CHAPTER NO. 7 BRICK WORK DESCRIPTION OF ITEM: Item No. 1 Pucca brick work in mud mortar i (i) In foundation and plinth. Detail Unit Rate (British Sy Qty MATERIAL 1 Bricks 9\" x 4½\" x 3\" 1350.00 Nos. 2 Good earth or stiff clay for m 35.00 Cft Total Contractor's Profit & 20 Percent Total LABOUR for 125 Cft For Masonry Work 1 Mason 1.50 Nos. 2 Coolies unskilled 2.00 Nos. 3 Bahishti 0.13 No For Mud Mortar 1 Cooly unskilled 0.67 No. 2 Bahishty 0.33 No Total Sundries 10 Percent Total Contractor's Profit & 20 Percent Total ITEM RATES Labour rate per 100 Cft Rs. Labour rate per Cum Rs. Composite rate per 100 Cft Rs. Composite rate per Cum Rs.

Rate Analysis Plumbing1

Embed Size (px)

DESCRIPTION

jgjhgjg

Citation preview

  • CHAPTER NO. 7

    BRICK WORKDESCRIPTION OF ITEM:

    Item No. 1 Pucca brick work in mud mortar in building.(i) In foundation and plinth.

    Detail Unit Rate (British System) per 100 CftQty

    MATERIAL1 Bricks 9\" x 4\" x 3\" 1350.00 Nos.2 Good earth or stiff clay for m35.00 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 CftFor Masonry Work1 Mason 1.50 Nos.2 Coolies unskilled 2.00 Nos.3 Bahishti 0.13 No

    For Mud Mortar1 Cooly unskilled 0.67 No.2 Bahishty 0.33 No

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATESLabour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 1

  • Pucca brick work in mud mortar in building.

    Unit Rate (British System) per 100 CftRate Per UnitAmount (Rs.)

    Nos.% Cft

    per dayper dayper day

    per dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:Item No. 1 Pucca brick work in mud mortar in building.

    (ii) In ground floor.

    Detail Unit Rate (British System) per 100 Cft

    Qty

    MATERIAL1 Bricks 9\" x 4\" x 3\" 1350.00 Nos.2 Good earth or stiff clay for m35.00 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 CftFor Masonry Work1 Mason 2.00 Nos.2 Coolies unskilled 3.00 Nos.3 Bahishti 0.13 No.For Mud Mortar

    1 Cooly unskilled 0.67 No.2 Bahishty 0.33 No

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATESLabour rate per 100 Cft Rs.Labour rate per Cum Rs.

    Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 2

  • Pucca brick work in mud mortar in building.

    Unit Rate (British System) per 100 Cft

    Rate Per UnitAmount (Rs.)

    Nos.% Cft

    per dayper dayper day

    per dayper day

    SaySay

    SaySay

  • DESCRIPTION OF ITEM:

    Item No. 2 Add extra labour in item No.1 for brick work in

    Detail Unit Rate (British System) per 100 CftQty

    LABOUR for 125 CftFirst Floor1 Mason 0.25 No.2 Cooly unskilled 1.00 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATESLabour rate per 100 Cft

    Labour rate per Cum

    LABOUR for 125 CftSecond Floor1 Masons 0.75 No.2 Coolies unskilled 2.00 Nos.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATESLabour rate per 100 Cft

    Labour rate per Cum

  • Page 3

  • Add extra labour in item No.1 for brick work in

    Unit Rate (British System) per 100 CftRate Per UnitAmount (Rs.)

    per dayper day

    Say

    Say

    per dayper day

    Say

    Say

  • Detail Unit Rate (British System) per 100 Cft

    Qty

    LABOUR for 125 CftThird Floor1 Masons 1.25 Nos.2 Coolies unskilled 3.00 Nos.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATESLabour rate per 100 Cft

    Labour rate per Cum

    LABOUR for 125 Cft4th & Subsequent Floor1 Masons 2.25 Nos.2 Coolies unskilled 4.50 Nos.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Cft Rs.Labour rate per cum Rs.

  • Page 4

  • Unit Rate (British System) per 100 Cft

    Rate Per UnitAmount (Rs.)

    per dayper day

    Say

    Say

    per dayper day

    SaySay

  • DESCRIPTION OF ITEM:

    Item No. 3 Pucca brick work in mud mortar other than building.(i) Upto 20 ft. (6 metre) high.

    Detail Unit Rate (British System) per 100 Cft

    QtyMATERIAL

    1 Bricks 9\" x 4\" x 3\" 1350.00 Nos.2 Good earth or stiff clay 35.00 CftTotalContractor's Profit &20 PercentTotal

    LABOUR for 125 CftFor Masonry Work

    1 Mason 2.00 Nos.2 Coolies unskilled 3.00 Nos.For Mud Mortar

    1 Cooly unskilled 1.00 No.2 Bahishty 0.33 No

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATESLabour rate per 100 Cft Rs.Labour rate per Cum Rs.

    Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 5

  • Pucca brick work in mud mortar other than building.

    Unit Rate (British System) per 100 Cft

    Rate Per UnitAmount (Rs.)

    Nos.% Cft

    per dayper day

    per dayper day

    SaySay

    SaySay

  • DESCRIPTION OF ITEM:Item No. 3 Pucca brick work in mud morter other than building:

    (ii) Extra labour for every 5.0' (1.5 metre) additional height thereof.

    Detail Unit Rate (British System) per 100 Cft

    Qty

    LABOUR for 125 Cft

    1 Mason 0.25 No.2 Cooly unskilled 1.00 No

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATESLabour rate per 100 Cft Rs.Labour rate per Cum Rs.

  • Page 6

  • Pucca brick work in mud morter other than building:

    Extra labour for every 5.0' (1.5 metre) additional height

    Unit Rate (British System) per 100 CftRatePer Unit Amount (Rs.)

    per dayper day

    SaySay

  • DESCRIPTION OF ITEM:

    Item No. 4 (i) Pucca brick work in foundation & plinth in

    Cement sand mortar Ratio (1:2).

    Detail Unit Rate (British System) per 100 Cft

    QtyMATERIAL

    1 Bricks 9\" x 4\" x 3\" 1350.00 Nos.2 Cement 8.00 bags3 Sand 20.00 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 CftFor Masonry Work

    1 Mason 2.00 Nos.2 Coolies unskilled 2.50 Nos.3 Bahishti 0.25 No.LABOUR for 125 CftFor Cement Mortar1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 7

  • Pucca brick work in foundation & plinth in

    Unit Rate (British System) per 100 Cft

    Rate Per UnitAmount (Rs.)

    Nos.per bag% Cft

    per dayper dayper day

    per dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 4 (i) Pucca brick work in foundation & plinth in:Cement sand mortar Ratio (1:3).

    Detail Unit Rate (British System) per 100 Cft

    QtyMATERIAL

    1 Bricks 9\" x 4\" x 3\" 1350.00 Nos.2 Cement 6.00 bags3 Sand 22.50 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 CftFor Masonry Work

    1 Mason 2.00 Nos.2 Coolies unskilled 2.50 Nos.3 Bahishti 0.25 No.LABOUR for 125 CftFor Cement Mortar1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 8

  • Pucca brick work in foundation & plinth in:

    Unit Rate (British System) per 100 Cft

    Rate Per UnitAmount (Rs.)

    Nos.per bags% Cft

    per dayper dayper day

    per dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 4 (i) Pucca brick work in foundation & plinth in:Cement sand mortar Ratio (1:4).

    Detail Unit Rate (British System) per 100 Cft

    QtyMATERIAL

    1 Bricks 9\" x 4\" x 3\" 1350.00 Nos.2 Cement 4.80 bags3 Sand 24.00 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 CftFor Masonry Work

    1 Mason 2.00 Nos.2 Coolies unskilled 2.50 Nos.3 Bahishti 0.25 No.

    For Cement Mortar1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 9

  • Pucca brick work in foundation & plinth in:

    Unit Rate (British System) per 100 Cft

    Rate Per UnitAmount (Rs.)

    Nos.per bag% Cft

    per dayper dayper day

    per dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 4 (i) Pucca brick work in foundation & plinth in:Cement sand mortar Ratio (1:5).

    Detail Unit Rate (British System) per 100 Cft

    QtyMATERIAL

    1 Bricks 9\" x 4\" x 3\" 1350.00 No2 Cement 4.00 bags3 Sand 25.00 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 CftFor Masonry Work

    1 Mason 2.00 Nos.2 Coolies unskilled 2.50 Nos.3 Bahishti 0.25 No.For Cement Mortar1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 10

  • Pucca brick work in foundation & plinth in:

    Unit Rate (British System) per 100 Cft

    Rate Per UnitAmount (Rs.)

    Nos.per bag% Cft

    per dayper dayper day

    per dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:Item No. 4 (i) Pucca brick work in foundation & plinth in

    Cement sand mortar Ratio (1:6).

    Detail Unit Rate (British System) per 100 Cft

    Qty

    MATERIAL1 Bricks 9\" x 4\" x 3\" 1350.00 No2 Cement 3.40 bags3 Sand 25.70 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 CftFor Masonry Work1 Mason 2.00 Nos.2 Coolies unskilled 2.50 Nos.3 Bahishti 0.25 No.LABOUR for 125 CftFor Cement Mortar

    1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 11

  • Pucca brick work in foundation & plinth in

    Unit Rate (British System) per 100 Cft

    Rate Per UnitAmount (Rs.)

