Treasure Island Treasure Island Yerba Buena Island Yerba Buena Island Community Meeting Community Meeting January 29, 2011 Overview Land Use Open Space Sustainability Infrastructure Transportation Housing & Transition Development Process NOTE: Materials can be found on TIDA’s website: http://www.sftreasureisland.org/index.aspx?page=26 Agenda Agenda

Renovacion Isla Del Tesoro

Embed Size (px)

DESCRIPTION

Descripcion del plan de desarrollo

Citation preview

  • Treasure Island Treasure Island Yerba Buena IslandYerba Buena IslandCommunity MeetingCommunity Meeting

    January 29, 2011

    Overview Land Use Open Space Sustainability Infrastructure Transportation Housing & Transition Development Process

    NOTE: Materials can be found on TIDAs website:http://www.sftreasureisland.org/index.aspx?page=26

    AgendaAgenda

  • OverviewOverview

    HOUSINGA New San Francisco NeighborhoodA New San Francisco Neighborhood

    PARKS AND RECREATIONA Regional DestinationA Regional Destination

    SUSTAINABILITYTriple Bottom LineTriple Bottom Line

    COMMUNITY BENEFITSJobs and Economic Development,Jobs and Economic Development,

    Community Facilities, New InfrastructureCommunity Facilities, New Infrastructure

    Project CornerstonesProject Cornerstones

  • Up to 8,000 New Homes * Up to 500 Hotel Rooms * Up to 450,000 SF Retail & Historic Reuse * Up to 100,000 SF Office * 300 Acres Open Space Jobs and Community Benefits

    * Amounts shown are the maximum program being reviewed as part of the environmental impact report; the actual amount of development could be less

    Development ProgramDevelopment Program

    19931993 Congress and the President selected TI for closure and disposition by the Base Realignment & Closure Commission

    19941994 Citizens Reuse Committee formed to review reuse planning efforts. Navy completes Environmental Baseline Survey under BRAC law and initiates Installation Remediation program under CERCLA

    19961996 Draft Reuse Plan endorsed in 1996 by Mayor, Board of Supervisors and the Planning CommissionCity finalized TIHDI Agreement as part of the homeless componentof the Reuse Plan

    19971997 TIDA created by State legislation as single purpose redevelopment agency pursuant to California Community Redevelopment Law and as Trustee of Public Trust Lands

    Planning Process SummaryPlanning Process Summary

  • 19971997 NSTI officially closed and Navy and TIDA signed Co-op Agreement for interim reuse of Treasure Island and Yerba Buena Island

    2000 2000 -- 20022002 TIDA starts competitive selection process for Master Developer via RFQ/RFP. TICD selected as master developer

    2003 2003 -- 20062006 TIDA and TICD enter into Exclusive Negotiating Agreement, and begin planning for future redevelopment of TI along with CAB, TIDA and community.

    2006 2006 Development Plan and Term Sheet approved by the TIDA Board and Board of Supervisors

    2006 2006 20102010 TIDA and TICD continue planning in collaboration with CAB, TIDA and community involvement.

    Planning Process SummaryPlanning Process Summary

    May 2010May 2010 TIDA Board and Board of Supervisors unanimously endorse update to Development Plan and Term Sheet, Navy EDC MOA, and TIHDI Term Sheet

    July 2010July 2010 Draft Environmental Impact Report publishedAug 2010Aug 2010 Terms for the conveyance of former Naval Station

    Treasure Island from the Navy to the City signedDec 2010Dec 2010 Draft Transition Housing Rules and Regulations published

    and presented to residents, CAB, and TIDA BoardJan 2011Jan 2011 Draft Transaction Documents published and presented to

    CAB, TIDA Board and community groupsMar 2011Mar 2011 Responses to Comments (EIR) document anticipated to

    be published; Public hearing for EIR certification anticipated

    MarMar--May 2011May 2011 Public hearings and final project approvals

    Planning Process SummaryPlanning Process Summary

  • Land UseLand Use

    800 Residential Units (Market Rate and Affordable)

    Commercial Leasing Program

    Recreational Uses

    Job Corps Campus (Department of Labor)

