CHAPTER NO. 7
BRICK WORKDESCRIPTION OF ITEM:
Item No. 1 Pucca brick work in mud mortar in building.(i) In foundation and plinth.
Detail Unit Rate (British System) per 100 CftQty
MATERIAL1 Bricks 9\" x 4\" x 3\" 1350.00 Nos.2 Good earth or stiff clay for m35.00 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 CftFor Masonry Work1 Mason 1.50 Nos.2 Coolies unskilled 2.00 Nos.3 Bahishti 0.13 No
For Mud Mortar1 Cooly unskilled 0.67 No.2 Bahishty 0.33 No
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATESLabour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 1
Pucca brick work in mud mortar in building.
Unit Rate (British System) per 100 CftRate Per UnitAmount (Rs.)
Nos.% Cft
per dayper dayper day
per dayper day
SaySaySaySay
DESCRIPTION OF ITEM:Item No. 1 Pucca brick work in mud mortar in building.
(ii) In ground floor.
Detail Unit Rate (British System) per 100 Cft
Qty
MATERIAL1 Bricks 9\" x 4\" x 3\" 1350.00 Nos.2 Good earth or stiff clay for m35.00 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 CftFor Masonry Work1 Mason 2.00 Nos.2 Coolies unskilled 3.00 Nos.3 Bahishti 0.13 No.For Mud Mortar
1 Cooly unskilled 0.67 No.2 Bahishty 0.33 No
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATESLabour rate per 100 Cft Rs.Labour rate per Cum Rs.
Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 2
Pucca brick work in mud mortar in building.
Unit Rate (British System) per 100 Cft
Rate Per UnitAmount (Rs.)
Nos.% Cft
per dayper dayper day
per dayper day
SaySay
SaySay
DESCRIPTION OF ITEM:
Item No. 2 Add extra labour in item No.1 for brick work in
Detail Unit Rate (British System) per 100 CftQty
LABOUR for 125 CftFirst Floor1 Mason 0.25 No.2 Cooly unskilled 1.00 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATESLabour rate per 100 Cft
Labour rate per Cum
LABOUR for 125 CftSecond Floor1 Masons 0.75 No.2 Coolies unskilled 2.00 Nos.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATESLabour rate per 100 Cft
Labour rate per Cum
Page 3
Add extra labour in item No.1 for brick work in
Unit Rate (British System) per 100 CftRate Per UnitAmount (Rs.)
per dayper day
Say
Say
per dayper day
Say
Say
Detail Unit Rate (British System) per 100 Cft
Qty
LABOUR for 125 CftThird Floor1 Masons 1.25 Nos.2 Coolies unskilled 3.00 Nos.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATESLabour rate per 100 Cft
Labour rate per Cum
LABOUR for 125 Cft4th & Subsequent Floor1 Masons 2.25 Nos.2 Coolies unskilled 4.50 Nos.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Cft Rs.Labour rate per cum Rs.
Page 4
Unit Rate (British System) per 100 Cft
Rate Per UnitAmount (Rs.)
per dayper day
Say
Say
per dayper day
SaySay
DESCRIPTION OF ITEM:
Item No. 3 Pucca brick work in mud mortar other than building.(i) Upto 20 ft. (6 metre) high.
Detail Unit Rate (British System) per 100 Cft
QtyMATERIAL
1 Bricks 9\" x 4\" x 3\" 1350.00 Nos.2 Good earth or stiff clay 35.00 CftTotalContractor's Profit &20 PercentTotal
LABOUR for 125 CftFor Masonry Work
1 Mason 2.00 Nos.2 Coolies unskilled 3.00 Nos.For Mud Mortar
1 Cooly unskilled 1.00 No.2 Bahishty 0.33 No
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATESLabour rate per 100 Cft Rs.Labour rate per Cum Rs.
Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 5
Pucca brick work in mud mortar other than building.
Unit Rate (British System) per 100 Cft
Rate Per UnitAmount (Rs.)
Nos.% Cft
per dayper day
per dayper day
SaySay
SaySay
DESCRIPTION OF ITEM:Item No. 3 Pucca brick work in mud morter other than building:
(ii) Extra labour for every 5.0' (1.5 metre) additional height thereof.
Detail Unit Rate (British System) per 100 Cft
Qty
LABOUR for 125 Cft
1 Mason 0.25 No.2 Cooly unskilled 1.00 No
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATESLabour rate per 100 Cft Rs.Labour rate per Cum Rs.
Page 6
Pucca brick work in mud morter other than building:
Extra labour for every 5.0' (1.5 metre) additional height
Unit Rate (British System) per 100 CftRatePer Unit Amount (Rs.)
per dayper day
SaySay
DESCRIPTION OF ITEM:
Item No. 4 (i) Pucca brick work in foundation & plinth in
Cement sand mortar Ratio (1:2).
Detail Unit Rate (British System) per 100 Cft
QtyMATERIAL
1 Bricks 9\" x 4\" x 3\" 1350.00 Nos.2 Cement 8.00 bags3 Sand 20.00 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 CftFor Masonry Work
1 Mason 2.00 Nos.2 Coolies unskilled 2.50 Nos.3 Bahishti 0.25 No.LABOUR for 125 CftFor Cement Mortar1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 7
Pucca brick work in foundation & plinth in
Unit Rate (British System) per 100 Cft
Rate Per UnitAmount (Rs.)
Nos.per bag% Cft
per dayper dayper day
per dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 4 (i) Pucca brick work in foundation & plinth in:Cement sand mortar Ratio (1:3).
Detail Unit Rate (British System) per 100 Cft
QtyMATERIAL
1 Bricks 9\" x 4\" x 3\" 1350.00 Nos.2 Cement 6.00 bags3 Sand 22.50 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 CftFor Masonry Work
1 Mason 2.00 Nos.2 Coolies unskilled 2.50 Nos.3 Bahishti 0.25 No.LABOUR for 125 CftFor Cement Mortar1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 8
Pucca brick work in foundation & plinth in:
Unit Rate (British System) per 100 Cft
Rate Per UnitAmount (Rs.)
Nos.per bags% Cft
per dayper dayper day
per dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 4 (i) Pucca brick work in foundation & plinth in:Cement sand mortar Ratio (1:4).
Detail Unit Rate (British System) per 100 Cft
QtyMATERIAL
1 Bricks 9\" x 4\" x 3\" 1350.00 Nos.2 Cement 4.80 bags3 Sand 24.00 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 CftFor Masonry Work
1 Mason 2.00 Nos.2 Coolies unskilled 2.50 Nos.3 Bahishti 0.25 No.
For Cement Mortar1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 9
Pucca brick work in foundation & plinth in:
Unit Rate (British System) per 100 Cft
Rate Per UnitAmount (Rs.)
Nos.per bag% Cft
per dayper dayper day
per dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 4 (i) Pucca brick work in foundation & plinth in:Cement sand mortar Ratio (1:5).
Detail Unit Rate (British System) per 100 Cft
QtyMATERIAL
1 Bricks 9\" x 4\" x 3\" 1350.00 No2 Cement 4.00 bags3 Sand 25.00 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 CftFor Masonry Work
1 Mason 2.00 Nos.2 Coolies unskilled 2.50 Nos.3 Bahishti 0.25 No.For Cement Mortar1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 10
Pucca brick work in foundation & plinth in:
Unit Rate (British System) per 100 Cft
Rate Per UnitAmount (Rs.)
Nos.per bag% Cft
per dayper dayper day
per dayper day
SaySaySaySay
DESCRIPTION OF ITEM:Item No. 4 (i) Pucca brick work in foundation & plinth in
Cement sand mortar Ratio (1:6).
Detail Unit Rate (British System) per 100 Cft
Qty
MATERIAL1 Bricks 9\" x 4\" x 3\" 1350.00 No2 Cement 3.40 bags3 Sand 25.70 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 CftFor Masonry Work1 Mason 2.00 Nos.2 Coolies unskilled 2.50 Nos.3 Bahishti 0.25 No.LABOUR for 125 CftFor Cement Mortar
1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 11
Pucca brick work in foundation & plinth in
Unit Rate (British System) per 100 Cft
Rate Per UnitAmount (Rs.)
Nos.per bag% Cft
per dayper dayper day
per dayper day
SaySaySaySay
DESCRIPTION OF ITEM:Item No. 4 (i) Pucca brick work in foundation & plinth in
Cement sand mortar Ratio (1:7).
Detail Unit Rate (British System) per 100 Cft
Qty
MATERIAL1 Bricks 9\" x 4\" x 3\" 1350.00 No2 Cement 3.00 bags3 Sand 26.50 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 CftFor Masonry Work1 Mason 2.00 Nos.2 Coolies unskilled 2.50 Nos.3 Bahishti 0.25 No.LABOUR for 125 CftFor Cement Mortar
1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 12
Pucca brick work in foundation & plinth in
Unit Rate (British System) per 100 Cft
Rate Per UnitAmount (Rs.)