    Nos.per bag% Cft

    per dayper dayper day

    per dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:Item No. 4 (i) Pucca brick work in foundation & plinth in

    Cement sand mortar Ratio (1:7).

    Detail Unit Rate (British System) per 100 Cft

    Qty

    MATERIAL1 Bricks 9\" x 4\" x 3\" 1350.00 No2 Cement 3.00 bags3 Sand 26.50 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 CftFor Masonry Work1 Mason 2.00 Nos.2 Coolies unskilled 2.50 Nos.3 Bahishti 0.25 No.LABOUR for 125 CftFor Cement Mortar

    1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 12

  • Pucca brick work in foundation & plinth in

    Unit Rate (British System) per 100 Cft

    Rate Per UnitAmount (Rs.)

    Nos.per bag% Cft

    per dayper dayper day

    per dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 4 (i) Pucca brick work in foundation & plinth inCement sand mortar Ratio (1:8).

    Detail Unit Rate (British System) per 100 Cft

    QtyMATERIAL

    1 Bricks 9\" x 4\" x 3\" 1350.00 No2 Cement 2.66 bags3 Sand 26.67 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 CftFor Masonry Work

    1 Mason 2.00 Nos.2 Coolies unskilled 2.50 Nos.3 Bahishti 0.25 No.For Cement Mortar1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 13

  • Pucca brick work in foundation & plinth in

    Unit Rate (British System) per 100 Cft

    Rate Per UnitAmount (Rs.)

    Nos.per bag% Cft

    per dayper dayper day

    per dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 4 (ii) Pucca brick work in foundation & plinth inLime cement sand mortar Ratio (1:1:6).

    Detail Unit Rate (British System) per 100 Cft

    QtyMATERIAL

    1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Cement 3.20 bags3 Slaked lime 59.72 kg4 Sand 24.00 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 CftFor Masonry Work1 Mason 2.00 Nos.2 Coolies unskilled 2.50 Nos.3 Bahishti 0.25 No.

    For Cement Mortar1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 14

  • Pucca brick work in foundation & plinth inLime cement sand mortar Ratio (1:1:6).

    Unit Rate (British System) per 100 Cft

    Rate Per UnitAmount (Rs.)

    Nos.per bagper kg% Cft

    per dayper dayper day

    per dayper day

    Say

    SaySay

  • DESCRIPTION OF ITEM:

    Item No. 4 (ii) Pucca brick work in foundation & plinth in:Lime cement sand mortar Ratio (1:1:7).

    Detail Unit Rate (British System) per 100 CftQty

    MATERIAL

    1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Cement 2.85 bags3 Slaked lime 53.00 kg4 Sand 24.78 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 CftFor Masonry Work1 Mason 2.00 Nos.2 Coolies unskilled 2.50 Nos.3 Bahishti 0.25 No.For Cement Mortar

    1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATESLabour rate per 100 Cft Rs.Labour rate per Cum Rs.

    Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 15

  • Pucca brick work in foundation & plinth in:Lime cement sand mortar Ratio (1:1:7).

    Unit Rate (British System) per 100 CftRate Per UnitAmount (Rs.)

    Nos.per bagper kg% Cft

    per dayper dayper day

    per dayper day

    SaySay

    SaySay

  • DESCRIPTION OF ITEM:

    Item No. 4 (ii) Pucca brick work in foundation & plinth inLime cement sand mortar Ratio (1:1:8).

    Detail Unit Rate (British System) per 100 Cft

    QtyMATERIAL

    1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Cement 2.56 bags3 Slaked lime 47.78 kg4 Sand 25.60 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 CftFor Masonry Work1 Mason 2.00 Nos.2 Coolies unskilled 2.50 Nos.3 Bahishti 0.25 No.

    For Cement Mortar1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 16

  • Pucca brick work in foundation & plinth inLime cement sand mortar Ratio (1:1:8).

    Unit Rate (British System) per 100 Cft

    Rate Per UnitAmount (Rs.)

    Nos.per bagper kg% Cft

    per dayper dayper day

    per dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 4 (ii) Pucca brick work in foundation & plinth inLime cement sand mortar Ratio (1:1:9).

    Detail Unit Rate (British System) per 100 Cft

    QtyMATERIAL

    1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Cement 2.32 bags3 Slaked lime 43.30 kg4 Sand 26.20 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 CftFor Masonry Work1 Mason 2.00 Nos.2 Coolies unskilled 2.50 Nos.3 Bahishti 0.25 No.

    For Cement Mortar1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 17

  • Pucca brick work in foundation & plinth inLime cement sand mortar Ratio (1:1:9).

    Unit Rate (British System) per 100 Cft

    Rate Per UnitAmount (Rs.)

    Nos.per bagper kg% Cft

    per dayper dayper day

    per dayper day

    Say

    SaySay

  • DESCRIPTION OF ITEM:

    Item No. 4 (ii) Pucca brick work in foundation & plinth inLime cement sand mortar Ratio (1:1:10).

    Detail Unit Rate (British System) per 100 Cft

    QtyMATERIAL

    1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Cement 2.14 bags3 Slaked lime 39.94 kg4 Sand 26.66 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 CftFor Masonry Work1 Mason 2.00 Nos.2 Coolies unskilled 2.50 Nos.3 Bahishti 0.25 No.

    For Cement Mortar1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 18

  • Pucca brick work in foundation & plinth inLime cement sand mortar Ratio (1:1:10).

    Unit Rate (British System) per 100 Cft

    Rate Per UnitAmount (Rs.)

    Nos.per bagper kg% Cft

    per dayper dayper day

    per dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 4 (iii) Lime, sand mortar Ratio (1:2).

    Detail Unit Rate (British System) per 100 CftQty

    MATERIAL1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Lime Slaked 174.30 Kg.3 Sand 23.33 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 CftFor Masonry Work1 Mason 2.00 Nos.2 Coolies unskilled 2.50 Nos.3 Bahishti 0.25 No.

    For Cement Mortar1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATESLabour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 19

  • Unit Rate (British System) per 100 CftRate Per UnitAmount (Rs.)

    Nos.Per Kg.% Cft

    per dayper dayper day

    per dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 5 (i) Pacca brick work in ground floor (including striking of joCement sand mortar Ratio (1:2).

    Detail Unit Rate (British System) per 100 Cft

    QtyMATERIAL

    1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Cement 8.00 bags3 Sand 20.00 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 CftFor Masonry Work

    1 Mason 2.50 Nos.2 Coolies unskilled 4.00 Nos.3 Bahishti 0.25 No.For Cement Mortar1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 20

  • Pacca brick work in ground floor (including striking of jo

    Unit Rate (British System) per 100 Cft

    Rate Per UnitAmount (Rs.)

    Nos.per bag% Cft

    per dayper dayper day

    per dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 5 (i) Pacca brick work in ground floor (including striking of joCement sand mortar Ratio (1:3).

    Detail Unit Rate (British System) per 100 Cft

    QtyMATERIAL

    1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Cement 6.00 bags3 Sand 22.50 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 CftFor Masonry Work

    1 Mason 2.50 Nos.2 Coolies unskilled 4.00 Nos.3 Bahishti 0.25 No.For Cement Mortar1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 21

  • Pacca brick work in ground floor (including striking of jo

    Unit Rate (British System) per 100 Cft

    Rate Per UnitAmount (Rs.)

    Nos.per bag% Cft

    per dayper dayper day

    per dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 5 (i) Pacca brick work in ground floor (including striking of joCement sand mortar Ratio (1:4).

    Detail Unit Rate (British System) per 100 Cft

    QtyMATERIAL

    1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Cement 4.80 bags3 Sand 24.00 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 CftFor Masonry Work

    1 Mason 2.50 Nos.2 Coolies unskilled 4.00 Nos.3 Bahishti 0.25 No.For Cement Mortar1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 22

  • Pacca brick work in ground floor (including striking of jo

    Unit Rate (British System) per 100 Cft

    Rate Per UnitAmount (Rs.)

    Nos.per bag% Cft

    per dayper dayper day

    per dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 5 (i) Pacca brick work in ground floor (including striking of jo

    Cement sand mortar Ratio (1:5).

    Detail Unit Rate (British System) per 100 Cft

    QtyMATERIAL

    1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Cement 4.00 bags3 Sand 25.00 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 CftFor Masonry Work

    1 Mason 2.50 Nos.2 Coolies unskilled 4.00 Nos.3 Bahishti 0.25 No.For Cement Mortar

    1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 23

  • Pacca brick work in ground floor (including striking of jo

    Unit Rate (British System) per 100 Cft

    Rate Per UnitAmount (Rs.)

    Nos.per bag% Cft

    per dayper dayper day

    per dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 5 (i) Pacca brick work in ground floor (including striking of joCement sand mortar Ratio (1:6).

    Detail Unit Rate (British System) per 100 Cft

    QtyMATERIAL

    1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Cement 3.40 bags3 Sand 25.70 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 CftFor Masonry Work

    1 Mason 2.50 Nos.2 Coolies unskilled 4.00 Nos.3 Bahishti 0.25 No.For Cement Mortar1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 24

  • Pacca brick work in ground floor (including striking of jo

    Unit Rate (British System) per 100 Cft

    Rate Per UnitAmount (Rs.)

