CHAPTER NO. 15
SHEET PILING
1 Unless otherwise stated, the rate includes handling of materials with in 3 chains (90M).2 Rates for all finished works include the removal of surplus debris, unused material
and by products.3 For handling of all types of materials for shortleads including carriage upto 3 Chains,
(90 M) nothing is to be paid as extra. Where handling and carriage involves an extralead beyond 3 Chains, (90 M) carriage for whole of the distance should be paid.
The above notes are to be referred to all items of the chapter.
DESCRIPTION OF ITEM NO 1: Cutting ransome and larson piles.
Detail Unit Rate (British System) per Cut
Qty RatePer Unit (Rs.) Amount (Rs.)
Assumed for 1.25 cut
Labour
Blacksmith 0.25 No 170.00 P. Day 42.50
Total 42.50 Sundries 10 Percent 4.25 Total 46.75
Contractor's Profit & Overhea 20 Percent 9.35 Total 56.10
Item Rates
Labour Rate Per Cut Rs. 56.10 44.88 Say 44.90 1.25
Page 2
DESCRIPTION OF ITEM NO 2: Cutting universal Piles.
Detail Unit Rate (British System) per Cut
Qty RatePer Unit (Rs.) Amount (Rs.)
Assumed for 1.25 cut
Labour
Blacksmith 0.37 No 170.00 P. Day 62.90
Total 62.90 Sundries 10 Percent 6.29 Total 69.19
Contractor's Profit & Overhea 20 Percent 13.84 Total 83.03
Item Rates
Labour Rate Per Cut Rs. 83.03 66.42 Say 66.40 1.25
Page 3
DESCRIPTION OF ITEM NO 3: Driving steel piles 25' to 30' (7.5 to 9 M).
Detail Unit Rate (British System) per Cut
Qty RatePer Unit (Rs.) Amount (Rs.)
Rate Analysis for 125 Sft
Labour
Skilled Cooly 4.25 Nos 160.00 P. Day 680.00 Unskilled Cooly 2.00 Nos 140.00 P. Day 280.00
Total 960.00 Sundries 10 Percent 96.00 Total 1,056.00
Contractor's Profit & Overhea 20 Percent 211.20 Total rate for 125 Sft 1,267.20
Item Rates
Labour Rate Per 100 Sft Rs. ### 1013.76 Say 1,013.75 1.25
Labour Rate Per Sqm Rs. 109.08 Say 109.10
Page 4
DESCRIPTION OF ITEM NO 4: Driving steel piles more than 15' (4.5 M) andless than 25' (7.5 M).
Detail Unit Rate (British System) per Cut
Qty RatePer Unit (Rs.) Amount (Rs.)
Rate Analysis for 125 Sft
Labour
Skilled Cooly 4.00 Nos 160.00 P. Day 640.00 Unskilled Cooly 2.00 Nos 140.00 P. Day 280.00
Total 920.00 Sundries 10 Percent 92.00 Total 1,012.00
Contractor's Profit & Overhea 20 Percent 202.40 Total rate for 125 Sft 1,214.40
Item Rates
Labour Rate Per 100 Sft Rs. ### 971.52 Say 971.50 1.25
Labour Rate Per SqmRs. 104.53 Say 104.55
Page 5
DESCRIPTION OF ITEM NO 5: Driving steel piles 15' (4.5 M) and under.
Detail Unit Rate (British System) per Cut
Qty RatePer Unit (Rs.) Amount (Rs.)
Rate Analysis for 125 Sft
Labour
Skilled Cooly 2.50 Nos 160.00 P. Day 400.00 Unskilled Cooly 2.00 Nos 140.00 P. Day 280.00
Total 680.00 Sundries 10 Percent 68.00 Total 748.00
Contractor's Profit & Overhea 20 Percent 149.60 Total rate for 125 Sft 897.60
Item Rates
Labour Rate Per 100 Sft Rs. 897.60 718.08 Say 718.10 1.25
Labour Rate Per SqmRs. 77.27 Say 77.25
Page 6
DESCRIPTION OF ITEM NO 6: Dolleying piles.
Detail Unit Rate (British System) per Cut
Qty RatePer Unit (Rs.) Amount (Rs.)
Assumed for 1.25 No.
