Upload
mark-randall
View
154
Download
1
Tags:
Embed Size (px)
DESCRIPTION
MINISTRY OF ENERGY. OIL AND GAS SECTOR IN MYANMAR. Warmly Welcome All Delegates from United State of America. Republic of the Union of Myanmar. U Zaw Aung Director (Planning) Myanma Oil gas enterprise 27.2.2013, Naypyitaw , Myanmar. Myanmar in Brief. - PowerPoint PPT Presentation
Citation preview
Myanmar in BriefMyanmar in Brief
• Myanmar is the second largest nation in South-East Asia
• Total area is 676,577 square kilometers
• Coastal strip is 2832 kilometers
• Population is about 60 million
The Republic of the Union of The Republic of the Union of MyanmarMyanmar
Ministry of Energy
Energy Planning
Department(EPD)
Myanma Oiland Gas
Enterprise(MOGE)
Myanma Petrochemical
Enterprise(MPE)
Myanma PetroleumProducts
Enterprise(MPPE)
• Exploration• Drilling• Production• Onshore Pipeline Network• CNG
• Refineries & Process• Fertilizer Plants• Methanol Plant• CO2 and LPG Plants• Waxing & Tar
• Coordination• Management• Regulation
• Marketing• Distribution
3
Organization Setup of Ministry of EnergyOrganization Setup of Ministry of Energy
Demarcated Blocks for Demarcated Blocks for Production Sharing BasisProduction Sharing Basis
• Onshore Blocks 53 blocks
• Offshore Blocks 51 blocks
Total 104 blocks for Onshore and offshore
• Type of ContractMainly Production Sharing
Contract (PSC)
Current ActivitiesCurrent Activities
Onshore BlocksOnshore BlocksCurrently,Currently,1717 Blocks are under operating by Blocks are under operating by 1212 companies in onshore area. companies in onshore area.
11stst bidding round was completed in 2011 bidding round was completed in 2011 andand22ndnd bidding round was launched on bidding round was launched on 17.1.201317.1.2013..
Offshore BlocksOffshore BlocksCurrently, Currently, 2020 Blocks are under operating by Blocks are under operating by
99 companies in offshore area.companies in offshore area.
Offshore bidding round will be launched in Offshore bidding round will be launched in
very near future.very near future.
Projects in OffshoreProjects in Offshore
Existing ProjectsExisting Projects1)1) Yadana Project Yadana Project ~~~ Exporting to Thailand~~~ Exporting to Thailand
(some amount is used for domestic supply)(some amount is used for domestic supply)
2)2) Yetagun Project Yetagun Project ~~~ Exporting to Thailand~~~ Exporting to Thailand
Ongoing ProjectsOngoing Projects1)1) Shwe Project Shwe Project ~~~ Exporting to China~~~ Exporting to China
(some amount will be used for domestic supply)(some amount will be used for domestic supply)
2)2) Zawtika Project Zawtika Project ~~~ Exporting gas to Thailand~~~ Exporting gas to Thailand (some amount will be used for domestic supply)(some amount will be used for domestic supply)
Future ProjectFuture Project1)1) Block M-3 Project Block M-3 Project ~~~ New Discovery,~~~ New Discovery,
(All of M-3 gas will be used for Domestic supply)(All of M-3 gas will be used for Domestic supply)
00
LOCATION : MOATTAMA OFFSHORE
BLOCKS : M-5 / M-6
SELLERS : TOTAL 31.24 %
UNOCAL 28.26 %
PTTEP 25.50 %
MOGE 15.00 %
BUYER : PTT Plc
RESERVES : 6.5 TCF
EXPORT DCQ : 565 MMCFD
DOMESTIC GAS : 200 MMCFD
OFFSHORE FACILITIES : WELL HEAD PLATFORM 1 ( 8 WELLS )
WELL HEAD PLATFORM 2 ( 7 WELLS )
WELL HEAD PLATFORM 3 ( 2 WELLS )
PROCESSING PLATFORM
LIVING QUARTER PLATFORM
FLARE PLATFORM
MEDIUM COMPRESSION PLATFORM
ONSHORE FACILITIES : PIPELINE CENTER
METERING STATION
PIPELINES : 216 MILES 36” PIPELINE ( OFFSHORE )
39 MILES 36” PIPELINE ( ONSHORE )
START OF GAS EXPORT : 1998
PROJECT COST : 1200 MM$
Yadana ProjectYadana Project
LOCATION : TANINTHARYI OFFSHORE
BLOCKS : M-12 / M-13 / M-14
SELLERS : PETRONAS 40.75 %
NIPPON 19.40 %
PTTEP 19.40 %
MOGE 20.45 %
BUYER : PTT Plc
RESERVES : 4.16 TCF
EXPORT DCQ : 400 MMCFD
( ABOUT 30 BL CONDENSATE / MMCF )
OFFSHORE FACILITIES: WELLHEAD PLATFORM ( 10 WELLS ) PROCESSING PLATFORM
FSO
COMPRESSION PLATFORM
YTG BOOSTER COMPRESSION PLATFORM
ONSHORE FACILITIES : PIPELINE CENTER