    Nos.per bag% Cft

    per dayper dayper day

    per dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 5 (i) Pacca brick work in ground floor (including striking of joCement sand mortar Ratio (1:7).

    Detail Unit Rate (British System) per 100 Cft

    QtyMATERIAL

    1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Cement 3.00 bags3 Sand 26.50 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 CftFor Masonry Work

    1 Mason 2.50 Nos.2 Coolies unskilled 4.00 Nos.3 Bahishti 0.25 No.For Cement Mortar1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 25

  • Pacca brick work in ground floor (including striking of jo

    Unit Rate (British System) per 100 Cft

    Rate Per UnitAmount (Rs.)

    Nos.per bag% Cft

    per dayper dayper day

    per dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 5 (i) Pacca brick work in ground floor (including striking of joCement sand mortar Ratio (1 : 8).

    Detail Unit Rate (British System) per 100 Cft

    QtyMATERIAL

    1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Cement 2.66 bags3 Sand 26.57 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 CftFor Masonry Work

    1 Mason 2.50 Nos.2 Coolies unskilled 4.00 Nos.3 Bahishti 0.25 No.For Cement Mortar1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 26

  • Pacca brick work in ground floor (including striking of joCement sand mortar Ratio (1 : 8).

    Unit Rate (British System) per 100 Cft

    Rate Per UnitAmount (Rs.)

    Nos.per bag% Cft

    per dayper dayper day

    per dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 5 (ii) Lime cement sand mortar Ratio (1:1:6).

    Detail Unit Rate (British System) per 100 CftQty

    MATERIAL1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Slaked lime 59.72 kg3 Cement 3.20 bags4 Sand 24.00 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 CftFor Masonry Work1 Mason 2.50 Nos.2 Coolies unskilled 4.00 Nos.3 Bahishti 0.25 No.For Cement Mortar

    1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATESLabour rate per 100 Cft Rs.Labour rate per Cum Rs.

    Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 27

  • Lime cement sand mortar Ratio (1:1:6).

    Unit Rate (British System) per 100 CftRate Per UnitAmount (Rs.)

    Nos.per kgper bag% Cft

    per dayper dayper day

    per dayper day

    SaySay

    SaySay

  • DESCRIPTION OF ITEM:

    Item No. 5 (ii) Lime cement sand mortar Ratio (1 : 1 : 7).

    Detail Unit Rate (British System) per 100 Cft

    Qty

    MATERIAL1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Slaked lime 53.37 kg3 Cement 2.85 bags4 Sand 24.78 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 CftFor Masonry Work

    1 Mason 2.50 Nos.2 Coolies unskilled 4.00 Nos.3 Bahishti 0.25 No.For Cement Mortar

    1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 28

  • Lime cement sand mortar Ratio (1 : 1 : 7).

    Unit Rate (British System) per 100 Cft

    Rate Per UnitAmount (Rs.)

    Nos.per kgper bag% Cft

    per dayper dayper day

    per dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 5 (ii) Lime cement sand mortar Ratio (1:1:8).

    Detail Unit Rate (British System) per 100 Cft

    QtyMATERIAL

    1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Slaked lime 47.78 kg3 Cement 2.56 bags4 Sand 25.60 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 CftFor Masonry Work

    1 Mason 2.50 Nos.2 Coolies unskilled 4.00 Nos.3 Bahishti 0.25 No.For Cement Mortar1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 29

  • Lime cement sand mortar Ratio (1:1:8).

    Unit Rate (British System) per 100 Cft

    Rate Per UnitAmount (Rs.)

    Nos.per kgper bag% Cft

    per dayper dayper day

    per dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 5 (ii) Lime cement sand mortar Ratio ( 1 : 1 : 9 ).

    Detail Unit Rate (British System) per 100 Cft

    Qty

    MATERIAL1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Slaked lime 43.30 kg3 Cement 2.32 bags4 Sand 26.20 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 CftFor Masonry Work

    1 Mason 2.50 Nos.2 Coolies unskilled 4.00 Nos.3 Bahishti 0.25 No.For Cement Mortar

    1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 30

  • Lime cement sand mortar Ratio ( 1 : 1 : 9 ).

    Unit Rate (British System) per 100 Cft

    Rate Per UnitAmount (Rs.)

    Nos.per kgper bag% Cft

    per dayper dayper day

    per dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 5 (ii) Lime cement sand mortar Ratio ( 1 : 1 : 10 ).

    Detail Unit Rate (British System) per 100 CftQty

    MATERIAL1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Slaked lime 40.00 kg3 Cement 2.14 bags4 Sand 26.66 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 CftFor Masonry Work1 Mason 2.50 Nos.2 Coolies unskilled 4.00 Nos.3 Bahishti 0.25 No.For Cement Mortar

    1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATESLabour rate per 100 Cft Rs.Labour rate per Cum Rs.

    Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 31

  • Lime cement sand mortar Ratio ( 1 : 1 : 10 ).

    Unit Rate (British System) per 100 CftRate Per UnitAmount (Rs.)

    Nos.per kgper bag% Cft

    per dayper dayper day

    per dayper day

    SaySay

    SaySay

  • DESCRIPTION OF ITEM:

    Item No. 5 (iii) Lime sand mortar Ratio (1:2).

    Detail Unit Rate (British System) per 100 CftQty

    MATERIAL1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Lime 174.30 kg3 Sand 23.33 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 CftFor Masonry Work1 Mason 2.50 Nos.2 Coolies unskilled 4.00 Nos.3 Bahishti 0.25 No.For Cement Mortar

    1 Cooly unskilled 0.83 No.2 Bahishty 0.50 No

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATESLabour rate per 100 Cft Rs.Labour rate per Cum Rs.

    Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 32

  • Unit Rate (British System) per 100 CftRate Per UnitAmount (Rs.)

    Nos.per kg% Cft

    per dayper dayper day

    per dayper day

    SaySay

    SaySay

  • DESCRIPTION OF ITEM:

    Item No. 6 Add extra labour in item No.5 for brick work in:-

    Detail Unit Rate (British System) per 100 CftQty

    LABOUR for 125 CftFirst Floor1 Mason 0.25 No.2 Cooly unskilled 1.00 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATESLabour rate per 100 Cft Rs.

    Labour rate per Cum Rs.

    LABOUR for 125 CftSecond Floor1 Masons 0.75 No.2 Coolies unskilled 2.00 Nos.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATESLabour rate per 100 Cft Rs.

    Labour rate per Cum Rs.

  • Page 33

  • Add extra labour in item No.5 for brick work in:-

    Unit Rate (British System) per 100 CftRate Per UnitAmount (Rs.)

    per dayper day

    Say

    Say

    per dayper day

    Say

    Say

  • Detail Unit Rate (British System) per 100 Cft

    Qty

    LABOUR for 125 CftThird Floor1 Masons 1.25 Nos.2 Coolies unskilled 3.00 Nos.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATESLabour rate per 100 Cft

    Labour rate per Cum

    LABOUR for 125 Cft4th & Subsequent Floor1 Masons 2.25 Nos.2 Coolies unskilled 4.50 Nos.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Cft Rs.Labour rate per cum Rs.

  • Page 34

  • Unit Rate (British System) per 100 Cft

    Rate Per UnitAmount (Rs.)

    per dayper day

    Say

    Say

    per dayper day

    SaySay

  • DESCRIPTION OF ITEM:

    Item No. 7 (i) Pacca brick work other than building including striking ofupto 10 ft. (3 metre) height.Cement sand mortar Ratio (1:2).

    Detail Unit Rate (British System) per 100 Cft

    QtyMATERIAL

    1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Cement 8.00 bags3 Sand 20.00 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 CftFor Masonry Work

    1 Mason 2.50 Nos.2 Coolies unskilled 3.00 Nos.For Cement Mortar

    1 Cooly unskilled 1.00 No.2 Bahishty 0.50 No

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 35

  • Pacca brick work other than building including striking of

    Unit Rate (British System) per 100 Cft

    Rate Per UnitAmount (Rs.)

    Nos.per bag% Cft

    per dayper day

    per dayper day

    SaySaySaySay

  • Item No. 7 Pacca brick work other than building including striking ofupto 10 ft. (3 metre) height.

    Cement sand mortar Ratio (1:3).

    Detail Unit Rate (British System) per 100 Cft

    Qty

    MATERIAL1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Cement 6.00 bags3 Sand 22.50 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 CftFor Masonry Work1 Mason 2.50 Nos.2 Coolies unskilled 3.00 Nos.For Cement Mortar

    1 Cooly unskilled 1.00 No.2 Bahishty 0.50 No

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATESLabour rate per 100 Cft Rs.Labour rate per Cum Rs.

    Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 36

  • Pacca brick work other than building including striking of

    Unit Rate (British System) per 100 Cft

    Rate Per UnitAmount (Rs.)

    Nos.per bag% Cft

    per dayper day

    per dayper day

    SaySay

    SaySay

  • DESCRIPTION OF ITEM:

    Item No. 7 (i) Pacca brick work other than building including striking ofupto 10 ft. (3 metre) height.Cement sand mortar Ratio (1 : 4).

    Detail Unit Rate (British System) per 100 Cft

    QtyMATERIAL

    1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Cement 4.80 bags3 Sand 24.00 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 CftFor Masonry Work

    1 Mason 2.50 Nos.2 Coolies unskilled 3.00 Nos.For Cement Mortar

    1 Cooly unskilled 1.00 No.2 Bahishty 0.50 No

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 37

  • Pacca brick work other than building including striking of

    Cement sand mortar Ratio (1 : 4).

