RÉSUMÉ (1992-2014)
INTERNAL AUDIT, MANAGEMENT AND ADMINISTRATION OF CONSTRUCTION
RESIDENTIAL INDUSTRIAL
COMERCIAL
AUTHOR: RANDY DE LA ROSA RUBALCAVA
2
MISSION
PHILOSOPHY
We are an organization which purpose is to satisfy and overcome the common expectative of the national and international industry of construction, by always achieving excellence in the management of construction work.
To integrate all the tasks involved in Planning and Controlling Construction Work, with the priority goal of finishing the project within time, cost and quality.
3
PROJECT MANAGEMENT SYSTEM
Procedure Manual
Control System
Not Failing Guarantee
VEGA has developed a methodology which allows us guarantee the complete satisfaction of our client achieving from a 20% to a 30% either is an industrial, commercial or residential project.
4
SERVICES OFFERED BY VEGA
VEGA
Construction Management
Project Management
Engineering Development
Internal AuditRedesign Procedure Manual Strategy
Supervision in MaintenancePersonal Services for
Administration
25% GUARANTEED SAVINGS
5
FOCUS ON OUR SERVICES
School and
Institutions
Residential
6
BENEFITS OF SUPERVISION
MO
RE (
$)
INV
ES
TEM
EN
T
TIME MORELESS
VEGA• Continuous presence at
construction site• Strict control of quality • Organized budget control• Direct coordination with
companies specialists• 25% guaranteed savings
and on in TIME and COST
TRADITIONAL SYSTEM• Lack of supervision• Lack of time and cost
control• No budget control• Poor quality• Extra Costs and Overhead
Costs• Generally a 25% more than
planned
7
PROJECT METHODOLOGY
We rely on our system that assures the best quality in our service provided based on the experienced workmanship and the procedure of our methodology that certifies our service quality. This is supported by specialists in different areas of construction, guarantying an excellent project closure.
General Statement
Financial Budget Control
Resource Estimation
1. Generate the Conceptual Project
II. Select Project Direction
III. Develop the Preliminary Project
IV. Develop the Executive Project
V. Invitation to Tender
VI. Management and Supervision
VII. Start Up and Tests
VIII. Settlement of Building Site
Tracking and Monitoring of Progress
8
OUR PROJECTSResidential, Commercial, Industrial, Apartments
9
OUR PROJECTSResidential, Commercial, Industrial, Apartments
10
INDUSTRIAL PROJECTSSome industrial projects
11
INDUSTRIAL PROJECTSSome industrial projects
12
COMMERCIAL RÉSUMÉ
13
CO
MM
ER
CIA
L R
ÉSU
MÉ
1) CLIENT: Cigarrera La Moderna 1. Rectangular and Semicircular Stables.PROJECT: Desarrollo Hípico “El Diente” 2. Food StorageLOCATION: Monterrey, Nuevo León 3. Roofed Riding School CONSTRUCTION: 100 Hectáreas 4. RoadsTERM: 1992 - 1995 5. High and Low Tension SystemPHONE: 83-47-78-07 6. TracksRESPONSIBLE: Ing. Gustavo Romo 7. International StablesCOST: $ 73,000,000.00
2) CLIENT: Propiedad de la Inmobiliaria INVEC, S. A. de C. V. (Fina Factor)PROJECT: Mall “Plaza Carranza”DESCRIPTION: Project Management and Mall ConstructionLOCATION: Monterrey, Nuevo LeónCONSTRUCTION: 4,950 m2
TERM: July-December 1992PHONE: 83-35-21-63/83-35-49-30RESPONSIBLE: Ing. Hugo ChapaCOST: $10,500,000.00
3) CLIENT: Propiedad de Inversiones Safi, S. A. de C. V.PROJECT: Best Western Royal HotelLOCATION: Monterrey, Nuevo León.CONSTRUCTION: 7,500 m2
TERM: November 1992.PHONE: 83-40-11-88/83-43-81-00RESPONSIBLE: Sr. Jorge Safi.COST: $8,500,000.00
4) CLIENT: Internacional de Inversiones, S.A. De C. V.PROJECT: San Agustín Medical CenterDESCRIPTION: Project Direction, Development of Preliminary Project, Permits and EngineeringLOCATION: San Pedro, Garza García, Nuevo León. CONSTRUCTION: 18,000 m2
TERM: From March to July 1993PHONE: 83-63-24-34/83-63-30-70RESPONSIBLE: Lic. Octavio HinojosaCOST: $30,000.00
5) CLIENT: Planeación Inmobiliaria Capital.PROJECT: Santa Elena BuildingDESCRIPTION: Engineering DirectionLOCATION: San Pedro, Garza García, Nuevo León.CONSTRUCTION: 3,000 m2
TERM: May 1995RESPONSIBLE: Lic. Luis Oseguera.COST: $6,000,000.00
14
6) CLIENT: Galáz, Gómez, Mortin, Chavero, Yamazaki, S.C.PROJECT: Corp. Torres Kumay.DESCRIPTION: Project Direction, Development of Preliminary Project, Permits and EngineeringLOCATION: Monterrey, Nuevo León.CONSTRUCTION: 21,000 m2
TERM: August de 1995.PHONE: 83-33-10-33 / 83-48-68-92 RESPONSIBLE: C.P. Ma. Estela Imamura, C.P. Celso Javier Treviño.COST: $30,000,000.00
7) CLIENT: Comercial América.PROJECT: Remodel of Cash Registers.LOCATION: San Pedro, Garza García, Nuevo León.CONSTRUCTION: 150 m2
TERM: March to April 1996.PHONE: 83-68-40-78RESPONSIBLE: C.P. Armando Fernández.COST: $200,000.00
8) CLIENT: Restaurante Remembers.PROJECT: Remodeling and construction of the new construction of the Restaurant Remembers.LOCATION: Monterrey, Nuevo León.TERM: April 1996PHONE: 83-78-44-14RESPONSIBLE: Arq. Felipe Mier.COST: $1,000,000.00
9) CLIENT: Comercial América.PROJECT: Office Remodeling of: Promotoría en Seguros.LOCATION: San Pedro, Garza García, Nuevo León.CONSTRUCTION: 400 m2
