44
RÉSUMÉ (1992-2014) INTERNAL AUDIT, MANAGEMENT AND ADMINISTRATION OF CONSTRUCTION RESIDENTIAL INDUSTRIAL COMERCIAL AUTHOR: RANDY DE LA ROSA RUBALCAVA

RÉSUMÉ (1992-2014)

Embed Size (px)

Citation preview

Page 1: RÉSUMÉ (1992-2014)

RÉSUMÉ (1992-2014)

INTERNAL AUDIT, MANAGEMENT AND ADMINISTRATION OF CONSTRUCTION

RESIDENTIAL INDUSTRIAL

COMERCIAL

AUTHOR: RANDY DE LA ROSA RUBALCAVA

Page 2: RÉSUMÉ (1992-2014)

2

MISSION

PHILOSOPHY

We are an organization which purpose is to satisfy and overcome the common expectative of the national and international industry of construction, by always achieving excellence in the management of construction work.

To integrate all the tasks involved in Planning and Controlling Construction Work, with the priority goal of finishing the project within time, cost and quality.

Page 3: RÉSUMÉ (1992-2014)

3

PROJECT MANAGEMENT SYSTEM

Procedure Manual

Control System

Not Failing Guarantee

VEGA has developed a methodology which allows us guarantee the complete satisfaction of our client achieving from a 20% to a 30% either is an industrial, commercial or residential project.

Page 4: RÉSUMÉ (1992-2014)

4

SERVICES OFFERED BY VEGA

VEGA

Construction Management

Project Management

Engineering Development

Internal AuditRedesign Procedure Manual Strategy

Supervision in MaintenancePersonal Services for

Administration

25% GUARANTEED SAVINGS

Page 5: RÉSUMÉ (1992-2014)

5

FOCUS ON OUR SERVICES

School and

Institutions

Residential

Page 6: RÉSUMÉ (1992-2014)

6

BENEFITS OF SUPERVISION

MO

RE (

$)

INV

ES

TEM

EN

T

TIME MORELESS

VEGA• Continuous presence at

construction site• Strict control of quality • Organized budget control• Direct coordination with

companies specialists• 25% guaranteed savings

and on in TIME and COST

TRADITIONAL SYSTEM• Lack of supervision• Lack of time and cost

control• No budget control• Poor quality• Extra Costs and Overhead

Costs• Generally a 25% more than

planned

Page 7: RÉSUMÉ (1992-2014)

7

PROJECT METHODOLOGY

We rely on our system that assures the best quality in our service provided based on the experienced workmanship and the procedure of our methodology that certifies our service quality. This is supported by specialists in different areas of construction, guarantying an excellent project closure.

General Statement

Financial Budget Control

Resource Estimation

1. Generate the Conceptual Project

II. Select Project Direction

III. Develop the Preliminary Project

IV. Develop the Executive Project

V. Invitation to Tender

VI. Management and Supervision

VII. Start Up and Tests

VIII. Settlement of Building Site

Tracking and Monitoring of Progress

Page 8: RÉSUMÉ (1992-2014)

8

OUR PROJECTSResidential, Commercial, Industrial, Apartments

Page 9: RÉSUMÉ (1992-2014)

9

OUR PROJECTSResidential, Commercial, Industrial, Apartments

Page 10: RÉSUMÉ (1992-2014)

10

INDUSTRIAL PROJECTSSome industrial projects

Page 11: RÉSUMÉ (1992-2014)

11

INDUSTRIAL PROJECTSSome industrial projects

Page 12: RÉSUMÉ (1992-2014)

12

COMMERCIAL RÉSUMÉ

Page 13: RÉSUMÉ (1992-2014)

13

CO

MM

ER

CIA

L R

ÉSU

1) CLIENT: Cigarrera La Moderna 1. Rectangular and Semicircular Stables.PROJECT: Desarrollo Hípico “El Diente” 2. Food StorageLOCATION: Monterrey, Nuevo León 3. Roofed Riding School CONSTRUCTION: 100 Hectáreas 4. RoadsTERM: 1992 - 1995 5. High and Low Tension SystemPHONE: 83-47-78-07 6. TracksRESPONSIBLE: Ing. Gustavo Romo 7. International StablesCOST: $ 73,000,000.00

2) CLIENT: Propiedad de la Inmobiliaria INVEC, S. A. de C. V. (Fina Factor)PROJECT: Mall “Plaza Carranza”DESCRIPTION: Project Management and Mall ConstructionLOCATION: Monterrey, Nuevo LeónCONSTRUCTION: 4,950 m2

TERM: July-December 1992PHONE: 83-35-21-63/83-35-49-30RESPONSIBLE: Ing. Hugo ChapaCOST: $10,500,000.00

3) CLIENT: Propiedad de Inversiones Safi, S. A. de C. V.PROJECT: Best Western Royal HotelLOCATION: Monterrey, Nuevo León.CONSTRUCTION: 7,500 m2

TERM: November 1992.PHONE: 83-40-11-88/83-43-81-00RESPONSIBLE: Sr. Jorge Safi.COST: $8,500,000.00

4) CLIENT: Internacional de Inversiones, S.A. De C. V.PROJECT: San Agustín Medical CenterDESCRIPTION: Project Direction, Development of Preliminary Project, Permits and EngineeringLOCATION: San Pedro, Garza García, Nuevo León. CONSTRUCTION: 18,000 m2

TERM: From March to July 1993PHONE: 83-63-24-34/83-63-30-70RESPONSIBLE: Lic. Octavio HinojosaCOST: $30,000.00

5) CLIENT: Planeación Inmobiliaria Capital.PROJECT: Santa Elena BuildingDESCRIPTION: Engineering DirectionLOCATION: San Pedro, Garza García, Nuevo León.CONSTRUCTION: 3,000 m2

TERM: May 1995RESPONSIBLE: Lic. Luis Oseguera.COST: $6,000,000.00

Page 14: RÉSUMÉ (1992-2014)

14

6) CLIENT: Galáz, Gómez, Mortin, Chavero, Yamazaki, S.C.PROJECT: Corp. Torres Kumay.DESCRIPTION: Project Direction, Development of Preliminary Project, Permits and EngineeringLOCATION: Monterrey, Nuevo León.CONSTRUCTION: 21,000 m2

TERM: August de 1995.PHONE: 83-33-10-33 / 83-48-68-92 RESPONSIBLE: C.P. Ma. Estela Imamura, C.P. Celso Javier Treviño.COST: $30,000,000.00

7) CLIENT: Comercial América.PROJECT: Remodel of Cash Registers.LOCATION: San Pedro, Garza García, Nuevo León.CONSTRUCTION: 150 m2

TERM: March to April 1996.PHONE: 83-68-40-78RESPONSIBLE: C.P. Armando Fernández.COST: $200,000.00

8) CLIENT: Restaurante Remembers.PROJECT: Remodeling and construction of the new construction of the Restaurant Remembers.LOCATION: Monterrey, Nuevo León.TERM: April 1996PHONE: 83-78-44-14RESPONSIBLE: Arq. Felipe Mier.COST: $1,000,000.00

9) CLIENT: Comercial América.PROJECT: Office Remodeling of: Promotoría en Seguros.LOCATION: San Pedro, Garza García, Nuevo León.CONSTRUCTION: 400 m2

TERM: November1996.PHONE: 83-68-40-78RESPONSIBLE: C.P. Armando Fernández.COST: $900,000.00