Nos.per bag% Cft
per dayper dayper day
per dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 4 (i) Pucca brick work in foundation & plinth inCement sand mortar Ratio (1:8).
Detail Unit Rate (British System) per 100 Cft
QtyMATERIAL
1 Bricks 9\" x 4\" x 3\" 1350.00 No2 Cement 2.66 bags3 Sand 26.67 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 CftFor Masonry Work
1 Mason 2.00 Nos.2 Coolies unskilled 2.50 Nos.3 Bahishti 0.25 No.For Cement Mortar1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 13
Pucca brick work in foundation & plinth in
Unit Rate (British System) per 100 Cft
Rate Per UnitAmount (Rs.)
Nos.per bag% Cft
per dayper dayper day
per dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 4 (ii) Pucca brick work in foundation & plinth inLime cement sand mortar Ratio (1:1:6).
Detail Unit Rate (British System) per 100 Cft
QtyMATERIAL
1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Cement 3.20 bags3 Slaked lime 59.72 kg4 Sand 24.00 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 CftFor Masonry Work1 Mason 2.00 Nos.2 Coolies unskilled 2.50 Nos.3 Bahishti 0.25 No.
For Cement Mortar1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 14
Pucca brick work in foundation & plinth inLime cement sand mortar Ratio (1:1:6).
Unit Rate (British System) per 100 Cft
Rate Per UnitAmount (Rs.)
Nos.per bagper kg% Cft
per dayper dayper day
per dayper day
Say
SaySay
DESCRIPTION OF ITEM:
Item No. 4 (ii) Pucca brick work in foundation & plinth in:Lime cement sand mortar Ratio (1:1:7).
Detail Unit Rate (British System) per 100 CftQty
MATERIAL
1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Cement 2.85 bags3 Slaked lime 53.00 kg4 Sand 24.78 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 CftFor Masonry Work1 Mason 2.00 Nos.2 Coolies unskilled 2.50 Nos.3 Bahishti 0.25 No.For Cement Mortar
1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATESLabour rate per 100 Cft Rs.Labour rate per Cum Rs.
Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 15
Pucca brick work in foundation & plinth in:Lime cement sand mortar Ratio (1:1:7).
Unit Rate (British System) per 100 CftRate Per UnitAmount (Rs.)
Nos.per bagper kg% Cft
per dayper dayper day
per dayper day
SaySay
SaySay
DESCRIPTION OF ITEM:
Item No. 4 (ii) Pucca brick work in foundation & plinth inLime cement sand mortar Ratio (1:1:8).
Detail Unit Rate (British System) per 100 Cft
QtyMATERIAL
1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Cement 2.56 bags3 Slaked lime 47.78 kg4 Sand 25.60 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 CftFor Masonry Work1 Mason 2.00 Nos.2 Coolies unskilled 2.50 Nos.3 Bahishti 0.25 No.
For Cement Mortar1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 16
Pucca brick work in foundation & plinth inLime cement sand mortar Ratio (1:1:8).
Unit Rate (British System) per 100 Cft
Rate Per UnitAmount (Rs.)
Nos.per bagper kg% Cft
per dayper dayper day
per dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 4 (ii) Pucca brick work in foundation & plinth inLime cement sand mortar Ratio (1:1:9).
Detail Unit Rate (British System) per 100 Cft
QtyMATERIAL
1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Cement 2.32 bags3 Slaked lime 43.30 kg4 Sand 26.20 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 CftFor Masonry Work1 Mason 2.00 Nos.2 Coolies unskilled 2.50 Nos.3 Bahishti 0.25 No.
For Cement Mortar1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 17
Pucca brick work in foundation & plinth inLime cement sand mortar Ratio (1:1:9).
Unit Rate (British System) per 100 Cft
Rate Per UnitAmount (Rs.)
Nos.per bagper kg% Cft
per dayper dayper day
per dayper day
Say
SaySay
DESCRIPTION OF ITEM:
Item No. 4 (ii) Pucca brick work in foundation & plinth inLime cement sand mortar Ratio (1:1:10).
Detail Unit Rate (British System) per 100 Cft
QtyMATERIAL
1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Cement 2.14 bags3 Slaked lime 39.94 kg4 Sand 26.66 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 CftFor Masonry Work1 Mason 2.00 Nos.2 Coolies unskilled 2.50 Nos.3 Bahishti 0.25 No.
For Cement Mortar1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 18
Pucca brick work in foundation & plinth inLime cement sand mortar Ratio (1:1:10).
Unit Rate (British System) per 100 Cft
Rate Per UnitAmount (Rs.)
Nos.per bagper kg% Cft
per dayper dayper day
per dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 4 (iii) Lime, sand mortar Ratio (1:2).
Detail Unit Rate (British System) per 100 CftQty
MATERIAL1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Lime Slaked 174.30 Kg.3 Sand 23.33 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 CftFor Masonry Work1 Mason 2.00 Nos.2 Coolies unskilled 2.50 Nos.3 Bahishti 0.25 No.
For Cement Mortar1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATESLabour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 19
Unit Rate (British System) per 100 CftRate Per UnitAmount (Rs.)
Nos.Per Kg.% Cft
per dayper dayper day
per dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 5 (i) Pacca brick work in ground floor (including striking of joCement sand mortar Ratio (1:2).
Detail Unit Rate (British System) per 100 Cft
QtyMATERIAL
1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Cement 8.00 bags3 Sand 20.00 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 CftFor Masonry Work
1 Mason 2.50 Nos.2 Coolies unskilled 4.00 Nos.3 Bahishti 0.25 No.For Cement Mortar1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 20
Pacca brick work in ground floor (including striking of jo
Unit Rate (British System) per 100 Cft
Rate Per UnitAmount (Rs.)
Nos.per bag% Cft
per dayper dayper day
per dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 5 (i) Pacca brick work in ground floor (including striking of joCement sand mortar Ratio (1:3).
Detail Unit Rate (British System) per 100 Cft
QtyMATERIAL
1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Cement 6.00 bags3 Sand 22.50 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 CftFor Masonry Work
1 Mason 2.50 Nos.2 Coolies unskilled 4.00 Nos.3 Bahishti 0.25 No.For Cement Mortar1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 21
Pacca brick work in ground floor (including striking of jo
Unit Rate (British System) per 100 Cft
Rate Per UnitAmount (Rs.)
Nos.per bag% Cft
per dayper dayper day
per dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 5 (i) Pacca brick work in ground floor (including striking of joCement sand mortar Ratio (1:4).
Detail Unit Rate (British System) per 100 Cft
QtyMATERIAL
1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Cement 4.80 bags3 Sand 24.00 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 CftFor Masonry Work
1 Mason 2.50 Nos.2 Coolies unskilled 4.00 Nos.3 Bahishti 0.25 No.For Cement Mortar1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 22
Pacca brick work in ground floor (including striking of jo
Unit Rate (British System) per 100 Cft
Rate Per UnitAmount (Rs.)
Nos.per bag% Cft
per dayper dayper day
per dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 5 (i) Pacca brick work in ground floor (including striking of jo
Cement sand mortar Ratio (1:5).
Detail Unit Rate (British System) per 100 Cft
QtyMATERIAL
1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Cement 4.00 bags3 Sand 25.00 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 CftFor Masonry Work
1 Mason 2.50 Nos.2 Coolies unskilled 4.00 Nos.3 Bahishti 0.25 No.For Cement Mortar
1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 23
Pacca brick work in ground floor (including striking of jo
Unit Rate (British System) per 100 Cft
Rate Per UnitAmount (Rs.)
Nos.per bag% Cft
per dayper dayper day
per dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 5 (i) Pacca brick work in ground floor (including striking of joCement sand mortar Ratio (1:6).
Detail Unit Rate (British System) per 100 Cft
QtyMATERIAL
1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Cement 3.40 bags3 Sand 25.70 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 CftFor Masonry Work
1 Mason 2.50 Nos.2 Coolies unskilled 4.00 Nos.3 Bahishti 0.25 No.For Cement Mortar1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 24
Pacca brick work in ground floor (including striking of jo
Unit Rate (British System) per 100 Cft
Rate Per UnitAmount (Rs.)
Nos.per bag% Cft
per dayper dayper day
per dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 5 (i) Pacca brick work in ground floor (including striking of joCement sand mortar Ratio (1:7).
Detail Unit Rate (British System) per 100 Cft
QtyMATERIAL
1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Cement 3.00 bags3 Sand 26.50 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 CftFor Masonry Work
1 Mason 2.50 Nos.2 Coolies unskilled 4.00 Nos.3 Bahishti 0.25 No.For Cement Mortar1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 25
Pacca brick work in ground floor (including striking of jo
Unit Rate (British System) per 100 Cft
Rate Per UnitAmount (Rs.)