    Coast Guard Facility

    Property Owned by FHWA / CalTrans

    COAST GUARD

    EXISTING RESIDENTIAL UNITS

    Existing ConditionsExisting Conditions

  • Wind | Fog | Sun

    Street Grid Responds to Micro ClimateStreet Grid Responds to Micro Climate

    Compact and Walkable | 90-100 Homes per acre | Convenient Transit Options

    A TransitA Transit--First Community First Community

  • Homes | Open Space and Recreation | Innovative Sustainable Urban Design

    Illustrative Land PlanIllustrative Land Plan

    Creating NeighborhoodsCreating Neighborhoods

    Island CenterIsland Center

    EastsideEastside

    Yerba Buena IslandYerba Buena Island

    CitysideCityside

  • Island Center Neighborhood

    Image of town center perspectiveIsland Center Neighborhood

  • Island Center Neighborhood Form

    Cityside Neighborhood

  • Cityside Promenade

    MewsNeighborhood Parks

    Cityside Shared Public Way

  • TICD LLC

    Neighborhood Park with City View

    Cityside Neighborhood Form

  • Eastside Neighborhood

    Eastside Commons

  • Eastside Neighborhood Form

    Yerba Buena Island

  • Yerba Buena Island

    Yerba Buena Island FormYerba Buena Island Form

  • Parks and RecreationParks and Recreation

    Over 300 acres of Parks & Open Space

    March 5th 2010 Public Draft Newly Revised

    1. Tower Entrance2. Shared Public Way3. Windrow Street4. Existing Chapel Building5. Hotel Entrance

    1. Tower Entrance2. Shared Public Way3. Windrow Street4. Cultural Building5. Hotel Entrance6. Shared Public Way

    Changes to Land PlanChanges to Land PlanRetention of Chapel in Cultural ParkRetention of Chapel in Cultural Park

  • March 5th 2010 Public Draft

    Newly Revised

    Changes to Land Plan Changes to Land Plan Macalla Road R.O.WMacalla Road R.O.W

    March 5th 2010Public Draft

    Newly Revised

    Changes to Land Plan Changes to Land Plan Bicycle CirculationBicycle Circulation

  • Changes to Land Plan Changes to Land Plan Heights Heights Original PlanOriginal Plan

    +340 height of YBI

    +450+315

    +525 Height of bridge suspension towers

    Changes to Land Plan Changes to Land Plan Heights Heights Revised Building Heights IndicatedRevised Building Heights Indicated

  • Changes to Land Plan Changes to Land Plan Heights Heights Current PlanCurrent Plan

    Everyone Pays Metered On street parking Shared parking for efficiency Strictly enforced and monitored Pricing to encourage use of other

    modes Sufficient parking necessary for viability

    of commercial/retail

    Commercial Parking Minimize Automobile Impacts

    Unbundled from sale or rent of unit 1 parking space per unit

    Residential Parking Pricing and Management

    Parking PrinciplesParking Principles

  • Trust ExchangeTrust Exchange

    Design for DevelopmentDesign for Development The Design for Development sets forth the underlying vision and

    principles for redevelopment of Treasure Island and Yerba Buena Island.

    It establishes development standards and design guidelines, as well as the vision for the Islands districts, the parks and open spaces, and the network of pedestrian and bicycle routes.

    The document would establish specific land use controls and zoning, define and protect view corridors, establish guidance and requirements for sustainable building design, building envelope and design controls (such as height and bulk limits, tower separation, setbacks and fenestration), and establish parking, loading, signage and lighting controls for the TI/YBI Development Plan Area.

    The D4Ds design standards and guidelines would supersede the Planning Code for all new construction on the Islands.

  • Land Use PlanLand Use Plan

    Describes overall project entitlements and scope of development program

    Indicates the general type, pattern and location of development

    Specific design controls and permitted uses regulated through Design for Development document

