Richard C. Dean P.E. Experienced senior level project manager offers a unique combination of project management and leadership experience within the technology industries. He has extensive practice in providing strategic solutions to multiple industries including semiconductor manufacturing, pharmaceutical, chemical, ethanol, general manufacturing, laboratories and state and federal government/DOE groups. He also has proven abilities to deliver innovative results that fully support his client’s objectives. Continues to competently manage multiple assignments, while maintaining the highest emphasis on meeting the client’s cost and schedule needs and quality requirements. Has demonstrated ability to communicate effectively with clients, local state and federal officials, legal representatives, developers, and real estate personnel. Strengths are summarized: PROFESSIONAL EXPERIENCE : CRB Consulting Engineers - Cary, NC 2009-Present Responsible for managing project deliverables for biotech/pharmaceutical and microelectronics projects. Manage multidiscipline project teams from project kickoff through project as- builts phase. Maintain and manage project budgets, schedules and project documentation (i.e. scopes of work, change orders, cost reports, etc.) for all minor projects. Conduct design reviews and provide direction to design teams to meet client expectations for project deliverables. Kellogg Brown & Root, Inc., BE&K Division - Chester, VA 2007-2009 Responsible for managing project deliverables for minor projects (less than $500M) for DuPont and DuPont/Teijin Films joint venture business. Minor projects budget $5MM annually. Manage multidiscipline project teams from project kickoff through project as- builts phase. Maintain and manage project budgets, schedules and project documentation (i.e. scopes of work, change orders, cost reports, etc.) for all minor projects. Conduct design reviews and provide direction to design teams to meet client expectations for project deliverables. Worked with the owners to purchase and install process equipment including specialized air handling units for cooling of head rolls, upgrading of existing DI water system, design for flammable oil storage system, upgrading of instruments and control systems for solvent storage system and fire suppression system for hazardous chemical processing area. Technical HVAC Issues Cleanroom Design Strategic Planning Engineering Management Integrated Team Management Construction Management

Richard C. Dean P.E. - Cleanroom Construction Associatescleanroom-construction.net/wp-content/uploads/2015/...support deck, and equipment (RAB) facilitation including securing of all

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Richard C. Dean P.E. - Cleanroom Construction Associatescleanroom-construction.net/wp-content/uploads/2015/...support deck, and equipment (RAB) facilitation including securing of all

Richard C. Dean P.E.

Experienced senior level project manager offers a unique combination of project management and leadership experience within the technology industries. He has extensive practice in providing strategic solutions to multiple industries including semiconductor manufacturing, pharmaceutical, chemical, ethanol, general manufacturing, laboratories and state and federal government/DOE groups. He also has proven abilities to deliver innovative results that fully support his client’s objectives.

Continues to competently manage multiple assignments, while maintaining the highest emphasis on meeting the client’s cost and schedule needs and quality requirements. Has demonstrated ability to communicate effectively with clients, local state and federal officials, legal representatives, developers, and real estate personnel. Strengths are summarized:

PROFESSIONAL EXPERIENCE: CRB Consulting Engineers - Cary, NC 2009-Present

Responsible for managing project deliverables for biotech/pharmaceutical and microelectronics projects. • Manage multidiscipline project teams from project kickoff through project as-

builts phase. • Maintain and manage project budgets, schedules and project documentation

(i.e. scopes of work, change orders, cost reports, etc.) for all minor projects. • Conduct design reviews and provide direction to design teams to meet client

expectations for project deliverables.

Kellogg Brown & Root, Inc., BE&K Division - Chester, VA 2007-2009 Responsible for managing project deliverables for minor projects (less than $500M) for DuPont and DuPont/Teijin Films joint venture business. Minor projects budget $5MM annually. • Manage multidiscipline project teams from project kickoff through project as-

builts phase. • Maintain and manage project budgets, schedules and project documentation

(i.e. scopes of work, change orders, cost reports, etc.) for all minor projects. • Conduct design reviews and provide direction to design teams to meet client

expectations for project deliverables. • Worked with the owners to purchase and install process equipment including

specialized air handling units for cooling of head rolls, upgrading of existing DI water system, design for flammable oil storage system, upgrading of instruments and control systems for solvent storage system and fire suppression system for hazardous chemical processing area.

Technical HVAC Issues • Cleanroom Design

Strategic Planning • Engineering

Management Integrated Team Management • Construction Management

Page 2: Richard C. Dean P.E. - Cleanroom Construction Associatescleanroom-construction.net/wp-content/uploads/2015/...support deck, and equipment (RAB) facilitation including securing of all

AdvanceTEC LLC - Richmond, VA 2004- 2007 Managed design/build pharmaceutical/nanoscience/microelectronics projects ranging from $2.0M to $10.5 constructed value. Worked with owners to purchase and install process equipment included powder fill lines, de-pyrogenation sterilizers, unpackaging lines from the pharmaceutical side to wet process hoods, gas cabinets, VMBs and VMPs from the microelectronics side. • Norfolk State University – Norfolk, VA

Design/Build and Construction Manager for a 6,000 sq. ft. Class 100 R&D Nanotech Facility ($2,800,000) including mechanical services, cleanroom envelope, process systems, exhaust systems, structural engineering and EMI and Vibration Isolation Systems. Process systems include DI water system, process gases, chilled water system, acid exhaust, and solvent exhaust.

