CITY OF LE SUEUR
REQUEST FOR COUNCIL ACTION
TO: Mayor and City Council FROM: Jasper Kruggel, City Administrator
Zach Doud, Finance Director SUBJECT: 2020 Budget Review
DATE: For the City Council meeting of November 12, 2019 PURPOSE/ACTION REQUESTED Provide an update for the 2020 Budget including the Tax Levy, Enterprise Budgets including rates, and Capital Improvement/Capital Equipment (CIP/CEP) for 2020-2024. SUMMARY Tax Levy No major changes have occurred to the Preliminary Tax Levy as City Staff has not gotten final information from all insurance providers (health, dental, auto, liability, etc.) for the 2020 fiscal year. City Staff has worked on the tax levy budget for the information that has been received and is working to make sure that all of the changes that have been received are able to get to the goal of City Staff of a 6.0% tax levy increase. As a reminder that the Preliminary Tax Levy was approved at 9.47% which results in a tax impact decrease of 2.48%. Some major points were the hiring of a Streets and Parks employee, change in allocation of the Community Development Director, reduction of revenues to be more accurate based on current projection of revenues, and finally the increase in number of pools hours which results in an increase in pool staff time. Enterprise Budgets Overall the Enterprise Budgets, with the exception of the Sewer Fund, are performing at a level that is sustainable if the City Council was not focused on planning for the future. Due to the City Council being focused on planning for the future of the City, Enterprise Budgets will all need to be increased slightly with this in mind. The Enterprise Budgets are all being adjusted to plan for the future and to cover the increased costs due to inflation increases. Water Fund: Additional planning for CIP/CEP, one additional W/WW Supervisor (50% funded by the Water Fund), reduction of bond costs due to a bond being paid off in 2019. These are the major changes for the Water Fund. Sewer Fund: First off, the budgets were designed without MRVPUC in mind and full operations of the Sewer Treatment Plants under the control of the City. With this being said, there are additional costs and additional revenues for this change. Again additional planning for CIP/CEP, and the additional W/WW supervisor (50% funded by the Sewer Fund). These are the major changes for the Sewer Fund. Electric Fund: Additional planning for CIP/CEP is the only major change for the Electric Fund.
Storm Water Fund: No major changes noted in the 2020. Refuse Fund: No major changes noted in 2020. Overall, Enterprise Budgets are all needing small changes to rates based on the CIP/CEP planning that City Staff and City Council has focused on over the past couple of years. The proposed utility rates for 2020 are in the tables below: Water Rates – Note that all rates per 1,000 gallons was $4.00 in 2019.
2019 Actual 2020 Proposed Meter Size Accessibility Fee (Monthly) Accessibility Fee (Monthly) Factor 5/8” meter $15.00 $20.00 1” meter $35.25 $47.00 135% 1.5” meter $70.50 $94.00 100% 2” meter $112.80 $150.40 60% 3” meter $225.60 $300.80 100% 4” meter $351.94 $469.25 56% 6” meter $703.87 $938.50 100% All accounts Absorbed in rates $0.81/month ($9.72/year) MDH testing fee
Tiered Rates
• 0-10,000 Gallons - $3.25 per 1,000 gallons • 10,001-20,000 Gallons - $3.75 per 1,000 gallons • 20,001 and up - $4.25 per 1,000 gallons
Non-Essential (Irrigation) Water
2019 Actual 2020 Proposed Meter Size Accessibility Fee (Monthly) Accessibility Fee (Monthly) Factor 5/8” meter $15.00 $5.00 1” meter $35.25 $11.75 135% 1.5” meter $70.50 $23.50 100% 2” meter $112.80 $37.60 60% 3” meter $225.60 $75.20 100% 4” meter $351.94 $117.31 56%
Tiered Rates
• 0-20,000 Gallons - $5.00 per 1,000 gallons • 20,001-40,000 - $6.00 per 1,000 gallons • 40,001 and up - $7.00 per 1,000 gallons
Electric Rates
2019 Actual 2020 Proposed Service Type Accessibility Fee (Monthly) Service Charge
(Monthly) Rate & Demand Factor
Large Industrial Service & Time of Use
$175.00 $180.00 10%
Large General Service
$34.00 $35.00 10%
General Service $18.00 $18.50 110%
Residential $8.00 $8.50 100% Rural $10.00 $10.50 125% Interdepartmental $10.00 $20.00 10% EAC (Energy Adjustment Charge)
5% 5% 5%
• Franchise Fee of $0.0042 per kWh • Underground Fee of $0.005 per kWh
Account Type Usage Type 2019 Actual 2020 Proposed Large Industrial Service & Time of Use
Demand (Oct-May) $9.89 $9.79 Demand (Jun-Sep) $14.80 $16.59 Time of Use Weekdays kWh
$0.05667 $0.05611
Time of Use Weekends kWh
$0.04834 $0.04786
Time of Use Off Peak $0.03445 $0.03411 Large General Service
Demand (Oct-May) $9.89 $9.79 Demand (Jun-Sep) $14.80 $16.59 kWh $0.05667 $0.05611
General Service kWh $0.1082 $0.10712 Residential kWh $0.10304 $0.10202 Rural kWh $0.11592 $0.11477 Interdepartmental kWh $0.5667 $0.05611
Sanitary Sewer Rates – Note that all rates per 1,000 gallons was $13.50 in 2019.
