Quality Plan TPS 53-2013

Embed Size (px)

Citation preview

  • 7/27/2019 Quality Plan TPS 53-2013

    1/12

    Client THYNA PETROLEUMSERVICES

    7 Avenue Abdelrahmen El Ghafiki BP 069 / 3069

    Sfax-Hached Sfax (Tunisia)Phone: 216 74 229 999 - Fax: 216 74 299 916

    TENDER REFERENCE

    PUR/TEN/02/2013

    Constructor

    HALWANI COMPANY LtdINDUSTRIAL AND METAL

    CONSTRUCTIONZone Industrielle Madagascar Prs Somatra

    CP 3000 Sfax (Tunisia)Phone: 216 74 497 166/010 - Fax: 216 74 497 795

    DOCUMENT No.

    PDOC-53/2013-QC-03

    Project Title:

    LOADING / OFFLOADING STATIONSAND METERING SKIDS INSTALLATION

    AT TANK BATTERY / GUEBIBA BASE & TRAPSA

    QUALITY PLAN Rev. 00

    REVISION RECORD

    Rev.No.

    SubmissionDate

    RevisionDetails

    Prepared By Checked By Approved by

    00Oct 242013

    Submitted forapproval

    A.FERCHICHI A.FERCHICHI

    This document has been prepared for the titled project or named part thereof and should not be relied upon or used forany other project without an independent check being carried out as to its suitability and prior written authority ofHalwani Company being obtained. Halwani Company accepts no responsibility or liability for the consequences of thisdocument being used for a purpose other than the purposes for which it was commissioned. Any person using orrelying on the document for such other purpose agrees, and will by such use or reliance be taken to confirm hisagreement to indemnify Mott MacDonald for all loss or damage resulting therefrom. Halwani Company accepts no

    responsibility or liability for this document to any party other than the person by whom it was commissioned.

  • 7/27/2019 Quality Plan TPS 53-2013

    2/12

    HALWANI COMPANY Ltd

    AUTHOR: AKRAM FERCHICHI

    DOC.: QUALITY PLAN

    PROJECT: LOADING / OFFLOADING STATIONS

    Job No : 53-2013

    PDOC-53/2013-QP-03

    Rev. : 00

    Sheet : 2 of 12

    Rev. : 00 Sheet : 2 of 12

    TABLE OF CONTENTS

    1. INTRODUCTION ................................................................................................................................. 42. PROJECT SCOPE .............................................................................................................................. 43. PROJECT QUALITY STATEMENT ................................................................................................... 44. REVISION STATUS/AMENDMENTS AND DISTRIBUTION ............................................................. 45. DEFINITION & THERMINOLOGY ...................................................................................................... 56. QUALITY POLICY, QUALITY SYSTEM AND QUALITY STRATEGY ............................................. 76.1 Quality Policy Concept ............................................................................................................................. 76.1.1 Quality Policy: ........................................................................................................................................ 76.1.2 Quality System: ..................................................................................................................................... 76.1.3 Structure of Quality management System documentation: ................................................................... 86.1.4 Quality Management System Manual: .................................................................................................. 86.1.5 Quality Process and Procedure manual: ............................................................................................... 86.1.6 Project Quality Plan: .............................................................................................................................. 86.1.7 Other Quality Documents: ..................................................................................................................... 86.1.8 Quality Strategy: .................................................................................................................................... 86.2 Planning .................................................................................................................................................... 96.2 Verification ................................................................................................................................................ 97. QUALITY MANAGEMENT IN CONSTRUCTION AND REPORTING............................................... 97.1 Management Responsibilities: ................................................................................................................. 97.2 Responsibilities of Staff at Project Execution Team: .............................................................................. 107.2.1 Project Manager: ................................................................................................................................. 107.2.2 Team Leader Execution: .................................................................................................................. 107.2.3 QA & QC Manager: ............................................................................................................................. 107.2.4 Safety Responsible: ............................................................................................................................. 107.4.8 Surveyor: ............................................................................................................................................. 117.5 Functions of QA / QC System: ............................................................................................................... 117.6 Quality Management Reports: ................................................................................................................ 127.7 Management Reviews: ........................................................................................................................... 127.8 Monthly Progress Reports: ..................................................................................................................... 128. PROGRESS CONTROL ................................................................................................................... 12