TERM: November1996.PHONE: 83-68-40-78RESPONSIBLE: C.P. Armando Fernández.COST: $900,000.00
10) CLIENT: Comercial América.PROJECT: Employee Dinning Room.LOCATION: San Pedro, Garza García, Nuevo León.CONSTRUCTION: 180 m2
TERM: January 1997.PHONE: 83-68-40-78RESPONSIBLE: C.P. Armando Fernández.COST: $550,000.00C
OM
MER
CIA
L R
ÉSU
MÉ
15
11) CLIENT: Bueno Alimentos, S.A. de C.V.PROJECT: Corp. for Bueno Alimentos, S.A. de C.V.DESCRIPTION: Direction of the Engineering and the Construction of the Office BuildingUBICATION: Monterrey, Nuevo León.TERM: December 1997 to January 1999.PHONE: 83-33-34-43RESPONSIBLE: Lic. Guillermo Bueno.COST: $500,000.00
12) CLIENT: Lic. Alejandro Bueno, Arq. Felipe Mier, Lic. Alfonso Guzmán.PROJECT: Apartments in the Project: Torre Blanca.LOCATION: San Pedro, Garza García, Nuevo León.TERM: May 1998.PHONE: 83-48-63-55RESPONSIBLE: Lic. Alejandro Bueno.COST: $2,500,000.00
13) CLIENT: Superficies Decorativas, S. A. de C.V.PROJECT: Construction of Distribution CenterLOCATION: Direction of the Engineering, the Construction of the Office Building and the Industrial WarehouseCONSTRUCTION: Monterrey, Nuevo León.TERM: June 2000PHONE: 86-25-50-00RESPONSIBLE: Lic. Luis de la Garza.COST: $15,000,000.00
14) CLIENT: Chrysler.PROJECT: Chrysler Poza Rica Chrysler Agency
DESCRIPTION:Direction of the Engineering, the Construction of the Office Building, exposure area, industrial workshop, stock and maneuver
UBICATION: Poza Rica, Veracruz.TERM: July 2000PHONE: (138) 2-22-42RESPONSIBLE: Lic. Ramón Caballero.COST: $ 18'000,000.00
15) CLIENT: Supermercados Internacionales HEB.PROJECT: HEBDESCRIPTION: Store and Mall ConstructionUBICATION: Santa Catarina, Nuevo León.TERM: January 15 of 2001 to August 29 of 2001.PHONE: 81-53-11-61RESPONSIBLE: Arq. Irene PadillaCOST: $150,000,000.00
CO
MM
ER
CIA
L R
ÉSU
MÉ
16
16) CLIENT: Super Mercados Internacionales HEB.PROJECT: HEB Tampico.DESCRIPTION: Mall and Store ConstructionLOCATION: Tampico, Tamaulipas.TERM: October 2001 PHONE: 81-53-11-61RESPONSIBLE: Arq. Mauricio Toloumsis.COST: $150,000,000.00
17) CLIENT: Internet por Fibra, S. A. de C. V. PROJECT: Celda S5.
DESCRIPTION: Project Direction, Permits, Engineering and Fiber Optic Network Construction. LOCATION: San Pedro Garza García, Nuevo León. TERM: April 2002 PHONE: 84-79-55-10 RESPONSIBLE: Ing. Jorge Eugenio Ortíz. COST: $3,000,000.00
18) CLIENT: Parroquia Santa EngraciaPROJECT: Centro Pastoral San AgustínDESCRIPTION: Temple Construction including chapel, offices, salons and parking lot. (20,000 m2)LOCATION: Sendero de las Privanzas 402, Col. Las Privanzas, San Pedro Garza GarcíaTERM: November 2003PHONE: 80-40-28-95RESPONSIBLE: Pbro. Marcelo VarelaCOST: $ 16'000,000.00
19) CLIENT: Grupo Acosta VerdePROJECT: Mall: Plaza PeriféricoDESCRIPTION: Construction Management of: High Category Mall CenterLOCATION: Reynosa, TamaulipasTERM: January 2004 to December de 2004PHONE: 10-01-98-00RESPONSIBLE: Arq. Miguel Reyes VidalesCOST: $ 280'000,000.00
20) CLIENT: Corporación ControlPROJECT: Woolworth MonterreyDESCRIPTION: Construction Management of the Departmental Store.LOCATION: Monterrey, N.L.TERM: September 2004 to December 2004PHONE: 83-29-55-00RESPONSIBLE: Arq. Javier IbarraCOST: $ 20'000,000.00C
OM
MER
CIA
L R
ÉSU
MÉ
17
21) CLIENT: Lic. Javier DelgadoPROJECT: Centro Comercial Las LajasDESCRIPTION: Construction Management of the MallLOCATION: Monterrey, N.L.TERM: January 2005.PHONE: 83-45-88-45RESPONSIBLE: Ing. Javier DelgadoCOST: $ 5'000,000.00
22) CLIENT: G y H de JuárezPROJECT: Plaza Galería TEC (Multimedios)DESCRIPTION: Project and Construction ManagementLOCATION: Cd. Juárez, Chihuahua.TERM: January 2005 to November 2006PHONE: 83-56-20-99RESPONSIBLE: Lic. Marco MartínezCOST: $ 60'000,000.00
23) CLIENT: Wal Mart de MéxicoPROYECT: Supercenter Miguel Alemán RemodelingDESCRIPTION: Direction and SupervisionLOCATION: Monterrey, N.L.TERM: May 2005 to August 2005PHONE: 83-18-04-34RESPONSIBLE: Ing. Luis Eduardo OchoaCOSTO: $3,000,000.00
24) CLIENT: Wal Mart de MéxicoPROJECT: Supercenter Las Torres RemodelingDESCRIPTION: Direction and SupervisionLOCATION: Monterrey, N.L.TERM: May 2005 a August 2005PHONE: 83-18-04-34RESPONSIBLE: Ing. Luis Eduardo OchoaCOST: $3,000,000.00
25) CLIENT: Wal Mart de MéxicoPROJECT: Bodega Aurrera Saltillo (Change of A/C Equipment)DESCRIPTION: Direction and SupervisionLOCATION: Saltillo, Coah.TERM: January 2006 to March 2006PHONE: 83-18-04-34RESPONSIBLE: Ing. Luis Eduardo OchoaCOST: $1,500,000.00
CO
MM
ER
CIA
L R
ÉSU
MÉ
18
26) CLIENT: Grupo SorianaPROJECT: Soriana TangamangaDESCRIPTION: Direction and SupervisionLOCATION: San Luis Potosí, S.L.P.TERM: February 2006 to July 2006PHONE: 83-29-90-00RESPONSIBLE: Ing. Sergio DíazCOST: $ 85'000,000.00
27) CLIENT: Fideicomiso Paque FundidoraPROJECT: Fundidora Park Expansion Phase 1DESCRIPTION: Direction and SupervisionLOCATION: Monterrey, N.L.TERM: March 2006 to June 2006PHONE: 83-40-52-50RESPONSIBLE: Ing. Sergio CantúCOST: $140,000,000.00