    Unit Rate (British System) per 100 Cft

    Rate Per UnitAmount (Rs.)

    Nos.per bag% Cft

    per dayper day

    per dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 7 (i) Pacca brick work other than building including striking ofupto 10 ft. (3 metre) height.Cement sand mortar Ratio (1 : 5).

    Detail Unit Rate (British System) per 100 Cft

    QtyMATERIAL

    1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Cement 4.00 bags3 Sand 25.00 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 CftFor Masonry Work

    1 Mason 2.50 Nos.2 Coolies unskilled 3.00 Nos.For Cement Mortar

    1 Cooly unskilled 1.00 No.2 Bahishty 0.50 No

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 38

  • Pacca brick work other than building including striking of

    Cement sand mortar Ratio (1 : 5).

    Unit Rate (British System) per 100 Cft

    Rate Per UnitAmount (Rs.)

    Nos.per bag% Cft

    per dayper day

    per dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 7 (i) Pacca brick work other than building including striking ofupto 10 ft. (3 metre) height.Cement sand mortar Ratio (1 : 6).

    Detail Unit Rate (British System) per 100 Cft

    QtyMATERIAL

    1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Cement 3.40 bags3 Sand 25.70 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 CftFor Masonry Work

    1 Mason 2.50 Nos.2 Coolies unskilled 3.00 Nos.For Cement Mortar

    1 Cooly unskilled 1.00 No.2 Bahishty 0.50 No

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 39

  • Pacca brick work other than building including striking of

    Cement sand mortar Ratio (1 : 6).

    Unit Rate (British System) per 100 Cft

    Rate Per UnitAmount (Rs.)

    Nos.per bag% Cft

    per dayper day

    per dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 7 (i) Pacca brick work other than building including striking ofupto 10 ft. (3 metre) height.Cement sand mortar Ratio (1 : 7).

    Detail Unit Rate (British System) per 100 Cft

    QtyMATERIAL

    1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Cement 3.00 bags3 Sand 26.50 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 CftFor Masonry Work

    1 Mason 2.50 Nos.2 Coolies unskilled 3.00 Nos.For Cement Mortar

    1 Cooly unskilled 1.00 No.2 Bahishty 0.50 No

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 40

  • Pacca brick work other than building including striking of

    Cement sand mortar Ratio (1 : 7).

    Unit Rate (British System) per 100 Cft

    Rate Per UnitAmount (Rs.)

    Nos.per bag% Cft

    per dayper day

    per dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 7 (i) Pacca brick work other than building including striking ofupto 10 ft. (3 metre) height.Cement sand mortar Ratio (1 : 8).

    Detail Unit Rate (British System) per 100 Cft

    QtyMATERIAL

    1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Cement 2.66 bags3 Sand 26.67 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 CftFor Masonry Work

    1 Mason 2.50 Nos.2 Coolies unskilled 3.00 Nos.For Cement Mortar

    1 Cooly unskilled 1.00 No.2 Bahishty 0.50 No

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 41

  • Pacca brick work other than building including striking of

    Cement sand mortar Ratio (1 : 8).

    Unit Rate (British System) per 100 Cft

    Rate Per UnitAmount (Rs.)

    Nos.per bag% Cft

    per dayper day

    per dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 7 (ii) Pacca brick work other than building including striking ofupto 10 ft. (3 metre) height.Lime, cement, sand mortar Ratio (1 : 1 : 6).

    Detail Unit Rate (British System) per 100 Cft

    QtyMATERIAL

    1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Slaked lime 59.72 kg3 Cement 3.20 bags4 Sand 24.00 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 CftFor Masonry Work1 Mason 2.50 Nos.2 Coolies unskilled 3.00 Nos.

    For Cement Mortar1 Cooly unskilled 1.00 No.2 Bahishty 0.50 No

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 42

  • Pacca brick work other than building including striking of

    Lime, cement, sand mortar Ratio (1 : 1 : 6).

    Unit Rate (British System) per 100 Cft

    Rate Per UnitAmount (Rs.)

    Nos.per kgper bag% Cft

    per dayper day

    per dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 7 (ii) Pacca brick work other than building including striking ofupto 10 ft. (3 metre) height.Lime, cement, sand mortar Ratio (1 : 1 : 7).

    Detail Unit Rate (British System) per 100 Cft

    QtyMATERIAL

    1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Slaked lime 53.00 kg3 Cement 2.85 bags4 Sand 24.78 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 CftFor Masonry Work1 Mason 2.50 Nos.2 Coolies unskilled 3.00 Nos.

    For Cement Mortar1 Cooly unskilled 1.00 No.2 Bahishty 0.50 No

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 43

  • Pacca brick work other than building including striking of

    Lime, cement, sand mortar Ratio (1 : 1 : 7).

    Unit Rate (British System) per 100 Cft

    Rate Per UnitAmount (Rs.)

    Nos.per kgper bag% Cft

    per dayper day

    per dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 7 (ii) Pacca brick work other than building including striking ofupto 10 ft. (3 metre) height.Lime, cement, sand mortar Ratio (1 : 1 : 8).

    Detail Unit Rate (British System) per 100 CftQty

    MATERIAL

    1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Slaked lime 47.78 kg3 Cement 2.56 bags4 Sand 25.60 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 CftFor Masonry Work1 Mason 2.50 Nos.2 Coolies unskilled 3.00 Nos.

    For Cement Mortar1 Cooly unskilled 1.00 No.2 Bahishty 0.50 No

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 44

  • Pacca brick work other than building including striking of

    Lime, cement, sand mortar Ratio (1 : 1 : 8).

    Unit Rate (British System) per 100 CftRate Per UnitAmount (Rs.)

    Nos.per kgper bag% Cft

    per dayper day

    per dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 7 (ii) Pacca brick work other than building including striking ofupto 10 ft. (3 metre) height.Lime, cement, sand mortar Ratio (1 : 1 : 9).

    Detail Unit Rate (British System) per 100 Cft

    QtyMATERIAL

    1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Slaked lime 43.29 kg3 Cement 2.32 bags4 Sand 26.20 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 CftFor Masonry Work1 Mason 2.50 Nos.2 Coolies unskilled 3.00 Nos.

    For Cement Mortar1 Cooly unskilled 1.00 No.2 Bahishty 0.50 No

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 45

  • Pacca brick work other than building including striking of

    Lime, cement, sand mortar Ratio (1 : 1 : 9).

    Unit Rate (British System) per 100 Cft

    Rate Per UnitAmount (Rs.)

    Nos.per kgper bag% Cft

    per dayper day

    per dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 7 (ii) Pacca brick work other than building including striking ofupto 10 ft. (3 metre) height.Lime, cement, sand mortar Ratio (1 : 1 : 10).

    Detail Unit Rate (British System) per 100 Cft

    QtyMATERIAL

    1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Slaked lime 39.94 kg3 Cement 2.14 bags4 Sand 26.66 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 CftFor Masonry Work1 Mason 2.50 Nos.2 Coolies unskilled 3.00 Nos.

    For Cement Mortar1 Cooly unskilled 1.00 No.2 Bahishty 0.50 No

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 46

  • Pacca brick work other than building including striking of

    Lime, cement, sand mortar Ratio (1 : 1 : 10).

    Unit Rate (British System) per 100 Cft

    Rate Per UnitAmount (Rs.)

    Nos.per kgper bag% Cft

    per dayper day

    per dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 7 (iii) Lime, sand, mortar ratio (1 : 2)

    Detail Unit Rate (British System) per 100 CftQty

    MATERIAL1 Pacca brick 9\" x 4\" x 3\" 1350.00 No2 Slaked lime 174.30 kg3 Sand 23.33 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 CftFor Masonry Work1 Mason 2.50 Nos.2 Coolies unskilled 3.00 Nos.

    For Cement Mortar1 Cooly unskilled 1.00 No.2 Bahishty 0.50 No

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 47

  • Lime, sand, mortar ratio (1 : 2)

    Unit Rate (British System) per 100 CftRate Per UnitAmount (Rs.)

    Nos.per kg% Cft

    per dayper day

    per dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:Item No. 8 Additional extra labour in item No.7 for every 10 ft. (3 m

    additional height.

    Detail Unit Rate (British System) per 100 CftQty

    LABOUR for 125 Cft1 Masons 0.25 No.2 Cooly 1.00 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate Per 100 Cft. Rs.Labour Rate Per Cum. Rs.

  • Page 48

  • Additional extra labour in item No.7 for every 10 ft. (3 m

    Unit Rate (British System) per 100 CftRate Per UnitAmount (Rs.)

    per dayper day

    SaySay

  • DESCRIPTION OF ITEM:

    Item No. 9 Extra labour for arch work in brick masonry including labocentering and de-centering.

    Detail Unit Rate (British System) per 100 Cft

    Qty

    LABOUR for 125 Cft

    1 Masons 1.50 No.2 Cooly 0.50 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATESLabour rate Per 100 Cft. Rs.Labour Rate Per Cum. Rs.