2019 Actual 2020 Proposed Meter Size Accessibility Fee (Monthly) Accessibility Fee (Monthly) Factor 5/8” meter $20.00 $25.00 1” meter $47.00 $58.75 135% 1.5” meter $94.00 $117.50 100% 2” meter $150.40 $188.00 60% 3” meter $300.80 $376.00 100% 4” meter $469.25 $586.56 56% 6” meter $938.50 $1,173.12 100%
Flat Rate of $12.85 per 1,000 gallons
Storm Water Rates
Stormwater Stormwater 2019 2020
MAX Acreage
Base Rate Charge Base Rate Charge
0.5 $ 8.00 $ 6.00 $ 9.50 $ 7.13 1 $ 8.00 $ 8.00 $ 9.50 $ 9.50 2 $ 8.00 $ 12.80 $ 9.50 $ 15.20 3 $ 8.00 $ 16.80 $ 9.50 $ 19.95 10 $ 8.00 $ 20.00 $ 9.50 $ 23.75
Refuse
Refuse Refuse 2019 (6% WM Increase) 2020 (2% WM Increase) Container Base Admi
n Recycling
9.75% TAX
TOTAL Base Admin
Recycling
9.75% TAX
TOTAL
96 Gallon $ 17.82
$ 2.45
$ 3.45
$ 2.31
$ 26.03
$ 18.17
$ 2.45
$ 3.51
$ 2.35
$ 26.49
64 Gallon $ 14.67
$ 2.05
$ 3.45
$ 1.97
$ 22.13
$ 14.96
$ 2.45
$ 3.51
$ 2.04
$ 22.97
32 Gallon $ 8.61
$ 1.35
$ 3.45
$ 1.31
$ 14.71
$ 8.78
$ 1.35
$ 3.51
$ 1.33
$ 14.97
2/96 Gallon
$ 28.42
$ 3.60
$ 3.45
$ 3.46
$ 38.92
$ 28.99
$ 3.60
$ 3.51
$ 3.52
$ 39.62
Senior $ 8.08
$ 1.30
$ 3.45
$ 1.25
$ 14.07
$ 8.24
$ 1.30
$ 3.51
$ 1.27
$ 14.33
Overall We will look at the Overall Utility Bill along with the Property Taxes to show the entire picture of how Utility Rates and Taxes will affect the City of Le Sueur Residents as they are proposed today. Average Home is valued at $189,100 in 2019 that uses 6,000 gallons on a ¾” meter, 450 kWh of electricity, 96 gallon refuse bin, and a .5 acre parcel. I have provided both the home with no increase in value from 2019 to 2020 and a home that increases 12% to $211,200 which is the tax capacity increase from 2019 to 2020.