28) CLIENT: Fundación Monterrey 2007 A.CPROJECT: Fundidora Park Expansion Phase 2DESCRIPTION: Direction and SupervisionLOCATION: Monterrey, N.L.TERM: April 2006 to December 2006PHONE: 83-40-52-50RESPONSIBLE: Ing. Sergio CantúCOST: $120,000,000.00
29) CLIENT: Wal Mart de MéxicoPROJECT: Suburbia La Silla (Remodeling)DESCRIPTION: Direction and Supervision LOCATION: Monterrey, N.L.TERM: April 2006 a July 2006PHONE: 83-18-04-34RESPONSIBLE: Ing. Carlos AcevedoCOST: $3,000,000.00
30) CLIENT: Wal Mart de MéxicoPROJECT: Bodega Aurrera ConstructionDESCRIPTION: Direction and SupervisionLOCATION: Río Grande, ZacatecasTERM: June 2006 to September 2006PHONE: 83-56-84-10RESPONSIBLE: Arq. Rodrigo MariscalCOST: $13,500,000.00C
OM
MER
CIA
L R
ÉSU
MÉ
19
31) CLIENT: Universidad de MonterreyPROJECT: Internal Audit UDEM ResidencesDESCRIPTION: Internal Audit LOCATION: San Pedro Garza García, N.L.TERM: September 2006 to December 2006PHONE: 81-24-11-21RESPONSIBLE: Lic. Luis MirandaCOST:
32) CLIENT: Lic. Luis Alberto Troncoso / Arq. José Carlos VillanuevaPROJECT: La Cima Apartment BuildingDESCRIPTION: Management and SupervisionLOCATION: San Pedro Garza García, N.L.TERM: September 2006PHONE: 80-40-20-05RESPONSIBLE: Lic. Luis Alberto Troncoso / Arq. José Carlos VillanuevaCOST: $16,500,000.00
33) CLIENT: Wal Mart de MéxicoPROJECT: Mi Bodega AurreraDESCRIPTION: Direction and SupervisionLOCATION: Madero, CoahuilaTERM: January 2007 a March 2007PHONE: 01-55-53-70-30-00RESPONSIBLE: Arq. Federico DíazCOST: $8,000,000.00
34) CLIENT: Wal Mart de MéxicoPROJECT: Bodega AurreraDESCRIPTION: Direction and SupervisionLOCATION: Villa de García, N.L.TERM: March 2007 PHONE: 01-55-53-71-30-00RESPONSIBLE: Arq. Rodrigo MariscalCOST: $ 34'000,000.00
35) CLIENT: Desarrolladora MPROJECT: School ClassroomsDESCRIPTION: Direction and SupervisionLOCATION: Monterrey, N.L. y su área MetropolitanaTERM: April 2007 - PHONE: (55) 52-57-17-56RESPONSIBLE: Ing. Joaquín Martínez del CampoCOST: $ 100'000,000.00C
OM
MER
CIA
L R
ÉSU
MÉ
20
36) CLIENT: Motores Competitivos SA de CV
PROJECT: Agency Pro-shop Suzuki
DESCRIPTION: Direction and Supervision
LOCATION: Monterrey, N.L. y su área Metropolitana
TERM: October 2007- February 2008
PHONE: 12-33-00-00
RESPONSIBLE: Ing. Humberto Guzmán
COST: $3,500,000.00
37) CLIENT: Trebotti SA de CV
PROJECT: Torre de Departamentos y Oficinas
LOCATION: Torreón Coahuila
TERMN: Octubre 2007
PHONE: 01-871) 719-10-00
RESPONSIBLE: Lic. Luis Treviño Botti
38) CLIENT: Max Construcciones de Arenas y Parques SA de CV
PROJECT: Estacionamiento Oriente Arena Monterrey
DESCRIPTION: Direction and Construction
LOCATION: Monterrey, N. L.
TERM: May 2008 – July 2009
PHONE: 82-21-20-20
RESPONSIBLE: C.P. Guillermo Garza Mercado
COST:
39) CLIENT: Inversity Desarrollo Inmobiliario
PROJECT: Habitation Apartments in: Campo de Golf
LOCATION: San Miguel de Allende, Gto.
TERM: May to September 2008
PHONE: 83-63-86-32
RESPONSIBLE: Arq, Marco Garza
COST:
CO
MM
ER
CIA
L R
ÉSU
MÉ
21
40) CLIENT: Century 21 Marcos & Assad
PROJECT: Apartment Tower
DESCRIPTION: Direction and Construction
LOCATION: Monterrey. N. L.
TERM: August 2008 to May 2009
PHONE: 50-00-21-00
RESPONSIBLE: Lic. Marco Garza Mercado
COST:
41) CLIENT: Ing. Rogelio Sada Zambrano
PROJECT: Fraccionamiento Canoas
DESCRIPTION: Parametric Budget Elaboration
LOCATION: Montemorelos Nuevo León
TERM: June to July 2009
PHONE: 83-65-02-21
RESPONSIBLE: Ing. Rogelio Sada Zambrano
42) CLIENT: Arq. Eudelio Garza
PROJECT: Plaza Fiesta Anáhuac
DESCRIPTION: Internal Audit
LOCATION: San Nicolás de los Garza Nuevo León
TERM: August 2009 to January 2010
PHONE: 83-63-31-08
RESPONSIBLE: Arq. Eudelio Garza
43) CLIENT: Inmobiliaria Celer SA de CV
PROJECT: Hidalgo Tower
DESCRIPTION: Direction and Construction
LOCATION: Monterrey, Nuevo León
TERM: October 2010
PHONE: 83-99-88-00
RESPONSIBLE: Arq. Alick Amador
CO
MM
ER
CIA
L R
ÉSU
MÉ
22
44) CLIENT: Deportivo Alpino Chipinque
PROJECT: Parking lot, Golf Practice Camp, Elevator Installation and Internal Remodel
DESCRIPTION: Diagnose and Internal Audit
LOCATION: Av. San Ángel No. 118 Col. Chipinque, CP 66290, San Pedro Garza García . N. L.
TERM: 2014
PHONE: 81-15-00-00
RESPONSIBLE: Ing. Sergio Unger
COST: $30,300,000.00
45) CLIENT: Trazzo Desarrollos Verticales, S.A. de C.V.
PROJECT: SAQQARA
DESCRIPTION: Diagnose and Internal Audit
LOCATION: Batallon de San Patricio 109 Col. Valle Oriente, San Pedro Garza García . N. L.
TERM: 2014
PHONE:
RESPONSIBLE: Matias Kreifler
COST: $685,000,000.00
46) CLIENT: IDEI
PROJECT: KOI Sky Residences
DESCRIPTION: Diagnose and Internal Audit
LOCATION: Av. Fundadores Esq. Con David Alfaro Siqueiros Valle Oriente, San Pedro Garza García . N. L.
TERM: 2014
PHONE:
RESPONSIBLE: Abelardo Garza Evia
COST: $1,726,382,951.00
CO
MM
ER
CIA
L R
ÉSU
MÉ
23
INDUSTRIAL RÉSUMÉ
24
1) CLIENT: Abogados Garza O’farrill y Asociados.PROJECT: Abogados Garza O’farrill y Asociados HeadquartersLOCATION: Monterrey, Nuevo León.TERM: 1987PHONE: 83-45-70-16RESPONSIBLE: Lic. Antonio O'farrilCOST: $5,000,000.00
2) PROJECT: Bolsa Profesional Building.UBICACIÓN: Los Ángeles, California, USA.TERM: 1998-1990COST: $3,000,000.00 U.S. Dlls.