Labour
Dolly man (Skilled Cooly) 0.20 No 160.00 P. Day 32.00 Unskilled Cooly 0.20 No 140.00 P. Day 28.00
Total 60.00 Sundries 10 Percent 6.00 Total 66.00
Contractor's Profit & Overhea 20 Percent 13.20 Total 79.20
Item Rates
Labour Rate for Each Rs. 79.20 63.36 Say 63.35 1.25
Page 7
DESCRIPTION OF ITEM NO 7: Drilling holes in piles by hand.
Detail Unit Rate (British System) per Cut
Qty RatePer Unit (Rs.) Amount (Rs.)
Assumed for 12 Holes
Labour
Blacksmith 0.33 No 170.00 P. Day 56.10
Total 56.10 Sundries 10 Percent 5.61 Total 61.71
Contractor's Profit & Overhea 20 Percent 12.34 Total 74.05
Item Rates
Labour Rate for Each Rs. 74.05 6.17 Say 6.15 12
Page 8
DESCRIPTION OF ITEM NO 8: Raising and lowering machine.
Detail Unit Rate (British System) per Cut
Qty RatePer Unit (Rs.) Amount (Rs.)
Assumed for 1.5 Feet
Labour
Fitter 1.00 No 170.00 P. Day 170.00 Skilled Cooly 4.00 Nos 160.00 P. Day 640.00 Unskilled Cooly 2.00 Nos 140.00 P. Day 280.00
Total 1,090.00 Sundries 10 Percent 109.00 Total 1,199.00
Contractor's Profit & Overhea 20 Percent 239.80 Total 1,438.80
Item Rates
Labour Rate Per Foot Rs. ### 959.20 Say 959.20 1.5
Labour Rate Per Rm Rs. 3146.18 Say 3,146.20
Page 9
DESCRIPTION OF ITEM NO 9: Turning machine 90°.
Detail Unit Rate (British System) per Cut
Qty RatePer Unit (Rs.) Amount (Rs.)
Assumed for 1.25 Jobs
Labour
Fitter 1.00 No 170.00 P. Day 170.00 Skilled Cooly 3.00 Nos 160.00 P. Day 480.00 Unskilled Cooly 5.00 Nos 140.00 P. Day 700.00
Total 1,350.00 Sundries 10 Percent 135.00 Total 1,485.00
Contractor's Profit & Overhea 20 Percent 297.00 Total 1,782.00
Item Rates
Labour Rate Per Job Rs. ### 1425.60 Say 1,425.60 1.25
Page 10
DESCRIPTION OF ITEM NO 10: Turning machine 135°.
Detail Unit Rate (British System) per Cut
Qty RatePer Unit (Rs.) Amount (Rs.)
Assumed for 1.25 Jobs
Labour
Fitter 1.00 No 170.00 P. Day 170.00 Skilled Cooly 5.00 Nos 160.00 P. Day 800.00 Unskilled Cooly 5.00 Nos 140.00 P. Day 700.00
Total 1,670.00 Sundries 10 Percent 167.00 Total 1,837.00
Contractor's Profit & Overhea 20 Percent 367.40 Total 2,204.40
Item Rates
Labour Rate Per Job Rs. ### 1763.52 Say 1,763.50 1.25
Page 11
DESCRIPTION OF ITEM NO 11: Turning machine 180°.
Detail Unit Rate (British System) per Cut
Qty RatePer Unit (Rs.) Amount (Rs.)
Assumed for 1.25 Jobs
Labour
Fitter 1.00 No 170.00 P. Day 170.00 Skilled Cooly 7.00 Nos 160.00 P. Day 1,120.00 Unskilled Cooly 7.00 Nos 140.00 P. Day 980.00
Total 2,270.00 Sundries 10 Percent 227.00 Total 2,497.00
Contractor's Profit & Overhea 20 Percent 499.40 Total 2,996.40
Item Rates
Labour Rate Per Job Rs. ### 2397.12 Say 2,397.10 1.25
Page 12
DESCRIPTION OF ITEM NO 12: Traveling machine (Light).
Detail Unit Rate (British System) per Cut
Qty RatePer Unit (Rs.) Amount (Rs.)