    Indicates areas where uses must be consistent with the Tidelands Trust

    Recognizes existing conditions

    Land Use PlanLand Use Plan

  • Maximum Height PlanMaximum Height Plan

    Open SpaceOpen Space

  • Open Space Network & Regional Destinations

    Chapel and

    Treasure Island Waterfront Open Spaces

  • Sculpture Park Waterfront Promenade

    Cityside Waterfront Park

    Cityside Waterfront Park

  • Northern Shoreline Park

    Northern Shoreline Park

  • Eastside Shoreline Park

    Urban Agricultural Park

  • Recreation Fields

    Livable Streets

  • Shared Public Way

    Shared Public Way

  • Shared Public Way

    Cityside Mews StreetShared Public Way

  • Shared Public Way

    Eastside Commons

  • Eastside Commons

    Eastside Commons

  • Eastside Commons

    40

    56

    Clipper Cove Promenade

  • 40

    56

    Clipper Cover Promenade

    Waterfront Plaza

  • Yerba Buena IslandOpen Spaces

    Habitat Management Area

  • Hilltop Park

    PARKING FOR OPEN SPACE

    Open Space Development Phasing

  • Open Space Development Phasing

    Open Space Development Phasing

  • Open Space Development Phasing

    Open Space Development Phasing

  • Open Space Development Phasing

    SustainabilitySustainability

  • Enduring Asset for Future

    Generations

    Enduring Asset for Future

    Generations

    Economic Viability

    Social Equity

    Environmental Stewardship

    A Vision for SustainabilityA Vision for SustainabilityTriple Bottom LineTriple Bottom Line

    A vision for sustainability

    Economic Viability

    - 2000+ new construction jobs and 2500+ new permanent jobs created

    - New hotel, commercial and recreational uses attract visitors and generates new revenues for City

    - Private sector experience leveraged through public private partnership

    - Implementation of an economically viable Project results in a long term positive impact on the Citys general fund

    Triple Bottom LineTriple Bottom Line

  • A vision for sustainability

    Social Equity - 30% affordable housing

    - Economic development opportunities provided in conjunction with TIHDI

    - Community-serving spaces including reuse of the Treasure Island school and Life Learning Academy, new sports fields and recreation, retention of Church and additional community-serving spaces

    - Socially and economically diverse communities embraced throughout project design

    - Public participation and transparency

    Triple Bottom LineTriple Bottom Line

    A vision for sustainability

    Environmental Stewardship- Remediation of contaminated areas

    - Landscape design with regionally-appropriate species

    - 300 acres of new public and open spaces

    - Habitat preservation and management plan

    - A new wetland habitat

    - Sustainable buildings exceeding Title 24 requirements

    - Right-sized on-island infrastructure

    - Generate renewable energy on-site

    Triple Bottom LineTriple Bottom Line

  • Clinton Climate Initiative (CCI)Climate Positive Development Program

    AIA 2009 National Honor Award Regional and Urban Design

    Governors Economic and Environmental Leadership Award

    Recognition Of Comprehensive ApproachRecognition Of Comprehensive Approach

    Climate Positive Development Program

    TREASURE ISLANDREDEVELOPMENT PROJECT

  • Sustainability FrameworkSustainability Framework

    Committed to LEED ND Gold CertificationClinton Climate Initiative Participant

    Treasure Island Green Building Specifications Exceeds San Franciscos Green Building Ordinance Applies to All New Buildings Condition of Approval for Building Permits Developed with SF Dept. on Environment

    Master Plan

    Buildings

    Verifiable Sustainability Plan

    solar orientation | wind protection

    Responsive to Microclimate

  • 90-100 homes per acre | 65% open space | less infrastructure

    A Compact, Walkable Community

    adaptive reuse of Building 1, 2 and 3 and the YBI historic buildings

    Reuse Historic Resources

  • 300 acres of open space | habitat management plan

    Promote Habitat Conservation & Protect BiodiversityPromote Habitat Conservation & Protect Biodiversity

    Transportation

    15 minute walk to transit hub | ferries and buses | bike friendly | transit incentives

    Transit First Community

  • Enhanced Connectivity to City via Ferry & Bus

    Introduce Organic FarmingUrban FarmOffers Connection to Food and to Environment

  • efficient buildings | efficient infrastructure systems | title 24 exceeded by 15%

    Energy Efficiency

    Water and Wastewater

    reduce potable water consumption by 40% | treat 100% stormwater wastewater on-site| on-site recycled water

    Water and Wastewater

  • Divert all waste from the landfill, and use waste as a resourcecomposting on-island | 100% diversion by 2020 | Consider automated waste management

    Solid Waste Management

    Use technology to improve efficiency | monitor resource impact | foster transparency

    Information & Communication Technology

  • Homes | Open Space and Recreation | Sustainable Urban Design

    Innovative Sustainable DesignInnovative Sustainable Design

    InfrastructureInfrastructure

  • Defines Developer obligations for all horizontal construction

    Includes all new grading/geotech, potable water, recycled water,stormwater, wastewater and sea level rise measures and full environmental remediation; Variants permitted only by EIR