Nos.per bag% Cft
per dayper dayper day
per dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 5 (i) Pacca brick work in ground floor (including striking of joCement sand mortar Ratio (1 : 8).
Detail Unit Rate (British System) per 100 Cft
QtyMATERIAL
1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Cement 2.66 bags3 Sand 26.57 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 CftFor Masonry Work
1 Mason 2.50 Nos.2 Coolies unskilled 4.00 Nos.3 Bahishti 0.25 No.For Cement Mortar1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 26
Pacca brick work in ground floor (including striking of joCement sand mortar Ratio (1 : 8).
Unit Rate (British System) per 100 Cft
Rate Per UnitAmount (Rs.)
Nos.per bag% Cft
per dayper dayper day
per dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 5 (ii) Lime cement sand mortar Ratio (1:1:6).
Detail Unit Rate (British System) per 100 CftQty
MATERIAL1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Slaked lime 59.72 kg3 Cement 3.20 bags4 Sand 24.00 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 CftFor Masonry Work1 Mason 2.50 Nos.2 Coolies unskilled 4.00 Nos.3 Bahishti 0.25 No.For Cement Mortar
1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATESLabour rate per 100 Cft Rs.Labour rate per Cum Rs.
Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 27
Lime cement sand mortar Ratio (1:1:6).
Unit Rate (British System) per 100 CftRate Per UnitAmount (Rs.)
Nos.per kgper bag% Cft
per dayper dayper day
per dayper day
SaySay
SaySay
DESCRIPTION OF ITEM:
Item No. 5 (ii) Lime cement sand mortar Ratio (1 : 1 : 7).
Detail Unit Rate (British System) per 100 Cft
Qty
MATERIAL1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Slaked lime 53.37 kg3 Cement 2.85 bags4 Sand 24.78 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 CftFor Masonry Work
1 Mason 2.50 Nos.2 Coolies unskilled 4.00 Nos.3 Bahishti 0.25 No.For Cement Mortar
1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 28
Lime cement sand mortar Ratio (1 : 1 : 7).
Unit Rate (British System) per 100 Cft
Rate Per UnitAmount (Rs.)
Nos.per kgper bag% Cft
per dayper dayper day
per dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 5 (ii) Lime cement sand mortar Ratio (1:1:8).
Detail Unit Rate (British System) per 100 Cft
QtyMATERIAL
1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Slaked lime 47.78 kg3 Cement 2.56 bags4 Sand 25.60 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 CftFor Masonry Work
1 Mason 2.50 Nos.2 Coolies unskilled 4.00 Nos.3 Bahishti 0.25 No.For Cement Mortar1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 29
Lime cement sand mortar Ratio (1:1:8).
Unit Rate (British System) per 100 Cft
Rate Per UnitAmount (Rs.)
Nos.per kgper bag% Cft
per dayper dayper day
per dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 5 (ii) Lime cement sand mortar Ratio ( 1 : 1 : 9 ).
Detail Unit Rate (British System) per 100 Cft
Qty
MATERIAL1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Slaked lime 43.30 kg3 Cement 2.32 bags4 Sand 26.20 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 CftFor Masonry Work
1 Mason 2.50 Nos.2 Coolies unskilled 4.00 Nos.3 Bahishti 0.25 No.For Cement Mortar
1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 30
Lime cement sand mortar Ratio ( 1 : 1 : 9 ).
Unit Rate (British System) per 100 Cft
Rate Per UnitAmount (Rs.)
Nos.per kgper bag% Cft
per dayper dayper day
per dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 5 (ii) Lime cement sand mortar Ratio ( 1 : 1 : 10 ).
Detail Unit Rate (British System) per 100 CftQty
MATERIAL1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Slaked lime 40.00 kg3 Cement 2.14 bags4 Sand 26.66 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 CftFor Masonry Work1 Mason 2.50 Nos.2 Coolies unskilled 4.00 Nos.3 Bahishti 0.25 No.For Cement Mortar
1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATESLabour rate per 100 Cft Rs.Labour rate per Cum Rs.
Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 31
Lime cement sand mortar Ratio ( 1 : 1 : 10 ).
Unit Rate (British System) per 100 CftRate Per UnitAmount (Rs.)
Nos.per kgper bag% Cft
per dayper dayper day
per dayper day
SaySay
SaySay
DESCRIPTION OF ITEM:
Item No. 5 (iii) Lime sand mortar Ratio (1:2).
Detail Unit Rate (British System) per 100 CftQty
MATERIAL1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Lime 174.30 kg3 Sand 23.33 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 CftFor Masonry Work1 Mason 2.50 Nos.2 Coolies unskilled 4.00 Nos.3 Bahishti 0.25 No.For Cement Mortar
1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATESLabour rate per 100 Cft Rs.Labour rate per Cum Rs.
Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 32
Unit Rate (British System) per 100 CftRate Per UnitAmount (Rs.)
Nos.per kg% Cft
per dayper dayper day
per dayper day
SaySay
SaySay
DESCRIPTION OF ITEM:
Item No. 6 Add extra labour in item No.5 for brick work in:-
Detail Unit Rate (British System) per 100 CftQty
LABOUR for 125 CftFirst Floor1 Mason 0.25 No.2 Cooly unskilled 1.00 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATESLabour rate per 100 Cft Rs.
Labour rate per Cum Rs.
LABOUR for 125 CftSecond Floor1 Masons 0.75 No.2 Coolies unskilled 2.00 Nos.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATESLabour rate per 100 Cft Rs.
Labour rate per Cum Rs.
Page 33
Add extra labour in item No.5 for brick work in:-
Unit Rate (British System) per 100 CftRate Per UnitAmount (Rs.)
per dayper day
Say
Say
per dayper day
Say
Say
Detail Unit Rate (British System) per 100 Cft
Qty
LABOUR for 125 CftThird Floor1 Masons 1.25 Nos.2 Coolies unskilled 3.00 Nos.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATESLabour rate per 100 Cft
Labour rate per Cum
LABOUR for 125 Cft4th & Subsequent Floor1 Masons 2.25 Nos.2 Coolies unskilled 4.50 Nos.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Cft Rs.Labour rate per cum Rs.
Page 34
Unit Rate (British System) per 100 Cft
Rate Per UnitAmount (Rs.)
per dayper day
Say
Say
per dayper day
SaySay
DESCRIPTION OF ITEM:
Item No. 7 (i) Pacca brick work other than building including striking ofupto 10 ft. (3 metre) height.Cement sand mortar Ratio (1:2).
Detail Unit Rate (British System) per 100 Cft
QtyMATERIAL
1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Cement 8.00 bags3 Sand 20.00 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 CftFor Masonry Work
1 Mason 2.50 Nos.2 Coolies unskilled 3.00 Nos.For Cement Mortar
1 Cooly unskilled 1.00 No.2 Bahishty 0.50 No
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 35
Pacca brick work other than building including striking of
Unit Rate (British System) per 100 Cft
Rate Per UnitAmount (Rs.)
Nos.per bag% Cft
per dayper day
per dayper day
SaySaySaySay
Item No. 7 Pacca brick work other than building including striking ofupto 10 ft. (3 metre) height.
Cement sand mortar Ratio (1:3).
Detail Unit Rate (British System) per 100 Cft
Qty
MATERIAL1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Cement 6.00 bags3 Sand 22.50 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 CftFor Masonry Work1 Mason 2.50 Nos.2 Coolies unskilled 3.00 Nos.For Cement Mortar
1 Cooly unskilled 1.00 No.2 Bahishty 0.50 No
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATESLabour rate per 100 Cft Rs.Labour rate per Cum Rs.
Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 36
Pacca brick work other than building including striking of
Unit Rate (British System) per 100 Cft
Rate Per UnitAmount (Rs.)
Nos.per bag% Cft
per dayper day
per dayper day
SaySay
SaySay
DESCRIPTION OF ITEM:
Item No. 7 (i) Pacca brick work other than building including striking ofupto 10 ft. (3 metre) height.Cement sand mortar Ratio (1 : 4).
Detail Unit Rate (British System) per 100 Cft
QtyMATERIAL
1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Cement 4.80 bags3 Sand 24.00 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 CftFor Masonry Work
1 Mason 2.50 Nos.2 Coolies unskilled 3.00 Nos.For Cement Mortar
1 Cooly unskilled 1.00 No.2 Bahishty 0.50 No
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 37
Pacca brick work other than building including striking of
Cement sand mortar Ratio (1 : 4).
Unit Rate (British System) per 100 Cft
Rate Per UnitAmount (Rs.)
Nos.per bag% Cft
per dayper day
per dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 7 (i) Pacca brick work other than building including striking ofupto 10 ft. (3 metre) height.Cement sand mortar Ratio (1 : 5).