  • 7/27/2019 Quality Plan TPS 53-2013

    3/12

    HALWANI COMPANY Ltd

    AUTHOR: AKRAM FERCHICHI

    DOC.: QUALITY PLAN

    PROJECT: LOADING / OFFLOADING STATIONS

    Job No : 53-2013

    PDOC-53/2013-QP-03

    Rev. : 00

    Sheet : 3 of 12

    Rev. : 00 Sheet : 3 of 12

  • 7/27/2019 Quality Plan TPS 53-2013

    4/12

    HALWANI COMPANY Ltd

    AUTHOR: AKRAM FERCHICHI

    DOC.: QUALITY PLAN

    PROJECT: LOADING / OFFLOADING STATIONS

    Job No : 53-2013

    PDOC-53/2013-QP-03

    Rev. : 00

    Sheet : 4 of 12

    Rev. : 00 Sheet : 4 of 12

    1. INTRODUCTION

    The Globalization and developing Technology in the Construction Industry is leading to High

    competition in the Current market. The best response to a competitive challenge in the Construction

    Industry is to become more competitive. The best means of achieving this is by improving the product

    quality and meeting the project schedule through a well-designed Quality Management system. The

    Quality Management system shall focus on providing improved control on processes and practices,

    thus enhancing customer satisfaction through its effective implementation

    2. PROJECT SCOPE

    Tender Reference : PUR/TEN/02/2013

    QP Project Number : PDOC-53/2013-QP-03

    Project Works Time : 120 days

    Project location(s) : Tank Battery / Guebiba base & Trapsa

    Supply and Erection of Trucks loading and offloading steel stations at Tank Battery / Guebiba base &

    Trapsa, including procurement and pre-construction as well as this scope will covers all Civil & Steel

    activities.

    Scope:

    Terminal Shelter at Trapsa

    Skid Shelter at Trapsa Loading Shelter at Tank Battery

    Offloading Shelter at Tank Battery

    Loading/Offloading Shelter at Guebiba base

    3. PROJECT QUALITY STATEMENT

    To strive for Quality Excellence, in order to achieve Customer Satisfaction by Providing goods and

    services to the standards set by the Customer and to contribute to increasing the Companys

    competitiveness.

    4. REVISION STATUS/AMENDMENTS AND DISTRIBUTION

    The issue number, revision number and revision date are stated on each page of the Project Quality

    Manual. Should amendment of the Project Quality Manual be necessary during the life of the project,

    only the revised sub-section shall be reissued and its revision number and date changed accordingly?

    Amendments shall be approved by the Head Project Operations at Head Office.

    The Revision Status Sheet detailing the amendment, date and approval shall be issued with each

    amendment by the Project Manager. Each new revision shall be distributed as per the original with a

    request that the revised sub-sections be destroyed. After ten (10) revisions a new issue shall be

    introduced superseding all previous revisions.

  • 7/27/2019 Quality Plan TPS 53-2013

    5/12

    HALWANI COMPANY Ltd

    AUTHOR: AKRAM FERCHICHI

    DOC.: QUALITY PLAN

    PROJECT: LOADING / OFFLOADING STATIONS

    Job No : 53-2013

    PDOC-53/2013-QP-03

    Rev. : 00

    Sheet : 5 of 12

    Rev. : 00 Sheet : 5 of 12

    5. DEFINITION & THERMINOLOGY

    Calibration

    All the operations for the purpose of determining the values of the errors of measuring instruments,material measures, and measurement standards.

    Controlled DocumentAn original numbered copy of a document for which amendments will be automatically advised.

    Corrective ActionAn activity the intention of which is to return a non-conforming item or action to a stat or conformity. Italso covers action taken to prevent further recurrences of Non-conformity.

    DispositionAn action to be taken concerning material, components or products about which a Decision has beenmade.

    DocumentAny written or printed manual, procedure or form that is part of the quality system. The term includesdocuments and data that can be read by people or machines.

    InspectionThe careful examination, measurement and testing of the characteristics of Products and services toensure they meet regulatory and contractual requirements.

