19
1 MW Solar PV Project installed at GANDHINAGAR,GUJARAT. For Sun Edison-USA : End User:GUJARATPOWER CORPORATION LIMITED (GPCL) Installed & Executed (EPC) By EverSun Energy Pvt Ltd.,Bangalore

1 MW Solar PV Project Installed

Embed Size (px)

DESCRIPTION

Solar

Citation preview

Page 1: 1 MW Solar PV Project Installed

1 MW Solar PV Project installed at

GANDHINAGAR,GUJARAT.

For

Sun Edison-USA:End User:GUJARAT POWER CORPORATION LIMITED

(GPCL)

Installed & Executed (EPC)

By

EverSun Energy Pvt Ltd.,Bangalore

Page 2: 1 MW Solar PV Project Installed

1 MW Solar PV Project installed at Gandhi Nagar,Gujarat.

PROJECT WRITE UP

EverSun Energy Private Limited, Bangalore successfully executed the turnkey EPC work (Engineering,

Procurement and Contracting) of 1 MW Solar Photovoltaic Power Plant, through SunEdison Energy India

Private Limited, Chennai for project site at Gujarat Power Corporation Limited, Raisand, Near PDPU

Campus, Gandhinagar.

This 1 MW project has encompassed in its design, for the first time in India and Asia, different technologies in

a demonstration basis. The success of the design and engineering in integrating multiple technologies on a

single project site was appreciated by all. The project has got crystalline silicon panels of 230 WP, Thin Film

micro crystalline amorphous panels of 140 Wp, both on fixed axis mounting, Concentrating PV panels of 220micro crystalline amorphous panels of 140 Wp, both on fixed axis mounting, Concentrating PV panels of 220

Wp with Tracker based system, string inverters, central inverters apart from variety of protection features

and systems, evacuating to a 11 KV Grid. The project was completed on 31st December 2010, and after initial

trials started regular generation from 5th Jan 2011. The system has generated on an average 5200 units plus

for the fixed axis panels, apart from generation of concentrator panels. The execution from start to finish

was completed in a landmark timeline of 90 days and overall project time of 106 days.

The project was inaugurated by the Honorable Chief Minister of Gujarat Mr Narendra Modi and dedicated to

the nation on Jan 22nd 2011. Also present were the Honorable Revenue Minister of Gujarat

Smt.Jayantiben Patel and Principal Secretary Energy, Govt. of Gujarat Mr.D.J.Pandian apart from various

other dignitaries. The benefits accruing to Gujarat include generation annually of minimum 1.5 million units

of electricity, enables 1500 All Electric Homes to be powered, reduces Carbon Dioxide to the extent of 1500

tons annually and helps protect the environment.

Page 3: 1 MW Solar PV Project Installed

Completion Certificate

Page 4: 1 MW Solar PV Project Installed

BLOCK DIAGRAM OF THE INSTALLED 1 MW SOLAR PV PROJECT AT GANDHINAGAR,GUJARAT.

SJB

AJB

MJB

INVERTER

STRING

INVERTER

AUXILLARY POWER

ISOLATION

TRNSFORMER

LT PANEL

MAIN TRASFORMER

ACDB

BATTERY

HT PANEL

RELAY PANEL

METERING PANEL GRID ( 11 KV)

BATTERY CHARGER

DCDB

AUXILLARY LOAD

GRID

Page 5: 1 MW Solar PV Project Installed

1 MW Solar PV Project installed at Gandhi Nagar,Gujarat.

CRYSTALLINE PV MODULES CPV MODULE WITH TRACKERCRYSTALLINE PV MODULES CPV MODULE WITH TRACKER

THIN FLIM PV MODULES INVERTER ROOM

Page 6: 1 MW Solar PV Project Installed

1 MW Solar PV Project installed at Gandhiagar,Gujarat

Inauguration

Transformer Yard

Control Room

CRYSTALLINE PV MODULE ARRAY

Page 7: 1 MW Solar PV Project Installed

1 MW Solar PV Project installed at Gandhi Nagar,Gujarat.

Inaugurated by Mr.Narendra Modi-CM Gujarat

Page 8: 1 MW Solar PV Project Installed

1 MW Solar PV Project installed at Gandhi Nagar,Gujarat.

Inaugurated by Shri.Narendra Modi-CM Gujarat

Page 9: 1 MW Solar PV Project Installed

1 MW Solar PV Project installed at Gandhi Nagar,Gujarat.

Inaugural Speech by Mr.Narendra Modi-CM Gujarat

Page 10: 1 MW Solar PV Project Installed

1 MW Solar PV Project installed at Gandhi Nagar,Gujarat.

Inauguration Function

Page 11: 1 MW Solar PV Project Installed

1 MW Solar PV Project installed at Gandhi Nagar,Gujarat.

Developer:GPCL-Gujarat Power Corporation Limited.

Page 12: 1 MW Solar PV Project Installed

1 MW Solar PV Project installed at Gandhi Nagar,Gujarat.

Developer:GPCL-Gujarat Power Corporation Limited.

Page 13: 1 MW Solar PV Project Installed

1 MW Solar PV Project installed at Gandhi Nagar,Gujarat.

Developer:GPCL-Gujarat Power Corporation Limited.

Page 14: 1 MW Solar PV Project Installed

1 MW Solar PV Project installed at Gandhi Nagar,Gujarat.

Developer:GPCL-Gujarat Power Corporation Limited

Page 15: 1 MW Solar PV Project Installed

1 MW Solar PV Project installed at Gandhi Nagar,Gujarat.

Developer:GPCL-Gujarat Power Corporation Limited

Page 16: 1 MW Solar PV Project Installed

1 MW Solar PV Project installed at Gandhi Nagar,Gujarat.

Developer:GPCL-Gujarat Power Corporation Limited

Page 17: 1 MW Solar PV Project Installed

1 MW Solar PV Project installed at Gandhi Nagar,Gujarat.

Developer:GPCL-Gujarat Power Corporation Limited

Page 18: 1 MW Solar PV Project Installed

1 MW Solar PV Project installed at Gandhi Nagar,Gujarat.

Developer:GPCL-Gujarat Power Corporation Limited

Page 19: 1 MW Solar PV Project Installed

1 MW Solar PV Project installed at Gandhi Nagar,Gujarat.

Developer:GPCL-Gujarat Power Corporation Limited