Detail Unit Rate (British System) per 100 Cft
QtyMATERIAL
1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Cement 4.00 bags3 Sand 25.00 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 CftFor Masonry Work
1 Mason 2.50 Nos.2 Coolies unskilled 3.00 Nos.For Cement Mortar
1 Cooly unskilled 1.00 No.2 Bahishty 0.50 No
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 38
Pacca brick work other than building including striking of
Cement sand mortar Ratio (1 : 5).
Unit Rate (British System) per 100 Cft
Rate Per UnitAmount (Rs.)
Nos.per bag% Cft
per dayper day
per dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 7 (i) Pacca brick work other than building including striking ofupto 10 ft. (3 metre) height.Cement sand mortar Ratio (1 : 6).
Detail Unit Rate (British System) per 100 Cft
QtyMATERIAL
1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Cement 3.40 bags3 Sand 25.70 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 CftFor Masonry Work
1 Mason 2.50 Nos.2 Coolies unskilled 3.00 Nos.For Cement Mortar
1 Cooly unskilled 1.00 No.2 Bahishty 0.50 No
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 39
Pacca brick work other than building including striking of
Cement sand mortar Ratio (1 : 6).
Unit Rate (British System) per 100 Cft
Rate Per UnitAmount (Rs.)
Nos.per bag% Cft
per dayper day
per dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 7 (i) Pacca brick work other than building including striking ofupto 10 ft. (3 metre) height.Cement sand mortar Ratio (1 : 7).
Detail Unit Rate (British System) per 100 Cft
QtyMATERIAL
1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Cement 3.00 bags3 Sand 26.50 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 CftFor Masonry Work
1 Mason 2.50 Nos.2 Coolies unskilled 3.00 Nos.For Cement Mortar
1 Cooly unskilled 1.00 No.2 Bahishty 0.50 No
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 40
Pacca brick work other than building including striking of
Cement sand mortar Ratio (1 : 7).
Unit Rate (British System) per 100 Cft
Rate Per UnitAmount (Rs.)
Nos.per bag% Cft
per dayper day
per dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 7 (i) Pacca brick work other than building including striking ofupto 10 ft. (3 metre) height.Cement sand mortar Ratio (1 : 8).
Detail Unit Rate (British System) per 100 Cft
QtyMATERIAL
1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Cement 2.66 bags3 Sand 26.67 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 CftFor Masonry Work
1 Mason 2.50 Nos.2 Coolies unskilled 3.00 Nos.For Cement Mortar
1 Cooly unskilled 1.00 No.2 Bahishty 0.50 No
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 41
Pacca brick work other than building including striking of
Cement sand mortar Ratio (1 : 8).
Unit Rate (British System) per 100 Cft
Rate Per UnitAmount (Rs.)
Nos.per bag% Cft
per dayper day
per dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 7 (ii) Pacca brick work other than building including striking ofupto 10 ft. (3 metre) height.Lime, cement, sand mortar Ratio (1 : 1 : 6).
Detail Unit Rate (British System) per 100 Cft
QtyMATERIAL
1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Slaked lime 59.72 kg3 Cement 3.20 bags4 Sand 24.00 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 CftFor Masonry Work1 Mason 2.50 Nos.2 Coolies unskilled 3.00 Nos.
For Cement Mortar1 Cooly unskilled 1.00 No.2 Bahishty 0.50 No
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 42
Pacca brick work other than building including striking of
Lime, cement, sand mortar Ratio (1 : 1 : 6).
Unit Rate (British System) per 100 Cft
Rate Per UnitAmount (Rs.)
Nos.per kgper bag% Cft
per dayper day
per dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 7 (ii) Pacca brick work other than building including striking ofupto 10 ft. (3 metre) height.Lime, cement, sand mortar Ratio (1 : 1 : 7).
Detail Unit Rate (British System) per 100 Cft
QtyMATERIAL
1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Slaked lime 53.00 kg3 Cement 2.85 bags4 Sand 24.78 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 CftFor Masonry Work1 Mason 2.50 Nos.2 Coolies unskilled 3.00 Nos.
For Cement Mortar1 Cooly unskilled 1.00 No.2 Bahishty 0.50 No
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 43
Pacca brick work other than building including striking of
Lime, cement, sand mortar Ratio (1 : 1 : 7).
Unit Rate (British System) per 100 Cft
Rate Per UnitAmount (Rs.)
Nos.per kgper bag% Cft
per dayper day
per dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 7 (ii) Pacca brick work other than building including striking ofupto 10 ft. (3 metre) height.Lime, cement, sand mortar Ratio (1 : 1 : 8).
Detail Unit Rate (British System) per 100 CftQty
MATERIAL
1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Slaked lime 47.78 kg3 Cement 2.56 bags4 Sand 25.60 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 CftFor Masonry Work1 Mason 2.50 Nos.2 Coolies unskilled 3.00 Nos.
For Cement Mortar1 Cooly unskilled 1.00 No.2 Bahishty 0.50 No
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 44
Pacca brick work other than building including striking of
Lime, cement, sand mortar Ratio (1 : 1 : 8).
Unit Rate (British System) per 100 CftRate Per UnitAmount (Rs.)
Nos.per kgper bag% Cft
per dayper day
per dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 7 (ii) Pacca brick work other than building including striking ofupto 10 ft. (3 metre) height.Lime, cement, sand mortar Ratio (1 : 1 : 9).
Detail Unit Rate (British System) per 100 Cft
QtyMATERIAL
1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Slaked lime 43.29 kg3 Cement 2.32 bags4 Sand 26.20 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 CftFor Masonry Work1 Mason 2.50 Nos.2 Coolies unskilled 3.00 Nos.
For Cement Mortar1 Cooly unskilled 1.00 No.2 Bahishty 0.50 No
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 45
Pacca brick work other than building including striking of
Lime, cement, sand mortar Ratio (1 : 1 : 9).
Unit Rate (British System) per 100 Cft
Rate Per UnitAmount (Rs.)
Nos.per kgper bag% Cft
per dayper day
per dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 7 (ii) Pacca brick work other than building including striking ofupto 10 ft. (3 metre) height.Lime, cement, sand mortar Ratio (1 : 1 : 10).
Detail Unit Rate (British System) per 100 Cft
QtyMATERIAL
1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Slaked lime 39.94 kg3 Cement 2.14 bags4 Sand 26.66 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 CftFor Masonry Work1 Mason 2.50 Nos.2 Coolies unskilled 3.00 Nos.
For Cement Mortar1 Cooly unskilled 1.00 No.2 Bahishty 0.50 No
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 46
Pacca brick work other than building including striking of
Lime, cement, sand mortar Ratio (1 : 1 : 10).
Unit Rate (British System) per 100 Cft
Rate Per UnitAmount (Rs.)
Nos.per kgper bag% Cft
per dayper day
per dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 7 (iii) Lime, sand, mortar ratio (1 : 2)
Detail Unit Rate (British System) per 100 CftQty
MATERIAL1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Slaked lime 174.30 kg3 Sand 23.33 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 CftFor Masonry Work1 Mason 2.50 Nos.2 Coolies unskilled 3.00 Nos.
For Cement Mortar1 Cooly unskilled 1.00 No.2 Bahishty 0.50 No
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 47
Lime, sand, mortar ratio (1 : 2)
Unit Rate (British System) per 100 CftRate Per UnitAmount (Rs.)
Nos.per kg% Cft
per dayper day
per dayper day
SaySaySaySay
DESCRIPTION OF ITEM:Item No. 8 Additional extra labour in item No.7 for every 10 ft. (3 m
additional height.
Detail Unit Rate (British System) per 100 CftQty
LABOUR for 125 Cft1 Masons 0.25 No.2 Cooly 1.00 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate Per 100 Cft. Rs.Labour Rate Per Cum. Rs.
Page 48
Additional extra labour in item No.7 for every 10 ft. (3 m
Unit Rate (British System) per 100 CftRate Per UnitAmount (Rs.)
per dayper day
SaySay
DESCRIPTION OF ITEM:
Item No. 9 Extra labour for arch work in brick masonry including labocentering and de-centering.
Detail Unit Rate (British System) per 100 Cft
Qty
LABOUR for 125 Cft
1 Masons 1.50 No.2 Cooly 0.50 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATESLabour rate Per 100 Cft. Rs.Labour Rate Per Cum. Rs.
Page 49
Extra labour for arch work in brick masonry including labo
Unit Rate (British System) per 100 Cft
Rate Per UnitAmount (Rs.)
per dayper day
SaySay
DESCRIPTION OF ITEM:Item No. 10 Extra for Pacca brick work in steining of wells or any oth
circular masonry.
Detail Unit Rate (British System) per 100 CftQty
MATERIAL1 Pacca bricks 82.00 No.
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 Cft
1 Mason 1.25 No.TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATESLabour rate per 100 Cft Rs.Labour rate per Cum Rs.
Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 50
Extra for Pacca brick work in steining of wells or any oth
Unit Rate (British System) per 100 CftRate Per UnitAmount (Rs.)
% Cft
per day
SaySay
SaySay
DESCRIPTION OF ITEM:
Item No. 11 Extra labour for profile and flared walls.
Detail Unit Rate (British System) per 100 CftQty
LABOUR for 125 Cft1 Mason 0.43 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Cft Rs.Composit rate per Cum Rs.
Page 51
Extra labour for profile and flared walls.
Unit Rate (British System) per 100 CftRate Per UnitAmount (Rs.)
per day
SaySay
DESCRIPTION OF ITEM:Item No. 12 Extra labour for Pacca brick work in piers and abutment.
(i) From 10 ft. (3 metre) to 20 ft. (6 metre) height.
Detail Unit Rate (British System) per 100 Cft
Qty
LABOUR for 125 Cft
1 Mason 0.12 No.2 Cooly unskilled 0.50 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATESLabour rate per 100 Cft Rs.Composit rate per Cum Rs.
Page 52
Extra labour for Pacca brick work in piers and abutment.
From 10 ft. (3 metre) to 20 ft. (6 metre) height.
Unit Rate (British System) per 100 Cft
Rate Per UnitAmount (Rs.)
per dayper day
SaySay
DESCRIPTION OF ITEM:
Item No. 12 Extra labour for Pacca brick work in piers and abutment.(ii) Above 20 ft. (6 metre) height.
Detail Unit Rate (British System) per 100 CftQty
LABOUR for 125 Cft1 Mason 0.25 No.2 Cooly unskilled 1.00 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Cft Rs.Composit rate per Cum Rs.
Page 53
Extra labour for Pacca brick work in piers and abutment.
Unit Rate (British System) per 100 CftRate Per UnitAmount (Rs.)
per dayper day
SaySay
DESCRIPTION OF ITEM:Item No. 13 Extra for face work (half brick thick) using special brick
of Ist class bricks.
Detail
MATERIAL1 Special moulded Stretcher
courses bricks 2702 Header courses 513
Total 783Add 5% wastage 39.15Total 822.15
Difference in cost of specialmoulded and ordinary Ist classbricks
2 Extra cost = 0 -= - 0
Contractor's Profit &20 PercentTotal
Labour rate for 100 CftComposit rate per Cum
Page 54
Extra for face work (half brick thick) using special brick
Unit Rate (British System) per 100 CftQty Rate Per UnitAmount (Rs.)
% 0 Nos.
Rs. SayRs. Say
DESCRIPTION OF ITEM:
Item No. 14 Reinforced brick work in lintels of opening, laid in (1:3)sand mortar including, all labour material forms, moulds, and shuttering etc., but excluding cost and labour of steereinforcement which shall be paid for separately.
Detail Unit Rate (British System) per CftQty
MATERIAL1 Pacca bricks 10.00 No.2 Cement 0.11 bag3 Sand 0.41 Cft4 Kikar wood for centring & shuttering
(10 x 1.60 x 0.2) Can be use 20 times 0.002 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 Cft
1 Mason 0.067 No.2 Cooly unskilled 0.11 No.3 Bahishti 0.023 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per Cft Rs.Labour rate per Cum Rs.Composite rate per Cft Rs.Composite rate per Cum Rs.
Page 55
Reinforced brick work in lintels of opening, laid in (1:3)sand mortar including, all labour material forms, moulds, and shuttering etc., but excluding cost and labour of steereinforcement which shall be paid for separately.
Unit Rate (British System) per CftRate Per UnitAmount (Rs.)
Nos.per bag% Cft
Cft
per dayper dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 15 (a) Extra for dressing or chamfering of bricks (special orarchitectaral shape).
Detail Unit Rate (British System) per 100 No.
Qty
LABOUR for 125 Cft
1 Mason 3.00 No.2 Cooly unskilled 0.34 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATESLabour rate per 100 No. Rs.
Page 56
Extra for dressing or chamfering of bricks (special or
Unit Rate (British System) per 100 No.
Rate Per UnitAmount (Rs.)
per dayper day
Say
DESCRIPTION OF ITEM:Item No. 15 (b) All other purposes.
Detail Unit Rate (British System) per 100 No.Qty
LABOUR for 125 Cft1 Mason 1.50 No.2 Cooly unskilled 0.17 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 No. Rs.
Page 57
Unit Rate (British System) per 100 No.Rate Per UnitAmount (Rs.)
per dayper day
Say
DESCRIPTION OF ITEM:
Item No. 16 Peforated Pacca brick walling 114 mm (4\") thick in groundfloor in
(i) Mud mortar.
Detail Unit Rate (British System) per 100 Sft
Qty
MATERIAL
1 Pacca bricks 9\" x 4\" x 3\" 338.00 No.2 Good earth 8.75 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 Sft
1 Mason 1.00 No.2 Coolies unskilled 1.83 Nos.3 Bahishti 0.23 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.
Page 58
Peforated Pacca brick walling 114 mm (4\") thick in ground
Unit Rate (British System) per 100 Sft
Rate Per UnitAmount (Rs.)
Nos.% Cft
per dayper dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 16 (ii) Cement sand mortar Ratio (1 : 2).
Detail Unit Rate (British System) per 100 Sft
Qty
MATERIAL
1 Pacca bricks 9\" x 4\" x 3\" 338.00 No.2 Cement 2.00 bags3 Sand 5.00 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 Sft
1 Mason 1.25 Nos.2 Coolies unskilled 2.42 Nos.3 Bahishti 0.38 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.
Page 59
Cement sand mortar Ratio (1 : 2).
Unit Rate (British System) per 100 Sft
Rate Per UnitAmount (Rs.)
Nos.per bag% Cft
per dayper dayper day
SaySaySaySay
DESCRIPTION OF ITEM:Item No. 16 (ii) Cement sand mortar Ratio (1:3).
Detail Unit Rate (British System) per 100 SftQty
MATERIAL1 Pacca bricks 9\" x 4\" x 3\" 338.00 No.2 Cement 1.50 bags3 Sand 5.60 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 Sft1 Mason 1.25 Nos.2 Coolies unskilled 2.42 Nos.3 Bahishti 0.38 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.
Page 60
Unit Rate (British System) per 100 SftRate Per UnitAmount (Rs.)
Nos.per bag% Cft
per dayper dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 16 (ii) Cement sand mortar Ratio (1:4).
Detail Unit Rate (British System) per 100 Sft
Qty
MATERIAL
1 Pacca bricks 9\" x 4\" x 3\" 338.00 No.2 Cement 1.20 bags3 Sand 6.00 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 Sft
1 Mason 1.25 Nos.2 Coolies unskilled 2.42 Nos.3 Bahishti 0.38 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATESLabour rate per 100 Sft Rs.Labour rate per Sqm Rs.
Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.
Page 61
Unit Rate (British System) per 100 Sft
Rate Per UnitAmount (Rs.)
Nos.per bag% Cft
per dayper dayper day
SaySay
SaySay
DESCRIPTION OF ITEM:
Item No. 16 (ii) Cement sand mortar Ratio (1:5).
Detail Unit Rate (British System) per 100 Sft
Qty
MATERIAL
1 Pacca bricks 9\" x 4\" x 3\" 338.00 No.2 Cement 1.00 bags3 Sand 6.25 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 Sft
1 Mason 1.25 Nos.2 Coolies unskilled 2.42 Nos.3 Bahishti 0.38 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.
Page 62
Unit Rate (British System) per 100 Sft
Rate Per UnitAmount (Rs.)
Nos.per bag% Cft
per dayper dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 16 (ii) Cement sand mortar Ratio (1:6).
Detail Unit Rate (British System) per 100 Sft
Qty
MATERIAL
1 Pacca bricks 9\" x 4\" x 3\" 338.00 No.2 Cement 0.86 bags3 Sand 6.40 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 Sft
1 Mason 1.25 Nos.2 Coolies unskilled 2.42 Nos.3 Bahishti 0.38 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.
Page 63
Unit Rate (British System) per 100 Sft
Rate Per UnitAmount (Rs.)
Nos.per bag% Cft
per dayper dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 16 (ii) Cement sand mortar Ratio (1:7).
Detail Unit Rate (British System) per 100 Sft
Qty
MATERIAL
1 Pacca bricks 9\" x 4\" x 3\" 338.00 No.2 Cement 0.75 bags3 Sand 6.58 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 Sft
1 Mason 1.25 Nos.2 Coolies unskilled 2.42 Nos.3 Bahishti 0.38 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.
Page 64
Unit Rate (British System) per 100 Sft
Rate Per UnitAmount (Rs.)
Nos.per bag% Cft
per dayper dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 16 (ii) Cement sand mortar Ratio (1:8).