    Inspection and test pointA location or stage in the manufacturing, production or construction cycle where inspection and testingare performed by personnel whose responsibility is to determine the acceptability of products orservices and to record inspection and test data.

    Non-conformance / NonconformityA deficiency in characteristic, documentation, or procedure which renders the quality of a product orservice unacceptable or indeterminate or not according to specified requirements.

    ProcedureA document that specifies, as applicable, the purpose and scope of an activity; what shall be done andby whom; when, where and how it shall be done; what materials, equipment, and documentations shallbe used; and how it is all controlled.

    ProductMaterial, part, item, component, assembly, sub-assembly structure, plant equipment, or finished

    project identified in or described in any standard or specification and production or obtained as a result

    of some manufacturing or construction operation or process.

    Product Quality AuditInspection of the product at a lesser frequency than the inspection carried out for normal quality control

  • 7/27/2019 Quality Plan TPS 53-2013

    6/12

    HALWANI COMPANY Ltd

    AUTHOR: AKRAM FERCHICHI

    DOC.: QUALITY PLAN

    PROJECT: LOADING / OFFLOADING STATIONS

    Job No : 53-2013

    PDOC-53/2013-QP-03

    Rev. : 00

    Sheet : 6 of 12

    Rev. : 00 Sheet : 6 of 12

    purposes as an aid to assessing the effectiveness of quality control.

    Quality AssuranceAll those planned and systematic actions necessary to provide confidence that products or services willsatisfy given requirements.

    Quality AuditA systematic and independent examination to determine whether quality activities and related resultscomply with planned arrangements and whether these arrangements are implemented effectively andare suitable to achieve objective.

    Quality System AuditThe independent examination of an organizations quality assurance system carried out by an auditingteam from within or outside the organization.

    Quality ControlThose actions which provide a means to measure and regulate the characteristics of a product orservice to establish requirements. Operational techniques or activities (e.g. inspection or test) used toverify technical and quality requirements for services and or products.

    Quality PolicyThe overall quality intentions and directions of an organization as regards quality, as formallyexpressed by top management

    Quality PlanA document setting out the specific quality practices, resources, activities and responsibilities relevant

    to a particular contract or project.

    Remedial ActionAn action to be taken concerning material, components or products about which a decision has been

    made.

    RepairThe process of restoring a non-conforming characteristic to a condition such that the item conforms to

    the original specified requirements, where such a repair or restoration is acceptable.

    VerificationConfirming that an activity or condition conforms to specified requirement

  • 7/27/2019 Quality Plan TPS 53-2013

    7/12

    HALWANI COMPANY Ltd

    AUTHOR: AKRAM FERCHICHI

    DOC.: QUALITY PLAN

    PROJECT: LOADING / OFFLOADING STATIONS

    Job No : 53-2013

    PDOC-53/2013-QP-03

    Rev. : 00

    Sheet : 7 of 12

    Rev. : 00 Sheet : 7 of 12

    6. QUALITY POLICY, QUALITY SYSTEM AND QUALITY STRATEGY

    6.1 Quality Policy ConceptThe Quality Policy is communicated and made understood at all level of the organization through

    awareness program an display of the Quality Policy boards at all the Project sites/departments.

    The Quality Policy shall be reviewed annually for continual improvement and suitability to the purpose

    of the division. Taking Quality Policy as guide, the quality objectives are established in related functions

    and monitored in the monthly steering committee meetings and periodic Management Review

    meetings.

    Management review includes review of Quality objectives and specific policy statements with the view

    to achieve Quality objectives and meeting the requirements of the policy statement.

    6.1.1 Quality Policy:

    We aspire to fulfill the expectations of our customer by a dedicated and organized approach, which isamenable to skill and knowledge enhancement. We shall improve the competence of our Qualitymanagement System continually. Our focus to accomplish this aim shall be on:

    Effective design

    Effective Implementation of planning and Methodology

    Effective Supplier Management

    Proficient Management of Workforce.

    Training and development of Human Resource.

    6.1.2 Quality System:

    The Quality System has been designed to ensure that the Quality Policy, objectives and therequirements of ISO 9001:2008 are implemented. The system has been determined in terms of thefollowing main processes.