    Provides conceptual design plans and details, and technical design criteria approved by City Departments

    Consistent with plans endorsed by the CAB, TIDA and Board of Supervisors in 2010

    Final plans will be reviewed and approved by City Departments

    InfrastructurePlanInfrastructurePlan

    GeotechnicalStabilizationGeotechnicalStabilization

  • ADAPTIVE STRATEGIES AT PERIMETER

    ADAPTIVE APPROACH WITH POTENTIAL HABITAT

    ELEVATED DEVELOPMENT AREAS

    WIDE SETBACKS

    ESTABLISH PROJECT GENERATED FUNDING MECHANISM

    ProtectionAgainstSeaLevelRiseProtectionAgainstSeaLevelRiseAdaptive Management

    ScaleofWestern/EasternShorelineScaleofWestern/EasternShoreline

  • Adaptive Strategies

    Western Shoreline Elevated Edge

    SeaLevelRiseSeaLevelRise

    Clipper Cove Sea Wall

    Adaptive Strategies

    SeaLevelRiseSeaLevelRise

  • YBI Streets

    InfrastructureInfrastructure

    Macalla Road

    InfrastructureInfrastructure

  • YBI Street Sections

    InfrastructureInfrastructure

    Treasure Island Streets

    InfrastructureInfrastructure

  • Treasure Island Street Sections

    InfrastructureInfrastructure

    Treasure Island Intersections: Turning Radii

    InfrastructureInfrastructure

  • Utilities and Right of Way Alignment

    InfrastructureInfrastructure

    Stormwater Treatment System

    InfrastructureInfrastructure

  • Stormwater Treatment Areas

    InfrastructureInfrastructure

    Wastewater Treatment System

    InfrastructureInfrastructure

  • Recycled Water System

    InfrastructureInfrastructure

    Domestic Water System

    InfrastructureInfrastructure

  • Dry Utilities

    InfrastructureInfrastructure

    TransportationTransportation

  • Transportation Plan Principles

    A Sustainable Plan

    Dense development focused around central transit node for walk, bike and transit

    New integrated bus and ferry hub High levels of transit service and use On island shuttles serving entire island Institutional framework that provides flexibility Financially balanced program

    TransportationPlanPrinciplesTransportationPlanPrinciples

    90-100 homes per acre | more open space | less infrastructure

    ACompact,WalkableNeighborhoodCommunityACompact,WalkableNeighborhoodCommunity

  • WalkableandBikeableCommunityWalkableandBikeableCommunity

    FerryTerminalandTransitHubFerryTerminalandTransitHub

  • Ferry Quay and TerminalMuni, Eastbay and Shuttle

    Bus TerminalBike LibraryCarshare programTDM Offices

    NewIntermodalTransitHubNewIntermodalTransitHub

    One ferry boat beginning with first occupancy

    Two additional boats added in later phases

    FerryFerry

  • San Francisco Muni bus lines to Transbay Terminal and Civic Center

    East Bay buses to downtown Oakland

    FerryFerry BusBus

    Shuttle routes serving TI, YBI and Open Space

    Shuttle is freeAlternative fuel

    vehicles

    FerryFerry BusBus ShuttleShuttle

  • Congestion Pricing

    Ramp Metering

    Unbundled 1:1 Residential Parking

    Public Parking Revenues Fund Transit Service

    Transit Passes

    Transit and Parking District

    TransitIncentivesandAutomobileMitigationTransitIncentivesandAutomobileMitigation

    Flexible Institutional Controls to Respond to Changing Conditions

    Legislatively created Collects revenues and disburses revenues to support

    transit and TDM Sets and enforces parking and congestion pricing charges Subsidizes Transit and on-Island Shuttle

    Administers TDM programs

    Adjusts policies over time to achieve the Transportation Plan goals

    ProposedTransportationAgencyProposedTransportationAgency

  • Affordable Housing Affordable Housing and Transitionand Transition

    Housing Plan 30% Affordable Housing Sets Parameters for Housing Proportions,

    Affordability, Type, Location and Tenure (for sale / for rent)

    Defines Developers Affordable Housing Obligations Prepare Land for Housing Sites to be Developed by TIDA &

    TIHDI Provide Subsidy for Construction of Affordable Housing Require Inclusionary Housing in Market-Rate Projects