• US Navy Naval Research Laboratory - Washington, DC Design/Build and Construction Manager for 2,000 sq. ft. Class 100 R&D Nanotech Facility ($1,700,000) for Sensor Research, including mechanical services, cleanroom envelope, process systems, exhaust systems, structural engineering and EMI and Vibration Isolation Systems. Process systems include DI water system, process gases, chilled water system, acid exhaust, and solvent exhaust.

• Merck & Company- Primaxin Facility - Elkton, VA Grade A, B, & C Space Facility Infrastructure Design/Design/Build and Construction Manager for a 4,000 sq. ft. Aseptic Fill Suite for Manufacturing, including modular cleanroom suite and installation of the recirculation fan support deck, and equipment (RAB) facilitation including securing of all permits. Process systems include WFI water system, 20% Relative Humidity Control, chilled water system, exhaust systems, and architectural finishes.

• Merck & Company- Component Preparation Room - Elkton, VA Grade C Space Facility Retrofit Design/Design/Build and Construction Manager for a 1,000 sq. ft. Grade “C” Manufacturing modular cleanroom suite ($1,000,000) and modification of the HVAC supply system. Process systems include chilled water system, exhaust systems, and architectural finishes including flooring.

Lockwood Greene Engineers – Spartanburg, S.C. 1978- 2004

Project/Construction Manager Advanced Technology Group As the lead HVAC engineer was responsible for the design and construction support of cleanrooms controlled to ISO Class 1. Progressed to the position of project engineer responsible for the technical coordination of multiple specialized engineering disciplines. As a project/construction manager was responsible for managing projects up to $200,000,000 in constructed value. Selected to solicit and manage within the Advanced Technology Group, the design and construction of both large and small advanced technology projects. Primary focus was on identifying and securing projects, generating design and construction proposal including scope of services and pricing, scheduling, staffing, project execution, change management, budget control and client relations. • RF Micro Devices Fab 2– Greensboro, NC

Project manager for planning, design, tool hook-up design and construction support services for the conversion of 136,000 sq. ft. of distribution warehouse into an EPI semiconductor wafer fabrication facility utilizing

Page 3: Richard C. Dean P.E. - Cleanroom Construction Associatescleanroom-construction.net/wp-content/uploads/2015/...support deck, and equipment (RAB) facilitation including securing of all

Gallium Arsenide (GaAs) Heterojunction Bipolar Transistor (HBT) process technology and 150mm and 100mm wafers.

• RF Micro Devices Fab 3 – Greensboro, NC Project manager for planning, design, tool hook-up design and construction support services for a 223,517 sq. ft. greenfield semiconductor wafer fabrication facility utilizing Gallium Arsenide (GaAs) Heterojunction Bipolar Transistor (HBT) process technology and 150mm and 100mm wafers. Phases I and II included 30,187 sq. ft. (2,805 m2) of Class 10, Class 1,000 and Class 100,000 cleanrooms.

• Motorola, GDL – Guadalajara, Jalisco, Mexico Project Manager for the design effort. The project involved relocation of a product line in Phoenix and the renovation and installation into existing 30,000 SF area in Mexico. The completed spaces included Class 100 areas for the production of Rectifier devices using 6-inch wafers.

• Matsushita Semiconductor Corporation of America – Puyallup, WA Project manager for the process tool hookup phase of a new 100,000 sq. ft., 200mm semiconductor wafer fabrication facility. The project included the design and construction phase services for over 300 new tools.

• Motorola MOS 15 – Research Triangle Park, NC Project manager for a multi-task order on-site A/E services contract involving a wide range of activities from programming, planning and budgeting to detailed design and construction management One of these tasks was a fast-track expansion of Class 1 photolithography areas, etch areas, diffusion areas, chiller expansion, process gas, and DI water distribution systems expansions.

• National Semiconductor – South Portland, ME Project manager for a 52,000 SF addition involving a 3-level FAB expansion containing 17,000 SF of Class 1 Cleanroom area and HPM (liquid and gas) storage and distribution systems including process equipment tool hookup design.

• DOE Projects – Multiple Sites Project Engineer and lead HVAC on multiple projects at DOE sites including Y12 in Oak Ridge, TN and Savannah River Site in Augusta, GA. Project included working with DOE to upgrade site HVAC, electrical systems, security and fire suppression systems in manufacturing and laboratory spaces.

Education ■ B.S. in Mechanical Engineering, University of South Carolina

Additional Training ■ BBN Noise Control Course

Technical Skills ■ MS Project, Word, Excel, Outlook, Lotus Notes, Visio, AutoCAD,

Power Point and AutoCAD for Managers

Page 4: Richard C. Dean P.E. - Cleanroom Construction Associatescleanroom-construction.net/wp-content/uploads/2015/...support deck, and equipment (RAB) facilitation including securing of all

Professional Registrations ■ Florida, Kentucky, Maryland, Massachusetts, Missouri, North

Carolina, South Carolina, Virginia and Michigan

Professional Affiliations ■ Senior Member, Institute of Environmental Sciences and Technology