    Estimation, Costing and Tendering

    Design and Engineering

    Quality planning and Control

    Planning, Monitoring and Control

    Plant and Machinery provision

    Project Operation

    Commercial, Contract and Procurement

    Personnel and training

    Finance

    Quality System

  • 7/27/2019 Quality Plan TPS 53-2013

    8/12

    HALWANI COMPANY Ltd

    AUTHOR: AKRAM FERCHICHI

    DOC.: QUALITY PLAN

    PROJECT: LOADING / OFFLOADING STATIONS

    Job No : 53-2013

    PDOC-53/2013-QP-03

    Rev. : 00

    Sheet : 8 of 12

    Rev. : 00 Sheet : 8 of 12

    6.1.3 Structure of Quality management System documentation:

    6.1.4 Quality Management System Manual:

    This quality Management system manual describes the purpose and scope of the Quality management

    system. Interaction of functional process and establishment of documented to fulfil requirements ofISO 9001:2008 standard. The applicable causes of ISO 9001:2008 standard have been included in thechapters describing the systems as applicable.

    6.1.5 Quality Process and Procedure manual:

    The Procedures are established to meet the requirements of ISO 9001:2008 and are included in thequality process and procedure Manual. These procedures covers control of documents, control ofrecords, internal quality audit, control of non-conforming products and corrective / preventative actions.

    6.1.6 Project Quality Plan:A definite quality plan for every project, detailing there in the activities, Acceptance criteria, Verifyingdocuments, controlling agency (Organization/Customer) and the type of control and responsibility forimplementing the activity and its control, including resource requirements are developed before start ofthe Project.

    6.1.7 Other Quality Documents:

    Quality records and formats from this level of documents. Other standards, check list and guidelinesare also used for the supports of overall quality system structure.

    6.1.8 Quality Strategy:

    Implementation of the quality Management system and its effectiveness is ascertained by periodicalmonitoring as well as by structured internal quality audit and corrective and preventive action to ensureimprovement in effectiveness of the Quality system in operation.

  • 7/27/2019 Quality Plan TPS 53-2013

    9/12

    HALWANI COMPANY Ltd

    AUTHOR: AKRAM FERCHICHI

    DOC.: QUALITY PLAN

    PROJECT: LOADING / OFFLOADING STATIONS

    Job No : 53-2013

    PDOC-53/2013-QP-03

    Rev. : 00

    Sheet : 9 of 12

    Rev. : 00 Sheet : 9 of 12

    A continuous process of feasible Technology up gradation and value analysis is initially targeted atpersisting unsolved non-conformities to be attended to as well as potential problems.

    Management review of the quality system is conducted periodically, to check for continued suitabilityfor effectiveness, towards meeting the requirement of the organizations Quality Policy and objectives.

    The integrity of Quality Management System is ensured when changes are planned and implemented.

    6.2 Planning

    This Project Quality Manual is the document which details the Quality System to be planned,established, implemented and maintained as part of the contract for the road works for the project.

    The Quality Plan consists of the following:(i) The Project Quality Statement of the company(ii) Project Specific Details including Organization and System Element Description.(iii) Inspection and Test Plans (including Construction Process Flowcharts and Quality VerificationChecklists).(iv) Project specific Procedures as required by the contract specification / concession agreement

    The Project Quality Manual describes the managerial and technical systems which shall beimplemented to achieve conformance to specified requirements. The systems shall cover on site workunder the contract. Where necessary the systems shall be extended to include offsite activities. Theinspection and test plan shall identify necessary inspections and tests to verify conformance of thework during performance of the identified project tasks. It shall include acceptance criteria and details

    for performance of inspection and test activities, as applicable.

    6.3 Verification

    Verification processes shall be established to ensure that the planning and controls have been

    effective and the Quality System and constructed works conform to the specified requirements. The

    outcome of all verification activities shall be documented and maintained as quality records. Records of

    conformance shall be available for inspection by the Client / Clients Representative upon request to

    provide evidence of the outcome of activities undertaken to achieve conformance.