10) CLIENT: Comercial América.PROJECT: Employee Dinning Room.LOCATION: San Pedro, Garza García, Nuevo León.CONSTRUCTION: 180 m2

TERM: January 1997.PHONE: 83-68-40-78RESPONSIBLE: C.P. Armando Fernández.COST: $550,000.00C

OM

MER

CIA

L R

ÉSU

Page 15: RÉSUMÉ (1992-2014)

15

11) CLIENT: Bueno Alimentos, S.A. de C.V.PROJECT: Corp. for Bueno Alimentos, S.A. de C.V.DESCRIPTION: Direction of the Engineering and the Construction of the Office BuildingUBICATION: Monterrey, Nuevo León.TERM: December 1997 to January 1999.PHONE: 83-33-34-43RESPONSIBLE: Lic. Guillermo Bueno.COST: $500,000.00   

12) CLIENT: Lic. Alejandro Bueno, Arq. Felipe Mier, Lic. Alfonso Guzmán.PROJECT: Apartments in the Project: Torre Blanca.LOCATION: San Pedro, Garza García, Nuevo León.TERM: May 1998.PHONE: 83-48-63-55RESPONSIBLE: Lic. Alejandro Bueno.COST: $2,500,000.00

13) CLIENT: Superficies Decorativas, S. A. de C.V.PROJECT: Construction of Distribution CenterLOCATION: Direction of the Engineering, the Construction of the Office Building and the Industrial WarehouseCONSTRUCTION: Monterrey, Nuevo León.TERM: June 2000PHONE: 86-25-50-00RESPONSIBLE: Lic. Luis de la Garza.COST: $15,000,000.00

14) CLIENT: Chrysler.PROJECT: Chrysler Poza Rica Chrysler Agency

DESCRIPTION:Direction of the Engineering, the Construction of the Office Building, exposure area, industrial workshop, stock and maneuver

UBICATION: Poza Rica, Veracruz.TERM: July 2000PHONE: (138) 2-22-42RESPONSIBLE: Lic. Ramón Caballero.COST: $ 18'000,000.00

15) CLIENT: Supermercados Internacionales HEB.PROJECT: HEBDESCRIPTION: Store and Mall ConstructionUBICATION: Santa Catarina, Nuevo León.TERM: January 15 of 2001 to August 29 of 2001.PHONE: 81-53-11-61RESPONSIBLE: Arq. Irene PadillaCOST: $150,000,000.00

CO

MM

ER

CIA

L R

ÉSU

Page 16: RÉSUMÉ (1992-2014)

16

16) CLIENT: Super Mercados Internacionales HEB.PROJECT: HEB Tampico.DESCRIPTION: Mall and Store ConstructionLOCATION: Tampico, Tamaulipas.TERM: October 2001 PHONE: 81-53-11-61RESPONSIBLE: Arq. Mauricio Toloumsis.COST: $150,000,000.00

17) CLIENT: Internet por Fibra, S. A. de C. V.  PROJECT: Celda S5.

DESCRIPTION: Project Direction, Permits, Engineering and Fiber Optic Network Construction.  LOCATION: San Pedro Garza García, Nuevo León.  TERM: April 2002   PHONE: 84-79-55-10  RESPONSIBLE: Ing. Jorge Eugenio Ortíz.  COST: $3,000,000.00

18) CLIENT: Parroquia Santa EngraciaPROJECT: Centro Pastoral San AgustínDESCRIPTION: Temple Construction including chapel, offices, salons and parking lot. (20,000 m2)LOCATION: Sendero de las Privanzas 402, Col. Las Privanzas, San Pedro Garza GarcíaTERM: November 2003PHONE: 80-40-28-95RESPONSIBLE: Pbro. Marcelo VarelaCOST: $ 16'000,000.00

19) CLIENT: Grupo Acosta VerdePROJECT: Mall: Plaza PeriféricoDESCRIPTION: Construction Management of: High Category Mall CenterLOCATION: Reynosa, TamaulipasTERM: January 2004 to December de 2004PHONE: 10-01-98-00RESPONSIBLE: Arq. Miguel Reyes VidalesCOST: $ 280'000,000.00

20) CLIENT: Corporación ControlPROJECT: Woolworth MonterreyDESCRIPTION: Construction Management of the Departmental Store.LOCATION: Monterrey, N.L.TERM: September 2004 to December 2004PHONE: 83-29-55-00RESPONSIBLE: Arq. Javier IbarraCOST: $ 20'000,000.00C

OM

MER

CIA

L R

ÉSU

Page 17: RÉSUMÉ (1992-2014)

17

21) CLIENT: Lic. Javier DelgadoPROJECT: Centro Comercial Las LajasDESCRIPTION: Construction Management of the MallLOCATION: Monterrey, N.L.TERM: January 2005.PHONE: 83-45-88-45RESPONSIBLE: Ing. Javier DelgadoCOST: $ 5'000,000.00

22) CLIENT: G y H de JuárezPROJECT: Plaza Galería TEC (Multimedios)DESCRIPTION: Project and Construction ManagementLOCATION: Cd. Juárez, Chihuahua.TERM: January 2005 to November 2006PHONE: 83-56-20-99RESPONSIBLE: Lic. Marco MartínezCOST: $ 60'000,000.00

23) CLIENT: Wal Mart de MéxicoPROYECT: Supercenter Miguel Alemán RemodelingDESCRIPTION: Direction and SupervisionLOCATION: Monterrey, N.L.TERM: May 2005 to August 2005PHONE: 83-18-04-34RESPONSIBLE: Ing. Luis Eduardo OchoaCOSTO: $3,000,000.00

24) CLIENT: Wal Mart de MéxicoPROJECT: Supercenter Las Torres RemodelingDESCRIPTION: Direction and SupervisionLOCATION: Monterrey, N.L.TERM: May 2005 a August 2005PHONE: 83-18-04-34RESPONSIBLE: Ing. Luis Eduardo OchoaCOST: $3,000,000.00

25) CLIENT: Wal Mart de MéxicoPROJECT: Bodega Aurrera Saltillo (Change of A/C Equipment)DESCRIPTION: Direction and SupervisionLOCATION: Saltillo, Coah.TERM: January 2006 to March 2006PHONE: 83-18-04-34RESPONSIBLE: Ing. Luis Eduardo OchoaCOST: $1,500,000.00

CO

MM

ER

CIA

L R

ÉSU

Page 18: RÉSUMÉ (1992-2014)

18

26) CLIENT: Grupo SorianaPROJECT: Soriana TangamangaDESCRIPTION: Direction and SupervisionLOCATION: San Luis Potosí, S.L.P.TERM: February 2006 to July 2006PHONE: 83-29-90-00RESPONSIBLE: Ing. Sergio DíazCOST: $ 85'000,000.00

27) CLIENT: Fideicomiso Paque FundidoraPROJECT: Fundidora Park Expansion Phase 1DESCRIPTION: Direction and SupervisionLOCATION: Monterrey, N.L.TERM: March 2006 to June 2006PHONE: 83-40-52-50RESPONSIBLE: Ing. Sergio CantúCOST: $140,000,000.00

28) CLIENT: Fundación Monterrey 2007 A.CPROJECT: Fundidora Park Expansion Phase 2DESCRIPTION: Direction and SupervisionLOCATION: Monterrey, N.L.TERM: April 2006 to December 2006PHONE: 83-40-52-50RESPONSIBLE: Ing. Sergio CantúCOST: $120,000,000.00   