Assumed for 1.25 Chain
Labour
Fitter 1.25 Nos 170.00 P. Day 212.50 Skilled Cooly 8.00 Nos 160.00 P. Day 1,280.00 Unskilled Cooly 8.50 Nos 140.00 P. Day 1,190.00
Total 2,682.50 Sundries 10 Percent 268.25 Total 2,950.75
Contractor's Profit & Overhea 20 Percent 590.15 Total 3,540.90
Item Rates
Labour Rate Per Chain Rs. ### 2832.72 Say 2,832.70 1.25
Labour Rate Per 30 Meter Rs. 2832.72 Say 2,832.70
Page 13
DESCRIPTION OF ITEM NO 13: Loading and unloading piles.
Detail Unit Rate (British System) per Cut
Qty RatePer Unit (Rs.) Amount (Rs.)
Assumed for 1.25 Ton
Labour
Unskilled Cooly 0.37 No 140.00 P. Day 51.80
Total 51.80 Sundries 10 Percent 5.18 Total 56.98
Contractor's Profit & Overhea 20 Percent 11.40 Total 68.38
Item Rates
Labour Rate Per Ton Rs. 68.38 54.70 Say 54.70 1.25
Labour Rate Per Tonne Rs. 53.84 Say 53.85
Page 14
DESCRIPTION OF ITEM NO 14: Dismantling piling machine.
Detail Unit Rate (British System) per Cut
Qty RatePer Unit (Rs.) Amount (Rs.)
Assumed for 1.5 No.
Labour
Foreman 3.00 Nos 170.00 P. Day 510.00 Fitter 18.00 Nos 170.00 P. Day 3,060.00 Skilled Cooly 12.00 Nos 160.00 P. Day 1,920.00 Unskilled Cooly 9.50 Nos 140.00 P. Day 1,330.00
Total 6,820.00 Sundries 10 Percent 682.00 Total 7,502.00
Contractor's Profit & Overhea 20 Percent 1,500.40 Total 9,002.40
Item Rates
Labour Rate for Each Rs. ### 6001.60 Say 6,001.60 1.5
Page 15
DESCRIPTION OF ITEM NO 15: Erecting pilling machine.
Detail Unit Rate (British System) per Cut
Qty RatePer Unit (Rs.) Amount (Rs.)
Assumed for 1.3 No.
Labour
Foreman 3.00 Nos 170.00 P. Day 510.00 Fitter 18.00 Nos 170.00 P. Day 3,060.00 Skilled Cooly 12.00 Nos 160.00 P. Day 1,920.00 Unskilled Cooly 9.50 Nos 140.00 P. Day 1,330.00
Total 6,820.00 Sundries 10 Percent 682.00 Total 7,502.00
Contractor's Profit & Overhea 20 Percent 1,500.40 Total 9,002.40
Item Rates
Labour Rate for Each Rs. ### 6924.92 Say 6,924.90 1.3
Page 16
DESCRIPTION OF ITEM NO 16: Carriage of pile machine under differentcondition.
Detail Unit Rate (British System) per Cut
Qty RatePer Unit (Rs.) Amount (Rs.)
Assumed for 1.25 Chain
Labour
Fitter 1.00 No 170.00 P. Day 170.00 Skilled Cooly 2.50 Nos 160.00 P. Day 400.00 Unskilled Cooly 3.75 Nos 140.00 P. Day 525.00
Total 1,095.00 Sundries 10 Percent 109.50 Total 1,204.50
Contractor's Profit & Overhea 20 Percent 240.90 Total 1,445.40
Item RatesLabour Rate Per Chain Rs. ### 1156.32 Say 1,156.30
1.25
Labour Rate Per 30 Meter Rs. 1156.32 Say 1,156.30
Page 17
Amount (Rs.)
Page 18
Amount (Rs.)
Page 19
Amount (Rs.)
Page 20
Amount (Rs.)
Page 21
Amount (Rs.)
Page 22
Amount (Rs.)
Page 23
Amount (Rs.)
Page 24
Amount (Rs.)
Page 25
Amount (Rs.)
Page 26
Amount (Rs.)
Page 27
Amount (Rs.)
Page 28
Amount (Rs.)
Page 29
Amount (Rs.)
Page 30
Amount (Rs.)
Page 31
Amount (Rs.)
Page 32
Amount (Rs.)