paramtres dj entrs.

    Table

    Constr. stage: TRAFIC TRAFIC TRAFIC TRAFIC

    Insert: Tableau Bas Tableau Bas Tableau Bas Tableau Bas

    Action: Calcula-tion (Static)

    Calcula-tion (Static)

    Calcula-tion (Static)

    Calcula-tion (Static)

    Type: Infl Infl LivelL LivelL

    Confirm: OK OK OK OK

    Input 1: 1 2 1 2

    Input 2: - - 1 1

    Input 3: - - - -

    Output 1: lane0001.inf lane0002.inf Voie1.sup Voie2.sup

    Output 2: * * - -

    Delta-T: - - - -

    Description: - - - -

    Confirm: OK OK OK OK

    Table

    Constr. stage: TRAFIC TRAFIC

    Insert: Tableau Bas Tableau Bas

    Action: LC/Envelope action

    LC/Envelope action

    Type: SupAddSup SupAddSup

    Confirm: OK OK

    Input 1: Trafic.sup Trafic.sup

    Input 2: Voie1.sup Voie2.sup

    Input 3: - -

    Output 1: - -

    Output 2: * *

    Delta-T: - -

    Description: - -

    Confirm: OK OK

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 8-39

    Bentley Systems France

    8 Combinaison de Cas de charge pour vrification au Code

    8.1 Table de Combinaison

    Sched

    ule

    Choisir Schedule et Load Definition pour ouvrir la dfini-

    tion des charges

    Com

    b.

    Choisir Load Combi-nation dans larborescence

    Choisir Ajout Aprs pour entrer pour un cas de charge, les coefficients appliqus dans la

    combinaison.

    Com

    bin

    ations

    Choisir pour Load Case le groupe PP1 (G1 poids propres).

    Utilisez la loi de com-

    binaison SupAddLc , ajout inconditionnel

    des cas de charge.

    .

    Confirmez

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 8-40

    Bentley Systems France

    Continuez ajouter des lignes avec les valeurs suivantes

    Table

    Comb. Table:

    Result Type: LCase LCase LCase LCase

    Name: PP1 PP2 PT RF

    Comb. Law: SupAddLc SupAddLc SupAddLc SupAddLc

    favourable I: 1 1 1 1

    unfavourable I: 1 1 1 1

    favourable II: 1.35 1.35 1 1

    unfavourable II: 1.35 1.35 1 1

    favourable III: - - - -

    unfavourable III: - - - -

    Confirm: OK OK OK OK

    Table

    Comb. Table:

    Result Type: LCase superpo-

    sition superpo-

    sition

    Name: LC-GT Vent.sup Trafic.sup

    Comb. Law: SupAddLc SupAddSup SupAddSup

    favourable I: 1 1 1

    unfavourable I: 1 1 1

    favourable II: 0.8 0.8 1.5

    unfavourable II: 0.8 0.8 1.5

    favourable III: - - -

    unfavourable III: - - -

    Confirm: OK OK OK

    8.2 Actions de Calcul pour les Combinaisons de Cas de Charge

    Schedule

    Choisir Schedule et Stages pour ouvrir la liste des phases

    Insrer une nouvelle phase qui lancer le calcul des combinaisons

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 8-41

    Bentley Systems France

    Table

    Name: Comb

    List file: -

    Duration.: -

    Description: Load Combination

    Action

    Choisir Schedule Ac-tions pour dfinir les actions effectuer

    Ajouter Aprs, avec les valeurs suivantes pour lancer les 2 combinaisons dfinies et

    stocker les rsultats

    Table

    Constr. Stage: Comb Comb

    Insert: Tableau Bas Tableau Bas

    Action: LC/envelope action

    LC/envelope action

    Type: SupComb SupComb

    Confirm: OK OK

    Input 1: 1 2

    Input 2: - -

    Input 3: - -

    Output 1: Comb1.sup Comb2.sup

    Output 2: - -

    Delta-T: - -

    Description: - -

    Confirm: OK OK

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 9-42

    Bentley Systems France

    9 Vrifications au Code

    9.1 Vrification de contrainte aux fibres (ELS)

    9.1.1 Action de calcul de vrification des contraintes aux fibres

    Constr

    . S

    ched.