3) CLIENT: Ing. Cecilio Villanueva.PROJECT: Villanueva Industrial StorageDESCRIPTION: Two Level Storage ConstructionLOCATION: Monterrey, Nuevo, León.CONSTRUCTION: 1,500 m2
TERM: March1993 to January de 1994.PHONE: 83-51-88-86RESPONSIBLE: Ing. Cecilio Villanueva.COST: $1,400,000.00
4) CLIENT: Fama, S. A. de C. V. PROJECT: New Roof for: Nave Maquinaria of Vitro GroupLOCATION: Monterrey, Nuevo León.TERM: 1996RESPONSIBLE: Ing. Juan Manuel Arrieta.COST: $800,000.00
5) CLIENT: Vidriera Monterrey, S. A. de C. V. PROJECT: Horno No. 6. RemodelDESCRIPTION: Demolition, Survey for new installationsLOCATION: Monterrey, Nuevo León.TERM: 1997PHONE: 83-29-10-00RESPONSIBLE: Ing. Ramiro Sánchez.COST: $52,663,810.00
6) CLIENT: Promapi, S. A. de C. V. PROJECT: (WWTP) Waste Water Treatment Plant Construction.LOCATION: México, D.F.TERM: 1997PHONE: (55) 58-55-30-33RESPONSIBLE: C.P. Justo Gómez.COST: $4,800,000.00
IND
USTR
IAL
RÉSU
MÉ
25
IND
USTR
IAL
RÉSU
MÉ
7) CLIENT: Auto Templex, S. A. de C. V.PROJECT: Horno T-11 Auto Templex.DESCRIPTION: Production line construction, fans and warehouseLOCATION: Villa de García, Nuevo León.TERM: 1997 to 1998PHONE: 83-29-36-00RESPONSIBLE: Ing. Sergio Martínez.COST: $108,576,000.00
8) CLIENT: Lic. Patricio O’farrill.PROJECT: Titanium Almacenaje y Maquila.DESCRIPTION: 6 warehouses construction for storage for light industry.LOCATION: 10,000 m2.
CONSTRUCTION: Apodaca, Nuevo, León.TERM: March to September 1997.PHONE: 83-40-32-48RESPONSIBLE: Lic. Antonio O’farrill.COST: $5,850,000.00
9) CLIENT: Bueno Alimentos, S.A. de C.V. PROJECT: Warehouse ReconstructionDESCRIPTION: Demolition and Construction.LOCATION: Santa Catarina, Nuevo, León.CONSTRUCTION: 1,680 m2
TERM: January 1998.PHONE: 83-33-34-43RESPONSIBLE: Lic. Eugenio Bueno.COST: $ 800,000.00.
10) CLIENT: Cervecería Cuauhtémoc Moctezuma.PROJECT: Project MP Phase I.DESCRIPTION: Orizaba, Veracruz.LOCATION: 2,500 m2
TERM: February 1998 to August 1999.PHONE: 83-28-50-00 / 83-28-54-93
RESPONSIBLE: Ing. Eduardo Saldaña.COST: $80,000,000.00
11) CLIENT: Seguros Comercial América.PROJECT: Valuation área standsLOCATION: Monterrey, Nuevo León.TERM: April to May 1998.PHONE: 83-68-40-78RESPONSIBLE: C.P. Armando Fernández. COST: $15,000,000.00
12) CLIENT: Metalsa, S.A, de C.V.PROJECT: Thermic Treatment Warehouse DESCRIPTION: Apodaca, Nuevo, León.LOCATION: 17,200 m2
TERM: August de 1998.PHONE: 83-69-74-00RESPONSIBLE: Ing. Ignacio PrietoCOST: $30,000,000.00
26
IND
USTR
IAL
RÉSU
MÉ
13) CLIENT: Vitro Supermatic, S. A. de C. V.PROJECT: Storage Warehouse RoofingDESCRIPTION: Apodaca, Nuevo León.LOCATION: 17,000 m2
TERM: August 1998.PHONE: 83-29-23-00RESPONSIBLE: Ing. Juan Antonio Villarreal.COST: $6,500,000.00
14) CLIENT: Vidriera Monterrey, S. A. PROJECT: Remodeling Historic HallwayDESCRIPTION: Monterrey, Nuevo León.LOCATION: 6,000 m2
TERM: Augusto 1998.PHONE: 83-29-10-00RESPONSIBLE: Arq. Eduardo Carrillo.COST: $3,200,000.00
15) CLIENT: Vidriera Monterrey, S. A.PROJECT: Remodeling Horno No.7.DESCRIPTION: Demolition and Construction of production line, fans and warehouseLOCATION: Monterrey, Nuevo León.TERM: Septiember 1998 to Junr 1999.PHONE: 83-29-10-00RESPONSIBLE: Ing. Jesús García.COST: $98,000,000.00
16) CLIENT: Perrigo de México. PROJECT: Warehouse for: Reempaque de Perrigo de México. DESCRIPTION: Ramos Arizpe, Coahuila.LOCATION: 2,500 m2
TERM: December 1998 to September 1999.PHONE: 83-88-36-46RESPONSIBLE: Ing. Vicente Saro.COST: $ 1,592,000.00 Dlls.
17) CLIENT: Supermatic.PROJECT: New roof for Supermatic Warehouse.DESCRIPTION: Metallic cover installation for the existing warehouse, while plant was still working and producing.LOCATION: Apodaca, Nuevo León. TERM: December1998 to September 1999.PHONE: 83-29-23-00RESPONSIBLE: Ing. Alfonso CamposCOST: $15,000,000.00
18) CLIENT: Ampolletas, S. A. de C. V.PROJECT: Warehouse for: Frascos y Cuarto Limpio.LOCATION: Querétaro, Querétaro.TERM: 1999PHONE: (442) 2-11-11-65RESPONSIBLE: Ing. Jesús Delgado.COST: $3,765,000.00
27
IND
USTR
IAL
RÉSU
MÉ
19) CLIENT: Cervecería Cuauhtémoc Moctezuma.PROYECT: Carbonic Gas Line ModificationLOCATION: Navojoa, Sonora.TERM: March a December de 1999.RESPONSIBLE: Ing. Cristóbal Cantú.COST: $56,000,000.00
20) CLIENT: Simeprodeso. PROJECT: Processing Plant of Solid Wastes from the LandfillDESCRIPTION: Construction of a Processing Plant of Solid WastesLOCATION: Monterrey, Nuevo León.TERM: April1999 to March 2000.PHONE: 83-44-54-30RESPONSIBLE: Lic. Guillermo Castillo.COST: $35,000,000.00
21) CLIENT: Cervecería Cuauhtémoc Moctezuma.PROJECT: Carta Blanca de Hidalgo AgencyLOCATIONN: Parral, Chihuahua.TERM: May to July 1999.RESPONSIBLE: Ing. Javier Marroquín.COST: $10,000,000.00
22) CLIENT: Pepsi Gemex. PROJECT: Warehouse of: Llenos y Vacíos.
DESCRIPTION: Warehouse and maneuver patio construction LOCATION: Apodaca, Nuevo León. TERM: June1999 to January 2000 PHONE: 83-86-37-55 RESPONSIBLE: Arq. Enrique de la Jara COST: $4,200,000.00
23) CLIENT: Industrial Power Counting. PROJECT: Línea de Polvos, Largueros de Camión en Metalsa.