  • Page 49

  • Extra labour for arch work in brick masonry including labo

    Unit Rate (British System) per 100 Cft

    Rate Per UnitAmount (Rs.)

    per dayper day

    SaySay

  • DESCRIPTION OF ITEM:Item No. 10 Extra for Pacca brick work in steining of wells or any oth

    circular masonry.

    Detail Unit Rate (British System) per 100 CftQty

    MATERIAL1 Pacca bricks 82.00 No.

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 Cft

    1 Mason 1.25 No.TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATESLabour rate per 100 Cft Rs.Labour rate per Cum Rs.

    Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 50

  • Extra for Pacca brick work in steining of wells or any oth

    Unit Rate (British System) per 100 CftRate Per UnitAmount (Rs.)

    % Cft

    per day

    SaySay

    SaySay

  • DESCRIPTION OF ITEM:

    Item No. 11 Extra labour for profile and flared walls.

    Detail Unit Rate (British System) per 100 CftQty

    LABOUR for 125 Cft1 Mason 0.43 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Cft Rs.Composit rate per Cum Rs.

  • Page 51

  • Extra labour for profile and flared walls.

    Unit Rate (British System) per 100 CftRate Per UnitAmount (Rs.)

    per day

    SaySay

  • DESCRIPTION OF ITEM:Item No. 12 Extra labour for Pacca brick work in piers and abutment.

    (i) From 10 ft. (3 metre) to 20 ft. (6 metre) height.

    Detail Unit Rate (British System) per 100 Cft

    Qty

    LABOUR for 125 Cft

    1 Mason 0.12 No.2 Cooly unskilled 0.50 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATESLabour rate per 100 Cft Rs.Composit rate per Cum Rs.

  • Page 52

  • Extra labour for Pacca brick work in piers and abutment.

    From 10 ft. (3 metre) to 20 ft. (6 metre) height.

    Unit Rate (British System) per 100 Cft

    Rate Per UnitAmount (Rs.)

    per dayper day

    SaySay

  • DESCRIPTION OF ITEM:

    Item No. 12 Extra labour for Pacca brick work in piers and abutment.(ii) Above 20 ft. (6 metre) height.

    Detail Unit Rate (British System) per 100 CftQty

    LABOUR for 125 Cft1 Mason 0.25 No.2 Cooly unskilled 1.00 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Cft Rs.Composit rate per Cum Rs.

  • Page 53

  • Extra labour for Pacca brick work in piers and abutment.

    Unit Rate (British System) per 100 CftRate Per UnitAmount (Rs.)

    per dayper day

    SaySay

  • DESCRIPTION OF ITEM:Item No. 13 Extra for face work (half brick thick) using special brick

    of Ist class bricks.

    Detail

    MATERIAL1 Special moulded Stretcher

    courses bricks 2702 Header courses 513

    Total 783Add 5% wastage 39.15Total 822.15

    Difference in cost of specialmoulded and ordinary Ist classbricks

    2 Extra cost = 0 -= - 0

    Contractor's Profit &20 PercentTotal

    Labour rate for 100 CftComposit rate per Cum

  • Page 54

  • Extra for face work (half brick thick) using special brick

    Unit Rate (British System) per 100 CftQty Rate Per UnitAmount (Rs.)

    % 0 Nos.

    Rs. SayRs. Say

  • DESCRIPTION OF ITEM:

    Item No. 14 Reinforced brick work in lintels of opening, laid in (1:3)sand mortar including, all labour material forms, moulds, and shuttering etc., but excluding cost and labour of steereinforcement which shall be paid for separately.

    Detail Unit Rate (British System) per CftQty

    MATERIAL1 Pacca bricks 10.00 No.2 Cement 0.11 bag3 Sand 0.41 Cft4 Kikar wood for centring & shuttering

    (10 x 1.60 x 0.2) Can be use 20 times 0.002 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 Cft

    1 Mason 0.067 No.2 Cooly unskilled 0.11 No.3 Bahishti 0.023 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per Cft Rs.Labour rate per Cum Rs.Composite rate per Cft Rs.Composite rate per Cum Rs.

  • Page 55

  • Reinforced brick work in lintels of opening, laid in (1:3)sand mortar including, all labour material forms, moulds, and shuttering etc., but excluding cost and labour of steereinforcement which shall be paid for separately.

    Unit Rate (British System) per CftRate Per UnitAmount (Rs.)

    Nos.per bag% Cft

    Cft

    per dayper dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 15 (a) Extra for dressing or chamfering of bricks (special orarchitectaral shape).

    Detail Unit Rate (British System) per 100 No.

    Qty

    LABOUR for 125 Cft

    1 Mason 3.00 No.2 Cooly unskilled 0.34 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATESLabour rate per 100 No. Rs.

  • Page 56

  • Extra for dressing or chamfering of bricks (special or

    Unit Rate (British System) per 100 No.

    Rate Per UnitAmount (Rs.)

    per dayper day

    Say

  • DESCRIPTION OF ITEM:Item No. 15 (b) All other purposes.

    Detail Unit Rate (British System) per 100 No.Qty

    LABOUR for 125 Cft1 Mason 1.50 No.2 Cooly unskilled 0.17 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 No. Rs.

  • Page 57

  • Unit Rate (British System) per 100 No.Rate Per UnitAmount (Rs.)

    per dayper day

    Say

  • DESCRIPTION OF ITEM:

    Item No. 16 Peforated Pacca brick walling 114 mm (4\") thick in groundfloor in

    (i) Mud mortar.

    Detail Unit Rate (British System) per 100 Sft

    Qty

    MATERIAL

    1 Pacca bricks 9\" x 4\" x 3\" 338.00 No.2 Good earth 8.75 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 Sft

    1 Mason 1.00 No.2 Coolies unskilled 1.83 Nos.3 Bahishti 0.23 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.

  • Page 58

  • Peforated Pacca brick walling 114 mm (4\") thick in ground

    Unit Rate (British System) per 100 Sft

    Rate Per UnitAmount (Rs.)

    Nos.% Cft

    per dayper dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 16 (ii) Cement sand mortar Ratio (1 : 2).

    Detail Unit Rate (British System) per 100 Sft

    Qty

    MATERIAL

    1 Pacca bricks 9\" x 4\" x 3\" 338.00 No.2 Cement 2.00 bags3 Sand 5.00 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 Sft

    1 Mason 1.25 Nos.2 Coolies unskilled 2.42 Nos.3 Bahishti 0.38 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.

  • Page 59

  • Cement sand mortar Ratio (1 : 2).

    Unit Rate (British System) per 100 Sft

    Rate Per UnitAmount (Rs.)

    Nos.per bag% Cft

    per dayper dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:Item No. 16 (ii) Cement sand mortar Ratio (1:3).

    Detail Unit Rate (British System) per 100 SftQty

    MATERIAL1 Pacca bricks 9\" x 4\" x 3\" 338.00 No.2 Cement 1.50 bags3 Sand 5.60 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 Sft1 Mason 1.25 Nos.2 Coolies unskilled 2.42 Nos.3 Bahishti 0.38 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.

  • Page 60

  • Unit Rate (British System) per 100 SftRate Per UnitAmount (Rs.)

    Nos.per bag% Cft

    per dayper dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 16 (ii) Cement sand mortar Ratio (1:4).

    Detail Unit Rate (British System) per 100 Sft

    Qty

    MATERIAL

    1 Pacca bricks 9\" x 4\" x 3\" 338.00 No.2 Cement 1.20 bags3 Sand 6.00 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 Sft

    1 Mason 1.25 Nos.2 Coolies unskilled 2.42 Nos.3 Bahishti 0.38 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATESLabour rate per 100 Sft Rs.Labour rate per Sqm Rs.

    Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.

  • Page 61

  • Unit Rate (British System) per 100 Sft

    Rate Per UnitAmount (Rs.)

    Nos.per bag% Cft

    per dayper dayper day

    SaySay

    SaySay

  • DESCRIPTION OF ITEM:

    Item No. 16 (ii) Cement sand mortar Ratio (1:5).

    Detail Unit Rate (British System) per 100 Sft

    Qty

    MATERIAL

    1 Pacca bricks 9\" x 4\" x 3\" 338.00 No.2 Cement 1.00 bags3 Sand 6.25 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 Sft

    1 Mason 1.25 Nos.2 Coolies unskilled 2.42 Nos.3 Bahishti 0.38 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.

  • Page 62

  • Unit Rate (British System) per 100 Sft

    Rate Per UnitAmount (Rs.)

    Nos.per bag% Cft

    per dayper dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 16 (ii) Cement sand mortar Ratio (1:6).

    Detail Unit Rate (British System) per 100 Sft

    Qty

    MATERIAL

    1 Pacca bricks 9\" x 4\" x 3\" 338.00 No.2 Cement 0.86 bags3 Sand 6.40 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 Sft

    1 Mason 1.25 Nos.2 Coolies unskilled 2.42 Nos.3 Bahishti 0.38 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.

  • Page 63

  • Unit Rate (British System) per 100 Sft

    Rate Per UnitAmount (Rs.)

    Nos.per bag% Cft

    per dayper dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 16 (ii) Cement sand mortar Ratio (1:7).

    Detail Unit Rate (British System) per 100 Sft

    Qty

    MATERIAL

    1 Pacca bricks 9\" x 4\" x 3\" 338.00 No.2 Cement 0.75 bags3 Sand 6.58 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 Sft

    1 Mason 1.25 Nos.2 Coolies unskilled 2.42 Nos.3 Bahishti 0.38 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.

  • Page 64

  • Unit Rate (British System) per 100 Sft

    Rate Per UnitAmount (Rs.)