29) CLIENT: Wal Mart de MéxicoPROJECT: Suburbia La Silla (Remodeling)DESCRIPTION: Direction and Supervision LOCATION: Monterrey, N.L.TERM: April 2006 a July 2006PHONE: 83-18-04-34RESPONSIBLE: Ing. Carlos AcevedoCOST: $3,000,000.00

30) CLIENT: Wal Mart de MéxicoPROJECT: Bodega Aurrera ConstructionDESCRIPTION: Direction and SupervisionLOCATION: Río Grande, ZacatecasTERM: June 2006 to September 2006PHONE: 83-56-84-10RESPONSIBLE: Arq. Rodrigo MariscalCOST: $13,500,000.00C

OM

MER

CIA

L R

ÉSU

Page 19: RÉSUMÉ (1992-2014)

19

31) CLIENT: Universidad de MonterreyPROJECT: Internal Audit UDEM ResidencesDESCRIPTION: Internal Audit LOCATION: San Pedro Garza García, N.L.TERM: September 2006 to December 2006PHONE: 81-24-11-21RESPONSIBLE: Lic. Luis MirandaCOST:  

32) CLIENT: Lic. Luis Alberto Troncoso / Arq. José Carlos VillanuevaPROJECT: La Cima Apartment BuildingDESCRIPTION: Management and SupervisionLOCATION: San Pedro Garza García, N.L.TERM: September 2006PHONE: 80-40-20-05RESPONSIBLE: Lic. Luis Alberto Troncoso / Arq. José Carlos VillanuevaCOST: $16,500,000.00

33) CLIENT: Wal Mart de MéxicoPROJECT: Mi Bodega AurreraDESCRIPTION: Direction and SupervisionLOCATION: Madero, CoahuilaTERM: January 2007 a March 2007PHONE: 01-55-53-70-30-00RESPONSIBLE: Arq. Federico DíazCOST: $8,000,000.00

34) CLIENT: Wal Mart de MéxicoPROJECT: Bodega AurreraDESCRIPTION: Direction and SupervisionLOCATION: Villa de García, N.L.TERM: March 2007 PHONE: 01-55-53-71-30-00RESPONSIBLE: Arq. Rodrigo MariscalCOST: $ 34'000,000.00

35) CLIENT: Desarrolladora MPROJECT: School ClassroomsDESCRIPTION: Direction and SupervisionLOCATION: Monterrey, N.L. y su área MetropolitanaTERM: April 2007 - PHONE: (55) 52-57-17-56RESPONSIBLE: Ing. Joaquín Martínez del CampoCOST: $ 100'000,000.00C

OM

MER

CIA

L R

ÉSU

Page 20: RÉSUMÉ (1992-2014)

20

36) CLIENT: Motores Competitivos SA de CV

PROJECT: Agency Pro-shop Suzuki

DESCRIPTION: Direction and Supervision

LOCATION: Monterrey, N.L. y su área Metropolitana

TERM: October 2007- February 2008

PHONE: 12-33-00-00

RESPONSIBLE: Ing. Humberto Guzmán

COST: $3,500,000.00

37) CLIENT: Trebotti SA de CV

PROJECT: Torre de Departamentos y Oficinas

LOCATION: Torreón Coahuila

TERMN: Octubre 2007

PHONE: 01-871) 719-10-00

RESPONSIBLE: Lic. Luis Treviño Botti

38) CLIENT: Max Construcciones de Arenas y Parques SA de CV

PROJECT: Estacionamiento Oriente Arena Monterrey

DESCRIPTION: Direction and Construction

LOCATION: Monterrey, N. L.

TERM: May 2008 – July 2009

PHONE: 82-21-20-20

RESPONSIBLE: C.P. Guillermo Garza Mercado

COST:  

39) CLIENT: Inversity Desarrollo Inmobiliario

PROJECT: Habitation Apartments in: Campo de Golf

LOCATION: San Miguel de Allende, Gto.

TERM: May to September 2008

PHONE: 83-63-86-32

RESPONSIBLE: Arq, Marco Garza

COST:  

CO

MM

ER

CIA

L R

ÉSU

Page 21: RÉSUMÉ (1992-2014)

21

40) CLIENT: Century 21 Marcos & Assad

PROJECT: Apartment Tower

DESCRIPTION: Direction and Construction

LOCATION: Monterrey. N. L.

TERM: August 2008 to May 2009

PHONE: 50-00-21-00

RESPONSIBLE: Lic. Marco Garza Mercado

COST:

41) CLIENT: Ing. Rogelio Sada Zambrano

PROJECT: Fraccionamiento Canoas

DESCRIPTION: Parametric Budget Elaboration

LOCATION: Montemorelos Nuevo León

TERM: June to July 2009

PHONE: 83-65-02-21

RESPONSIBLE: Ing. Rogelio Sada Zambrano

42) CLIENT: Arq. Eudelio Garza

PROJECT: Plaza Fiesta Anáhuac

DESCRIPTION: Internal Audit

LOCATION: San Nicolás de los Garza Nuevo León

TERM: August 2009 to January 2010

PHONE: 83-63-31-08

RESPONSIBLE: Arq. Eudelio Garza

43) CLIENT: Inmobiliaria Celer SA de CV

PROJECT: Hidalgo Tower

DESCRIPTION: Direction and Construction

LOCATION: Monterrey, Nuevo León

TERM: October 2010

PHONE: 83-99-88-00

RESPONSIBLE: Arq. Alick Amador

CO

MM

ER

CIA

L R

ÉSU

Page 22: RÉSUMÉ (1992-2014)

22

44) CLIENT: Deportivo Alpino Chipinque

PROJECT: Parking lot, Golf Practice Camp, Elevator Installation and Internal Remodel

DESCRIPTION: Diagnose and Internal Audit

LOCATION: Av. San Ángel No. 118 Col. Chipinque, CP 66290, San Pedro Garza García . N. L.

TERM: 2014

PHONE: 81-15-00-00

RESPONSIBLE: Ing. Sergio Unger

COST: $30,300,000.00

45) CLIENT: Trazzo Desarrollos Verticales, S.A. de C.V.

PROJECT: SAQQARA

DESCRIPTION: Diagnose and Internal Audit

LOCATION: Batallon de San Patricio 109 Col. Valle Oriente, San Pedro Garza García . N. L.

TERM: 2014

PHONE:

RESPONSIBLE: Matias Kreifler

COST: $685,000,000.00

46) CLIENT: IDEI

PROJECT: KOI Sky Residences

DESCRIPTION: Diagnose and Internal Audit

LOCATION: Av. Fundadores Esq. Con David Alfaro Siqueiros Valle Oriente, San Pedro Garza García . N. L.

TERM: 2014

PHONE:

RESPONSIBLE: Abelardo Garza Evia

COST: $1,726,382,951.00

CO

MM

ER

CIA

L R

ÉSU

Page 23: RÉSUMÉ (1992-2014)

23

INDUSTRIAL RÉSUMÉ

Page 24: RÉSUMÉ (1992-2014)

24

1) CLIENT: Abogados Garza O’farrill y Asociados.PROJECT: Abogados Garza O’farrill y Asociados HeadquartersLOCATION: Monterrey, Nuevo León.TERM: 1987PHONE: 83-45-70-16RESPONSIBLE: Lic. Antonio O'farrilCOST: $5,000,000.00

2) PROJECT: Bolsa Profesional Building.UBICACIÓN: Los Ángeles, California, USA.TERM: 1998-1990COST: $3,000,000.00 U.S. Dlls.

