RATE ANALYSIS OF CONSTRUCTION MATERIALS Batch 2012

Rate Analysis Assignment 2014

Embed Size (px)

Citation preview

Page 1: Rate Analysis Assignment 2014

RATE ANALYSIS OF CONSTRUCTION MATERIALS

Batch

2012

Page 2: Rate Analysis Assignment 2014

2 | P a g e

Muhammad Bilal Waseem (2012-CV-150)

Tariq Ali Soomro (2012-CV-131)

Shahbaz Khan (2012-CV-157)

Syed Muhammad Atif (2012-CV-169)

Abdullah Dal (2012-CV-158)

Azhar Ali Khurshadi (2012-CV-112)

Jan Muhammad Solangi (2012-CV-092)

Page 3: Rate Analysis Assignment 2014

3 | P a g e

ACKNOWLEDGEMENT

The group effort and ability of team work made it possible for us to

complete the task which was given to us and we all thanks Almighty

Allah for helping us through all this process.

PROFESSOR SYED FARAZ JAFRI is teacher as well as a inspiration for all

of the students. With his effort and encouragement we finally

completed our work and also it proved to be informative.

We are thankful to our sir for conveying us such a job which helped us

in accepting all technical terms, estimating the cost of a project and

computing the amount and rate of material used in project. It also

boost our confidence level and motivated us towards field work

analysis.