DESCRIPTION: Civil Work and Equipment installation for painting rooms LOCATION: Apodaca, Nuevo León. TERM: July 1999 February 2000. PHONE: 83-69-75-61 RESPONSIBLE: Ing. Luis Carlos Carranza. COST: $ 2,300,000.00 Dlls
24) CLIENT: Transportes Tamaulipas, S.A de C.V.PROJECT: Box Office, Service Workshops, Dorm rooms Project LOCATION: Various places at the North-East of MexicoTERM: July 1999 to 2001.PHONE: 81-51-44-00RESPONSIBLE: Ing. Rodolfo Siller.COST: $11,000,000.00
28
IND
USTR
IAL
RÉSU
MÉ
25) CLIENT: Autobuses del Noreste, S. A. de C. V. PROJECT:: Box Office, Service Workshops, Dorm rooms Project LOCATION: Various places at the North-East of MexicoTERM: July 1999 to 2001.PHONE: 81-51-44-00RESPONSIBLE: Ing. Rodolfo Siller.COST: $6,000,000.00
26) CLIENT: Prefabricados Monterrey, S. A. de C. V.PROJECT: Plant IIDESCRIPTION: Construction of a Prefabricated Block PlantLOCATION: México, D. F.TERM: September 1999 to August 2000.PHONE: 83-84-85-40RESPONSIBLE: Ing. Mauricio Flores.COST: $16,000,000.00
27) CLIENT: Servicio Industrial Regiomontano, S. A. de C. V. PROJECT: Construction of Pensión S.I.R. F DESCRIPTION: Construction of Dorm Rooms, Offices, Commodores, Workshops, Warehouse and Maneuver PatioLOCATION: Guadalupe, Nuevo León.TERM: November 1999 to April 2000.PHONE: 81-51-44-00RESPONSIBLE: Ing. Rodolfo Siller / Lic. Enrique Sánchez.COST: $5,500,000.00
28) CLIENT: Pepsi Gemex.PROJECT: Centro de Distribución Monclova. CEDIS.DESCRIPTION: Warehouse Construction and Office RemodelLOCATION: Monclova, Coahuila.TERM: 2000PHONE: 83-86-37-55RESPONSIBLE: Arq. Enrique de la Jara.COST: $900,000.00
29) CLIENT: Autobuses del Noreste, S. A. de C. V. PROJECT: North-East Villagrán HeadquartersDESCRIPTION: Construction of Dorm Rooms, Offices, Commodores, Workshops, Warehouse and Maneuver PatioLOCATION: Noreste Villagrán.TERM: Janury to October 2000.PHONE: Ing. Rodolfo Siller.RESPONSIBLE: 81-51-44-00COST: $ 20,500'000.00
30) CLIENT: Servicio Industrial Regiomontano, S. A. de C. V. PROJECT: Workshop, Dorm Rooms and Warehouse ExtensionDESCRIPTION: ConsConstruction of Dorm Rooms, Offices, Commodores, Workshops, Warehouse and Maneuver PatioLOCATION: Monterrey, Nuevo León.TERM: February to June 2000.PHONE: 81-51-44-00RESPONSIBLE: Ing. Rodolfo Siller / Lic. Enrique Sánchez.COST: $2,000,000.00
29
IND
USTR
IAL
RÉSU
MÉ
31) CLIENT: Grupo Toluca S.A de C.V.PROJECT: Bus Station Morelia.DESCRIPTION: 18 hour Project of 13,000 m2LOCATION: Morelia, Michoacán.TERM: April 2000 to August 2002PHONE: (5) 273-30-09RESPONSIBLE: C.P. Rodolfo Flores.COST: $150,000,000.00
32) CLIENT: Servicio Industrial Regiomontano, S. A. de C. V. PROJECT: Dinning Room Construction S.I.R. B LOCATION: San Nicolás de los Garza, Nuevo León.TERM: April to June 2000.PHONE: 81-51-44-00RESPONSIBLE: Ing. Rodolfo Siller / Lic. Enrique Sánchez.COST: $250,000.00
33) CLIENT: Servicio Industrial Regiomontano, S. A. de C. V. PROJECT: Pension Construction S.I.R. G DESCRIPTION: Construction of Dorm Rooms, Offices, Commodores, Workshops, Warehouse and Maneuver PatioLOCATION: Escobedo, Nuevo León.TERM: October 2000 PHONE: 81-51-44-00RESPONSIBLE: Ing. Rodolfo Siller / Lic. Enrique Sánchez.COST: $ 3, 000,000.00
34) CLIENT: Transportes Tamaulipas, S.A de C.V.PROJECT: Workshop and Dorm Rooms for: Autobuses Coahuilenses y Transportes Tamaulipas.DESCRIPTION: Construction of Dorm Rooms, Offices, Commodores, Workshops, Warehouse and Maneuver PatioLOCATION: Monterrey, N.L.TERM: January to August 2001.PHONE: 81-51-44-00RESPONSIBLE: Ing. Rodolfo Siller.COST: $13,500,000.00
35) CLIENT: Autobuses Coahuilenses S.A. De C.V.PROJECT: Dorm Rooms, Bus wash, Workshop and Offices.DESCRIPTION: Construction of Dorm Rooms, Offices, Commodores, Workshops, Warehouse and Maneuver PatioLOCATION: Monclova, Coahuila.TERM: January to September 2001.PHONE: 81-51-44-00RESPONSIBLE: Ing. Rodolfo Siller.COST: $3,000,000.00
36) CLIENT: Transportes Tamaulipas, S.A. de C.V.PROJECT: Polyvalent Classroom Construction in: Centro de Desarrollo Senda.LOCATION: Monterrey, Nuevo León.TERM: February to July 2001.PHONE: 81-51-44-00RESPONSIBLE: Ing. Rodolfo Siller.COST: $1,200,000.00
30
IND
USTR
IAL
RÉSU
MÉ
37) CLIENTE: Vidriera Querétaro, S. A. de C. V.PROYECTO: Line VQ-34.DESCRIPCIÓN: Warehouse Construction, Remodel and Line VQ-34 Installation of Glass Bottle Production.UBICACIÓN: Querétaro, Querétaro.CONSTRUCCIÓN: 750 m2
FECHA: June 2002 February 2003TELÉFONO: 88-63-10-00RESPONSABLE: Ing. Humberto Calderón.COSTO: $10,000,000.00 Dlls.