Detail Unit Rate (British System) per 100 Sft
Qty
MATERIAL
1 Pacca bricks 9\" x 4\" x 3\" 338.00 No.2 Cement 0.67 bags3 Sand 6.67 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 Sft
1 Mason 1.25 Nos.2 Coolies unskilled 2.42 Nos.3 Bahishti 0.38 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.
Page 65
Unit Rate (British System) per 100 Sft
Rate Per UnitAmount (Rs.)
Nos.per bag% Cft
per dayper dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 16 (iii) Lime cement sand mortar Ratio (1 : 1 : 6).
Detail Unit Rate (British System) per 100 Sft
Qty
MATERIAL
1 Pacca bricks 9\" x 4\" x 3\" 338.00 No.2 Slaked lime 14.93 kg3 Cement 0.80 bags4 Sand 6.00 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 Sft
1 Mason 1.25 Nos.2 Coolies unskilled 2.42 Nos.3 Bahishti 0.38 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.
Page 66
Lime cement sand mortar Ratio (1 : 1 : 6).
Unit Rate (British System) per 100 Sft
Rate Per UnitAmount (Rs.)
Nos.kgper bag% Cft
per dayper dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 16 (iii) Lime cement sand mortar Ratio (1 : 1 : 7).
Detail Unit Rate (British System) per 100 Sft
Qty
MATERIAL
1 Pacca bricks 9\" x 4\" x 3\" 338.00 No.2 Slaked lime 13.44 kg3 Cement 0.71 bags4 Sand 6.13 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 Sft
1 Mason 1.25 Nos.2 Coolies unskilled 2.42 Nos.3 Bahishti 0.38 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.
Page 67
Lime cement sand mortar Ratio (1 : 1 : 7).
Unit Rate (British System) per 100 Sft
Rate Per UnitAmount (Rs.)
Nos.per kgper bag% Cft
per dayper dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 16 (iii) Lime cement sand mortar Ratio (1 : 1 : 8).
Detail Unit Rate (British System) per 100 Sft
Qty
MATERIAL
1 Pacca bricks 9\" x 4\" x 3\" 338.00 No.2 Slaked lime 12.32 kg3 Cement 0.64 bags4 Sand 6.40 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 Sft
1 Mason 1.25 Nos.2 Coolies unskilled 2.42 Nos.3 Bahishti 0.38 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.
Page 68
Lime cement sand mortar Ratio (1 : 1 : 8).
Unit Rate (British System) per 100 Sft
Rate Per UnitAmount (Rs.)
Nos.per kgper bag% Cft
per dayper dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 16 (iii) Lime cement sand mortar Ratio (1 : 1 : 9).
Detail Unit Rate (British System) per 100 Sft
Qty
MATERIAL
1 Pacca bricks 9\" x 4\" x 3\" 338.00 No.2 Slaked lime 10.82 kg3 Cement 0.58 bags4 Sand 6.50 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 Sft
1 Mason 1.25 Nos.2 Coolies unskilled 2.42 Nos.3 Bahishti 0.38 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.
Page 69
Lime cement sand mortar Ratio (1 : 1 : 9).
Unit Rate (British System) per 100 Sft
Rate Per UnitAmount (Rs.)
Nos.per kgper bag% Cft
per dayper dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 16 (iii) Lime cement sand mortar Ratio (1 : 1 : 10).
Detail Unit Rate (British System) per 100 Sft
Qty
MATERIAL
1 Pacca bricks 9\" x 4\" x 3\" 338.00 No.2 Slaked lime 10.08 kg3 Cement 0.54 bags4 Sand 6.70 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 Sft
1 Mason 1.25 Nos.2 Coolies unskilled 2.42 Nos.3 Bahishti 0.38 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.
Page 70
Lime cement sand mortar Ratio (1 : 1 : 10).
Unit Rate (British System) per 100 Sft
Rate Per UnitAmount (Rs.)
Nos.per kgper bag% Cft
per dayper dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 16 (iv) Lime cement sand mortar Ratio (1 : 2).
Detail Unit Rate (British System) per 100 Sft
Qty
MATERIAL
1 Pacca bricks 9\" x 4\" x 3\" 338.00 Nos2 Slaked lime 43.67 kg3 Sand 5.58 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 Sft
1 Mason 1.25 Nos.2 Coolies unskilled 2.42 Nos.3 Bahishti 0.38 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATESLabour rate per 100 Sft Rs.Labour rate per Sqm Rs.
Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.
Page 71
Lime cement sand mortar Ratio (1 : 2).
Unit Rate (British System) per 100 Sft
Rate Per UnitAmount (Rs.)
Nos.per kg% Cft
per dayper dayper day
SaySay
SaySay
DESCRIPTION OF ITEM:Item No. 17 Add. extra labour on item No.15 for pacca brick work.
Detail Unit Rate (British System) per 100 SftQty
LABOUR for 125 SftFirst Floor1 Mason 0.13 No.2 Cooly unskilled 0.50 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATESLabour rate for 100 Sft Rs.
Labour rate per Sqm Rs.
LABOUR for 125 SftSecond Floor1 Masons 0.37 No.2 Coolies unskilled 1.00 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATESLabour rate for 100 Sft Rs.
Labour rate per Sqm Rs.
LABOUR for 125 CftThird Floor1 Masons 0.63 No.2 Coolies unskilled 1.50 Nos.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATESLabour rate for 100 Sft
Labour rate per Sqm
Page 72
Add. extra labour on item No.15 for pacca brick work.
Unit Rate (British System) per 100 SftRate Per UnitAmount (Rs.)
per dayper day
Say
Say
per dayper day
Say
Say
per dayper day
Say
Say
LABOUR for 125 Sft4th & Subsequent Floor1 Masons 1.12 Nos.2 Coolies unskilled 2.12 Nos.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate for 100 Sft Rs.Labour rate per Sqm Rs.
Page 73
per dayper day
SaySay
DESCRIPTION OF ITEM:Item No. 18 (i) Perforated pacca brick walling 9\" thick in ground floor in
Mud Mortar
Detail Unit Rate (British System) per 100 SftQty
MUD MORTAR1 Pacca bricks 9\" x 4\" x 3\" 675.00 Nos2 Good earth 17.50 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 Sft1 Mason 1.25 Nos.2 Coolies unskilled 2.75 Nos.3 Bahishti 0.35 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.
Page 74
Perforated pacca brick walling 9\" thick in ground floor in
Unit Rate (British System) per 100 SftRate Per UnitAmount (Rs.)
Nos.% Cft
per dayper dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 18 (ii) Cement sand mortar Ratio (1 : 2)
Detail Unit Rate (British System) per 100 Sft
Qty
MATERIAL
1 Pacca bricks 9\" x 4\" x 3\" 675.00 Nos2 Cement 4.00 bags3 Sand 10.00 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 Sft
1 Mason 1.90 Nos.2 Coolies unskilled 3.63 Nos.3 Bahishti 0.55 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.
Page 75
Cement sand mortar Ratio (1 : 2)
Unit Rate (British System) per 100 Sft
Rate Per UnitAmount (Rs.)
Nos.bags% Cft
per dayper dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 18 (ii) Cement sand mortar Ratio (1 : 3)
Detail Unit Rate (British System) per 100 Sft
Qty
MATERIAL
1 Pacca bricks 9\" x 4\" x 3\" 675.00 Nos2 Cement 3.00 bags3 Sand 11.25 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 Sft
1 Mason 1.90 Nos.2 Coolies unskilled 3.63 Nos.3 Bahishti 0.55 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.
Page 76
Cement sand mortar Ratio (1 : 3)
Unit Rate (British System) per 100 Sft
Rate Per UnitAmount (Rs.)
Nos.bags% Cft
per dayper dayper day
SaySaySaySay
DESCRIPTION OF ITEM:Item No. 18 (ii) Cement sand mortar Ratio (1 : 4)
Detail Unit Rate (British System) per 100 SftQty
MATERIAL1 Pacca bricks 9\" x 4\" x 3\" 675.00 Nos2 Cement 2.40 bags3 Sand 12.00 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 Sft
1 Mason 1.90 Nos.2 Coolies unskilled 3.63 Nos.3 Bahishti 0.55 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATESLabour rate per 100 Sft Rs.Labour rate per Sqm Rs.
Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.
Page 77
Cement sand mortar Ratio (1 : 4)
Unit Rate (British System) per 100 SftRate Per UnitAmount (Rs.)
Nos.per bag% Cft
per dayper dayper day
SaySay
SaySay
DESCRIPTION OF ITEM:
Item No. 18 (ii) Cement sand mortar Ratio (1 : 5)
Detail Unit Rate (British System) per 100 Sft
Qty
MATERIAL
1 Pacca bricks 9\" x 4\" x 3\" 675.00 Nos2 Cement 2.00 bags3 Sand 12.50 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 Sft
1 Mason 1.90 Nos.2 Coolies unskilled 3.63 Nos.3 Bahishti 0.55 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.
Page 78
Cement sand mortar Ratio (1 : 5)
Unit Rate (British System) per 100 Sft
Rate Per UnitAmount (Rs.)