3) CLIENT: Ing. Cecilio Villanueva.PROJECT: Villanueva Industrial StorageDESCRIPTION: Two Level Storage ConstructionLOCATION: Monterrey, Nuevo, León.CONSTRUCTION: 1,500 m2

TERM: March1993 to January de 1994.PHONE: 83-51-88-86RESPONSIBLE: Ing. Cecilio Villanueva.COST: $1,400,000.00

4) CLIENT: Fama, S. A. de C. V. PROJECT: New Roof for: Nave Maquinaria of Vitro GroupLOCATION: Monterrey, Nuevo León.TERM: 1996RESPONSIBLE: Ing. Juan Manuel Arrieta.COST: $800,000.00

5) CLIENT: Vidriera Monterrey, S. A. de C. V. PROJECT: Horno No. 6. RemodelDESCRIPTION: Demolition, Survey for new installationsLOCATION: Monterrey, Nuevo León.TERM: 1997PHONE: 83-29-10-00RESPONSIBLE: Ing. Ramiro Sánchez.COST: $52,663,810.00

6) CLIENT: Promapi, S. A. de C. V. PROJECT: (WWTP) Waste Water Treatment Plant Construction.LOCATION: México, D.F.TERM: 1997PHONE: (55) 58-55-30-33RESPONSIBLE: C.P. Justo Gómez.COST: $4,800,000.00

IND

USTR

IAL

RÉSU

Page 25: RÉSUMÉ (1992-2014)

25

IND

USTR

IAL

RÉSU

7) CLIENT: Auto Templex, S. A. de C. V.PROJECT: Horno T-11 Auto Templex.DESCRIPTION: Production line construction, fans and warehouseLOCATION: Villa de García, Nuevo León.TERM: 1997 to 1998PHONE: 83-29-36-00RESPONSIBLE: Ing. Sergio Martínez.COST: $108,576,000.00

8) CLIENT: Lic. Patricio O’farrill.PROJECT: Titanium Almacenaje y Maquila.DESCRIPTION: 6 warehouses construction for storage for light industry.LOCATION: 10,000 m2.

CONSTRUCTION: Apodaca, Nuevo, León.TERM: March to September 1997.PHONE: 83-40-32-48RESPONSIBLE: Lic. Antonio O’farrill.COST: $5,850,000.00

9) CLIENT: Bueno Alimentos, S.A. de C.V. PROJECT: Warehouse ReconstructionDESCRIPTION: Demolition and Construction.LOCATION: Santa Catarina, Nuevo, León.CONSTRUCTION: 1,680 m2

TERM: January 1998.PHONE: 83-33-34-43RESPONSIBLE: Lic. Eugenio Bueno.COST: $ 800,000.00.

10) CLIENT: Cervecería Cuauhtémoc Moctezuma.PROJECT: Project MP Phase I.DESCRIPTION: Orizaba, Veracruz.LOCATION: 2,500 m2

TERM: February 1998 to August 1999.PHONE: 83-28-50-00 / 83-28-54-93

RESPONSIBLE: Ing. Eduardo Saldaña.COST: $80,000,000.00

11) CLIENT: Seguros Comercial América.PROJECT: Valuation área standsLOCATION: Monterrey, Nuevo León.TERM: April to May 1998.PHONE: 83-68-40-78RESPONSIBLE: C.P. Armando Fernández. COST: $15,000,000.00

12) CLIENT: Metalsa, S.A, de C.V.PROJECT: Thermic Treatment Warehouse DESCRIPTION: Apodaca, Nuevo, León.LOCATION: 17,200 m2

TERM: August de 1998.PHONE: 83-69-74-00RESPONSIBLE: Ing. Ignacio PrietoCOST: $30,000,000.00

Page 26: RÉSUMÉ (1992-2014)

26

IND

USTR

IAL

RÉSU

13) CLIENT: Vitro Supermatic, S. A. de C. V.PROJECT: Storage Warehouse RoofingDESCRIPTION: Apodaca, Nuevo León.LOCATION: 17,000 m2

TERM: August 1998.PHONE: 83-29-23-00RESPONSIBLE: Ing. Juan Antonio Villarreal.COST: $6,500,000.00

14) CLIENT: Vidriera Monterrey, S. A. PROJECT: Remodeling Historic HallwayDESCRIPTION: Monterrey, Nuevo León.LOCATION: 6,000 m2

TERM: Augusto 1998.PHONE: 83-29-10-00RESPONSIBLE: Arq. Eduardo Carrillo.COST: $3,200,000.00

15) CLIENT: Vidriera Monterrey, S. A.PROJECT: Remodeling Horno No.7.DESCRIPTION: Demolition and Construction of production line, fans and warehouseLOCATION: Monterrey, Nuevo León.TERM: Septiember 1998 to Junr 1999.PHONE: 83-29-10-00RESPONSIBLE: Ing. Jesús García.COST: $98,000,000.00

16) CLIENT: Perrigo de México. PROJECT: Warehouse for: Reempaque de Perrigo de México. DESCRIPTION: Ramos Arizpe, Coahuila.LOCATION: 2,500 m2

TERM: December 1998 to September 1999.PHONE: 83-88-36-46RESPONSIBLE: Ing. Vicente Saro.COST: $ 1,592,000.00 Dlls.

17) CLIENT: Supermatic.PROJECT: New roof for Supermatic Warehouse.DESCRIPTION: Metallic cover installation for the existing warehouse, while plant was still working and producing.LOCATION: Apodaca, Nuevo León. TERM: December1998 to September 1999.PHONE: 83-29-23-00RESPONSIBLE: Ing. Alfonso CamposCOST: $15,000,000.00

18) CLIENT: Ampolletas, S. A. de C. V.PROJECT: Warehouse for: Frascos y Cuarto Limpio.LOCATION: Querétaro, Querétaro.TERM: 1999PHONE: (442) 2-11-11-65RESPONSIBLE: Ing. Jesús Delgado.COST: $3,765,000.00

Page 27: RÉSUMÉ (1992-2014)

27

IND

USTR

IAL

RÉSU

19) CLIENT: Cervecería Cuauhtémoc Moctezuma.PROYECT: Carbonic Gas Line ModificationLOCATION: Navojoa, Sonora.TERM: March a December de 1999.RESPONSIBLE: Ing. Cristóbal Cantú.COST: $56,000,000.00

20) CLIENT: Simeprodeso. PROJECT: Processing Plant of Solid Wastes from the LandfillDESCRIPTION: Construction of a Processing Plant of Solid WastesLOCATION: Monterrey, Nuevo León.TERM: April1999 to March 2000.PHONE: 83-44-54-30RESPONSIBLE: Lic. Guillermo Castillo.COST: $35,000,000.00

21) CLIENT: Cervecería Cuauhtémoc Moctezuma.PROJECT: Carta Blanca de Hidalgo AgencyLOCATIONN: Parral, Chihuahua.TERM: May to July 1999.RESPONSIBLE: Ing. Javier Marroquín.COST: $10,000,000.00   

22) CLIENT: Pepsi Gemex.  PROJECT: Warehouse of: Llenos y Vacíos.

