100 Climate Solutions Project Campaign ~ 2016100 Climate Solutions Project Campaign ~ 2016
Renewable Energies
REGIONS OFCLIMATE ACTION
Summary
Mandating Authority :
Expected project CAPEX :
Main stakeholders
Location and population
Project Type :
Social and environmental impact
Umuziwabantu Municipality Solar PV Project
The success of the solar farm will have significant social impacts because it will increase electricity available on the grid and reduce spending by the municipality, thereby freeing up budget for service de-livery projects.
Umuziwabantu Municipality aims to reduce carbon emissions, and has made it a top priority to investigate the opportunity of using renewable energy. We aim to start by utilizing as much of our building rooftops as possible to generate power for own use.
Umuziwabantu Municipality
6’000’000 €
Umuziwabantu Municipality
Harding, South Africa9 544 inh.
Solar
100 Climate Solutions Project Campaign ~ 2016100 Climate Solutions Project Campaign ~ 2016
Port facilities
Project maturity ( IFC / World Bank Categories )
STAGE 1 : Concept Development, Site identification
Site identified :
Site access :
STAGE 3 : Feasibility Studies
STAGE 2 : Pre-Feasibility Studies
Pre-feasibility study :
Feasibility study :
Expected installed capacity :
Expected type of contract :
Adequate road Rail access
Building permits signed :
STAGE 4 : Permitting / Financing / Contracts
Land concession signed :
Environmental impact study :
Grid Connection :
Power Purchase Agreement Off-Taker :
Tenor : Price of electricity :
Identified sources of fundings
Engineering, Procurement and Construction Contractor :
Operation and Maintenance Contractor :
STAGE 5 : Engineering / Construction / Commercial Operation
Comments
Energy resource data
Technology :
STAGE 1 : Concept Development, Site identification
STAGE 2 : Pre-Feasibility Studies
STAGE 3 : Feasibility Studies
STAGE 4 : Permit t ing / Financing / Contracts
STAGE 5 : Engineering/Construction/Commercial Operation
No
Solar PV. We have not selected a specific brand; we have looked into the various technology providers. We will be looking at the following standards as a guide to selecting the right technology: • Tier 1 Solar Pv Panels • Power Optimizer’s• MPPT’s
No
City owned land
Not applicable
TBD
TBD
No
No
Yes
Umuziwabantu Municipality
TBD No
No
2 MWp
N/A
Engineering Procurement Construction
Yes
✓