2019 2020
Proposed Difference Water $39.00 $39.50 $0.50 Sewer $101.00 $102.10 $1.10 Electricity $56.17 $58.55 $2.38 Refuse $26.03 $26.49 $0.46 Stormwater $6.00 $7.13 $1.13 Total $228.20 $233.77 $5.57
No Value of Home Increase and 1/2 Dep
Average Utility Bill discussed previously w/no Sprinkler Home Value of $189,100 in 2019 Monthly Yearly 2019 2020 2019 2020 Average Utility Bill 228.20 $233.77 2,738.38 2,805.23 City Taxes 114.27 111.01 1,371.18 1,332.13 County Taxes 75.30 78.52 903.58 942.29 School Taxes (assuming no ref) 56.26 54.89 675.12 658.71 Total $474.02 $478.20 $5,688.26 $5,738.36 Total Change $4.18 Total Change $50.10 Total Percent 0.88% Total Change w/ No Utility Increases Monthly ($1.40) Yearly ($16.75)
Home Value Increase and 1/2 Dep Average Utility Bill discussed previously w/no Sprinkler Home Value of $189,100 in 2019 and Increased based on Tax Capacity Increase (12%) to $211,792 Monthly Yearly 2019 2020 2019 2020 Average Utility Bill 228.20 $233.77 2,738.38 2,805.23 City Taxes 114.27 124.33 1,371.18 1,491.98 County Taxes 75.30 87.95 903.58 1,055.37 School Taxes (assuming no ref) 56.26 61.48 675.12 737.76 Total $474.02 $507.53 $5,688.26 $6,090.34 Total Change $33.51 Total Change $402.08 Total Percent 7.07% Total Change w/ No Utility Increases Monthly $27.94 Total Change $335.23 5.89%
CIP/CEP Please see the attached CIP/CEP listing which shows all of the planned projects/equipment needs for the City from 2020-2024. RECOMMENDATION Provide feedback/ask questions about the 2020 budget overall to City Staff.
City of Le Sueur, MinnesotaCIP and CEP Plan 2020 - 2024
Department Project # 2020 2021 2022 2023 2024
Capital Lease Payment 30,200 16,000 16,000 16,000 16,000
Administration Total 30,200$ 16,000$ 16,000$ 16,000$ 16,000$
Taxiway Extension w/ Utilities 795,464
Pull Behind Finish Mower 14,000
2004 New Holland TV145 Tractor 225,000 Airport Hanger Construction Project 450,000
Airport Total 809,464$ 225,000$ 450,000$ -$ -$
Council Chamber AV Upgrades 25,000
City Council Total 25,000$ -$ -$ -$ -$
Capital Lease Payment 94,942 94,942 94,942 94,942 94,942
Underground Conversion 150,000 150,000 150,000 150,000 150,000
Expansion Joint Repairs to Building 10,000
Utility Billing Conversion 48,000
Fencing/Dirt Structure 15,000
Truck Replacement - 2008 70,000
Cost of Service Study 50,000
Distribution System Planning (DGR) 27,000
Future Projects 371,143
125 CFM Air Compressor 20,000
Skid Loader Replacement - 1994 70,000
Backhoe Replacement - 2007 75,000
Replace Boright II Substation Capacitors 75,000
SCADA System Maintenance 60,000
Jack Hammer Replacement 10,000
Double Bucket Truck Replacment - 2006 250,000
CSAH 22 Turnback Bond 110,000 110,000 110,000 110,000
Dump Truck Replacement - 1985 85,000
Digger Derrick Replacement - 1989 210,000
Underground Conversion Projects 900,000 Upgrade Main Street Substation Bond 115,000 115,000 115,000
Electric Total 836,085$ 914,942$ 1,664,942$ 469,942$ 469,942$
Administration
Airport
City Council
Electric
1 of 4 11/6/2019
City of Le Sueur, MinnesotaCIP and CEP Plan 2020 - 2024
Department Project # 2020 2021 2022 2023 2024
Capital Lease Payment 21,000 21,000 21,000 21,000 21,000
Fire Department Total 21,000$ 21,000$ 21,000$ 21,000$ 21,000$
Air Conditioner Replacement 5,000 Furnace Replacement 5,000
Library Total 5,000$ 5,000$ -$ -$ -$
Police Leases 19,500 19,500 19,500 19,500 19,500
Police Total 19,500$ 19,500$ 19,500$ 19,500$ 19,500$
Locker Room's Renovation Planning 5,000
Gym/Fitness Wall Project 30,000
Indoor Pool Resurfacing (Diamond Brite) 125,000
Ice Arena Water Heater 7,000
Outdoor Pool Diving Board 20,000
Outdoor Pool Bath Floors 5,000