DESCRIPTION: Warehouse and maneuver patio construction  LOCATION: Apodaca, Nuevo León.  TERM: June1999 to January 2000  PHONE: 83-86-37-55  RESPONSIBLE: Arq. Enrique de la Jara  COST: $4,200,000.00

23) CLIENT: Industrial Power Counting.  PROJECT: Línea de Polvos, Largueros de Camión en Metalsa.

DESCRIPTION: Civil Work and Equipment installation for painting rooms  LOCATION: Apodaca, Nuevo León.  TERM: July 1999 February 2000.  PHONE: 83-69-75-61  RESPONSIBLE: Ing. Luis Carlos Carranza.  COST: $ 2,300,000.00 Dlls

24) CLIENT: Transportes Tamaulipas, S.A de C.V.PROJECT: Box Office, Service Workshops, Dorm rooms Project LOCATION: Various places at the North-East of MexicoTERM: July 1999 to 2001.PHONE: 81-51-44-00RESPONSIBLE: Ing. Rodolfo Siller.COST: $11,000,000.00

Page 28: RÉSUMÉ (1992-2014)

28

IND

USTR

IAL

RÉSU

25) CLIENT: Autobuses del Noreste, S. A. de C. V. PROJECT:: Box Office, Service Workshops, Dorm rooms Project LOCATION: Various places at the North-East of MexicoTERM: July 1999 to 2001.PHONE: 81-51-44-00RESPONSIBLE: Ing. Rodolfo Siller.COST: $6,000,000.00

26) CLIENT: Prefabricados Monterrey, S. A. de C. V.PROJECT: Plant IIDESCRIPTION: Construction of a Prefabricated Block PlantLOCATION: México, D. F.TERM: September 1999 to August 2000.PHONE: 83-84-85-40RESPONSIBLE: Ing. Mauricio Flores.COST: $16,000,000.00

27) CLIENT: Servicio Industrial Regiomontano, S. A. de C. V. PROJECT: Construction of Pensión S.I.R. F DESCRIPTION: Construction of Dorm Rooms, Offices, Commodores, Workshops, Warehouse and Maneuver PatioLOCATION: Guadalupe, Nuevo León.TERM: November 1999 to April 2000.PHONE: 81-51-44-00RESPONSIBLE: Ing. Rodolfo Siller / Lic. Enrique Sánchez.COST: $5,500,000.00   

28) CLIENT: Pepsi Gemex.PROJECT: Centro de Distribución Monclova. CEDIS.DESCRIPTION: Warehouse Construction and Office RemodelLOCATION: Monclova, Coahuila.TERM: 2000PHONE: 83-86-37-55RESPONSIBLE: Arq. Enrique de la Jara.COST: $900,000.00   

29) CLIENT: Autobuses del Noreste, S. A. de C. V. PROJECT: North-East Villagrán HeadquartersDESCRIPTION: Construction of Dorm Rooms, Offices, Commodores, Workshops, Warehouse and Maneuver PatioLOCATION: Noreste Villagrán.TERM: Janury to October 2000.PHONE: Ing. Rodolfo Siller.RESPONSIBLE: 81-51-44-00COST: $ 20,500'000.00

30) CLIENT: Servicio Industrial Regiomontano, S. A. de C. V. PROJECT: Workshop, Dorm Rooms and Warehouse ExtensionDESCRIPTION: ConsConstruction of Dorm Rooms, Offices, Commodores, Workshops, Warehouse and Maneuver PatioLOCATION: Monterrey, Nuevo León.TERM: February to June 2000.PHONE: 81-51-44-00RESPONSIBLE: Ing. Rodolfo Siller / Lic. Enrique Sánchez.COST: $2,000,000.00

Page 29: RÉSUMÉ (1992-2014)

29

IND

USTR

IAL

RÉSU

31) CLIENT: Grupo Toluca S.A de C.V.PROJECT: Bus Station Morelia.DESCRIPTION: 18 hour Project of 13,000 m2LOCATION: Morelia, Michoacán.TERM: April 2000 to August 2002PHONE: (5) 273-30-09RESPONSIBLE: C.P. Rodolfo Flores.COST: $150,000,000.00

32) CLIENT: Servicio Industrial Regiomontano, S. A. de C. V. PROJECT: Dinning Room Construction S.I.R. B LOCATION: San Nicolás de los Garza, Nuevo León.TERM: April to June 2000.PHONE: 81-51-44-00RESPONSIBLE: Ing. Rodolfo Siller / Lic. Enrique Sánchez.COST: $250,000.00   

33) CLIENT: Servicio Industrial Regiomontano, S. A. de C. V. PROJECT: Pension Construction S.I.R. G DESCRIPTION: Construction of Dorm Rooms, Offices, Commodores, Workshops, Warehouse and Maneuver PatioLOCATION: Escobedo, Nuevo León.TERM: October 2000 PHONE: 81-51-44-00RESPONSIBLE: Ing. Rodolfo Siller / Lic. Enrique Sánchez.COST: $ 3, 000,000.00

34) CLIENT: Transportes Tamaulipas, S.A de C.V.PROJECT: Workshop and Dorm Rooms for: Autobuses Coahuilenses y Transportes Tamaulipas.DESCRIPTION: Construction of Dorm Rooms, Offices, Commodores, Workshops, Warehouse and Maneuver PatioLOCATION: Monterrey, N.L.TERM: January to August 2001.PHONE: 81-51-44-00RESPONSIBLE: Ing. Rodolfo Siller.COST: $13,500,000.00

35) CLIENT: Autobuses Coahuilenses S.A. De C.V.PROJECT: Dorm Rooms, Bus wash, Workshop and Offices.DESCRIPTION: Construction of Dorm Rooms, Offices, Commodores, Workshops, Warehouse and Maneuver PatioLOCATION: Monclova, Coahuila.TERM: January to September 2001.PHONE: 81-51-44-00RESPONSIBLE: Ing. Rodolfo Siller.COST: $3,000,000.00

36) CLIENT: Transportes Tamaulipas, S.A. de C.V.PROJECT: Polyvalent Classroom Construction in: Centro de Desarrollo Senda.LOCATION: Monterrey, Nuevo León.TERM: February to July 2001.PHONE: 81-51-44-00RESPONSIBLE: Ing. Rodolfo Siller.COST: $1,200,000.00

Page 30: RÉSUMÉ (1992-2014)

30

IND

USTR

IAL

RÉSU

37) CLIENTE: Vidriera Querétaro, S. A. de C. V.PROYECTO: Line VQ-34.DESCRIPCIÓN: Warehouse Construction, Remodel and Line VQ-34 Installation of Glass Bottle Production.UBICACIÓN: Querétaro, Querétaro.CONSTRUCCIÓN: 750 m2

FECHA: June 2002 February 2003TELÉFONO: 88-63-10-00RESPONSABLE: Ing. Humberto Calderón.COSTO: $10,000,000.00 Dlls.