    Choisir Schedule et Stages pour dfinir une nouvelle phase de

    calcul des vrifications

    aux fibres

    Insrer Aprs la tche suivante

    Table

    Name: ELS

    List file: -

    Duration.: -

    Description: Vrification Fibres

    Ajouter Aprs, dans la table du bas laction suivante

    Table

    Constr. Stage: ELS

    Insert: Tableau Bas

    Action: Check Actions (SUP)

    Type: FibSup

    Confirm: OK

    Input 1: Comb1.sup

    Input 2: 1

    Input 3: -

    Output 1: -

    Output 2: *

    Delta-T: -

    Description: -

    Confirm: OK

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 9-43

    Bentley Systems France

    9.2 Vrification aux tats limites ultimes (ELU)

    9.2.1 Action de Calcul pour vrification aux tats limites ultimes

    Constr

    . S

    tage

    Choisir Schedule et Stages pour dfinir une nouvelle tape de

    calcul.

    Ajouter Aprs, le calcul de vrification aux tats limites ultimes

    Table

    Name: ELU

    List file: -

    Duration.: -

    Description: Vrification ELU

    Ajouter dans le tableau du bas les actions suivantes.

    Table

    Constr. Stage: ELU ELU ELU ELU

    Insert: Tableau Bas Tableau Bas Tableau Bas Tableau Bas

    Action: LC/Envel

    pe action Checking action (Sup)

    Checking action (Sup)

    Checking action (Sup)

    Type: SupInit ReiIni UltSup UltSup

    Confirm: OK OK OK OK

    Input 1: - - Comb2.sup Comb2.sup

    Input 2: - - Rein UltMz

    Input 3: - - - -

    Output 1: Ult-

    Comb2.sup - -

    Ult-Comb2.sup

    Output 2: - - * *

    Delta-T: - - - -

    Description: - - - -

    Confirm: OK OK OK OK

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 10-44

    Bentley Systems France

    10 Lancement du calcul suivant calendrier

    Maintenant que nous avons dfini toutes les donnes de charges et de calcul, nous pouvons

    lancer lanalyse.

    10.1 Lancement du Calcul

    Calc

    ul

    Appuyer sur la touche

    Recalc pour lancer

    lanalyse

    Dm

    arr

    age d

    es C

    alc

    uls

    Avant de lancer le cal-

    cul nous devons indi-

    quer dans quel fichier

    se fait les sommations.

    Ce sera PERM-SUM.

    Dautre part suivant si vous avez fait ou pas

    les initialisations des

    cas de charges, il faut

    cocher ou dcocher Init

    Load Manager

    Dmarrer le calcul en

    appuyant sur

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 11-45

    Bentley Systems France

    11 Prsentation des Rsultats Post-Processing

    Tout type de rsultat (forces, dplacement, contraintes,..) peut tre affich numriqauement

    ou graphiquement. Pour les graphiques, un certain nombre dactions doivent tre prpares et ajoutes au calendrier de calcul.

    11.1 Rsultats Numriques

    11.1.1 Listings Standards

    Plusieurs fichiers sont gnrs automatiquement pendant le calcul. Les rsultats des cas de

    charge peuvent tre consults au moyen de lditeur. Tous ces listings contiennent efforts et dplacement, pour les lments et les cbles.

    Dautre part, les fichiers dcrivant lensemble des entres sont aussi produits afin de vri-fier les hypothses de calcul.

    Choisir licne de lancement de lditeur

    Lis

    tings

    Slectionner le rper-

    toire (Default Sche-dule) qui rassemble les fichiers .lst et choi-

    sir le fichier que vous

    voulez diter

    11.1.2 Revue Interactive des Rsultats

    Tous les rsultats peuvent aussi tre obtenus interactivement. La procdure suivante doit

    tre utilise.

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 11-46

    Bentley Systems France

    Rsulta

    ts

    Choisir Results et Loading Cases pour ouvrir les tableaux de

    rsultats

    Rsulta

    ts L

    Case

    Le listing affich mon-

    tre les efforts pour le

    chargement G1. Vous

    pouvez ainsi faire dfi-

    ler les diffrents cas de

    charge.

    Nous pouvons aussi obtenir les Minima et Maxima.

    Les rsultats peuvent tre obtenus de 3 manires:

    Primary: Effets Primaires : uniquement effets isostatiques des charges

    Secondary: Effets secondaires : effets hyperstatiques des charges.

    Total: Primary + Secondary = Total.

    Si vous slectionnez Diagram en bas droite, les composants dsirs peuvent tre affi-chs graphiquement de manire simple.