Page 4: Rate Analysis Assignment 2014

4 | P a g e

INDEX

S# DESCRIPTION PAGE

EXCAVATION AND FORMWORK 1-2

1 EXCAVATION AND FORMWORK 2

CEMENT,BLOCKS,SAND,CRUSH AND STEEL 3-7

2 CEMENT 4

3 BLOCKS 5

4 SAND AND CRUSH 6

5 STEEL 7

SANITARY FITTINGS 8-15

6 SANITARY FITTING 9

7 PIPE FITTINGS 10-11

8 COMMODE 12

9 WC 13

10 BASIN 14

11 TILES 15

ELECTRICAL FITTINGS 16-18

12 ACCESSORIES AND FITTING 17

13 WIRES AND CABLES 18

PAINTS 19-21

14 PAINTS 20-21

DOORS, WINDOWS AND WARDROBE 22-24

15 DOORS ,WINDOWS AND WARDROBE 23-24

STEEL WORKS 25-26

16 MAIN GATE 26

LABOUR 27-28

17 MASON, PAINTER, PLUMBER,ELECTRICIAN 28

Page 5: Rate Analysis Assignment 2014

EXCAVATION AND FORMWORK

Page 6: Rate Analysis Assignment 2014

6 | P a g e

EXCAVATION AND FORMWORK

S # DESCRIPTION UNIT COST DEALER

1 EXCAVATION Sq. Yd 60-70 AYAZ ALI AND BROTHERS QAYUMABAD CHOWRANGI KARACHI

0311-8972233 2 FORMWORK

OLD PLANKS Sq. Ft 22 NEW PLANKS Sq. Ft 30

3 EXCAVATION Sq. Yd 55-70 ISMAIL & SONS GIZRI DHA , KARACHI

0333-8929992 4 FORMWORK

OLD PLANKS Sq. Ft 23 NEW PLANKS Sq. Ft 35

5 EXCAVATION Sq. Yd 65-75 BASHIR BROTHERS ORANGI TOWN , KARACHI

0343-2087869 6 FORMWORK OLD PLANKS Sq. Ft 21

NEW PLANKS Sq. Ft 33

Page 7: Rate Analysis Assignment 2014

7 | P a g e

CEMENT, BLOCKS, SAND,CRUSH AND STEEL

Page 8: Rate Analysis Assignment 2014

8 | P a g e

CEMENT

S NO ITEM MAKER UNIT COST DEALER

1 OPC LUCKY BAG(50 KG) 525

FALCON BAG(50 KG) 535 POWER BAG(50 KG) 510

2 SULPHATE RESISTING

LUCKY BAG(50 KG) 545

FALCON BAG(50 KG) 560 POWER BAG(50 KG) 490

3 WHITE CEMENT KOHAT BAG(40 KG) 850

MAPLE BAG(40 KG) 790

4 OPC LUCKY BAG(50 KG) 530

FALCON BAG(50 KG) 545 POWER BAG(50 KG) 510

5 SULPHATE RESISTING

LUCKY BAG(50 KG) 550

FALCON BAG(50 KG) 540

POWER BAG(50 KG) 550 6 WHITE CEMENT KOHAT BAG(40 KG) 860

MAPLE BAG(40 KG) 800

7 OPC LUCKY BAG(50 KG) 525

FALCON BAG(50 KG) 540

POWER BAG(50 KG) 505 8 SULPHATE

RESISTING

LUCKY BAG(50 KG) 560

FALCON BAG(50 KG) 550

POWER BAG(50 KG) 545 9 WHITE CEMENT KOHAT BAG(40 KG) 850 MAPLE BAG(40 KG) 805

Page 9: Rate Analysis Assignment 2014

9 | P a g e

BLOCKS

S NO SIZE(inches) UNIT COST DEALER

1 3x8x12 1 PIECE 15

2 4x8x12 1 PIECE 16.5

3 5x8x12 1 PIECE 18.5 4 6x8x12 1 PIECE 20

5 3x8x12 1 PIECE 16

6 4x8x12 1 PIECE 17 7 5x8x12 1 PIECE 19

8 6x8x12 1 PIECE 21

9 3x8x12 1 PIECE 15.5

10 4x8x12 1 PIECE 16.5 11 5x8x12 1 PIECE 18

12 6x8x12 1 PIECE 23

Page 10: Rate Analysis Assignment 2014

10 | P a g e

SAND AND CRUSH

S NO ITEM UNIT COST DEALER

1 COARSE DUMPER(450 ftᶟ) 14500

2 FINE DUMPER(450 ftᶟ) 12500

3 COARSE DUMPER(450 ftᶟ) 14000

4 FINE DUMPER(450 ftᶟ) 13000

5 COARSE DUMPER(450 ftᶟ) 14000

6 FINE DUMPER(450 ftᶟ) 13500

Page 11: Rate Analysis Assignment 2014

11 | P a g e

STEEL

S NO DIA OF BAR TYPE UNIT COST DEALER

TWISTED SHIP PLATES

1 3/8 TONNES 85500 2 1/2 TONNES 86000 3 4/8 TONNES 84500 PLAIN SHIP PLATES

4 2/8 TONNES 82000

TWISTED SHIP PLATES

5 3/8 TONNES 86000

6 1/2 TONNES 83000 7 5/8 TONNES 82500

PLAIN SHIP PLATES 8 2/8 TONNES 81000

Page 12: Rate Analysis Assignment 2014

12 | P a g e

SANITARY FITTINGS AND TILES

Page 13: Rate Analysis Assignment 2014

13 | P a g e

SANITARY FITTINGS

S NO ITEM MAKER UNIT COST DEALER

1

SANITARY SET

Super asia

Per set 3000

Gold star Per set 15000 shalimar PER SET 30000 2 SANITARY FITTNG PER SET 5000

PER SET 6000

3

SANITARY SET

Super asia PER SET 5200

Golden star

PER SET 3500

shalimar

PER SET 7000

4 SANITARY FITTNG CLIMAX PER SET 6700 MASTER PER SET 9000

5

SANITARY SET

super asia PER SET 5500

Golden

star

PER SET 8000

