R&D Roadmap-Issues and Problems to be Solved before CCS Deployment

Dr. Usman

Ministry of Energy and Mineral Resources

R & D C e n t r e f o r O i l a n d G a s Te c h n o l o g y

Republic of Indonesia LEMIGAS

C C S W o r k s h o p

T h e S u l t a n H o t e l

2 2 F e b r u a r y 2 0 1 1

Page 2: R&D Roadmap-Issues and Problems to be Solved Before CCS Deployment · 2014-08-07 · R&D Roadmap-Issues and Problems to be Solved before CCS Deployment Dr. Usman Ministry of Energy

Structure of Presentation

• The Purpose of the R&D Roadmap

• R&D Milestone and Roadmap on CCS

• Main Issues & Challenges-Solutions

• Possible CCS Development in Indonesia

• Key Elements to Prompt Deployment of CCS

• What’s Next?

Page 3: R&D Roadmap-Issues and Problems to be Solved Before CCS Deployment · 2014-08-07 · R&D Roadmap-Issues and Problems to be Solved before CCS Deployment Dr. Usman Ministry of Energy

The purpose of the R&D roadmap

• To identify the knowledge gaps

• To address the challenges of technology integration and scale-up

• To set up R&D target achievement

• To provide a vision for addressing the current challenges

Page 4: R&D Roadmap-Issues and Problems to be Solved Before CCS Deployment · 2014-08-07 · R&D Roadmap-Issues and Problems to be Solved before CCS Deployment Dr. Usman Ministry of Energy

CCS Development in Indonesia

Page 5: R&D Roadmap-Issues and Problems to be Solved Before CCS Deployment · 2014-08-07 · R&D Roadmap-Issues and Problems to be Solved before CCS Deployment Dr. Usman Ministry of Energy

R&D - Roadmap:

CCS Development in Indonesia

2010Storage in

Depleted Oil & Gas Reservoir

Capture & Transportation

CCS as

CDM

Carbon trade

Mechanism

Existing Legal & Reg.

Framework

CO2

Emission Source

CO2 emission from Energy

Sector

Impact of Energy Eff. &

Renew. Energy

2011Storage in

Depleted Oil & Gas Reservoir

CO2 Capture & Transportation

National Regulatory Framework

CO2 Emission Source

CO2 emission from Energy

Sector

Impact of Energy Eff. & Renew. Energy

2012Storage in Depleted Oil & Gas

ReservoirStorage in Saline and Coal

SeamsCO2 Capture & Transportation

2013 CCS Cost Unit

2014 Risk Assessment on Geological Storage

Page 6: R&D Roadmap-Issues and Problems to be Solved Before CCS Deployment · 2014-08-07 · R&D Roadmap-Issues and Problems to be Solved before CCS Deployment Dr. Usman Ministry of Energy

Main Issues & Challenges-Solutions

Financing near-term demonstration projects and incentivizing longer-term commercialization

• Engaging energy company to invest in CCS

projects

• Collaborating with international organization

• Establish incentives to accelerate commercial-

scale CCS deployment

Page 7: R&D Roadmap-Issues and Problems to be Solved Before CCS Deployment · 2014-08-07 · R&D Roadmap-Issues and Problems to be Solved before CCS Deployment Dr. Usman Ministry of Energy

Main Issues & Challenges-Solutions

Establishing effective public regulatory schemes

• Review and adapt existing legal frameworks to regulate CCS demonstration

• Develop comprehensive CCS regulatory frameworks

• Address outstanding international legal issues, such as the development of international protocols for monitoring and verification of CO2

Page 8: R&D Roadmap-Issues and Problems to be Solved Before CCS Deployment · 2014-08-07 · R&D Roadmap-Issues and Problems to be Solved before CCS Deployment Dr. Usman Ministry of Energy

Main Issues & Challenges-Solutions

Engaging and educating the public adequately to incorporate their concerns into project designs

• Expand government activities on CCS public outreach and engagement

• Formalize international public engagement networks and create a public education and engagement toolkit

Page 9: R&D Roadmap-Issues and Problems to be Solved Before CCS Deployment · 2014-08-07 · R&D Roadmap-Issues and Problems to be Solved before CCS Deployment Dr. Usman Ministry of Energy

• Energy company is reluctant on investing money on EOR

• High risk-High Cost-Many Uncertainties

• Lack of attractive incentives from the government

• They prefer doing exploration to find new hydrocarbon fields.

CO2-EOR can offset the costs of CCS

CO2-EOR might be more familiar

CCS requires significant amount investment

No public awareness of CCS

Main Issues and Challenges on CO2-EOR

Page 10: R&D Roadmap-Issues and Problems to be Solved Before CCS Deployment · 2014-08-07 · R&D Roadmap-Issues and Problems to be Solved before CCS Deployment Dr. Usman Ministry of Energy

Power Plant

Legend:

Storage Location

Pipeline

Note: Unscaled Map

Gas Processing Plant

GUU

U

Muara Tawar 2,3,4

Combined Cycle Power Plant

3 x 750 MW

Emissions Projection up to

2018: 26.6 MtCO2

Indramayu

Steam Coal Power Plant

2 x 1000 MW

Emissions Projection up to

2018: 65.8 MtCO2

Jawa Sea Offshore

South Sumatera Onshore

East Kalimantan Onshore

Bangko Tengah

Steam Coal Power Plant

4 x 600 MW

Emissions Projection up to

2018: 11.5 MtCO2

Subang

Gas Processing Plant

Emissions Projection up to

2018: 6.2 MtCO2

Muara Jawa

Steam Coal Power Plant

2 x 100 MW

Emissions Projection up to

2018: 10.6 MtCO2

60 km

60 km

320 km

35 km300 km

15 km

129.7 km

Power Plant

Legend:

Storage Location

Pipeline

Note: Unscaled Map

Gas Processing Plant

Power Plant

Legend:

Storage Location

Pipeline

Note: Unscaled Map

Gas Processing Plant

GUU

GUU

U

Muara Tawar 2,3,4

Combined Cycle Power Plant

3 x 750 MW

Emissions Projection up to

2018: 26.6 MtCO2

Indramayu

Steam Coal Power Plant

2 x 1000 MW

Emissions Projection up to

2018: 65.8 MtCO2

Jawa Sea Offshore

South Sumatera Onshore

East Kalimantan Onshore

Bangko Tengah

Steam Coal Power Plant

4 x 600 MW

Emissions Projection up to

2018: 11.5 MtCO2

Subang

Gas Processing Plant

Emissions Projection up to

2018: 6.2 MtCO2

Muara Jawa

Steam Coal Power Plant

2 x 100 MW

Emissions Projection up to

2018: 10.6 MtCO2

60 km

60 km

320 km

35 km300 km

15 km

129.7 km

Possible CCS Development in Indonesia

Page 11: R&D Roadmap-Issues and Problems to be Solved Before CCS Deployment · 2014-08-07 · R&D Roadmap-Issues and Problems to be Solved before CCS Deployment Dr. Usman Ministry of Energy

Page 11

KEY ELEMENTS

Capture

REGULATORY

FRAMEWORK

Transport Storage

NATIONAL/LOCAL REGULATIONS

IPCC Guidelines

GLOBAL METHODOLOGY

ENABLING

POLICIES

LONG-

TERM

LIABILITY

PUBLIC

ACCEPTANCE

INTERNATIONAL

FINANCING

PROMPT

DEPLOYMENT

OF CCS

CCS REGULATORY FRAMEWORK AND ENABLING POLICIES

Page 12: R&D Roadmap-Issues and Problems to be Solved Before CCS Deployment · 2014-08-07 · R&D Roadmap-Issues and Problems to be Solved before CCS Deployment Dr. Usman Ministry of Energy

What’s Next?

• Grow CCS collaborative efforts, particularly related to R&D

• Expand capacity-building efforts in CCS

• Create new CCS collaboration efforts for the most important

industrial sectors

• Use international collaboration to speed up the learning process

and information sharing that needs to occur

• Demonstration projects are needed in gathering evidence that CCS

is safe and effective

Page 13: R&D Roadmap-Issues and Problems to be Solved Before CCS Deployment · 2014-08-07 · R&D Roadmap-Issues and Problems to be Solved before CCS Deployment Dr. Usman Ministry of Energy

Thank You

[email protected]

Ministry of Energy and Mineral Resources

R & D C e n t r e f o r O i l a n d G a s Te c h n o l o g y

Republic of Indonesia LEMIGAS

Page 14: R&D Roadmap-Issues and Problems to be Solved Before CCS Deployment · 2014-08-07 · R&D Roadmap-Issues and Problems to be Solved before CCS Deployment Dr. Usman Ministry of Energy

LEMIGAS

Relevant Oil and Gas Regulations with CCS

Characteristics

Reservoir management, best

practice and environmental

protection

General environmental protection

Standardization and specification of

hydrocarbon pipelines

Regulations

Government Regulation No.35 year

2004 concerning upstream oil and

gas activities

Law No. 22 year 2001 regarding oil

and gas

Ministerial Decree No. 15 year 2008

concerning hydrocarbon

transportation

Mostly only consider common/general environmental impact

Oil and gas Laws/Regulations can barely be adapted to CCS activities at the

moment

Page 15: R&D Roadmap-Issues and Problems to be Solved Before CCS Deployment · 2014-08-07 · R&D Roadmap-Issues and Problems to be Solved before CCS Deployment Dr. Usman Ministry of Energy

LEMIGAS

Relevant Environmental Regulations with CCS

“The protection and

management of the

environment”

Only emphasize on

adverse impact of climate

change and its mitigation

and adaptation step

Exclusion ecosystem

damage of subsurface

Not specify injection of

CO2 to the subsurface

Law No. 32 year 2009

“Management of

hazardous and toxic

waste “

Cover methods of storage,

transport, permits and risk

assessment, monitoring,

liability and cost scheme,

transboundary project,

public awareness & etc.

CO2 is not classified yet

as hazardous and toxic

waste

Government Regulation

No. 18/1999 and No.74/2001

“Requirements and

procedures of waste

water treatment for

upstream oil and gas and

geothermal activities

using injection method

into the subsurface”

Covers the whole

subsurface elements

(containment, migration,

and etc.)

Serve as a basis for

developing further legal

and regulatory

frameworks

Minister Regulation

No.13 /2007