Ice Arena Acoustic Panels 17,500
Fitness Equipment Lease Payment 72,000 72,000 72,000
Ice Arena Coolant 10,000 10,000 10,000 10,000
Ice Arean Coolant Conversion (Ammonia) 1,000,000
Hockey Scoreboard Replacment (1 and 2) 30,000
Zamboni Water Heater Replacement 7,000
Outdoor Pool Slide 90,000
Security System Maintenance 25,000
Outdoor Pool Feature 20,000
Outdoor Pool Media Filter 20,000 Outdoor Pool Caulking 7,000
Recreation Total 291,500$ 1,119,000$ 244,000$ 10,000$ -$
Capital Lease Payment 153,200 153,200 153,200 153,200 153,200
Annual Street Maintenance 450,000 450,000 450,000 450,000 450,000
Bruce Frank Field Rehabilitation 150,000
Police
Fire Department
Library
Recreation
Streets and Parks
2 of 4 11/6/2019
City of Le Sueur, MinnesotaCIP and CEP Plan 2020 - 2024
Department Project # 2020 2021 2022 2023 2024
1998 Ford F-250 Replacement 35,000
Outdoor Pickleball Court 70,000
POST Plan Contingency 50,000
1999 Ford F-150 Replacement 35,000
1995 Chevy Plow Truck Replacment 225,000
Legion Park Playground 250,000
2004 Ford Ranger Replacement 30,000
2001 EZ-GO Freedom Series Replacement 19,096
Annual Street Maintenance Projects 75,000
2008 Freightliner Water Truck Replacement 225,000
Curbing on Kingsway Trail 350,000
Inclusive Playground 850,000
Facility Roof Maintenance 5,000 5,000 50,000
Sign Maintenance Program 50,000 50,000 50,000 50,000
CSAH 22 Turnback Bond 175,000 175,000 175,000 175,000
Anderson Park Basketball Court Maintenance 25,000
Anderson Park Playground Mulch 6,000
Park Sign Replacement 6,000
Annual Street Maintenance Projects 75,000
2008 Ford F-150 Replacement 35,000
1973 John Deere 302 Tractor Replacment 100,000 2001 Freightliner Plow Truck Replacement 240,000
Streets and Parks Total 908,200$ 2,892,296$ 1,320,200$ 878,200$ 828,200$
Ferric Doors, Bldg B doors, screen room garage door 34,000
pH Probes & spectometer 25,000
RAS Gates (3 @ 5,000) 15,000
Kruger/Centrifuge SCADA Conversion 60,000
Locator 2,750
Future Projects 67,936
Capital Lease Payment 47,000 118,680 118,680 118,680 118,680
Sewer Slip Lining/Spot Repairs 50,000 50,000 50,000 50,000 50,000
Manhole Rehabilitation and Replacement 20,000 20,000 20,000 20,000 20,000
Fiber (Henderson Rd, Mayo, LS 4,6,9) 25,000 25,000 25,000 25,000 25,000
Sewer Video Camera Maintenance 100,000
Truck Replacement - 2006 3/4 Ton 65,000 CSAH 22 Turnback Bond 90,000 90,000 90,000 90,000
Wastewater Total 346,686$ 468,680$ 303,680$ 303,680$ 303,680$
Wastewater
3 of 4 11/6/2019
City of Le Sueur, MinnesotaCIP and CEP Plan 2020 - 2024
Department Project # 2020 2021 2022 2023 2024
Water Treatment Plant Maintenance 15,000
Booster Station Generator 40,000
Well House Roof Maintenance 10,000
SCADA Communication 48,181
Middle/Lower PRV Vault and Valving 95,000
Meters: Influent, Lower, Middle 40,000
Fluoride & Chlorine Systems Maintenance 90,000
Booster Station Pump 1 check valve/motor 16,000
Doppy Lane Water Main 550,000
Hometown BioEnergy water service 10,000
Cost of Service Study 25,000
Well Acccess Controls & Camera System 15,000 15,000 15,000
Well Inspections/Rehabilitation 40,000 35,000 35,000 35,000
Water Valve Replacement Projects 20,000 30,000 30,000 30,000
Fire Hydrant Repair and Replacement Projects 20,000 30,000 30,000 30,000
Capital Lease Payment 72,729 72,729 72,729 72,729 72,729
Water System Master Plan 1,900,000 1,350,000
Well House Fencing Projects 15,000 15,000 15,000
CSAH 22 Turnback Bond 120,000 120,000 120,000 120,000 Water Tower Inspection/Cleaning 25,000
Water Total 1,106,910$ 2,217,729$ 1,692,729$ 302,729$ 192,729$
4,399,545$ 7,899,147$ 5,732,051$ 2,021,051$ 1,851,051$
Water
Grand Total
4 of 4 11/6/2019