    Choisir Results et Envelopes pour afficher les rsultats des combinaisons de la mme manire.

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 11-47

    Bentley Systems France

    11.2 Rsultats Graphiques

    11.2.1 RMSets

    Pour un affichage rapide et ais des Efforts, Dplacements, Contraintes et Armatures, il

    existe la possibilit de dfinir, ce que lon nome des RMSets. Avec quelques commandes un trac peut tre dfini, affich et incorpor dans le calendrier de construction.

    RM

    Sets

    Choisir Properties et RMSets pour dfinir un ou plusieurs groupes

    dont on veut construire

    la reprsentation gra-

    phique (et numrique)

    des rsultats.

    .

    RM

    Sets

    Le tableau du haut

    montre les noms pour

    le RMSet choisi (vide

    pour linstant). Tous les RMSets peuvent tre

    utiliss au cours du

    phasage de construc-

    tion. Vous pouvez ajou-

    ter tout instant les

    actions y affrant au

    cours du calendrier de

    construction. Les

    RMSets produiront des

    graphiques et des lis-

    tings.

    Choisir Ajout Aprs pour ajouter un nouveau RMSet.

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 11-48

    Bentley Systems France

    RM

    Set

    - N

    ouvea

    u

    Ce nouveau RMSet est

    suppose montrer la

    valeur du moment MZ

    la fin de la premire

    phase de construction.

    (Phase1-MZ)

    Appuyer sur I pour obtenir le menu de saisie interactif.

    Lis

    te

    lm

    ents

    Choisir Elements and Nodes pour dfinir les lments tracer.

    Choisir Element of a group: TAB.

    Une fois que tous les

    lments ont t choi-

    sis, confirmez vos

    choix en appuyant sur

    licne Insrer Avant .

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 11-49

    Bentley Systems France

    Lis

    ting

    l

    ments

    Choisir Load Cases pour choisir le cas de charge..

    Choisir le cas PERM-SUM.

    Choisir le composant-

    Mz.

    Choisir insrez avant

    Sauvegarder la dfini-

    tion en appuyant sur

    Save.

    11.2.2 Diagrammes

    RM

    Set

    tracs

    Pour la configuration

    choisie, vous pouvez

    dfinir un nom de trac.

    Dfinir Dgm-Phase1-Mz.pl

    Pour voir le rsultat

    appuyez sur la com-

    mande plot diagram file

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 11-50

    Bentley Systems France

    11.2.3 Listings

    Impre

    ssio

    n R

    MS

    et

    Pour cette mme confi-

    guration vous pouvez

    definer un nom de lis-

    ting qui sera gnr

    Choisir Rep-Phase1-Mz.lst

    Pour voir le rsultat,

    appuyez sur write to report file

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 11-51

    Bentley Systems France

    11.2.4 Utilisation des RMSet dans le calendrier de construction

    Lis

    ting E

    lm

    ents

    Les RMSets peuvent

    tre incorops dans le

    calendrier de construc-

    tion. Caque fois que

    lon doit sauvegarder des rsultats graphiques

    ou numrique au cours

    du calendrier de cons-

    truction, on doit insrer

    laction suivante.

    Laction DgmSet est insre pour utiliser un

    RMSet pour tracer un

    diagramme.

    Laction DoRep est insrer pour utiliser un

    RMSet pour gnrer un

    listing.

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 11-52

    Bentley Systems France

    11.3 Reprsentation Graphique des Rsultats

    Tra

    cs

    Choisir Results, Plot et Directory pour afficher tous les

    graphiques..

    11.3.1 Plot

    Plot contient les types suivants:

    Directory: Tous les Rm-Sets sont lists ici en tant que plot.

    Plot Container: un ou plusieurs Plots avec des plot-dfinitions de RM (cf ci-dessous)

    RMSet: Tous les RM-Sets sont lists

    PLSYS: Une liste des fichiers ASCII *.rm venant de versions antrieures de RM.

    C&S: Retrait & Fluage

    Choisir Plot Container et ouvrir un nouveau Plot Container.

    Plo

    t C

    onta

    iner

    Choisir un nouveau

    nom ou accepter le nom

    par dfaut propospar

    le programme.

    .

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 11-53

    Bentley Systems France

    Tra

    c

    Pro

    fil

    Pressez Insrez aprs

    Tra

    c

    Pro

    fil

    Choisir un nouveau

    nom ou accepter le nom

    par dfaut propos par

    le programme.

