November 26, 2019 Addendum # 2 P38.2019 Pump Station Standards/Upgrades To All Bidders of P38.2019: Please note: the following addendum applies to P38.2019 and shall be taken into consideration when preparing bid documents. Please be advised that the drywell side of the Williams Lake Road pump station is defined as a confined space. Entry to the drywell must comply with confined space entry regulations. A signed copy of each Addendum must also be included with the bid submission. Failure to include this Addendum may be cause for rejection. If you have any questions, please contact our office by email at [email protected]. ALL OTHER SPECIFICATIONS, TERMS AND CONDITIONS REMAIN UNCHANGED. Acknowledgement by Bidder: Company Name: _________________________ Print Name: _____________________________ Signed: ______________________________ Date: ______________________________ End of Addendum #2

Pump Station Standards/Upgrades - Nova Scotia · Pump Station Standards/Upgrades To All Bidders of P38.2019: Please note: the following addendum applies to P38.2019 and shall be taken

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

November 26, 2019

Addendum # 2

P38.2019 Pump Station Standards/Upgrades

To All Bidders of P38.2019: Please note: the following addendum applies to P38.2019 and shall be taken into consideration when preparing bid documents. Please be advised that the drywell side of the Williams Lake Road pump station is defined as a confined space. Entry to the drywell must comply with confined space entry regulations.

A signed copy of each Addendum must also be included with the bid submission. Failure to include this Addendum may be cause for rejection. If you have any questions, please contact our office by email at [email protected].

ALL OTHER SPECIFICATIONS, TERMS AND CONDITIONS REMAIN UNCHANGED. Acknowledgement by Bidder: Company Name: _________________________ Print Name: _____________________________ Signed: ______________________________ Date: ______________________________

End of Addendum #2

1 | P a g e

November 25, 2019

Clarification # 1

Request for Proposal P38.2019

Pump Station Standards/Upgrades To All Bidders of P38.2019: Please note: the following clarification is in response to questions received for P38.2019 and should be taken into consideration when preparing bid submission. Question 1: Will the existing stations be designed to the standards which are to be developed, or existing standards? If they will consider the new standards and these are currently unknown, what benchmark will be used for the design? Need to know when allocating resources to design. Answer 1: As the schedule in section 5.1.2.1 indicates, the standards will not be complete before design of the pump stations begin. It is not anticipated that the pump station design work be completed to the new standards. However it is anticipated that the ongoing design work will help with and inform development of the new standards. Question 2: Will the Williams Lake and Russell Lake existing stations be replaced entirely including building and foundation, or will the buildings stay and be re-furbished with interior system upgrades and building exterior finishes? Answer 2: Please review Section 3.0 – Scope of Work. I believe it is evident that the existing building/foundation is to remain. Subsequent to an inspection and review of existing equipment at the station, the general scope of work is replacement of all mechanical/electrical/instrumentation and installation of stair access to the dry-well. Question 3: Page 21 of the RFP refers to Quantity Surveying and Cost Estimation. Do consultants have to carry a registered quantity surveyor, (ie Hanscomb or other) or is it appropriate to use in-house knowledge, completed construction project references and estimating tools to generate the construction cost estimates? Answer 3: A registered quantity surveyor is not required. Question 4: What period is to be considered into the future for design sustainability, adaptability (25, 50, 75…. years)?

2 | P a g e

Answer 4: Please assume a 25 year design horizon. These items are for clarification purposes only and does not change the scope of work of the tender. If you have any questions, please contact our office by email at [email protected].

ALL OTHER SPECIFICATIONS, TERMS AND CONDITIONS REMAIN UNCHANGED.

A signed copy of the Clarification is NOT required with your bid submission.

End of Clarification #1

1 | P a g e V e r s i o n 1 . 0 – J u n e ’ 1 9

November 15, 2019

Addendum # 1

Request for Proposals P38.2019

Pump Station Standards/Upgrades To All Proponents of P38.2019: Please note: the following addendum applies to P38.2019 and shall be taken into consideration when preparing proposal documents. The closing date and time is extended to Thursday December 5, 2019 at 2:00 p.m., Atlantic Time. A signed copy of each Addendum must also be included with the bid submission. Failure to include this Addendum may be cause for rejection. If you have any questions, please contact our office by email at [email protected]. ALL OTHER SPECIFICATIONS, TERMS AND CONDITIONS REMAIN UNCHANGED. Acknowledgement by Bidder: Company Name: _________________________ Print Name: _____________________________ Signed: ________________________________ Date: __________________________________

End of Addendum #1