Results of Münster-Meeting
4 flanges on roof instead of 12 (two 2 DN250, 2 DN100)
Stiffeners can be placed on the roof
Also variabel in amount and/or placement
Rails have to be built on the roof for safe access to the flanges
Top disk is flanged to roof
Diameter of top disk will be changed to 2.75m; to keep height the slope of roof will be increased
Cryo-pipe is lead through wall of water-tank by a flange
Status Water-tank before Münster-meeting
More activities
• TPC– Cryo for TPC– Outer vessel– Accessories
• Gassystem– Check Layout– Check already bought valves– List of to be ordered parts (MFC,
etc.)– Place in lab? Accessories.