Upload
others
View
8
Download
1
Embed Size (px)
Citation preview
QS4USB INSTALLATION INSTRUCTIONS
2009-2013 Aprilia RSV4 FACTORY / RSV4R
PN’s Q940S, Q940R
WARNING! USE ONLY IN RACE OR OTHER CLOSED COURSE APPLICATIONS AND NEVER ON
PUBLIC ROADS
PARTS LIST:
QS4USB Control Unit
Bazzaz Harness
Shift Switch DOWNLOAD Z-FI MAPPER SOFTWARE & ITS INSTRUCTIONS FROM WEBSITE
USB Cable
Velcro
Bazzaz stickers
Cable ties
15330 Fairfield Ranch Rd., Unit E, Chino Hills, CA 91709 (909)597-8300 Fax (909)597-5580 www.Bazzaz.net
Read through all instructions before beginning installation. If any problem is found, please carefully follow
through the installation steps again. If problem still persists, please call Bazzaz tech support department at
(909) 597-8300.
Control Unit
Connector
Ground
Coil #3
Gear
Position
Sensor
Shift
Switch
Shift
Light
Coil #2
Coil #1 Coil #4
12V Switched Power
Photo 1
1. Remove following components: Seat, fuel tank, left side fairing, air box.
2. Locate the throttle control unit, found bolted to the front left frame spar near the radiator. Remove the mount-
ing hardware and install the Bazzaz control unit mounting bracket over the throttle control unit. Secure by rein-
stalling the existing hardware. Attach supplied velcro to the back side of the control unit and also the mounting
bracket to secure the control unit within the mounting bracket. (Photo 1)
3. To properly route the harness and gain access to coil connectors for the front two cylinders the air box must be
removed. See your service manual for air box removal instructions. Once the air box has been removed route the
Bazzaz harness through the engine compartment in front of the engine down to the control unit mounted in the
bracket on the frame. Connect the harness to the control unit, and secure the harness using supplied cable ties.
Be sure to secure the harness away from any hot or moving components that may cause damage to the harness.
(Photo 2)
WE STRONGLY SUGGEST THAT AN EXPERIENCED TECHNICIAN
INSTALL THIS BAZZAZ PRODUCT
4. Route the remaining harness inside of the left frame spar. With the air box removed, connect the Bazzaz
harness inline with the corresponding coils for the front two cylinders. Once these connections have been
made, secure the harness routing neatly with cable ties and reinstall the air box. (Photo 3)
Photo 3
CYL
2
CYL
4
CYL
1 CYL
3
Gear
Position
Connector
Cylinder and component identification
Cylinder 2
Coil
Connectors
Cylinder 4
Coil
Connectors
Coil #2 Coil #4
Coil #1 Coil #3
Photo 2
Bazzaz
Ground
Lug
5. Connect the mating Bazzaz connectors inline with the rear cylinder and coils. (Photo 4)
6. Locate the Gear Position Sensor connectors found between the left side frame spar and the left rear cylinder
head. Connect the mating Bazzaz connectors inline with the sensor and stock harness connectors. (Photo 5)
7. Route the ground lug lead of the Bazzaz harness between the frame and engine and connect it to the countershaft
sprocket cover using the existing mounting hardware. (Photo 6) Note: Any solid chassis ground may be used for
mounting the ground lug.
Photo 4
Photo 5
Photo 6
Stock Gear
Position Sensor
Connectors
Bazzaz Gear
Position Sensor
Connectors
Bazzaz
Coil
Cylinder 1
Stock
Coil
Cylinder 1
Bazzaz
Coil
Cylinder 3
Stock
Coil
Cylinder 3
8. Now on the right side of the bike locate the speed sensor connector, located just inside the right side sub frame rail under
the fuel tank. Using the supplied scotchlok connector, crimp onto the green wire. This connection will supply the Bazzaz
system with switched 12 volts. Insert the T-Tap connector on the Bazzaz harness with the red wire attached. (Photo 7)
9. The stock gear lever is not equipped with a shift linkage / rod. The Bazzaz shift switch installation requires the use
of after market rear sets for this application. First install the Bazzaz shift switch followed by the replacement shift rod
supplied with the kit. Adjust the combined length of these components to allow for complete actuation of the shift
shaft and also maintain a comfortable riding position. Once the desired length is established tighten the 10mm nuts to
secure the switch and rod in place. Route the wiring lead of the shift switch sensor into the engine compartment and
connect it with the mating connector on the Bazzaz harness. Secure any excess wiring length away from any hot or
moving components on the bike, as contact with these components may cause damage or failure to the sensor.
(Photo 8)
Notes: (1) The female end of Bazzaz shift switches are cross tapped to allow them to be mounted to either the rear set
or shift shaft heim joint regardless of the thread design. (2) If the replacement rod supplied with your kit contains fe-
male style ends, it is design to allow the user to shorten its length to suit various aftermarket reset configurations. The
female style rods contain grooves in 10mm increments on both ends identifying areas where the rod can be modified
and adequate threads will remain for proper installation.
Photo 8
Photo 7
Stock Speed
Sensor
Connectors
12 Volt Power
10. Now that the Bazzaz hardware installation is complete please verify proper installation and system functionality. If
any problem is found, please carefully follow through the installation steps again. If problem still persists, please call
Bazzaz tech support department at (909) 597-8300. After it is determined that everything is correct take a moment to
secure the Bazzaz harness along its routing path with cable ties. Secure wiring away from any hot or moving compo-
nents on the bike, as contact with these components may cause system damage or failure. Reinstall the components
removed in step 1.