38) CLIENT: Franklin Electric.PROJECT: Phase I Offices and Plant.DESCRIPTION: 700 m2 construction: Office, 2200 m2 construction: WarehouseLOCATION: Linares, Nuevo León.TERM: August 2002 to March 2003RESPONSIBLE: Mr. Dan CrossCOST: $14,000,000.00
39) CLIENT: Franklin Electric.PROJECT: Phase II Offices and Plant.DESCRIPTION: Production Warehouse of 9000 m2 Construction.LOCATION: Linares, Nuevo León.TERM: September 2003 RESPONSIBLE: Mr. Dan CrossCOST: $46,000,000.00
40) CLIENT: Grupo Empresarial LogistikPROJECT: Urban Master Plan and Multimodal TerminalDESCRIPTION: Project Management and Industrial Park ConstructionLOCATION: San Luis Potosí, S.L.P.TERM: September 2004PHONE: 82-62-35-17RESPONSIBLE: C.P. Félix GarcíaCOST: $ 120'000,000.00
41) CLIENT: Alcoa Wheel Products MéxicoPROJECT: Industrial WarehouseDESCRIPTION: Project and Construction ManagementLOCATION: Ciénega de Flores, N.L.TERM: February 2005.PHONE: 81-54-64-32RESPONSIBLE: Rodrigo CortésCOST: $ 5'500,000.00
42) CLIENT: Fortacero, S.A. de C.V:PROJECT: Industrial WarehouseDESCRIPTION: Direction and SupervisionLOCATION: Gómez Palacio, Durango.TERM: October 2006PHONE: 81-56-52-00RESPONSIBLE: Ing. Luis Treviño GuajardoCOST: $16,000,000.00
31
IND
USTR
IAL
RÉSU
MÉ
43) CLIENT: Adhoc Bienes RaícesPROJECT: GonherMex Warehouse
DESCRIPTION: Direction and ConstructionLOCATION: León, GuanajuatoTERM: November 2008 to August 2009PHONE: 81-74-40-00RESPONSIBLE: C.P. Patricia RamírezCOST:
44) CLIENT: Industrias Alen SA de CVPROJECT: Preforma Industril WarehouseDESCRIPTION: Direction and ConstructionLOCATION: Santa Catarina, N. L.TERM: March 2010PHONE: 81-22-10-00RESPONSIBLE: Pedro Alejandro Salas MarmolejoCOST:
45) CLIENT: Adhoc Bienes RaícesPROJECT: Warehouse GonherMexDESCRIPTION: Direction and ConstructionLOCATION: Pachuca, Los Mochis y San Luis PotosíTERM: June 2010PHONE: 81-74-40-00RESPONSIBLE: C.P. Patricia RamírezCOST:
46) CLIENT: Industrias Alen SA de CVPROJECT: Office Construction and Remodel.DESCRIPTION: Direction and ConstructionLOCATION: Santa Catarina, N. L.TERM: May 2010PHONE: 81-22-10-00RESPONSIBLE: Pedro Alejandro Salas MarmolejoCOST:
32
IND
USTR
IAL
RÉSU
MÉ
47) CLIENT: Plásticos Industriales Monterrey, S.A. de C.V.PROJECT: Industrial WarehouseDESCRIPTION: Internal AuditLOCATION: 25 de Mayo 153 Col. Trabajadores, CP. 66149 Santa Catarina, NL.TERM: 2014PHONE: 83-3601-99RESPONSIBLE: Ing. Jorge GarcíaCOST: $27,000,000.00
48) CLIENT: FORTACERO JaliscoPROJECT: Industrial WarehouseDESCRIPTION: Internal AuditLOCATION: El Salto, JaliscoTERM: 2014PHONE:RESPONSIBLE: Luis TreviñoCOST: $46,000,000.00
33
RESIDENTIAL RÉSUMÉ
34
RESID
EN
TIA
L R
ÉSU
MÉ
1) CLIENT: Ing. Reynaldo Reina.
PROJECT: Ing. Reynaldo Reina’s Residence , Director of Cervecería Cuauhtémoc. LOCATION: San Pedro Garza García, Nuevo León. TERM: 1986 RESPONSIBLE: Ing. Reynaldo Reina. COST: $4,500,000.00 2) CLIENT: Lic. Antonio O’farrill. PROJECT: Lic. Antonio O’farrill’s Residence LOCATION: San Pedro Garza García, Nuevo León. TERM: 1987 PHONE: 83-40-32-48 RESPONSIBLE: Lic. Antonio O’farrill. COST: $7,000,000.00 3) CLIENT: Sr. Don David Garza Lagüera. PROJECT: Sr. Don David Garza Lagüera’s Residence Remodel LOCATION: San Pedro Garza García, Nuevo León. TERM: 1988 RESPONSIBLE: Sr. Don David Garza Lagüera. COST: $1,000,000.00 4) CLIENT: Ing. Alejandro O’farrill. PROJECT: Ing. Alejandro O’farrill Residence LOCATION: Monterrey, Nuevo León. CONSTRUCTION: 450 m2
TERM: February to December 1992. PHONE: 83-56-68-27 83-56-35-85 RESPONSIBLE: Ing. Alejandro O’farrill. COST: $4,500,000.00 5) CLIENT: Lic. Sergio Tapia C. PROJECT: Lic. Sergio Tapia C.’s Residence Phase I LOCATION: Monterrey, Nuevo León. CONSTRUCTION: 150 m2
TERM: March to August 1992. PHONE: 83-78-96-30 / 83-78-97-36 RESPONSIBLE: Lic. Sergio Tapia C. COST: $180,000.00
35
RESID
EN
TIA
L R
ÉSU
MÉ
6) CLIENT: Ing. Alejandro Torres Q. PROJECT: Residence Remodel. LOCATION: San Pedro Garza García, Nuevo León. TERM: March to October 1992. PHONE: 83-03-38-74 RESPONSIBLE: Ing. Alejandro Torres Q. COST: $1,600,000.00 7) CLIENT: Omega. PROJECT: Phase I Urbanization of: “Residencial Valle Alto” LOCATION: Monterrey, Nuevo León. TERM: March to December 1992. PHONE: 83-48-21-77 RESPONSIBLE: Lic. Mateo Mazal. COST: $25,500,000.00 8) CLIENT: Ing. Alejandro Torres Q. PROJECT: “Villa las Flores” neighborhood LOCATION: Monterrey, Nuevo León. CONSTRUCTION: 15 Acres. TERM: May to July 1992. PHONE: 83-99-56-72 RESPONSIBLE: Ing. Alejandro Torres Q. COST: $5,000,000.00 9) CLIENT: Arq. Agustín Landa.