shalimar PER SET 8500 6 SANITARY FITTNG CLIMAX PER SET 6800 MASTER PER SET 9200

Page 14: Rate Analysis Assignment 2014

14 | P a g e

S NO ITEM MAKER UNIT COST DEALER

1 PIPES(20 Ft)

3/4” DIA (cold) PAK ARAB PER PIECE 400 3/4” DIA(hot) PAK ARAB PER PIECE 1200 3”DIA PAK ARAB PER PIECE 1350

2 TEE 1” DIA PAK ARAB PER PIECE 45 2” DIA PAK ARAB PER PIECE 60

3”DIA PAK ARAB PER PIECE 100 3 ELBOW 1” DIA PAK ARAB PER PIECE 45 2” DIA PAK ARAB PER PIECE 60

3”DIA PAK ARAB PER PIECE 90 4 UNION 1” DIA PAK ARAB PER PIECE 90 2” DIA PAK ARAB PER PIECE 290

5 VALVE 1” PAK ARAB PER PIECE 130

1.5” PAK ARAB PER PIECE 200 2” PAK ARAB PER PIECE 360

6 PIPES(20 Ft)

1/2” DIA PPR PER PIECE 320

3/4” DIA PPR PER PIECE 455 1”DIA PPR PER PIECE 550

7 TEE 1” DIA PPR PER PIECE 40

2” DIA PPR PER PIECE 55 3”DIA PPR PER PIECE 90

8 ELBOW 1” DIA PPR PER PIECE 40

2” DIA PPR PER PIECE 55 3”DIA PPR PER PIECE 80

9 UNION 1” DIA PPR PER PIECE 90

2” DIA PPR PER PIECE 290 10 VALVE

1” PPR PER PIECE 120

1.5” PPR PER PIECE 200 2” PPR PER PIECE 350

Page 15: Rate Analysis Assignment 2014

15 | P a g e

COMMODE

S NO SHADE MAKER SIZE COST DEALER

1 LIGHT LUCKY CERAMICS LARGE 3600

2 LIGHT DAIMOND LARGE 4500

3 LIGHT KARAM LARGE 5500

4 LIGHT LUCKY CERMAICS LARGE 4000

5 LIGHT DAIMOND LARGE 8500

6 LIGHT KARAM LARGE 7500

7 LIGHT LUCKY CERMAICS LARGE 4200

8 LIGHT DAIMOND LARGE 8600

9 LIGHT KARAM LARGE 7300

Page 16: Rate Analysis Assignment 2014

16 | P a g e

WC

S NO SHADE MAKER SIZE COST DEALER

1 LIGHT LUCKY CERAMIC LARGE 1000 DARK LARGE 1400

2 LIGHT MASTER LARGE 3000 DARK LARGE 3500

3 LIGHT AL KARAM LARGE 2000 DARK LARGE 2200

4 LIGHT LUCKY CERAMIC LARGE 1050 DARK LARGE 1350

5 LIGHT MASTER LARGE 2600 DARK LARGE 2900

6 LIGHT AL KARAM LARGE 1850 DARK LARGE 2150

7 LIGHT LUCKY CERAMIC LARGE 1150 DARK LARGE 1350

8 LIGHT MASTER LARGE 2700

DARK LARGE 3100 9 LIGHT AL KARAM LARGE 1950 DARK LARGE 2200

Page 17: Rate Analysis Assignment 2014

17 | P a g e

TILES

MARBLE

S NO ITEM MAKER UNIT COST DEALER

FLOOR 1 16x16 KAMRAN m² 550

2 16x16 SONEX m² 750

3 16x16 ALKARAM m² 900 WALL

4 8x12 KAMRAN m² 550 5 8x12 SONEX m² 600

6 8x12 ALKARAM m² 720

FLOOR 7 16x16 KAMRAN m² 620

8 16x16 SONEX m² 780 9 16x16 ALKARAM m² 610 WALL

10 8x12 KAMRAN m² 560 11 8x12 SONIX m² 620 12 8x12 ALKARAM m² 610

FLOOR 7 16x16 KAMRAN m² 550

8 16x16 SONEX m² 820 9 16x16 ALKARAM m² 550

WALL 10 8x12 KAMRAN m² 580 11 8x12 SONIX m² 630 12 8x12 ALKARAM m² 620

S NO ITEM MAKER UNIT COST DEALER

FLOOR 1 MARBLE SUNY GREEN Sq.ft 160

2 MARBLE CHECKU Sq.ft 130

3 MARBLE CANA BROWN Sq.ft 250 4 MARBLE GRANITE Sq.ft 1200

Page 18: Rate Analysis Assignment 2014

18 | P a g e

ELECTRICAL FITTINGS

Page 19: Rate Analysis Assignment 2014

19 | P a g e

S NO ITEM MAKER UNIT COST DEALER

1 MAIN SWITCH MILLAT PER PIECE 260

2 DOUBLE BREAKER MILLAT PER PIECE 200

3 DB(12X15) MILLAT PER PIECE 950 4 BREAKER MILLAT PER PIECE 280

5 SWITCH SHEET MILLAT PER PIECE 90 6 MULTIPOWER

SWITCH

MILLAT PER PIECE 90

7 POWER BOARD MILLAT PER PIECE 180

8 SWITCH SHEET MILLAT PER PIECE 30 9 DIMMER MILLAT PER PIECE 80

10 SWITCH MILLAT PER PIECE 15 11 SOCKET MILLAT PER PIECE 20 12 CHANNEL FITTING MILLAT PER Ft 5.5

13 MAIN SWITCH MILLAT PER PIECE 280

14 DOUBLE BREAKER MILLAT PER PIECE 240 15 DB(12X15) MILLAT PER PIECE 980

16 BREAKER MILLAT PER PIECE 250 17 SWITCH SHEET MILLAT PER PIECE 120

18 MULTIPOWER SWITCH MILLAT PER PIECE 100 19 POWER BOARD MILLAT PER PIECE 190 20 SWITCH SHEET MILLAT PER PIECE 40 21 DIMMER MILLAT PER PIECE 80 22 SWITCH MILLAT PER PIECE 15 23 SOCKET MILLAT PER PIECE 20