    Includes Mechanisms to Ensure Developer Meets Obligations

    Provides Mechanisms to Implement the Transition Housing Rules and Regulations

    Works in Concert with Separate TIDA-TIHDI Agreement

    AffordableHousingAffordableHousing

  • Affordable Housing Program 30% affordable Affordability range of 0% to 120% of area median

    income (AMI) $0 - $119,300 for a family of four

    Average affordability below 50% AMI $49,700 for a family of four

    AffordableHousingAffordableHousing

    Affordable Housing Program

    Anticipated Unit Count

    Maximum Unit Count TICD Obligation

    TIHDI 435 435

    Provide land for 435 units and subsidy for 250 replacement units

    TIDA (Authority) 1,549 Up to 1,670

    Provide land and subsidy proportionally with market rate development

    Inclusionary 278 Up to 295

    Construct 5%, on average, of the units in market rate buildings as inclusionary

    Total Affordable 2,262 Up to 2,400

    Total Market Rate 5,278 Up to 5,600

    GRAND TOTAL 7,540 Up to 8,000

    AffordableHousingAffordableHousing

  • TIDA (Authority) Units Approximately 1,549 units Targeted to a range of populations: Low income

    families, seniors, singles Average affordability of 50% AMI or less Includes units for Transitioning Households

    AffordableHousingAffordableHousing

    TIHDI Units 435 units for formerly homeless individuals and

    families 250 units to replace current program units 185 new units

    Affordable to extremely low income households (0-30% AMI)

    Housing Plan obligates developer to provide funding and land to TIDA, who in turn will provide it to TIHDI

    Separate agreement between TIHDI and TIDA covering housing and economic development opportunities

    AffordableHousingAffordableHousing

  • Funding for Authority and TIHDI Units Typical outside funding sources (e.g. tax credits)

    These sources alone not sufficient to pay for construction of affordable housing

    Project-generated tax increment and other fees for affordable housing

    Impact fees Tax Increment Financing (TIF)

    Developer subsidy of $92 Million to fill remaining gap Paid as market rate land is sold $17,500/market rate unit ($51,000/affordable unit)

    AffordableHousingAffordableHousing

    Inclusionary Units On average, 5% of all units in market rate projects

    must be affordable Certain product types may be excluded but units must be

    provided elsewhere No off-site payment options

    Range of Affordability: Rental: 60% AMI ($59,650 for a family of four) For Sale: 80-120% AMI (Average 100% AMI, $99,400

    for a family of four)

    AffordableHousingAffordableHousing

  • Transition Housing Rules and Regulations Policy document that establishes guidelines for process

    of transitioning existing eligible residents Consistent with TIDA & Board of Supervisors

    Commitments Attached to Housing Plan, which provides a mechanism

    for implementation Developer pays for transition housing benefits through

    housing subsidy TIDA administers transition housing program Housing Plan requires market rate developers comply

    with the premarketing requirements

    TransitionTransition

    Eligible Households will have: Benefits package with options (including opportunity to

    purchase)

    Right to new unit with long term rent protection, same as current size, with exceptions and allowances.

    In-Lieu payment ($5k - $20k+), depending on household size

    Unit Purchase Assistance ($5k - $20k+), depending on household size

    Premarketing notification thirty days before general public

    Sufficient notice before asked to move (at least 3 mos.)

    TransitionTransition

  • 1. DDA Approved Eligible Households determined

    2. Interim Move Notice min. 90 days(if applicable) Select option:

    A. Existing rental unit on Treasure Island

    B. In lieu payment

    3. Long Term Move See next slide(at least several years)

    Transition Housing ProcessTransitionTransition

    1. First Notice Minimum 120 days

    2. Household interviewed to describe housing benefits, assess special needs

    3. Income certification

    4. Second Notice 60 days later Households advised of eligibility, options, unit, rent

    5. Select OptionA. New Rental Housing Unit

    B. In Lieu Payment

    C. Unit Purchase Assistance

    sftreasureisland.org for Proposed Transition Housing Rules and Regulations

    Process for Long-Term MovesTransitionTransition

  • Development ProcessDevelopment Process

    EIR analyzes the Proposed Project

    Draft EIR was published July 2010

    Responses to Comments Expected in March 2011

    EIR must be Certified by TIDA and San Francisco Planning Commission Before the Board of Supervisors can Approve Project and Transaction Documents; expected in March 2011