METERING STATION
PIPELINES : 126 MILES 24” PIPELINE ( OFFSHORE )
42 MILES 24” PIPELINE ( ONSHORE )
START OF GAS EXPORT : 2000
PROJECT COST : ABOUT 700 MM$
Yetagun ProjectYetagun Project
LOCATION : RAKHINE OFFSHORE
BLOCKS : A-1 / A-3
SELLERS : DAEWOO 51 %
ONGE 17 %
GAIL 8.5 %
KOGAS 8.5 %
MOGE 15 %
BUYER : CHINA OIL
RESERVES : 4.5 TCF
EXPORT DCQ : 400 MMCFD
DOMESTIC GAS : 100 MMCFD
OFFSHORE FACILITIES : SHWE PROCESSING PLATFORM ( 11 WELLS )
MYA-NORTH SUB-SEA WELL HEAD (4 WELLS)
ONSHORE FACILITIES : ONSHORE GAS TERMINAL
PIPELINES : 110 KM 32” PIPELINE ( OFFSHORE )
5.7 KM 32” PIPELINE ( ONSHORE )
START OF GAS EXPORT : 2013
PROJECT COST : ~ 2000 MM$
Shwe ProjectShwe Project
LOCATION : MOATTAMA OFFSHORE
BLOCKS : M-9
SELLERS : PTTEPI 80 %
MOGE 20 %
BUYER : PTT Plc
RESERVES : 1.44 TCF
EXPORT DCQ : 245 MMCFD
DOMESTIC GAS : 100 MMCFD
OFFSHORE FACILITIES : ZAWTIKA PROCESSING QUARTER
WELL HEAD PLATFORM 1 ( 7 WELLS )
WELL HEAD PLATFORM 2 ( 12 WELLS )
WELL HEAD PLATFORM 3 ( 16 WELLS )
ONSHORE FACILITIES : ZAWTIKA PIPELINE OPERATING CENTER
ZAWTIKA METERING STATION
PIPELINES : 230 KM 28” PIPELINE ( OFFSHORE )
72 KM 28” PIPELINE ( ONSHORE )
START OF GAS EXPORT : 2013
PROJECT COST : ~ 2000 MM$
Zawtika ProjectZawtika Project
Length : 770 kmDiameter : 32 inchesDCQ : 400,000 blFirst Oil Transport : 2013Project Cost : 2.45 billion US$
Length : 792 kmDiameter : 40 inchesDCQ : 500 mmcfFirst Gas Transport : 2013Project Cost : 2.15 billion US$
Myanmar-China Oil and Gas Pipeline ProjectsMyanmar-China Oil and Gas Pipeline Projects
• MOGE has been laying the pipes throughout Myanmar to expand its national pipeline network.
• Various size from 6” to 24” of pipeline were constructed.
• Total length is about 2100 miles
12
Domestic PipelineDomestic Pipeline
Offshore Onland
• Yadana(36”) 216 miles 39 miles
• Yetagun (24”) 126 miles 43 miles
• Zawtika (28”) 143 miles 42 miles
• Shwe (32”) 65 miles 3 miles
• China-Myanmar(40”) nil 495 miles(Gas)
• China-Myanmar(32”) nil 481 miles(Oil)
Export PipelineExport Pipeline
Pipeline NetworkPipeline Network
(40)
CNG / NGV Converting ProgrammeCNG / NGV Converting Programme
Initiated in Myanmar since 1985.
1985 – August 2004 :
- 5 CNG Filling Stations ;
- 2 in Yangon City
- 2 in Yenangyaung Field
- 1 in Chauk Field
- 587 NGVs (Converted from petrol buses)
CNG / NGV Programme was reactivated
in August 2004 and Widely used in 2005.
As at 2012 :
- 45 CNG Filling Stations were constructed
- 40 in Yangon City
- 2 in Mandalay City
- 2 in Yenangyaung Oil Field
- 1 in Chauk Oil Field
Currently, more than 27600 passenger cars were converted to NGVs
The project is still continuing with high momentum
Refineries -No. 1 Refinery (Thanlyin) (20,000 B/D)No. 2 Refinery (Chauk) (6,000 B/D)Petrochemical Complex (Thanbayakan) (25,000 B/D)
Urea Plants -No. 1 Fertilizer Factory (Sale) (465 MT/D)No. 2 Fertilizer Factory(KyunChaung) (207 MT/D)No. 3 Fertilizer Factory (Kyawzwa) (600 MT/D)No. 4 Fertilizer Factory(Myaungdaga) (500 MT/D)No. 5 Fertilizer Factory(Kangyidauk) (500 MT/D)
Others -LPG Extraction Plant (Minbu) (24 mmcfd gas)Skid-Mounted LPG Plant(Nyaungdon) (10-16 mmcfd)Skid-Mounted LPG Plant(Kyunchaung) (8-10 mmcfd)Methanol Plant (Seiktha) (450 MT/D)Bitumen Plant (Thanlyin) (548 MT/D)
Refineries -No. 1 Refinery (Thanlyin) (20,000 B/D)No. 2 Refinery (Chauk) (6,000 B/D)Petrochemical Complex (Thanbayakan) (25,000 B/D)
Urea Plants -No. 1 Fertilizer Factory (Sale) (465 MT/D)No. 2 Fertilizer Factory(KyunChaung) (207 MT/D)No. 3 Fertilizer Factory (Kyawzwa) (600 MT/D)No. 4 Fertilizer Factory(Myaungdaga) (500 MT/D)No. 5 Fertilizer Factory(Kangyidauk) (500 MT/D)
Others -LPG Extraction Plant (Minbu) (24 mmcfd gas)Skid-Mounted LPG Plant(Nyaungdon) (10-16 mmcfd)Skid-Mounted LPG Plant(Kyunchaung) (8-10 mmcfd)Methanol Plant (Seiktha) (450 MT/D)Bitumen Plant (Thanlyin) (548 MT/D)
Urea Plants -Urea Plants -
Downstream SectorDownstream Sector
Health
Infrastructure
Education
Socio-Economic Programme ActivitiesSocio-Economic Programme Activities
18