24 CHANNEL FITTING MILLAT PER Ft 6

25 MAIN SWITCH MILLAT PER PIECE 285

26 DOUBLE BREAKER MILLAT PER PIECE 240 27 DB(12X15) MILLAT PER PIECE 980

28 BREAKER MILLAT PER PIECE 270 29 SWITCH SHEET MILLAT PER PIECE 120 30 MULTIPOWER

SWITCH MILLAT PER PIECE 100

31 POWER BOARD MILLAT PER PIECE 200 32 SWITCH SHEET MILLAT PER PIECE 45 33 DIMMER MILLAT PER PIECE 80 34 SWITCH MILLAT PER PIECE 15 35 SOCKET MILLAT PER PIECE 15 36 CHANNEL FITTING MILLAT PER Ft 6

Page 20: Rate Analysis Assignment 2014

20 | P a g e

S NO ITEM MAKER UNIT COST DEALER

1 3-29 PAKISTAN CABLES PER COIL 1700

ASHFAQ CABLES PER COIL 880 FAYAZ CABLES PER COIL 1060

2 7-29 PAKISTAN CABLES PER COIL 3630 ASHFAQ CABLES PER COIL 1880

FAYAZ CABLES PER COIL 2400 3 7-36 PAKISTAN CABLES PER COIL 4570

ASHFAQ CABLES PER COIL 2750 FAYAZ CABLES PER COIL 3680

4 7-44 PAKISTAN CABLES PER COIL 6990 ASHFAQ CABLES PER COIL 4300 FAYAZ CABLES PER COIL 5425 PER COIL

5 3-29 PAKISTAN CABLES PER COIL 1850

ASHFAQ CABLES PER COIL 940

FAYAZ CABLES PER COIL 1200 6 7-29 PAKISTAN CABLES PER COIL 3700 ASHFAQ CABLES PER COIL 1900 FAYAZ CABLES PER COIL 2500

7 7-36 PAKISTAN CABLES PER COIL 4600 ASHFAQ CABLES PER COIL 2800 FAYAZ CABLES PER COIL 3750

8 7-44 PAKISTAN CABLES PER COIL 7000 ASHFAQ CABLES PER COIL 4400

FAYAZ CABLES PER COIL 5500

9 3-29 PAKISTAN CABLES PER COIL 1750

ASHFAQ CABLES PER COIL 890

FAYAZ CABLES PER COIL 1120 10 7-29 PAKISTAN CABLES PER COIL 3680

ASHFAQ CABLES PER COIL 1900 FAYAZ CABLES PER COIL 2450

11 7-36 PAKISTAN CABLES PER COIL 4600 ASHFAQ CABLES PER COIL 2770 FAYAZ CABLES PER COIL 3700

12 7-44 PAKISTAN CABLES PER COIL 7000 ASHFAQ CABLES PER COIL 4500

FAYAZ CABLES PER COIL 5500

Page 21: Rate Analysis Assignment 2014

21 | P a g e

PAINTS

Page 22: Rate Analysis Assignment 2014

22 | P a g e

PAINTS

S NO ITEM MAKER UNIT COST DEALER

1 OIL PAINT BERGER 1 GALLON 1300

BELTA 1 GALLON 1050 ICI 1 GALLON 1700

2 MATT FINISH BERGER 1 GALLON 1950 BELTA 1 GALLON 2000 ICI 1 GALLON 1950

3 WEATHER SHIELD BERGER 1 GALLON 1930 BELTA 1 GALLON 1750 ICI 1 GALLON 1950

4 DISTEMPER BERGER 1 GALLON 720 BELTA 1 GALLON 1100 ICI 1 GALLON 1980

5 PUTTY BERGER BAG(20 KG) 1900

BELTA BAG(20 KG) 1900 ICI BAG(20 KG) 1500

6 OIL PAINT BERGER 1 GALLON 1800

BELTA 1 GALLON 1900 ICI 1 GALLON 1700

7 MATT FINISH BERGER 1 GALLON 1900 BELTA 1 GALLON 1950 ICI 1 GALLON 1800

8 WEATHERSHIELD BERGER 1 GALLON 2200 BELTA 1 GALLON 2100 ICI 1 GALLON 1800

9 DISTEMPER BERGER 1 GALLON 1000

BELTA 1 GALLON 1050 ICI 1 GALLON 800

10 PUTTY BERGER BAG(20 KG) 2400 BELTA BAG(20 KG) 2600

ICI BAG(20 KG) 1400

Page 23: Rate Analysis Assignment 2014

23 | P a g e