    As part of Project Approvals, Mitigation Measures will be Adopted

    EIROverviewEIROverview

  • Open Space Plan

    Open Space Plan

    Jobs & Economic

    Development Plan

    Jobs & Economic

    Development Plan

    CommunityFacilities

    Plan

    CommunityFacilities

    Plan

    Housing & Transition

    Plan

    Housing & Transition

    PlanFinancing

    PlanFinancing

    Plan

    Transportation Implementation

    Plan

    Transportation Implementation

    Plan

    Sustainability Plan

    Sustainability Plan

    Infrastructure Plan

    Infrastructure Plan

    Land Use Plan

    Land Use Plan

    Disposition & Development

    Agreement

    Disposition & Development

    Agreement

    Other Project Documents

    Redevelopment Plan

    Development Agreement

    Interagency Cooperation Agreement

    Design for Development

    Design Review and Document Approval Procedure

    Navy Conveyance Agreement

    Trust Exchange Agreement

    OverviewofPlansAttachedtoDDAOverviewofPlansAttachedtoDDA

    Land Use Plan Describes overall project entitlements and scope Fixed heights and zoning through Design for Development

    Open Space Plan Defines Developer Obligations for each Open Space Timeline for construction tied to adjacent development

    through the Schedule of Performance

    OverviewofPlansAttachedtoDDAOverviewofPlansAttachedtoDDA

  • Infrastructure Plan Defines Developer Obligations for all Horizontal Construction Includes Conceptual Design and Technical Specifications Consistent with Plan presented to CAB in November 2009 Reviewed and Approved by City Departments

    Sustainability Plan Defines Developer Obligations Updates Long-term Goals and Objectives Reflects Participation in Clinton Climate Initiative

    Implementation Approach to be Flexible as Technology Changes

    Green Building Specifications to required; attached to D4D

    OverviewofPlansAttachedtoDDAOverviewofPlansAttachedtoDDA

    Transportation Implementation Plan Describes the Transportation Improvements and Transit Service Defines Developer Obligations

    Construction of Facilities (including Streets, Ferry Quay, bike/pedestrian facilities, Transit Hub, bus shelters, parking facilities)

    Funding of Operating Subsidy Implementation Plan for Expanded Transit Service

    Consistent with EIR Mitigation Measure Describes TI Transportation Management Agency MOUs with Outside Transit Agencies (WETA, AC Transit) Muni concurrence via ICA

    OverviewofPlansAttachedtoDDAOverviewofPlansAttachedtoDDA

  • Financing Plan Profit Participation Structure

    Consistent with Term Sheet, Navy Transaction City benefits include Community Benefits, New Jobs and

    Profit Participation. Terms for Public Financing

    Types of Public Financing Terms for TICD to Reimburse TIDA for Its Costs Terms for City to Reimburse TICD for Public

    Infrastructure Reporting, Audit Requirements

    OverviewofPlansAttachedtoDDAOverviewofPlansAttachedtoDDA

    Housing Plan Fulfills Term Sheet Requirements for 30% Affordable

    Housing Defines Developers Affordable Housing Obligations

    Prepare Land for Housing Sites to be Developed by TIDA & TIHDI

    Provide Funding for Construction of Affordable Housing Require Inclusionary Housing in Market-Rate Projects

    Separate TIDA-TIHDI Agreement to Provide Land, Funding to TIHDI

    Transition Housing Rules and Regulations Establishes Rules and Procedures for Transition of Eligible

    Existing Households to Occur Obligation to Comply and Funding for Program Provided by

    TICD via Housing Plan

    OverviewofPlansAttachedtoDDAOverviewofPlansAttachedtoDDA

  • Community Facilities Plan Defines Developers Obligations to Provide Funding and space

    for Community Facilities Neighborhood-Serving Retail Construction and Subsidies Construction of the Police / Fire Station Improvements to School Other Programmable Community Facility Space (Controlled

    by TIDA) Approach to Implementation and Phasing Over Time

    Intent to Continue Existing Services / Re-use Facilities where Possible

    Timing For New Facilities Tied to Development, Schedule of Performance

    Employment and Contracting Plan Establishes Procedures for Hiring Compliance Covers Construction and Permanent Jobs TIHDI Joint-Venture Service Contract and Economic