38) CLIENT: Franklin Electric.PROJECT: Phase I Offices and Plant.DESCRIPTION: 700 m2 construction: Office, 2200 m2 construction: WarehouseLOCATION: Linares, Nuevo León.TERM: August 2002 to March 2003RESPONSIBLE: Mr. Dan CrossCOST: $14,000,000.00

39) CLIENT: Franklin Electric.PROJECT: Phase II Offices and Plant.DESCRIPTION: Production Warehouse of 9000 m2 Construction.LOCATION: Linares, Nuevo León.TERM: September 2003 RESPONSIBLE: Mr. Dan CrossCOST: $46,000,000.00

40) CLIENT: Grupo Empresarial LogistikPROJECT: Urban Master Plan and Multimodal TerminalDESCRIPTION: Project Management and Industrial Park ConstructionLOCATION: San Luis Potosí, S.L.P.TERM: September 2004PHONE: 82-62-35-17RESPONSIBLE: C.P. Félix GarcíaCOST: $ 120'000,000.00

41) CLIENT: Alcoa Wheel Products MéxicoPROJECT: Industrial WarehouseDESCRIPTION: Project and Construction ManagementLOCATION: Ciénega de Flores, N.L.TERM: February 2005.PHONE: 81-54-64-32RESPONSIBLE: Rodrigo CortésCOST: $ 5'500,000.00

42) CLIENT: Fortacero, S.A. de C.V:PROJECT: Industrial WarehouseDESCRIPTION: Direction and SupervisionLOCATION: Gómez Palacio, Durango.TERM: October 2006PHONE: 81-56-52-00RESPONSIBLE: Ing. Luis Treviño GuajardoCOST: $16,000,000.00

Page 31: RÉSUMÉ (1992-2014)

31

IND

USTR

IAL

RÉSU

43) CLIENT: Adhoc Bienes RaícesPROJECT: GonherMex Warehouse

DESCRIPTION: Direction and ConstructionLOCATION: León, GuanajuatoTERM: November 2008 to August 2009PHONE: 81-74-40-00RESPONSIBLE: C.P. Patricia RamírezCOST:

44) CLIENT: Industrias Alen SA de CVPROJECT: Preforma Industril WarehouseDESCRIPTION: Direction and ConstructionLOCATION: Santa Catarina, N. L.TERM: March 2010PHONE: 81-22-10-00RESPONSIBLE: Pedro Alejandro Salas MarmolejoCOST:

45) CLIENT: Adhoc Bienes RaícesPROJECT: Warehouse GonherMexDESCRIPTION: Direction and ConstructionLOCATION: Pachuca, Los Mochis y San Luis PotosíTERM: June 2010PHONE: 81-74-40-00RESPONSIBLE: C.P. Patricia RamírezCOST:

46) CLIENT: Industrias Alen SA de CVPROJECT: Office Construction and Remodel.DESCRIPTION: Direction and ConstructionLOCATION: Santa Catarina, N. L.TERM: May 2010PHONE: 81-22-10-00RESPONSIBLE: Pedro Alejandro Salas MarmolejoCOST:

Page 32: RÉSUMÉ (1992-2014)

32

IND

USTR

IAL

RÉSU

47) CLIENT: Plásticos Industriales Monterrey, S.A. de C.V.PROJECT: Industrial WarehouseDESCRIPTION: Internal AuditLOCATION: 25 de Mayo 153 Col. Trabajadores, CP. 66149 Santa Catarina, NL.TERM: 2014PHONE: 83-3601-99RESPONSIBLE: Ing. Jorge GarcíaCOST: $27,000,000.00

48) CLIENT: FORTACERO JaliscoPROJECT: Industrial WarehouseDESCRIPTION: Internal AuditLOCATION: El Salto, JaliscoTERM: 2014PHONE:RESPONSIBLE: Luis TreviñoCOST: $46,000,000.00

Page 33: RÉSUMÉ (1992-2014)

33

RESIDENTIAL RÉSUMÉ

Page 34: RÉSUMÉ (1992-2014)

34

RESID

EN

TIA

L R

ÉSU

1) CLIENT: Ing. Reynaldo Reina.

  PROJECT: Ing. Reynaldo Reina’s Residence , Director of Cervecería Cuauhtémoc.  LOCATION: San Pedro Garza García, Nuevo León.  TERM: 1986  RESPONSIBLE: Ing. Reynaldo Reina.  COST: $4,500,000.00     2) CLIENT: Lic. Antonio O’farrill.  PROJECT: Lic. Antonio O’farrill’s Residence  LOCATION: San Pedro Garza García, Nuevo León.  TERM: 1987  PHONE: 83-40-32-48  RESPONSIBLE: Lic. Antonio O’farrill.  COST: $7,000,000.00     3) CLIENT: Sr. Don David Garza Lagüera.  PROJECT: Sr. Don David Garza Lagüera’s Residence Remodel  LOCATION: San Pedro Garza García, Nuevo León.  TERM: 1988  RESPONSIBLE: Sr. Don David Garza Lagüera.  COST: $1,000,000.00     4) CLIENT: Ing. Alejandro O’farrill.  PROJECT: Ing. Alejandro O’farrill Residence  LOCATION: Monterrey, Nuevo León.  CONSTRUCTION: 450 m2

  TERM: February to December 1992.  PHONE: 83-56-68-27 83-56-35-85  RESPONSIBLE: Ing. Alejandro O’farrill.  COST: $4,500,000.00     5) CLIENT: Lic. Sergio Tapia C.  PROJECT: Lic. Sergio Tapia C.’s Residence Phase I  LOCATION: Monterrey, Nuevo León.  CONSTRUCTION: 150 m2

  TERM: March to August 1992.  PHONE: 83-78-96-30 / 83-78-97-36  RESPONSIBLE: Lic. Sergio Tapia C.  COST: $180,000.00

Page 35: RÉSUMÉ (1992-2014)

35

RESID

EN

TIA

L R

ÉSU

6) CLIENT: Ing. Alejandro Torres Q.  PROJECT: Residence Remodel.  LOCATION: San Pedro Garza García, Nuevo León.  TERM: March to October 1992.  PHONE: 83-03-38-74  RESPONSIBLE: Ing. Alejandro Torres Q.  COST: $1,600,000.00     7) CLIENT: Omega.  PROJECT: Phase I Urbanization of: “Residencial Valle Alto”  LOCATION: Monterrey, Nuevo León.  TERM: March to December 1992.  PHONE: 83-48-21-77  RESPONSIBLE: Lic. Mateo Mazal.  COST: $25,500,000.00     8) CLIENT: Ing. Alejandro Torres Q.  PROJECT: “Villa las Flores” neighborhood  LOCATION: Monterrey, Nuevo León.  CONSTRUCTION: 15 Acres.  TERM: May to July 1992.  PHONE: 83-99-56-72  RESPONSIBLE: Ing. Alejandro Torres Q.  COST: $5,000,000.00     9) CLIENT: Arq. Agustín Landa.

  PROJECT: 3 level residence construction, including pool, yard construction.  LOCATION: San Pedro Garza García, Nuevo León.  CONSTRUCTION: 600 m2

  TERM: September1992 to October 1993.  PHONE: 83-46-95-29  RESPONSIBLE: Arq. Agustín Landa.  COST: $2,000,000.00     

10) CLIENT: Ing. Alejandro Lamothe.  PROJECT: Ing. Alejandro Lamothe’s Residence  LOCATION: San Pedro Garza García, Nuevo León.  CONSTRUCTION: 750 m2

  TERM: April 1993 to June 1994.  PHONE: 83-56-65-50  RESPONSIBLE: Ing. Alejandro Lamothe.  COST: $3,500,000.00

Page 36: RÉSUMÉ (1992-2014)

36

RESID

EN

TIA

L R

ÉSU

11) CLIENT: Lic. Bruno Ferrari de Alba.  PROJECT: Lic. Bruno Ferrari’s Residence  LOCATION: San Pedro Garza García, Nuevo León.  CONSTRUCTION: 650 m2