S NO ITEM MAKER UNIT COST DEALER

11 OIL PAINT NELSON 1 GALLON 1750

GOBI 1 GALLON 1950 ICI 1 GALLON 1750

12 MATT FINISH NELSON 1 GALLON 1900 GOBI 1 GALLON 1980

ICI 1 GALLON 1850 13 WEATHER SHIELD NELSON 1 GALLON 2200

GOBI 1 GALLON 1980

ICI 1 GALLON 1850 14 DISTEMPER NELSON 1 GALLON 1100

GOBI 1 GALLON 1070 ICI 1 GALLON 830

15 PUTTY NELSON BAG(20 KG) 2600 GOBI BAG(20 KG) 2720

ICI BAG(20 KG) 1500

Page 24: Rate Analysis Assignment 2014

24 | P a g e

DOORS, WINDOWS AND WARDROBE

Page 25: Rate Analysis Assignment 2014

25 | P a g e

DOORS AND WINDOWS

S NO ITEM SIZE UNIT COST DEALER

1 DOORS

SKIN DOOR 3’x7’ Sq.Ft 2520 SKIN DOOR(CAL) 3’x7’ Sq.Ft 3150 SKIN DOOR(GLASS) 3’x7’ Sq.Ft 7350

2 WINDOWS SIMPLE RUNNING Ft 110 FANCY RUNNING Ft 130

3 PANEL CAL RUNNING Ft 185

GOLDEN TEAK RUNNING Ft 250 4 CABINET

LASANI Sq.Ft 380 LASANI(GLASS) Sq.Ft 750

5 WARDROBE CHIPBOARD Sq.Ft 550 LASANI Sq.Ft 700

6 DOORS

SKIN DOOR 3’x7’ Sq.Ft 2300 SKIN DOOR(CAL) 3’x7’ Sq.Ft 1995

SKIN DOOR(GLASS) 3’x7’ Sq.Ft 18900 7 WINDOWS

SIMPLE RUNNING Ft 95 FANCY RUNNING Ft 110

8 PANEL CAL RUNNING Ft 175

GOLDEN TEAK RUNNING Ft 250 9 CABINET

LASANI Sq.Ft 360

LASANI(GLASS) Sq.Ft 750 10 WARDROBE

CHIPBOARD Sq.Ft 520 LASANI Sq.Ft 675

Page 26: Rate Analysis Assignment 2014

26 | P a g e

S NO ITEM SIZE UNIT COST DEALER

11 DOORS

SKIN DOOR 3’x7’ Sq.Ft 2200 SKIN DOOR(CAL) 3’x7’ Sq.Ft 3900

SKIN DOOR(GLASS) 3’x7’ Sq.Ft 8400 12 WINDOWS

SIMPLE RUNNING Ft 92 FANCY RUNNING Ft 92>

13 PANEL CAL RUNNING Ft 180 GOLDEN TEAK RUNNING Ft 240

14 CABINET LASANI Sq.Ft 380

LASANI(GLASS) Sq.Ft 730 15 WARDROBE CHIPBOARD Sq.Ft 540 LASANI Sq.Ft 680

Page 27: Rate Analysis Assignment 2014

27 | P a g e

LABOUR

Page 28: Rate Analysis Assignment 2014

28 | P a g e

LABOUR

S NO ITEM UNIT COST CONTACT

1 MASON SHAFIQ AHMAD, SOHRAB GOTH,

0332-2584475 SKILLED PER DAY 1200 UNSKILLED PER DAY 600

2 MASON WALI KHAN, WATERPUMP 0300-2545232

SKILLED PER DAY 1100

UNSKILLED PER DAY 600

3 MASON MOLA BUKSH, SAFURA GOTH

0343-2985521 SKILLED PER DAY 1300

UNSKILLED PER DAY 700

4 ELECTRICIAN

Sq Ft 14 MAQSUD, HYDERI 0345-2316903

Sq Ft 11 SHAKEEL, LIAQATABAD 0306-2010420

Sq Ft 13 REHAN, NAZIMABAD 0300-9214169

5 PLUMBER

FOR 120 Sq Yds LUMP SUM 17000 QASIM, GOLIMAAR 0345-2760866

FOR 120 Sq Yds LUMP SUM 20000 ALI RAZA, WATERPUMP 0300-2554100

FOR 120 Sq Yds LUMP SUM 19000 NOOR MUHAMMAD, SAFURA

0342-2705358

6 PAINTER

FOR 120 Sq Yds LUMP SUM 22000 YAMIN KHAN, SAFURA 0346-2773248

FOR 120 Sq Yds LUMP SUM 25000 SULEMAN , LIAQATABAD 0313-2757653

FOR 120 Sq Yds LUMP SUM 18500 ABDULLAH, WATERPUMP 0312- 2130742

1 CARPENTER WAQAS AHMED 0302-2894639 SKILLED PER Sq.ft 250