    7. QUALITY MANAGEMENT IN CONSTRUCTION AND REPORTING

    7.1 Management Responsibilities:

    The Head Project Operations has the overall responsibility for construction of the project, ensuring

    Customer satisfaction. The Project Manager of Project will be in charge of this Project and will be

    reporting to the Head Project Operations. Project Quality Plan will be implemented by the Project

    Manager. The Project QA/QC team will interact with QA /QC team of Client / Clients Representative for

    review of material tests, mix designs and QA/QC procedures as per the Project Quality Plan and

    reports functionally to Head QA/QC H.O. The Head QA/QC H.O will report to the top management

    and act independently to implements QA policy of the Organization. He has the responsibility for

    formulating, implementing, reviewing, monitoring, verifying and assessing the effectiveness of Quality

    Assurance program. He has also been delegated the authority to take corrective measures in case of

    any significant quality related problems are noticed, with the intimation to the Project Manager.

  • 7/27/2019 Quality Plan TPS 53-2013

    10/12

    HALWANI COMPANY Ltd

    AUTHOR: AKRAM FERCHICHI

    DOC.: QUALITY PLAN

    PROJECT: LOADING / OFFLOADING STATIONS

    Job No : 53-2013

    PDOC-53/2013-QP-03

    Rev. : 00

    Sheet : 10 of 12

    Rev. : 00 Sheet : 10 of 12

    7.2 Responsibilities of Staff at Project Execution Team:

    7.2.1 Project Manager:

    The Project Manager for the project has the following responsibilities

    Overall Management of this Project. He shall have the authority and responsibility for time, cost, andsafety and quality aspects of the Project.

    Determining the policy with respect to the management of quality on the project.

    Issuing the Project Quality Plan including System Element Descriptions and Inspection and TestPlans.

    Approving the disposition of Non-conformance Reports issued by the authorized representativenominated by him.

    Communication and interface between CLIENT, Contractor, Subcontractors (if existed) and theProject team.

    7.2.2 Team Leader

    Execution:

    The Construction Manager for the project has the following responsibilities Responsibilities for the planning, implementation, control and maintenance of the Project Quality

    Plan.

    Issue all relevant documentation and amendments to the Project team.

    Guide and instruct others in the essential aspects of quality management.

    Verification of inspection and test activities.

    Liaise with the contractor in regard of Final Inspection and Acceptance of the work.

    Apply acceptance criteria and classify work as conforming or Non-conforming. IssueNon-conformance Reports where necessary.

    Recommend remedial action and re inspect to close out.

    Recommend corrective action in case of recurring non-conformance.

    Communication and interface between CLIENT, Contractor, Subcontractors (if existed) and theProject team

    7.2.3 QA & QC Manager:

    The QA & QC Manager for the project has the following responsibilities.

    Responsibilities for the planning, implementation, control and maintenance of the Project QualityPlan.

    Guide and instruct others in the essential aspects of quality management.

    Liaise that the quality of manufacture and construction satisfies the standards. Ensure that suitable measuring and testing equipment is available and calibration of same is

    monitored regularly.

    Verification of inspection and test activities.

    Recommend remedial action and re inspect to close out.

    Recommend corrective action in case of recurring non-conformance.

    Responsible for preparing Monthly Quality Management Report

    Interaction with CLIENTs representative, approval of all materials as per CA in day to day basis.

    7.2.4 Safety Responsible:

    The Safety Responsible of the project has the following responsibilities.

    Assist Project Manager in all aspect of Safety and Environment Management compliance as per

    Contract Agreement.

    Responsible for overall implementation of Safety and Environmental Compliance plan.

    Monitor, Inspect and Guide the project team in aspect of Safety, Environmental Compliance w.r.t

  • 7/27/2019 Quality Plan TPS 53-2013

    11/12

    HALWANI COMPANY Ltd

    AUTHOR: AKRAM FERCHICHI

    DOC.: QUALITY PLAN

    PROJECT: LOADING / OFFLOADING STATIONS

    Job No : 53-2013

    PDOC-53/2013-QP-03

    Rev. : 00

    Sheet : 11 of 12

    Rev. : 00 Sheet : 11 of 12

    Contract agreement.