  TERM: March 1994 to October 1995.  PHONE: 83-63-15-10  RESPONSIBLE: Lic. Bruno Ferrari de Alba.  COST: $5,000,000.00     

12) CLIENT: C.P. Raúl Farías.  PROJECT: Torreón located inFracc. Villa Las Flores.  LOCATION: Monterrey, Nuevo León.  CONSTRUCTION: 10,000 m2

  TERM: January 1995.  PHONE: 83-99-56-00  RESPONSIBLE: C.P. Raúl Farías.  COST: $350,000.00

13) CLIENT: Ing. Rubén Alanís.  PROJECT: Ing. Rubén Alanis's Residence  LOCATION: Monterrey, Nuevo León.  CONSTRUCTION: 300 m2

  TERM: January 1995.  PHONE: 83-48-80-85  RESPONSIBLE: Ing. Rubén Alanís.  COST: $500,000.00

14) CLIENT: Ing. Eugenio Nájera.  PROJECT: Construction and Urbanization of: Fraccionamiento Villa las Flores.  LOCATION: Monterrey, Nuevo León.  CONSTRUCTION: 10,000 m2

  TERM: July 1995 to August 1996.  PHONE: 83-33-46-46  RESPONSIBLE: Ing. Eugenio Nájera.  COST: $1,500,000.00     

15) CLIENT: Sra. Roberta Brittingham.

  PROJECT: Construction and Urbanization of: pista y redondel for Mrs. Roberta Brittingham.  LOCATION: Villa de Santiago, Nuevo León.  CONSTRUCTION: 3,000 m2

  TERM: January 1996.  PHONE: 83-65-52-39  RESPONSIBLE: Lic. Daniel Milmo.  COST: $700,000.00

Page 37: RÉSUMÉ (1992-2014)

37

RESID

EN

TIA

L R

ÉSU

16) CLIENT: Fideicomiso Desarrollado por Confia, S. A.  PROJECT: Supervision of 24 habitation houses of: INFONAVIT Line III.  LOCATION: Reynosa, Tamaulipas.

  CONSTRUCTION: 2,000 m2

  TERM: January to June 1996.  PHONE: 83-99-60-70  RESPONSIBLE: Lic. Horacio Tijerina.  COST: $2,500,000.0017) CLIENT: Lic. María Elena Chapa.  PROJECT: Remodel and Last Details in Misiones Residence.  LOCATION: Villa de Santiago, Nuevo León.

  CONSTRUCTION: 600 m2

  TERM: March to June 1996.  PHONE: 83-43-88-16  RESPONSIBLE: Lic. María Elena Chapa.  COST: $150,000.00

18) CLIENT: Ing. Alejandro Torres Q.  PROJECT: Palapa Construction in San José de la Montaña.  LOCATION: Villa de Santiago, Nuevo León.

  CONSTRUCTION: 150 m2

  TERM: March 1996 to March de 1997.  PHONE: 83-99-56-72  RESPONSIBLE: Ing. Alejandro Torres Q.  COST: $450,000.00     

19) CLIENT: Ing. Carlos Rosenzweig.

  PROJECT: Structural Development and Project for Ing. Carlos Rosenzweig’s Residence  LOCATION: San Pedro Garza García, Nuevo León.

  CONSTRUCTION: 450 m2

  TERM: April to June 1996.  PHONE: 83-90-09-32  RESPONSIBLE: Ing. Carlos Rosenzweig.  COST: $15,000.00

20) CLIENT: Sra. Eugenia Rodríguez.  PROJECT: Mrs. Eugenia Rodríguez’s Residence  LOCATION: San Pedro Garza García, Nuevo León.  TERM: August 1997.  PHONE: 83-18-35-69  RESPONSIBLE: Sra. Eugenia Rodríguez.  COST: $1,000,000.00

Page 38: RÉSUMÉ (1992-2014)

38

RESID

EN

TIA

L R

ÉSU

21) CLIENT: Libra Alimentos, S. A. de C. V.  PROJECT: Two Habitation Houses in: Fraccionamiento la Muralla.  LOCATION: Monterrey, Nuevo León.  TERM: 750 m2

  PHONE: June 1998.  RESPONSIBLE: 83-50-09-21  COST: $1,050,000.00     22) CLIENT: Ing. Bernardo Garza de la Fuente.  PROJECT: Garza de la Fuente Familiar Residence  LOCATION: San Pedro Garza García, Nuevo León.  TERM: August 2000.  PHONE: 83-99-90-02  RESPONSIBLE: Ing. Bernardo Garza de la Fuente.  COST: $ 20'000,000.00     23) CLIENT: Cap. Enrique Vázquez.  PROJECT: Residence in: Fraccionamiento Las Misiones.  LOCATION: Villa de Santiago, Nuevo León.  TERM: January 2001 to July 2002.  PHONE: 83-86-25-33  RESPONSIBLE: Cap. Enrique Vázquez.  COST: $10,000,000.00     24) CLIENT: Inversiones Trim.  PROJECT: Las Palmas Residential Condos  LOCATION: Construction of 60 departments.  CONSTRUCTION: Monterrey, Nuevo León.  TERM: June 2001 to December 2002  PHONE: 83-33-00-19  RESPONSIBLE: C.P. Celso Javier Treviño.  COST: $50,000,000.00     25) CLIENT: Grupo Delphi, S. A. de C. V.  PROJECT: Balcones de la Loma  LOCATION: Construction Management of: 82 Residential Apartments  CONSTRUCTION: Monterrey, Nuevo León.  TERM: May 2002 to November 2003  PHONE: 83-35-55-76  RESPONSIBLE: Ing. Keneth Cruz Acosta.  COST: $50,000,000.00

Page 39: RÉSUMÉ (1992-2014)

39

RESID

EN

TIA

L R

ÉSU

26) CLIENT: Ing. Eduardo Cantú Segovia  PROJECT: Bosques de Linda Vista  LOCATION: Construction of 25 Habitation Houses  CONSTRUCTION: San Nicolás de los Garza  TERM: May 2003.  PHONE: 83-90-70-50  RESPONSIBLE: Ing. Eduardo Cantú Segovia  COST: $ 7'500,000.00     27) CLIENT: Familia Cantú Segovia  PROJECT: Fraccionamiento Los Encinos  LOCATION: Project Management and Construction of 19 Residential Houses  CONSTRUCTION: San Pedro Garza García, Nuevo León  TERM: October 2003   PHONE: 83-90-70-50  RESPONSIBLE: Ing. Eduardo Cantú Segovia  COST: $ 25'000,000.0028) CLIENT: Grupo Atlas  PROJECT: Pedregal de Valle Alto  LOCATION: 5 Acre Development in: Fraccionamiento Residencial  CONSTRUCTION: Monterrey, Nuevo León, Zona Valle Alto  TERM: October 2003   PHONE: 83-78-45-18  RESPONSIBLE: Lic. Estanislao Martínez Paz  COST: $4,000,000.00     29) CLIENT: Nadiex, S. A. de C. V.  PROJECT: Residencial Miravalle  LOCATION: 17 apartments  CONSTRUCTION: Av. San Jerónimo No. 200, Col. Miravalle, Monterrey, N. L.  TERM: November 2003  PHONE: 83-45-88-45  RESPONSIBLE: Lic. Javier Delgado Navarro  COST: $ 18'000,000.0030) CLIENT: Constructora Milimex  PROJECT: Balcones de Satélite  DESCRIPTION: Vertical Construction, 10 floors for 486 low-cost housing in 16 Acres      LOCATION: Monterrey, Nuevo León  TERM: January 2004  PHONE: 83-78-46-00  RESPONSIBLE: Lic. Estanislao Martínez Martínez  COST: $ 24'000,000.00