    Nos.per bag% Cft

    per dayper dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 16 (ii) Cement sand mortar Ratio (1:8).

    Detail Unit Rate (British System) per 100 Sft

    Qty

    MATERIAL

    1 Pacca bricks 9\" x 4\" x 3\" 338.00 No.2 Cement 0.67 bags3 Sand 6.67 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 Sft

    1 Mason 1.25 Nos.2 Coolies unskilled 2.42 Nos.3 Bahishti 0.38 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.

  • Page 65

  • Unit Rate (British System) per 100 Sft

    Rate Per UnitAmount (Rs.)

    Nos.per bag% Cft

    per dayper dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 16 (iii) Lime cement sand mortar Ratio (1 : 1 : 6).

    Detail Unit Rate (British System) per 100 Sft

    Qty

    MATERIAL

    1 Pacca bricks 9\" x 4\" x 3\" 338.00 No.2 Slaked lime 14.93 kg3 Cement 0.80 bags4 Sand 6.00 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 Sft

    1 Mason 1.25 Nos.2 Coolies unskilled 2.42 Nos.3 Bahishti 0.38 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.

  • Page 66

  • Lime cement sand mortar Ratio (1 : 1 : 6).

    Unit Rate (British System) per 100 Sft

    Rate Per UnitAmount (Rs.)

    Nos.kgper bag% Cft

    per dayper dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 16 (iii) Lime cement sand mortar Ratio (1 : 1 : 7).

    Detail Unit Rate (British System) per 100 Sft

    Qty

    MATERIAL

    1 Pacca bricks 9\" x 4\" x 3\" 338.00 No.2 Slaked lime 13.44 kg3 Cement 0.71 bags4 Sand 6.13 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 Sft

    1 Mason 1.25 Nos.2 Coolies unskilled 2.42 Nos.3 Bahishti 0.38 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.

  • Page 67

  • Lime cement sand mortar Ratio (1 : 1 : 7).

    Unit Rate (British System) per 100 Sft

    Rate Per UnitAmount (Rs.)

    Nos.per kgper bag% Cft

    per dayper dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 16 (iii) Lime cement sand mortar Ratio (1 : 1 : 8).

    Detail Unit Rate (British System) per 100 Sft

    Qty

    MATERIAL

    1 Pacca bricks 9\" x 4\" x 3\" 338.00 No.2 Slaked lime 12.32 kg3 Cement 0.64 bags4 Sand 6.40 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 Sft

    1 Mason 1.25 Nos.2 Coolies unskilled 2.42 Nos.3 Bahishti 0.38 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.

  • Page 68

  • Lime cement sand mortar Ratio (1 : 1 : 8).

    Unit Rate (British System) per 100 Sft

    Rate Per UnitAmount (Rs.)

    Nos.per kgper bag% Cft

    per dayper dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 16 (iii) Lime cement sand mortar Ratio (1 : 1 : 9).

    Detail Unit Rate (British System) per 100 Sft

    Qty

    MATERIAL

    1 Pacca bricks 9\" x 4\" x 3\" 338.00 No.2 Slaked lime 10.82 kg3 Cement 0.58 bags4 Sand 6.50 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 Sft

    1 Mason 1.25 Nos.2 Coolies unskilled 2.42 Nos.3 Bahishti 0.38 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.

  • Page 69

  • Lime cement sand mortar Ratio (1 : 1 : 9).

    Unit Rate (British System) per 100 Sft

    Rate Per UnitAmount (Rs.)

    Nos.per kgper bag% Cft

    per dayper dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 16 (iii) Lime cement sand mortar Ratio (1 : 1 : 10).

    Detail Unit Rate (British System) per 100 Sft

    Qty

    MATERIAL

    1 Pacca bricks 9\" x 4\" x 3\" 338.00 No.2 Slaked lime 10.08 kg3 Cement 0.54 bags4 Sand 6.70 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 Sft

    1 Mason 1.25 Nos.2 Coolies unskilled 2.42 Nos.3 Bahishti 0.38 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.

  • Page 70

  • Lime cement sand mortar Ratio (1 : 1 : 10).

    Unit Rate (British System) per 100 Sft

    Rate Per UnitAmount (Rs.)

    Nos.per kgper bag% Cft

    per dayper dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 16 (iv) Lime cement sand mortar Ratio (1 : 2).

    Detail Unit Rate (British System) per 100 Sft

    Qty

    MATERIAL

    1 Pacca bricks 9\" x 4\" x 3\" 338.00 Nos2 Slaked lime 43.67 kg3 Sand 5.58 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 Sft

    1 Mason 1.25 Nos.2 Coolies unskilled 2.42 Nos.3 Bahishti 0.38 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATESLabour rate per 100 Sft Rs.Labour rate per Sqm Rs.

    Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.

  • Page 71

  • Lime cement sand mortar Ratio (1 : 2).

    Unit Rate (British System) per 100 Sft

    Rate Per UnitAmount (Rs.)

    Nos.per kg% Cft

    per dayper dayper day

    SaySay

    SaySay

  • DESCRIPTION OF ITEM:Item No. 17 Add. extra labour on item No.15 for pacca brick work.

    Detail Unit Rate (British System) per 100 SftQty

    LABOUR for 125 SftFirst Floor1 Mason 0.13 No.2 Cooly unskilled 0.50 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATESLabour rate for 100 Sft Rs.

    Labour rate per Sqm Rs.

    LABOUR for 125 SftSecond Floor1 Masons 0.37 No.2 Coolies unskilled 1.00 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATESLabour rate for 100 Sft Rs.

    Labour rate per Sqm Rs.

    LABOUR for 125 CftThird Floor1 Masons 0.63 No.2 Coolies unskilled 1.50 Nos.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATESLabour rate for 100 Sft

  • Labour rate per Sqm

    Page 72

  • Add. extra labour on item No.15 for pacca brick work.

    Unit Rate (British System) per 100 SftRate Per UnitAmount (Rs.)

    per dayper day

    Say

    Say

    per dayper day

    Say

    Say

    per dayper day

    Say

  • Say

  • LABOUR for 125 Sft4th & Subsequent Floor1 Masons 1.12 Nos.2 Coolies unskilled 2.12 Nos.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate for 100 Sft Rs.Labour rate per Sqm Rs.

  • Page 73

  • per dayper day

    SaySay

  • DESCRIPTION OF ITEM:Item No. 18 (i) Perforated pacca brick walling 9\" thick in ground floor in

    Mud Mortar

    Detail Unit Rate (British System) per 100 SftQty

    MUD MORTAR1 Pacca bricks 9\" x 4\" x 3\" 675.00 Nos2 Good earth 17.50 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 Sft1 Mason 1.25 Nos.2 Coolies unskilled 2.75 Nos.3 Bahishti 0.35 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.

  • Page 74

  • Perforated pacca brick walling 9\" thick in ground floor in

    Unit Rate (British System) per 100 SftRate Per UnitAmount (Rs.)

    Nos.% Cft

    per dayper dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 18 (ii) Cement sand mortar Ratio (1 : 2)

    Detail Unit Rate (British System) per 100 Sft

    Qty

    MATERIAL

    1 Pacca bricks 9\" x 4\" x 3\" 675.00 Nos2 Cement 4.00 bags3 Sand 10.00 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 Sft

    1 Mason 1.90 Nos.2 Coolies unskilled 3.63 Nos.3 Bahishti 0.55 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.

  • Page 75

  • Cement sand mortar Ratio (1 : 2)

    Unit Rate (British System) per 100 Sft

    Rate Per UnitAmount (Rs.)

    Nos.bags% Cft

    per dayper dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 18 (ii) Cement sand mortar Ratio (1 : 3)

    Detail Unit Rate (British System) per 100 Sft

    Qty

    MATERIAL

    1 Pacca bricks 9\" x 4\" x 3\" 675.00 Nos2 Cement 3.00 bags3 Sand 11.25 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 Sft

    1 Mason 1.90 Nos.2 Coolies unskilled 3.63 Nos.3 Bahishti 0.55 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.

  • Page 76

  • Cement sand mortar Ratio (1 : 3)

    Unit Rate (British System) per 100 Sft

    Rate Per UnitAmount (Rs.)

    Nos.bags% Cft

    per dayper dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:Item No. 18 (ii) Cement sand mortar Ratio (1 : 4)

    Detail Unit Rate (British System) per 100 SftQty

    MATERIAL1 Pacca bricks 9\" x 4\" x 3\" 675.00 Nos2 Cement 2.40 bags3 Sand 12.00 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 Sft

    1 Mason 1.90 Nos.2 Coolies unskilled 3.63 Nos.3 Bahishti 0.55 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATESLabour rate per 100 Sft Rs.Labour rate per Sqm Rs.

    Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.

  • Page 77

  • Cement sand mortar Ratio (1 : 4)

    Unit Rate (British System) per 100 SftRate Per UnitAmount (Rs.)