    Carry out regular inspection in line with the requirement of contract agreement and recommend

    corrective action in case of recurring non-conformance. Responsible for participating in preparation of Monthly Progress Report.

    Interaction with CLIENT regarding all aspect of Safety and Environmental Compliance plan.

    7.4.8 Surveyor:

    Report day to day basis to Construction Responsible in all aspects of Survey work.

    Responsible for organizing for detailed survey for the Pavement, checking alignment,Horizontal and vertical profile. Any difference shall be reported to Construction.

    Checking Lines and levels for the execution of works in accordance with drawing and ContractAgreement.

    7.5 Functions of QA / QC System:

    i) For each major activity of work, method statement will be prepared indicating the quality checks forincorporated materials and stage of construction. Detailed description shall be followed in later part ofthis section 10.

    ii) Ensure that equipment and testing instruments are calibrated properly and adjusted to maintain theiraccuracy within acceptable limits.

    iii) Provide day to day routine checks on materials and finished products.

    iv) Identify problems and initiate action, which results in solution.

    v) Verify implementation of solutions / corrections.

    vi) Report regularly on effectiveness of the system.

    vii) Tests to be performed jointly with Contractor and CLIENT at site before start of any activity and after

    review / approval of the same activity have to start.

    viii) All the test reports have to be certified by the Contractor and CLIENTs Representative. CLIENT

    has to nominate his representatives for joint testing during site working hours. In case of

    non-availability of CLIENTs Representative, tests will be carried out by Contractors QC Engineer

    under information in the interest of work.

    ix) All records of qualifying and routine tests / checks will be jointly maintained at the QA/QC

    Responsible office.

    x) Monthly Project QA report will be prepared by project QA/QC Responsible, summarizing the

    activities of QA department which is to be submitted to Management.

    xi) Head of QA from H.Q shall deploy his representative to carry out internal quality audit to ensure

    compliance of quality measures covered hereunder and to make necessary improvement, if required in

    quality system.

  • 7/27/2019 Quality Plan TPS 53-2013

    12/12

    HALWANI COMPANY Ltd

    AUTHOR: AKRAM FERCHICHI

    DOC.: QUALITY PLAN

    PROJECT: LOADING / OFFLOADING STATIONS

    Job No : 53-2013

    PDOC-53/2013-QP-03

    Rev. : 00

    Sheet : 12 of 12

    R 00 Sh t 12 f 12

    xii) Project Manager / QA & QC In-charge through his representative at site will point out the

    non-conformity of standards if any, to the contractors authorized representative in writing and a copy ofthe same to be sent to the General Manager for getting the work done as per quality standard required

    as specified in Contract Agreement, quality specifications or drawings. CLIENT, Material supplier and

    Manufacturer, each form a link of the quality chain. The strength of this chain is dependent on each and

    every link. The QA/QC Responsible is to keep a continuous watch on this chain and spot the weak link

    before it snapped.

    7.6 Quality Management Reports:

    The QA/QC in-charge at site shall prepare a Monthly Quality Management Report for review by the

    Project Manager / Construction Responsible. The Quality Report shall be subdivided into the followingheadings: Summary of Inspection and Test Activities. (Field & Laboratory) Registers of

    Non-conformance & Corrective Action. Status of Approvals of all Materials. Outstanding approvals by

    the CLIENTs Representative Items of specific concern.

    7.7 Management Reviews:

    The operation and effectiveness of the Project Quality Plan shall be regularly reviewed by

    Management Review meetings held once in One month for the duration of the project. The monthly

    Quality Management Report together with Audit Reports shall form the basis of the review.

    7.8 Monthly Progress Reports:

    The Monthly progress report (including daily reports) shall be prepared and submitted to the CLIENT

    as per requirement of Contractor agreement. The detailed format for the report, contained all the

    activities of the month, major achievements, miles stone achieved, progress, quality control reports,

    problems, issues etc.

    8. PROGRESS CONTROLThis section of the Manual outlines requirements and procedures for construction scheduling and

    control of work progress.

    8.1 Construction Work Program

    The Contractor is required to submit a detailed work program for execution of the works as per the

    QMS Process S00/PO/P/03 Project Planning & Budgeting process site.

    8.2 Progress control