REPP-CO2 – Czech-Norwegian project towards a research CO2 storage pilot in the Czech Republic

V. Hladík, O. Krejčí, J. Franců, V. Kolejka (Czech Geological Survey), R. Berenblyum (IRIS)

REPP-CO2

• Preparation of a REsearch Pilot Project on CO2 Geological Storage in the Czech Republic

• Příprava výzkumného pilotního projektu geologického ukládání CO2 v České republice

REPP-CO2 • Coordinator: Czech Geological Survey (CGS) • Partners:

– IRIS – International Research Institute of Stavanger (IRIS)

– VŠB – Technical University of Ostrava (VSB) – ÚJV Řež, a.s. (UJV) – Research Centre Řež (CVR) – Miligal, s.r.o. (Miligal) – Institute of Physics of the Earth, Masaryk

University (UFZ)

REPP-CO2

• Funding: Norway Grants • Grant provider: Ministry of Finance • Project partner: Ministry of Environment • Project duration: 23/1/2015 – 30/11/2016

Project objectives

(i) Assess the selected geological structure (a depleted oilfield) as a possible geological storage site for a research CO2 storage pilot project, utilising the methodology according to the Czech national law No 85/2012 Coll. on the storage of carbon dioxide in natural geological structures; (ii) Strengthen the Czech-Norwegian cooperation in the area of CO2 geological storage and related research and development;

Project objectives

(iii) Test the methodology, procedures and criteria for description and assessment of a planned CO2 storage complex as specified by the law No 85/2012 Coll. on the storage of carbon dioxide in natural geological structures under real conditions of a concrete storage site preparation; (iv) Perform geological modelling of the storage site and subsequent numerical simulation of CO2 injection;

Project objectives

(v) Perform a risk analysis of the storage site, including assessment of conflicts of interest, proposal of risk mitigation measures and compilation of storage site monitoring plan; (vi) Newly assess the potential of the Carpathian rock formations in the area of the Czech Republic from the CO2 storage point of view.

Project complexity

Team work, cooperation and keeping deadlines are essential: • 10 Activities • 54 Tasks • >109 researchers and technicians from

7 institutions • CGS - > 50 collaborators from 4 workplaces

(Brno, Jeseník, Klárov, Barrandov)

Project structure

Example of the complex inteptretation of the well Br-66 (from profile IV, authors J.

Franců, L. Jurenka, S. Nehyba and O. Prokop).

Product of Activity 2

A1 – Re-assessment of old data

A1 - Archive cores

Sequence stratigraphic interpretation of well log data

Relative sea level fluctuation Stratigraphic architecture

Upward coarsening / fining

Integration of seismic stratigraphy and well log data

CZ SVK

BR 71 BR 61 BR 83

Pinchout of Lab horizon

A2 – 3D model

N

3D View - Attribute - Average Absolute Amplitude

Oil and Gas Field LBr1

Fault 3 Fault 2

Testing of seismic attributes at the level of the Lab horizon

Construction of the first version of the 3D geometric model

Concepts: simulation

Initialisation and HM

Finilising activity in full

3D model

Scenarios Storage Pressure relief EOR

Scenario Weights

Pure storage 𝑤𝑤𝐶𝐶𝐶𝐶2 > 0; 𝑤𝑤𝑜𝑜𝑜𝑜𝑜𝑜 = 0; 𝑤𝑤𝑔𝑔𝑔𝑔𝑔𝑔 = 0; 𝑤𝑤𝑤𝑤𝑔𝑔𝑤𝑤𝑤𝑤𝑤𝑤 = 0

Storage in aquifer with pressure relief 𝑤𝑤𝐶𝐶𝐶𝐶2 > 0; 𝑤𝑤𝑜𝑜𝑜𝑜𝑜𝑜 = 0; 𝑤𝑤𝑔𝑔𝑔𝑔𝑔𝑔 = 0; 𝑤𝑤𝑤𝑤𝑔𝑔𝑤𝑤𝑤𝑤𝑤𝑤 > 0

Storage in abandoned field without EOR

but with pressure relief 𝑤𝑤𝐶𝐶𝐶𝐶2 > 0; 𝑤𝑤𝑜𝑜𝑜𝑜𝑜𝑜 < 0; 𝑤𝑤𝑔𝑔𝑔𝑔𝑔𝑔 < 0; 𝑤𝑤𝑤𝑤𝑔𝑔𝑤𝑤𝑤𝑤𝑤𝑤 > 0

Storage and EOR 𝑤𝑤𝐶𝐶𝐶𝐶2 > 0; 𝑤𝑤𝑜𝑜𝑜𝑜𝑜𝑜 > 0; 𝑤𝑤𝑔𝑔𝑔𝑔𝑔𝑔 > 0; 𝑤𝑤𝑤𝑤𝑔𝑔𝑤𝑤𝑤𝑤𝑤𝑤 > 0

Risk identification - Summary

Main approach: Bow-tie analysis to map causes, preventive and mitigating barriers, and undesirable effects (to humans, operations and environment

LBr-1 – status of wells

Top of Lab Horizon

SK

CZ

Abandoned well

Re-abandoned well

Targeted well

Fault

Pinch-out boundary

Gas zone

Oil zone

BR72 – well design after original abandonment and re-abandonment

Future steps • Finalisation of dynamic modelling and

simulations of CO2 injection into the reservoir • Finalisation of risk analysis – quantification of

risks, tool for evaluation of abandoned wells • Drafting of final monitoring plan • Scenarios for further development of the pilot

project • Lessons learned • Final project conference & workshop in Norway