    Nos.per bag% Cft

    per dayper dayper day

    SaySay

    SaySay

  • DESCRIPTION OF ITEM:

    Item No. 18 (ii) Cement sand mortar Ratio (1 : 5)

    Detail Unit Rate (British System) per 100 Sft

    Qty

    MATERIAL

    1 Pacca bricks 9\" x 4\" x 3\" 675.00 Nos2 Cement 2.00 bags3 Sand 12.50 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 Sft

    1 Mason 1.90 Nos.2 Coolies unskilled 3.63 Nos.3 Bahishti 0.55 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.

  • Page 78

  • Cement sand mortar Ratio (1 : 5)

    Unit Rate (British System) per 100 Sft

    Rate Per UnitAmount (Rs.)

    Nos.per bag% Cft

    per dayper dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 18 (ii) Cement sand mortar Ratio (1 : 6)

    Detail Unit Rate (British System) per 100 Sft

    Qty

    MATERIAL

    1 Pacca bricks 9\" x 4\" x 3\" 675.00 Nos2 Cement 1.72 bags3 Sand 12.80 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 Sft

    1 Mason 1.90 Nos.2 Coolies unskilled 3.63 Nos.3 Bahishti 0.55 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.

  • Page 79

  • Cement sand mortar Ratio (1 : 6)

    Unit Rate (British System) per 100 Sft

    Rate Per UnitAmount (Rs.)

    Nos.per bag% Cft

    per dayper dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 18 (ii) Cement sand mortar Ratio (1 : 7)

    Detail Unit Rate (British System) per 100 Sft

    Qty

    MATERIAL

    1 Pacca bricks 9\" x 4\" x 3\" 675.00 Nos2 Cement 1.50 bags3 Sand 13.13 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 Sft

    1 Mason 1.90 Nos.2 Coolies unskilled 3.63 Nos.3 Bahishti 0.55 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.

  • Page 80

  • Cement sand mortar Ratio (1 : 7)

    Unit Rate (British System) per 100 Sft

    Rate Per UnitAmount (Rs.)

    Nos.per bag% Cft

    per dayper dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 18 (ii) Cement sand mortar Ratio (1 : 8)

    Detail Unit Rate (British System) per 100 Sft

    Qty

    MATERIAL

    1 Pacca bricks 9\" x 4\" x 3\" 675.00 Nos2 Cement 1.33 bags3 Sand 13.34 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 Sft

    1 Mason 1.90 Nos.2 Coolies unskilled 3.63 Nos.3 Bahishti 0.55 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.

  • Page 81

  • Cement sand mortar Ratio (1 : 8)

    Unit Rate (British System) per 100 Sft

    Rate Per UnitAmount (Rs.)

    Nos.per bag% Cft

    per dayper dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 18 (iii) Lime cement sand mortar Ratio (1 : 1 : 6)

    Detail Unit Rate (British System) per 100 Sft

    Qty

    MATERIAL

    1 Pacca bricks 9\" x 4\" x 3\" 675.00 Nos2 Slaked lime 29.86 kg3 Cement 1.60 bags4 Sand 12.00 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 Sft

    1 Mason 1.90 Nos.2 Coolies unskilled 3.63 Nos.3 Bahishti 0.55 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.

  • Page 82

  • Lime cement sand mortar Ratio (1 : 1 : 6)

    Unit Rate (British System) per 100 Sft

    Rate Per UnitAmount (Rs.)

    Nos.per kgper bag% Cft

    per dayper dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 18 (iii) Lime cement sand mortar Ratio (1 : 1 : 7)

    Detail Unit Rate (British System) per 100 Sft

    Qty

    MATERIAL

    1 Pacca bricks 9\" x 4\" x 3\" 675.00 Nos2 Slaked lime 26.50 kg3 Cement 1.42 bags4 Sand 12.39 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 Sft1 Mason 1.90 Nos.2 Coolies unskilled 3.63 Nos.3 Bahishti 0.55 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.

  • Page 83

  • Lime cement sand mortar Ratio (1 : 1 : 7)

    Unit Rate (British System) per 100 Sft

    Rate Per UnitAmount (Rs.)

    Nos.per kgper bag% Cft

    per dayper dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 18 (iii) Lime cement sand mortar Ratio (1 : 1 : 8)

    Detail Unit Rate (British System) per 100 Sft

    Qty

    MATERIAL

    1 Pacca bricks 9\" x 4\" x 3\" 675.00 Nos2 Slaked lime 23.90 kg3 Cement 1.28 bags4 Sand 12.80 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 Sft

    1 Mason 1.90 Nos.2 Coolies unskilled 3.63 Nos.3 Bahishti 0.55 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.

  • Page 84

  • Lime cement sand mortar Ratio (1 : 1 : 8)

    Unit Rate (British System) per 100 Sft

    Rate Per UnitAmount (Rs.)

    Nos.per kgper bag% Cft

    per dayper dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 18 (iii) Lime cement sand mortar Ratio (1 : 1 : 9)

    Detail Unit Rate (British System) per 100 Sft

    Qty

    MATERIAL

    1 Pacca bricks 9\" x 4\" x 3\" 675.00 Nos2 Slaked lime 21.65 kg3 Cement 1.16 bags4 Sand 13.10 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 Sft1 Mason 1.90 Nos.2 Coolies unskilled 3.63 Nos.3 Bahishti 0.55 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.

  • Page 85

  • Lime cement sand mortar Ratio (1 : 1 : 9)

    Unit Rate (British System) per 100 Sft

    Rate Per UnitAmount (Rs.)

    Nos.per kgper bag% Cft

    per dayper dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 18 (iii) Lime cement sand mortar Ratio (1 : 1 : 10)

    Detail Unit Rate (British System) per 100 Sft

    Qty

    MATERIAL

    1 Pacca bricks 9\" x 4\" x 3\" 675.00 Nos2 Slaked lime 20.16 kg3 Cement 1.07 bags4 Sand 13.33 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 Sft1 Mason 1.90 Nos.2 Coolies unskilled 3.63 Nos.3 Bahishti 0.55 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.

  • Page 86

  • Lime cement sand mortar Ratio (1 : 1 : 10)

    Unit Rate (British System) per 100 Sft

    Rate Per UnitAmount (Rs.)

    Nos.per kgper kg% Cft

    per dayper dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 18 (iv) Lime sand mortar Ratio (1 : 2)

    Detail Unit Rate (British System) per 100 Sft

    Qty

    MATERIAL

    1 Pacca bricks 9\" x 4\" x 3\" 675.00 Nos2 Slaked lime 86.97 kg3 Sand 11.67 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 Sft

    1 Mason 1.90 Nos.2 Coolies unskilled 3.63 Nos.3 Bahishti 0.55 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.

  • Page 87

  • Unit Rate (British System) per 100 Sft

    Rate Per UnitAmount (Rs.)

    Nos.per kg% Cft

    per dayper dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 19 Extra labour in item No.18 for per perforated pacca brick work in

    Detail Unit Rate (British System) per 100 Sft

    Qty

    LABOUR First Floor

    Labour of item No.6 for 100 Cft 0.75

    Labour of item No.6 per Cum 0.75

    LABOUR Second FloorLabour of item No.6 for 100 Cft 0.75

    Labour of item No.6 per Cum 0.75

    LABOUR Third FloorLabour of item No.6 for 100 Cft 0.75

    Labour of item No.6 per Cum 0.75

    LABOUR Fourth & Subsequent Floor

    Labour of item No.6 for 100 Cft 0.75

    Labour of item No.6 per Cum 0.75

  • Page 88

  • Extra labour in item No.18 for per perforated pacca brick

    Unit Rate (British System) per 100 Sft

    Rate Per UnitAmount (Rs.)

    Say

    Say

    Say

    Say

    Say

    Say

    Say

    Say

  • DESCRIPTION OF ITEM:

    Item No. 20 Fire brick masonary in fire clay mortar.(i) Upto 20 ft. (6 metre) height including all charges.

    Detail Unit Rate (British System) per Cft

    QtyPer 100 Cft

    MATERIAL

    1 Fire clay bricks 9\" x 4\" x 3\" 1350.00 No2 Fire resistant Cement 8.80 bags3 Brick grinded sand 22.00 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 Cftfor masonary work1 Mason 3.00 Nos.2 Coolies 3.00 Nos.3 Bahishti 0.25 No.for mortar

    1 Cooly 1.00 No.2 Bahishti 0.25 No

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATESLabour rate per Cft Rs.Labour rate per Cum Rs.

    Composite rate per Cft Rs.Composite rate per Cum Rs.

  • Page 89

  • Fire brick masonary in fire clay mortar.Upto 20 ft. (6 metre) height including all charges.

    Unit Rate (British System) per Cft

    Rate Per UnitAmount (Rs.)

    Eachper bagper Cft

    per dayper dayper day

    per dayper day

    SaySay

    SaySay

  • DESCRIPTION OF ITEM:Item No. 20 Fire brick masonary in fire clay mortar.

    (ii) Extra for every 1.5 metre additional height.

    Detail Unit Rate (British System) per 100 Cft

    Qty

    LABOUR for 125 Cft

    1 Mason 0.25 No.2 Cooly unskilled 1.00 No

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATESLabour rate per 100 Cft Rs.Labour rate per Cum Rs.

  • Page 90

  • Fire brick masonary in fire clay mortar.

    Extra for every 1.5 metre additional height.

    Unit Rate (British System) per 100 Cft

    Rate Per UnitAmount (Rs.)

    per dayper day

    SaySay

  • DESCRIPTION OF ITEM:

    Item No. 21 First class brick walling laid in (1 : 3) cement sand mortreinforced with (1\") 25 mm wide 18 gauge hoop iron.

