    Pumping Test at WaynePumping Test at WayneLandfill Site, PALandfill Site, PA

    Md. Khalequzzaman, Ph.D.Md. Khalequzzaman, Ph.D.

    Dept. of Geology & PhysicsDept. of Geology & Physics

    Lock Haven UniversityLock Haven UniversityLock Haven, Pa 17745Lock Haven, Pa 17745

  • 7/27/2019 Pumping Test at Wayne Landfill Site.pdf

    2/13

    Overview of Geology of the SiteOverview of Geology of the Site

    Mr. Bob Hershey ofMeiser & Earl, Inc.

    Todd Lowrey ofMeiser & Earl, Inc.

    Bruce Milliman of FirstQuality Products, Inc.

  • 7/27/2019 Pumping Test at Wayne Landfill Site.pdf

    3/13

    Measuring Groundwater LevelMeasuring Groundwater Level

  • 7/27/2019 Pumping Test at Wayne Landfill Site.pdf

    4/13

    Setting Up the EquipmentSetting Up the Equipment

    Shallow well

    Deep well

    Submersible Pump

    MiniTroll

  • 7/27/2019 Pumping Test at Wayne Landfill Site.pdf

    5/13

    MiniTrollMiniTroll--Computer InterfaceComputer Interface

    MiniTroll

    Laptop withSoftware

  • 7/27/2019 Pumping Test at Wayne Landfill Site.pdf

    6/13

    Controller for the PumpController for the Pump

    Connection toGenerator

    Connection toPump

    Controller ofPumpingRate

  • 7/27/2019 Pumping Test at Wayne Landfill Site.pdf

    7/13

    Generator for the PumpGenerator for the Pump

    Connection toController

  • 7/27/2019 Pumping Test at Wayne Landfill Site.pdf

    8/13

    Measuring DischargeMeasuring Discharge

    Half-gallon jar

  • 7/27/2019 Pumping Test at Wayne Landfill Site.pdf

    9/13

    Array of Pumping Test EquipmentArray of Pumping Test Equipment

    Controller

    DischargeHose

    MiniTroll

    Generator

    Pumping Well

    Computer

    Owner ofthe Site

  • 7/27/2019 Pumping Test at Wayne Landfill Site.pdf

    10/13

    Measuring Chemical ParametersMeasuring Chemical Parameters

    Conductance,TDS & Temp

    pH Meter

  • 7/27/2019 Pumping Test at Wayne Landfill Site.pdf

    11/13

    Monitoring WellMonitoring Well

    Monitoring Well ~ 61 feetaway from the pumping well

    GroundwaterLevel Probe

  • 7/27/2019 Pumping Test at Wayne Landfill Site.pdf

    12/13

    Display of Drawdown GraphDisplay of Drawdown Graph

    Instant Display

    of Results

  • 7/27/2019 Pumping Test at Wayne Landfill Site.pdf

    13/13

    Thanks!Thanks!The faculty members and students inThe faculty members and students in

    Geology & Physics Department at LHUGeology & Physics Department at LHUexpress their gratitude to Mr. Bob Hersheyexpress their gratitude to Mr. Bob Hershey

    and Toddand Todd LowreyLowrey ofofMeiserMeiser && Earl,IncEarl,Inc. and. and

    Mr. BruceMr. Bruce MillimanMilliman of First Qualityof First Quality

    Products, Inc. for making this wonderfulProducts, Inc. for making this wonderful

    educational experience possible for oureducational experience possible for ourstudents in Hydrogeology Classstudents in Hydrogeology Class