PROJECT: 3 level residence construction, including pool, yard construction. LOCATION: San Pedro Garza García, Nuevo León. CONSTRUCTION: 600 m2
TERM: September1992 to October 1993. PHONE: 83-46-95-29 RESPONSIBLE: Arq. Agustín Landa. COST: $2,000,000.00
10) CLIENT: Ing. Alejandro Lamothe. PROJECT: Ing. Alejandro Lamothe’s Residence LOCATION: San Pedro Garza García, Nuevo León. CONSTRUCTION: 750 m2
TERM: April 1993 to June 1994. PHONE: 83-56-65-50 RESPONSIBLE: Ing. Alejandro Lamothe. COST: $3,500,000.00
36
RESID
EN
TIA
L R
ÉSU
MÉ
11) CLIENT: Lic. Bruno Ferrari de Alba. PROJECT: Lic. Bruno Ferrari’s Residence LOCATION: San Pedro Garza García, Nuevo León. CONSTRUCTION: 650 m2
TERM: March 1994 to October 1995. PHONE: 83-63-15-10 RESPONSIBLE: Lic. Bruno Ferrari de Alba. COST: $5,000,000.00
12) CLIENT: C.P. Raúl Farías. PROJECT: Torreón located inFracc. Villa Las Flores. LOCATION: Monterrey, Nuevo León. CONSTRUCTION: 10,000 m2
TERM: January 1995. PHONE: 83-99-56-00 RESPONSIBLE: C.P. Raúl Farías. COST: $350,000.00
13) CLIENT: Ing. Rubén Alanís. PROJECT: Ing. Rubén Alanis's Residence LOCATION: Monterrey, Nuevo León. CONSTRUCTION: 300 m2
TERM: January 1995. PHONE: 83-48-80-85 RESPONSIBLE: Ing. Rubén Alanís. COST: $500,000.00
14) CLIENT: Ing. Eugenio Nájera. PROJECT: Construction and Urbanization of: Fraccionamiento Villa las Flores. LOCATION: Monterrey, Nuevo León. CONSTRUCTION: 10,000 m2
TERM: July 1995 to August 1996. PHONE: 83-33-46-46 RESPONSIBLE: Ing. Eugenio Nájera. COST: $1,500,000.00
15) CLIENT: Sra. Roberta Brittingham.
PROJECT: Construction and Urbanization of: pista y redondel for Mrs. Roberta Brittingham. LOCATION: Villa de Santiago, Nuevo León. CONSTRUCTION: 3,000 m2
TERM: January 1996. PHONE: 83-65-52-39 RESPONSIBLE: Lic. Daniel Milmo. COST: $700,000.00
37
RESID
EN
TIA
L R
ÉSU
MÉ
16) CLIENT: Fideicomiso Desarrollado por Confia, S. A. PROJECT: Supervision of 24 habitation houses of: INFONAVIT Line III. LOCATION: Reynosa, Tamaulipas.
CONSTRUCTION: 2,000 m2
TERM: January to June 1996. PHONE: 83-99-60-70 RESPONSIBLE: Lic. Horacio Tijerina. COST: $2,500,000.0017) CLIENT: Lic. María Elena Chapa. PROJECT: Remodel and Last Details in Misiones Residence. LOCATION: Villa de Santiago, Nuevo León.
CONSTRUCTION: 600 m2
TERM: March to June 1996. PHONE: 83-43-88-16 RESPONSIBLE: Lic. María Elena Chapa. COST: $150,000.00
18) CLIENT: Ing. Alejandro Torres Q. PROJECT: Palapa Construction in San José de la Montaña. LOCATION: Villa de Santiago, Nuevo León.
CONSTRUCTION: 150 m2
TERM: March 1996 to March de 1997. PHONE: 83-99-56-72 RESPONSIBLE: Ing. Alejandro Torres Q. COST: $450,000.00
19) CLIENT: Ing. Carlos Rosenzweig.
PROJECT: Structural Development and Project for Ing. Carlos Rosenzweig’s Residence LOCATION: San Pedro Garza García, Nuevo León.
CONSTRUCTION: 450 m2
TERM: April to June 1996. PHONE: 83-90-09-32 RESPONSIBLE: Ing. Carlos Rosenzweig. COST: $15,000.00
20) CLIENT: Sra. Eugenia Rodríguez. PROJECT: Mrs. Eugenia Rodríguez’s Residence LOCATION: San Pedro Garza García, Nuevo León. TERM: August 1997. PHONE: 83-18-35-69 RESPONSIBLE: Sra. Eugenia Rodríguez. COST: $1,000,000.00
38
RESID
EN
TIA
L R
ÉSU
MÉ
21) CLIENT: Libra Alimentos, S. A. de C. V. PROJECT: Two Habitation Houses in: Fraccionamiento la Muralla. LOCATION: Monterrey, Nuevo León. TERM: 750 m2
PHONE: June 1998. RESPONSIBLE: 83-50-09-21 COST: $1,050,000.00 22) CLIENT: Ing. Bernardo Garza de la Fuente. PROJECT: Garza de la Fuente Familiar Residence LOCATION: San Pedro Garza García, Nuevo León. TERM: August 2000. PHONE: 83-99-90-02 RESPONSIBLE: Ing. Bernardo Garza de la Fuente. COST: $ 20'000,000.00 23) CLIENT: Cap. Enrique Vázquez. PROJECT: Residence in: Fraccionamiento Las Misiones. LOCATION: Villa de Santiago, Nuevo León. TERM: January 2001 to July 2002. PHONE: 83-86-25-33 RESPONSIBLE: Cap. Enrique Vázquez. COST: $10,000,000.00 24) CLIENT: Inversiones Trim. PROJECT: Las Palmas Residential Condos LOCATION: Construction of 60 departments. CONSTRUCTION: Monterrey, Nuevo León. TERM: June 2001 to December 2002 PHONE: 83-33-00-19 RESPONSIBLE: C.P. Celso Javier Treviño. COST: $50,000,000.00 25) CLIENT: Grupo Delphi, S. A. de C. V. PROJECT: Balcones de la Loma LOCATION: Construction Management of: 82 Residential Apartments CONSTRUCTION: Monterrey, Nuevo León. TERM: May 2002 to November 2003 PHONE: 83-35-55-76 RESPONSIBLE: Ing. Keneth Cruz Acosta. COST: $50,000,000.00
39
RESID
EN
TIA
L R
ÉSU
MÉ
26) CLIENT: Ing. Eduardo Cantú Segovia PROJECT: Bosques de Linda Vista LOCATION: Construction of 25 Habitation Houses CONSTRUCTION: San Nicolás de los Garza TERM: May 2003. PHONE: 83-90-70-50 RESPONSIBLE: Ing. Eduardo Cantú Segovia COST: $ 7'500,000.00 27) CLIENT: Familia Cantú Segovia PROJECT: Fraccionamiento Los Encinos LOCATION: Project Management and Construction of 19 Residential Houses CONSTRUCTION: San Pedro Garza García, Nuevo León TERM: October 2003 PHONE: 83-90-70-50 RESPONSIBLE: Ing. Eduardo Cantú Segovia COST: $ 25'000,000.0028) CLIENT: Grupo Atlas PROJECT: Pedregal de Valle Alto LOCATION: 5 Acre Development in: Fraccionamiento Residencial CONSTRUCTION: Monterrey, Nuevo León, Zona Valle Alto TERM: October 2003 PHONE: 83-78-45-18 RESPONSIBLE: Lic. Estanislao Martínez Paz COST: $4,000,000.00 29) CLIENT: Nadiex, S. A. de C. V. PROJECT: Residencial Miravalle LOCATION: 17 apartments CONSTRUCTION: Av. San Jerónimo No. 200, Col. Miravalle, Monterrey, N. L. TERM: November 2003 PHONE: 83-45-88-45 RESPONSIBLE: Lic. Javier Delgado Navarro COST: $ 18'000,000.0030) CLIENT: Constructora Milimex PROJECT: Balcones de Satélite DESCRIPTION: Vertical Construction, 10 floors for 486 low-cost housing in 16 Acres LOCATION: Monterrey, Nuevo León TERM: January 2004 PHONE: 83-78-46-00 RESPONSIBLE: Lic. Estanislao Martínez Martínez COST: $ 24'000,000.00