    (i) 4\" (114 mm) thick walling with hoop iron bouding 6\"(150 mm) apart.

    Detail Unit Rate (British System) per 100 SftQty

    MATERIAL1 Pacca bricks 9\" x 4\" x 3\" 525.00 Nos2 Cement 2.40 bags3 Sand 9.00 Cft4 Hoop iron 45.00 lbs

    20.41 Kg.TotalContractor's Profit &20 PercentTotal

    LABOUR

    1 Mason 1.00 No.2 Coolies unskilled 1.25 Nos.3 Bahishti 0.25 No.4 Black-smith 0.15 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.

  • Page 91

  • First class brick walling laid in (1 : 3) cement sand mortreinforced with (1\") 25 mm wide 18 gauge hoop iron.4\" (114 mm) thick walling with hoop iron bouding 6\"

    Unit Rate (British System) per 100 SftRate Per UnitAmount (Rs.)

    Nos.per bag% CftPer Kg.

    per dayper dayper dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 21 First class brick walling laid in (1 : 3) cement sand mortreinforced with 1\" (25 mm) wide 18 gauge hoop iron.

    (ii) 4\" (114 mm) thick walling with hoop iron bouding12\" (300 mm) apart.

    Detail Unit Rate (British System) per 100 SftQty

    MATERIAL1 Pacca bricks 9\" x 4\" x 3\" 525.00 Nos2 Cement 2.40 bags3 Sand 9.00 Cft4 Hoop iron 22.50 lbs

    10.20 kg.TotalContractor's Profit &20 PercentTotal

    LABOUR

    1 Mason 1.00 No.2 Coolies unskilled 1.00 No.3 Bahishti 0.25 No.4 Black-smith 0.10 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.

  • Page 92

  • First class brick walling laid in (1 : 3) cement sand mortreinforced with 1\" (25 mm) wide 18 gauge hoop iron.4\" (114 mm) thick walling with hoop iron bouding

    Unit Rate (British System) per 100 SftRate Per UnitAmount (Rs.)

    Nos.per bag% CftPer Kg.

    per dayper dayper dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 21 First class brick walling laid in (1 : 3) cement sand mortreinforced with 1\" (25 mm) wide 18 gauge hoop iron.

    (iii) 3\" (75 mm) thick walling with hoop iron bouding 6\"(150 mm) apart.

    Detail Unit Rate (British System) per 100 SftQty

    MATERIAL1 Pacca bricks 9\" x 4\" x 3\" 350.00 Nos2 Cement 1.80 bags3 Sand 6.50 Cft4 Hoop iron 45.00 lbs

    20.41 Kg.TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 Cft

    1 Mason 0.75 No.2 Coolies unskilled 1.00 No.3 Bahishti 0.20 No.4 Black-smith 0.15 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.

  • Page 93

  • First class brick walling laid in (1 : 3) cement sand mortreinforced with 1\" (25 mm) wide 18 gauge hoop iron.3\" (75 mm) thick walling with hoop iron bouding 6\"

    Unit Rate (British System) per 100 SftRate Per UnitAmount (Rs.)

    Nos.per bag% CftPer Kg.

    per dayper dayper dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 21 First class brick walling laid in (1 : 3) cement sand mortreinforced with 1\" (25 mm) wide 18 gauge hoop iron.

    (iv) 3\" (75 mm) thick walling with hoop iron bouding 12\"(300 mm) apart.

    Detail Unit Rate (British System) per 100 SftQty

    MATERIAL1 Pacca bricks 9\" x 4\" x 3\" 350.00 Nos2 Cement 1.80 bags3 Sand 6.50 Cft4 Hoop iron 20.00 lbs

    9.070 Kg.TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 Cft

    1 Mason 0.75 No.2 Coolies unskilled 1.00 No.3 Bahishti 0.20 No.4 Black-smith 0.15 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Sft Rs.Labour rate per Sqm Rs.Composite rate per 100 Sft Rs.Composite rate per Sqm Rs.

  • Page 94

  • First class brick walling laid in (1 : 3) cement sand mortreinforced with 1\" (25 mm) wide 18 gauge hoop iron.3\" (75 mm) thick walling with hoop iron bouding 12\"

    Unit Rate (British System) per 100 SftRate Per UnitAmount (Rs.)

    Nos.per bag% CftPer Kg.

    per dayper dayper dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 22 Ghilafi work (1 brick thick wall).

    Detail Unit Rate (British System) per 100 Cft

    Qty

    MATERIAL

    1 B.B in mud ( of item No.1) x 2 Sundried bricks ( of item No.24) x

    Total

    LABOUR for 125 Cft1 Mason 2.00 Nos.2 Coolies unskilled 3.67 Nos.3 Bahishti 0.50 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 95

  • Ghilafi work (1 brick thick wall).

    Unit Rate (British System) per 100 Cft

    Rate Per UnitAmount (Rs.)

    per dayper dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 23 Dry brick pitching.

    Detail Unit Rate (British System) per 100 Cft

    Qty

    MATERIAL

    1 Ist class burnt brick 1350.00 No

    TotalContractor's Profit &20 PercentTotal

    LABOUR

    1 Mason 1.00 No.2 Coolies unskilled 2.00 Nos.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 96

  • Unit Rate (British System) per 100 Cft

    Rate Per UnitAmount (Rs.)

    Nos.

    per dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 24 Sun dried bricks in Mud mortar.

    Detail Unit Rate (British System) per 100 Cft

    Qty

    MATERIAL

    1 Sun dried bricks 1350.00 No2 Siff clay 35.00 Cft

    TotalContractor's Profit &20 PercentTotal

    LABOUR for 125 Cft

    1 Mason 1.50 Nos.2 Coolies unskilled 3.50 Nos.3 Bahishti 0.25 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Cft Rs.Labour rate per Cum Rs.Composite rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 97

  • Unit Rate (British System) per 100 Cft

    Rate Per UnitAmount (Rs.)

    Nos.% Cft

    per dayper dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 25 Pise wall (mud walling).

    Detail Unit Rate (British System) per 100 Cft

    Qty

    LABOUR for 125 Cft

    1 Coolies skilled 1.00 No.2 Coolies unskilled 1.50 Nos.3 Bahishti 0.50 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per 100 Cft Rs.Composite rate per Cum Rs.

  • Page 98

  • Unit Rate (British System) per 100 Cft

    Rate Per UnitAmount (Rs.)

    per dayper dayper day

    SaySay

  • DESCRIPTION OF ITEM:

    Item No. 26 Providing Eave brick moulded weathered and throated with bbrick or drip course cornice in (1 : 3) cement mortar.

    (i) 3\" (76 mm) thick drip course.

    Detail Unit Rate (British System) per RftQty

    MATERIAL (FOR 100 RFT.)1 Moulded brick 280.00 Nos2 Cement for laying and plastering 1.50 bag3 Sand 5.00 Cft

    Deduct cost of ordinary bricks 140 Nos.TotalContractor's Profit &20 PercentTotal

    LABOUR (FOR 125 RFT.)

    1 Mason 1.75 Nos.2 Coolies unskilled 1.75 Nos.3 Bahishti 0.25 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per Rft Rs.Labour rate per R.M Rs.Composite rate per Rft Rs.Composite rate per R.M Rs.

  • Page 99

  • Providing Eave brick moulded weathered and throated with bbrick or drip course cornice in (1 : 3) cement mortar.

    Unit Rate (British System) per RftRate Per UnitAmount (Rs.)

    Nos.per bag% Cft Nos.

    per dayper dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 26 Providing Eave brick moulded weathered and throated with bbrick or drip cornice in (1 : 3) cement mortars.

    (ii) 4\" (114 mm) thick drip course cornice.

    Detail Unit Rate (British System) per RftQty

    MATERIAL (FOR 100 RFT.)1 Brick moulded I/C wastage 420.00 Nos2 Cement for laying and plastering 1.75 bag3 Sand 6.00 Cft

    Deduct cost of ordinary bricks 210.00 NosTotalContractor's Profit &20 PercentTotal

    LABOUR (FOR 125 RFT)

    1 Mason 2.00 Nos.2 Coolies unskilled 2.00 Nos.3 Bahishti 0.25 No.

    TotalSundries 10 PercentTotalContractor's Profit &20 PercentTotal

    ITEM RATES

    Labour rate per Rft Rs.Labour rate per R.M Rs.Composite rate per 100 Rft Rs.Composite rate per R.M Rs.

  • Page 100

  • Providing Eave brick moulded weathered and throated with bbrick or drip cornice in (1 : 3) cement mortars.4\" (114 mm) thick drip course cornice.

    Unit Rate (British System) per RftRate Per UnitAmount (Rs.)

    Nos.per bag% Cft Nos.

    per dayper dayper day

    SaySaySaySay

  • DESCRIPTION OF ITEM:

    Item No. 26 Providing Eave brick moulded weathered and throated with bbrick or drip cornice in (1 : 3) cement mortar.

    (iii) 4\" (114 mm) thick eave brick with back brick.

    Detail Unit Rate (British System) per RftQty

    MATERIAL (FOR 100 RFT)1 Brick moulded (including wastage) 465.00 Nos2 Back bricks ordinary 465.00 Nos3 Cement 1.20 bag4 Sand 5.00 Cft

    TotalContractor's Profit &