Page 40: RÉSUMÉ (1992-2014)

40

RESID

EN

TIA

L R

ÉSU

31) CLIENT: Acuña Bienes Raíces  PROJECT: Benetton Tower  LOCATION: Project Direction and Construction  CONSTRUCTION: Monterrey, N.L.  TERM: April 2005 to October 2006.  PHONE: 83-35-70-15  RESPONSIBLE: Lic. Rafael Acuña  COST: $40,000,000.00     32) CLIENT: Gamo Bienes Raíces  PROJECT: Fraccionamiento La Silla  LOCATION: Project Management and Construction  CONSTRUCTION: Monterrey, N.L.  TERM: August 2005 to December 2006  PHONE: 83-35-23-20  RESPONSIBLE: Lic. Raúl Garza  COST: $20,000,000.00     33) CLIENT: Quail Construction  PROJECT: Fraccionamiento Codornices  LOCATION: Direction and Supervision  CONSTRUCTION: Monterrey, N.L.  TERM: April 2006  PHONE: 83-56-84-10  RESPONSIBLE: Ing. Eugenio Nájera  COST: $10,000,000.00     34) CLIENT: Desarrollos Sierra Madre  PROJECT: Fraccionamiento La Silla  LOCATION: Direction and Supervision  CONSTRUCTION: Monterrey, N.L.  TERM: April 2006   PHONE: 83-38-10-30  RESPONSIBLE: Sra. Lila Garza   COST: $110,000,000.00     35) CLIENT: Quail Construction  PROJECT: Fraccionamiento Los Aldama  LOCATION: Direction and Supervision  CONSTRUCTION: Monterrey, N.L.  TERM: Septiember 2006   PHONE: 83-56-84-10  RESPONSIBLE: Ing. Eugenio Nájera Padilla  COST: $8,500,000.00

Page 41: RÉSUMÉ (1992-2014)

41

RESID

EN

TIA

L R

ÉSU

36) CLIENT: Fam. Argüelles  PROJECT: Casa - Club  LOCATION: Direction and Supervision  CONSTRUCTION: San Pedro Garza García  TERM: December 2006  PHONE: 81-52-42-49  RESPONSIBLE: Lic. Sergio Argüelles  COST: $ 5'000,000.0037) CLIENT: Empresas Santos  PROJECT: Fracc. Los Ángeles  LOCATION: Direction and Supervision  CONSTRUCTION: San Pedro Garza García, N.L.  TERM: February 2007   PHONE: 81-14-20-20  RESPONSIBLE: Ing. Fernando Moreno  COST: $ 26'000,000.00     38) CLIENT: Empresas Ese  PROJECT: Fracc. Santa Catarina  LOCATION: Direction and Supervision  CONSTRUCTION: Santa Catarina, N.L.  TERM: April 2007  PHONE: 81-80-10-60-50  RESPONSIBLE: Lic. Salvador Alanís  COST: $ 5'500,000.0039) CLIENT: Grupo Gentor  PROJECT: Fracc. Las Fuentes  LOCATION: Internal Audit  CONSTRUCTION: San Pedro Garza García, N.L.  TERM: April 2007   PHONE: 83-44-75-65  RESPONSIBLE: Lic. Luis Alberto Ruiz  COST: $ 206'000,000.00     40) CLIENT: Lic. Ernesto Santos  PROJECT: Residencial  LOCATION: Direction and Supervision  CONSTRUCTION: San Pedro Garza García, N.L.  TERM: January 2008   PHONE: 81-73-53-53  RESPONSIBLE: Lic. Ernesto Santos  COST: $ 206'000,000.0041) CLIENT: Lic. Angel Galván  PROJECT: Residentiall  DESCRIPTION: Direction and Supervision  LOCATION: San Pedro Garza García, N.L.  TERM: October 2008 to May 2009  PHONE: 15-94-27-61  RESPONSIBLE: Lic. Angel Galván

Page 42: RÉSUMÉ (1992-2014)

42

RESID

EN

TIA

L R

ÉSU

42) CLIENT: Inmobiliaria Cañón del Huajuco  PROJECT: Fracc. Los Azulejos  LOCATION: Direction  CONSTRUCTION: Monterrey, N. L.   TERM: 2008  PHONE: 83-63-38-88  RESPONSIBLE: C.P. Artemio Garza  COST:     43) CLIENT: Ing. Jorge Llaguno  PROJECT: Fam . Llaguno’s Residence  LOCATION: Direction and Supervision  CONSTRUCTION: San Pedro Garza García  TERM: July 2009  PHONE: 83-31-77-01  RESPONSIBLE: Ing. Jorge Llaguno  COST:

44) CLIENT: Lic. Armando Vejar  PROJECT: Fracc. Puerto Bahía Villas  LOCATION: Direction and Supervision  CONSTRUCTION: Puerto Vallarta  TERM: July 2010  PHONE: 81-55-65-05  RESPONSIBLE: Lic. Armando Vejar  COST:

Page 43: RÉSUMÉ (1992-2014)

43

RESID

EN

TIA

L R

ÉSU

45) CLIENT: Grupo Corporativo BATAB, S.A. de C.V. (NURBAN)  PROJECT: Fraccionamiento de Lotes Urbanizados con Campos de Golf  LOCATION: Ave. Patria 1300 Col. Villa Universidad, Zapopan, Jalisco.  CONSTRUCTION: Fraccionamiento de Lotes Urbanizados con Campos de Golf  TERM: 2014.  PHONE: 122-917-94444  RESPONSIBLE: Ing. Ernesto Bortoni  COST: $264,000,000.00     46) CLIENT: GESTA Desarrollos, S.A. de C.V.  PROJECT: Habitation Building  LOCATION: Av. Eugenio Garza Sada No. 800 sur Col. Mas Palomas, Monterrey, NL.  CONSTRUCTION: Edificio de Usos Multiples 2 niveles comercial, 9 niveles de departamentos y sotano 4 niveles.  TERM: 2014  PHONE: 81-5536-54  RESPONSIBLE: Ing. Oscar de la Garza Clariond  COST: $360,000,000.00     47) CLIENT: El Molino  PROJECT: Internal Audit  LOCATION: Leon, Guanajuato  CONSTRUCTION: Fraccionamiento Residencial con Campo de Gold y Casa Club  TERM: 2014  PHONE: 477-7811-016  RESPONSIBLE: Ing. Ernesto Bortoni  COST: $200,000,000.00     48) CLIENT: La Reserva  PROJECT: Internal Audit  LOCATION: Queretaro, Qro  CONSTRUCTION: Fraccionamiento con Edificios Multifamiliares  TERM: 2014  PHONE: 442-1927-700  RESPONSIBLE: Yolanda Hernandez  COST: $400,000,000.00     

Page 44: RÉSUMÉ (1992-2014)

44

GENERAL INFORMATION

Enterprise: VEGA CONSULTORES S.A. de C.V.

Location: Distrito B-4 #397 Col. Leones, Monterrey, N.L.

Phone/Fax: (81)-83333-6400, 8333-8818

Executive Director: Ing. Manuel Ventosa Gzz.

Webpage: www.vegagerencia.com.mx

AUTHOR: RANDY DE LA ROSA RUBALCAVA