    Development Opportunities

    OverviewofPlansAttachedtoDDAOverviewofPlansAttachedtoDDA

    Redevelopment Plan Grants TIDA Land Use Authority Authorizes Design for Development Enables Use of Tax Increment Financing for Qualified Project

    Costs

    Development Agreement Contract between City and TICD

    Vests Development Rights Works Together with DDA between TIDA and TICD

    Interagency Cooperation Agreement Contract between City and TIDA

    Establishes cooperative relationship between two entities Memorializes City approval of the DDA and its attachments

    RelatedTransactionDocumentsRelatedTransactionDocuments

  • Design for Development Establishes Detailed Design Standards and Guidelines for all

    new construction Public Draft Released March 2010 Includes Green Building Specifications

    Design Review and Document Approval Procedure (DRDAP) Design Review Process for Streets, Open Space and

    Infrastructure Conducted at Major Phase, Sub-Phase, and Permit Stages by TIDA

    and City Agencies Design Review Process for all Buildings

    Conducted at Schematic Design, Design Development, and Permit Stages by TIDA and City Agencies

    RelatedTransactionDocumentsRelatedTransactionDocuments

    Key Terms Major Phases allow for planning of large mixed-use

    areas or neighborhoods within the Project Site. Sub-Phases allow for more detailed planning of

    smaller-scale areas within a Major Phase. The Design Review and Document Approval

    Procedure, or DRDAP, sets out the application requirements for both Major Phases and Sub-Phases.

    PhasingPhasing

  • Land Transfer Process

    Major Phase Approval

    Complete Infrastructure

    Sub-Phase Approval Close of

    Escrow

    Sale of Lots

    Covers 5-8 BlocksDesign ReviewOpen Space Planning

    Covers 2-4 BlocksDesign ReviewPark DesignPermits / Subdivision Maps

    Transfer of Subphase Posting of SecurityRight of Reverter

    In accordance with Approved Plans, Schedule of Performance

    Vertical DDA with Homebuilder / Vertical Developer

    PhasingPhasing

    4 Y12

    3

    32

    4

    PhasingPlanPhasingPlan

    2012 20162012 20172015 20202018 20232021 2026

  • 4 Application for the Major Phase and each Sub-Phase

    Commencement and Completion ofInfrastructure Construction for each Sub-Phase

    Commencement and Completion of the Parks and Open Space Associated with the Major Phase or Sub-Phase

    Commencement and Completion of Other Development Obligations

    For each Major Phase, Schedule of Performance Identifies Outside Dates for:

    PhasingPlanPhasingPlan

    Process for Changes to the Phasing Plan TIDA to review and approve (reasonableness

    standard) if conditions are met: Complies with Phasing Goals, including:

    Proportionality of Public Benefits Orderly Infrastructure Construction Provides Service to Existing Uses

    TIDA can still comply with its obligations to others (i.e. TIHDI Agreement, Transition Housing Program, Redevelopment Law, Trust Agreement)

    PhasingPlanPhasingPlan

  • JANUARYJANUARY FEBRUARYFEBRUARY MARCHMARCH

    Informational Presentations

    CAB (January 11 & 18)

    TIDA Board (January 12 & 26)

    Community Informational Session (January 29)

    Informational Presentations

    CAB (2 meetings)

    TIDA Board (2 meetings)

    Planning Commission (2-3 meetings)

    Informational Presentations

    CAB (2 meetings)

    TIDA Board (2 meetings)

    Planning Commission (1-2 meetings)

    Actions

    CABTIDA BoardPlanning Commission

    PublicMeetingSchedulePublicMeetingSchedule

    JANUARYJANUARY FEBRUARYFEBRUARY MARCHMARCH

    Informational Presentations

    Transition Rules and RegulationsLand Use PlanPhasing Plan / Schedule of PerformanceInfrastructure PlanHousing PlanRedevelopment Plan

    Design Review and Document Approval Procedure (DRDAP)Subdivision Code Development AgreementInteragency Cooperation AgreementFinancing Plan

    Informational Presentations

    Sustainability PlanTransportation PlanDesign for DevelopmentJobs & Economic DevelopmentCommunity Facilities PlanDDA

    Informational Presentations

    Any Remaining Documents

    Action

    Recommend on All Transaction Documents

    CABReviewScheduleCABReviewSchedule

  • NOTE: Materials can be found on TIDAs website:http://www.sftreasureisland.org/index.aspx?page=26