    Dautre sorties peuvent tre gnres, utilisant les Macros proposes.

    Macro

    Choisir Macro pour crer un plot standard.

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 11-54

    Bentley Systems France

    Macro

    Choisir Loading case result afin dafficher les rsultats dun cas de charge. La donne du

    champ Plot Profile est utilise pour sauve-

    garder les entres.

    Pressez: Run Macro

    Macro

    Choisir les lments

    afficher (Group: Ta-

    blier).

    Choisir les rsultats

    afficher sur les l-

    ments (Dplacements et

    Efforts)

    Dpendant du type de Plot-Container, le bouton Info ouvre le menu appropri. Des mo-difications ou des ajouts peuvent alors tre faits.

    Choisir I pour ouvrir le contenu du trac (= Editeur de trac).

    Lditeur de trac permet la dfinition et la modification des graphiques et tracs de profils. Le rsultat sera un plot File. Ce Plot File contient la taille de la feuille (page) et une ou

    plusieurs vues. Une vue contient plusieurs objets.

    Trois niveaux peuvent tre dfinis et modifis. Les fonctions principales de modification,

    effacement et copie, sont accessibles par le menu suprieur.

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 11-55

    Bentley Systems France

    11.3.2 Affichage de Profils (Plot Profiles) dans le calendrier de construction

    Tra

    c

    Des commandes de

    traces de profils peu-

    vent tre insres tout

    moment dans le calen-

    drier de construction.

    Laction DoPlot est utilise pour dfinir le

    plot container et le Plot

    Profile utiliser pour

    gnrer un trac.

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 11-56

    Bentley Systems France

    Plo

    ttin

    g

    Utilisez la flche prs

    du champ de saisie

    pour choisir un plot

    container et un plot

    profile.

    Utilisez input1 et iput2

    pour renseigner les

    variables ventuelles du

    plot profile.

    11.3.3 Affichage Interactif des contraintes, efforts et dplacements:

    Plo

    ttin

    g

    Par un clic droit au

    milieu de la fentre

    vous accdez un me-

    nu contextuel.

    Prenez View Op-tions

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 11-57

    Bentley Systems France

    Tra

    c

    Cochez Draw cross sections et Draw CS mesh

    Cochez Draw ele-ment bodies et Draw detailed bo-dies

    Cochez Result et pressez Choose

    Tra

    c

    Choisir Load Case et slectionnez PERM-

    SUM.

    Cochez Stresses puis presses OK

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 11-58

    Bentley Systems France

    Plo

    ttin

    g

    La figure montre la

    distribution des

    contraintes sur les l-

    ments (Rouge : lev,

    vert : faible).

    Vous pouvez facile-

    ment afficher de la

    mme manire les d-

    placements et les ef-

    forts

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 12-59

    Bentley Systems France

    12 Export et Stockage

    12.1 Export du projet

    Toutes les donnes (sections, matriaux, systmes, calendrier,.) peuvent tre sauvegar-

    des dans un fichier ASCII au format descriptif puissant appel TCL utilise par RM . Cest un langage de programmation qui permet en particulier de dfinir des boucles..

    Export

    Choisir File et Ex-port TCL Project Da-

    ta pour crer le fichier ASCII

    Aucun rsultat ne sera

    stock, seules les en-

    tres sont sauvegar-

    des.

    Export

    Choisir un nom de fi-

    chier.

    Vous pouvez choisir ou

    pas de sauvegarder cer-

    taines parties des don-

    nes. Ceci est trs

    commode pour gnrer

    une trame partielle de

    donnes qui sera dite,

    modifie puis r-

    importe.

    Vous pouvez facile-

    ment diter ce fichier

    avec lditeur fournit

    avec RM, qui com-prend et corrige la syn-

    taxe TCL. Si vous r-importez des donnes,

    vous devez relancer les

    calculs (Recalc) pour

    prendre en compte les

    modifications dans les

    rsultats

  • RM Bridge

    D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 12-60

    Bentley Systems France

    12.2 Quiter le Programme

    Sort

    ir d

    e R

    M

    Pour sortir de RM pres-

    sez File et Exit

    RM, ou utilisez licne standard.

    Une sauvegarde du

    projet sous forme de

    TCL vous sera propo-

    se au moment de la

    sortie.