Nos.per bag% Cft
per dayper dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 18 (ii) Cement sand mortar Ratio (1 : 6)
Detail Unit Rate (British System) per 100 Sft
Qty
MATERIAL
1 Pacca bricks 9\" x 4\" x 3\" 675.00 Nos2 Cement 1.72 bags3 Sand 12.80 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 Sft
1 Mason 1.90 Nos.2 Coolies unskilled 3.63 Nos.3 Bahishti 0.55 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.
Page 79
Cement sand mortar Ratio (1 : 6)
Unit Rate (British System) per 100 Sft
Rate Per UnitAmount (Rs.)
Nos.per bag% Cft
per dayper dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 18 (ii) Cement sand mortar Ratio (1 : 7)
Detail Unit Rate (British System) per 100 Sft
Qty
MATERIAL
1 Pacca bricks 9\" x 4\" x 3\" 675.00 Nos2 Cement 1.50 bags3 Sand 13.13 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 Sft
1 Mason 1.90 Nos.2 Coolies unskilled 3.63 Nos.3 Bahishti 0.55 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.
Page 80
Cement sand mortar Ratio (1 : 7)
Unit Rate (British System) per 100 Sft
Rate Per UnitAmount (Rs.)
Nos.per bag% Cft
per dayper dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 18 (ii) Cement sand mortar Ratio (1 : 8)
Detail Unit Rate (British System) per 100 Sft
Qty
MATERIAL
1 Pacca bricks 9\" x 4\" x 3\" 675.00 Nos2 Cement 1.33 bags3 Sand 13.34 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 Sft
1 Mason 1.90 Nos.2 Coolies unskilled 3.63 Nos.3 Bahishti 0.55 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.
Page 81
Cement sand mortar Ratio (1 : 8)
Unit Rate (British System) per 100 Sft
Rate Per UnitAmount (Rs.)
Nos.per bag% Cft
per dayper dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 18 (iii) Lime cement sand mortar Ratio (1 : 1 : 6)
Detail Unit Rate (British System) per 100 Sft
Qty
MATERIAL
1 Pacca bricks 9\" x 4\" x 3\" 675.00 Nos2 Slaked lime 29.86 kg3 Cement 1.60 bags4 Sand 12.00 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 Sft
1 Mason 1.90 Nos.2 Coolies unskilled 3.63 Nos.3 Bahishti 0.55 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.
Page 82
Lime cement sand mortar Ratio (1 : 1 : 6)
Unit Rate (British System) per 100 Sft
Rate Per UnitAmount (Rs.)
Nos.per kgper bag% Cft
per dayper dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 18 (iii) Lime cement sand mortar Ratio (1 : 1 : 7)
Detail Unit Rate (British System) per 100 Sft
Qty
MATERIAL
1 Pacca bricks 9\" x 4\" x 3\" 675.00 Nos2 Slaked lime 26.50 kg3 Cement 1.42 bags4 Sand 12.39 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 Sft1 Mason 1.90 Nos.2 Coolies unskilled 3.63 Nos.3 Bahishti 0.55 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.
Page 83
Lime cement sand mortar Ratio (1 : 1 : 7)
Unit Rate (British System) per 100 Sft
Rate Per UnitAmount (Rs.)
Nos.per kgper bag% Cft
per dayper dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 18 (iii) Lime cement sand mortar Ratio (1 : 1 : 8)
Detail Unit Rate (British System) per 100 Sft
Qty
MATERIAL
1 Pacca bricks 9\" x 4\" x 3\" 675.00 Nos2 Slaked lime 23.90 kg3 Cement 1.28 bags4 Sand 12.80 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 Sft
1 Mason 1.90 Nos.2 Coolies unskilled 3.63 Nos.3 Bahishti 0.55 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.
Page 84
Lime cement sand mortar Ratio (1 : 1 : 8)
Unit Rate (British System) per 100 Sft
Rate Per UnitAmount (Rs.)
Nos.per kgper bag% Cft
per dayper dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 18 (iii) Lime cement sand mortar Ratio (1 : 1 : 9)
Detail Unit Rate (British System) per 100 Sft
Qty
MATERIAL
1 Pacca bricks 9\" x 4\" x 3\" 675.00 Nos2 Slaked lime 21.65 kg3 Cement 1.16 bags4 Sand 13.10 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 Sft1 Mason 1.90 Nos.2 Coolies unskilled 3.63 Nos.3 Bahishti 0.55 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.
Page 85
Lime cement sand mortar Ratio (1 : 1 : 9)
Unit Rate (British System) per 100 Sft
Rate Per UnitAmount (Rs.)
Nos.per kgper bag% Cft
per dayper dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 18 (iii) Lime cement sand mortar Ratio (1 : 1 : 10)
Detail Unit Rate (British System) per 100 Sft
Qty
MATERIAL
1 Pacca bricks 9\" x 4\" x 3\" 675.00 Nos2 Slaked lime 20.16 kg3 Cement 1.07 bags4 Sand 13.33 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 Sft1 Mason 1.90 Nos.2 Coolies unskilled 3.63 Nos.3 Bahishti 0.55 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.
Page 86
Lime cement sand mortar Ratio (1 : 1 : 10)
Unit Rate (British System) per 100 Sft
Rate Per UnitAmount (Rs.)
Nos.per kgper kg% Cft
per dayper dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 18 (iv) Lime sand mortar Ratio (1 : 2)
Detail Unit Rate (British System) per 100 Sft
Qty
MATERIAL
1 Pacca bricks 9\" x 4\" x 3\" 675.00 Nos2 Slaked lime 86.97 kg3 Sand 11.67 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 Sft
1 Mason 1.90 Nos.2 Coolies unskilled 3.63 Nos.3 Bahishti 0.55 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.
Page 87
Unit Rate (British System) per 100 Sft
Rate Per UnitAmount (Rs.)
Nos.per kg% Cft
per dayper dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 19 Extra labour in item No.18 for per perforated pacca brick work in
Detail Unit Rate (British System) per 100 Sft
Qty
LABOUR First Floor
Labour of item No.6 for 100 Cft 0.75
Labour of item No.6 per Cum 0.75
LABOUR Second FloorLabour of item No.6 for 100 Cft 0.75
Labour of item No.6 per Cum 0.75
LABOUR Third FloorLabour of item No.6 for 100 Cft 0.75
Labour of item No.6 per Cum 0.75
LABOUR Fourth & Subsequent Floor
Labour of item No.6 for 100 Cft 0.75
Labour of item No.6 per Cum 0.75
Page 88
Extra labour in item No.18 for per perforated pacca brick
Unit Rate (British System) per 100 Sft
Rate Per UnitAmount (Rs.)
Say
Say
Say
Say
Say
Say
Say
Say
DESCRIPTION OF ITEM:
Item No. 20 Fire brick masonary in fire clay mortar.(i) Upto 20 ft. (6 metre) height including all charges.
Detail Unit Rate (British System) per Cft
QtyPer 100 Cft
MATERIAL
1 Fire clay bricks 9\" x 4\" x 3\" 1350.00 No2 Fire resistant Cement 8.80 bags3 Brick grinded sand 22.00 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 Cftfor masonary work1 Mason 3.00 Nos.2 Coolies 3.00 Nos.3 Bahishti 0.25 No.for mortar
1 Cooly 1.00 No.2 Bahishti 0.25 No
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATESLabour rate per Cft Rs.Labour rate per Cum Rs.
Composite rate per Cft Rs.Composite rate per Cum Rs.
Page 89
Fire brick masonary in fire clay mortar.Upto 20 ft. (6 metre) height including all charges.
Unit Rate (British System) per Cft
Rate Per UnitAmount (Rs.)
Eachper bagper Cft
per dayper dayper day
per dayper day
SaySay
SaySay
DESCRIPTION OF ITEM:Item No. 20 Fire brick masonary in fire clay mortar.
(ii) Extra for every 1.5 metre additional height.
Detail Unit Rate (British System) per 100 Cft
Qty
LABOUR for 125 Cft
1 Mason 0.25 No.2 Cooly unskilled 1.00 No
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATESLabour rate per 100 Cft Rs.Labour rate per Cum Rs.
Page 90
Fire brick masonary in fire clay mortar.
Extra for every 1.5 metre additional height.
Unit Rate (British System) per 100 Cft
Rate Per UnitAmount (Rs.)
per dayper day
SaySay
DESCRIPTION OF ITEM:
Item No. 21 First class brick walling laid in (1 : 3) cement sand mortreinforced with (1\") 25 mm wide 18 gauge hoop iron.