40
RESID
EN
TIA
L R
ÉSU
MÉ
31) CLIENT: Acuña Bienes Raíces PROJECT: Benetton Tower LOCATION: Project Direction and Construction CONSTRUCTION: Monterrey, N.L. TERM: April 2005 to October 2006. PHONE: 83-35-70-15 RESPONSIBLE: Lic. Rafael Acuña COST: $40,000,000.00 32) CLIENT: Gamo Bienes Raíces PROJECT: Fraccionamiento La Silla LOCATION: Project Management and Construction CONSTRUCTION: Monterrey, N.L. TERM: August 2005 to December 2006 PHONE: 83-35-23-20 RESPONSIBLE: Lic. Raúl Garza COST: $20,000,000.00 33) CLIENT: Quail Construction PROJECT: Fraccionamiento Codornices LOCATION: Direction and Supervision CONSTRUCTION: Monterrey, N.L. TERM: April 2006 PHONE: 83-56-84-10 RESPONSIBLE: Ing. Eugenio Nájera COST: $10,000,000.00 34) CLIENT: Desarrollos Sierra Madre PROJECT: Fraccionamiento La Silla LOCATION: Direction and Supervision CONSTRUCTION: Monterrey, N.L. TERM: April 2006 PHONE: 83-38-10-30 RESPONSIBLE: Sra. Lila Garza COST: $110,000,000.00 35) CLIENT: Quail Construction PROJECT: Fraccionamiento Los Aldama LOCATION: Direction and Supervision CONSTRUCTION: Monterrey, N.L. TERM: Septiember 2006 PHONE: 83-56-84-10 RESPONSIBLE: Ing. Eugenio Nájera Padilla COST: $8,500,000.00
41
RESID
EN
TIA
L R
ÉSU
MÉ
36) CLIENT: Fam. Argüelles PROJECT: Casa - Club LOCATION: Direction and Supervision CONSTRUCTION: San Pedro Garza García TERM: December 2006 PHONE: 81-52-42-49 RESPONSIBLE: Lic. Sergio Argüelles COST: $ 5'000,000.0037) CLIENT: Empresas Santos PROJECT: Fracc. Los Ángeles LOCATION: Direction and Supervision CONSTRUCTION: San Pedro Garza García, N.L. TERM: February 2007 PHONE: 81-14-20-20 RESPONSIBLE: Ing. Fernando Moreno COST: $ 26'000,000.00 38) CLIENT: Empresas Ese PROJECT: Fracc. Santa Catarina LOCATION: Direction and Supervision CONSTRUCTION: Santa Catarina, N.L. TERM: April 2007 PHONE: 81-80-10-60-50 RESPONSIBLE: Lic. Salvador Alanís COST: $ 5'500,000.0039) CLIENT: Grupo Gentor PROJECT: Fracc. Las Fuentes LOCATION: Internal Audit CONSTRUCTION: San Pedro Garza García, N.L. TERM: April 2007 PHONE: 83-44-75-65 RESPONSIBLE: Lic. Luis Alberto Ruiz COST: $ 206'000,000.00 40) CLIENT: Lic. Ernesto Santos PROJECT: Residencial LOCATION: Direction and Supervision CONSTRUCTION: San Pedro Garza García, N.L. TERM: January 2008 PHONE: 81-73-53-53 RESPONSIBLE: Lic. Ernesto Santos COST: $ 206'000,000.0041) CLIENT: Lic. Angel Galván PROJECT: Residentiall DESCRIPTION: Direction and Supervision LOCATION: San Pedro Garza García, N.L. TERM: October 2008 to May 2009 PHONE: 15-94-27-61 RESPONSIBLE: Lic. Angel Galván
42
RESID
EN
TIA
L R
ÉSU
MÉ
42) CLIENT: Inmobiliaria Cañón del Huajuco PROJECT: Fracc. Los Azulejos LOCATION: Direction CONSTRUCTION: Monterrey, N. L. TERM: 2008 PHONE: 83-63-38-88 RESPONSIBLE: C.P. Artemio Garza COST: 43) CLIENT: Ing. Jorge Llaguno PROJECT: Fam . Llaguno’s Residence LOCATION: Direction and Supervision CONSTRUCTION: San Pedro Garza García TERM: July 2009 PHONE: 83-31-77-01 RESPONSIBLE: Ing. Jorge Llaguno COST:
44) CLIENT: Lic. Armando Vejar PROJECT: Fracc. Puerto Bahía Villas LOCATION: Direction and Supervision CONSTRUCTION: Puerto Vallarta TERM: July 2010 PHONE: 81-55-65-05 RESPONSIBLE: Lic. Armando Vejar COST:
43
RESID
EN
TIA
L R
ÉSU
MÉ
45) CLIENT: Grupo Corporativo BATAB, S.A. de C.V. (NURBAN) PROJECT: Fraccionamiento de Lotes Urbanizados con Campos de Golf LOCATION: Ave. Patria 1300 Col. Villa Universidad, Zapopan, Jalisco. CONSTRUCTION: Fraccionamiento de Lotes Urbanizados con Campos de Golf TERM: 2014. PHONE: 122-917-94444 RESPONSIBLE: Ing. Ernesto Bortoni COST: $264,000,000.00 46) CLIENT: GESTA Desarrollos, S.A. de C.V. PROJECT: Habitation Building LOCATION: Av. Eugenio Garza Sada No. 800 sur Col. Mas Palomas, Monterrey, NL. CONSTRUCTION: Edificio de Usos Multiples 2 niveles comercial, 9 niveles de departamentos y sotano 4 niveles. TERM: 2014 PHONE: 81-5536-54 RESPONSIBLE: Ing. Oscar de la Garza Clariond COST: $360,000,000.00 47) CLIENT: El Molino PROJECT: Internal Audit LOCATION: Leon, Guanajuato CONSTRUCTION: Fraccionamiento Residencial con Campo de Gold y Casa Club TERM: 2014 PHONE: 477-7811-016 RESPONSIBLE: Ing. Ernesto Bortoni COST: $200,000,000.00 48) CLIENT: La Reserva PROJECT: Internal Audit LOCATION: Queretaro, Qro CONSTRUCTION: Fraccionamiento con Edificios Multifamiliares TERM: 2014 PHONE: 442-1927-700 RESPONSIBLE: Yolanda Hernandez COST: $400,000,000.00
44
GENERAL INFORMATION
Enterprise: VEGA CONSULTORES S.A. de C.V.
Location: Distrito B-4 #397 Col. Leones, Monterrey, N.L.
Phone/Fax: (81)-83333-6400, 8333-8818
Executive Director: Ing. Manuel Ventosa Gzz.
Webpage: www.vegagerencia.com.mx
AUTHOR: RANDY DE LA ROSA RUBALCAVA