(i) 4\" (114 mm) thick walling with hoop iron bouding 6\"(150 mm) apart.
Detail Unit Rate (British System) per 100 SftQty
MATERIAL1 Pacca bricks 9\" x 4\" x 3\" 525.00 Nos2 Cement 2.40 bags3 Sand 9.00 Cft4 Hoop iron 45.00 lbs
20.41 Kg.TotalContractor's Profit &20 PercentTotal
LABOUR
1 Mason 1.00 No.2 Coolies unskilled 1.25 Nos.3 Bahishti 0.25 No.4 Black-smith 0.15 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.
Page 91
First class brick walling laid in (1 : 3) cement sand mortreinforced with (1\") 25 mm wide 18 gauge hoop iron.4\" (114 mm) thick walling with hoop iron bouding 6\"
Unit Rate (British System) per 100 SftRate Per UnitAmount (Rs.)
Nos.per bag% CftPer Kg.
per dayper dayper dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 21 First class brick walling laid in (1 : 3) cement sand mortreinforced with 1\" (25 mm) wide 18 gauge hoop iron.
(ii) 4\" (114 mm) thick walling with hoop iron bouding12\" (300 mm) apart.
Detail Unit Rate (British System) per 100 SftQty
MATERIAL1 Pacca bricks 9\" x 4\" x 3\" 525.00 Nos2 Cement 2.40 bags3 Sand 9.00 Cft4 Hoop iron 22.50 lbs
10.20 kg.TotalContractor's Profit &20 PercentTotal
LABOUR
1 Mason 1.00 No.2 Coolies unskilled 1.00 No.3 Bahishti 0.25 No.4 Black-smith 0.10 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.
Page 92
First class brick walling laid in (1 : 3) cement sand mortreinforced with 1\" (25 mm) wide 18 gauge hoop iron.4\" (114 mm) thick walling with hoop iron bouding
Unit Rate (British System) per 100 SftRate Per UnitAmount (Rs.)
Nos.per bag% CftPer Kg.
per dayper dayper dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 21 First class brick walling laid in (1 : 3) cement sand mortreinforced with 1\" (25 mm) wide 18 gauge hoop iron.
(iii) 3\" (75 mm) thick walling with hoop iron bouding 6\"(150 mm) apart.
Detail Unit Rate (British System) per 100 SftQty
MATERIAL1 Pacca bricks 9\" x 4\" x 3\" 350.00 Nos2 Cement 1.80 bags3 Sand 6.50 Cft4 Hoop iron 45.00 lbs
20.41 Kg.TotalContractor's Profit &20 PercentTotal
LABOUR for 125 Cft
1 Mason 0.75 No.2 Coolies unskilled 1.00 No.3 Bahishti 0.20 No.4 Black-smith 0.15 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.
Page 93
First class brick walling laid in (1 : 3) cement sand mortreinforced with 1\" (25 mm) wide 18 gauge hoop iron.3\" (75 mm) thick walling with hoop iron bouding 6\"
Unit Rate (British System) per 100 SftRate Per UnitAmount (Rs.)
Nos.per bag% CftPer Kg.
per dayper dayper dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 21 First class brick walling laid in (1 : 3) cement sand mortreinforced with 1\" (25 mm) wide 18 gauge hoop iron.
(iv) 3\" (75 mm) thick walling with hoop iron bouding 12\"(300 mm) apart.
Detail Unit Rate (British System) per 100 SftQty
MATERIAL1 Pacca bricks 9\" x 4\" x 3\" 350.00 Nos2 Cement 1.80 bags3 Sand 6.50 Cft4 Hoop iron 20.00 lbs
9.070 Kg.TotalContractor's Profit &20 PercentTotal
LABOUR for 125 Cft
1 Mason 0.75 No.2 Coolies unskilled 1.00 No.3 Bahishti 0.20 No.4 Black-smith 0.15 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.
Page 94
First class brick walling laid in (1 : 3) cement sand mortreinforced with 1\" (25 mm) wide 18 gauge hoop iron.3\" (75 mm) thick walling with hoop iron bouding 12\"
Unit Rate (British System) per 100 SftRate Per UnitAmount (Rs.)
Nos.per bag% CftPer Kg.
per dayper dayper dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 22 Ghilafi work (1 brick thick wall).
Detail Unit Rate (British System) per 100 Cft
Qty
MATERIAL
1 B.B in mud ( of item No.1) x 2 Sundried bricks ( of item No.24) x
Total
LABOUR for 125 Cft1 Mason 2.00 Nos.2 Coolies unskilled 3.67 Nos.3 Bahishti 0.50 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 95
Ghilafi work (1 brick thick wall).
Unit Rate (British System) per 100 Cft
Rate Per UnitAmount (Rs.)
per dayper dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 23 Dry brick pitching.
Detail Unit Rate (British System) per 100 Cft
Qty
MATERIAL
1 Ist class burnt brick 1350.00 No
TotalContractor's Profit &20 PercentTotal
LABOUR
1 Mason 1.00 No.2 Coolies unskilled 2.00 Nos.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 96
Unit Rate (British System) per 100 Cft
Rate Per UnitAmount (Rs.)
Nos.
per dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 24 Sun dried bricks in Mud mortar.
Detail Unit Rate (British System) per 100 Cft
Qty
MATERIAL
1 Sun dried bricks 1350.00 No2 Siff clay 35.00 Cft
TotalContractor's Profit &20 PercentTotal
LABOUR for 125 Cft
1 Mason 1.50 Nos.2 Coolies unskilled 3.50 Nos.3 Bahishti 0.25 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 97
Unit Rate (British System) per 100 Cft
Rate Per UnitAmount (Rs.)
Nos.% Cft
per dayper dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 25 Pise wall (mud walling).
Detail Unit Rate (British System) per 100 Cft
Qty
LABOUR for 125 Cft
1 Coolies skilled 1.00 No.2 Coolies unskilled 1.50 Nos.3 Bahishti 0.50 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per 100 Cft Rs.Composite rate per Cum Rs.
Page 98
Unit Rate (British System) per 100 Cft
Rate Per UnitAmount (Rs.)
per dayper dayper day
SaySay
DESCRIPTION OF ITEM:
Item No. 26 Providing Eave brick moulded weathered and throated with bbrick or drip course cornice in (1 : 3) cement mortar.
(i) 3\" (76 mm) thick drip course.
Detail Unit Rate (British System) per RftQty
MATERIAL (FOR 100 RFT.)1 Moulded brick 280.00 Nos2 Cement for laying and plastering 1.50 bag3 Sand 5.00 Cft
Deduct cost of ordinary bricks 140 Nos.TotalContractor's Profit &20 PercentTotal
LABOUR (FOR 125 RFT.)
1 Mason 1.75 Nos.2 Coolies unskilled 1.75 Nos.3 Bahishti 0.25 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per Rft Rs.Labour rate per R.M Rs.Composite rate per Rft Rs.Composite rate per R.M Rs.
Page 99
Providing Eave brick moulded weathered and throated with bbrick or drip course cornice in (1 : 3) cement mortar.
Unit Rate (British System) per RftRate Per UnitAmount (Rs.)
Nos.per bag% Cft Nos.
per dayper dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 26 Providing Eave brick moulded weathered and throated with bbrick or drip cornice in (1 : 3) cement mortars.
(ii) 4\" (114 mm) thick drip course cornice.
Detail Unit Rate (British System) per RftQty
MATERIAL (FOR 100 RFT.)1 Brick moulded I/C wastage 420.00 Nos2 Cement for laying and plastering 1.75 bag3 Sand 6.00 Cft
Deduct cost of ordinary bricks 210.00 NosTotalContractor's Profit &20 PercentTotal
LABOUR (FOR 125 RFT)
1 Mason 2.00 Nos.2 Coolies unskilled 2.00 Nos.3 Bahishti 0.25 No.
TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal
ITEM RATES
Labour rate per Rft Rs.Labour rate per R.M Rs.Composite rate per 100 Rft Rs.Composite rate per R.M Rs.
Page 100
Providing Eave brick moulded weathered and throated with bbrick or drip cornice in (1 : 3) cement mortars.4\" (114 mm) thick drip course cornice.
Unit Rate (British System) per RftRate Per UnitAmount (Rs.)
Nos.per bag% Cft Nos.
per dayper dayper day
SaySaySaySay
DESCRIPTION OF ITEM:
Item No. 26 Providing Eave brick moulded weathered and throated with bbrick or drip cornice in (1 : 3) cement mortar.
(iii) 4\" (114 mm) thick eave brick with back brick.
Detail Unit Rate (British System) per RftQty
MATERIAL (FOR 100 RFT)1 Brick moulded (including wastage) 465.00 Nos2 Back bricks ordinary 465.00 Nos3 Cement 1.20 bag4 Sand 5.00 Cft
TotalContractor's Profit &